The Proceeding people have been Co cted concemmg the request for final
payment&have released this project for such payment. ATION AND PUBLIC WORKS
Clearance Conducted By Shameka Kennedy F PROJECT COMPLETION 9-6w�
D.O.E.No: 7234
Regarding contract 117234 for HERITAGE ADDITION PHASE 3B SECT 6 as required by the
TRANSPORTATION&PUBLIC WORKS as approved by City Council on N/A through M&C N/A the director
of the TRANSPORTATION&PUBLIC WORKS upon the recommendation of the Assistant Director of the
Transportation&Public Works Department has accepted the project as complete.
Original Contract Prices: $102,281.90
Amount of Approved Change Orders: Ns
Revised Contract Amount:
Total Cost Work Completed: $102,281.90
Less Deductions:
Liquidated Damages: Days®$210.00/Day
Pavement Deficiencies:
Total Deduction Amount:
Total Cost Work Completed: $102,281.90 I
Less Previous Payments: $0.00
Final Payment Due $102,281.90
4�9' 8!2
Recommended for Acceptance Date
Asst. Di ctor, TPW - Infrastructure Design and Construction
A (-J m (J
Accepted 0 Date
Asst. Director, TRANSPORTATION PUBLIC WORKS gf S-1jr
sst. City Manager Date
Comments: C205-541200-204760229183
OFFICIAL RECORD
CITY SECRETARY
RECEIVED AUG 2 4 2015 FT' �n1ORTH, TX
FORT WORTH
CITY OF FORT WORTH
FINAi,PAYMENT REQUEST
Contract Name HERITAGE ADDITION PHASE 3B SECTION 6
Contract Limits
Project Type DRAINAGE
City Project Numbers 02291
DOE Number 7234
Estimate Number 1 Payment Number I For Period Ending 7/28/2015
CD
City Secretary Contract Number 117234 Contract Time 4E1)
Contract Date 9/24/2014 Days Charged to Date 268
Project Manager Buckley Contract is 100.00 Complete
Contractor KCK UTILITY CONSTRUCTION
103 N.ALLEN DRIVE
ALLEN, TX 75013
Inspectors LAYER / VEGA,A
Tuesday,July 28,2015 Page I of 4
City Project Numbers 02291 DOE Number 7234
Contract Name HERITAGE ADDITION PHASE 3B SECTION 6 Estimate Number 1
Contract Limits Payment Number I
Project Type DRAINAGE For Period Ending 7/28/2015
Project Funding
UNIT III:DRAINAGE IMPROVEMENTS
Item Estimated Estimated Completed Completed
Description of Items Unit Unit Cost
No. Quanity Total Quanity Total
———————— ————— —— -- - -- — ———— ————— —-
I REMOVE SIDEWALK 42 SF $13.50 $567.00 42 $567.00
2 21"RCP CLASS III 162 LF $39.00 $6,318.00 162 $6,318.00
3 24"RCP CLASS III 737 LF $42.00 $30,954.00 737 $30,954.00
4 30"RCP CLASS 111 474 LF $55.OD $26,070.00 474 $26,070.00
5 4'STORM JUNCTION BOX 4 EA $2,970.00 $11,880.00 4 $11,880.00
6 30"SET 1 PIPE 1 EA $1,780.00 $1,780.00 1 $1,780.00
7 10'CURB INLET I EA $2,525.00 $2,525.00 1 $2,525.00
8 15'CURB INLET 2 EA $3,400.00 $6,800.00 2 $6,800.00
9 4'DROP INLET 3 EA $2,425.00 $7,275.00 3 $7,275.00
10 4"CONC SIDEWALK 42 SF $8.80 $369.60 42 $369.60
11 CONCRETE COLLAR 1 EA $550.00 $550.00 1 $550.00
12 REMOVE 24"STORM LINE 18 LF $20.00 $360.00 18 $360.00
13 CONCRETE RIPRAP 50 SY $79.00 $3,950.00 50 $3,950.00
14 TRENCH SAFETY 1373 LF $0.10 $137.30 1373 $137.30
15 STORM TEST-LAB 1373 LF $2.00 $2,746.00 1373 $2,746.00
Sub-Total of Previous Unit $102,281.90 $102,281.90
Tuesday,July 28,2015 Page 2 of 4
City Project Numbers 02291 DOE Number 7234
Contract Name HERrTAGE ADDITION PHASE 3B SECTION 6 Estimate Number I
Contract Limits Payment Number I
Project Type DRAINAGE For Period Ending 7282015
Project Funding
Contract Information Summary
Original Contract Amount $102,281.90
Chane Orders
Total Contract Price $102,281.90
i Date D _3 Total Cost of Work Completed $102,281.90
Con /WLess %Retained $0.00
r
/'S Net Earned S102,281.90
2 Date Earned This Period $102,281.90
Inspection '
Date r J� Retainage This Period $0.00
Less Liquidated Damages
0-01 Project Ma e
q Days® /Day $0.00
Date / S LessPavement Deficiency $0.00
Asst. i to/I PW-Infas�tructure Design and Construction Less Penalty $0.00
/r
J. Date Ios Less Previous Payment $0.00
Directorl tracting Dcpartm t Plus Material on Hand Less 15% 50.00
�. Balance Due This Payment $102,281.90
Tuesday,July 28,2015 Page 3 of 4
City Project Numbers 02291 DOE Number 7234
Contract Name HERITAGE ADDITION PHASE 3B SECTION 6 Estimate Number I
Contract Limits Payment Number I
Project Type DRAINAGE For Period Ending 7/28/2015
Project Funding
Project Manager Buckley City Secretary Contract Number 117234
Inspectors LAYER / VEGA,A Contract Date 9/24/2014
Contractor KCK UTILITY CONSTRUCTION Contract Time 45 CD
103 N.ALLEN DRIVE Days Charged to Date 268 CD
ALLEN, TX 75013 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $102,281.90
Less %Retained $0.00
Net Earned $102,281.90
Earned This Period $102,281.90
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $102,281.90
Tuesday,July 28,2015 Page 4 of 4
FORT WORTH REV:02/20/07
"'*4 �
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
CONTRACTOR&PROJECT DATA
Name of Contractor Project Name
KCK Utility Construction Heita a Addition Phase 3B Section 6
DOE Inspector DOE Number
Alex Vega 7234
DOE Lupector Project Manager
0 Water p Waste Water p Storm Drainagep Pavement Patrick Buckle
Initial Contract Amount Project DWIculty
$102,281.90 O Simple OO Routine O Complex
Final Contract Amount Date
$102,28J.90 8/3/2015
I1)PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE -Y/N) RATING 0-4 MAX SCORE SCORE
I Submission of Documents 2 Y 4 8 8
2 Public Notifications 5 N
3 Plans on Site 5 Y 4 20 20
4 Field Supervision 15 Y 3 60 45
5 Work Performed 15 Y 3 60 45
6 Finished Product 15 Y 4 60 60
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 3 60 45
9 Daily Clean Up 5 Y 3 20 15
10 Citizen's Complaint Resolution 5 N
11 Property Restoration 5 Y 3 20 15
12 After Hours Response 5 N
13 Project Completion 5 Y 3 20 15
TOTAL ELEMENT SCORE(A) 329
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 328
III)CONTRACTOR'S RATING
Maximum Score(MS)=448 gr sum of applicable element score maximums which= 388
Rating(ITS/MS]*100%) 328 / 388 = 85%
Performance Category Excellent
<20%=Inadequate 20%to<40%—Deflelent 40%to<60%=Standard 60/to<80%=Good >_80%—Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
`'-
Signature DOE Inspector Signature Contractor
Signature DOE Inspector's Supervisor ! l
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
'� The City of Fort Worth-1000 Throckmorton Street-Fort Worth,TX 76012-6311
(817)392-7941 -Fix:(817)392-7845
I
STANDARD PACIFIC HOMES
July 27,2015
Greg Littrell
KCK Utility Construction Inc.,
1024 S. Greenville Avenue,Suite 100
Allen,TX 75002
RE: Heritage Addition Phase 3B Section 6 Water,Sanitary Sewer, Storm Drain,
Paving&Street Light Improvements
City of Fort Worth, State of Texas
Dear Mr. Littrell,
Standard Pacific of Texas Inc.,hereby acknowledges that KCK Utility Construction Inc.,has
completed the Stone Sewer,Water and Sanitary Sewer portions of the above_captioned project in
a timely manner. Although the contractual time was exceeded,Standard Pacific of Texas Inc.,
will not assess any penalties or liquidated damages due to time extensions.
If you have any questions,please feel free to contact our office.
Sincerely,
Standard Pacific Inc.,
Vice President—Land Development
Dallas Division
909 Lake Carolyn Parkway,Suite 1700,lrvinP,TX 75039 TEL 972.590.2400 FAX 972.550.0606 wwmstandardpacifichomea.com
AFFIDAVIT
STATE OF TEXAS
COUNTY OF COLLIN
Before me,the undersigned authority,a Notary Public in the state on county aforesaid,on
this day personally appeared Jerry Covington,Jr.,Vice President of KCK Utility Construction
Inc.,known to me to be a credible person,who being by me duly sworn,upon his oath deposed
and said:
That all persons,firms,associations,corporations or other organizations furnishing labor
and/or materials have been paid in full;
That the wage scale established by the City Council in the City of Fort Worth,has been
paid in full;and
That there are no claims pending for personal injury and/or property damages;
On Contract described as;
Utility Improvements for
Heritage Addition Phase 3B Section 6
City Project No. 02291
CITY OF FORT WORTH
STATE OF TEXAS
KCK UTILITY 7TRUCTION INC.,
Je Covj4onJK
Subscribed and sworn to before me this 27 day of July,2015
EE,,
GORDON GREGORY LITTREII
Notory Public,State of Texas Notary Pub1 Collin County,Texas
my commission Expires
August 15, 2017
CONSENT OF OWNER
SURETY COMPANY ARCITITCT
TO FINAL PAYMENT CONTRACTOR
SURETY
AIA DOCUMENT G707 OTHER
Bond No. 2189108
PROJECT: Heritage Addition Ph 3B Sect.6 Utility Improvements,City Project No.02291,Ft. Worth
(name,address) TX
TO(Owner-) [ City of Ft.Worth and Pacific of Texas,Inc ARCHITECT'S PROJECT NO:
c/o J.Volk Consulting,Inc 800 E.Campbell
Rd,Ste 120 CONTRACT FOR: Construction
Richardson,TX 75081
[ ] CONTRACT DATE: 8/22/2014
CONTRACTOR: KCK Utility Construction,Inc.
1024 So. Greenville Avenue,Suite 100
Allen, TX 75002
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the
(here insert name and address of Surety Company)
North American Specialty Insurance Company
650 Ehu Street
Manchester,NI-I 03101 SURETY COMPANY,
on bond of(here insert name and address of'Contractor)
KCK Utility Construction,Inc.
1024 So. Greenville Avenue,Suite 100
Allen,TX 75002 CONTRACTOR,
hereby approves of the final payment to the Contractors,and agrees that final payment to the Contractor shall not relieve
the Surety Company of any of its obligations to(here insert name and address of Owner)
City of Ft.Worth and Pacific of Texas,Inc.
c/o J.Volk Consulting, Inc 800 E.Campbell Rd,Ste 120
Richardson,TX 75081 OWNER,
as set forth in the said Surety Company's bond.
IN WfI'NESS WHEREOF,
the Surety Company has hereunto set its hand this 28th day of July , 2015
North American Specialty Insurance Company
Surety Company
Cf
Signature of Authorized Representative
Attest:
(Seal): �'��� -��z- �c_�.:y�c_ r Andrea Rose Crawford Attorney-In-Fact
rJ1 Title
NOTE: This form is to be used as a companion document to AIA DOCUMENT 6706,CONTRACTOR'S AFFIDAVIT OP PAYMENT OF DEBTS AND CLAIMS,
Current Edition
AIA DOCUPAFNT(3707 CONSI-,N 1'OP SUltri I'�'COMPANY l'O FINAL PAYMENT APRIL 1970 ED17l0N AIA ONE PAGE
1970 'I Fit'.AMERICAN 1NSTITUT6 OF ARCNtTECTS, 1735 New York Ave..,NW_NASI LING TON,D.C. 20006
FORTWORTHREV:02/22/07
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
I PROJECT INFORMATION Date: 6/8/2011
Now of Contractor Project Nmne
KCK Utility Construction Heritage Addition 3B Section 6
DOE Inspector Project Manager
Alex Vega Patrick Buckle
DOE Number lProject Difficully Tjpe of Contract
7234 10 Simple O Routine O Complex ❑ water❑ Waste water O Storm Drainage❑ Pavement
Initial Contract Amount Final Contract Amount
$102,281.90 $102,281.90
II)PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3-Good 4-Excellent
ELEMENT RATING ELEMENT RATI NG
(0-4) 0-4
INSPECTION EVALUATION PLANS&SPECIFICATIONS
1 Availability of Inspector 1 Accuracy of Plans to Existing Conditions
2 Knowledge of Inspector 3 2 Clarity&Sufficiency of Details
3 Accuracy of Measured Quantities 13 Applicability of Specifications
4 Display Of Professionalism 14 14 Accuracy of Plan Quantities 3
5 Citizen Complaint Resolution U 1PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs I Knowledge And/Or Problem Resolution 3
ADMINISTRATION 2 Availability of Project Manager
1 Change Order Processing Time 3 Communication
2 Timliness of Contractor Payments q 4 Resolution of Utility Conflicts
3 Bid Opening to Pre-Con Meeting Timeframe
111)COMMENTS&SIGNATURES
COMMENTS
Signature Contractor
Signature DOE Inspector j
Signature DOE Inspector's Supervisor
INSPECTOR'S COMMENTS
TRANSPORTA'110N AND PUBLIC WORKS
(a The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax:(817)392-7845
FORTWORTH rev 03/05/07
TRANSPORTATION&PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:1
NAME OF PROJECT: Heritage Addition Phase 3B Section 6
PROJECT NO.: 2291 CONTRACTOR: KCK Utility construction
DOE NO.: 7234
PERIOD FROM:10/13/14 TO: 07/07/15 FINAL INSPECTION DATE: 29-Jul-15
WORK ORDER EFFECTIVE:10/13/2014 CONTRACT TIME: 45 Q WD •CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGED CREDITED MONTH CHARGED CREDITED
DURING DURING
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
11. 26. uFFIGOAL D
12. 27.
13. 28. - TIC,u y
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES OTHERS* DAYS TOTAL
&HOLIDAYS &TOO COLD RELOCATIONS CHARGED DAYS
THIS
268
PERIOD
PREVIOUS
0
PERIOD
TOTALS
268
TO DATE
*REMARKS:
C CTOR DATE INSPECTOR - I DATE