HomeMy WebLinkAboutContract 45884-FP3 ,
CITY S
/ MAN,
r
r
r qi
Rio � r
r
r
r
rrrrr „/
r
�/ rri✓/Sri ,� ,/�,,� /r ..,i /, ,/% ;,� r/ � fi ,; r/, - ,,,,,,� .,,,, ;�
a'
/�
r
r
r
7
k//
„rill
pill�
%//
rrrrr r�ir
D� v:
/%%/
/
ri// 'f� r' ,,,, ,,,,ry (y�
/ 7 � "
VFV/ / rri
„��
/r ri °/ �rr� //iii �v ��%i
%rre �% '� �i/� � .���rill
y��kf � �'RfG,�i��w�.���/ +'ta�f/lulN!7wF/a�4✓,�eJY ;,,fi4W,��aPrw.'urwau%ar+,p�,wa mwimmu'n Hi�✓rvaw, ^�N;�W/M'� '7�r�uYw�Www �� „� ��� 7/
n
ri / � r✓vy�/lei// r/ � r %� ,, �� ri � ,,, -� 6 % /%rill�i%r;// j /�i
/ii i,„ / / ��/�1,
r�W'rl t ��,;,,s y. a ..� /i��rrir ���'
rr r� ,f,- r r�`r,�,r r / /�,,,/iii///�i �;✓ %� /�
rrrrrrrrr rill �/ar
ri//����/i/i / '� (�� .. , <;, ri... is ����� ��r;, �, � �✓��4T
riiiiii///piiiai
o�% r
„,,, rii%pp///ppp/�� ,,, wwmiaw,a�� 'ww��+ wrrta ✓�ma�ir�wFl�P��� ��%//����%�
ri
Off At
CITY, "fie N
i
T.
r/iii/iii r' r � '11 www
ri
Foffr,n WORTH W
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name HERITAGE ADDITION PHASE 3B SECTION 6
Contract Limits
Project Type WATER&SEWER
City Project Numbers 02291
DOE Number 7234
Estimate Number I Payment Number I For Period Ending 7/28/2015
CD
City Secretary Contract Number 117234 Contract Time 4ED
Contract Date 9/24/2014 Days Charged to Date 268
Project Manager Buckley Contract is 100.00 Complete
Contractor KCK UTILITY CONSTRUCTION
103 N.ALLEN DRIVE
ALLEN, TX 75013
Inspectors LAYER / VEGA,A
i
i
Tuesday,July 28,2015 Page I of 5
I
I
City Project Numbers 02291 DOE Number 7234
Contract Name HERITAGE ADDITION PHASE 3B SECTION 6 Estimate Number I
Contract Limits Payment Number I
Project Type WATER&SEWER For Period Ending 7/28/2015
Project Funding
UNIT l:WATER IMPROVEMENTS
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
-- - -------------------------
I REMOVE CONC PVMT 15 SY $21.00 $315.00 15 $315.00
2 REMOVE I2"WATER LINE 18 LF $15.00 $270.00 I8 $270.00
3 2"CONDT PVC SCH 40(T) 1 LF $20.00 $20.00 1 $20.00
4 4"CONDT PVC SCH 40(T) 267 LF $20.00 $5,340.00 267 $5,340.00
5 CONC PVMT REPAIR,HES,RESIDENTIAL 15 SY $110.00 $1,650.00 15 $1,650.00
6 DUCTILE IRON WATER FITTINGS W/ 0.9 TN $5,220.00 $4,698.00 0.9 $4,698.00
RESTRAINT
7 8"PVC WATER PIPE 1566 LF $26.60 $41,655.60 1566 $41,655.60
8 12"PVC WATER PIPE 629 LF $38.80 $24,405.20 629 $24,405.20
9 FIRE HYDRANT 3 EA $2,530.00 $7,590.00 3 $7,590.00
10 CONNECTION TO EXISTING 4"-12"WATER 2 EA $900.00 $1,800.00 2 $1,800.00
MAIN
11 I"WATER SERVICE 34 EA $582.00 $19,788.00 34 $19,788.00
12 1 1/2"WATER SERVICE 2 EA $1,190.00 $2,380.00 2 $2,380.00
13 6"GATE VALVE 3 EA $785.00 $2,355.00 3 $2,355.00
14 8"GATE VALVE 2 EA $1,125.00 $2,250.00 2 $2,250.00
15 12"GATE VALVE 1 EA $2,000.00 $2,000.00 1 $2,000.00
16 12"X12"TAPPING SLEEVE&VALVE 1 EA $7,680.00 $7,680.00 1 $7,680.00
17 TRENCH SAFETY 2195 LF $0.10 $219.50 2195 $219.50
18 WATER TEST-LAB -------- 2195 LF --$1.75 $3,84125 2195 $3,841.25
Sub-Total of Previous Unit $128,257.55 $128,257.55
UNIT It:SANITARY SEWER IMPROVEMENTS
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
- ----------------------- --- - - -------
1 REMOVE 8"SEWER LINE 240 LF $16.00 $3,840.00 240 $3,840.00
2 REMOVE 4"SEWER MANHOLE 3 EA $575.00 $1,725.00 3 $1,725.00
3 CONCRETE ENCASE SEWER PIPE 1 CY $125.00 $125.00 1 $125.00
4 PRE-CCTV INSPECTION 2661 LF $0.90 $2,394.90 2661 $2,394.90
5 POST-CCTV INSPECTION 2661 LF $0.90 $2,394.90 2661 $2,394.90
6 MANHOLE VACUUM TESTING 13 EA $100.00 $1,300.00 13 $1,300.00
7 MANHOLE ADJUSTMENT,MINOR I EA $475.00 $475.00 1 $475.00
Tuesday,July 28,2015 Page 2 of 5
City Project Numbers 02291 DOE Number 7234
Contract Name HERITAGE ADDITION PHASE 3B SECTION 6 Estimate Number i
Contract Limits Payment Number I
Project Type WATER&SEWER For Period Ending 7/28/2015
Project Funding
8 TRENCH WATER STOPS 10 EA $330.00 $3,300.00 10 $3,300.00 I
9 CONCRETE ENCASEMENT FOR UTILITY PIPES 20 CY $125.00 $2,500.00 20 $2,500.00
10 4"SEWER SERVICE 34 EA $495.00 $16,830.00 34 $16,830.00
II 8"SEWER PIPE 2661 LF $27.90 $74,241.90 2661 $74,241.90
12 EPDXY MANHOLE LINER 102 VF $150.00 $15,300.00 102 $15,300.00
13 4'MANHOLE 12 EA $2,400.00 $28,800.00 12 $28,800.00
14 4'DROP MANHOLE I EA $2,885.00 $2,885.00 1 $2,885.00
15 4'EXTRA DEPTH MANHOLE 33 VF $120.00 $3,960.00 33 $3,960.00
16 TRENCH SAFETY 2661 LF $0.10 $266.10 2661 $266.10
17 SEWER TEST-LAB – ———___—— 2661 LF __$2.00 —$5,322.00 2661 $5,322.00
Sub-Total of Previous Unit $165,659.80 $165,659.80
I
I
I
I
i
i
3
Tuesday,July 28,2015 Page 3 of 5
i
City Project Numbers 02291 DOE Number 7234
Contract Name HERITAGE ADDITION PHASE 313 SECTION 6 Estimate Number I
Contract Limits Payment Number I
Project Type WATER&SEWER For Period Ending 7)2812015
Project Funding
Contract InfOrMatiOU Summary
Original Contract Amount $293,91735
Change Orders
Total Contract Price $293,91735
D, Total Cost of Work Completed $293,917.35
Con r Less %Retained $0.00
Date Net Earned $293,917.35
ate
Inspectipn e Earned This Period $293,91735
Retainage This Period $0.00
Date Less Liquidated Damages
Project M
Days Day $0.00
Date LessPavement Deficiency $0.00
or ign and C ction Less Penalty $0.00
li 1 Less Previous Payment $O.OD
4. Director/Contracting Derm1 Plus Material on Hand Less 15% $0.00
Balance Due This Payment $293,917.35
Tuesday,July 28,2015 Page 4 of 5
tirv � �
P 12
City Project Numbers 02291 °Y DOE Number 7234
Contract Name HERITAGE ADDITION PHASE 3B SECTION 6 Estimate Number I
Contract Limits Payment Number I
Project Type WATER&SEWER For Period Ending 7/28/2015
Project Funding
Project Manager Buckley City Secretary Contract Number 117234
Inspectors LAYER / VEGA,A Contract Date 9/24/2014
Contractor KCK UTILITY CONSTRUCTION Contract Time 45 CD
103 N.ALLEN DRIVE Days Charged to Date 268 CD
ALLEN, TX 75013 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
i
i
i
Total Cost of Work Completed $293,917.35
Less %Retained $0.00
Net Earned $293,917.35
Earned This Period $293,917.35
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $293,917.35
Tuesday,July 28,2015 Page 5 of 5
'FORT WORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: Heritage Addition Phase 3B Section 6
PROJECT NUMBER: 2291
DOE NUMBER: 7234
WATER
PIPE LAID SIZE TYPE OF PIPE LF
Yes 12" PVC 629
8" PVC 1566
FIRE HYDRANTS: 3 VALVES(1611 OR LARGER)
PIPE ABANDONED SIZE TYPE OF PIPE LF
Removed 1211 PVC 18
DENSITIES: Yes
NEW SERVICES: 1 1/2" Copper 40
Copper 510
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
Yes 8" PVC 2661
PIPE ABANDONED SIZE TYPE OF PIPE LF
Yes 811 PVC 240
DENSITIES: Yes
NEW SERVICES: 411 PVC 510
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth• 10001hrockmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax:(817)392-7845
i
i
STANDARD PACIFIC HoMES
July 27,2015
Date R. Gilreath
Gilco Contracting Inc.,
6331 Southwest Boulevard
Benbrook,TX 76132
RE: Heritage Addition Phase 3B Section 6 Water, Salutary Sewer, Storm Drain,
Paving&Street Light Improvements
City of Fort Worth, State of Texas
Dear Mr. Gilreath,
Standard Pacific of Texas Inc.,hereby acknowledges that Gilco Contracting Inc.,has completed
the Paving and Street Light Improvement portions of the above captioned project in a timely
manner. Although the contractual time was exceeded,Standard Pacific of Texas Inc., will not
assess any penalties or liquidated damages due to time extensions.
If you have any questions,please feel free to contact our office.
Sincerely,
Oe
Standard Pacific Inc.,
Vice President—Land Development
Dallas Division
909 Lake Carolyn Parkway,Suite 1700, Irving,TX 75039 TEL 972.590.2400 ( FAX 972.550.0606 wNy-,v.standardpacifichanes.com
i
REV:02/20/07
FORTWORTH
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
1) CONTRACTOR&PROJECT DATA
Nance of Contractor Project Nance
KCK Utility contrustion, Heritage Addition Phase 313 Section 6
DOE Inspector DOE Number
Alex Vega 7234
DOEInspector Project Manager
21 Water El Waste Water 2 Storm Drainage ❑ Pavement Khal Jaafari
Initial Contract Amount Project Dculty
$293,917.35 0 Simple Routine 0 Complex
Final Contract Amount Date
$293,917.35 7/20/2015
11)PERFORMANCE EVALUATION
0-Inadequate I-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT x APPLICABLE(Y N) RATING(0-4) MAX SCORE SCORE
I Submission of Documents 2 Y 4 8 8
T Public Notifications 5 N
3 Plans on Site 5 Y 3 20 15
4 Field Supervision 15 Y 3 60 45
5 Work Performed 15 Y 4 60 60
Finished Product 15 Y 4 60 60
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 4 60 60
9 Daily Clean Up 5 Y 3 20 15
10 Citizen's Complaint Resolution 5 Y 4 20 2
11 Property Restoration 5 Y 3 20 15
12 After Hours Response 5 N
13 Project Completion 5 Y 3 20 15
TOTAL ELEMENT SCORE(A) 373
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 373
III)CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 408
Rating([TS/MS] * 100%) 373 * / 408 = 91%
Performance Category Excellent
<20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good �:80%=Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Signature DOE Inspector Signature Contractor
Signature DOE Inspector's Supervisor
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth•1000 Tbrockmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax: (817)392-7845
CONSENT OF OWNER
SURETY COMPANY NRCHIT>;CT
TO .FINAL PAYMENT CONTRACTOR
SURETY
AIA DOCUMENT G707 OTHER
Bond No. 7189108
PROJECT: heritage Addition Ph 3B Sect.6 Utility Improvements, City Project No.02291,Ft.Worth
(name,address) TX
TO(Owner) [ City of Ft.Worth and Pacific of Texas,Inc ARCHITECT'S PROJECT NO:
c/o J.Volk Consulting,Inc 800 F.Campbell
Rd,Ste 120 CONTRACT FOR: Construction
Richardson,TX 75081
[ ] CONTRACT DATE: 8/22/2014
CONTRACTOR: KCK Utility Construction,Inc.
1024 So. Greenville Avenue,Suite 100 I
Allen, TX 75002
In accordance mrith the provisions of the Contract between the Owner and the Contractor as indicated above,the
(here insert name and address oCSurety Company)
North American Specialty Insurance Company
650 Elm Street
Manchester, COI,TANY,
Manchester,NII 03101 -
on bond of(here insert name and address of Contractor)
KCK Utility Construction,Inc.
1024 So. Greenville Avenue,Suite 100
Allen,TX 75002 CONTRACTOR,
hereby approves of the final payment to the Contractors,and agrees that final payment to the Contractor shall not relieve
the Surety Company of any of its obligations to(here insert name and address of Owner)
City of Ft.Worth and Pacific of Texas,Inc.
c/o J.Voik Consulting,Inc 800 E.Campbell Rd,Ste 120
Richardson,TX 75081
O Wi1ER,
as set forth in the said Surety Company's bond.
IN WITNESS WHEREOF,
the Surety Company has hereunto set its hand this 28th day of July 2015
1
North American Specialty Insurance Company
Surety Company
Sieature of Authorized Representative
Attest: l I
(Seal): fl ��ci•�t :�lc y! � r Andrea Rose Crawford Attorney-In-Fact
c Title
NOTE: This foram is to be used as a companion document to AIA DOCUMENT G706,CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLA INIS,
Current Edition
i
i
AIA DOCUMENT G707 CONSENT OF SURETY COMPANY TO FINAL PAYWNT APRIL 1970 EDMON AIA ONE PAGE
1970 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 New York Ave..NW,WASHINGTON,D.C. 20006
i
i
AFFIDAVIT
STATE OF TEXAS
i
COUNTY OF COLLIN I
Before me,the undersigned authority, a Notary Public in the state on county aforesaid, on
this day personally appeared Jerry Covington, Jr.,Vice President of KCK Utility Construction
Inc.,known to me to be a credible person, who being by me duly sworn, upon his oath deposed
and said:
f
That all persons,firms, associations, corporations or other organizations furnishing labor
and/or materials have been paid in full;
That the wage scale established by the City Council in the City of Fort Worth,has been
paid in full; and
That there are no claims pending for personal injury and/or property damages;
On Contract described as;
Utility Improvements for
Heritage Addition Phase 3B Section 6
City Project No. 02291
CITY OF FORT WORTH
STATE OF TEXAS
KCK UTILITY CONSTRUCTION INC.,
Jerry Cov j4on,Ar-
Subscribed and sworn to before me this 27 day of July,2015
, / "l
"Y?"°UB��� GORDON GREGORY L ITTRELL
Notary Public,state of Texas Notary Publ-k-in Collin County,Texas
My Commission Expires
August 15, 2017
REV:02/22/07
FORTWORTH
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
1)PROJECT INFORMATION Date: 7/7/201
lVaine of Contractor Project Name
KCK Utility construction Heritage Addition Phase 3113 Section 6
DOE Inspector Project Manager
Alex Vega Jaafari
DOE Num Pr
ber oject Difficulty Type o
7234 Simple Routine 0 Complex E water fContract E Waste Water R] Storm Drainage❑ Pavement
Initial Contract Amount Final ouft-, ct Amoun
$293,917.35 $293,917.35
11)PERFORMANCE EVALUATION
0-Inadequate I-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT RATING ELEMENT RATING
(0-4) (0-4)
INSPECTION_E"VA_L_U_ATI 0N _ PLANS&SPECIFICATIONS
I Availability of Inspector I Accur y.of Plans.to Existing Conditions
1_1<-nowledge of Inspector 3 ccurac
2 Clarity&Sufficiency of Details
3 Accuracy of Measured Quantities L Applicability of Specifications
4 Display Of Professionalism 4 Accuracy of Plan Quantities
5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION
6 Performance-Stting 9Valve Crews,Labs I Kn)wledgeAnd/Or Problem Resolution
ADMINISTRATION 2 Availability of Project Manager
I Change Order Processing Time 3 Communication
2 Tirnliness of Contractor Pa ments . 4 Resolution of Utility Conflicts
3 Bid Opening to Pre-Con Meeting Time frame '
111)COMMENTS&SIGNATURES
COMMENTS
Signature Contractor
Signature DOE Inspector .
Signature DOE Inspector's Supervisor
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth-1000 Tbrockmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax:(817)392-7845
FORTWORTH rev 03/05/07
TRANSPORTATION& PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:I
NAME OF PROJECT: Heritage Addition Phase 313 Section 6
PROJECT NO.: 2291 CONTRACTOR: KCK Utility construction
DOE NO.: 7234
PERIOD FROM;10/13/14 TO: 07/07/15 FINAL INSPECTION DATE: -Jul-15
WORK ORDER EFFECTIVE:10/13/2014 CONTRACT TIME: 45 0 WD * CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGED CREDITED MONTH CHARGED CREDITED
DURING DURING
1. 16.
2. 17.
3. 18.
4. 19.
5, 20.
6. 21.
7. 22.
8. 23,
9. 24.
10. 25.
it. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL
&HOLIDAYS &TOO COLD RELOCATIONS OTHERS* ,CHARGED DAYS
THIS
PERIOD 268
PREVIOUS
PERIOD 0
TOTALS
TO DATE 268
*REMARKS:
K-1)
COMP RACTOR DATE INSPECTOR
wr ENGINEERING DEPARn4ENT
The Ciqr of Fort Worth- 1000'niroclanorton Street•Fort Worth,TX 7601 ffall HAURA""tt,'r(;('40RD
(817)392-7941 •Fax: (817)392-7845 CITY SE(',31EITIAIRY