HomeMy WebLinkAboutOrdinance 6006 { ARY f. WO IN, TEX. ORDINANCE NO. (� AN ORDINANCE APPROVING AND ADOPTING ESTIMATES OF THE COST OF IMPROVE- MENTS AND OF AMOUNTS TO BE ASSESSED FOR IMPROVEMENTS ON A PORTION OF Long Avenue AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS ; FIXING TIME AND PLACE FOR HEARING TO THE OWNERS OF ABUTTING PROPERTY AND TO ALL OTHERS INTERESTED; DIRECTING THE CITY SECRETARY :0 GIVE NOTICE OF SUCH HEARING; AND DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL AND BY FILING THE COMPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THE CITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City Council of the City of Fort Worth, Texas, has heretofore or- dered that each of the hereinafter described portions of streets, avenues and public places in the City of Fort Worth, Texas , be improved by raising, grading and filling same and by constructing thereon the following, to-wit: Unit 12: From Jacksboro Highway to N.W. 26th Street, :mown and designated as Unit 12, Project No. 104-23000-104: to be improved by constructing a seven-inch reinforced concrete eavement on a six-incl thick lime stabilized subgrade with seven-inch high reinforced concrete curbs and two-foot wide reinforced concrete gutters and by constructing five-inch thick concrete sidewalks and six-inch thick concrete driveways where specified and by recon- structing existing sidewalks and drive- ways to proper alignment and grade, so that the finished street will consist of two 33-foot wide roadways with concrete median strips and necessary left turn lanes. together with concrete curbs, gutters, driveways and incidentals to such improvements on proper grade and line where same are not already so constructed, together with storm sewers and drains and other necessary incidentals and appurtenances; all of said im- provements to be constructed as and where shown on the Plans and in strict accordance with the Plans and Specifications therefor; contract therefor has been made and entered into with J. L. BERTRAM CONSTRUCTION & ENGINEERING,. INC. ; and WHEREAS, the City Council of the City of Fort Worth, Texas, has caused the Public Works Director to prepare and file estimates of the cost of such improvements and estimates of the amount per front foot proposed to be assessed against abutting property and the owners thereof, and such estimates have been examined, NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: I. Such estimates be, and they are hereby adopted and approved. II. It is hereby found and determined that the cost of improvements on each portion of streets, avenues and public places hereinafter described, with the amount or amounts per front foot proposed to be assessed for such improvements against abutting pro- perty and the owners thereof, are as follows, to-wit: 1.. IANG AVENUE EXTENSION From Jacksboro Highway to NW 26th Street, Down and designated as Unit No. 12, Project No. 104-23000-104, Contract 10. The estimated cost of improvements is $ 3411421.71 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2.37 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 12.09 ; the estimated amount per front foot to be assessed against abuttingroperty and the owners thereof for 4 foot wide concrete sidewalk is $ 2. ; the estimated amount per square foot to be assessed against abutting property and the owners there- of for 6-inch thick concrete driveway is $ .76 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 16,88 plus the cost incurred for concrete driveway construction where specified. IV. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council and by filing the complete ordinance in the appropriate Ordinance Records of this City. V. This ordinance shall take effect and be in full force and effect from and after the date of its passage. Passed and approved this day of ® 19 (O CY APPROVED AS TO FORM AND LEGALITY: ity ttorney 0 NOTICE THE STATE OF TEXAS COUNTY OF TARRANT Notice is hereby given that the governing body of the City of Fort Worth, Texas, has ordered and determined it to be necessary that the following portion of /LONG AVENUE EXTENSION in the,tity of Fort Worth, Tarrant County, Texas, be improved and that a portion of the ct#at of such improvement is to be specially assessed as a lien upon the property abutting thereon, said portion of street in the City of Fort Worth, Texas, being as follows: LONG AVENUE EXTENSION From Jacksboro Highway to NW 26th Street, known and designated as Unit No. 12, Project No. 104-23000-104, Contract 10. IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in its behalf and signed by its Mayor, this0( "�day of aw -�— A.D. , 19�. - CITY OF RT WORT ATTES BY City Secretary STATE OF TEXAS COUNTY OF TARRANT BEFORE ME, the undersigned authority, a Notary Public in and Mfor the State and County aforesaid, on this day personally appeared ecJ"' 11 -` A-',^"t e)4 known to me to be the person whose name to subscribed to the foregoing instrument, and acknowledged to me that he executed the same as the act and deed of the City of Fort Worth, a municipal corporation of Tarrant County, Texas, and as the Mayor thereof, and for the purposes and consideration therein expressed. GIVEN UNDER MY HAND AND SIAL OF OFFICE, this the day of A.D. ,19, N ary Public in and for Tarrant County, Texas vot 2123 ,'Au 4 71 VOL ?Apr 4'72 w • Q 0 W z 41 rq P4 N N o 5 4141 ------ �-1 CO Q �'' zz x g3 ,t�1 OMEN c 00 a �- 41 .-i A o C5 °Z w :411 z G0V +• $$4 �p A V' xj y V F+ O Qi W _ A Z N ° O o H sr 13 00 M 0-iH z mai ,�.. oAj w w ° . 4 u ----------a a u r-4 z o W� Pa u r-4 $4 N � 0 " • cin 0x c W w UEI OZu UH fw� ami 4mi4J14 H � Q 4 .1 U U U W zU a � STATE OF TEM BOUNTY OF TARRANT I hereby certify that this Instrument Was FILED on tht date and at the time stamped hereon by me and vat duly RECORDED in the Volume and Page of the DEED OF TRUST RECORDS of Tarrant County, Texas,as stamped hereon by me. OCT 14 1968 '�'.''-c��`� ,!n•�`/ted' ,�,e,`^,y'✓ COUNTY CLERK TARRANT COUNTY, TUM C!T FORT WORTH, TEXAS FT. h �s L .. 19 TO THE HONORABLE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS. Gentlemen: In accordance with the proceedings of your Honorable Body, I have prepared estimates of the cost of street improvements as shown below: Estimates of the total cost of improvements on a portion of _ TANG A=JE EXTENSTON and portions of sundry other streets, avenues and public places in the City of Fort Worth, Texas, and estimated amounts per front foot to be assessed against abutting property and the owners thereof, on each portion of street, avenue and public place are as follows, to-wit, PROJECT NO. 104-23000-104, UNIT NO. 12, CONTRACT 10: FROM JACKSBORO HIGHWAY TO NW 2 TH STREET, to be improved by constructing a seven-inch thick reinforced concrete pavement on a six-inch thick lime stabilized subgrade, with seven-inch high reinfor- ced concrete curbs and two-foot wide reinforced concrete gutters, and by constructing five-inch thick concrete sidewalks and six-inch thick concrete driveways where speci- fied, and by reconstructing existing sidewalks and driveways to proper alignment and grade, so that the finished street will consist of two 33-foot wide roadways with con- crete median strips and necessary left turn lanes. The following assessment rates have been established: Seven-inch curb and two-foot gutter. . . . . . . . . . . . . . . . . . . . .$ 2.37 per L.F. Seven-inch Hot-Mix Asphaltic Concrete Pavement. . . . . . . . . . 12.36 per L.F. (With $.27 credit granted for existing pavement) (Commercial Zoning) .. . . . . . .. . . . . . . . .. . . . . . . . . . . . . . . 12.09 per L.F. (Residential Zoning) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.76 per L.F. Five-inch thick concrete sidewalk. . . .. . . . . . . . . . . . .. . . . . . 2.42 per L.F. Six-inch thick concrete driveway. . . .. . . . . . . . . . . . . . . . . . . . .76 per S.F. The assessments result in the following division of costs: Total Property Owners' cost for pavement. . . . . . . . . . ..$ 23,565.90 Total Property Owners' cost for curb, gutter, sidewalks and driveways. . .. . . 19,797.07 TOTAL PROPERTY OWNERS' COST $ 43,362.97 Total City of Fort Worth cost for pavement, curb gutter, etc. $298,058.74 TOTAL CITY OF FORT WORTH COST 98,058.74 TOTAL ESTIMATED CONSTRUCTION COST $341,421.71 JACK M. GRAHAM, P.E. CITY ENGINEER MOMARAN City of Fort Worth, Texas IV E Mayor and Council Communication Rae. DAREFERENCE SUBJECTAward o Contract - Assessment PAGE TE : 9!23/68 NUMBER Paving Long Avenue Extension C-1320 GGRAHAMContract 10, Unit 12 1 or Council action on the project described below is requested. Project Description Nature of work: Assessment Paving at Long Avenue Extension as follows: UNIT STREET LIMITS ROADWAY WIDTH R.O.W. 12 Long Avenue Extension Jacksboro Highway to Dual 32' Roadway 108'-110' N. W. 26th Street Sidewalks are included on both sides of Long Avenue to divide and protect pedes- trian traffic from vehicular traffic and to tie in with existing sidewalks in the area. Submission of Bids The following bids have been received: BIDDER AMOUNT OF BID J. L. Bertram Construction and Enginering, Inc. $310,383.47 Texas Bitulithic Company 313,727.50 Austin Road Construction Co. and Worth Construction Co. 321,272.25 120 Working Days Project Cost and Financing Based on the low bid, approximately $43,362.97 will be assessed against abutting property owners. The cost to the City-at-large will be approximately $298,058.74, including engineering. A portion of this amount will be reimbursed to the City by the Federal Government. The Department of H.U.D. will participate in this project in the amount of two-thirds of the cost excluding storm drainage. Total H.U.D. participation is estimated at $208,000, including engineering costs. Sufficient funds are available to finance the City's cost in Account No. 060-21301-4566, NIP Project Astro. Supplemental Information The normal procedure on assessment paving projects is to conduct a Neighborhood Hearing and prepare an assessment roll prior to the award of contract. Because of the shortness of the period between final Department of H.U.D. approval of the plans and the expiration of the applicable Federal Wage Rates, there has been insufficient time for the completion of assessment rolls and neighborhood hearings. The current wage rates expire September 28, 1968. M DATE REFERENCE SUBJECT: Award of Contract - Assessment PAGE 9/23/68 NUMBER Paving Long Avenue Extension 2 2 C-1320 Contract 10, Unit 12 or A resume of the Neighborhood Hearing, distribution of cost, and assessment rolls will be furnished to the City Council at the time of the Benefit Hearing. Recommendations It is recommended: 1) That the following Bond Fund Transfer be approved: AMOUNT FROM TO REASON $43,362.97 Revolving Fund NIP Project Astro To finance property 960 21301 456 owners' portion of ,,Po, loIW- 3 construction cost. 2) That an ordinance be adopted: a) Declaring the necessity for and ordering the improvements; and, b) Making provisions for levying assessments; and, c) Directing the Public Works Department to prepare estimates of costs and amounts to be assessed; and, d) Awarding a contract to J. L. Bertram Construction and Engineering, Inc. in the amount of $310,383.37; and, e) Making appropriations to cover the indebtedness thereby incurred for improvements of the project named above. { 3) That an ordinance be adopted: a) Approving the estimates of cost and amounts proposed to be assessed; and, b) Setting October 28, 1968, as the date of the Benefit Hearing. HDM:Jp SUBMITTED BY: DISPOSITION COUNCIL: PROCESSED BY APPROVED p OTHER (DESCRIBE) �C Adopted Ordinance No. Declaring Necessity CITY SECR ARY of Paving; Adopted Ord. No. li,,rn Ca setting DATE ITYY-nMANAGER date Of Benefit Hearin