Loading...
HomeMy WebLinkAboutIR 2407 INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 2407 'pT`p`��ofEORryo To the Mayor and Members of the City Council December 11, 1974 V � _ Subject: AWARD OF CONTRACT-ASSESSMENT PAVING AT TWO LOCATIONS; '07 RECONSTRUCTION OF TWO LOCATIONS; AND MONTERREY DRIVE STORM DRAIN CONSTRUCTION, M&C C-2973 On December 9, 1974, the Staff was requested to investigate the possibility of funding the construction of Project No. 104-24000-238, Assessment Paving of North Commerce Street and N.E. 38th Street from the proposed Economic Development Administration Grant for the Stockyards Restoration area. Pro- jects to be funded by the proposed EDA Grant will be limited to the clearly defined Special Impact Area which does not include North Commerce Street from N.E. 28th to N.E. 29th Streets or N.E. 38th Street from the G.C. & S.F. RR to North Grove Street. According to information available to the City Staff it is not anticipated that funds from the proposed EDA project can be utilized for the proposed assessment paving projects. In addition, the N.E. 38th Street project includes the enlargement of the drainage culvert which will eliminate potential flooding of the area north of 38th Street. The Tandy Corporation has reported that some of its facil- ities at this location have been flooded two or three times this year and presently a 360,000 square foot building is under construction. The com- pany is very concerned about the potential for serious flooding of its -prop- erties unless the existing culvert is enlarged as proposed under the N.E. 38th Street Assessment Paving Project. If any additional information is desired, it will be supplied upon request. Respectfully submitted, R. N. Line City _Manager RNL:lm ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS