HomeMy WebLinkAboutContract 28530CITY SECRETARY ✓�'`�(�r
SECOND AMENDMENT TO CONTRACT No. �
CITY SECRETARY CONTRACT NO. 19352
BETHESDA WATER SUPPLY CORPORATION
WHOLESALE WATER CONTRACT
WHEREAS, on the 22"d day of September, 1992, the City of Fort Worth and the
Bethesda Water Supply Corporation entered into City of Fort Worth City Secretary
Contract No. 19352, providing for the sale of treated water by the City of Fort Worth to
the Bethesda Water Supply Corporation; and
WHEREAS, on the 30th day of March, 2001, the City of Fort Worth and the
Bethesda Water Supply Corporation entered into City of Fort Worth City Secretary
Contract No. 26644, amending City of Fort Worth City Secretary Contract No. 19352;
and
WHEREAS, the Bethesda Water Supply Corporation desires to obtain an additional
point of connection to the Fort Worth System, as well as contribute to the cost of a water
main that Fort Worth is constructing that will enable the Bethesda Water Supply
Corporation to obtain additional water from the Fort Worth System, such main being known
as the 36" Southside Water Main; and
WHEREAS, City of Fort Worth City Secretary Contract No. 19352 provides that
for the cost of each additional connection to the Fort Worth System, Bethesda Water Supply
Corporation will pay an amount not less than that which would be paid by a developer to
Fort Worth under Fort Worth's then existing connection and line extension policy, or an
amount agreed upon mutually by Fort Worth, Bethesda Water Supply Corporation, and the
Water System Advisory Committee; and
WHEREAS, on the 20th day of February, 2001, the City of Fort Worth and Bethesda
Water Supply Corporation entered into an amendment to City of Fort Worth City Secretary
Contract 19352, such amendment being City of Fort Worth City Secretary Contract No.
26644, wherein Bethesda Water Supply Corporation agreed to construct certain
improvements to the Fort Worth System.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
uMCNAd EEcoo ED
1.
City of Fort Worth City Secretary Contract No. 19352 is amended by adding a new
paragraph 24, which shall be and read as follows:
24.
Additional Point of Connection
24.1 The meter to be installed at such connection shall be a sixteen -inch (16") meter. In
consideration of Customer's agreement to make the payments described in paragraph 24.4
below, Customer is granted a third point of connection to the Fort Worth System at the
approximate location as shown on Exhibit "A" attached hereto and made a part hereof for all
purposes. The meter to be installed at such connection shall be a sixteen -inch (16") meter.
Customer's failure to make the payments described in paragraph 24.4 below shall entitle
Fort Worth to suspend water service through this third point of connection until payments
are brought current.
24.2 Customer, at its sole cost and expense, shall be responsible for the design and
construction of the meter vault and the installation of all metering equipment, which shall be
subject to the review and approval of Fort Worth. The metering equipment shall be in
compliance with paragraph 3.1 of City of Fort Worth City Secretary Contract No. 19352.
All construction shall be inspected by and acceptable to Fort Worth. Upon completion and
acceptance of the meter vault and metering equipment, the operation and maintenance of
same shall be the responsibility of Fort Worth, the cost thereof being a System Cost.
24.3 Customer, at its sole cost and expense, shall design and construct install a backflow
prevention device, together with any necessary housing therefore, which shall be subject to
the review and approval of Fort Worth. Customer, at its sole cost and expense, shall be
responsible for the operation and maintenance of such backflow prevention device and
housing. In lieu of the installation of a backflow prevention device, Customer may install an
air gap, such air gap to be approved in writing by Fort Worth prior to installation, on
Customer's ground storage tank immediately after the meter; provided, however, that no
service line or main line connections will be installed between the meter and the ground
storage tank.
24.4 Fort Worth and Customer further agree that Customer's cost associated with the
construction of the 36" Southside HI Water Main is $2,482,940, such cost being based upon
Customer's estimated capacity/demand demand in 2020, and estimated cost for the
construction, engineering and acquisition of rights -of -way, and after the credit for
Customer's cost incurred under City of Fort Worth City Secretary Contract No. 26644.
Upon completion of construction, Customer's costs shall be recalculated using the actual
costs incurred for engineering, construction, and acquisition of rights -of -way. Such
recalculated amount shall be payable over a period of sixty (60) months and shall accrue
interest at the rate of six percent (6%) per annum from the date of completion and final
acceptance by the City. The Customer shall be notified in writing of the date of final
acceptance. Notwithstanding, Customer may make additional and/or early payments
without penalty. The monthly payment shall be billed by Fort Worth with t e-monthiybill-'
0ECC0V2D
CNN RUPERY
issued for wholesale water service. Late payments shall accrue interest at the rate of 1% per
month or at the highest rate permitted by law.
24.5 In the event Customer desires to have a larger meter installed at a time when the
sixteen -inch (16") meter is not otherwise in need of replacement, Customer shall make
written request to Fort Worth for its consideration. If Fort Worth, in its sole discretion,
approves the installation of the larger meter, Customer, at its sole cost and expense, will be
responsible for the design of the improvements, such design being subject to Fort Worth's
written approval. The installation of the larger meter will be at Customer's sole cost and
expense. In addition, the Customer's cost as stated in paragraph 24.4 above will be
recalculated to include the additional capacity/demand allowed by the meter.
24.6 Fort Worth agrees to charge any wholesale customer who in the future connects
directly to the 36" Southside III Water Main based upon the methodology contained in
paragraph 24.4.
2.
All other terms, conditions, and covenants contained in City of Fort Worth City
Secretary Contract 19352 not amended herein continue in full force and effect.
(Remainder of page intentionally left blank)
G'�C00Q,D
Executed this the day of
AT ST:
Gloria Pearso#' "City Sec!�y
Contract Authoi iz at�Yo�n
APPROVED AS TO' FORM
AND LEGALITYpate
C��'
Assistant ity Attorney
ATTEST:
Corporate Secretary
APPROVED AS TO FORM AND
LEGALITY
— -LAtt rney for Bethesda ater Supply
Corporation
, 2001.
CIT,
LIM
Assistant City Manager
APPROVAL RECOMMENDED
WeDaleseler, P. E., Director
Fort Worth Water Department
BETHESDA WATER SUPPLY
CORPORATION
By: _
Steve Sievers
General Manager
GU I k,Ro, 00U,D
�C l urN�
City of Fort Worth, Texas
n1cAtionimA ar And council COMMU
DATE REFERENCE, NUMBER LOG NAME PAGE
1/14/03 **C-19417 I 30LOUIS I 1 of 3
SUBJECT AMENDMENT OF WHOLESALE WATER CONTRACTS AND AWARD OF CONTRACT
TO S.J. LOUIS CONSTRUCTION OF TEXAS, LTD., LLP FOR SOUTHSIDE III, 36-INCH
WATER TRANSMISSION MAIN EXTENSION FROM CLEBURNE CROWLEY ROAD
TO THE CITY OF BURLESON AT SHANNON CREEK
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize the City Manager to execute amendments to wholesale water contracts with the City of
Burleson, City of Crowley, and Bethesda Water. Supply Corporation providing for cost participation
by these entities in the proposed water transmission main extension to meet each customer's
estimated capacity/demand in 2020; and
2. Authorize the City Manager to execute a contract with S.J. Louis Construction of Texas, Ltd., LLP,
in the amount of $2,781,800 for the Southside III, 36-Inch Water Transmission Main Extension from
Cleburne Crowley Road to the City of Burleson at Shannon Creek.
DISCUSSION:
On August 8, 2001 (M&C C-18713), the City Council authorized the City Manager to execute an
engineering contract with Freese & Nichols, Inc. to prepare plans and specifications for the Southside III
water transmission main from Cleburne Crowley Road to the City of Burleson at Shannon Creek. This
project will accommodate new growth in the Fort Worth extraterritorial jurisdiction, as well as areas
currently served by wholesale water customers (Bethesda Water Supply Corporation and the Cities of
Burleson and Crowley).
In order to share in the costs. of the overall project, wholesale water contracts must be amended. The
wholesale customers agree to participate in the engineering and construction based on capacity of
each customer's need as stated in the contract amendments.
Under the terms of the contract amendment, the following cost participation estimates will apply to this
final phase of the project:
City of Burleson
City of Crowley
Bethesda Water Supply Corporation
City of Fort Worth
$1,099,084
$ 31,817
$1,099,084
551,815
Total $2,781,800
City of Fort Worth, Texas
4Vejljor And Council Communication
DATE REFERENCE NUMBER LOG NAME PAGE
1/14/03 **C-19417 I 30LOUIS I 2 of 3
SUBJECT AMENDMENT OF WHOLESALE WATER CONTRACTS AND AWARD OF CONTRACT
TO S.J. LOUIS CONSTRUCTION OF TEXAS, LTD., LLP FOR SOUTHSIDE III, 36-INCH
WATER TRANSMISSION MAIN EXTENSION FROM CLEBURNE CROWLEY ROAD
TO THE CITY OF BURLESON AT SHANNON CREEK
The wholesale customers agree to repay Fort Worth, over a period of sixty (60) months, interest at a
rate of six percent (6%) per annum from the date of completion and acceptance of the construction by
the Water Department.
The project consists of the installation of approximately 24,270 linear feet of 36-inch water line.
BID ADVERTISEMENT - This project was advertised for bid on September 26 and October 3, 2002.
On October 31, 2002, the following bids were received:
S.J. Louis Construction of Texas. Ltd., LLP
Oscar Renda Contracting, Inc.
BRB Contractor's, Inc.
Jackson Construction, Ltd.
Texas Electric Utility
William J. Schultz, Inc. d/b/a Circle "C"
Construction Company
AMOUNT
$2,781,800.00
$3,158,344.00
$3,173,366.00
$3,281,700.50
$3,521,310.64
$3,990,830.00
TIME OF COMPLETION
175 Calendar Days
In addition to the contract cost, $194,726.00 is required for inspection and survey, and $83,454.00 is
required for project contingency to cover change orders.
M/WBE - S. J. Louis Construction of Texas, Ltd., LLP is in compliance with the City's M/WBE
Ordinance by committing to 22% M/WBE participation. The City's goal on this project is 21%.
This project is located in COUNCIL DISTRICT 6, Mapsco 117 and 118.
City of Fort Worth, Texas
qVinflor And Council Communication
DATE REFERENCE NUMBER LOG NAME PAGE
1/14/03 **C-19417 I 30LOUIS I 3 of 3
SUBJECT AMENDMENT OF WHOLESALE WATER CONTRACTS AND AWARD OF CONTRACT
TO S.J. LOUIS CONSTRUCTION OF TEXAS, LTD., LLP FOR SOUTHSIDE III, 36-INCH
WATER TRANSMISSION MAIN EXTENSION FROM CLEBURNE CROWLEY ROAD
TO THE CITY OF BURLESON AT SHANNON CREEK
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that funds are available in the current capital budget, as appropriated, of
the Water Capital Projects Fund.
MO:k
Submitted for City Manager's
Office by:
Marc Ott
Originating Department Head:
Douglas Rademaker
Additional Information Contact:
Douglas Rademaker
FUND I ACCOUNT I CENTER AMOUNT CITY SECRETARY
(to)
8476 I I
6157 I (from)
P162 541200 060162141140 $2,781,800.00
I 1
6157 I.