Loading...
HomeMy WebLinkAboutOrdinance 16528-07-2005ORDINANCE NO I (osa~-o~ ~.~ AN ORDINANCE FINDING THAT CONDITIONS HAVE MATERIALLY CHANGED IN THE CITY'S REQUIRED PARTICIPATION IN THE BRIDGE REPLACEMENT PROJECT AT PRECINCT LINE-WALKERS BRANCH SO THAT A PORTION OF THE FUNDING FOR THIS PROJECT AS ORIGINALLY PROPOSED IN THE 2004 CAPITAL IMPROVEMENT PROGRAM IS UNNECCESARY (BOND ALLOCATION $1,650,000), AUTHORIZING THE TRANSFER OF $775,000 AVAILABLE FROM THE PRECINCT LINE-WALKERS BRANCH BRIDGE PROJECT TO THE SOUTH PIPELINE ROAD BRIDGE PROJECT IN THE AMOUNT OF $125,000, AND THE CHAPIN ROAD BRIDGE PROJECT IN THE AMOUNT OF $650,000• PROVIDING THAT THIS ORDINANCE IS CUMULATIVE PROVIDING A SEVERABILITY CLAUSE, AND PROVIDING AN EFFECTIVE DATE. WHEREAS, on February 7 2004 the citizens of the city of Fort Worth approved the 2004 Capital Improvement Program, and WHEREAS, the 2004 Capital Improvement Program included $1 650 000 for the replacement of the Precinct Line Walkers Branch Bridge and WHEREAS, the city's required participation m this bridge replacement project has been reduced, and WHEREAS, staff recommends using $775 000 in 2004 Capital Improvement Program funds that were designated for the Precinct Line-Walkers Branch Bridge Project for a) the South Pipeline Road Bridge Project in the amount of $125 000 and b) the Chapin Road Bridge Project in the amount of $650 000 NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH. SECTION 1 That the City Council finds that conditions have materially changed so that a portion of funding for the Precinct Line Walkers Branch Bridge Project as included in the 2004 Capital Improvement Program is no longer necessary SECTION 2 Therefore, the City Council authorizes the transfer of 2004 Capital Improvement Program funds in the amount of $775 000 available from the Precinct Lme-Walkers Branch Bridge Project to the a) South Pipeline Road Bridge Project m the amount of $125 000 and b) the Chapin Road Bridge Project m the amount of $650 000 SECTION 3 This ordinance shall be cumulative of all provisions of ordinances and of the Code of the City of Fort Worth, Texas (1986), as amended, except where the provisions of this ordinance are in direct conflict with the provisions of such ordinances and such Code, m which event conflicting provisions of such ordinances and such Code are hereby repealed. .SECTION 4 It is hereby declared to be the intention of the City Council that the sections, paragraphs, sentences, clauses and phrases of this ordinance are severable, and, if any phrase, clause, sentence, paragraph or section of this ordinance shall be declared unconstitutional by the valid judgment or decree of any court of competent~urisdiction, such unconstitutionality shall not affect any of the remaining phrases, clauses, sentences, paragraphs and sections of this ordinance, since the same would have been enacted by the City Council without the incorporation m this ordinance of any such unconstitutional phrase, clause, sentence, paragraph or section SECTION 5 This ordinance shall be in full force and effect upon adoption. APPROVED AS TO FORM AND LEGALITY llA"1'E ADOPTED ~ ~ ~~~` ~~.Co i ~~ EFFECTIVE ~c1)l~~ a-~o { ~5" City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION Approved on 7/26/2005 Ordinance No 16528-07 2005 DATE Tuesday July 26 2005 LOG NAME. 20PRECINCT BRDG REFERENCE NO *C-20868 SUBJECT Adopt an Ordinance and Authorize Execution of an Advance Funding Agreement with the Texas Department of Transportation for the Construction of a New Bridge to Replace the Precinct Line Road Bridge RECOMMENDATION It is recommended that City Council 1 Adopt an ordinance finding that a material change in the City's required participation has occurred with the bridge replacement project at Precinct Line-Walkers Branch so that a portion of the funding for this project, as originally proposed in the 2004 Capital Improvement Program is unnecessary (bond allocation $1 650 000) 2. Authorize the City Manager to utilize funds in the amount of $775 000 available from the Precinct Line- Walkers Branch Bridge project for the reconstruction of a) the South Pipeline Road Bridge project in the amount of $125 000 b) the Chapin Road Bridge project in the amount of $650 000' and 3 Authorize the City Manager to execute an Advance Funding Agreement with the Texas Department of Transportation (TxDOT) for the construction of a new bridge to replace the Precinct Line Road Bridge over Walkers Branch for an estimated City participation of $1 384 000 00 DISCUSSION The 2004 Capital Improvement Program (CIP) included funding for the Precinct Line-Walkers Branch Bridge reconstruction project in the amount of $1 650 000 which was to be used for City participation with TxDOT on this project.The existing two-lane bridge will be replaced by a five-lane bridge that is 294 feet long and approximately four feet higher in elevation than the current structure This project will also include roadway improvements 150 feet north and south of the bridge and the widening and raising of Trinity Boulevard in the vicinity of the bridge Bond Funding Of the $1 650 000 bond allocation $5'09 000 was included as 10% match for the City's participation and an estimate in the amount of $1 141 000 for other eligible and .ineligible costs. However based on TxDOT's Equivalent Match Program TxDOT will waive the City's 10% match ($509 000) for the Precinct Line Road Bridge Project if these match funds are used for the replacement of other minor deficient bridges. By utilizing this option from TxDOT to fund other bridges the City will only be responsible on the Precinct Line Road-Walkers Branch Bridge project for 100% of all other costs that are deemed ineligible work. Specifically some of these ineligible costs estimated at $875 000 include channelization right-of-way acquisition and utility relocation and were also included in the 2004 CIP budget allocation Thus it is anticipated that $775 000 of the initial $1 650 000 funding allocated in the bond program for Precinct Line Bridge .project is available for other deficient bridge projects In the 2004 Capital Improvement Program s Statement of Commitment, the City Council shall have the Logname 20PRECINCT BRDG Page 1 of 2 right to abandon or modify a project if in the City Council's opinion conditions materially change so that the project as originally proposed is unwise or unnecessary In that event, the City Council may direct that the bond proceeds be expended for other projects within the voted purposes of the bonds. Other Deficient Bridge Projects On October 22 2002 Council approved an Advance Funding Agreement with TxDOT whereby the state agreed to construct a new East First Street Bridge (M&C C-19303) Also under the terms of the agreement, TxDOT waived the City's standard 10% cost participation in the East First Street Bridge project, in lieu of the City's agreement to replace at our sole expense two minor load-restricted bridges Accordingly Council approved utilizing the 10% match funding from the East First Street Bridge to supplement previous bond funding available for two minor bridge projects Specifically when the agreement was executed the City agreed to reconstruct South Pipeline Road Bridge over a tributary of the West Fork of the Trinity River at an estimated cost of $ 500 000 and also reconstruct Chapin Road Bridge over Santa Clara Channel at an estimated cost of $354 000 Subsequently the estimated costs of these structures have increased South Pipeline Road has increased from $500 000 to $625 000 and Chapin Road Bridge from $354 000 to $1 004 000 Most of the cost increases are associated with increased structure size as determined by hydraulic studies unavailable at the time of the original estimates Therefore in keeping within the guidelines of the TxDOT's Equivalent Match program City staff recommends directing the remaining funds in the amount of $775 000 from the Precinct Line Road-Walkers Branch Bridge project to two additional minor bridge projects, the South Pipeline Road Bridge project {$125 000) and the Chapin Road Bridge project, ($650 000) If approved by Council City staff will subsequently present for Council consideration an amendment to the agreement with TxDOT for minor bridge replacements: This project is located in Council Districts 3 4 and 5 FISCAL INFORMATION/CERTIFICATION The Finance Director certifies that funds are available in the current capital budget, as appropriated of the Street Improvements Fund TO Fund/Account/Centers FROM Fund/AccountlCenters C200 VARIOUS 2042600105XX $875.000.00 Submitted for City Manager's Office by• Marc Ott (8476) Originating Department Head Robert Goode (7804) Additional Information Contact: George Behmanesh (7914) Logname 20PRECINCT BRDG Page 2 of 2