Loading...
HomeMy WebLinkAboutContract 34488-FP2 CITY SECRETAW Department TP&W Const. Services ft CONTRACT NO. D D A Project Manager t A Risk Management J.Pa e RT , D.O.E. Brotherton ICFA Westerman/Scanned vi The Proceeding people have been ConfiaZied concemlng­the request for final payment&have released this project for such payment rATION AND PUBLIC WORKS 16 5 -0-2 35 0 Clearance Conducted By Shameka Kennedy )F PROJECT COMPLETION D.O.E.N2: 7288 CJ Regarding contract 117288 for THE RANCHES EAST ADDN PH 2-STORM DRAIN as required by the TRANSPORTATION&PUBLIC WORKS as approved'by City Council.on N/A through M&C N/A the director of the TRANSPORTATION&PUBLIC WORKS upon the reconu-nendation of the Assistant Director of the Transportation&Public Works Department bas accepted the project as corapIete. Original Contract Prices- $817,828.05 r, Amount of Approved Change Orders: $34,846.10 X21,2,3 Revised Contract Amount: 5852,674.15 Total Cost Work Completed: $852,674.15 Less Deductions: Liquidated Damages: as $210.00/Day Pavement Deficiencies: Total Deduction Amount: Total Cost Work Completed: $852,674.15 Less Previous Payments: $0.00 Final Payment Due $852,674.15 .... ............. .... . ......... Recommended for Acceptance Date Asst. TPW Infrastructure Design and Construction c"o P IJ Accepted Date 41& Director, TRANSPORTN'rION & UBLIC WORKS .......... ............. st &�; a�ager Date Comments, ('-205 541.200--20"7"760235083 100 ................... w. w, OFFUNA 1, RE-C 011t . CITYS IF .............. jq.,WonITH,TX VI 11 FORTWORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name THE RANCHES FAST ADDITION PHASE 11 Contract Limits Project Type STORM DRAIN&PAVING City Project Numbers 02350 DOE Number 7288 Estimate Number I Payment Number I For Period Ending 9/2/2015 CD City Secretary Contract Number 117288 Contract Time I NED Contract Date Days Charged to Date 218 Project Manager Ehia Contract is 100.00 Complete Contractor BURNSCO CONSTRUCTION,INC. 6331 SOUTHWEST BLVD FORT WORTI I, TX 76132 Inspectors LAYER I TAFZAZ I Monday,September 14,2015 Pagel of 5 City Project Numbers 02350 DOE Number 7288 Contract Name THE RANCHES EAST ADDITION PHASE 11 Estimate Number I Contract Limits Payment Number I Project Type STORM DRAIN&PAVING For Period Ending 9/2/2015 Project Funding DRAINAGE Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 21"RCP 81 LF $40.00 $3,240.00 81 $3,240.00 2 24"RCP 1110 LF $44.50 $49,395.00 1110 $49,395.00 3 30"RCP 169 LF $56.50 $9,548.50 169 $9,548.50 4 24"RCP 318 LF $50.00 $15,900.00 318 $15,900.00 5 10'CURB INLET 6 EA $3,100,00 $18,600.00 6 $18,600.00 6 201 CURB INLET I EA $6,200.00 $6,200.00 1 $6,200.00 7 4'DROP INLET 3 EA $3,300.00 $9,900.00 3 $9,900.00 8 4'STORM JUNCTION BOX 10 EA $3,000.00 $30,000.00 10 $30,000.00 9 2411 FLARED HEADWALL I EA $2,400.00 $2,400.00 1 $2,400.00 10 CONCRETE RIPRAP co#3 62 SY $47.00 $2,914.00 62 $2,914.00 11 LARGE STONE RIPRAP 250 SY $60.00 $15,000.00 250 $15,000.00 12 24"SET 4 EA $2,000.00 $8,000.00 4 $8,000.00 13 21"SLOPING HEADWALL I EA $1,700.00 $1,700.00 1 $1,700.00 14 24"SLOPING HEADWALL 2 EA $1,800.00 $3,600.00 2 $3,600.00 15 30"SLOPING HEADWALL I EA $2,000.00 $2,000.00 1 $2,000.00 16 ENERGY DISSIPATORS 17 EA $90.00 $1,530.00 17 $1,530.00 17 ETTP-10 TRM CON3 873 SY $4.00 $3,492.00 873 $3,492.00 Sub-Total of Previous Unit $183,419.50 $183,419.50 PAVING Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total I REMOVE GUARDRAIL 28 LF $10.00 $280.00 28 $280.00 2 REMOVE ASPHALT PVMT 485 SY $10.00 $4,850.00 485 $4,850.00 3 TEMPORARY ASPHALT PAVING REPAIR 10 SY $250.00 $2,500.00 10 $2,500.00 4 HYDRATED LRvffi CO#1 224 TN $155.00 $34,720.00 224 $34,720.00 5 6"LIME"TREAT CO#I 14949 SY $2.75 $41,109.75 14949 $41,109.75 6 6"CONC PVMT CONI 11862 SY $3290 $390,259.80 11862 $390,259.80 7 4"CONC SIDEWALK CO#1 2920 SF $4.30 $12,556.00 2920 $12,556.00 8 BARRIER FREIE RAMI1 6 EA $1,750.00 $10,500.00 6 $10,500.00 10 8"CONC PAVEMENT 2126 SY $39.85 $84,721.10 2126 $84,721.10 Monday,September 14,2015 Page 2 of 5 City Project Numbers 02350 DOE Number 7288 Contract Name THE RANCHES EAST ADDITION PHASE 11 Estimate Number I Contract Limits Payment Number I Project Type STORM DRAIN&PAVING For Period Ending 9/22015 Project Funding I I SIDEWALK 5660 SF $4.30 $24,338.00 5660 $24,339.00 12 PERMANENT ASPHALT PAVEMENT REPAIR 729 LF $80.00 $58,320.00 729 $58,320.00 CO#2 13 TRAFFIC CONTROL CO#2 I LF $1,500.00 $1,500.00 1 $1,500.00 14 REMOVE CONCRETE PAVEMENT C09 1 180 SY $20.00 $3,600.00 180 $3,600.00 Sub-Total of Previous Unit $669,254.65 $669,254.65 Monday,September 14,2015 Page 3 of 5 City Project Numbers 02350 DOE Number 7288 Contract Name THE RANCHES EAST ADDITION PHASE 11 Estimate Number 1 Contract Limits Payment Number 1 Project Type STORM DRAIN&PAVING For Period Ending 9/2/2015 Project Funding Contract Information Summary Original Contract Amount $817,828.05 Change Orders Change Order Number 1 $12,565.10 Change Order Number 2 $59,820.00 Change Order Number 3 ($37,539.00) Total Contract Price $852,674.15 Date Total Cost of Work Completed $852,674.15 Con r Less %Retained $0.00 1 1 Net Earned $852,674.15 Date / S Inspection Sup rv' r Earned This Period $852,674.15 Retainage This Period $0.00 L G , Date Less Liquidated Damages Project Mana Days @ /Day $0.00 Dat /s LessPavement Deficiency $0.00 t. irector/PPW/-Infrastructure Design and Construction Less Penalty $0.00 . to � Less Previous Payment $0.00 Director/ tracting Department Plus Material on Hand Less 15% $0.00 Balance Due This Payment $852,674.15 Monday,September 14,2015 Page 4 of 5 City Project Numbers 02350 DOE Number 7288 Contract Name THE RANCHES FAST ADDITION PHASE If Estimate Number l Contract Limits Payment Number 1 Project Type STORM DRAIN&PAVING For Period Ending 9/mo15 Project Funding Project Manager Ehia City Secretary Contract Number 117288 Inspectors LAYER / TAEZAZ Contract Date Contractor BURNSCO CONSTRUCTION,INC. Contract Time 150 CD 6331 SOUTHWEST BLVD Days Charged to Date 218 CD FORT WORTH, Tx 76132 Contract is .000000 Complete CITY OF PORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $852,674.15 Less %Retained $0.00 Net Earned $852,674.15 Earned This Period $852,674.15 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 i Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $852,674.15 Monday,September 14,2015 Page 5 of 5 F ORT WORTH rev 013/05/0'7 TRANSPORTATION& PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.:I NAME OF PROJECT: The FAncbes East Addition Pb—ase2— PROJECT NO.: 23 5........................_­_C0N'I'RA"_CT0RBurns_'c'o Construction DOE 7299 PERIOD FROM:0 1.0-0/15 TO: 08/31/�T_FIN' lEC"TION DATE: 13-Augg-15 W 0 RK 0 RD F R f FTF E C—TI V 1,:1/2 6/2,6, CONTRACT TIME. .............. DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARGED CREDITED MONTH CHARGED CREDITED DURING DURING L 16. 2. 17. 3. 18. 4. 19. 5. 20. 6. 21. 9. 24. 10. 25. ............. if. 26. 12. 27. 13. 2& 14. 29. 15. 30. ............ 31. SAT,SUN, RAIN,TOO WET, U111KIES ERS DAYS TOTAL &HOLIDAY'S &TOO COLD RELOCATIONS OTH CHARGED DAYS THIS 0 0 0 0 218 PERIOD PREVIOUS 0 0 0 0 0 IT 0 PERIOD TOTALS 0 0 0 218 TO DATE *REMARKS;_.. .................. CONTRACPR DATE INSPEC'm DATE nic City of F'ortWord,- T—hrockin—aa"o"n Street-Fort Wordi,"ll',X76012-631 I (813)392 �"7941 -IFT=(817)392.. 7845 MV�L R-AVPj, iZ-RR9 WZ6 TF6T-NA-M-E—� '—,Th"e —Phaie ......... CON ORDER No., CFA 9 ............ ............... pm ........... ........... DOE# 1288: ................. WATER PROJECT X P261�6071502350 F­F E WV R P K5ECT# P275 40T13023,50 ; ............ .................. .. .............. WSPE.CTOR: Iabte A.7aar.az Phone Nm 214-325.1666 PRa9EG'r MANAGER: Fmd ENz phanp my (8.17)392-8424 ............................... ....... .......... GOMRAC U[M.T............ � AM R SEWER "--- ORMAGE STREFT UGMS C® CT 77�-lll -T D v A S airs a tA4Z C-t ........... v UTWINO.50 S TO DATE MOO To som �35 cs Sg Do is .......... .............. ............ $0.00 so D CON TT0QA7F !a 0 $177X0,114 Z $S96,86935 jf�,� s 0, .50 M.. MAI;", MOO ISO .......... ITTM MIT" C ........... .�Rqt-�11A.GEORrICR jS_ i, sla'sam! 00 m PA-NMELD TI NY oa.rw LA, �0 as TOTAL REYISED CONTRACT AMOUNT 17 94 W-� 2� .......... .......... 6 $ , C7,77,�� -7, Revism cosr wwc Dee,comr, ,7� 7, ........... TOTAL RhAE;ED OUNTRAM ......................... ....... ................................ Revised:10-12-2611 Ybo are directed to make I he(oPlovAn chap es Fn the contract documents: CITY 910 ITEM PAY ITEM 4 11 QUANTITY UNIT ITEM DESCRIPTION UNIT'PRICE TOTAL —02sv.100 /T80\ SY Remove Cone Pvmt ,,,-_520.00—_-§_360000-- —T. S-155,67- $05,00 -Lime Treatment 3owsy 47 SY b 52.76 _ 5550.90 6 iy 6°G<mo Nmi �3230 u 46 321 v.U4g0—48 --i-2-130701 tk _$5.854.60- -49 3213.0301 404 �430 520 ��F 4"ConcSidewalk -ii TOTAL REASONS FOR CHANGE ORDER c-m-fo to o,v f;(r�;a pc(;(,,j1'roo,41,Cafnm, CITY FUNDS INVOLVED IN THIS CONTRACT,CEVCLOPER IS RESPONSIBLE FOR IODI/,OF THE CHANGE ORDER COST AND NO vr,.k—;�lh'a q C tv NO REIMBURSEMENT FROM THE CITY INILL BE SOUGHT BY THC DEVELOPER. EECOMMENDEO-' APPROVED: APPROVED: .vj I t1cm .wj D,;jju ;-p—L— ew.,-Q 6,�l-,-'kewn Fret B Name: .me: lq-11—k�4�1 Name: J.h.BUMS �—idh—aetk Thomas P Title:Principal Till -------Emmgeol- Taw Revised:10.12-2011 Page 2MffiLQP-L-R-A-WABQEQ-PR-QjgjZl-��Gf.QBQ�R ................. ...... PROJECTNAME The Ranchas East Addition Phase 11 Th R, ..........--.-..................... CHANGE "has C", T-0—NTRW—,T (A)Water,(B)Sanitary Sewpir, Q M&ORma,(D)&met Light Improvements 7a ORI)ER No! CFA 0 CITY PROJECT Of 23 9t 50E—# WATER PROJECT# P2W5--6Ol—1=350 2 ................ 'SE—WIR PRdTE—(,T# P27,5407113023-50 ............. FLF—0 X" INSPECTOR: Hable A.Taezaz Phane Nw 214.326-1866 PROJECT MANAGEK reed FhTz Phmic No: 017)392-8424 ............ CONTPACT UNIT R sewaece-- — —,—PAVING nPBABaAlaE 6TidE&TLt6&9T8 CONTRACT ,V 777 '7—, DAYS uw-'F"w*— COAL ma clomst ........... tilmaosm "Its"k gumiscut i 160 Ex.TRAS 10 DATE um slia i .......... comm AcrIOUNTE ussm"a 494,1), $649434.04 'il 150 L 2tftOP OIAMOE OR--T% 01n.0n9aa 10i, $0,00 sow REVISED CONTRACT AMOUNT $240,3118.10 "30100` TOTAL RffMEb CONTRACT AMOUNT PER yin 0.56 77" REVMEO COST SHARE now.cmt TOTAL REVISED CONIRACT ........... ............. Yal atefiwleU(a ffilke the followinj changes;n inn conleact doctimnis PAY i MA 9 F OLIANTITY UNIT IfEm DESCRUITtr(I UNIT rin-ct TOTAL 3 1—— 6 ----—S 1-50-0 6T—To—.owdo 3 12,210,1 6 —EA—iiL-r-11—flo—lion 3209.69—12 120 --LF— —9,—550——ri—Am oo ---i F i'errnannnleiall P.yerrNtni Reparc 500.00 $58.32000 3471,001 1 —1.7—TodrcConool —31.5-0000 TOTAL REMNS FOR CHANGE ORDER RECOMMENDED: APPROVED: APPROVED: BY BY: N—m F#7: Wq��.�P)E' Hawn Nance- 7111L< rdncgal rme: Me R0,451c:10.12-2011 Page n. U C; z LLJ 0 LV cli z 0 0) ci E W 4 w z (D 0 z z IL '9 < E C; L) . 0 a; r, Lij V-) z z 0 Q) LO °0 0 to cr 0 0� 40 q m N 0 C5 m ko tn w 0 Cl) V) 0 (L w tu 0 0 Z F- LL) o w Q ;v> < C14 (N C> C) co a to 7 y O 0 S CCOO to c-, L L X z n ui 0 w 4 0 w o❑ z U3 In C) C) ,, w LL) z u(K 0 I '-) 0 C,w Ck cli p q p u, u p< < w IL U) w io 0 2 o to U) z FL� Lu 0, 0 0 0 , w 0 ul cc w 0 w -13 4t CL qt uj w 0 < w Lij 0- 0 (If 0 Ll- Cl) cu w w C> CL C) LL \ � � : ! R k »fcn \ §&k. $_ m §48 \7a [ � § § Q . � ■ § \ E r . & * J k z � § ) 2 � � § \ % { % GA Q ! ^ § \ Go \ \/ ) \ § \ \ / ) \## \ \ § 72 } 2 § & § � m { § 5 'S \ ( / [ ® k f \» j � Z w E / } w & § \ f � § § t \ I I I I I I ƒ W v I � FORIWORTH REV�02/22/07 ,rRANSPORTxf ION AND PI)BLI C WORKS CONTRACTOR'S EVALUATION OF CITY 1)PROJECT INFORMATION Date: 8/31/2015 Nance of Contractor, Project Name Burnsco Construction Inc. The Ranches East Addition Phase 2 DOFInspector Project Manager 7288 Fred .................... T)(--ENuTn—ber '— Project Difjiculty type qj'Confracl 2350 10 simple /Routine 0 Coniplex 0� ater ante Water Q Storm Drainage 0 Pavement Initial Contract Amount al Contract Amount $817,828.05 $852,631.1.5 11)PERFORMANCE EVALUATION 0-Inadequate I -Deficient 2-Standard 3-Good 4-Excellent .......... -FLEMENT 'TING, EL E EMNT RATING r (0-4) (0-4) INSPECTION EVALUATION PLANS&SPECIFICATIONS I Availability of Inspector 1 Accuracy of Plans to Existing Conditions Knowledge of Inspector 2 Clarity&Sufficiency of Details 3 Accuracy of Measured Quantities,­......... � 3 Applicability of Specifications 4 Display Of Professionalism q 4 Accuracy of Plan Quantities Citizen Complaint Resolution -PROJECT MANAGER EVAL(JATION 6 Performance-Setting tip Valve Crews,Labs I Knowledge And/Or Problem Resolution ADMINISTRATION 2 Availability of Project Manager —1 ­ ............. 4-­--.-4------4 1 Change Order Processing Time 3 Communication 4 I U I 2 Timliness of Contractor Payments (-1 4 Resolution of Utility Conflicts 3 Bid Opening to Pre-Con Meeting'rimeframe 111)COMMENTS&SIGNATURES COMMENTS ............ ................... ................ ...... ...................................................................................­.......... ............. ............. ................. .......................... —­ .......... .......... Signature Contractor Signature DOE Inspector 1-1 4j �' Ate_� - Signature DOE Inspector's Supervisor INSPECTOR'S COMMENTS__­_.­_ ......................... .......... .......... .............................................. TRANSPOIR1.I ATIONAND PUBLIC WORICS Ee '.Me City of Fort Worth•100011tockmorton Street•Fort Worth,TX 7601.2-6311 (8117)392..7941 ®Fax (81° 392 - '7845 FORTOR i H REV:02/20/07 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR 1) CON'TRAC'TOR&PROJECT DATA Name of Contractor Project Name Burnsco Construction Inc. The Ranches East Addition Phase 2 DOE Inspector DOI,"Number Habte Tae7az 7288 DOE Inspector Project Manager 2 Water El Waste Water [3-,Storm Drainage n-Pavement Fred Initial Contract Amount Project Difficulty $817,828.05 0 Simple @ Routine 0 Complex Final Contract Amount Date $852,631.15 8/31/2015 M PERFORMANCE EVALUATION 0-Inadequate I•-Deficient 2-Standard 3-Good 4 Excellent ELEMENT W[UGHT(x) APPLICABLE(YIN) RATING(0 4) MAX SCORE SCORE I Submission of Documents 2 Y 3 8 6 T Public Notifications 55 N 3 Plans on Site 5 Y 3 20 15 T Field Supervision 15 Y 3 60 45 5 Work Performed IT Y 3 60 45 6 Finished Product 15 Y 3 60 45 7 Job Site Safety 15 Y 4 60 60 8 Traffic Control Maintenance 15 7 4 60 60 97 Daily Clean Up 5 Y 3 20 15 10 Citizen's Complaint Resolution 5 Y 4 20 1 20 11 Property Restoration 5 Y 3 20 15 12 After Hours Response 5 N 13 Project Completion 5 Y 3 20 15 TOTAL ELEMENT SCORE(A) 341 BONUS POINTS(25 Maximum)(B)— TOTAL SCORE(TS) 341 111)CONTRACTOR'S RATING Maximum Score(MS):=448 or sum of applicable element score maximums which 408 Rating(ITS I MS1*100%) 341 408 84% Performance Category Excellent <20%=Inadequate 20%to<40%—Dqftcient 40%to<60%----Standard 60%to 80%--::::Good 80%=Eaceflent Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Signature DOE liaspector Signature Contractor Signature DOE Inspector's Supervisor CONTRACTOR'S COMMENT'S I I R.ANS]P0Rr,F,A'110N.AND PUBLIC WORKS The City of Fort Worth• 100011roclailorton Street•Fort Worth,T.X.76012-6311 (817)392 7941 •F=(81'0 392 .7845 AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me, the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Ab Grantges, Contract Mgr, Of Burnsco construction, Inc.,known to me to be a credible person, who being by me duly sworn,upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; The Ranches East Phase 2 - Water, Sanitary Sewer, Storm Drain and h BY Ab Grantge ; Contract Manager Subscribed and sworn before me on this date 14th of August, 2015. Notary Public �`"°"� LEIA MC®WEN Tarrant County,Texas My Comm+ssbn dune 26.2018 „4 '-11 IF �f CONSENT OF OWNER ❑ SURETY COMPANY ARCHITECT ❑ CONTRACTOR ❑ TO FINAL PAYMENT SURETY ❑ Conforms with the American Institute of OTHER Architects,AIA Document G707 Bond No 022048407 PROJECT: (name, address)The Ranches East Addition Phase II TO (Owner) ID.R.HORTON-TEXAS,LTD AND CITY OF FORT ARCHITECT'S PROJECT NO: WORTH CONTRACT FOR: 6751 North Freeway The Ranches East Addition Phase II Fort Worth TX 76131 CONTRACT RACT DATE: CONTRACTOR:BURNSCO CONSTRUCTION, INC. In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the (here Insert name and address of Surety Company) LIBERTY MUTUAL INSURANCE COMPANY 175 Berkeley Street Boston MA 02116 , SURETY COMPANY on bond of (here insert name and address of Contractor) BURNSCO CONSTRUCTION, INC. 6331 Southwest Boulevard Benbrook TX 76132 , CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety Company of any of its obligations to (here insert name and address of Owner) D.R. HORTON-TEXAS, LTD AND CITY OF FORT WORTH 6751 North Freeway Fort Worth TX 76131 , OWNER, as set forth in the said Surety Company's bond, IN WITNESS,WHEREOF, the Surety Company has hereunto set its hand this 12th day of August,2015 LIBERTY MUTUAL INSURANCE COMPANY Sur ty Company Attest:Robbi Morales (Seal): Signafure of Authorized Representative SoDhinie Hunter Attorney-in-Fact Title NOTE; This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS, Current Edition ONE PAGE ................................................................... THIS P`OWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND. This Power of Attorney limits the acts of those named herein,and they have no authority,to bind the Company except In the manner and to the extent herein stated. Certificate No.jE1!19R American Fire and Casualty Company Liberty Mutual Insurance Company The Ohio Casualty Insurance Cornpany West American Insurance Ccoilcany POWER OF ATTORNEY KNOWN ALL PERSONS BY THESE PRESENTS: 'That American Fire&Casualty Comparly and The Ohio Casualty irisuralim Company are cv,poratiors duly organized under the laws of the State of New Hampshire,that Liberty Mutual insurance Company is a corporation duty organized under the laws of the State of Massachusetts,and West American Insurance Company is a corporation duty organized under the laws of the State of Indiana(herehi collectively called tlbe'Ccrnpav�ies"),pursuant to and by authority herein set forth,does i reby name,canifihite and appoint, Don E,Cornell, �4l2r209kJ:-!§_a_M,—BODD91ti Del-ene—marstiall ..... ......................... ............ ......... ..............I——.............. .........................................................................­­_1­­­­.___­__1... .................. .......... ......................................... ......................... ............................... all of the city of j�gI�jrj__state of each individually if there be more than one named,its true and lawful attorney-h4act to rrlak®,execute,seal,acknowledge and deliver,for and on its behalf as surety and as its act and dead,any and all undertakings,bonds,recognizances and other surety obligations,in pursuance of these presents and shall be as binding upon the Companies as if they have been(Uysigned by the president and attested by the secretary of the Companies in their own proper persons. IN WITNESS WHEREOF.,this Power of Attorney has been subscribed by an authorized offi cer or official of the Companies and the corporate seals of the Companies have been affixed thereto lhhL.±9th day of Mardi 2015 D C LNsv '01,15 UR4 INSUP" American Fire and Casualty Company The Ohio Casualty Insurance Company to Llbefty Mutual Insurance Company 1906 0 0 191 n 1912 1991 0 W mencan insurance Company (n 'es, STATE OF PENNSYLVANIA as David M.Cars Zsfarit Secretary COUNTY OF MONTGOMERY 0 0 On this before me personally appeared David M.Carey,who acknowledged himself to be the Assistant Secretary of American Fire and _lD_th day of parrs I....................................... ........ as Casualty Company,Libedy Mutual Insurance Company,The Onto Casualty Insurance Company,and West American Insurance Company,and that he,as such,being authorized so to do, >M 46.2 execute the foregoing instrument for the purposes thereto contained by signing on behalf of the corporations by himself as a duly authorized officer. 0)W L. M Lr.- E (D > IN WITNESS WHEREOF,I have hereunto subscribed in name and affixed my notarial seal at Plymouth Meeting,Pennsylvania,on the day and year first above written. 0 CL r COMMONWEALTH OF PENNSYLVANIA Vol <n N Pei COMMONWEALTH.................... Notarial Seal It 71 Teresa Pastelle,Notary Publ[c By: 0 OF Plymouth Twp,,Montgomery 0wrty 'Thresa f2astalls,Ncrtaq Public 0 C 0 My Commission Exprres March 28,201 ---....................... 0 Member,Pennsylvania Anaclalion of Notaries 0 r= Ry 0�4) r- This Power of Attorney Is made and executed purs sot to and by authority of the following By-laws and Authorizations of American Fire and Casualty Company,The Ohio Casualty InsAnance u) Company,Liberty Mutual Insurance Company,arid West American insurance Compny which resolutions are now In full force and effect reading as follows: IM U) m ARTICLE IV-OFFICERS Section 12.Flowe!olAftorney.Any officer or other official of the Corporation authorized for that purpose In writing by the Chairman or the President and subject 0 r- 0 to such limitation as the Chairman or the President may prescribe,shall appoint such attorneys-in-fact,as may be necessary to act in behalf of the Corporaton to make,execute,seal, W>4 O.S arknowledge and deliver as surely any and all undertakings,bonds,reongnizances mid other surety obligations.Sucti aftorneys-in-t3d,subject to the limitations set forth in their respective E 6 powers of attorney,shall have VI power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When'so G -its shall be as binding as if signed by 4�e President and attested to by the Secretary.Any power or authority granted to any representative or u nder >,Q executed,such instrurnst the provisions of this article may be revoked at any time by the Board,the Chairman,the President or by the officer or officers granting Such power or authority. C141 ARTICLE X111 Execution of Conbsicts-SECTION 5.,Surety Bonds and Undertakings.Any officer of the Company authorized for that purpose in writing by the chairman or the presiden t' E > and subilect to such limitations as the chairman or the president may prescribe,shall appoint such aftorneys-in-fact,as may be necessary to act.In behalf of the Company 6 make execute O sea(acknowledge and deliver as surely any and ail undertakings,bands,reGogrilzances and other surety obligations. Such aflarneys-in-fact subject to me limitations set lbrift in their Z v respectlye powers of attorney,shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so 0 o executed such instruments shall be as binding as if signed by the president and arrested by the secretary. o cD Certificate of Designation--The President of the Company,acting pursuant to the News of the Company,authorizes David M.Carey,Assistant Secretary to appoint such attar reys-In- fact as may b e n ecessary to act on behalf of N Company to make,execute,seat,acknowledge and deliver as surety any arid all undertakings,bonds,recogirilzances and other surety obligations. Authorization-By unanimous consent of the Company's Board of Directors,the Company consents that facsimile or mechanically reproduced signature of arty assistants etary of the Company,wherever appearing upon a cerdfied copy of any power of attorney Issued by the Company In connection with surely bonds,shall be valid and binding upon the Company with the same force and effect as though manually affixed, t 1,Gregory W.Davenport,the undersigned,Assistant Secretary,of American Fire and Casualty Company,The Ohio Casualty Insurance Company,Llborty Mutual Insurance Company,and West American Insurance Company do hereby certffy that the original power of attorney of which the foregoing is a full,true and correct copy of the Power of Attorney executed by said Compariles,Is in full force and effect and has not been revoked. IN TESTIMONY-WHEREOF,I have hereunto set my hand and affixed the seals of said Companies this day of ........................... 20 D CA's, INS& 104 Msuy 044, 1906 By: 0 1919 Q >- 1 12 ° 1991 Gregory W.Davcvnpovt Assistant Secretary A 4, 246 of 500 LMS 12873 122019 -------------- Liberty Mutual, SURETY Important tic TO OBTAIN INFORMATION OR TO MAKE A COMPLAINT: You may write to Liberty Mutual Surety at: Liberty Mutual Surety Interchange Corporate Center 450 Plymouth Road, Suite 400 Plymouth Meeting, PA 19462-8284 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance: P, 0, Box 149104 Austin, TX 78714-9104 Fax: (512) 475-1771 Web: ht_tp://www.tdi.state,tx.us E-mail: Cons umerProtection -tdi.state.tx.us Premium or Claim Disputes i Should you have a dispute concerning a premium, you should contact the agent first. If you have a dispute concerning a claim, you should contact the company first. If the dispute is not resolved, you may contact the Texas Department of Insurance. Attach This Notice To Your Policy: This notice is for information only and does not become a part or condition of the attached document. LMIC-3500