Loading...
HomeMy WebLinkAboutContract 47020 n m , reds'5 � � f CONTRACT NO. Developer and Project Information Cover Sheet: De.� c r Company Name: Hillwood Group, LLC Address, State, Zip Code: 4704 Patterson Ln, Colleyville, TX 76034 Phone& Email: 817-336-6000, dashaimd(a),yahoo.com Authorized Signatory, Title: Daud Ashai, President Project Name and Brief Boat Club Village Retail Center Description: Watcr, Sewer, Storm Drain & Street Light to serve Boat Club Village Retail Center Project Location: 4701 Boat Club Rd Plat Case Number: FS-013-095 Plat Name: Jinkens Heights Addition Mapsco: 46Q Council District: 7 City Proicct Number: 02337 CFA Number: 2014-079 DOE Number: 7280 To be completed by staff Received by:_ Date: ' OFFICIAL I MC(MID CITY SECRETARY FT. IN(MI'll IT City of Fort Worth, Texas Standard Community Facilities Agreement � CFA Official Release Date: 07.30.2015 Page 1 of 11 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, the undersigned Developer ("Developer") desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Boat Club Village Retail Center ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any fixture City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements and the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer acknowledges that the said acceptance process requires the Developer's contractor(s) to submit an affidavit of bills paid signed by its contractor and consent of surety signed by City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 2 of 11 its surety to ensure the contractor has paid any sub-contractors and suppliers in frill. Additionally, the contractor must also provide in writing that the contractor has been paid in full by Developer for all the services provided under their contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) ©, Sewer (A-1) ❑X, Paving (B) ❑, Storm Drain (B-1) ©, Street Lights & Signs (C) ®. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalifred, insured, licensed and bonded to do work in public streets and/or to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements valid for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 3 of 11 required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state- approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give at least 48 hours' advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide, at its expense, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements contemplated herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 4 of l 1 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character,whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub- contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the Ci& of Fort Worth, its officers, servants, or entploj>ees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in vart, by the alleged negligence of the City of Fort Worth, its officers, ser ants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 5 of 11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the hmprovements if at the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 6 of 11 iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 7 of I 1 Cost Summary Sheet Project Naine: Boat Club Village Retail Center CFA No.: 2014-079 DOE No.: 7280 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. 'The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 24,950.00 2.Sewer Construction $ 23,204.00 Water and Sewer Construction Total $ 48,154.00 B. TPW Construction 1.Street $ - 2.Storm Drain $ 91,400.00 3.Street Lights Installed by Developer $ 18,189.00 4. Signals $ - TPW Construction Cost Total $ 109,589.00 Total Construction Cost(excluding the fees): $ 157,743.00 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 963.08 D. Water/Sewer Material Testing Fee(2%) $ 963.08 Sub-Total for Water Construction Fees $ 1,926.16 E. TPW Inspection Fee(4%) $ 3,656.00 F. TPW Material Testing(2%) $ 1,828.00 G. Street Light Inspsection Cost $ 727.56 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 6,211.56 Total Construction Fees: $ 8,137.72 Choice Financial Guarantee Options,choose one Amount (Mark one) Bond=100% $ 157,743.00 Completion Agreement=100%/Holds Plat $ 157,743.00 Cash Escrow Water/Sanitary Sewer= 125% $ 60,192.50 Cash Escrow Paving/Storm Drain=125% $ 136,986.25 Letter of Credit=125%w/2yr expiration period $ 197,178.75 X City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 8 of 11 ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be executed in gtiadi•uhlicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER Hillwood Group, LLC r Jesus J. Chapa Assistant City Manager Name: Daud Ashai Title: President Date: Date: - Recomnaended by: ATTEST: (Only if required by Developer) Wendy Ch Babulal, EMBA, P.E. Development Engineering Manager Signature Water Department Name: Douglas . Wiersig, P.E. �Ap Director ` 'Transportation& Public Works Department — Appr°ovecl as to Form & Legality: ATTEST: %„% w, Mar' T. Kayser ... .—. ._. Douglas W. Black y Assistant City Attorney City Secretary M&C No. Date: O,.a.,wm�.,� �.,,,�o..�mw..,W��.,m��,.,�w.,, CIMSECRETARY 1"ISM NFORTH5 ' City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 9 of l l Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Illelllded Attachment ❑ Attachment I - Changes to Standard Community Facilities Agreement © Location Map © Exhibit A: Water Improvments © Water Cost Estimate ® Exhibit A-]: Sewer Improvements ❑X Sewer Cost Estimate ❑ Exhibit B: Paving Improvements ❑ Paving Cost Estimate © Exhibit B-1: Storm Drain Improvements ® Storm Drain Cost Estimate ® Exhibit C: Street Lights and Signs Improvements ® Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth, Texas Standard Coi1imunity Facilities Agreement CFA Official Release Date: 07.30.2015 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 02337 Insert "None. " if there are no negotiated changes. If changes have been negotiated please insert them belo1v citing to the paragraph for reference. City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 11 of 11 BOAT CLUB VILLAGE RETAIL CENTER LOT A , BLOCK 2 - B JINKENS HEIGHTS ADDITION 4701 CLU-B- NORTH HILL w etij<FiV `� R�� F NORTH � � c v RIDGE OAT w SOUTH RIDGE OVER SITE BA SWOOD LAKE RHEA RIDG J W ROX NNE W IVY �P Q Q BR �O HILL SEA BREEZE o ° REE FAIR WIND DEA SHAY DODSO PT SPRINGTIDE cn JOHN'S WAY DELL � 0 NtS1WA�( _ LAKESID ° m -- -' CANYON_ °0 0 LOCATION MAP N.T.S. MAPSCO: 46—Q, COUNCIL DISTRICT #7 DEVELOPER: ENGINEER: HILLWOOD GROUP, LLC GRANT ENGINEERING, INC. 4704 PATTERSON LANE 3244 HEMPHILL STREET COLLEYVILLE, TX 76034 FORT WORTH, TX 76110 817-336-6000 VOICE 817-923-3131 VOICE 817-336-2072 FAX 817-923--7171 FAX FIRM REGISTRATION NO. F-4313 1 m Ur. U�n�rl O x Zp �U OZZ L 'AMN 'YI j W J m W!- OW z r VFW Z7 as en � 0 i v 0 a > }�y� ftv�� —�j--- ° N CQD �3�d"o J I Q W t`-� or) w W _JW m z n8 m gppp-,,aZa ° 1a-a t,. '� 3 y W = C',o m F- W (L/ ygyg acy C.) NoQ<o O W>Od W G W�?M,� Z = >W O W F „ �w m=aJ w x�J� '-a �-WONN 0'k 0]V Z - a�ao� in ]"��r- +j`2 ao _1N0mNZ Q z F O JJ 3? h ao w �m,n < � � ¢:°mow Ww UFQ- 2 w 1 1 1 1 �n W 9 l�.l 0_ w N ? C zz � I I Z i I I IZl- I zmj5_�m W e A Q F- gy�I N A�� O m Q� NIVW aJRVM ,9t 9NIiSIX3— Q =j --3NI-1 L2J3dOdd iO3rons 00 — � T 09+0t ` 00+Ot -)rocs o YYS I N� ,,1 w SSVaJ N E,7 zoo8 ° 1 � � 03SOd0ad "f Yy. "2�a I W-I,- CL ND3°Ki wQO�aa ,OZ a wW � �iZ�Ln 0l V Yi a4� tea J y a i• ion > - Na --_--<Z•8b-• i � i w�3 a�o e e e e e e riz ao' z < ry 5 = W I— <<cd� — �2rW9 c>)Q;w oa 7 JZ�� pN Ot1.ON �a ' QW Q m o� w 'u5 W I U r cn ? o_¢_ N W W O0 ZO °z a 3 Cn O 2 S �po�s~ �omg g U U — — — — ------- 0--1-02- - I--�ao v - QCYz i~c�i) zoo ;*, r io � �G Z Z t 'A MN M ��-r�O Z NOZ �$ s 9 l � 1tl08 Q�Q000_� e-o O W W 0 t;lzm o o �i b SL'LiZ3 00t_'SAOS Q�zV)O Ow -- -- :D L j O l i b �pIl ti I N Z I 1 1 N O x Z Z Zm €¢ z W3 I 3Id I cmi6 46. I LLI LL N Oi fl a° n3'W Ii ¢KQZQoot~i a. a O x min AWN= W OQ CL �I a-�3 31 z a i ow 'L n 3s e ,71 i w N � oalaim I I 11 t �t � � t �1 1 t i z w Z \ oz ,ii to O F- yge�ze1 QQQggg I $ M Z zI OU d b � DA o a 0 o a W w Z o CD w 1 g tl 'Y g o I g >w CD °€ i O(T) R. S �43E 3S w a w J w �� Z ,8 °S p 6A $ -g o a z I=- m U 0.. W 1{ 84121 INK ui 05.1 gbh o v U)gLu I1 � � A z o I- I .LI ° 4 Z 1 = g ®8®8 ~�w FBI 1 I miri ici H4 �i� 56�� �°. Na I �y^ 'n v00inn F Fw- W3I 'a z I F Jo n ��11 o a i ¢ n nr a �$ zF N���zc°n Sib° � e3 ;� Yz i I F �ozz Hit is zoJwo S X n w 1 I J Z�� W Zzn� I I QW Q zz ° a n it ij O m F- �ptn . i I iriPn`�W2 >>. F� ' i z o 0_pU OW Wr Wiz~¢ 11 w zi i °w , wWOp 'o°^o UD(CL'o 09 �i t� Fi I F oz b II KOZr�Z N x i z 1 �?-�y� e�1' Il vn Z�F-� )O I F~z maw cv n O OoowO z°�n S w Z O X XX O d W Icy •- UNilo3 ac <F-_ZOO cs-1 ( +W w R�F W x D IXI WNGG 6_�,W.M. z O O_ 09 ZZ¢ E7GSIING 8-DI S. ____ _—{ z0 m 0 N z n e }~~ - n 0 Ln 0 10 N 0 L-6559 z v6ovsxn•uNe � _ EXISTIN 6" D.I. n `� 1 SANITAR SEWER _ G� 1-6559 TUB-17) V non _npq�nn J m? ° I 4' Ki A 0. Q f 6' I ¢ O 5�z�iN <rcti fi O �i in ci < Qn/ TFF JZb LLmj •_I F M10000 Oi"O nn a On LL. O I Nh, `t7N _ LL- NJ°Xi I °oo'u ONNa xx w o}% 3 nn ¢ ��A3 w ED .16.25' I Alt = n° Q 1� z o Gv �jn a ° °v F€ ° ZA _ 8ad� to m 4 w /� S 00`1' WY � a ✓ I N;wa °Wz�aWNWWr1 8 \ \ zL<W Wo zz w �^ I = op3 + (pj° 1F-,-=,"T0 DNS jX w w ° r� ;¢r-waa �KZaonr, �z nn <+I.. 3w �im�WO � za n z w a� xx �$' °� »zoln ^�3a�v1 <� an I'- �o z1gJa: oo ,rioonop Mo N 0,a l� j Og pU SUN ZOFU N...t w °z + +w �o NF°z�3 I1d-- ; nzF °+ W to W N m W o a � mot, �¢w m v �^ w m d .ao 3m + i� I 4 J a�°ooF n C, ui °n° F- p, 0 r� z (U w of W� �ma a a w Z25 S N _ a 0 W U F- '� °a W Z W W a I V) o W(n U) O)O ¢ N O_ 0 U =Z J O fn D 7 U tY i tl Q Q >r to 01 � Jd-Q� w�F- L7 U) �Z0w xO F- CC', W -1W G' z ;,afWNto NW W Q ¢QJh tO I,cO wONO)d' X J � � Q Z�WJ U' d �' ��� �Z � W F='Oh l�h NM N �W n. d'wM O J Zd - z = w @ LJ ¢z II II +¢Z II II WnCO 600) , 04 �� 0L'i F < 7�z Z m0 Z 8 l �� �O� N^t tOO of~ ^QU r~�W X HP O _jF in g 1 h z �� ZZ 0_tJi II II Uco�N ~FQ- L t�J �QO- W Z , U W V) Z r a w� J 0-o N_ Q tri o 0 v- F w e F- 0, H � ¢ I J Z W �{- 't= N d w 1=N Z�-)O��X 0_ ¢ Z p N +r QQ.. � O LLJ w ¢X �G u_acoF-tom tn� J -vim 0000 w Eg L� O Q Z j N N W Z W 0: m H- Q r z �CA C) N�w �t 3 r a �' Z U X p V)N (n O w O z<< N 0 -� 00 oQ m 0 z z t A M H ��' W � Y � 1 8 +r z� ozw 001Hcn I m 0 'd O - 8'I J__$ _ Z — xNx Q NIN O In li W� w0 I WI y. ii NI 9 X Ob�Z �-fl--- L,_J IQ- y/ ) +- —�__ +` +0 0 60 tp+0 ML Q Z W +It ylsl \ OY15 V ' y II-Vl zs i M 0¢o cr I// , I I y15 Yl5 r - \ - ro NO p 10 ��I \ _ I w0 a L'i a I I` Up W 0 G . I _ -, O . 3 Ow Q . -(i)J O m W Q Zaf I J (0 ' Z x _ N SZ (r �Q QIw �°°� w�OD g l n I g t y }Z I I W U O W i�J - aO T i �O 0_I 1- p Z w a x I' I I- 0 I I_ w� I� Q1a O 3r 3 H w In It ¢ J to F W I z to m z m I °J U COQ g OQF J) I I I z-' Ig I a azn IJ,oJ mQNt.iN �w0 ±�� ' F o t WO�Om ° r �t`'I Iw i o_ Y-O" v�0-0 Om N-O VlQ I to ro � 1` J 3-- a- J I W� I� 1 °- UcOWtil ( OaZM W - �oZ wlc� ' Jm Zom¢ j�� V) F' OQ=i (n 0 LWZ O V¢i I t <coZO ICI ' CL W I I m 3.s• I Ofoo" F---00 R aF-W �U I I to �oJ oal-5U on-= W >} Z J t+- I I ---o— J z O V) r') F_ --O O-ti x d'C-) G_ m Z t OU)LL,C) >-2 liF O I = o d Q� 'I 1 + I }1W-(nm�U< o tail{ -. <W�'p ' O ¢ OW 1' aowFW- II 0 W m�_ i �'\,\ =a X a J Fl\\ , I > T1TFTTT1-�rlll- zmJZ_ \ \ \ u_Ll \ \\ \\ � o ii � zoz°o (rN3g \ \ \ \ FFnoo F oo-ego c� a \\ \ ONia-tin8 llvl32A / 301 30 �� woo 0 \\ \ 00 z \\ \ ),801S 3NO 03SOdO21d cr 0 Cl LLJ Fj�W �\ \\\ > �O \\\ \ \\ — og z \\\ tyy o �m nlw�zw J Z 00 1- \ ♦ ' ° I-!n \ O w w Z \\\ x \ i '�i stn Y � vtl°�mz LD 1-tY d O O \ \ ``\� 4 U F-J `\ 0 000°0 \\�� o°c~ i)0 \ ffz Uww0Oaw g M \ \\ a wcr o �\ \ \ �\ o Y ¢mZzz W d0 J Q zed I 0zzt AMH 'H 'd t/1a03ammw p U U ~ O a 8 n l 0 1\�O B 10`¢1¢ M7' 0=mo`dr _ O W WK'-O NUOyyZ° Z 7W FL' Z MmZNW O,w L-FQ ° =e -3 X �' J °MW_ 't t=00 oacxi °xE�WwOZOO�n �' 1-uj Jui a z n8m 0.� ir) o�zxZ°' Frx'o °w~�I oYFz a w z �-. QZ° x WWQQ� tn$0-' tn3 NK mUgQ U ��- W = W U- ° to Ci to w 0. O 0-J J LJ N = W Z= p Q° � o25 �a�oa!rn�z°3 30NV1SI0 °D - O m-' J 7 `2 d° maZa zo a iN a m o z - 1H911 133a1S I�, to C)¢ Z w� 3 a. o I I Stn 01 iH011 W W 8 r ,10'4Zl - p Q in co co WM-,9l�1SIX3 c' l N U b 9 '1SIX3 L: } 00 N I ° > OS+OI ' I 00+O1 09 Y , U Y ei zfe n --_ O O Q 0 0> O°�p Y15 'tl1S Y O F WM �i� n w Y0_m Oµ 64 Z\ p 6K�000 O? .1 C t)w O QiW-I- I Nom Z m Ko°D ip=< apOO W � NZI-W �°O a0O &8 x (Y O wC=7 , �N? �� yI F- m3 c~i� j a ;gam a $°o°� '� °ern �V� w>:z I- ozWJQi � � ZO I oo wwo awa Oa° O�� o1n Ja F�v V,:01 oa' i zN m =.-a° I-W zF JW 0. 5U.... ' F 'axooQ n�w I cif ~�V~i S N1Un ZI-Z Z Q3r, NON O z AtN3dOtld / _ rn V A 1n W W I Z 1�3f8n w ° 1-00 0 O K }mZZZ W� Q z rn�O3am aoo - V7Qh0 �Q �'-M> Mmo, ° N �OOOi- > oo wo o °w�v°�Z w O Mk FO00� ° e is 3w °mf °w wooUN owr 10 w � 1°� Q~z 8z p�4cF3�! h X� WE o3JNamo�a� "1°Urco Ww g w" i z Z��S w o 0_�w�Qa �IQ-o3 �rW- a°d �''z qv o O�'-t- 3- 1s4 0-7d OOt/a vlo QS'- w� 1J. e e l 1 ! if w a0-mo��ii z }-nv°i°�z o °a: e°,: j OZO %'-''�9 8% o. O Z z Z zd 3�i = X A I N WW F-- - w �o & w — - - - -Q- - - — — — — — wa w aJ N QO2 n N U O L L O w V7 z_ c� m a oa _ e � o_ lv a N� ° rN� a " I 30NV1510 1HOIl 1338 ff z�E W 0 ?O ,l0'9Zt ,l5 0 S ,5 E2oE °, p x = __ pp ° i w. v al i,l m,9'4Z IL w ' O o I'I 00 I �z g 8 � i0 z j I I j ��n a W oz it ow 4 Wm Q Z, zx moh Qj az ° mO o Z= , '4j3 3I ww.0 0dw M3oH3 j I w °°Fa0 I � O�aa. � a¢ lY�� Kj !l3dd00 Q �i o z�=° a a y �waD �5 wo n w 1, --- i a - Nz°p �Y �av=�Gz G.-Z% n�� Hxat �, F a 5 a 3 h ,il O -Z. I to Zz¢31n SUN 3 N end o o ° z a 9 31n3 N1 9 N g e e a rc o o rc OF 1 I j MHH%bi o $ o z i zd j z I x31diNt } !r f5 W.0 zo e°. N Z 045 D:O 1. I zd ¢ oo �¢ _rc rc rc s I I I r � a 3r 'I °QWJJt W O W 8F1-Ft-mFFM v C WGj O Z Y II ' 3.51 o w z= W=oo-=owo°a.w"�woa 3 13I-- rr3 I3; Jw MQNoo ZxW?* O� 11y; �1 Gi I� GS S,S mN62 m wo DO� j = wIQ-20x0 't..Ut-a °��' z '1 W \ x Fp, EwW az� ( 2N a \ U3 ZO 0wo O - o W N n n 1 11 O \ N w �'1-KO01-° �i�n!- `\ g z O oz O VI d U� N N \\\ \\\ Q'M7m W VOOooR I V rcN NNN z Y Y w w Y + \\ w a \\ \ Z_ZZW° m?UUViNN i ¢Z U Q Z Z \ o WKl� E N�IaIWY \\ `\ \`\ I xyn t,°Q, w = Ww' Z> Zo 0 U ~NK \ ♦ Y \ �\ fOOmh mQ w� a NW NQ'M ®O z °' 8 \\� �°'.mo}3 w Z°U� N1p oF® m~ Q♦ a C °za4QO a Wow° v`a �FO1-wtL w H �� wg Zp txil¢cl�om,. vlt wo°o��x uo ? U o°U oaocV,,OI IL \ \ Section 00 42 43 4 CFW Developer Project Proposal Tool City Project Number: 02337 Project Type: CFW No City Funding, New Development (Private Bid) Specificatio Est Engineer's Estimate Extension Bidlist Unit n Qty Estimate Item Oe,scription of Section No. Measure No. 3311.0261 8" PVC Water Pipe LF 33 1112 20 $65.00 $1,300.00 3312.0001 Fire Hydrant EA 33 12 40 1 $6,100.00 $6,100.00 3312.2004 1" Private Water Service LF 33 12 10 1 $1,200.00 $1,200.00 3312.2204 2" Private Water Service LF 33 12 10 1 $3,700.00 $3,700.00 3312.4112 16"x8"Tapping Sleeve&Valve EA 33 1225 2 $6,000.00 $12,000.00 3331.5305 81' PVC Pipe,6'to 8'(Misc.Only),CSS Backfill LF 33 3120 10 $65.00 $650.00 Total Water Improvements $24,950.00 3331.5748 8"DIP Sewer Pipe,CLSM Backfill LF 33 1110 1.52 $75.00 $11,400.00 3339.1009. 4' Manhole EA 3339 10,33 39 20 1 $3,800.00 $3,800.00 33 39 10, 3339.1004 4'Shallow Manhole EA 33 39 20 1 $3,800.00 $3,800.00 3301.0002 Post-CCTV Inspection LF 33 01 31 1 $2,500.00 $2,500.00 r 9999.0001 Tie into existing Sanitary Sewer Manhole NS 1 $1,200.00 $1,200.00 3301.0101 Manhole Vacuum Testing EA 33 01 30 2 $100.00 $200.00 3305.0109 Trench Safety I_F 33 05 10 152 $2.00 $304.00 Total Sanitary Sewer Improvements $23,204.00 2.41.4401 Remove Headwall/SET EA 024114 1. $750.00 $750.00 3341.0305 33" RCP,Class III LF 33 41 10 11.8 $85.00 $10,030.00 3341.0409 48" RCP,Class III LF 33 41 10 530 $134.00 $71,020.00 9999.0002 Tie into Existing Storm Drain NS 2 $1,000.00 $2,000.00 3339.1101 5' Manhole EA 3339 10,33 39 20 1 $5,500.00 $5,500.00 9999.0003 Safety End Treatment NS 1 $2,100.00 $2,100.00 Total Storm Drain Improvements $91,400.00 3441.1405 NO 2 Insulated Elec Condr LF 33 41 10 444 $3.50 $1,554.00 3441.1408 NO 6 Insulated Elec Condr LF 33 41 10 504 $1.50 $756.00 3441.1413 NO 6 Bare Elec Condr SLID LF 33 41 10 252 $1.50 $378.00 2605.3015 2"CONDT PVC SCH 80(T) LF 26 05 33 363 $9.00 $3,267.00 2605.3026 3"CONDT PVC SCH 80(B) LF 26 05 33 37 $12.00 $444.00 3441.3002 Rdwy Illum Assmhly TY 8,11,D-25,and D-30 EA 34 41 20 2 $2,986.00 $5,972.00 3441.3201 LED Lighting Fixture EA 34 41 20 2 $825.00 $1,650.00 3441.3312 Contact Enclosure,Pad Mount EA 34 41 20 1 $4,168.00 $4,168.00 Total Street Light Improvements $18,189.00 TOTAL $157,743.00 I