Loading...
HomeMy WebLinkAboutContract 47022 CRETAN �'�".)N Cti gym^T icy Developer and Project Information Cover Sheet: IT Dey ^ r Company Name: FFW Properties, LLC Address, State,Zip Code: 1806 S. 16t" St. La Porte TX 77571 Phone 281-307-2070 E-Mail: gcook @ftlg.net Authorized Signatory/Title: George Cook/CEO Project Name and Brief Description: Frontier Logistics Project Location: 601 Northeast Loop 820 Plat Case No.: FP-006-097 Plat Name: Mapsco: Council District: 2 City Project No: 02511 CFA: 2015-040 DOE: 7388 To be complete staff Received by: Date: ®� FFF,�X17^ Won���'��� 01, UP R`D'^ f i COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, the undersigned Developer ("Developer") desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Frontier Logistics ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or"Agreement") in connection with the Improvements and the Project. NOW,THEREFORE,For and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer acknowledges that the said acceptance process requires the Developer's contractor(s) to submit an 2 affidavit of bills paid signed by its contractor and consent of surety signed by its surety to ensure the contractor has paid any sub-contractors and suppliers in full. Additionally, the contractor must also provide in writing that the contractor has been paid in full by Developer for all the services provided under their contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City- approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof. Water (A) x Sewer(A-1) x , Paving (B) x,, Storm.Drain(B-1) x Street Lights & Signs (C)_ E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section lI, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public streets and/or to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements valid for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of 3 Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give at least 48 hours' advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide, at its expense, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements contemplated herein. 1. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the 4 community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, 5 damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner,free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its 6 agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement (and any extension period)the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) 7 Cost Summary Sheet Project Name: Frontier Logistics CFA No.: 2015-040 DOE No.: 7388 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 46,490.52 2.Sewer Construction $ 39,371.50 Water and Sewer Construction Total $ 85,862.02 B. TPW Construction 1.Street $ 154,019.00 2.Storm Drain $ 199,308.27 3.Street Lights Installed by Developer 4. Signals TPW Construction Cost Total $ 353,327.27 Total Construction Cost(excluding the fees): $ 439,189.29 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 1,717.24 D. Water/Sewer Material Testing Fee(2%) $ 1,717.24 Sub-Total for Water Construction Fees $ 3,434.48 E. TPW Inspection Fee(4%) $ 14,133.09 F. TPW Material Testing(2%) $ 7,066.55 G. Street Light Inspsection Cost $ - H. Signals Inspection Cost H. Street Signs Installation Cost Sub-Total for TPW Construction Fees $ 21,199.64 Total Construction Fees: $ 24,634.12 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% $ 439,189.29 x Completion Agreement=100%/Holds Plat $ 439,189.29 Cash Escrow Water/Sanitary Sewer=125% $ 107,327.53 City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 07.01.2015 Page 8 of 11 IN TESTIMONY WHEREOF,the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City r Secretary,with the corporate seal of the City affixed, and said has executed this De e o e instrument in quadruplicate, at Fort Worth,Texas this day of o4 X20 --Ja. CITY OF FORT WORTH-Recommended by: Water Department Transportation&Public Works Department Wendy Chi-B bulal,EMBA,P.E. Douglas Wiersig, P.E. Developmen Engineering Manager Director Approved as to Form &Legality: Approved by City Manager's Office Douglas W. Black Assistant City Attorney Assistant City Manager M&C No. Date: � t ATTEST: f J M ry J. Kayser City Secretary w �D�roryaa' ° a w, ATTEST: DEVELOPER: FFW Properties LLC �Mr Signature Signature: (Print)Name:Paul Heard Print Name: George T. Cook Title:Manager OFFICIAL rRECOIRD CITY i"P'4,4i�4ft 9 w.I Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ❑ Location Map ® Exhibit A: Water Improvements ® Water Estimate ® Exhibit A-1: Sewer Improvements (� Sewer Estimate ® Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Estimate ❑ Exhibit C: Street Lights and Signs Improvements ❑ Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) 10 0 20 40 80 120 GRAPHIC SCALE IN FEET m x p O I (r 0 75' ACCESS EASEMENT (z— (DOC. NO. D205143846) ftmi (a RI N i v p � - 17.5' SANITARY SEWER EASEMENT D (DOC. NO. D206040402) APPROXIMATE END OF EXISTING 21" STEEL ENCASEMENT ( INSERT POLY PIG ( BEGIN PROPOSED 21" STEEL G) ( ENCASEMENT & 12" WATER _ L END OF PROPOSED �1" STEEL ENCASEMENT ' . . e D T` Cn INSTALL- 1-45- VERTICAL BEND ( INSTALL: ° ( 1-45' VERTICAL BEND D (INSERT CLEAN WYE & REMOVE (POLY PIG Ll (CONNECT TO EXISTING 12" WATER G) I (END PROPOSED 12" WATER D (� Cl) ' 0 �W FRONTIER LOGISTICS WATER I N. CENTRAL D(PWY. SUITE 1000 IMPROVEMENTS Pacheco Koch DALLAS, TX 75206 972.235.3031 TX REG. ENGINEERING FIRM F-469 RAILHEAD FORT WORTH DALLAS . FORT WORTH . HOUSTON TX REG. SURVEYING FIRM LS-100080-00 LOCATED IN THE CITY OF FORT WORTH DRAWN BY CHECKED BY SCALE DATE JOB HUA�ER TARRANT COUNTY, TEXAS AMS JDJ 1"=40' 05/11/2015 1977-14.326 PAGE 1 OF 7 FRONTIER LOGISTICS WATER IMPROVEMENTS Engineer's Opinion of Probable Construction Cost 6-May-15 Parts Description Spec# Qty Unit Unit Cost Total Cost CIVIL Division 2-Sitework 0, Remove 12"Water Line 02 41 14 100 LF $16.50 $1,650.00 12" Waterline Lowering 33 05 12 1 EA $7,015.00 $7,015.00 21" Casing By Open Cut 33 05 22 35 LF $107.00 $3,745.00 12" Water Pipe 33 1110, 33 1112 100 LF $58.50 $5,850.00 2" Water Service 33 12 10 2 EA $2,184.84 $4,369.68 10" Gate Valve 33 1220 1 EA $2,044.44 $2,044.44 12N10"Tapping Sleeve&Valve 33 12 25 — 1 EA $4,903.20 $4,903.20 Thrust Blocking 00 00 00 8 CY $255.20 $2,041.60 2" Domestic Water Meter 00 00 00 1 EA $4,957.20 $4,957.20 2" Irrigation Water Meter 00 00 00 2 EA $4,957.20 $9,914.40 Sukal -2, A"'O To,"t"16/111 0 20 40 80 120 < GRAPHIC SCALE IN FEET m , n x p Q (�0 75' ACCESS EASEMENT EXISTING (z— (DOC. NO. D205143846) MANHOLE \ m N s� O -s �sO D - _ _i J p F- ---� 17.5 SANITARY SEWER EASEMENT D (DOC. NO. uj D206040402) APPROXIMATE END OF EXISTING 24" STEEL ENCASEMENT I BEGIN PROPOSED 24" — STEEL ENCASEMENT REMOVE AND REPLACE I EXISTING 10" SANITARY SEWER EVEND OF PROPOSED 24" STEEL ENCASEMENT I I ( I I i �w FRONTIER LOGISTICS SANITARY SEWER 6350 N. CENTRAL EXPWY. SUITE 1000 IMPROVEMENTS Pacheco Koch DALLAS, TX 75206 972.235.3031 TX REG. ENGINEERING FIRM F-469 RAILHEAD FORT WORTH DALLAS . FORT WORTH . HOUSTON TX REG. SURVEYING FIRM LS-100080-00 LOCATED IN THE CITY OF FORT WORTH DRAWN BY I CHECKED BY SCALE DATE I JOB NVANER TARRANT COUNTY, TEXAS AMS JDJ 1"=40' 05/11/2015 1 1977-14.326 PAGE 2 OF 7 X1,`1 Z \fr woo 1,1,1 �.. p O i� a =M< Z Z 3 aM0 I DNS z �" d 0 !0 (w- �� W 3 u. / Z <OM Z p F O o 02O O W � � N O 90 00Q Q ,,,Q:: W 090 I ��0 V l III Q � II � d o I p � 0 0 ® c M W N 0 WE II oD tO 090 Q o I II I 1 ��o W s o aMa ° v I III N � J�0 o 0 I I I N as(,n- ='N � y=11 W aQ� ��� o i • I I � 0 I I �9° v 3 I I W I I 0W a LJ ' �N° o Z9� _ . o' U UU LLJ ZW — (0 j U � p 3wM IIII Q° WWO I I W ' a I I ZZ w mmo I I� IIIII I M W Z I a � d- Z II o J I �W N U) ON I I =M< I �v~iU 0 0 N I o(� QQ� < U Z Z q w O 0 I I aQ� I I 4.0 0 Cl 0~O II U m W , O Lu I U I FRONTIER LOGISTICS SANITARY SEWER IMPROVEMENTS Engineer's Opinion of Probable Construction Cost 6-May-15 Parts Description Spec# Qty Unit Unit Cost Total Cost CIVIL Division 2 Sitework i Remove Misc Conc Structure 02 41 13 1 LS $1,584.00 $1,584.00 Remove 10" Sewer Line 02 41 14 55 LF $16.50 $907.50 Remove 4' Manhole Riser 02 41 14 7 EA $1,803.00 $12,621.00 Pre-CCTV Inspection 33 01 31 415 LF $2.20 $913.00 Post-CCTV Inspection 33 01 31 415 LF $2.20 $913.00 Manhole Vacuum Testing 330130 7 EA $550.00 $3,850.00 Manhole Adjustment, Minor 33 05 14 7 EA $1,803.00 $12,621.00 24" Casing By Open Cut 33 05 22 55 LF $60.00 $3,300.00 33 11 10, 10" Sewer Pipe 33 31 12, 55 LF $48.40 $2,662.00 33 31 20 7"1�5t dotal $43 0 20 40 80 120 GRAPHIC SCALE IN FEET \ p Q 75' ACCESS EASEMENT ' (DOC. NO. D205143846) 17.5' SANITARY SEWER EASEMENT y (DOC. N0. LL D206040402) 7 37 -�� INSTALL: I CONNECT TO EXISTING - 10' CURB INLET I ° 54" STORM DRAIN _ INSTALL: ° D INSTALL: 24" STORM 124* STORM DRAIN INSTALL: I 48" STORM DRAIN INSTALL: CONNECT TO EXISTING 10' CURB INLET LI 54" STORM DRAIN INSTALL: INSTALL: 48" STORM DRAIN INSTALL I G) 48" STORM DRAIN 45' BEND 0i ID IW FRONTIER LOGISTICS STORM DRAIN Pacheco Koch �D ",- �I'"` °��' SUITE 130Do IMPROVEMENTS DALLAS, TX 75206 972.235.3031 TX REG. ENGINEERING FIRM F-469 RAILHEAD FORT WORTH DALLAS . FORT WORTH . HOUSTON TX REG. SURVEYING FIRM LS-100080-00 LOCATED IN THE CITY OF FORT WORTH DRAWN BY CHECKED BY SCALE DATE JOB NUAWEB TARRANT COUNTY, TEXAS AMS JDJ 1"=40' 05/11/2015 1977-14.326 PAGE 6 OF 7 0 20 40 80 120 — \ 47.5' RAILWAY, UTILITY, & GRAPHIC SCALE IN FEET DRAINAGE EASEMENT. DOC. NO. D205143846 • � N \ 75' ACCESS EASEMENT CONNECT TO Fkjs \ (DOC. N0. D205143846) EXISTING 36" / nNG \ STROM DRAIN STOiQ,� \ WITH WYE \ \ INSTALL: / 1 \ 30' BEND / s INSTALL: 1 36" STORM DRAIN 50' ACCESS EASEMENT \ �\ BY SEPERATE INSTRUMENT `o CONNECT TO EXISTING / 42" STORM DRAIN _ CONNECT TO EXISTING — L 36" STORM DRAIN \ 1 INSTALL: \ 1 42" STORM DRAIN / INSTALL: �- 36" STORM DRAIN INSTALL: 36" STORM DRAIN BY JACK AND BORE \ INSTALL: --{--- \ 42" FLARED HEADWALL INSTALL: 4'X4' EMERGENCY \ OUTFALL STRUCTURE (SEE CFA PLANS FOR DETAILS) INSTALL: 5'X5' PRIMARY OUTFALL STRUCTURE (SEE CFA PLANS FOR DETAILS) FRONTIER LOGISTICS STORM DRAIN Pacheco Koch �D " IMPROVEMENTS ., 'I'R"`7520 °��97' SUITE 23031 100o DALLAS, TX TX 6 2. 5.3 TX REG. ENGINEERING FIRM F-469 RAILHEAD FORT WORTH DALLAS FORTWORTH . HOUSTON IX REG. SURVEYING RRM LS-100080-00 LOCATED IN THE CITY OF FORT WORTH DRAWN BY CHECKED BY SCALE DATE JOB NUAMER TARRANT COUNTY, TEXAS AMS JDJ 1"=40' 05/11/2015 1977-14.326 PAGE 7 OF 7 mmmma FRONTIER LOGISTICS STORM DRAIN IMPROVEMENTS Engineer's Opinion of Probable Construction Cost 6-May-15 Parts Description Spec# Qty Unit Unit Cost Total Cost CIVIL Division 2-Sitework Storm Drain Remove 10' Curb Inlet 02 41 14 2 EA $1,690.00 $3,380.00 Trench Safety 33 05 10 175 LF $0.70 $122.50 Concrete Collar 33 05 17 7 EA $1,690.00 $11,830.00 24" RCP,Class 111 33 41 10 90 LF $66.90 $6,021.00 30" RCP, Class 111 33 41 10 52 LF $81.70 $4,248.40 36" RCP, Class 111 33 41 10 383 LF $110.33 $42,256.39 42" RCP, Class 111 33 41 10 147 LF $150.92 $22,185.24 48" RCP, Class 111 33 41 10 183 LF $195.69 $35,811.27 72" RCP,Class 111 33 41 10 60 LF $392.70 $23,562.00 24" Flared Headwall, 1 pipe 33 49 40 1 EA $2,808.00 $2,808.00 42" Flared Headwall, 1 pipe 334940 - 1 EA $3,846.67 $3,846.67 48" Flared Headwall, 1 pipe 33 49 40 1 EA $4,273.50 $4,273.50 72" Flared Headwall, 1 pipe 33 49 40 1 EA $6,655.00 $6,655.00 10' Curb Inlet 33 49 20 2 EA $3,717.00 $7,434.00 Primary Pond Outfall Structure 00 00 00 1 EA $4,762.00 $4,762.00 Pond Emeregency Overflow Structure 00 00 00 1 EA $3,540.90 $3,540.90 Concrete Cradle 00 00 00 1 EA $6,571.40 $6,571.40 Dewater Pond 00 00 00 1 LS $10,000.00 $10,000.00 S10tot4i !4 , $ 4, 4.0 40 0 20 40 80 120 GRAPHIC SCALE IN FEET � ZQ � p 75' ACCESS EASEMENT Qc (a ( (DOC. NO. D205143846) 17.5' SANITARY SEWER EASEMENT y (DOC. N0. Cn D206040402) 77 v o PROPOSED�- PROPOSED RAIL L-- I– I — ' POSED I 17 '7 0 V 0 '7 D O D 17 0 0 O 17 0 17 17 17 0 1 ' 17 0 17 V 0 17 > I I Iz V) \ I � 3" HMAC TRANSITION w I I FIELD & CAGE PANEL FOR RAIL CROSSING 8" REINFORCED CONCRETE PAVEMENT p p p p p 3,600 PSI WITH #3 BARS ® 24" O.C.E.W. (CLASS "C", 3600 PSI) FRONTIER LOGISTICS PAVEMENT a35o LL N. CE NTRAL EXPWY. IMPROVEMENTS Pacheco Koch DAAS, Tx 75206 972.23sUITE 5.303,1300 TX REG. ENGINEERING FIRM F-469 RAILHEAD FORT WORTH DALLAS . FORT WORTH . HOUSTON TX REG. SURVEYING FIRM LS-10DO80-00 LOCATED IN THE CITY OF FORT WORTH DRAWN BY I CHECKED BY I SCALE DATE JOB NUMBER TARRANT COUNTY, TEXAS AMS JDJ 1'=40' 05/11/2015 1 1977-14.326 PAGE 4 OF 7 0 50 100 200 300 GRAPHIC SCALE IN FEET 75' ACCESS EASEMENT (DOC:-NO. D205143846) RAILWAY, UTILITY, D AGE EASEMENT. -� �• - ti- \ Der N0. D205143846 'r I I- 703 f" 691 sIQ ROCK RIP RAP ° v ' r 10' MAINTENANCE ACCESS ROAD) 1 POND #3 \ ° 17 �, 10' MAINTENANCE ACCESS RAMP D 30' PERMANENT WATER 15' SANITARY SEWER EASEMENT ° \ MAIN EASEMENT (DOC. NO. D206040414) 17 (DOC. NO. D20433663) o 691 ;, - -- O q4EMP 8" REINFORCED CONCRETE PAVEMENT 0 0 0 3,500 PSI WITH #3 BARS 0 18" O.C.E.W. FRONTIER LOGISTICS PAVEMENT e N CENTRAL EXPWY. IMPROVEMENTS Pacheco Koch oALLLL„S,. ><, ��zos 97�2�.�03,suITE 1000 TX REG. ENGINEERING FIRM F-469 RAILHEAD FORT WORTH DALLAS . FORT WORTH . HOUSTON TX REG. SURVEYING FIRM LS-100080-00 LOCATED IN THE CITY OF FORT WORTH DRAWN BY I CHECKED BY SCALE I DATE JOB NUMBER TARRANT COUNTY, TEXAS AMS JDJ 1"=40' 05/11/2015 1977-14.326 PAGE 5 OF 7 FRONTIER LOGISTICS PAVING & GRADING IMPROVEMENTS Engineer's Opinion of Probable Construction Cost 6-May-15 Parts Description Spec# Qty Unit Unit Cost Total Cost CIVIL Division 2-Sitework 7777 77, 7 Railroad Coordination 013513 1 LS $1,000.00 $1,000.00 Railroad Flagmen 013513 12 WD $350.00 $4,200.00 Remove Conc Pvmt 02 41 15 717 SY $8.00 $5,736.00 Site Clearing 31 10 00 1 LS $15,376.00 $15,376.00 Unclassified Excavation by Plan 3123 16 7400 CY $1.60 $11,840.00 Medium Stone Riprap, dry 313700 945 SY $92.40 $87,318.00 Hydrated Lime 32 11 29 7 TN $170.00 $1,190.00 HMACTransition 321216 1 TN $2,000.00 $2,000.00 8" Conc Pvmt 32 13 13 425 SY $33.00 $14,025.00 6" Conc Curb and Gutter 32 16 13 275 LF $14.00 $3,850.00 Topsoil 32 91 19 380 CY $5.00 $1,900.00 Seeding, Hydromulch 32 91 19 380 CY $1.00 $380.00 Imported Embedment/Backfill, CLSM 33 05 10 56 CY $9.00 $504.00 Traffic Control 34 71 13 1 MC) $4,500.00 $4,500.00 Relocate RR Sign 00 00 00 2 EA $100.00 $200.00 bt t//' ..........