CHANGE ORDER NO. DATE D.O.E.NO. PROJECT NO. FAC PE45/705008/539120
11 August 28,2015 NONE PS46-070460300020 &P266-705300230987
PROJECT DESCRIPTION: CITY SECRETARY CONTRACT NO.
Long Term Solids Dewatering,Processing and Disposal Contract 30908-EIAI
Bio-solids Turbines Landfill TOTAL
Gas
ORIGINAL CONTRACT AMOUNT (1994-2000) C S#20283 $24,857,000 NA NA $ 24,857,000.00
Amendment# 1 (Grit addition) (1997) C S#22657 $ 5,678,532 NA NA $ 5,678,532.00
Amendment#2 (Contract Renewal# 1) (2000—2004) C S#25763 $29,893,086 NA NA $ 29,893,086.00
Amendment#3 (Contract Renewal#2) (2004—2010) C S#30908 $32,407,306 $4,448,585 $9,800,088 $ 46,655,979.00
Amendment#4(Turbine Re-Build) (2008) C S#36404 NA $ 955,000 NA $ 955,000.00
Amendment#5 (Contract Renewal#3) (2010-2015) CS#20283-R3 $35,897,842 $2,942,256 $5,909,178 $ 44,839,276.00
Amendment# 6(Contract Renewal#4) (2015-2020) CS#30908-EIAI $48,704,887 $3,313,110 $8,161,164 $ 67,330,360.16
.................................................................. ..... TOTAL $220,209,233.16
EXTRAS TO DATE (Change Orders#1 thru#10 and Travel) $ 616,796.08
CREDITS TO DATE........................................... ...................................................................... $ 0.00
CONTRACTAMOUNT..................................................................................................................................................... $220,826,029.24
AMOUNT OF PROPOSED CHANGE ORDER................................................................................................................ $ 95,040.00
REVISED CONTRACT AMOUNT................................................................................................................................... $220,921,069.24
ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS.......................................................................................... $ 0.00
REMAINING FUNDS AVAILABLE FOR CHANGE ORDER........................................................................................ $ 0.00
IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL:
Remove existing truck scale, including foundation, at the Sludge Only Landfill Site and install truck scale foundation and new truck
scale including road base and electrical/instrumentation to existing scale house. Itemized costs associated with the project are attached.
Ir
ga ir1,
9fi r
p
TOTAL COST FOR CHANGE ORDER $ 95,040.00
The�cornpl"eti'mi date for this the contact will remain at March 31,2020. (NO ADDITIONAL TIME in Change Order#11)
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction
and represents payment in full(both in time and money)for all costs arising out of,or incidental to,the Change Order.
ORIGINAL CONTRACTTIME ADDITIONAL APPROVED TIME TO DATE APPROVED CONTRACTTIME TO DATE ADDITIONALTIME FOR THIS CHANGE ORDER
1825 calendar days 7302 calendar days 9,127 calendar days 0 Days
CONTRACTOR DATE FIELD ENGINEER DATE
Renda Environmental Inc.
Steven L Nutter,Water Dept./Village Cr 1E
g 'r �. .. -e > ' '" DATE
MANAGER/CONST.SERVICES. c,.*^ DA -",
ffebaaht�trl(Buster)Fichera,°A t. Water Director
DIRECTOWCONTRACTING DEPT. �,y."^^J !�'� �l9 C, ATTORN Y 1 7 "(""�Y pd p'm DATE
/'
DATE
John Carman, Water Di ctor
ASSISTANT CITY MANAGER DA '�� COUNCIL �` DATE
NCIL ACTION(IF REQUI )'°
Jesus(Jay)Chapa PROVED O DISAPPRO 8 ❑
OTHER
..
OFFICIAL. RECORD
T. " ) j )j
g City Secretary
RENDA
Owkwo ENVIRONMENTAL
July 10, 2015
5eiavash Mir
Water Department
City of Fort Worth
1000 Throckmorton St.
Fort Worth,TX 76102
Re:Scale Replacement
Dear Mr. Mir:
As stated in previous correspondence the scale at the dewatering facility is in need of
replacement. Below is a list of all costs associated with removing the old scale,Inserting
a new one in its place, and connecting the new scale to the computer system.
Cost Items:
J.P. Bowlin Quote: $78,480
Road Base for Temp Ramps: $1,500
Loader to set base (4 hours): $340
labor(4 hours): $80
Update Hardware&Software: $10-00
Subtotal: $86,400
10%QH&P: $8,640
Total: $95,040
Sincerely,
Ben Davis, Environmental Program Manager
Attached:JP Bowfin Quotation
CC: Buster Fichera
David Townsend
File
I
2501 GREENBELT ROAD — FORT WORTH,TEXAS 761187606 N 811.571.9391 FAX 811571.6788
www.rendaeovironniontal.com
J.P. aa�
8Wu{ona to Measure ay
$NV4 tot
J.P. Bowlin Co., LLC Estimate
P.O. Box 123500
Fort Worth,Tx 76121.3500 Page 1 of 1
817.332.8116
817.332.2145 Date Number
6/16/2016 88089
Bill To Address: WorklShlp Address:
Renda Environmental Renda Environmental
Attn:Accounts Payable Eric Valdez
2601 Greenbelt Road 2601 Greenbelt Road
Fort Worth,TX 76118 Fort Worth,TX 76118
ii
i
Customer Phone: 817 571-9391
Agreement# PO# Terms Due Date Sales Rep w0#
Net 30 46/16/2016 Billy E.Vaughn
Item Description Quantity Price Amount
THU92390 Thurman Portable Steel Deck Truck Scale 70'x 10' 1.00 $42,453.00 $42,453.00
240,0001b 90K CLC
THUB8636 RUB RAIL KIT 70' 1.00 $2,695.00 $2,695.00
PRODUCT& Manholes for Cleaning 3.00 $805.00 $2,415.00
SUPPLIES
RLK101230 Rice Lake Weight indicator 7201 1.00 $995.00 $995.00
RLK76850 Rice Lake REMOTE DISPLAY 4"LASERLIGHT 1.00 $1,395.00 $1,395.00
RLK72691 EL-144 COMM CABLE 2-WIRE 100' 1.00 $75.00 $75.00
PRODUCT& Load Cell Cable 50.00 $1.00 $50.00
SUPPLIES
INSTALLATION Remove Old Scale&Install New Scale&Calibration Old 1.00 $01600.00 $6,600.00
Scale To Remain on site(Road Base,PVC From Scale To
Scale House Not Included.)
FREIGHT Freight from Factory(Estimate Only) 1.00 $3,202.00 $3,202.00
OUTSIDE LABOR Crane Rental 2 Trip Unload New Scale&Set in Place& 2.00 $600.00 $1,200.00
COST Remove&Install on New Foundation
OUTSIDE RENTAL Crane Rental to Remove Old Scale 2nd Trip to Move New 1.00 $5,000.00 $5,000.00
-SALES Scale&Set In Place(Old Scale To Stay On Site)
CONSTRUCTION CONSTRUCTION,FOUNDATION,ETC.Install Concrete 1.00 $12,500.00 $12,600.00
Beams&Cap Approuches To State Specs.Increase Scale
Deck 12"For Cleaning.(ANY PERMITS NEEDED NOT
INCLUDED)
ESTIMATED 113 Down 1/3 Due On Delivery &1/3 Due when Job Is 1.00 $0.00 $0.00
TERMS Complete
Approved by:Billy Vaughn-biliy@lpbowlln.com Subtotal $78,480.00
T:{8171 332.8116x101-F:(817)332-2145
Prices are quoted in U.S.Dollars, Pikes,Terms and conditions based on J.P.Bowlin Co.,LLC's current prko list, Sates Tax $0.00
udess otherwise specified. Specifications subject to change without notice. Quote valid for 70 days,FOB Factory
charges will be applied to the final Invoice.
Total $78,480.00