Loading...
HomeMy WebLinkAboutContract 40121-A7 CONTRACT . � � f AMENDMENT N0. 7 TO CITY SECRETARY CONTRACT W11EIIEWS, the City of Fort Worth (CITY) and RJN Group, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 40121, (the CONTRACT) which was authorized by M&C C-24176 on the 13th day of April, 2010 in the amount of $432,396.00; and WIIERF7AS, the CONTRACT was subsequently revised by: Amendment No. 1 in the amount of $92,009.00 which was authorized by M&C C-24999 on July 12, 2011, Amendment No. 2 in the amount of $21, 600.00 which was administratively authorized on August 30, 2011, Amendment No. 3 in the amount of $23,388 .50 which was administratively authorized on October 14, 2011, Amendment No.4 in the amount of $237, 678.50 which was authorized by M&C C-25433 on February 14, 2012, and Amendment No.S in the amount of $45,750.00 which was administratively authorized on April 8, 2013; Amendment No 6. In the amount of $42, 445.00 which was administratively authorized on May 13, 2014; and WIIERF.AS, the CONTRACT, involves engineering services for the following project: Clear Fork Drainage Basin M-210 Sanitary Sewer Improvements; and WHEREAS, it has become necessary to execute Amendment No.7 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated September 1X, 2015, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $43, 875.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all. work and services shall be an amount of $939,142.00 OFFICIAL RECOA11'11'1'�' Page -1- crnr SECRIE' R" r 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER RON Group, Inc. Jesus J. Chapa HuW M. Kelso Assistant City Manager Principal DATE: DATE: APPROVAL RECOMMENDED: Andrew T. Cronberg, W. E. Assistant Director, Water Department APPROVED AS TO FORM AND LEGALITY: M&C: Date: N/A_ Douglas W. Black Senior Assistant City Attorney QRf ATTEST: 9&t/ y S1 14 INFICIAL RECORD arry Vol 17 Page -2- ri n WWW rJin corn !-ti a;llrvn:�. rrard�ry Mt C74^enu^re,l°iiFa September 17,2015 Mr. Robert Sauceda,P.E. Project Manager Fort Worth Water Department City of Fort Worth 1000 Throckmorton Street Fort Worth,Texas 76102 RE: Revised Contract Amendment No.7 Clear Fork Drainage Basin—M-210 Sanitary Sewer Relocation City Project No. 010222, City Secretary No. 40121 RJN Group File No. 18242500 ATTN: Mr. Sauceda: Please find attached, Revised Contract Amendment No. 7 to the M-210 Sanitary Sewer Relocation Project. This amendment request is seeking to recover labor and expenses associated with the additional project management and engineering services (for final designs, bidding, conformed document preparation and future Part 4 record drawings)provided on the of the Part 4 project from December 2013 through September 2014. Additionally, this amendment includes design and services during construction, including record drawings, for the TRWD requested modifications to the M-210 Part 2, storm sewer drainage outfall into the Clear Fork of the Trinity River. Each of these amendment costs will be discussed in greater detail in the amendment summaries shown below. M-210 PART 4—PROJECTMANAGEMENT, DESIGN, BIDDING AND CONSTRUCTION PHASE SERVICES—EXTRA WORK During the reporting periods noted above,RJN was asked to integrate design plans from three(3) other design engineering entities and produce a comprehensive set of Contract Documents (plans and specifications). The integrated supplemental design plans included the following: 1. Integration of Kimley-Horn and Associates Heritage Park Plaza Water Line design nit IA near the Courthouse downtown. RJN had to coordinate the integration of their plans and bid proposals into the final contractor documents as well as modify standard details included in the specifications to avoid conflicts with their details included on the plan sheets.. 2. Integration of extensive in-house Colonial Parkway Water and Sewer Improvements designs (Unit 113) along Colonial Parkway, Simondale, and Lynncrest Dr. RJN had to coordinate a number of design modifications to these plans to correct conflicts with RJN's proposed M-210 sewer improvements in Part 4 and the actual as-built waterline improvements installed from M-210 Part 3. Additionally, RJN coordinated a number of other plan corrections, including the integration of official Fort Worth Standard Specifications pavement repair details and a utility crossing detail into .p'I"n.co rn C�;rillrrrzaa i ucuar4�+") o ai;hit., the plans. Lastly, RJN produced the bid proposal form and final cost estimate for the City's in-house design plans. 3. Integration of Hamilton Civil Engineering's Colonial Parkway Water and Sewer Improvements designs (Unit 1B) along Wilshire Blvd., Glenco Terrace, and Ward Pkwy. RJN also had to coordinate several bid proposal and plan corrections, including the integration of official Fort Worth Standard Specifications pavement repair details and some other call-out. RJN integrated their bid proposal form into the in-house design bid proposal form for a comprehensive Unit 1 B bid proposal form and merged their cost estimate into a final cost estimate for Unit IB. 4. The integration of these plans required modifications to RJN's plans and specifications in an attempt to avoid posting conflicting information in the contract documents prior to bidding. After advertising the project, several significant concerns were raised by City staff primarily related to the Unit 1B portion of the construction project and RJN was directed to pull the bid documents under Addendum No.1 that was issued. RJN satisfactorily addressed those issues working with the other engineers and re-issued the plans and specification under subsequent addendurns issued(four total)so that the project could be bid and awarded. RJN also produced conformed documents for this project and has budgeted supplemental costs to address record drawings under this amendment request. 5. Preparation of revised storm water outfall design plans to address TRWD & USACE potential erosion concerns at the submerged outfall along the Trinity Clear Fork channel. A summary of RJN's incurred and anticipated staff hours, labor and expenses that are requested for the work items noted above are shown in the table below: Task Description Hours Labor($) Expenses Total Costs No. ($ $ FINAL DESIGN SERVICES: 4.2J M-210 Part 4-FINAL 176 $24,910.00 $ 100.00 $25,010.00 CONTRACT DOCUMENTS MODIFICATIONS addressing the administrative and integration of 3 other sets of utility design projects for bidding Subtotals: 176 $24,910.00 $ 1.00.00 $ 25,010.00 BID PHASE SERVICES: 5.4 Issued 4 Addendums for bidding 26 $ 3,980.00 $ 520.00 $ 4,500.00 and awarding this integrated design project Subtotals: 26 $ 3,980.00 $ 520.00 $ 4,500.00 CONSTRUCTION PHASE SERVICES: 6.111 Preparation of Part 4 Conformed 67 $10,295.00 $ 30.00 $ 10,325.00 Documents; preparation of record drawings; extra site visits for qn ril ttr'a, lnirriac?ft 4PrFVierrt%h'i l technical assistance & public events coordination 6.2 Preparation of Storm Sewer 28 $ 4,010.00 $ 30.00 $ 4,040.00 Outfall Design Plan Modifications and providing SDC's for Part 2. Includes Cost Estimate, Permitting, Technical assistance, Site visits and Preparation of record drawings. Subtotals: 95 $14,305.00 $ 60.00 $ 14,365.00 TOTALS: 297 $43,195.00 $ 680.00 $43,875.00 Therefore, we are requesting Revised Contract Amendment No. 7 to the M-210 Sanitary Sewer Relief Main Agreement in the amount of$43,875.00. After Amendment No. 7, the total M/WBE participation rate on this amended contract is 15.25%. Revised Contract Amendment No. 7 represents approximately a five and a quarter percent(4.90%)increase in the total contract value. For your convenience, a summary of the total project fees are as follows: Contract Item Fee Original Contract Amount $ 432,396.00 Amendment No. 1 $ 92,009.00 Amendment No. 2 $ 21,600.00 Amendment No. 3 $ 23,388.50 Amendment No. 4 $ 237,678.50 Amendment No. 5R $ 45,750.00 Amendment No. 6 $ 42,445.00 Amendment No. 7R $ 43,875.00 Amended Contract Value $ 939,142.00 Please do not hesitate to contact us should you have questions or need any background information concerning this matter. Thank you for your time and consideration. Sincerely, A. AO&-- Chris Brooks,P.E., Senior Project Manager ATTACHMENTS CC: Tony Sholola,P.E.,FWWD,City of Fort Worth Hugh Kelso,Regional Manager-Vice President,RJN Group 1M111111 . Z Ifr ge r a nm W N i N iI1 / / ° M» 1111 N N �N NN� r o� w IS Mss was as I %5/g EEV/ %iii° w FEWNESS — I S S S AS a a M au °yww /,j%////w w^w 1 So p Yi 3 S ° o /�iio%� S its SS o S o 0 o p o 0 S° � op r° e° e° U ^ ^ h ^ v N �m M W y M w ww y wM� pMy ^y» y ww w m ° W 'o w .- oh a Tc ° uE3°<a a° o° Sa c mm E c WHIM og gc o p b q$z�I M 1 a E°`o c F o1 o a E+ c a l l° 2 y 0u I Z°a_ _a oi?qu t f p ¢ 2 fig° » c —e`_m 4o'�s : ang cciSa°�m�n3a°a °o We r / omo ° 01 /E �H LL a m MA lit S cR LL M�F°I � o vi.�mE3 88 yEc ES_o° . k,'ggo ae4"y U � O °°°° _ E w / ° C E'eo'ee oLL_ayEa?.. ° x r x V imp Ric a $ at at "u #;;; u a`m az a 1 3 9 N O 46 11 xriT x 14 M r �. N // e Sig Nil VV/as/ O e; g Now I % SSS S a Sao S fu 4 °s too m N m N N N N a<S MEN e Na N IN Ff o N o c e oa' moa � Soup gN ec3 `m� g° .. n2 l`°blr,a Hit° �,rc z` m € �- m°e@ °n € z e� I M 8s H" s t ea cCEis" � �«� s ° r„ a IM I U U n k]t N p F° I O�JN g s e z° °e89 a i $ aam a amm 'aa' as 2 $ $ 3 $ 8 ag a s .. � � �w m �m ax,', .: o m o Pu m m° v w•wsopaw r ma m w = ®= m o ^ o `a n is m m wm w c w E¢E ¢E F, a :09 g u Q p/p ��ggEg y a s 123128° ° .° a S a m o a ° lob 1 O9 io= � °° pppppppppppppppp ° ppp o i i i r.,, m MEo :�! 00 000 000000 0o bo 0 0 0 0 f z � w 00 000 000000 00 00 0 0 0 pp g 11 lilt so 1� � N11a 9 1��1 y w 0.2 m �' yy °g EEEEE EE? @. �Uaaaaaaa b o p m o ^ o b b q._m w byy nw vNi v. °qy oy y y y y _ccccc ccc w n y o o m � _ y y 'q wy °c EEEEE EE 2 m� pT�Y�Y>Y>Y.Tito p eU °"y y m saw w m N y N m w y 0 O W civil 1111 w at° ° ; b w b is v z a w o a roe! - a Ao a o®�' � �•- a� tl t to N ° C ° o€o O c m o c c n a Q¢1 a 3 a 2 q U S o _ aa�o q �m c x N p