Loading...
HomeMy WebLinkAboutContract 36324-A7 AMENDMENT No. 7 y TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Kimley-Horn and Associates, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 36324, (the CONTRACT) which was authorized by M&C C-22555 on the 4th day of December, 2007 in the amount of $251,355 . 00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $138, 730 . 00 which was authorized by M&C C-25028 on July 19, 2011, Amendment No. 2 in the amount of $49, 600 . 00 which was administratively authorized on August 23, 2012 , Amendment No. 3 in the amount of $27 ,000 . 00 which was administratively authorized on December 6, 2012 , Amendment No. 4 in the amount of $48,300 . 00 which was administratively authorized on July 24, 2013, Amendment No.5 in the amount of $41, 700 . 00 which was administratively authorized on January 6, 2014 and Amendment No. 6 in the amount of $35,000 . 00 which was administratively authorized on February 26, 2015; and WHEREAS, the CONTRACT involves engineering services for the following project: Water and Sanitary Sewer Relocations for State Highway 121T, Part 3; and ER , it has become necessary to execute Amendment No. 7 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated September 17, 2015, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $38,300 . 00 . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work`°`"`"and` " services performed under the Contract, as amended, so RECORD COT Y +a Page -1- E a 9 v %."('� "T"X total fee paid by the City for all work and services shall be an amount of $629, 985.00 . 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: ENGINEER City of Fort Worth Kimley-Horn and Associates,Inc. Jesus J. Chapa Glenn A Gary, P.E. Assistant City Manager Senior Vice-President DATE: DATE: APPROVAL RECOMMENDED: Andrew T. Cronber . P.E. Assistant Directo!)Water Department APPROVED AS TO FORM AND LEGALITY: M&C: N/A Date: N/A I'll wzm�a Douglas W. Black Senior Assistant City Attorney ATTEST: Mary 571,, Y e 1.,, � � f �� g,'C� ,4��e& n ` f �y V�� r. 7,kHm RE'V)H'D� 7r City S, crettry CITY R,,,t,,T H, TX Page i >> September 17, 2015 Mr. Liam Conlon Project Manager City of Fort Worth Water Department 1000 Throckmorton Street Fort Worth, TX 76102 Re: Water and Sanitary Sewer Relocations for SH-121T (Southwest Parkway), Part 3 Additional Services—Amendment No. 7 KHA No. 061018049 City Project No. 00899 Dear Liam: This is an amendment to a contract between Kimley-Horn and Associates, Inc. and the City of Fort Worth ("the City") dated 12-19-2007 referred to herein as the"Contract". This amendment will provide for Additional Construction Phase Services as indicated below: ITT 1 (CONSTRUCTION PHASE SERVICES): $38,300Kimley-born (Water$0, Serer$38,300) Kimley-Horn will provide additional construction phase services as defined in the Contract Exhibit"A- 1" Part D—Construction Phase Services including: • Review up to 25 Additional Shop Drawings • Attend up to 12 Additional Progress Meetings and Prepare Meeting Notes • Perform up to 10 Additional Site Observations • Provide clarification for up to 4 Contractor Requests for Information (RFI) We recommend that the City increase the budget by$38,300 for these additional services. From the additional services listed above, the recommended breakdown for water and sewer services is as follows: Description Water Sewer Total Item 1 —Construction Phase $38,300 $0 $38,300 Services Total $38,300 $0 $38,300 Kimley)))Horn Page 2 The following table summarizes the fee per Work Phase: Total Work Phase Water Fee Sewer Fee Fee 31 $0 $0 $0 32 $0 $0 $0 33 $38,300 $0 $38,300 51 $0 $0 $0 Total $38,300 $0 $38,300 The following table summarizes our recommended budget revisions by Item (please see attached Fee Breakdown for an hourly breakdown of each item): Description Item 1 Total Pre-Engineering $0 $0 Conceptual Engineering $0 $0 Preliminary Construction $0 $0 Plans Final Construction Plans $0 $0 Pre-Construction $0 $0 Services Construction Phase $38,300 $38,300 Services Total $38,300 $38,300 Kimley)))Horn Page 3 The following table summarizes our recommended budget revisions and shows the revised contract amount: Original Amend Amend Amend Amend Amend Amend Amend Revised Description Fee No. 1 No. 2 No. 3 No. 4 No. 5 No. 6 No. 7 Contract Pre-Engineering $35,900 $35,400 $5,200 $4,800 $81,300 Conceptual $62,980 $8,900 $71,880 Engineering Preliminary Construction $49,665 $32,130 $81,795 Plans Final Construction $85,010 $46,300 $44,400 $43,200 $ 18,600 $237,510 Plans Pre- Construction $3,600 $5,000 $ 5,100 $13,700 Services Construction $14,200 $11,000 $22,200 $23,100 $35,000 $38,300 $143,800 Phase Services Total Project $251,355 $138,730 $49,600 $27,000 $48,300 $41,700 $35,000 $38,300 $629,985 No additional M/WBE participation is proposed for this amendment Total Contract Description Per Amend No. 6 Contract Amount $591,685 Total Contract M/WBE $93,840 Total Contract M/WBE 15.8% Percentage MIMMMI=oil= KimlepMorn Page 4 The following table summarizes our revisions to the water and sanitary sewer design fees: Description Original Amend. Amend. Amend. Amend. Amend. Amend. Amend. Total No. 1 No.2 No.3 No.4 No. 5 No.6 No.7 Water $133,377 $108,695 $36,300 $0 $0 $0 $0 $38,300 $316,672 Sewer $117,978 $30,035 $1.3,300 $27,000 $48,300 $41,700 $35,000 $0 $313,313 We appreciate the opportunity to be of continued service to the City. Please contact us if we need to provide any further information. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC Glenn A. Gary, P.E. Sr. Vice President GAGljck 1\FTwFPD1\Data\ProiectlFlW U6lilies1061018049%PPP%Amendment-61KHA-SH121 Pt25 Amend 6-Ur-Updated.doc AN