HomeMy WebLinkAboutContract 47068 0 MET
CON TR
AR
Developer and Project Information Cover Sheet:
Developer Company Name: Copper Creek Partners, LP
Address, State,Zip Code: 5055 Keller Springs Rd. Suite 545
Phone: 214-914-9809 E-Mail: fspj87 @gmail.com
Authorized Signatory/Title: Fred Phillips/Vice President
Project Name and Brief Description: Cooper Creek Phase 1
Project Location: West of the FM 156 &Heritage Trace Parkway Intersection
Plat Case No.: FP-15-010 Plat Name: Copper Creek
Mapsco: Council District: 7 City Project No : 02572
CFA: 2015-053 DOE: 7452
To be complete y staff.
Received by: 1 - ate:
F,P
rARY
COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
WHEREAS, the undersigned Developer ("Developer") desires to make certain
specific improvements as described below and on the exhibits attached hereto
("Improvements") related to a project generally described as Copper Creek Phase 1
("Project") within the City of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the
Improvements or Project; and
WHEREAS, any future City participation in this CFA is subject to the availability
of City funds and approval by the Fort Worth City Council and shall be memorialized as an
amendment to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community
Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements and the
Project.
NOW, THEREFORE,For and in consideration of the covenants and
conditions contained herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth, as amended, is
hereby incorporated into this Agreement as if copied herein verbatim.
Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder and to cause all
contractors hired by Developer to comply with the Policy in connection with
the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section II, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the Improvements. Developer acknowledges `'i`ia' the"""".saii
`E� ,i
acceptance process requires the Developer's contractor(s) o su�mii an
Cat"
affidavit of bills paid signed by its contractor and consent of surety signed
by its surety to ensure the contractor has paid any sub-contractors and
suppliers in full. Additionally, the contractor must also provide in writing
that the contractor has been paid in full by Developer for all the services
provided under their contract.
C. Developer agrees to cause the construction of the Improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City-
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof: Water (A) X Sewer
(A-1) X , Paving(B) X_', Storm Drain(B-1')X Street Lights & Signs (C)
E. The Developer shall award all contracts for the construction of the
Improvements in accordance with Section II, paragraph 7 of the Policy and the
contracts shall be administered in conformance with paragraph 8, Section II, of
the Policy.
F. For all Improvements included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being prequalified, insured,
licensed and bonded to do work in public streets and/or to perform
water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the Improvements, and a maintenance bond
in the name of the City for one hundred percent (100%) of the contract price
of the Improvements valid for a period of two (2) years from the date of
final acceptance insuring the maintenance and repair of the constructed
infrastructure during the term of the maintenance bond. All bonds to be
furnished before work is commenced and to meet the requirements of
3
Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer-awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the Certificate of Insurance
(ACORD or other state-approved form) supplied by the contractor's
insurance provider and bound in the construction contract book.
iv. To require its contractor to give at least 48 hours' advance notice of intent
to commence construction to the City's Construction Services Division so
that City inspection personnel will be available; to require the contractor to
allow the construction to be subject to inspection at any and all times by
City inspection forces, to not install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City in order to schedule a Pre-Construction Meeting. The
submittal should occur no less than 10 working days prior to the desired
date of the meeting. No construction will commence without a City-issued
Notice to Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department.
G. Developer shall provide, at its expense, all engineering drawings and
documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the Improvements contemplated herein.
1. City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the
4
community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the
City harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to any
property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said
Developer, his contractors, subcontractors, officers, agents or employees,
or in consequence of any failure to properly safeguard the work, or on
account of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub-contractors, officers, agents or
employees, whether or not such injuries, death or damages are caused, in
whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees
M. Developer will further require its contractors to indemnify, defend and
hold harmless the City, its officers, agents and employees from and against
any and all claims, suits or causes of action of any nature whatsoever,
whether real or asserted, brought for or on account of any injuries or
damages to persons or property, including death, resulting from, or in any
way connected with, the construction of the infrastructure contemplated
herein, whether or not such injuries, death or damages are caused, in
whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees Further, Developer will require its
contractors to indemnify, and hold harmless the City for any losses,
5
damages, costs or expenses suffered by the City or caused as a result of said
contractor's failure to complete the work and construct the improvements
in a good and workmanlike manner, free from defects, in conformance with
the Policy, and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the
Improvements, Developer will assign to the City a non-exclusive right to
enforce the contracts entered into by the Developer with its contractor along
with an assignment of all warranties given by the contractor, whether express or
implied. Further, Developer agrees that all contracts with any contractor shall
include provisions granting to the City the right to enforce such contracts as an
express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years,
provided, however, if construction of the Improvements has started within
the two year period, the developer may request that the CFA be extended
for one additional year.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
6
agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements
if at the end of two (2) years from the date of this Agreement (and any
extension period) the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the Improvements or to cause the payment
of costs for construction of same before the expiration of two (2) years if
the Developer breaches this Agreement, becomes insolvent or fails to pay
costs of construction and the financial guarantee is not a Completion
Agreement. If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of
supplies and/or construction, the contractors and/or suppliers may put a lien
upon the property which is the subject of the Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
7
Cost Summary Sheet
Project Name: Copper Creek Phase 1
CFA No.: 2015-053 DOE No.: 7452
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $1,114,253
2.Sewer Construction $763,622.30
Water and Sewer Construction Total $ 1,877,875.28
B. TPW Construction
1.Street $ 3,293,758.00'e
2.Storm Drain $ 1,912,225.00:
3.Street Lights Installed by Developer $ 350,297.50
TPW Construction Cost Total $ 5,556,280.50
Total Construction Cost(excluding the fees): $ 7,434,155.78
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 37,557.51
D. Water/Sewer Material Testing Fee(2%) $ 37,557.51
Sub-Total for Water Construction Fees $ 75,115.02
E. TPW Inspection Fee(4%) $ 208,239.32
F. TPW Material Testing(2%) $ 104,119.66
G. Street Light Inspsection Cost $ 14,011.90
H. Street Signs Installation Cost $ 6,125.00
Sub-Total for TPW Construction Fees $ 332,495.88
Total Construction Fees: $ 407,610.90
Financial Guarantee Options Choose one Amount Mark c ce
Bond=100% $ 7,434,155.78
Completion Agreement=100%/Holds Plat $ 7,434,155.78
Cash Escrow Water/Sanitary Sewer-125% $ 2,347,344.10
Cash Escrow Paving/Storm Drain=125% $ 6,945,350.63
Letter of Credit=125%w/2 r expiration period $ 9,292,694.73
8
IN TESTIMONY WHEREOF,the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate ea o the City affixed,and said Developer elo p
er has executed t s�r
instrument in quadruplicate, at Fort Worth Texas this da y
t t
of '" .,�„�m -----
,20
CITY OF FORT WORTH m Recommended by:
Water Department Tra sportation&Public Works Department
�.
Wendy Chi abulal, EMBA,P.E. Do s . Wiersig, P.E.
Development Engineering Manager Dir
Approved as to Form &Legality: Approved by City Manager's Office
Douglas W. Black Jesus J. Chapa
Assistant City Attorney Assistant City Manager
M&C No. /
Date: }
ry V1
yy6pQ69�C/Y3 'e°
ATTEST: "
a J. s
City Secft
ATTEST: DEVELOPER: Copper Creek Partners,LP
Signature Signature:
(Print)Name: 1.. d ° 1 , Print Name: Fred P lips
Title:Vice Preside t
OFF('CIIAL fit( COR(,fit'
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included Attachment
® Location Map
® Exhibit A: Water Improvements
® Water Estimate
® Exhibit A-1: Sewer Improvements
® Sewer Estimate
® Exhibit B: Paving Improvements
® Paving Estimate
® Exhibit B-1: Storm Drain Improvements
® Storm Drain Estimate
® Exhibit C: Street Lights and Signs Improvements
® Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)
10
BONDS RANCH ROAD
z
0
cn
I-
n,
III
�0 1LRITAGE TRACE �((��
—MAY 3 5 W
LO Lij I -
(/> Q
LL-
-� 05 =-
C� J
z
PH. 1 HARMON
m
BAILEY — BOSWELL
VICIN11Y MAP
(NOT TO SCALE)
0
N
C
7
COPPER C
PHASE H
Y
U1LOCA 1l D ll N
C�
OF FORT W®RTH9 TEXAS
0
U
0
n OWNED/DEVELOPED BY:. PRir.irtllRED BY:
s
m
Copper Creek Partners, LP c
a5055 KELLER SPRINGS ROAD, SUITE 545 CML ENGINEERS—PLANNERS—SURVEYORS
ADDISON, TEXAS 75001 2405 Mustang DrNe,Grape44ne,Texas 76051
(214 ) 914-9809 Metro(e17)3294373
L0
L7
0
w U UNE9 2015
COPPER CREEK EEK
PHASE H s �`
WA�y�ir+.�n� GRAPHIC SCALE 1-300'
1C.Lil.1lltlll[Dll It t{a vY
Cil 0 300 600 900
LEGEND
� —w PROPOSED WATER LINE
— — — — EXISTING WATER LINE
6
Q
7 PROPOSED FIRE HYDRANT ASSEMBLY
�
-6- EXISTING FlRE HYDRANT ASSEMBLY
9 PROPOSED GATE VALVE
EXISTING GATE VALVE
U 1X ® PROPOSED REDUCER VALVE
AMENITY CENTER A�
PRIVATE OPEN SPACE G�
'O BLOCK L 19 20
3 ?0 21 22 e QC ALL WATER LINES SHOWN
0 2 hr 23 25 26 UNLESS
24 F OTHERWISE INDICATED
� 27 28
5 4 o p 29
, �Q3 2
Al
1 c F AgCF
4J 10 Ql
9
B
7 QCK
8 6 W
5 U
8 4 W BLOCK E
7 3 0 LOT 48X
6 2 PRIVATE
OPEN SPACE
5 •y 1 FLOODPLAIN
�4 p EASEMENT
3 SAX OPEN
2 SPACE
WATER KEY MAP sx
BLOCK RR
OPEN
SPACE
PREPARIED BY:
® G'00DVnNl '
MrARLHALL
CIVIL ENGINEERS-PLANNERS-SURVEYORS
2405 Mustang Drive,Grapevine,Texas 78051
ED
Matra(817)329-4373
PAGE i OF 4
E:\10591 - Copper Creek\Plans\Copper Creek Phase 1.pro 10 Jun 2015
COPPER CREEK N
W- E
PHASE
WATER
S
}��p'{v[v7�(7[A�7ll�7�+ GRAPHIC SCALE 1`=300'
1L'el]Lllllllmll ll "All/1
WATER KEYMAP L11 0 300 600 900
. ,_ILLL
EE
I I
LEGEND
-W PROPOSED WATER LINE
- -l- - EXISTING WATER LINE
- - PROPOSED FIRE HYDRANT ASSEMBLY
EXISTING FIRE HYDRANT ASSEMBLY
�� ►/ PROPOSED GATE VALVE
47 D4 EXISTING GATE VALVE
'�!Y
n 45 46 , PROPOSED REDUCER VALVE
8 44 90�
7 43 Oo
6 1 42 Fti NOTE
Y Sp ALL WATER LINES SHOWN
2 41 q ARE 8' IN DIAMETER UNLESS
27
3 26
2 25
3 4 5 3938 40 �F 0.THERWISE INDICATED.
1 L��yy
y' �
1 1 24 6
2 23 7 36
23 3 22 B 8 35�
4
22 21 5 O 21 �' 9 34�
20 6 20 �' 10 33�
19 B 7 19 11 32
1 8 18 12 31
17 ` 9 17 13 30
16 10 16
14
15 11 15
14 12 1
6 0 21 22 13 A(+�� 1
17 18 19 � �P PREPARED Ems:
O �
15 16 l GOODWINI
hd&RLE L L 9
�"-
CIVIL ENGINEERS-PLANNERS-SURVEYORS
N 2405 Mustang Drive,GrepwAne,Texas 76051
Metro(817)3294379
PAGE 2 OF 4
E 1\10591 — Copper Creek\Plans\Copper Creek Phase 1.pro 10 Jun 2015
N
COPPER CRE EK w E
PHASE ff s
RYA=
llll "Alt GRAPHIC SCALE 1-300'
0 300 600 900
LEGEND
W PROPOSED WATER LINE
EXISTING WATER LINE 26 5
PROPOSED FIRE HYDRANT ASSEMBLY 24
EXISTING FIRE HYDRANT ASSEMBLY 23 O
20 2 'f-
►t PROPOSED GATE VALVE 19 2 1'
21 18 20 19
D4 EXISTING GATE VALVE 22 17 18
� PROPOSED REDUCER VALVE 23� � 24 16 15 17
[?` 12 25 14 16
11 26 13 15 N�
NOTE 13 10
ALL WATER LINES SHOWN 9 28 12 14
ARE 8' IN DIAMETER UNLESS 1 4 11 O 13 c�
OTHERWISE INDICATED. \�(F 15 8 7 29�10 2 12 Z
2 22 16 p 6 x,30 g 11
23 17 31 8 10 m
CK LL 18 5 m 32 7 9
4
2 1 Z 19 3 34 6 8
5 7
20 2 35 4
1 1 6
36
3
2 19 N 37 2 5
4 3 16 1 'PFF 1 4
5 2
1 1 3 22 2
6 4 21
14 20 2 1 1
13 6 �' 19
7 18 3
1
1121 � 11 65
9 6 40 2
1 7 4
1 9 8 �6 5
12 7
10
WATER KEYMAP 11 8
9
10
11
-1 q=ri
II
PREPARED BY:
® (GOODWINI
KARS H(AU a
CML ENGINEERS—PLANNERS—SURVEYORS
2405 Mustang Drive,Grapevine,Taxes 78051
o �
Metro(817)3294378
PAGE 3 OF 4
E:\10591 — Copper Creek\Plans\Copper Creek Phase 1.pro 10 Jun 2015
COPPER CREEK "
PHASE R
WATER p s
+/ �r AT GRAPHIC SCALE 1-300'
SJ/ 1p\cylriniS[D 1IPft•ss/r si
���G 1L:A\1L1ullID1L 1t L7� 0 300 600 900
&'"
��C �8 /•• .c LEGEND
PROPOSED WATER LINE
F — — — — EXISTING WATER LINE
PROPOSED FIRE HYDRANT ASSEMBLY
N' 1 ST�e d EXISTING FIRE HYDRANT ASSEMBLY
�T F FQ�ccep�:, ' p�TS�•� PROPOSED GATE VALVE
EXISTING GATE VALVE
S / PROPOSED REDUCER VALVE
�o T�6.wC••.
NOTE,
/ 1Q• ALL WATER LINES SHOWN
ARE 8' IN DIAMETER UNLESS
C._ OTHERWISE INDICATED.
c
F�
.o FS TS
0
WATER KEYMAP
c��
�Y
II °
If
PREPARED BY:
® GOO Dom!
MARSH s
CML ENGINEERS—PLANNERS—SURVEYORS
2405 Mustang Wm,Grapevine,Texas 78051
e Q
Metro(817)3294373
PAGE 4 OF 4
E:\10591 — Copper Creek\Plans\Copper Creek Phase 1.pro 10 Jun 2015
COPPER CREEK ti
PHASE f s
Q 6 SEWER GRAPHIC SCALE 1'=300'
Ur 7 C IPT"A-111
0 300 600 900
� 8
9
10 1X OOp�9/yF
AMENITY CENTER
PRIVATE OPEN SPACE
'O BLOCK L
19 20
e3 �0 21 22
2 28
W
c �v p 24 F 25 26 27
5 4 A F A 28 29
HOC M 1 c F pgCF
k 10
9
NOTE, B k
ALL SANITARY SEWER LINES 7 O6� OT
SHOWN ARE 8' IN DIAMETER 8
UNLESS OTHERWISE INDICATED.
5
8 4
Q
7 3
6
2
LEGEND 5 �, 1
�— PROPOSED SANITARY SEWER LINE �4
— — — EXISTING SANITARY SEWER LINE 3 2 50k OPEN
PROPOSED SANITARY SEWER MANHOLE 1 SPACE
QS EXISTING SANITARY SEWER MANHOLE 1jX
Q LOT 74X
PRIVATE
SEWER KEYMAP OPEN SPACE
FLOODPLAIN
EASEMENT
EX.
s 21" S.S.
•S
n
II ��
PREPARED BY:
GOOD!
I HA a
CIVIL ENGINEERS—PLANNERS—SURVEYORS
2405 Mustang Drive,Grapevine,Texas 78051
O Metro(817)329-4373
PAGE 1 OF 3
E;\10591 — Copper Creek\Plans\Copper Creek Phase 1.pro 10 Jun 2015
COPPER CREEK N
D W E
PHASE f S
SEWER
t�,tU'i[�nt76�rc A m¶n GRAPHIC SCALE 1'=300'
1li,��AAUUfLllllllLlllIDID Lit Il 0 300 600 900
47
Y 46 \
45
8 44 \9�+
7 43 00
16 1 42
b�
- 2 41 40 \9�F`
�4 � 27 3 39
3 26 4 �, 38 \� — EX.
2 25 5 ` 37 21" S.S.
NOTE 1 1 2 24 23 6 36
ALL SANITARY SEWER LINES 23 3 22 7
SHOWN ARE 8' IN DIAMETER 8 35
UNLESS OTHERWISE INDICATED. 22
9 34�
20 5 6 20 0 10 33� N
19 7 P 19 11 32
18 �' 8 18 12 31
LEGEND 17 y 9 17 4 30
S— PROPOSED SANITARY SEWER LINE 16 10 16 14
— — — EXISTING SANITARY SEWER LINE 15 q
11 15E
PROPOSED SANITARY SEWER MANHOLE
14 12
QS EXISTING SANITARY SEWER MANHOLE 22 13
SEWER KEYMAP
II
II
PREIPARED;ate:
GOODW T$
M69LHA .1L
CIVIL ENGINEERS—PLANNERS—SURVEYORS
2465 Mustang Drive,Grapevine,Texas 78051
ED Matm(817)329-4373
PAGE 2 OF 3
E:\10591 — Copper Creek\Plans\Copper Creek Phase 1.pro 10 Jun 2015
N
COPPER 3 C REEK W E
PHASE H S
SEWER
lull "A— rr GRAPHIC SCALE 1'=300'
1 0 300 600 900
26 5 \ \
24
23 O
20 2 EX.
19 2 r1 \21" S.S.
21 18 20 19
22 17
23 16 18 \
24 15 17
12 25 14 16
11 26 15 N
10 27 13 2 1 14
13 0
9
14 28 11 p 13 m
15 87 29 X10 12 ZI
NOTE
30 U'
ALL SANITARY SEWER LINES 2 22 6 c-
SHOWN 11 m'
SHOWN ARE 8' IN DIAMETER CK LL 18 5 rr1 32 8 109
UNLESS OTHERWISE INDICATED.
2 1
4 33 6
Z 19 3 34 5 8
20 2 35 7 I
4 6
LEGEND 1 1 36 3
2 19 �7 2 4 5
�— PROPOSED SANITARY SEWER LINE 3
4 18 1 1
EXISTING SANITARY SEWER LINE 1 3 2 3
PROPOSED SANITARY SEWER MANHOLE 6 5 1 22 2
QS EXISTING SANITARY SEWER MANHOLE 7 Q in 5
6 4 20 1 1 1
�' 19 2
12 7 18 4 3 1
11 9 16 5 O 2 (a�
6 3
1 1 7 4
1
1 8
SEWER KEYMAP 12 10g 7
11 8
9 �)
10
11 ��
u
ii
PREIP BY:
G OODWIN&
� M( HALL
CIVIL ENGINEERS—PLANNERS—SURVEYORS
2405 Mustang Drive,Grapevine,Texas 78051
Metro(817)3294373
PAGE 3 OF 3
E t\10591 — Copper Creek\Plans\Copper Creek Phase 1.pro 10 Jun 2015
COPPER CREEK
PHASE H
s �
VS ll1Nn-.�-,lS GRAPHIC SCALE 1°=300'
7pt
0 300 600 900
6 15
7 O 16 17 L K
v
0 8 19 20 2
m 9
4
10
IDEWALK 1X
AMENITY CENTER
PRIVATE OPEN SPACE
BLOCK L ° 19 20 21
3 "yl�,p� 4' 22 6 pC
SIDEWALK 23 24 E
RO F� 25
ft 26 27
28 4'
S 4 ° p 29 SIDEWALK
3 F N
L0CI M 1 C pqC�
10
9
STREETS KEYMA.P i X. e
0
8 7 B
5
W
4 BLOCK E
7 °K LOT 48X
C� 41, PRIVATE
6 2 OPEN SPACE
FLOODPLAIN
4 p° EASEMENT
� 3
® 2 5pX OPEN
1 SPACE
>Sk °
O
BLOCK RR
OPEN
SPACE EX.
LEGEND PAVEMENT
10' °
PROPOSED 29' B-B ROADWAY SIDEWALK
w/ 50' R.O.W.
6' CONCRETE PAVING
e �
0 0 0 0 0 0 0 0 0❑ PROPOSED 37' B-B ROADWAY j
❑000000000❑ w/ 60' R.O.W.
8' CONCRETE PAVING PREPARED BY-
PROPOSED VARIABLE WIDTH l300DWW
B—B ROADWAY w/ 130' R.0.W. j�� ]L a
10' CONCRETE PAVING CIVIL ENGINEERS—PLANNERS—SURVEYORS
2405 Mustang Drive,Grapevine,Texas 76051
4' SIDEWALK BY HOMEBUILDER Metro(817)329-4373
SIDEWALK PER THIS CONTRACT
PAGE 1 OF 3
E:\10591 — Copper Creek\Plans\Copper Creek Phase 1.pro 10 Jun 2015
'r
PHASE COPPER CREEK N
W E
STIElETS
rtTa,n GRAPHIC SCALE 1'=300'
1Oi 0 300 600 900
EX.
STREETS KEYMAP PAVEMENT
10' EX. 4'
SIDEWALK SIDEWALK
cr
> O
b`= 46
45
- 8 44
7 43
6 1 42
10' O
A
SIDEWALK �q 27 2 3 4039 9�F
3 26 q
5 38
2 25
37
1 1 2 24 6
23 � 36
7
23 3 ✓ 22 B 8 35�
4
2� 21 5 O 21 c 9 34'
p 20 6 20 10 33
19 B 7 19 11 32
17 S 9 17 13 30
N. n' 16 10 16
15 14
11 15�
LEGEND 14 12 P V
13
PROPOSED 29' B–B ROADWAY 22 oo'..
w/ 50' R.O.W.
6' CONCRETE PAVING
0 0 0 0 0 0 0 0-0-0-70-1 PROPOSED 37' B–B ROADWAY
❑000000000❑ w/ 60' R.O.W.
8' CONCRETE PAVING PREPARED Ey;
PROPOSED VARIABLE WIDTH (Ci00DW !
B–B ROADWAY w/ 130' R.0.W. HALj[, a
10' CONCRETE PAVING CML ENGINEERS—PLANNERS—SURVEYORS
4' SIDEWALK BY HOMEBUILDER 2405 Mustang Drive,Grapevine,rexea 7eost
Metro(817)3294373
SIDEWALK PER THIS CONTRACT
PAGE 2 OF 3
E 1\10591 – Copper Creek\Plans\Copper Creek Phase 1.pro 10 Jun 2015
N
COPPER CREEK W E
PHASvE H S
7p�tpBll� GRAPHIC SCALE 1-300'
lC'eL111C7LILIDILIl PP7m fP
lID 0 300 600 900
STREETS KEYAMP 4
SIDEWALK
26 5
24
i 3 O
20 2 F
1g 2
21 1817 20 19
II 5&4 22 16 3 18
II 2
24 15 17
® 12 25 14 15
11 26 13 15 N
1 10 27 12 14
3 14 g o
28 11 Q 13 m
87 2g X10 2 12
2 22 16 0 6 30 c g 11 v
23 L 17 5 31 8 10 m
18 m32 7 g
4 4'
2 1 z 1g 3 33 6 e SIDEWALK
34 5 7
20 2 35 4
1 B/� 36 3 5
2 j/ 5
3 2 4
1
5 1 1 3 2 22 2F
2 3
8 7. 1415 5 20
13 6 19
7 18 3 1
12 8 1 4 Y
IN, 11 g 16 5 O 2 Q
1 1 6 3 Y
1 7 4
12 g 6
10 7 r`
11 8
9
a,voe>e 10 !�
LEGEND 11
PROPOSED 29' B—B ROADWAY
w/ 50' R.O.W.
6' CONCRETE PAVING
0 0 0 0 0 0 E-070-07 PROPOSED 37' B—B ROADWAY
0000000000E w/ 60' R.O.W.
8' CONCRETE PAVING PREPARED BY:
PROPOSED VARIABLE WIDTH GOODWWI
B—B ROADWAY w/ 130' R.O.W.
hLARS
a
10' CONCRETE PAVING CML ENGINEERS—PLANNERS—SURVEYORS
2405 Mustang Drive,Grapevine,Texas 7851
4' SIDEWALK BY HOMEBUILDER Metro(e17)329-4973
SIDEWALK PER THIS CONTRACT
PAGE 3 OF 3
E+\10591 — Copper Creek\Plans\Copper Creek Phase I.pro 10 Jun 2015
COPPER CREEK � ti
PHASE N s
STORM� 7j¶�[�7 D GRAPHIC SCALE 1'=300'
11iL1\1C1L111LD1111 YP1rye¶Pi
l� lL 0 300 600 900
NOTE:
6 15 ALL STORM DRAIN LATERALS
7 16 17 L SHOWN ARE 21' IN DIAMETER
8 18 19 20 2 UNLESS OTHERWISE INDICATED.
O
10 O 1X
AMENITY CENTER Q
PRIVATE OPEN SPACE lP
p�BLOCK L .e�A
3 ?0 Tc
4 � 2
��� A, HOC 2 1 0
10
9 R9
10' 7eOCk
INLETS 8 6 O tU
15' INL T U
INLET 5
2 BLOCK E
8 4 LOT 48X
7 3 PRIVATE
2
STORMI.DRAINKEYMAP 6 5 ti ETS �� OPEN
EASEMENTN
� �4 �
3 2 Kok INLETS
1 42'R P.
SX
INLET 10
u
.A INLETS
II BLOCK RR
®
160' SPAN OPEN
BRIDGE �� 1
9 �
LEGEND
PREPARED BY-
PROPOSED STORM DRAIN LINE GOODV NI
�.�IIAA a
CML ENGINEERS—PLANNERS S——S SURVEYORS
PROPOSED STORM DRAIN INLET 2405 Mustang Drive,Grapevine,Texas 76051
Metro(617)3294379
�— PROPOSED STORM DRAIN HEADWALL
PAGE 1 OF 3
E1\10591 — Copper Creek\Plans\Copper Creek Phase I.pro 10 Jun 2015
f
COPPER CREEK , E N
PHASE f w�S
S T®RM IDIAIl\T`
ev�e1�tv GRAPHIC SCALE i'=300'
A 0 300 600 900
NOTE
STO�Dn A 77YTKE�T ALL STORM DRAIN LATERALS
l'Ci[1� SHOWN ARE 21' IN DIAMETER
UNLESS OTHERWISE INDICATED.
i
I1
II
46
45
Y� 8 44 9�+
43
A
42 F
1 2 41 40 So
`Y 27 3
9
� 4
�( 26 2 38
'y 2 25 5 �c` 37
1 1 2 24 23 6 7 36
23 3 ✓ 22 � 8 35�
22 4 21
g 34
C�21 20 5 6 `0 20 G' 10 33'
10, 19 7 19 11 32
INLETS 18 8 18 12 31
24'P.C.P. X17 X g 17 1 30
10, 10 1 ETS
INLETS 16
27'P.C.P. 15 1 ETS 165 14 30'lR.C.P.
4 E C o, 15' INLET
14 12 36 2� 2
10' 22 13 2� 2
INLETS
o 2ti 2 e\/C�'vY
ti �r Y
LEGEND PREPARED BY.
PROPOSED STORM DRAIN LINE C4OODVENI
M(S-PLA NEM-S
CIVIL ENGINEERS—PLANNERS—SURVEYORS
PROPOSED STORM DRAIN INLET 2405 Mustang Drive,Grapevine,Texas 78051
Metro(817)329-4373
�— PROPOSED STORM DRAIN HEADWALL
PAGE 2 OF 3
E,\10591 — Copper Creek\Plans\Copper Creek Phase 1.pro 10 Jun 2015
L� N
COPPER PER C�RR 1 K W E
PHASE N S
STORM DRAIN
STOR�(.(�/1`D Y�`. T E A IT IoIB—A0 GRAPHIC SCALE 1-300'
�/� 0 300 600 900
Q' NOTE-
ALL STORM DRAIN LATERALS
SHOWN ARE 21' IN DIAMETER
• � UNLESS OTHERWISE INDICATED.
�OV
2 10
II 2 2
tI V 2 O�
® �Q' 20
2� 5' 19 2 1T
IN S 18 20 19
21 22 17 18
2 16
c� 24 15 17
o F-1 � 12 25 14 16
U 1110 26 5
7 13 1 N�
13 9 ,L 12 14 0
14 28 11 p 13
7 m
L 15 8 29 0 10 2 12 Z
�
2 22 16 0 6 30 `9 11 10
23 17 31 g 10 m INLETS
m 32
LL 18 4 33 7 9
2 1 m 19 3 34 6 8 \\
4S0/y �0 2 1 35 6 C�&Z G ,
1 R1t� 36 3 EX. 36"
2O 1915, 37 2 5 � R.C.P.
4 3 181 1 1 4 ��' 7—BARBELL
L 5 1 3 2 22 A 3 12 k10 R.C.B.
1
21 2
FUTURE 8 7 1415 6 5 19 0 2 '1 oA 10' INLETS
10' INLETS 13 3
FUTURE 24'R.C.P. 1 12 8 7 1 18 q 47 48'R.C.P.
24'R.C.P.0 g 16 5 0 3 2
INLETS 1 1 7 6 4
1 g 5 8
. 9 07 6 7
10' 10 8 F6 1 Y
INLETS 1 9 o y
10
10 11
INLETS 3
PEA BY:
LEGEND
PROPOSED STORM DRAIN LINE GOODWWI
h11�SNNERS IL, ;
CIVIL ENGINEERS—PLANNERS—SURVEYORS
PROPOSED STORM DRAIN INLET 2405 Mustang DNe,Grapevine,Texas 76051
Metro(617)5294M
�— PROPOSED STORM DRAIN HEADWALL
PAGE 3 OF 3
E!\10591 — Copper Creek\Plans\Copper Creek Phase I.pro 10 Jun 2015
COPPER CREEK 4- ti
sH SEH c
SllG LIGHTS
�tt GRAPHIC SCALE 1'=300'
1L'.AUC1u11mll1t H�ry
\4' 0 300 600 900
c
6 p 15
v� 7 15 17 18819 C K
� 8 � 20
m9
Q-
10 1X � F
AMENITY CENTER ��
PRIVATE OPEN SPACE
,o BLOCK L
e3 �O
5 4 �2
M
10
9
Bo �
STREET LIGHTS KEYAI" 6 6K °
5
W
T 8 4 BLOCK E
i 7 3 LOT 48X
6� 2 PRIVATE
OPEN SPACE
1 �J FLOODPLAIN
EASEMENT
3 SOX OPEN
2 1 SPACE
SX
I
BLOCK RR
o OPEN
SPACE
LEGEND
PVC Conduit 7
Transformer on PAD
®—e- Pole Assembly 100w HPS PRBPARED BY.
DuG1 Light Standard (CuOODWINI
HA,LL 9
Hand Ho% CIVIL ENGINEERS—PLANNERS—SURVEYORS
2405 Mustang Drive,Grapevine,Texas 780.51
Metro(817)329-4373
CoFW Ground Box
PAGE 1 OF 3
E:\10591 — Copper Creek\Plans\Copper Creek Phase 1.pro 10 Jun 2015
COPPER CREEK N
PD�LT� ,� W E
al ASE .!�(� S
STREET LIGHTS
HITS
F,=] O'C" GRAPHIC SCALE 1-300'
0 300 600 900
STREET LIGHTS KEYMAP
II
Ii rb
®
47
° O 7 46
45
G 8 44 9
,(` c 43
`y
1 42 O�
2 41 q0 So
27 3 399�F
3 25 4 8
37 36
2 25 5
1 1 24 6
2 23 7
23 3 22 � 8 35�
22�1 4 5 X021 G'g 34��
`0 6 20 10 33�
X19 7 19 11 32
18 8 18 12 31
217 y 9 17 13 30
16 10 16
14
15
11 15�
14 12
22 13 00Gp 2 2�O 1
'� ti222� 2 pA,�J�
LEGEND CI.
�
ti
PVC Conduit
Transformer on PAD
—�- Pole Assembly /OOw HPS PREPARED BY.
Dual Light Standard (GOOD INI
MARSHALL
Hand Hole CML ENGINEERS—PLANNERS—SURVEYORS
2405 Mustang Drive,Grapevine,Texas 78051
Metro(817)32MS73
CoFW Ground Box
PAGE 2 OF 3
E:\10591 — Copper Creek\Plans\Copper Creek Phase I.pro 10 Jun 2015
�G� N
COPPER CREEK W E
P ASE H S
,9 =LMHTS
1L:.11�1[Ili 11 eeC" 6flAPHIC SCALE 1'=300'
�L.• 0 300 600 900
STREET LIGHTS KEYM"
26 5
i 24
3
O
20 19 2 21 11
21 17 18 20 1
u 22
23 16 1
1
24 15
® 12 25 14 1
116 13 1
10 12 �1
13 14 9 28 °
7 9 0
O 10 12 Z
2 22 1 0 WU c,9 11 q
23 1 7,6 31 8 10
K LL � 18 Z 4 m32 �'7 9
2 1 Z19 3 3 q 6 8
5 7
20 2
35 q
1 1 36 3 6
'W 2 1 C 37
2
3 gg 9 1
S q 1 1 3, 22 3
Q-6 15 q 21 1 2
v 7 14 5� 20 2
8 13 O 6 19 3
12 87� 18
1 5q g
16 6 Q
10 15 7 4
1 8
12 y
1 9 OC'
1 07
9 �✓
LEGEND
PVC Conduit y
aTransformer on PAD
®--�- Pole Assembly 100w HPS PREPARED
Dual L ighl Standard G�D�'�
L a
Hand Hole CIVIL ENGINEERS—PLANNERS—SURVEYORS
2405 Mustang DrW,Grapevine,Tema 76051
Metro(817)3294379
CoFW Ground Box
PAGB 3 OF 3
E;\10591 — Copper Creek\Plans\Copper Creek Phase I.pro 10 Jun 2015
COPPER CREEK Ey
PHASE H s fi
S°ll?,MT,91GN,' GRAPHIC SCALE A'=300'
ILL?KIMrr'PC-It'
0 300 600 900
Q 6 Q 15 16
7 17 18 C
19 '
� B � � 20 2
m 9 ^_
100 1X
AMENITY CENTER
PRIVATE OPEN SPACE
BLOCK L
e3
5 4 O F
JAI roc M 1 c
Q 10
9
B p �
8 7 6K
5
8 n 4 BLOCK E
7 3 LOT 48X
6 w PRIVATE
2 J OPEN SPACE
� ti a 1 E N
STR�:T SIGNS KEY AP 4 EASEMENT
3 2 5�X OPEN
1 SPACE
USX
i
BLOCK RR
OPEN
u
' SPACE
u
®
1+
PREPARED BY:
GOODWI I
LEGEND R/fl ARS]EI.1L
CIVIL ENGINEERS—PLANNERS—SURVEYORS
STREET NAME SIGN 2405 Mustang Ddve,Grapevine,Tomas 78051
Metro(817)3294379
PAGE 1 OF 3
E:\10591 — Copper Creek\Plans\Copper Creek Phase 1.pro 10 Jun 2015
COPPER CREEK
PHASE w E
P �
S
STREET SHGNS
I vf�o�ii GRAPHIC SCALE 1'=300'
�L
0 300 600 900
STREET SIGNS KEYl►MAP
1
47
° 03 46
45
G 8 44 919
,( 7 43
42 oo
6
5 2 41
4 `p 27 3 40 9�F
3 26 4 y�38
2 25 5
1 1 24 6 ,fO37
2 23 7 3
23 3 4 22 e 8 35
22
n21 5 021 9 34
20 6 20 G 10 33
19 7 19 11 32
18 8 18 12 31
.y�17 '/ 9 17 13 30
16 10 16
14
15 11 15�
14 12
22 X13
2�
Q�
P
PRBPARIBD ESC:
G00DV9N1
LEGEND h IARSHALL
CML ENGINEERS—PLANNERS—SURVEYORS
STREET NAME SIGN 2405 Mustang Drive,Grapevine,Texas 78051
Metro(817)3294M
PAGE 2 OF 3
E 1\10591 - Copper Creek\Plans\Copper Creek Phase 1.pro 10 Jun 2015
N
COPPER CREEK W E
PHAb S
STRM IC SIGN
E���VIC— 11 GPAPHIC SCALE 1'=300'
�t
0 300 600 900
STREET SIGNS KEYM"
_ 26 5
2 23 p
s 22 'F
20
19 21 '
gr 22' 21 1817 2019
I I
nU 23 16 18
24 15 17
® 12 25 14 16
11 X26 13 15 N�
13 10g X27 12 X14 0
�� 14 28 11 13
O 15 87 29 X10 �,12
2 22 16 0 6 —30 `g 11
23 17 31 8 10 c--1
K LL 018 �5 m32 7 9
4
2 1 m19 3 34 6 8
5 7
20 2 35
4
1 B/�� 36 3 6
37
19 2 5
3 p 18 1 4
-9 1 1 2 22 0 1 3
�\ 3 2
�)) 6� 21 15 � 4 1
7 20 1 f1,
8 � 1C� 6 5� 18 19 2
U
7 3 �yV
12 8 17 44 21 Y
16 5 3
10 15
14 7
13 8 5
12 10 9 76
8
11 9
101
PREPARED Big:
GOODWHN1
LEGEND hd ARSH AL L a
CIVIL ENGINEERS—PLANNERS—SURVEYORS
STREET NAME SIGN Mustang DrIv%Grapevine,Texas 7605,
Metro(817)329-9373
PAGE 3 OF 3
E:\10591 – Copper Creek\Plans\Copper Creek Phase 1.pro 10 Jun 2015
183.73928941 09/29/15 08:55 Pg 1 0 1
Mike S Paving
G
SERVING THE DFW METROPLEX
"Seal Now or Pave Later!"
Seal Coating Crack Filling
Saw Cut Patching Pot Hole Repair
Remove & Replace New Asphalt
Overlays Striping
BANKS -CHURCHES -ROAD WORK- SHOPPING MALLS
TRAILER PARKS -PLAYGROUNDS -RESIDENTIAL
DRIVEWAYS - SCHOOLS -APARTMENTS - HOTELS
All Work Guaranteed — Fast Service — Free Estimates
8 -.a MM -
1j =v760=vj1'q' U" 70
-------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------
ACT NOW - SAVE BIG!
BOOK ANY OF OUR SERVICES BY OCT 9TH
FOR $500 DISCOUNT
If you have received this in error, call 855-595-3761.
Addendums 1-2&3 received
RE: Copper Creek Phase 1
Item No. Quantity Unit Description Unit Price Extension
Water Improvements
1 17,644 L.F. 8"Water Line $ 24.25 $ 427,867.00
2 1,689 L.F. 10"Water Line $ 31.70 $ 53,541.30
3 64 Ea. 8"Gate Valve&Valve Box $ 1,240.00 $ 79,360.00
4 3 Ea. 10"Gate Valve&Valve Box $ 1,850.00 $ 5,550.00
5 18 Ea.! Sid.Fire Hydrant Assembly w/6"Gate Valve& $ 3,635.00 $ 65,430.00
6 277 Ea. 1"Water Services $ 1,050.00 $ 290,850.00
7 4 Ea. 1''Y."Water Services $ 1,470.00 $ 5,880.00
8 55 L.F. 10"Water Line Bore $ 320.00 $ 17,600.00
9 55 L.F. 18"Steel Casing Pipe $ 78.00 $ 4,290.00
10 5 Ton C.I.R.T.Fittings $ 1,000.00 $ 5,400.00
11 1 Ea. Connect to Existing 8"W.L.Stub-Out $ 1,000.00 $ 1,000.00
12 1 Ea. 16"x10"Tapping Sleeve&Valve $ 8,000.00 $ 8,000.00
13 17,644 L.F. Trench Safety $ 0.10 $ 1,764.40
14 17,644 L.F. Water Test $ 0.50 $ 8,822.00
$ 975,354.70
Off Site Water Improvements
1 87 LF 8"Water Line $ 26.00 $ 2,262.00
2 1,574 LF I Meter Line $ 33.25 $ 52,335.50
3 5 EA 8"Gate Valve&Box $ 1,240.00 $ 6,200.00
4 251 LF 10"Water Line Bore $ 350.00 $ 87,850.00
5 251 LF 18"Steel Casing $ 80.00 $ 20,080.00
6 2 TN CIRT Fittings $ 1,000.00 $ 2,000.00
7 1 EA Connect to Ex.8"WL Stub,Out $ 1,000.00 $ 1,000.00
8 1,661 LF Trench Safety $ 0.10 $ 166.10
9 1,661 LF Water Test $ 0.50 �$— 830.50
is 172,724.10
Sanitary Sewer
1 13,844 L.F. 8"SDR-26 PVC $ 27.00 $ 373,788.00
2 149 L.F. Concrete Encasement $ 30.00 $ 4,470.00
3 2 Ea. Core Into Existing S.S.M.H.w/8"S.S. $ 1,500.00 $ 3,000.00
4 53 Ea. Std.4'Dia.S.S.M.H. $ 2,500.00 $ 132,500.00
5 1 Ea. Construct Std.4'Dia.S .S.M.H.on Ex.21"S.S. $ 4,500.00 $ 4,500.00
6 128 V.F. Extra Depth 4'Dia.S.S.M.H. $ 150.00 $ 19,200.00
7 560 L.F. Cement Stabilized Backfill $ 20.00 $ 11,200.00
8 309 Ea. SDR-26 Sewer Services $ 575.00 $ 177,675.00
9 13,844 L.F. Trench Safety < $ 010 $ 1,384.40
10 13,844 L.F. TV&Test Sanitary Sewer Lie $ 1.00 $ 13,844.00
$ 741,561.40
Storm Sewer
1 46 Ea. 10'Depressed Curb Inlet $ 3,000.00 $ 138,000.00
2 5 Ea. 15'Depressed Curb Inlet $ 3,400.00 $ 17,000.00
3 2 Ea. 20'Depressed Curb Inlet $ 4,100.00 $ 8,200.00
4 1 Ea. 24"Sloped End Headwall $ 1,500.00 $ 1,500.00
5 1 Ea. 27"Sloped End Headwall $ 1,900.00 $ 1,900.00
6 2 Ea. 36"Sloped End Headwall $ 3,400.00 $ 6,800.00
7 1 Ea. 42"Sloped End Headwall $ 4,625.00 $ 4,625.00
8 1 Ea. 48"Sloped End Headwall $ 5,150.00 $ 5,150.00
9 1 Ea. Double 30736"Sloped End Headwall $ 6,825.00 $ 6,825.00
10 1,467 L.F. 21"Class III R.C.P. $ 52.00 $ 76,284.00
11 1,580 L.F. 24"Class III R.C.P. $ 58.00 $ 91,640.00
12 1,062 L.F. 27"Class III R.C.P. $ 65.00 $ 69,030.00
13 1,550 L.F. 30"Class III R.C.P. $ 74.00 $ 114,700.00
14 884 L.F. 36"Class III R.C.P. $ 96.00 $ 84,864.00
15 118 L.F. 39"Class III R.C.P. $ 118.00 $ 13,924.00
16 286 L.F. 42"Class III R.C.P. $ 133.00 $ 38,038.00
17 328 L.F. 48"Class III R.C.P. $ 170.00 $ 55,760.00
18 1,318 S.Y. Flexamat $ 7.00 $ 9,226.00
19 1 Ea. End&Plug 24" $ 225.00 $ 225.00
20 1 Ea. Connect to Existing 36" $ 500.00 $ 500.00
21 1 Ea. Remove 36"Headwall $ 1,000.00 $ 1,000.00
22 34 L.F. Remove 36"R.C.P. $ 25.00 $ 850.00
23 1 L.S. Box Culvert WingWalls/Headwalls/Railing $ 500,000.00 $ 500,000.00
24 1 LS 4"Ledge on Box Culverts for future Fagade $ 7,500.00 $ 7,500.00
25 1 LS Stamp and Stain Box culvert $ 50,000.00 $ 50,000.00
26 104 L.F. 7 Barrel 12'x 10'and 1 Barrel 8'x8'Box $ 5,100.00 $ 530,400.00
27 9 Ea. 4'x 4'S.D.M.H. $ 3,665.00 $ 32,985.00
28 3 Ea. 5'x 5'S.D.M.H. $ 6,400.00 $ 19,200.00
29 2 Ea. 5 Sided S.D.M.H. $ 10,000.00 $ 20,000.00
$ 1,906,126.00
Paving Improvements
1 9,397 S.Y. 10"Concrete Pavement $ 43.00 $ 404,071.00
2 10,072 S.Y. 8"Lime Treated Subgrade(Heritage Trace $ 2.50 $ 25,180.00
3 181 Ton Lime at 36Ibs/S.Y.(Heritage Trace Parkway) $ 170.00 $ 30,821.00
4 16,350 S.Y. 8"Concrete Pavement $ 34.00 $ 555,900.00
5 17,320 S.Y. 8"Lime Treated Subgrade(Collector Road) $ 2.50 $ 43,300.00
6 312 Ton Lime at 36Ibs/S.Y.(Collector Road) $ 165.00 $ 51,447.00
7 37,810 S.Y. 6"Concrete Pavement $ 27.00 $ 1,020,870.00
8 40,115 S.Y. 6"Lime Treated Subgrade $ 2.00 $ 80,230.00
9 602 Ton Lime at 30lbs/S.Y.(Residential) $ 165.00 $ 99,280.50
10 112 L.F. Saw Cut Ex.Asphalt Pavement $ 6.00 $ 672.00
11 80 Ea. Barrier Free Ramps $ 1,100.00 $ 88,000.00
12 2,173 L.F. 4'Concrete Sidewalk $ 14.00 $ 30,422.00
13 3,430 L.F. 10'Concrete Sidewalk $ 3200 $ 109,760.00
14 54 L.F. Connect to Existing Concrete Header $ 16.00 $ 864.00
15 572 L.F. Concrete Header $ 10.00 $ 5,720.00
16 1 L.S. Pavement Marking $ - $ -
17 1 L.S. Traffic Control $ 5,500.00 $ 5,500.00
18 572 L.F. End of Road Barricades $ 71.00 $ 40,612.00
$ 2,592,649.50
Miscellaneous
1 1 LS Payment/Performance Bonds $ 85,800.00 $ 85,800.00
2 1 LF 2"Sch 40 Sleeves $ 15.00 $ 15.00
3 1 LF 4"Sch 40 Sleeves $ 20.00 $ 20.00
4 1 LF 6"Sch 40 Sleeves $ 25.00 $ 25.00
r$ 85,860.00
Street Lights
1 70 EA Single LED LTG Fixt-ATBO-30BLED-E70 $ 2,100.00 $ 147,000.00
2 7 EA Single LED LTG Fixt-ATB2-60BLED-E70 $ 3,050.00 $ 21,350.00
3 9,117 LF 2"Sch.40 pvc conduit(Trench) $ 5.95 $ 54,246.15
4 70 EA RDWY ILLUM Foundation-Type 1 $ 900.00 $ 63,000.00
5 7 EA RDWY ILLUM Foundation-Type 3 $ 1,050.00 $ 7,350.00
6 22,668 LF #6 XHHW Alum Electric Conductor $ 1.25 $ 28,335.00
7 1,562 LF #2/2/24 Quadplex Alum Elec Conductor $ 2.95 $ 4,607.90
8 1 EA Electric Service Pedestal-CoFW STD.(if $ 5,500.00 $ 5,500.00
9 1,560 LF 3"Sch.80 pvc conduit&pull box $ 9.95 $ 15,522.00
$ 346,911.05
Bridge Items
1 1 LS Bonds $ 8,860.00 $ 8,860.00
2 80 LF Drilled Shafts 24" $ 108.00 $ 8,640.00
3 280 LF Drilled Shafts 36" $ 210.00 $ 58,800.00
4 52 CY CL.C Cone.Abutment $ 955.00 $ 49,660.00
5 11 CY CL.C Cone Bent Columns(36") $ 955.00 $ 10,027.50
6 20 CY CL.C Cone Bents $ 955.00 $ 19,004.50
7 87 CY CL.S Cone Approach Slab $ 490.00 $ 42,385.00
8 7,360 SF Reinf Cone Slab $ 19.60 $ 144,256.00
9 954 LF Prestr Cone Graders TY TX34 $ 140.00 $ 133,560.00
10 2,222 SF CL.S Cone Sidewalk(Bridge&Appro slab) $ 9.30 $ 20,664.60
11 178 LF CL.S Cone Curb(Bridge&Appro slab) $ 25.75 $ 4,583.50
12 356 LF Rail TY T221 $ 185.00 $ 65,860.00
13 30 CY RipRap Concrete 5" $ 495.00 $ 14,850.00
14 84 LF Sealed Expansion Joint SEJ-A $ 88.00 $ 7,392.00
15 720 LF 3"pvc Conduits $ 12.50 $ 9,000.00
rT — 597,543.10
TOTAL QUOTE: $ 7,418,729.85