HomeMy WebLinkAboutContract 29458 AMENDMENT NO. 3 STATE OF TEXAS $ CITY SECRETARY CONTRACT NO. ► `-�1�� (No M&C Needed) COUNTY OF TARRANT $ WHEREAS, the City of Fort Worth (City) and TranSystems Corporation Consultants, (Engineer) made and entered into City Secretary Contract No. 28436, (the Contract) which was authorized by the City Council by M&C C-19457 on the 4th day of February 2002, and subsequently revised by two previous amendments; and WHEREAS, the Contract involves engineering services for the following project: Engineering contract for the design of Berry Street Streetscape Project from Waits Avenue to Forest Park Blvd. WHEREAS, it has become necessary to execute Amendment No. 3 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated December 10, 2003, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $20, 285 . 00 . 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $307, 631.20. 3 . All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the ,)( day of 2003 , ' in Fort Worth, Tarrant County, Texas. ATT I I ,,I Contract Authorization Gloria Pear on, City Secretary Date APPROVAL RECOMMENDED: APPROVED: ARIml r1 -)/--\V is A. Douglas Rademaker, P.E. arc A. *t Director, Department of Assistant City Manager Engineering TRANSYSTEMS CORPORATION CONSULTANTS ENGINEER By: �0- �7 Name: Joseph Masterson, P.E. a Vice-President 500 West Seventh Street, Suite 600 Fort Worth, TX 76102 APPROVED AS TO FORM AND LEGALITY: Gary Steinberger Assistant City Attorney WEEY Taaiv5VsTEA4s ADDENDUM 3 c o N S U L T A N T S SUMMARY OF DESIGN FEE December 10, 2003 Mike Domenech Department of Engineering City of Fort Worth 1000 Throckmorton Street Fort Worth, Texas 76102 RE: Berry Street Reconstruction, Waits to Forest Park Change in Scope —Additional Fee Dear Mr. Domenech, As per the Cities request to expand the scope of the project, we are requesting an additional fee of $20,285.00 dollars. TranSystems is preparing this amendment for additional fee to the original contract. The additional work is outlined below: 1. Sidewalk reconstruction for the south sidewalk of Berry Street between McCart and Forest Park that is a continuation of the current design for the project limits. 2. Lighting and Electrical design for the south side of Berry Street between McCart and Forest Park that is a continuation of the current design for the project limits. 3. Hardscape design for the south sidewalk of Berry Street between McCart and Forest Park that is a continuation of the current design including planting areas, sidewalk pavers design crosswalks, signage and wayfinding. 4. Landscape design for the south sidewalk of Berry Street between McCart and Forest Park that is a continuation of the current design. Original Contract Fee $262,376.00 Executed Amendment No. 1 (Geotech) $ 6,600.00 Executed Amendment No. 2 (SUE) $ 18,370.20 Proposed Amendment No. 3 $ 20,285.00 TOTAL $307,631.20 1P, r� 500 W. 7th Street, Suite 600, Postal Unit #20 • Fort Worth, TX 76102-4773 • Tel: (817) 339-8950 • FaRu(6-'�''#� 3Cp2 '>¢, If you have any questions or require additional information please give me a call. Sincerely, TranSyster} s Perp ration Consultants Ra UI Pena-fl1 P E. Principal 1 ADDITIONAL FEE- ADDENDUM 3 Berry Street Reconstruction DOE # 4227 Cost Breakdown by Task 12/10/2003 Hours Hourly Rate Total Roadway/PM Tech 60 $ 65.00 $ 3,900.00 El 18 $ 90.00 $ 1,620.00 E3 4 $ 115.00 $ 460.00 TDLR $ 1,865.00 PM $ 1,500.00 SUB-TOTAL $ 9,345.00 Hardscape Principal-in-Charge 1 61 $ 195.00 $ 1,170.00 Staff Designer 501 $ 105.00 $ 5,250.00 SUB-TOTAL $ 6,420.00 Electrical Design Engineer 16 $ 140.00 $ 2,240.00 Junior Designer 81 $ 95.00 $ 760.00 SUB-TOTAL $ 3,000.00 Landscape Irrigation revision $ 460.00 Design Development Principal-in-Charge 2 $ 100.00 $ 200.00 Staff Designer 5 $ 60.00 1 $ 300.00 Construction Document Principal-in-Charge 7$ 100.00 $ 200.00 Staff Designer 61 $ 60.00 1 $ 360.00 SUB-TOTAL $ 1,520.00 TOTAL $20,285.00 G:\FW03\0058\ProjectMgmt\Contracts\addendum 3\additional fee breakdown.As FORT WORTH MEMORANDUM TO: A. Douglas Rademaker, Director DOE and Marc A. Ott, Assistant City Manager FROM: Miguel A. Domenech, P.E. DATE: December 18, 2003 RE: DESIGN FEE AMENDMENT NO. 3, BERRY STREET STREETSCAPE PROJECT FROM WAITS AVENUE TO FOREST PARK, DOE NO. 4227, T&PW POJECT NO. C115-020115023226 The proposed amendment will allow TranSystems Corporation Consultants to provide addi- tional engineering services on the project as requested by the City. During the course of design, the City requested that TranSystems Corporation Consultants augment the limits of the project to include the south side of Berry Street between McCart and Forest Park. The original limits included the northern portion of Berry Street but ex- cluded the southern segment due to budgetary limitations. Amendment No. 1 provided compensation for the services of a professional geotechnical en- gineering firm to carry out subsurface testing and make recommendations to aid in the design of the new pavement on Berry Street, in compliance with the Texas Department of Transpor- tation. Amendment No. 2 allowed TranSystems to hire a sub-surface utility contractor to determine the exact location of underground utilities in order to avoid costly delays and additional costs associated with encountering conflicts during the construction phase. TranSystems Corporation Consultants has requested a fee of $20,285.00 for the additional services to be provided thereby increasing the contract fee from $287,346.20 to $307,631.20. I believe this fee is fair and reasonable for the additional services to be provided. Please authorize this additional design fee by your signatures on the attached contract amendment form. cc: Tony Sholola, P.E., Program Manager, DOE Christa Sharpe, Manager, T&PW T&PW File ; ENGINEERING DEPARTMENT � THE CITY OF FORT WORTH * 1000 THROCKMORTON STREET * FORT WORTH, TEXAS 76102-6,311 (817) 610 - (817) 871-7941 * FAx(817) 871-7854 CL Printed on recycled paper