HomeMy WebLinkAboutIR 7536 INFORMAL REPORT TO CITY COUNCIL MEMBERS ry No. 7536 �+'p T`"` July 23, 1991 e fo)? To the Mayor and Members of the City Council N y uAs }rEXPy Subject: EMERGENCY REPAIRS TO THE NORTH MAIN STREET BRIDGE 1077 On May 17, 1991 , a portion of a cantilever concrete bracket supporting the sidewalk beam on the North Main Street Bridge broke off . Walker Construction Company was retained, on an emergency procurement basis , to install a temporary support in place of the broken bracket . An engineering inspection was made of the bridge as well as a study of the original 1912 construction drawings . There was no visible evidence of any steel reinforcing in the broken portion of the concrete bracket . In order to analyze the safety of the bridge and determine if there were other areas where reinforcing steel was not installed, it was felt necessary to X-Ray the remaining concrete brackets . On July 2 , 1991 (MEPC C-12931 ) , the City Council authorized the City Manager to execute City Secretary Contract No . 18547 with Longview Inspection, Inc. , for a fee not to exceed $31 , 550 for Radiographic (X-Ray) services in order to determine necessary repairs to the North Main Street Bridge. X-Ray tests included in Stage 1 of City Secretary Contract No. 18547, consisting of twelve tests of the most suspected structural concrete brackets , were performed on Monday night , July 8th and Tuesday night , July 9th. The results of the tests were very positive. Staff feels the Bridge is safe for both vehicular and pedestrian traffic and no additional X-Ray testing is needed. Thus , after completion of Stage 1 , at a cost of $2 , 912 , further X-Ray testing was discontinued . Construction plans for repair of the one broken concrete bracket are now being prepared and bids are scheduled to be received on August 8th. This remedial work will be done later this summer . David Ivory City Manager ISSUED BY THE CITY MANAGER RTH, TEXAS