AMENDMENT No. 1
' TO CITY SECRETARY CONTRACT No. 45841
WHEREAS, the City of Fort Worth (CITY) and Tank Industry
Consultants, Inc, (ENGINEER) made and entered into City Secretary
Contract No. 45841, (the CONTRACT) which was authorized by M&C C-26879 on
the 22nd day of July, 2014 in the amount of $148, 500 . 00 ; and
WHEREAS, the CONTRACT involves engineering services for the
following project :
Timberline Elevated Storage Tank Rehabilitation Project; and
WHEREAS, it has become necessary to execute Amendment No. 1 to the
CONTRACT to include an increased scope of work and revised fee .
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
1 .
Article I of the CONTRACT is amended to include the additional
engineering services specified in a proposal dated September 25, 2015, a
copy of which is attached hereto and incorporated herein. The cost to
City for the additional services to be performed by Engineer totals
$28, 938 .21 .
2 .
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $177, 438.21 .
3 .
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect .
r
t r � rrry ,,vr h
rx
1 4
U UK .
TANK
September 2j`2Ul5
CONSULTANTS`"``,"+^A ~TS ChriohophcrHarder,P£.
~^~~^ Bogimcodu8K�aoagnr/\�u(ezPnodnoduu
Fort Worth Water od
77�oYvcm����m��on'� ~�~^^^^^
lud�uopv�,,Indiana 462l4 |8807hruuknu/dooSbo��
317/z71-3180'Phone Fort Worth,Texas 76lO2
3z7/%?1'330o-FAX
RE: Professional Services Associated with the Rehabilitation n/the
2,000,000 Gallon Timberline Elevated Water Storage Tank
Fort Worth,Texas,TIC Ref. |4.l64.S465.0l2
Dear Mr. Bmder:
Plainfield,Illinois
815/556-8S35 7lC`n billings ou this project have exceeded the authorized funding for this eu-
gioco/in�ugrecmeuL This ia�morequests ouao�on6mcnt0o the cu0inecdng
Pittsburgh.Pennsylvania ��*me��inoo�ue the oo�ori�d��i/�.
4/z/z6z-/5o*
El Paso,Texas Our proposal dated May l4,2014 included the estimated billings shown below.
915/790'0790
Billings Estimated Actual
Houston,Texas
281 /�67-3511 Evaluation $ 8,300 $ 8,300.00
Preparation ofI)TS $ 13^000 9,256.51
Bidding Assistance $ 2,400 2,063.67
Contract Administration $25,408 $ 32168107z
Project Representation $94,000 $|25,i94.96
First Anniversary Evaluation $ 5,4O03 $----_<L00
Total thnouabCompletion $148`500/ $177`438.21
�Per Attachment 8»n the contract. AnB did not include the above breakdown.
cSubcontract costs fTmuJamoxDu0tte Engineering and TTI Labs are included boActual
Cvutrmt&diniui,tratinn.
I Service not yet performed.
The contractor was authorized to proceed ou February 23" 2O|5. Rain,cold
temperatures and wind io March,April and May delayed pnnyreso of the work
resultiu-in late completion and unanticipated ovmdiouc work for 7IC`x ouoito
observer. Substantial Completion was required by June 23,2D}4,but the work
was not completed and the tank disinfected until August 26,20|5.
In May 28{5`TIC estimated costs for onuite Project Representation before TIC
had had uo opportunity to evaluate the actual condition of the tank. The Con-
tractor vvodkcdloogorhour»uu6onSuturduys,4nJoeurth:eodnmx&ivmnper-
ooissiootuworkouSon6uyouz000D/lete the project. These extra hours and
days required TIC's observer to be on site longer than estimated or budgeted.
TIC has invoiced $157`581.11 uo date and anticipates invoicing unadditional
$]9,&57.l0 before the First Ann ivemo'yEvaluation. The amooDttobe invoiced
An Owned Company
Christopher Harder,PE Page 2
Fort Worth Water Department September 25,2015
includes a few hours of contract administration for completing minority subcontracting reports and the ma-
jority of our subcontractors' invoiced amounts.
Please approve additional funding of$28,938.21 for Engineering Services on this project.
If you have any questions or need additional information,please contact me.
Sincerely,
Tar -Industry Consulta
f,.
Ray Penny
Manager, Southwest Region
cc Gregory R."Chip"Stein,P.E.—TIC, Indianapolis