Loading...
HomeMy WebLinkAboutOrdinance 5519 c , ORDINANCE NO. AN ORDINANCE DETERMINING THE NECESSITY FOR AND ORDERING AND PROVID- ING FOR THE IMPROVEMENT OF A PORTION OF BISHOP STREET AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS; LETTING CONTRACT TO TEXAS BITULITHIC CO. FOR THE MAKING AND CONSTRUCTION OF SUCH IMPROVEMENTS AND AUTHORIZING ITS EXECUTION; MAKING APPROPRIATIONS FOR THE PURPOSE OF PAYING THE INDEBT- EDNESS THEREBY INCURRED; MAKING PROVISIONS FOR THE LEVYING OF ASSESS- MENTS AGAINST ABUTTING PROPERTIES AND THE OWNERS.THEREOF FOR A PART OF THE COST OF SUCH IMPROVEMENTS AND THE ISSUANCE OF ASSIGNABLE CER- TIFICATES IN EVIDENCE OF SUCH ASSESSMENTS; DIRECTING THE PUBLIC WORKS DIRECTOR OF THE CITY TO PREPARE ESTIMATES; DIRECTING THE CITY SECRETARY TO FILE A NOTICE OF ADOPTION OF THIS ORDINANCE WITH THE COUNTY CLERK OF TARRANT COUNTY, TEXAS; DECLARING THAT THIS ORDINANCE AND ALL SUBSE- QUENT PROCEEDINGS RELATING TO SAID STREET IMPROVEMENT ARE AND SHALL BE PURSUANT TO THE ACT OF THE FIRST CALLED SESSION OF THE FORTIETH LEG- ISLATURE OF THE STATE OF TEXAS, CHAPTER 106, COMMONLY KNOWN AS ARTICLE 1105b OF VERNON'S TEXAS CIVIL STATUTES; AND DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOKS OF THE CITY COUNCIL AND BY FILING THE COMPLETE ORDI- NANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THIS CITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the Public Works Director for the City of Fort Worth, Texas, has prepared Plans and Speci- fications for the improvements of the hereinafter described portions of streets, avenues and public places in the City of Fort Worth, Texas, and same having been examined by the City Council of the City of Fort Worth, Texas, and found to be in all matters and things proper, NOW THEREFORE: BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: I. The hereinafter described Plans and Specifications are hereby approved and adopted. II. There exists a public necessity for the improvement of the hereinafter described portions of streets, av- enues and public places in the City of Fort Worth, Texas, to-wit: 1. BISHOP STREET: Ffom the north line of Lois Street to the south line of Hanger Streets known and designated as Unit No, 19 Project No, 094.27000-118- 2, COLLARD STREET: From the north line of East Rosedale Street to the south line of East Vickery Blvd-p known and designated as Unit No. 29 Project No- 094-27000- 118. 3, WESTRIDGE AVENUE: From Karen Circle to the north to Edgehill Road, known and designated as Unit No. 39 Project No. 094-27000-118. 4, BELLAIRE DRIVE NORTH: From the west line of Alton Road to the east line of Bellaire Drive Westy known and designated as Unit No. 49 Project No. 094-35000-138. � 8 III Each of the above described portions of streets, avenues and public places in the City of Fort Worth, Texas, shall be improved by raising, grading, and filling same and by constructing thereon the following, to-wit: 1. BISHOP STREET: From the north line of Lois Street to the south line of Hanger Street, known and designated as Unit No. 1, Project No. 094-27000-118, a lix hot mix asphaltic surface on a 7" cement stabilized base on a 36 foot roadway. 2. 'COLLARD STREET: From the north line of East Rosedale Street to the south line of East Vickery Blvd., known and designated as Unit No, 29 Project No. 094.27000- 1189 a 1i" hot mix asphaltic surface on a 7" cement stabilized base on a 32 foot roadway. 3. WESTRIDGE AVENUE: From Karen Circle to the north to Edgehill Road, known and designated as Unit No, 3* Project No. 094-27000-1189 a li" hot mix asphaltic surface on a 7" cement stabilized base on a 30 foot roadway. 4. BELLAIRE DRIVE NORTH: From the west line of Alton Road to the east line of Bellaire Drive West, known and designated- as Unit No. 49 Project Noe 094-35000-1389 a 17J" hot mix asphaltic surface on a 7" cement stabilized base on a 32 foot roadway. The above, together with combined concrete curbs and gutters on proper grade and line where same are not already so constructed, together with storm sewers and drains and other necessary incidentals and appurten- ances; all of said improvements to be constructed as and where shown on the Plans and Specifications therefor. IV. The cost of said improvements as herein defined shall be paid for as follows, to-wit: A. The property abutting on that portion of the street, avenue or public place and the real and true owners thereof shall pay all of the cost of curbs and gutters in front of their property and not exceeding nine- tenths (9/10ths) of the estimated cost of the remainder of such improvements. B. The City of Fort Worth shall pay all of the remainder of the cost of said improvements after deduct- ing the amounts herein specified to be paid by the abutting properties and the real and true owners thereof as set out in subsection A. The amounts payable by the abutting properties and the real and true owners thereof shall be assessed against such properties and the real and true owners thereof and shall constitute a first and prior lien upon such properties and a personal liability of the real and true owners thereof, and shall be payable, to-wit: When the improvements are completed and accepted by the City on a particular unit, the sums assessed against property abutting upon such completed and accepted unit shall be and become payable in five (5) equal installments, due respectively on or before thirty (30) days, and one (1), two (2), three (3), and four (4) Years from the date of such completion and acceptance, and the assessments against the property abutting upon the remaining units shall be and become due and payable in such installments after the date of completion and acceptance of such respective unit. The entire amount assessed against the particular parcels of property shall bear interest from the date of such completion and acceptance of the improvements on the unit upon which the particular property abuts at the rate of six (6%) per cent per annum, payable annually except as to interest on the first installment, which shall be due and payable on the date said installment matures, provided that any owner shall have the right to pay any and all of such installment at any time before maturity by paying princi- pal with interest accrued to the date of payment, and further provided if default be made in the payment of any installment promptly as the same matures, then at the option of the City of Fort Worth or its assigns, the entire amount of the assessment upon which such default is made shall be and become immediately due and payable; but it is specifically provided that no assessment shall in any case be made against an property or any owner thereof in excess of the special benefits to property in the enhanced value thereof byTheans of said improvements in the unit upon which the particular property abuts, as ascertained at the hearing provided by the law in force in the City, nor shall any assessment be made in any case until after notice of hearing as pro- vided by law. Said assessments against the respective lots and parcels of property and owners thereof shall be evidenced by certificates of a special assessment which shall be executed,in the name of the City of Fort Worth, PROVIDED, however, that acting through its duly authorized Director of Public Works, the City of Fort Worth retaining the right to authorize payment of the sums assessed against abutting property upon such com- pleted and accepted unit in not more'than_forty-eight equal regular monthly installments of not less than $9.00 each, the first of such installments to become due and payable not more than 30 days after the completion and acceptance by the City of the particular unit, PROVIDED FURTHER, that the City Attorney is hereby em- powered to authorize payments of said sums in lesser installments and/or over a longer period of time in cases in which the Director of Public Works has previously determined that an extreme financial hardship upon the property owner will otherwise result; and PROVIDED FURTHER, that such method of payment shall be authorized only in instances where the owner or owners of property abutting upon such completed and accepted unit shall have executed and delivered to the City of Fort Worth a lawful, valid and binding note and mechanic's and materialman's contract upon forms supplied by the City granting a mechanic's lien upon and conveying the said abutting property in trust to secure the payment by said owner or owners according to the terms there- of of the sums assessed against such property. X. In making assessments, if the name of the owner be unknown, it shall be sufficient to so state the fact, and if any property be owned by an estate or by any firm or corporation, it shall be sufficient to so state, and it shall not be necessary to give the correct name of the owner, but the real and true owners of the property mentioned shall be liable and the assessments against the property shall be valid. XI. The Director of Public Works of the City of Fort Worth, Texas, be and he is hereby, ordered and directed to file with the City Council, estimates of the cost of such improvements in each unit, in accordance with the terms of the powers and provisions of the Charter of the City of Fort Worth, Texas. XII. The City Secretary is directed to prepare, sign and file with the County Clerk of Tarrant County, Texas, a notice in accordance with the provisions of the Act passed at the Fifth Called Session of the Forty-first Legislature of the State of Texas, and shown as Chapter 21 of the Acts of said Session of the Legislature, said Act having been passed in the year 1930, and now shown as Article 1220a of Vernon's Texas Civil Statutes. XIII. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council and by filing the complete ordinance in the appropriate Ordinance Records of this City. XIV. This ordinance shall take effect and be in ull force and effect from and after the date of its passage. PASSED AND APPROVED THIS ._.__ DAY OF19��2. APPROVED AS TO FORM AND LEGALITY: City Attorney ATTACHMENT "B" Page 1 of 5 4 LOCATIONS RECONSTRUCTION Protect Nos. 094-27000-118 & 094-35000-138 PER CENT CONTRACT PRtCL..................................................................I......... , ......................,..> 1189088.05 ENGINEERING 119808.81 ESTIMATEDCONSTRUCTION COST...............................................................................................................s11291896.86 1000 RESIDENTIAL FOOTAGE................................14!000.6 76.9 COMMERCIAL FOOTAGE..............................' 49203.3 23.1 203.9 100.0 TOTAL FOOTAGE............................................189203,91 RESIDENTIAL ASSESSMENT...................................................... 319909.31 24.6 COMMERCIAL ASSESSMENT.................................................... 109244.90 7.9 GROSS AMOUNT AtiEiiED.......................................................................................... =421p 154.21 32.5 LESS CREDITS GRANTED......................... 22!977.37 17.7 ....................................................................... TOTAL NET ASSESSMENT.........................................._.................................................................................... 19 f176.84 14.8 NET AMOUNT PAID BY CITY AT I.ARGE...................................................I.................................................... 1100720.02 85.2 SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 18!203.9 PER CENT 100.0 PARCELS OF PROPERTY 110 PER CENT 100.0 o CUMMULATIVE RESULTS OF ~' POST CARD SURVEY ARE NO. OF PROPERTY OWNERS 100 AVAILABLE UPON REQUEST. PER CENT 100.0 cd 2 OWNERS LIVING ON STREET 77 O PER CENT 100.0 p; OWNERS LIVING ELSEWHERE 23 PER CENT 100.0 Ns A .r ATTACHMENT "B" Page 2 of 5 BISHOP STREET POLY FREEWAY TO HANGAR STREET UNIT 1 PER CENT CONTRACTPRICE............................................................................................................= 429289.10 ENGINEERING .............................................................................................................. 49228,.91 ESTIMATED CONSTRUCTION COST................................ ...$469518.01 100.0 RESIDENTIAL FOOTAGE ....... 39652.5 75.2 .......................... COMMERCIAL FOOTAGE.............................. 19203.0 24.8 TOTAL FOOTAGE............................................ 49855.5 100.0 RESIDENTIAL ASSESSMENT...................... 9 971.33 .............................. € f 21.4 COMMERCIAL ASSESSMENT 39284.20 7.1 GROSS AMOUNT ASSESSED.........................................................................................,$ 139255.53 28.5 LESS CREDITS GRANTED......................................... 60359.70 13.7 TOTAL NET ASSESSMENT......................................................................................................................... ...... 69895.83 14.8 NET AMOUNT PAID BY CITY AT LARGE.................................................................................. .....................$399622.18 85.2 SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 4855,5 793.0 2594.2 1468.3 PER CENT 100.0 16.3 53.4 30.3 PARCELS OF PROPERTY 42 7 21 14 PER CENT 100.0 0 16.7 50.0 33.3 NO. OF PROPERTY OWNERS 41 7 21 13 PER CENT 100.0 n 17.1 51.2 31.7 pm OWNERS LIVING ON STREET 29 W 3 17 9 PER CENT 100.0 a 10.4 58.6 31.0 OWNERS LIVING ELSEWHERE 12 4 4 4 PER CENT 100.0 33.3 33.3 33.4 P ATTACHMENT "B" Page 3 of 5 COLLARD STREET EAST ROSEDALE STREET TO EAST VICKERY BLVD, UNIT 2 PER CENT CONTRACTPRICL............................................................................. . .........................E 175 960.80 ENGINEERING .....................................................................................I....................... 15796.08 ESTIMATEDCONSTRUCTION COST............................................................................«..................................E 195756.88 100.0 RESIDENTIAL FOOTAGE................................ 0.0 0.0 3000.3 100.0 COMMERCIAL FOOTAGE.............................. TOTAL FOOTAGE............................................ 3000.3 100.0 RESIDENTIAL ASSESSMENT.................................................. 0.00 0.0 COMMERCIAL ASSESSMENT.................................................... 6960.70 35.2 GROSS AMOUNT A3i[EiED..........................................................................................E 6960.70 35.2 LESS CREDITS GRANTED.............................................................. ................................. 3332.68 16.8 TOTAL NET Aa31DE11ENT..........................................»............................................................................. 35628.02 18.4 NET AMOUNT PAID BY CITY AT IAJM.........................................................................................I.............III 165128.86 81.6 SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 3000.8 369.5 243.0 2387.8 PER CENT 100.0 12.3 8.1 79.6 PARCELS OF PROPERTY 15 3 2 10 PER CENT 100.0 0 20.0 13.3 66.7 11-4 NO. OF PROPERTY OWNERS 12 3 2 7 PER CENT 100.0 Ind 25.0 16.7 58.3 OWNERS LIVING ON STREET 5 0 1 4 PER CENT 100.0 u� 0.0 20.0 80.0 OWNERS LIVING ELSEWHERE 7 3 1 3 PER CENT 100.0 42.9 14.2 42.9 4 ATTACHMENT "B" Page 4 of 5 WESTRIDGE AVENUE KAREN CIRCLE TO EDGEHILL ROAD UNIT 3 PER CENT CONTRACTPRICE.............................................................................. , ............,...........5 461,877.95 ENGINEERING ............................................................................................................. 41,687.80 ESTIMATED CONSTRUCTION COST..................... .....,,,,,,,,,,,,...................$51p565*75 1000 ...................................................... RESIDENTIAL FOOTAGE 8178.1 100.0 COMMERCIAL FOOTAGE.............................. 0.0 0.0 TOTAL FOOTAGE............................................ 8178.1 100.0 RESIDENTIAL ASSESSMENT........................................ 17 337.58 33.6 COMMERCIAL ASSESSMENT.................................................... 0.00 0.0 GROSS AMOUNT ASSESSED....................................................... ...............................5 171,337.58 33.6 LESS CREDITS GRANTED......................... 11�101.39 21.5 ....................................................................... TOTAL NET ASSESSMENT................... 61,236.19 12.1 ...................................................................................................... NET AMOUNT PAID BY CITY AT LARGE.................................. ........5451,329.56 87.9 SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 8178.1 1517.9 90.0 6570,2 PER CENT 100.0 18.6 1.1 80.3 Z PARCELS OF PROPERTY 32 11 1 20 PER CENT 100. 34.4 3.1 62.5 x NO. OF PROPERTY OWNERS 27 11 1 15 PER CENT 100.0 40.7 3.7 55.6 OWNERS LIVING ON STREET 23 11 1 11 PER CENT 100.0 47.8 4.4 47.8 OWNERS LIVING ELSEWHERE 4 0 0 4 PER CENT 100.0 0.0 0.0 100.0 ATTACHMENT "B" Page 5 of 5 BELLAIRE DRIVE NORTH ALTON ROAD TO BELLAIRE DRIVE WEST PER UNIT 4 CENT CONTRACTPRICE............................................................................................................S 102 960.20 ENGINEERING .............................................................................................................. 1.096 02 ESTIMATED CONSTRUCTION COST...............................................................................................................a 126056.22 100.0 RESIDENTIAL FOOTAGE................................ 2170.0 100.0 COMMERCIAL FOOTAGE.............................. 0.0 0.0 TOTAL FOOTAGE............................................ 2170.0 100.0 RESIDENTIAL ASSESSMENT,.....................................................t 4600.40 38.2 COMMERCIAL ASSESSMENT.................................................... 0.00 0.0 GROSS AMOUNT ASSESSED..,......................................................................................$4600#40 38.2 LESS CREDITS GRANTED................................... 2183.60 18.1 TOTALNET ASSESSMENT............................................................................................................................... 2,,416.80 20.1 NET AMOUNT PAID BY CITY AT LARGE.......................................................................................I..............; 9f639.42 79.9 SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED 2170.0 1645.0 50.0 475.0 NO. OF FRONT FEET 100.0 75.8 2.3 21.9 PER CENT Z 21 Q PARCELS OF PROPERTY 100.0 1-4 40.6 4.8 40.6 PER CENT H NO. OF PROPERTY OWNERS 20 10 1 9100.0 50.0 5.0 45.0 PER CENT OWNERS LIVING ON STREET 20 x 10 1 9 100.0 50.0 5.0 45.0 PER CENT OWNERS LIVING ELSEWHERE 0 0 0 0 PER CENT 0.0 0.0 0.0 0.0 ATTACHMENT "C" ASSESSMENT ROLLS FOR PAVING OF BISHOP FROM POLY FREEWAY TO HANGAR PROJECT No. 094-27000-118 A.P. 65-157 UNIT No. 1 OF 4 PAGE No. 1 OF 14 PROPERTY DESCRIPTION AMOUNT zz RESULT OF POST CARD SURVEY o NAME AND ADDRESS ASSESSED W- z FEET PER AMOUNT AFTER z~ FRONT FEET OF APPARENT OWNER o 0�- ni LOT BLK. ADDITION FOOT ASSESSED CREDITS Na FOR AGAINST AN W ER Adams, Lambert K. B 8 10 Englewood Heights 127 2.73 346,71 212.0p 127 3204 Bishop Aults►an, L.T. B 18 26 " 132 2.73 , 360.36 212.00 �3 , 3411 Crenshaw Beacon Street Baptist Church E 1 & '- of i.10 1 20 " 139.5 2,73 380.84 144,16 .5 2521 Bishop a l l ear ` � O -40 v Beacon Street Baptist Church E N 76' of Lot 20 If 83,5 2.73 227.96 88.51 H 83,5 2521 Bishop 10 & -j of 4J closed alley a, Baker, Claude M. B 10 22 " 132 2.73 360,36 212.E 132 3401 Crenshaw Bell., C.A. B 1 27 127 2.73 346.71 212.0 127 3400 Burton Benson, W.R. E N 71' of 8 15 " 71 2.73 193.83 75.2 71 3326 Bideker Bloomer, J.E. E 1 22 132 2.73 360,36 251,22 132 4300 Hilldale Brackin, Wyatt J. E N of 9 10 16 66 2.73 180.18 139.92 66 2612 Bishop Brown, Ulric# W. B 1 26 " 132 2,73 360.36 212.00 132 3406 Thannisch ATTACHMENT "C" ASSESSyl6Lq Pai j&R PAVING OF BISHOP FROM TO HANGAR PROJECT No. 094-27000-118 A.p. 65-157 UNIT No. 1 OF 4 PAGE No. 2 OF 14 AMOUNT z RESULT OF POST CARD SURVEY NAME AND ADDRESS W PROPERTY DESCRIPTION FRONT RATE GROSS ASSESSED WO OF APPARENT OWNER z FEET PER AMOUNT z�" AFTER FRONT FEET O tmH ni LOT BLK. ADDITION FOOT ASSESSED CREDITS NUJ FOR AGAINST AN W ES Burgess, N.H. B 5 4 Meadowlawn 160 2.73 436.80 212.00 160 3401 Lois Couch, J.T. E S 61' of 8 15 Englewood H,aght;� 61 2.73 166.53 64.66 61 5083 Nell Street Davis Wm. L. B N 72' of 8 12 72 2.73 196.56 152.64 0 72 3330 Strong H Duke, D.R. B 8 11 of 132 2.73 360.36 212.00 0 132 3330 Thannisoh U m rx Englewood Heights Baptist :B 1 23 132 2.73 360.36 106.00 132 Church 2800 Bishop Englisht Henry N. E 1 21 " 132 2.73 360.36 231.08 132 3700 Sandgate Fox, John W. B 1 3 Meadowlawn 136.9 2.73 373.74 212.00 136.9 3324 Richardson Gibsont Leonard A. B 4 1 " 143.3 2.73 391.21 212.00 143.3 3401 E. Berry Gladden' Donald C, B 14 23 Englewood Heights 132 2.73 360.36 106.00 132 504 Burk Burnett Bldg. ATTACHMENT "C" ASSESSMENT ROLLS FOR PAVING OF BISHOP FROM POLY FREEWAY TQQ HANGAR PROJECT No. 094-27000-118 A.p. 65-157 UNIT No. 1 OF 4 PAGE No. 3 OF 14 AMOUNT z RESULT OF POST CARD SURVEY NAME AND ADDRESS W PROPERTY DESCRIPTION FRONT RATE GROSS ASSESSED co Z FEET PER AMOUNT z~ FRONT FEET OF APPARENT OWNER o AFTER 0 - N LOT BLK. ADDITION FOOT ASSESSED CREDITS Na FOR AGAINST N W CR Gunter, Lawrence E S 50' of 16 Englewood Heights 50 2.73 136.50 106.00 50 R 2 B 85-C-3 697 & 8 Burleson, Texas Gutierrez, Gilbert B 8 17 132 2.73 360.36 106.00 132 1416 N. Main 0 Hill, C.E. B 9 12 " 132 2.73 360.36 212.00 132 7200 Yolanda H N C Kelly, W.W. B 1 2 151,6 2.73 413.87 212.00 151.6 3325 Richardson Kimble, R.H. & C.E. E 10 21 132 2.73 360.36 279.84 132 3401 Bideker Lawler, C.L. B 24 3 Meadowlawn 160 2.73 436.80 212.00 160 3325 Lois Long, Allan M. B 9 11 Englewood Height 132 2.73 360.36 212.00 132 2142 South Jennings Martin, Mrs, J.L. B 8 14 132 2.73 360.36 212.00 132 3330 Crenshaw Meacham, Joe B N 81' of 9&10 13 81 2.73 221.13 85.86 81 2201 Glencrest Drive ATTACHMENT "C" ASSESSMENT ROLLS FOR PAVING OF BISHOP FROM POLY FREEWAY TO HANGAR PROJECT No. 094-27000-118 A.P. 65a-157 IRQI Moo 1 CF 4 PAGE No. 4 (w 14 NAME AND ADDRESS W PROPERTY DESCRIPTION FRONT RATE GROSS �AMOUNT RESULT OF POST CARD SURVEY OF APPARENT OWNER zo FEET PER AMOUNT AFS ©p FRONT FEET ni LOT BLK. ADDITION FOOT ASSESSED CREDITS �� FOR AGAINST AN w R Murray,, Ruth B 9 15 Englewood Heights 132 2. 360.36 212. 132 3331 Crenshaw Myallj Lucille & Pauline B 1 25 " 132 2. 360.36 106. 132 Curtin 3410 Strong 0 Newman, L.O. B 18 24 132 2.73 360.36 106.0c 132 3401 Strong c 0 0 0 Newman, 011ie B 1 24 132 2.721 360.36 106. 132 3400 Fitzhugh Norton,, John W. B S 51' of 9 13 " 51 2. 139.23 54.06 51 4201 Mansfield Road Old School Primitive Baptist E S of 9&10 16 " 66 2.73 180.18 139.W 66 Church 1614 W Allen Poston' Bill E S 561 of 10 20 56 2. 152.86 47.7C 56 619 Riverside Drive Rogersp Wallace B W 40' of 18 25 " 132 2. 360.36 212.00 132 3401 Thannisch Seymour,, W.E. B 8 13 132 2. 360.36 106. 132 2900 Bishop ATTACHMENT "C" ASSESSMENT ROLLS FOR PAVING OF BISHOP FROM POLY FREEWAY TO HANGAR PROJECT No. 094-27000-118 A.p. 65-157 UNIT No. l OF 4 PAGE No. 5 OF 14 AMOUNT NAME AND ADDRESS W PROPERTY DESCRIPTION FRONT RATE GROSS ASSESSED w� RESULT OF POST CARD SURVEY Z FEET PER AMOUNT Zt FRONT FEET OF APPARENT OWNER o AFTER �� n� LOT BLK. ADDITION FOOT ASSESSED CREDITS Na FOR AGAINST ANNO SWEB Spears, Chas. W. B S 601 of 8 12 Englewood Heights 60 2.73 163.80 63.60 60 3004 Bishop Stuart, Chas, E 9 17 " 132 2.73 360.36 279.84 132 2924 Fitzhugh 0 Vaenesiano Annie E N 82' of 16 it 82 2.73 223.86 150.52 N 82 2600 Bishop 607 & 8 N c 0 v Watson, L.E. B 9 14 " 132 2.73 360.36 212.00 a 132 3331 Fitzhugh Wyatt9 R.C. B 4 4 138.7 2.73 378.65 195.04 138.7 3400 East Berry Totals 4855.5 139255.53 6895.83 793.0 2594.2 1468.3 ATTACHMENT "C" ASSESSMENT ROLLS FOR PAVING OF COLLARD STREET FROME. ROSEDALE ST. TO E, VICKERY BLVD, PROJECT No. 09427000-118 A.P.65a157 UNIT No. 2 OF 4 PAGE No. 6 OF14 AMOUNT a RESULT OF POST CARD SURVEY NAME AND ADDRESS W PROPERTY DESCRIPTION FRONT RATE GROSS ASSESSED W o OF APPARENT OWNER zo FEET PER AMOUNT AFTER z� FRONT FEET ni LOT SLK- ADDITION FOOT ASSESSED CREDITS Na FOR AGAINST ANSWER Aultman Ronald F 8 6 Polytechnic 114 2,32 264.48 264.48 114 412 Sinclair Building Heights Baxter' R.A. C 9 6 114 2.32 264.48 264,48 114 11437 Royal Shire Drive Dallas9 Texas Booth9 Joe Co, J 8 8 a of 5 " 137.5 2.32 319,00 27,50 137,5 901 Collard closed Ave.A c 0 Covey9 Herschel I 9 5 is118 2.32 273.76 261.96 118 4062 Hampshire N 0 8 m Gauley9 W.A. C 8 11 is 125 2.32 290.00 290.00 aC 125 Box 16 Ringwood' Oklahoma Hewatt, J.W. F 9 17 of 107 2.32 248.24 21.40 107 3301 E. Rosedale Kuykendallp James E. J All of Blk E Hallbrook 3rd 96.8 2.32 224.58 19.36 96.8 321 S. Collard 8 * of closed Ave. A Pickard, W.M. C 8 12 Polytechnic 125 2.32 290.00 145.00 125 3300-Ave D Heights ATTACHMENT "C" ASSESSMENT ROLLS FOR PAVING OF COLLARD STREET FROM E. ROSEDA LE ST. TOE. VICKERY BLVD. PROJECT No. 094-27000-118 A.p. 65-157 UNIT N0.2 OF 4 PAGE No. 7 OF 14 AMOUNT z RESULT OF POST CARD SURVEY NAME AND ADDRESS w PROPERTY DESCRIPTION FRONT RATE GROSS ASSESSED WO OF APPARENT OWNER zo FEET PER AMOUNT AFTER zt FRONT FEET ni LOT BLK. ADDITION FOOT ASSESSED CREDITS Na FOR AGAINST AN W ER Polytechnic Methodist Church C 8 17 olytechnic 125 2.32 290,00 132,50 125 1310 Collard Street Heights Talleys Vivian C 9 11 125 2,32 290,00 12,50 125 3301 Avenue D Texas Wesleyan College C Campus abut"Im Collard St. from 1252 2,32 2904,64 1281,78 1252 PO Box 3277 Rosedale to A nuE B o -H v Texas Wesleyan College C 16 & all of 4 Polytechnic 168 2,32 389.76 389,76 N 168 PO Box 3277 closed Ave,B Heights o v at Texas Wesleyan College J 1 4 of 117 2,32 271.44 23,40 117 PO Box 3277 Texas Wesleyan College J Tract 8 J, Ringer Survey 151 2,32 350.32 336.40 151 PO Box 3277 Weaver, Mrs. Bess C. C 9 12 Polytechnic 125 2,32 290,00 157,50 125 3301 Ave E Heights Totals 3000.3 6960.70 3628.02 369,5 243.0 2387.8 ATTACHMENT "C" ASSESSMENT ROLLS FOR PAVING OF WESTRIDGE AVENUE FROM KAREN CIRCLE TO EDGESHILL ROAD PROJECT No. 094-27000-118 A.P. 65-157 UNIT No. 3 OF 4 PAGE No. 8 OF 14 AMOUNT z RESULT OF POST CARD SURVEY NAME AND ADDRESS W PROPERTY DESCRIPTION FRONT RATE GROSS ASSESSED Wo Z FEET PER AMOUNT AFTER Z- FRONT FEET OF APPARENT OWNER 0 NF„ NO n� LOT BLK. ADDITION FOOT ASSESSED CREDITS _a FOR AGAINST - ANSWER Banoch, Ralph E. A 79 51 Ridglea 90 2.12 190.80 0.00 90 4609 Westridge Bond, Tom B. A 5R 52 " 194 2.12 411.28 0.00 194 4750 Westridge Cook, William P. A 78 51 " 97.4 2.12 206.49 0.00 97.4 4601 Westridge Crebbs, C. M. A 42 51 " 114.7 2.12 243.16 0.00 114.7 4717 Westridge Ehrhardt., Don et al A Tract 1B Houston Survey 152 2.12 322.24 322.24 a 152 5001 Westridge �+ ca. F.H.A. 113-42061 A Ridgeway Man No. 570 2.12,. 1208.40 0.00 c 570 c/o Multifamily Mtg. Section w Comptroller Division 04 Washington, D. C. 20412 F.H.A. 113-42062 A Ridgeway Manor No, Z 1292 2.12 2739.04 0.00 1292 c/o Multifamily Mtg. Section Comptroller Division Washington, D.C. 20412. Gaines, Edward R. A 46 51 Ridglea 90 2.12 190.80 0.00 90 4817 Westridge Haynes, Jack A 66 51 It 100 2.12 212.00 0.00 100 4701 Westridge ATTACHMENT "e g ASSESSMENT ROLLS FOR PAVING OF WESTRTDGE AVENUE FROM Karen Circle TO Edgehill Road PROJECT No. 094-27000-118 A.P. 65°157 UNIT 110.3 OF 4 PAGE No. 9 OF14 AMOUNT z RESULT OF POST CARD SURVEY NAME AND ADDRESS w PROPERTY DESCRIPTION FRONT RATE GROSS ASSESSED W0 OF APPARENT OWNER zo FEET PER AMOUNT AFTER zr FRONT FEET n� LOT BLK. ADDITION FOOT ASSESSED CREDITS U)uJ FOR AGAINST W ER Holmes, Ray F. A 6 8 S. 10' 52 Ridglea 210 2.12 445.20 0.00 210 4800 Westridge of 5 Hooker, Freeman F. A S. 101.7' of 51 " 101.7 2.12 215.60 0.00 101.7 4701 Winthrop Lot 49 Kay, Maurice M. A 43 51 " 100 2.12 212.00 0.00 100 4759 Westridge Laughbaum, F. W. A 4B 52 " 196 2.12 415.52 345.56 196 4700 Westridge McDaniel, V. H. A 4A 52 291.6 2.12 618.19 493.11 0 291.6 6857 Woodstock Pearson, Robert H. A 48 51 276.3 2.12 585.76 0.00 276.3 c 4901 Westridge Poindexter, David H. A 47 51 90 2.12 190.80 0.00 90 4825 Westridge Reinecke, Carl W. A 45 51 " 90 2.12 190.80 0.00 90 4813 Westridge Ridglea Western Hills, Inc. A Ridglea Count3y Glut Golf -Course 155 2.12 328.60 328.60 155 Berni Anderson Avenue Abutting West idge Avenue from the South Line of Lot 81 Block 521, Ridglea Addition to a p6int approx. 155' South. ATTACHMENT "C" ASSESSMENT ROLLS FOR PAVING OF NESTRID(E AVENUE FROM KAREN CIRCLE TO EDGEHIL_L. ROAD PROJECT No. 094-27000-11,8 A.P. 65-157 UNn no. 3 OF 4 PAGE No. 10 OF 14 NAME AND ADDRESS PROPERTY DESCRIPTION ld FRONT RALE GROSS ASSESS WNT p RESULT OF POST CARD SURVEY z FEET PER AMOUNT z~ FRONT FEET OF APPARENT OWNER p AFTER Of- LOT kBLK_ ADDITION FOOT ASSESSED CREDITS ya FOR AGAINST WER Ridglea Western Hillsp Inc. A Ridglea l Golf Cowse 1260 2.12 2713.60 2713.60 1280 Berni Anderson Aver! abutting liese Avenue from 200' South of Kar m C' a (to the north) to Lot 1 Blo 54 Ridglea Addition Shiner, D. M. A S. 186.35' of 52 Ridglea 186.3 2.12 394.96 0.00 186.3 4606 Westridge Let 3 Shrell' Clyde A. A 69 51 ' 100 2.12 212.00 0.00 100 6300 Kenrick SmithIp 0. Leon A 31 51 ' 180.4 2.12 382.45 382,45 ss 180.4 4916 Winthrop .® Summers Dr, W. M. A 1 51 ' 149.3 2.12 316.52 01,00 149.3 4551 Westridge b m Sykes# C. S. A 30 51 ' 152.2 2.12 322.66 322.66 152.2 4924 Winthrop Nest Teaguep Gordon N. A 66 8 N. 10* 51 ' 90 2.12 190.80 0.00 90 4711 Westridge of 49 Thompsonq Robert H. A 67 51 ' 90 12,12 190.80 0.00 90 4709 Westridge Weiner, Ted A 8 52 ' 626.4 2,12 1327.97 1327.97 b26.4 P. 0. Box 12405 1le1ner, Ted A 7 52 200 2.12 424.00 0.00 200 P. 0, Box 12405 N I I AVnMCN I "lo" ASSESSMENT ROLLS FOR PAVING OF WESTRIDGE AVENUE FROM KAREN CIRCLE TO EDGEHILL ROAD PROJECT No. 094-27000-118 A.p. 65-157 UNIT No. 3 OF 4 PAGE No. 11 OF14 AMOUNT z RESULT OF POST CARD SURVEY NAME AND ADDRESS W PROPERTY DESCRIPTION FRONT RATE GROSS ASSESSED 00 OF APPARENT OWNER z FEET PER AMOUNT AFTER z� FRONT FEET n� LOT BLK. ADDITION FOOT ASSESSED CREDITS Na FOR AGAINST ANSW ER Williams, J. L. Company, Inc. A N. 39' of 3 52 Ridglea 39 2.12 82.68 0.00 39 1066 West Mockingbird Lane Dallas, Texas Williams, J. L. Company, Inc. A 2 52 " 280 2.12 593.60 0.00 0 280 1066 West Mockingbird Lane 0 Dallas, Texas Williams, J. L. Company, Inc. A 1 52 " 503.8 2.12 1068.06 0.00 0 503.8 1066 West Mockingbird Lane n Dallas, Texas a Tlepfel Jr., A. L. A 44 51 90 2.12 190.80 0.00 90 48 01 Westridge 8178.1 17337.58 6236.19 1517.9 90.0 6570.2 ATTACHMENT "C" ASSESSMENT ROLLS FOR PAVING OF BELLAIRE DRIVE NORTH FROM ALTON ROAD TO BELLAIRE DRIVE WEST PROTECT No.094-35000-138 A.P.65-157 UNIT No. 4 OF 4 PAGE No;2 OF 14 NAME AND ADDRESS W PROPERTY DESCRIPTION FRONT RATE GROSS ASSESSED WAMOUNT z RESULT OF POSTCARD SURVEY z FEET PER AMOUNT AFTER z OF APPARENT OWNER ~ FRONT FEET o 21-- LOT BLK. ADDITION FOOT ASSESSED CREDITS Cna FOR AGAINST NO ANSWER Bradley, Weldon A 22 8 E. of 20 Bellaire 75 2.12 159.00 01.00 75 3620 Bellaire Drive North 23 Bray, J. T. A 19 20 " 50 2.12 106.00 0.00 50 3608 Bellaire Drive North Byron, J. A. Jr. A 32 20 " 50 2.12 106.00 0.00 50 3720 Bellaire Drive North Clark, Adrian A 35 20 " 50 2.12 106.00 0.00 50 3732 Bellaire Drive North c 0 Douglass, Edythe A 29 20 50 2.12 106.00 0.00 J 50 3708 Bellaire Drive, North +J c Edmondson, Thomas J. A 18 20 " 50 2.12 106.00 0.00 50 3604 Bellaire Drive, North a Gillmore, Maurice A 28 20 " 50 2.12 106.00 0.00 50 3704 Bellaire Drive, North Hutcheson, W. J. A 30 20 " 50 2.12 106.00 0.00 50 3017 Alton Road Irwin, W. E. A 7 20 " 50 2.12 106.00 0.00 50 3700 Bellaire Drive, North Jordan, J. W. A 36 20 " 50 2.12 106.00 0.00 50 3737 Bellaire Drive, North ATTACHMENT "C" ASSESSMENT ROLLS FOR PAVING OF BELLAIRE DRIVE NORTH FROM ALTON ROAD TO BBLLAIRE DRIVE WEST PROJECT,No. 094-35000.138 A.P. 65-157 UNIT No. 4 OF 4 PAGE No. 13 OF 14 AMOUNT z RESULT OF POST CARD SURVEY NAME AND ADDRESS W PROPERTY DESCRIPTION FRONT RATE GROSS ASSESSED Wo OF APPARENT OWNER zAFTER FEET PER AMOUNT zt FRONT FEET o (M�-- NO N LOT BLK. ADDITION FOOT ASSESSED CREDITS ya FOR AGAINST ANSWER Langham, Howard H. A 26 20 Bellaire 50 2.12 106.00 0.00 50 3636 Bellaire Drivev North Lawson, Mrs. J.M. A 33 20 " 50 2.12 106.00 0.00 50 3724 Bellaire Dr N. M cBrideg James H A 31 20 50 2.12 106.00 0.00 50 3716 Bellaire Dr N. C 0 U Naham! Jeneila A 20 20 50 2.12 106.00 0.00 50 3612 Bellaire Dr N. c 0 v Petta, Joe N. A 24 20 50 2.12 106.00 0.00 50 3628 Bellaire Dr.N. Petta, Joe N. A Wj of 23 20 25 2.12 53.00 0.00 25 3628 Bellaire Dr. N. Shackelford' O.D. A 17 20 80 2.12 169.60 0.00 80 3600 Bellaire Dr.N. Siegmundq Martin 0, A 25 20 50 2.12 106.00 0.00 50 3632 Bellaire Dr.N. Singletons B.S. A 21 20 50 2.12 106.00 0.00 50 3616 Bellaire Dr. N. ATTACHMENT "C" ASSESSMENT ROLLS FOR PAVING OF BELLAIRE DRIVE NORTH FROM ALTON ROAD TO BELLAIRE DRIVE WEST PROJECT No. 094-35000-138 A.P. 65-157 UNIT No. 4 OF 4 PAGE No. 14 OF 14 NAME AND ADDRESS w PROPERTY DESCRIPTION FRONT RATE GROSS ASSESSED Wo AMOUNT RESULT OF POST CARD SURVEY z FEET PER AMOUNT AFTER zFRONT FEET OF APPARENT OWNER o 01-- N LOT BLK. ADDITION FOOT ASSESSED CREDITS Na FOR AGAINST AN W gR Texas Christian University A Tract out of A. Voght Survey abutting 1140 2.12 2416.80 2416.80 1140 2000-3000 South University Dr. Bellaire Dr. N. betty en Bellaire Dr.W. and Alton Road Thomps©nt J. Alfred A 34 20 Bellaire 50 2.12 106.00 0.00 50 3728 Bellaire Dr. N. a 0 v a0G Totals 2170.0 4600.40 2416.80 1645.0 50.0. 475.0 a s City of Fort Worth, Texas Mayor and Council Communication DATE REFERENCE SUBJECT: Reconstruction at 4 Locations, PAGE NUMBER Project Nos.094-27000-118 094-35000-13 2/7/66 C-646 ' I of 3 and 097-28000-190 CIP A-209) Council action on the project described below is requested: Prosect Description Nature of work: Reconstruction at Four Locations, as follows: Unit Street Limits Roadway Width R.O.W. 1 Bishop Street Poly Freeway to Hanger Street 36 feet 50 feet 2 Collard Street East Rosedale Street to East 32 feet 60 feet Vickery Boulevard 3 Westridge Avenue Karen Circle to Edgehill Road 30 feet 80 feet 4 Bellaire Drive.,. :. : Alton Road to Bellaire Drive, 32 feet 70 feet North East The project for reconstruction of Bishop Street, Unit 1, includes the exten- sion of the Bishop Street Storm Drain System from Berry Street to the Poly Freeway. Submission of Bids Bidder Amount Bid Working Days Texas Bitulithic Company $124,986.55 120 Glade Construction Company 133,203.94 120 General Construction Company 135,108.75 120 Worth Construction Company 135,684.40 120 W. E. Brittain, Inc. 137,909.29 120 R. W. Gibbins, Inc. 143,279.95 120 Project Cost and Financing The project costs will be financed from the following bond fund project accounts: Project Account--Number For Bid Price 1) 094-2700-118 and Reconstruction, Units $ 90,367.81 104-27000-118 "Recanatrue- 1, 2, & 3 tion" 2) 094-35000-138 "Miscl.Street Reconstruction, Unit 4 5 �: QA ry Improvements" � i Y cam• DATE REFERENCE SUBJECT: Reconstruction at 4 Locations, PAGE NUMBER Project Nos.094-26000-118, 094-35000-13 2/7/66 C-646 and 097-28000-190 (CIF A-209) 2 cf 3 Project Account Number For Bid Price 3) 097-28000-190 "Storm Bishop Street Storm Drain $ 6,898.50 Drains" 4) 042-09427-118 "Revolving Property Owners' Share of 19,176.84 Fund" Paving Cost Total Bid Price $:,124,986.55 Based on the low bid, approximately $19,176 will be assessed against abutting property owners. The cost to the City-at-large for the paving improvements will be approximately $110,720, including engineering and miscellaneous expenses. The cost to the City for drainage improvements on Bishop Street will be approximately $7,500, including engineering and miscellaneous expenses . Funds for the property owners ' share of the paving costs will be provided by a transfer from the Revolving Fund. Sufficient funds are available in Project 094-27000-118 and 104-27000-118 to finance the reconstruction of Units 1, 2 and 3, and in Project 094-35000-138 to finance reconstruction of Unit 4. Funds for the Bishop Street Storm Drain Extension are available in Project 097- 28000-190. Recommendations a It is recommended 1) That the following bond fund transfer be approved : Amount From To For $19,176.84 Revolving Fund 042-09427-118 Property owners ' portion of construction costs 2) That an ordinance be adopted: a. Declaring the necessity for and ordering the improvements ; b. Making provisions for levying of assessments ; c. Ordering the Public Works Department to prepare estimates of costs and amounts to be assessed; d. Awarding the contract to Texas Bitulithic Company on its low bid of $124,986.55; and 3. Making appropriations to cover the indebtedness thereby incurred. - p DATE REFERENCE SUBJECT: RECONSTRUCTION AT 4 LOCATIONS, PAGE 2-7-66 NUMBER PROJECT NOS. 094-27000-118,094-35000-13 3 3 C-646 and 097-28000-190. (CIP A-209) — of 3) That an ordinance be adopted: a.. Approving the estimates and amounts proposed to be assessed; and, b. Setting, February 28, 1966 as the date of the Benefit Hearing. JLB:eln Attached are the following summaries: "A" - Resume of the project "B" - Distribution of costs and assessments and result of post card survey "C" - Assessment Rolls in alphabetical order Rc�Q�© Q zo �-��— ��A - SUBMIKI) BY: DISPOSITION BY COUNCIL: , /�' QROCI�S �PPROYED [GATHER (DESCRIBE) CITY SECRETA Y DATE CITY MANAGER /_