HomeMy WebLinkAboutOrdinance 6514 ORDINANCE NO. AN ORDINANCE APPROVING AND ADOPTING ESTIMATES OF THE COST OF IMPROVE- MENTS AND OF AMOUNTS TO BE ASSESSED FOR IMPROVEMENTS ON A PORTION OF WILLIE STREET _ AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS; FIRING TIME AND PLACE FOR HEARING TO THE OWNERS OF ABUTTING PROPERTY AND TO ALL OTHERS INTERESTED; DIRECTING THE CITY SECRETARY TO GIVE NOTICE OF SUCH HEARING; AND DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL AND BY FILLING THE COMPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THE CITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City Council of the City of Fort Worth, Texas, has heretofore ordered that each of the hereinafter described portions of streets, avenues and public places in the City of Fort Worth, Texas, be im- proved by raising, grading and filling same and by constructing thereon the following, to-wit: UNIT 1: WILLIE STREET From Edgewood Terrace to Langston Street, known and designated as Unit 1, Project No. 104-24000-209, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen- inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. UNIT 2: DANNER STREET From Ramey Avenue to Chapman Street, known and designated as Unit 2, Project No. 104-24000-209, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen- inch wide concrete gutter, so that the finished roadway will be thirty feet wide, and by constructing six-inch thick concrete driveways where specified. UNIT 3: MACE0 LANE From Carverly Avenue to Ransom Terrace, known and designated as Unit 3, Project No. 104-24000-209, to be improved with six-inch thick hot-mix asphaltic ooncrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen- inch wide concrete gutter, so that the fin- ished roadway will be thirty feet wide, and by constructing six-inch thick concrete driveways where specified. where specified. together with concrete curbs, gutters, driveways and incidentals to such improvements on proper grade and line where same are not already so constructed, together with storm sewers and drains and other necessary incidentals and appurtenances; all of said im- provements to be constructed as and where shown on the Plans and in strict accordance with the Plans and Specifications therefor; contract therefore has been made and entered into with Gu}g_ INC. ; and WHEREAS, the City Council of the City of Fort Worth, Texas, has caused the Public Works Director to prepare and file estimates of the cost of such improvements and estimates of the amount per front foot proposed to be assessed against abutting property and the owners thereof, and such estimates have been examined, NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: I. Such estimates be, and they are hereby adopted and approved. II. It is hereby found and determined that the cost of improvements on each portion of streets, avenues, and public places hereinafter described, with the amount or amounts per front foot proposed to be assessed for such improvements against abutting pro- perty and the owners thereof, are as follows, to-wit: UNIT 1: WILLIE STREET From Edgewood Terrace to Langston Street, known and designated as Unit 1, Project No. 104-24000-209. The estimated cost of improvements is $ 12-491-05 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2.37 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 5.10 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for -0- wide concrete sidewalk is $ -0- ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for six-inch thick concrete driveway is $ .96 per square foot; the total estimated amount per front foot to be as against abutting property and the owners thereof is $ 7.47 , plus the cost incurred for concrete driveway construction where specified. III. A hearing be given and held by and before the City Council of the City of Fort Worth, Texas, to all owning or claiming any property abutting upon said portions of highways, streets, avenues and public places, as well as to all owning or claiming any interest in any such property. Such hearing shall be given and held on the 9th day of _August , 1971 . at 9:30 A.M. in the Council Chamber in the City Hall in the City of Fort Worth, Texas, and the City Secretary is hereby directed to give or cause to be given notice ,of the time and place of such hearing and of other matters and facts in accordance with the terms and provisions of an Act passed at the First Called Session of the Fortieth Legislature of the State of Texas, and known as Chapter 106 of the Acts of said Session, now being known as Article 1105b of Vernon's Texas Civil Statutes as amended by Acts 1967, 60th Legislature, Page 365, Chapter 176, Section 1, emergency effective May 12, 1967. Such notice shall be. by advertisement inserted at least three (3) times in a newspaper published in the -City of Fort Worth, Texas, the first publication to be made at least twenty-one (21) days before the date of said hearing. Said notice shall comply with and be in accordance with the terms and provisions of said Act as amended. The City Secretary is further directed to give or cause to be given personal notice of the time and place of such hearing to all owning or claiming any property abutting on said portions of highways, streets, avenues and public places, as well as to all owning or claiming any interest in any such property. Such personal notice shall be in writing and shall be given or caused to be given by the City Secretary by depositing such written notice in the United States Mail at least fourteen (14) days before the date of the hearing, postage prepaid, in envelopes addressed to all persons owning or claiming any interest in the respective properties abutting the high- ways, streets, avenues and public places or portions thereof to be improved, as the names bf such persons are shown on the current rendered tax rolls of the City of Fort Worth and at the addresses so shown, or if the name of such respective owners do not appear on such rendered tax rolls, then address to such owners as their names are shown on the current unrendered tax rolls of the City of Fort Worth at the addresses shown thereon. In those cases in which an owner of property abutting a highway, street, avenue or public place or portion or portions there- of which is to be .improved is listed as "unknown" on ,the then current City of Fort Worth tax rolls, or the name of an owner is shown on the City of Fort Worth tax rolls but no address for such owner is shown,' no notice need be mailed. In those cases where the owner is shown to be an estate, the mailed notice may be addressed to such estate. In this connection, the City Secretary shall prepare and file or cause to be prepared and filed with these proceedings a list of the- properties to be assessed, the names of those persons owning or claiming any interest in said properties to whom the notice was mailed, together with the last known addresses determined as aforesaid of the respective owners and those perms sons owning or claiming any interest in said property. The City Secretary shall certify that each of the parties in said list whose address is shown on the then current rendered or unrendered tax rolls of the City of Fort Worth was mailed a copy .of the notice of hearing and shall further certify the date or dates on which said notice was mailed. A copy of each notice shall be attached to such certificate. The certificate of the City Secretary will be con- clusive evidence of the facts therein recited. IV. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council and by filing the complete ordinance in the appropriate Ordinance Records of this City. V. This ordinance shall take effect and be in full force and effect from and after the date of its passage. Passed and approved this day of 19 APPROVED AS TO FORM AND LEGALITY: City Attorney UNIT 6: LANGSTON STREET From Ramey Avenue to Chapman Street, known and designated as Unit 6, Project No. 104-24000-209. The estimated cost of improvements is $ 22,005.50 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2,37 the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $5.10 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for -0- wide concrete sidewalk is $ -0- ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ ,96 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 7.47 , plus the cost incurred for concrete driveway con- struction where specified. The estimated cost of improvements is $ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for wide concrete sidewalk is $ ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ , plus the cost incurred for concrete driveway con- struction where specified. The estimated cost of improvements is $ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for wide concrete sidewalk is $ ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ , plus the cost incurred for concrete driveway con- struction where specified. UNIT 2: DANNER STREET From Ramey Avenue to Chapman Street, known and designated as Unit 2, Project No. 104-24000-209. The estimated cost of improvements is $ 23,752.30 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2.37 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 5.10 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for -0- wide concrete sidewalk is $ -0- ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .96 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 7.47 plus the cost incurred for concrete driveway con- struction where specified. UNIT 3: MACEO LANE From Carverly Avenue to Ransom Terrace, known and designated as Unit 3, Project No. 104-24000-209. The estimated cost of improvements is $ 5,480.47 - ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2.37 the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 5.10 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for -0- wide concrete sidewalk is $ -0- ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .96 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 7,47 plus the cost incurred for concrete driveway con- struction where specified. UNIT 5: COWAN STREET From Langston Street to Amanda Street, known and designated as Unit 5, Project No. 104-24000-209. The estimated cost of improvements is $ 9,267.50 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $' 2.37 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 4.31 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for -p- wide concrete sidewalk is $ -0- ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ ,96 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 6.68 , plus the cost incurred for concrete driveway con- struction where specified. UNIT 4: HANDLEY DRIVE (DELETED) UNIT 5: COWAN STREET From Langston Street to Amanda Street, known and designated as Unit 5, Project No. 104-24000-209, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen- inch wide concrete gutter, so that the finished roadway will be twenty-six feet wide, and by constructing six-inch thick concrete driveways where specified. UNIT 6: LANGSTON STREET From Ramey Avenue to Chapman Street, known and designated as Unit 6, Project No. 104-24000-209, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide, and by constructing six-inch thick concrete driveways where specified . City of Fort Worth, Texas Mayor and Council Communication DATE REFERENCE SUBJECT: Award of Contract - Assessment PAGE NUMUR Paving at 6 Locations on the 2 712/71 C-2032 East Side lof City Council action is requested on the project below. Project Description Nature of Work: Assessment Paving at 6 Locations on the East Side Roadway Width R.O.W. Unit Street Limits Feet Feet 1 Willie Street Edgewood Terrace to Langston Street 30 50 2 Danner Street Ramey Avenue to 30 44 Chapman Street 3 Maceo Lane Carverly Avenue to 30 50 Ransom Terrace 4 Handley Drive (Deleted) 5 Cowan Street Langston Street to 26 40 Amanda Street 6 Langston Street Ramey Avenue to 30 44 Chapman Street Unit 1 was initiated through a poll-card survey. Petitions were received from property owners on Units 2, 5 and 6. Unit 3 was City initiated as a request through a member of the Community Relations Commission. Submission of Bids The following bids have been received: Bidder Amount Glade, Inc. $89,693.55 Texas Bitulithic Co. 95,012.50 L. Grimes & Co. , Inc. 95,753.95 Austin Road Company 96,626.97 S.R.O. Asphalt, Inc. 99,743.10 Bids Received: June 17, 1971 Working Days Allotted: 85 DATE REFERENCE SUBJECT: Award of Contract - Assessment PAGE NUMBER 7/12/71 C-2032 Paving at 6 Locations on the 2 of 2 East Side Project Cost and Financing Based on the low net bid, approximately $37,364.49 will be assessed abutting property owners. The cost to the City-at-large will be approximately $62,000 which includes engineering expenses, inspection and miscellaneous expenditures. Recommendations 1) The following Bond Fund Transfer be approved: Amount From To Reason $37,364.49 Unspecified 6 Locations on To provide for property 042-09724-901 the East Side owners ' share of con- 042-10424-209 struction cost $62,000.00 Unspecified 6 Locations on To provide for the City's 104-24000-901 the East Side share of construction, in- 104-24000-209 spection engineering, and miscellaneous expenses. 2) An Ordinance be adopted: a) Declaring the necessity for ordering the improvements; b) Making the provisions for levying of assessments; c) Directing the Public Works Department to prepare estimates of costs and amounts to be assessed; d) Awarding the contract to Glade, Inc. , in the amount of $89,693.55; e) Making appropriations to cover indebtedness thereby in- curred for improvements of the project named above. 3) An Ordinance be adopted: a) Approving the estimates of cost and amounts proposed to be assessed; and, b) Setting August 9, 1971, as the date for the Benefit Hearing. Ri1L/j e Attachments: "A" - Project Map "B" - Resuma "C" - Engineers' Preliminary Assessment Rolls SUBMITTED BY: DISPOSITION B UNCN.: PROCESSED BY PROVED [3 OTHER (DESCRIBE) w 1 b O d'% r1 / „C'00` ITY SECRETARY DATE/� CITY MANAGER QI;I; ? ' or j '% ' ��F� / 71