HomeMy WebLinkAboutOrdinance 7814 ORDINANCE NO. 7914-1, ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF ALEMEDA BOULEVARD AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS; DECLARING THE CONTRACT WITH J. L. BERTRAM CONSTRUCTION COMPANY FOR THE CONSTRUCTION OF SAID IMPROVEMENTS FULLY COMPLETED AND PERFORMED; DIRECTING THE ISSUANCE, EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF SPECIAL ASSESSMENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS HEREIN AUTHORIZED AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS; DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL OF FORT WORTH, TEXAS, AND BY FILING THE COMPLETE ORDINANCE IN APPROPRIATE ORDINANCE RECORDS OF SAID CITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City of Fort Worth, Texas, has heretofore entered into a contract with J. L. Bertram Construction Company , for the making and construction of certain street improvements on the hereinafter described portions of streets, avenues and public places in said City, to-wit: ALEMEDA BOULEVARD From 4,586' south of White Settlement Road to White Settlement Road, known and designated as Project No. 104-36000-413, a seven-inch thick reinforced concrete pavement on a six- inch thick lime stabilized subgrade with seven- inch high superimposed concrete curb. The road- way will consist of two twenty-six foot wide traffic lanes with a forty-eight foot median, and twelve-foot wide left-turn lanes at all intersections. Four foot wide concrete side- walk will be constructed where specified. WHMMS, by sundry proceedings heretofore passed by the City Council of the City of Pbrt Worth, Texas, including Ordinance No. 7479 . a portion of the cost of said improvements was levied and assessed against the respective properties abutting on each of the above described portions of streets, avenues and public places and against the real and true owners thereof; and, WHEREAS, the City Council of the City of Port Worth, Texas, has, upon re- view, found and determined that, in some instances, in order to effect substantial justice and equality, it is desirable and necessary to grant and issue certain credits against some one or more of the assessments levied by Ordinance No. 7479 , and WHMEAS, the street improvements hereinabove mentioned have been completed u-pon each of the portions of streets, avenues and public places hereinabove described, and have been inspected and found to be in complete accordance with the contract therefor; NOW, TH771�_EFORE, BE IT ORDAI`•i-D BY TIL CITY COUNCIL OF THS CITY OF F%T WORTH, TV,XAS, THAT: I. The improvements on each of the portions of streets, avenues and public places hereinabove described be, and they are hereby, accepted; and the contract with re- ference thereto be, and it is hereby, found and declared fully completed and performed. 11. The Mayor, be, and he is hereby, directed to issue and execute in the name of the City, certificates in evidence of the special assessments levied against abutting property and the owner thereof for such improvements, and the City Secretary is directed to attest same and impress thereon the corporate seal of the City, all in accordance with the proceedings relating to such improvements and assessments. The certificates shall be numbered, shall describe the property against which the assessment has been levied, shall, where known, state the name or names of the true owners of the respective parcels of pro- perty assessed and shall be issued in an amount equal to the difference between the principal amount of the assessment and the amounts of any credit issued thereon. The numbers of the certificates, with the property descriptions to be shown on the respective certifi- cates, to,--ether with the names of the owners of said property, the principal amount of the assessment, the respective credits, if any which are hereby authorized, granted and allowed against the principal amount of some one or more of the assessments heretofore levied, and the principal amount for which each certificate is to be issued after giving effect to such credit, if any, are hereby enumerated and itemized as follows: III. When each of the certificates has been duly executed as hereinabove provided, same shall be delivered to the Tax Assessor-Collector as part payment of the contract price. IV. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas, and by filing the complete ordinance in the appropriate Ordinance Records of said City. V. This ordinance shall take effect and be in full force and effect from and after the date of its passage. PASSED AND APPROVED THIS (o "' .1 -day oA� � 19 '72F. APPROVED AS TO FORM AND LEGALITY: City Attorney PROJECT NO. 104-36000-413, ALEMEDA BOULEVARD FROM 4586' SOUTH OF WHITE SETTLEMENT ROAD TO WHITE SETTLEMENT ROAD, to, be improved by constructing a seven-inch thick reinforced concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch high superimposed concrete curb. The roadway will consist of two twenty-six foot wide traffic lanes with a forty-eight foot median and twelve-foot wide left-turn lanes at all intersections. Four-foot wide concrete sidewalk will be constructed on the west aide of roadway where specified. BLOCK U4NER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT 'WEST SIDE WEST POINT ADDITION West Point 29 1 63' Pavement $7.47 $470.61 Development Corp. Res. 63' Curb 1.03 64.89 F.O. Box 16545 63' Sidewalk 4.07 256.41 Fort Worth, Texas 76133 $791.91 Attn. Mr. Joseph S. Howell, III Cara velle Court intersects West Point 18 1 130' Side lot adjusted to: Development Corp. Res. 100' Pavement $7.47 $747.00 P.O. Box 16545 100' Curb 1.03 103.00 Fort Worth, Texas 76133 100' Sidewalk 4.07 407 .00 $1,257.00 Tumbleweed Blvd. intersects West Point 15 4 116' Side lot adjusted to: Development Corp. Res. 100' Pavement $7.47 $747.00 P.O. Box 16545 100' Curb 1.03 103.00 Fort Worth, Texas 76133 100' Sidewalk 4.07 407.00 $1,257.00 Alemeda Court intersects 1. c_RO ECT NO. 104-36000-413, ALEMEDA BOULEVARD, Continued: BLOCK Y4MR LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE WEST POINT ADDITION West Point 29 4 118' Side lot adjusted to: Development Corp. Res. 100' Pavement $7.47 $747 .00 P.O. Box 16545 100' Curb 1.03 10.00 Fort Worth, Texas 76133 100' Sidewalk 4,07 407.00 $1,257.00 West Point 1 4 113' Side lot adjusted to: Development Corp. Res. 100' Pavement $7.47 $747.00 P.O. Box 16545 100' Curb 1.03 103.00 Port Worth, Texas 76133 100' Sidewalk 4.07 407.00 $1,257.00 Pilot Point intersects West Point 13 5 109' Side lot adjusted to: Development Corp, Res. 100' Pavement $7.47 5747 .00 P.O. Box 16545 100' Curb 1.03 103.00 Fort Worth, Texas 76133 100' Sidewalk 4.07 407.00 $1,257.00 West Point 14 5 125' Side lot adjusted to: Development Corp. Res. 100' Pavement $7 .47 $747.00 P.O. Box 16545 100' Curb 1.03 103.00 Fort Worth, Texas 76133 100' Sidewalk 4.07 407.00 $1,257.00 Talleyrand Court intersects West Point 19 5 148' Side lot adjusted to: Development Corp. Res. 100' Pavement $7.47 $747.00 P.O. Box 16545 100' Curb 1.03 103.00 Fort Worth, Texas 76133 100' Sidewalk 4.07 407.00 $1,257.00 2. PROJECT NO. 104-36000-413, ALEMEDA BOULEVARD, Continued BLOCK OWNER IAT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE WEST POINT ADDITION West Point 1 5 118' Side lot adjusted to: Development Corp. Res. 100' Pavement $7.47 $747.00 P.O. Box 16545 100' Curb 1.03 103.00 Fort Worth, Texas 76133 100' Sidewalk 4.07 407.00 $1,257.00 Runnymeade Place intersects West Point 32 6 119' Side lot adjusted to: Development Corp. Res. 100' Pavement $7.47 $747 .00 P.O. Box 16545 100' Curb 1.03 103.00 Fort Worth, Texas 76133 100' Sidewalk 4.07 407.00 $1,257.00 West Point 1 6 120' Side lot adjusted to: Development Corp. Res. 100' Pavement $7.47 $747.00 P.O. Box 16545 100' Curb 1.03 103.00 Fort Worth, Texas 76133 100' Sidewalk 4.07 407.00 $1,257.00 Annapolis Drive intersects West Point 25 7 118' Side lot adjusted to: Development Corp. Res. 100' Pavement $7.47 $747.00 P.O. Box 16545 100' Curb 1.03 103.00 Fort Worth, Texas 76133 100' Sidewalk 4.07 407.00 $1,257.00 West Point 1 7 116' Side lot adjusted to: Development Corp. Res. 100' Pavement $7 .47 $747.00 P.O. Box 16545 100' Curb 1.03 103.00 Fort worth, Texas 76133 100' Sidewalk 4.07 407.00 $1,257.00 3. PROJECT NO. 104-36000-413, ALEMEDA BOULEVARD, Continued BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE WEST POINT ADDITION Panay Way Drive intersects West Point 30 300' Pavement $24.19 $7,257.00 Development Carp. Comm. 300' Curb 1,03 307.00 P.Q. Box 16545 300' Sidewalk 4.07 1,x-":1,00 $8,781.00 Fort Worth, Texas 76133 Farmers Branch intersects West Point 15 16 158' Side lot adjusted to: Development Corp. Res. 100' Pavement $7.47 $747.00 P.Q. Box 16545 100' Curb 1.03 103®00 Fort Worth, Texas 76133 100' Sidewalk 4,07 407.;00 $1,257.00 West Point 5 16 Rear lot Development Corp. Res. 95' Pavement $3.22 $305.90 P.O. Box 16545 95' Curb 1.03 97.85 Fort Worth, Texas 76133 95' Sidewalk 4.07 386 .65 $ 790.40 West Point 4 16 118' Rear lot adjusted to: Development Corp. Res. 95' Pavement $3.22 $305.90 P.O. Box 16545 95' Curb 1.03 97.85 Fort Worth, Texas 76133 95' Sidewalk 4,07 386.65 $ 790.40 West Point 3 16 Rear lot Develc,pment Corp. Res. 82' Pavement $3.22 $264.04 P.O. Box 16545 82' Curb 1.03 84.46 Fort Worth, Texas 76133 82' Sidewalk 4.07 33374 $ 682,24 4. PROJECT NO. 104-36000-413, ALEMEDA BOULEVARD, Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE WEST POINT ADDITION West Point 2 16 Rear lot Development Corp. Res. 70' Pavement $3.22 $225.40 P.O. Box 16545 70' Curb 1.03 72. 10 Fort Worth, Texas 76133 70' Sidewalk 4.07 284.90 $582.40 West Point 1 16 Rear lot Development Corp. Res. 80' Pavement $3.22 $257.60 P.O. Box 16545 80' Curb 1.03 82.40 Fort Worth, Texas 76133 80' Sidewalk 4,07 325.60 $665.60 Stoney Bridge Road intersects West Point 8 22 Rear lot Development Corp. Res. 103' Pavement $3.22 $331.66 P.O. Box 16545 103' Curb 1.03 106.09 Fort Worth, Texas 76133 103' Sidewalk 4.07 419.21 $856.96 WEst Point 6 22 Rear lot Development Corp. Res. 185' Pavement $3.22 $595.70 P.O. Box 16545 185' Curb 1.03 190.55 Fort Worth, Texas 76133 185' Sidewalk 4.07 752.95 $1,539.20 West Point 5 22 Rear lot Development Corp, Res. 76' Pavement $3.22 $244.72 P.O. Box 16545 76' Curb 1.03 78.28 Fort Worth, Texas 76133 76' Sidewalk 4.07 309.32 $632.32 5. PROJECT NO. 104-36000-413 ALEMEDA BOULEVARD, Continued B LOC K OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE WEST POINT ADDITION West Point 1 22 160' Side lot adjusted to: Development Corp. Res. 100' Pavement $7.47 $747.00 P.O. Box X6545 100' Curb 1.03 103.00 Fort Worth, Texas 76133 100' Sidewalk 4.07 407.00 $1,257,00 Ivy Leaf Lane intersects West Point 1 27 123' Side lot adjusted to: Development Corp. Res. 100' Pavement $7.47 $747.00 P.O. Box 16545 100' Curb 1.03 103.00 Fort Worth, Texas 76133 100' Sidewalk 4.07 407 .00 $1,257.00 T.O. MOODY SURVEY West Point Part of Tr. 1 360' Pavement $7 .47 $2,689.20 Development Corp. Res. 360' Curb 1.03 370.80 $3,060.00 P.O. Box 16545 Fort Worth, Texas 76133 West Point Part of Tr. 1 510' Pavement $24.19 $12,336.70 Development Corp. Comm. 510' Curb 1.03 525.30 $12,862.20 P.O. Box 16545 Fort Worth, Texas 76133 White Settlement Road intersects EAST SIDE T.O. MOODY SURVEY S4 Regional Financial & Tr. 2 467 .75' Pavement $24. 19 $11,314.87 Management Corp. , Trustee Comm. 467 .75' Curb 1.03 481.78 $11,796.65 611 Ryan Plaza, Suite 103 Arlington, Texas 76011 6. PROJECT NO. 104-36000-413, ALEMEDA BOULEVARD, continued BLOCK OWNER ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE T.O. MOODY SURVEY Southwest Regional Tract 3 1,004.8' Pavement $24.19 $24,306.11 Properties, Inc. Comm. 1,004.8' Curb 1.03 1,034.94 611 Ryan Plaza, Suite 103 $25,341.05 Arlington, Texas 76011 Southwest Regional Tract 4 1,087.41' Pavement $24.19 $26,304.45 Financial & Management Comm. 1,087.41' Curb 1.03 1,120.03 Corp. Trustee $27,424.48 611 Ryan Plaza, Suite 103 Arlington, Texas 76011 Western Hills Fifty Tract 5 170.1' adjusted to (Drainage easement) Partnership, Comm. 110.1' Pavement $24.19 $ 2,663.32 C/O Southwest Regional 110.1' Curb 1.03 113.40 Properties, Inc. $ 2,776.72 611 Ryan Plaza, Suite 103 Arlington, Texas 76011 J. W. OXFORD SURVEY Western Hills Fifty Tract 3 300' Pavement $24.19 $ 7,257.00 Partnership Comm. 300' Curb 1.03 309.00 C/O Southwest Regional $ 7,566.00 Properties, Inc. 611 Ryan Plaza, Suite 103 Arlington, Texas 76011 DR. HARRIS ROAD INTERSECTS Western Hills Fifty Tract--3 1,010' Pavement $24.19 $24,431.90 Partnership Comm. 1,010' Curb 1.03 1,040.30 C/O Southwest Regional $25,472.20 Properties, Inc. 611 Ryan Plaza, Suite 103 Arlington, Texas 76011 West Point Tract 1 440.37' Pavement $24.19 $10,652.55 Development Corp. Comm. 440.37' Curb 1.03 453.58 P. 0. Box 16545 $11,106.13 Fort Worth, Texas 76133 TOTAL COST TO PROPERTY OWNERS (ASSESSMENTS) . . . . . . . .$162,378.86 TOTAL COST CITY OF FORT WORTH (STORM DRAIN) . . . . . . . .$140,569.89 TOTAL COST CITY OF FORT WORTH (STREETS) . . . . . . . . . . . .$193,380.74 DEVELOPER'S COST (STREETS) . . . . . . . . . . . . . . . . . . . . . . . . .$ 65,643.46 TOTAL CONSTRUCTION COST. . . . . . . . . . . . . . . . . . . . . . . . . . . .$561,972.95 7. City of Fort Worth, Texas HERCHERT BAIUFF Mayor and Council Communication sYITH DATE REFERENCE sUBJECT:Final Payment - Assessment Paving PAGE NUMBER NU2 9/26/78 BERFP- 6 of Alemeda Boulevard Project No. 1 o 104-36413 Final Council action is requested ou the project described below. Project Description Name: Assessment Pavj-ng of Alemeda Boulevard. Project No. 104-36413 Contract No 9119 dated 12-20-76 Contractor: J. L. Bertram Construction Company Contract Awarded: December 20, 1976 (M&C C-3622) Work Order Issued. May 16, 1977 Work Order Effective: March 21, 1977 Work Began: March 21, 1977 Project Substantially Complete and Final Inspection Made: June 1, 1978 Final Construction Approval: September 7, 1978 Working Time Bid: 130 Working Days Working Time Used: 136 Working Days Project Cost and Financing Original Bid Price: $498,429.28 Change Order No. 1: -1.100.00 (A.R. 1-15 2.3.1) Na, 2: +7,859.16 (A.R. 1-15 2.3.1) Revised Bid Price: $505,!88.54 Final Contract Cost: $510,884.50 Less Six Days Liquidated damages at $100: -$600 Partial Payments Previously Made: 13 Amount: $449,428.60 Final Payment Due: $ 60,855.90 Contract Time The contractor used six working days in addition to the 130 days allotted. A charge of $100 per day for the additional six days has been deducted from the final payment as liquidated damages as provided in the contract. Final payment is to be made from Project Number 104-36413. A bond fund transfer is needed in the amount of $500. Deviation from Bid Price: The final contract cost of this project is $5,695.96 or 1.1% over final bid vrice. This cost difference resulted due to minor deviations between quantities estimated in the contract documents and quanities measured and used at the job site. DATE REFERENCE SU13JECT: Final Payment - Assessment Paving PAGE NUMBER of Alemeda Boulevard Project No. 2 2 9, 26{78 FP-•1336 104-36413 of Compliance with Specifications Tests made during construction show materials used and required thick- nesses were in compliance with contract specifications. Recommendations It is recommended that: to A bond fund transfer in the amount of $500 be made from Streets in New Additions Unspecified, 0.13-036-901-00, to Assessment Paving of Alemeda Boulevard, 013-036-413-00; and, 2. The project described be accepted by the adoption of an ordinance and final paymeLic of §bU,855.9U be maue to J. L. Bertram Construction and Engineering Co. , Inc. GG:jc SUBMI D BY: DISPOSITION COUNCIL: PROCY PPROVED ❑ OTHER (DESCRIBE) ADOPTED NPP «�N lC I 4DEZ: CITY MANAGER q _