HomeMy WebLinkAboutOrdinance 7814 ORDINANCE NO. 7914-1,
ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF ALEMEDA BOULEVARD
AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES
IN THE CITY OF FORT WORTH, TEXAS; DECLARING THE CONTRACT WITH
J. L. BERTRAM CONSTRUCTION COMPANY FOR THE CONSTRUCTION OF
SAID IMPROVEMENTS FULLY COMPLETED AND PERFORMED; DIRECTING THE
ISSUANCE, EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF
SPECIAL ASSESSMENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS
HEREIN AUTHORIZED AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS;
DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE
BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY
COUNCIL OF FORT WORTH, TEXAS, AND BY FILING THE COMPLETE ORDINANCE
IN APPROPRIATE ORDINANCE RECORDS OF SAID CITY; AND PROVIDING AN
EFFECTIVE DATE.
WHEREAS, the City of Fort Worth, Texas, has heretofore entered into a contract
with J. L. Bertram Construction Company , for the making and construction of
certain street improvements on the hereinafter described portions of streets, avenues and
public places in said City, to-wit:
ALEMEDA BOULEVARD From 4,586' south of White Settlement Road to
White Settlement Road, known and designated
as Project No. 104-36000-413, a seven-inch
thick reinforced concrete pavement on a six-
inch thick lime stabilized subgrade with seven-
inch high superimposed concrete curb. The road-
way will consist of two twenty-six foot wide
traffic lanes with a forty-eight foot median,
and twelve-foot wide left-turn lanes at all
intersections. Four foot wide concrete side-
walk will be constructed where specified.
WHMMS, by sundry proceedings heretofore passed by the City Council of the
City of Pbrt Worth, Texas, including Ordinance No. 7479 . a portion of the cost of
said improvements was levied and assessed against the respective properties abutting on each
of the above described portions of streets, avenues and public places and against the real
and true owners thereof; and,
WHEREAS, the City Council of the City of Port Worth, Texas, has, upon re-
view, found and determined that, in some instances, in order to effect substantial justice
and equality, it is desirable and necessary to grant and issue certain credits against
some one or more of the assessments levied by Ordinance No. 7479 , and
WHMEAS, the street improvements hereinabove mentioned have been completed
u-pon each of the portions of streets, avenues and public places hereinabove described, and
have been inspected and found to be in complete accordance with the contract therefor;
NOW, TH771�_EFORE,
BE IT ORDAI`•i-D BY TIL CITY COUNCIL OF THS CITY OF F%T WORTH,
TV,XAS, THAT:
I.
The improvements on each of the portions of streets, avenues and public
places hereinabove described be, and they are hereby, accepted; and the contract with re-
ference thereto be, and it is hereby, found and declared fully completed and performed.
11.
The Mayor, be, and he is hereby, directed to issue and execute in the name
of the City, certificates in evidence of the special assessments levied against abutting
property and the owner thereof for such improvements, and the City Secretary is directed
to attest same and impress thereon the corporate seal of the City, all in accordance with
the proceedings relating to such improvements and assessments. The certificates shall be
numbered, shall describe the property against which the assessment has been levied, shall,
where known, state the name or names of the true owners of the respective parcels of pro-
perty assessed and shall be issued in an amount equal to the difference between the
principal amount of the assessment and the amounts of any credit issued thereon. The numbers
of the certificates, with the property descriptions to be shown on the respective certifi-
cates, to,--ether with the names of the owners of said property, the principal amount of the
assessment, the respective credits, if any which are hereby authorized, granted and allowed
against the principal amount of some one or more of the assessments heretofore levied, and the
principal amount for which each certificate is to be issued after giving effect to such credit,
if any, are hereby enumerated and itemized as follows:
III.
When each of the certificates has been duly executed as hereinabove provided,
same shall be delivered to the Tax Assessor-Collector as part payment of the contract
price.
IV.
The City Secretary is hereby directed to engross and enroll this ordinance by
copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas,
and by filing the complete ordinance in the appropriate Ordinance Records of said City.
V.
This ordinance shall take effect and be in full force and effect from and after
the date of its passage.
PASSED AND APPROVED THIS (o "' .1 -day oA� � 19 '72F.
APPROVED AS TO FORM AND LEGALITY:
City Attorney
PROJECT NO. 104-36000-413, ALEMEDA BOULEVARD FROM 4586' SOUTH OF WHITE SETTLEMENT ROAD
TO WHITE SETTLEMENT ROAD, to, be improved by constructing a seven-inch thick reinforced
concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch high
superimposed concrete curb. The roadway will consist of two twenty-six foot wide
traffic lanes with a forty-eight foot median and twelve-foot wide left-turn lanes at
all intersections. Four-foot wide concrete sidewalk will be constructed on the west
aide of roadway where specified.
BLOCK
U4NER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
'WEST SIDE WEST POINT ADDITION
West Point 29 1 63' Pavement $7.47 $470.61
Development Corp. Res. 63' Curb 1.03 64.89
F.O. Box 16545 63' Sidewalk 4.07 256.41
Fort Worth, Texas 76133 $791.91
Attn. Mr. Joseph S. Howell, III
Cara velle Court intersects
West Point 18 1 130' Side lot adjusted to:
Development Corp. Res. 100' Pavement $7.47 $747.00
P.O. Box 16545 100' Curb 1.03 103.00
Fort Worth, Texas 76133 100' Sidewalk 4.07 407 .00 $1,257.00
Tumbleweed Blvd. intersects
West Point 15 4 116' Side lot adjusted to:
Development Corp. Res. 100' Pavement $7.47 $747.00
P.O. Box 16545 100' Curb 1.03 103.00
Fort Worth, Texas 76133 100' Sidewalk 4.07 407.00 $1,257.00
Alemeda Court intersects
1.
c_RO ECT NO. 104-36000-413, ALEMEDA BOULEVARD, Continued:
BLOCK
Y4MR LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
WEST SIDE WEST POINT ADDITION
West Point 29 4 118' Side lot adjusted to:
Development Corp. Res. 100' Pavement $7.47 $747 .00
P.O. Box 16545 100' Curb 1.03 10.00
Fort Worth, Texas 76133 100' Sidewalk 4,07 407.00 $1,257.00
West Point 1 4 113' Side lot adjusted to:
Development Corp. Res. 100' Pavement $7.47 $747.00
P.O. Box 16545 100' Curb 1.03 103.00
Port Worth, Texas 76133 100' Sidewalk 4.07 407.00 $1,257.00
Pilot Point intersects
West Point 13 5 109' Side lot adjusted to:
Development Corp, Res. 100' Pavement $7.47 5747 .00
P.O. Box 16545 100' Curb 1.03 103.00
Fort Worth, Texas 76133 100' Sidewalk 4.07 407.00 $1,257.00
West Point 14 5 125' Side lot adjusted to:
Development Corp. Res. 100' Pavement $7 .47 $747.00
P.O. Box 16545 100' Curb 1.03 103.00
Fort Worth, Texas 76133 100' Sidewalk 4.07 407.00 $1,257.00
Talleyrand Court intersects
West Point 19 5 148' Side lot adjusted to:
Development Corp. Res. 100' Pavement $7.47 $747.00
P.O. Box 16545 100' Curb 1.03 103.00
Fort Worth, Texas 76133 100' Sidewalk 4.07 407.00 $1,257.00
2.
PROJECT NO. 104-36000-413, ALEMEDA BOULEVARD, Continued
BLOCK
OWNER IAT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
WEST SIDE WEST POINT ADDITION
West Point 1 5 118' Side lot adjusted to:
Development Corp. Res. 100' Pavement $7.47 $747.00
P.O. Box 16545 100' Curb 1.03 103.00
Fort Worth, Texas 76133 100' Sidewalk 4.07 407.00 $1,257.00
Runnymeade Place intersects
West Point 32 6 119' Side lot adjusted to:
Development Corp. Res. 100' Pavement $7.47 $747 .00
P.O. Box 16545 100' Curb 1.03 103.00
Fort Worth, Texas 76133 100' Sidewalk 4.07 407.00 $1,257.00
West Point 1 6 120' Side lot adjusted to:
Development Corp. Res. 100' Pavement $7.47 $747.00
P.O. Box 16545 100' Curb 1.03 103.00
Fort Worth, Texas 76133 100' Sidewalk 4.07 407.00 $1,257.00
Annapolis Drive intersects
West Point 25 7 118' Side lot adjusted to:
Development Corp. Res. 100' Pavement $7.47 $747.00
P.O. Box 16545 100' Curb 1.03 103.00
Fort Worth, Texas 76133 100' Sidewalk 4.07 407.00 $1,257.00
West Point 1 7 116' Side lot adjusted to:
Development Corp. Res. 100' Pavement $7 .47 $747.00
P.O. Box 16545 100' Curb 1.03 103.00
Fort worth, Texas 76133 100' Sidewalk 4.07 407.00 $1,257.00
3.
PROJECT NO. 104-36000-413, ALEMEDA BOULEVARD, Continued
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
WEST SIDE WEST POINT ADDITION
Panay Way Drive intersects
West Point 30 300' Pavement $24.19 $7,257.00
Development Carp. Comm. 300' Curb 1,03 307.00
P.Q. Box 16545 300' Sidewalk 4.07 1,x-":1,00 $8,781.00
Fort Worth, Texas 76133
Farmers Branch intersects
West Point 15 16 158' Side lot adjusted to:
Development Corp. Res. 100' Pavement $7.47 $747.00
P.Q. Box 16545 100' Curb 1.03 103®00
Fort Worth, Texas 76133 100' Sidewalk 4,07 407.;00 $1,257.00
West Point 5 16 Rear lot
Development Corp. Res. 95' Pavement $3.22 $305.90
P.O. Box 16545 95' Curb 1.03 97.85
Fort Worth, Texas 76133 95' Sidewalk 4.07 386 .65 $ 790.40
West Point 4 16 118' Rear lot adjusted to:
Development Corp. Res. 95' Pavement $3.22 $305.90
P.O. Box 16545 95' Curb 1.03 97.85
Fort Worth, Texas 76133 95' Sidewalk 4,07 386.65 $ 790.40
West Point 3 16 Rear lot
Develc,pment Corp. Res. 82' Pavement $3.22 $264.04
P.O. Box 16545 82' Curb 1.03 84.46
Fort Worth, Texas 76133 82' Sidewalk 4.07 33374 $ 682,24
4.
PROJECT NO. 104-36000-413, ALEMEDA BOULEVARD, Continued:
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
WEST SIDE WEST POINT ADDITION
West Point 2 16 Rear lot
Development Corp. Res. 70' Pavement $3.22 $225.40
P.O. Box 16545 70' Curb 1.03 72. 10
Fort Worth, Texas 76133 70' Sidewalk 4.07 284.90 $582.40
West Point 1 16 Rear lot
Development Corp. Res. 80' Pavement $3.22 $257.60
P.O. Box 16545 80' Curb 1.03 82.40
Fort Worth, Texas 76133 80' Sidewalk 4,07 325.60 $665.60
Stoney Bridge Road intersects
West Point 8 22 Rear lot
Development Corp. Res. 103' Pavement $3.22 $331.66
P.O. Box 16545 103' Curb 1.03 106.09
Fort Worth, Texas 76133 103' Sidewalk 4.07 419.21 $856.96
WEst Point 6 22 Rear lot
Development Corp. Res. 185' Pavement $3.22 $595.70
P.O. Box 16545 185' Curb 1.03 190.55
Fort Worth, Texas 76133 185' Sidewalk 4.07 752.95 $1,539.20
West Point 5 22 Rear lot
Development Corp, Res. 76' Pavement $3.22 $244.72
P.O. Box 16545 76' Curb 1.03 78.28
Fort Worth, Texas 76133 76' Sidewalk 4.07 309.32 $632.32
5.
PROJECT NO. 104-36000-413 ALEMEDA BOULEVARD, Continued
B LOC K
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
WEST SIDE WEST POINT ADDITION
West Point 1 22 160' Side lot adjusted to:
Development Corp. Res. 100' Pavement $7.47 $747.00
P.O. Box X6545 100' Curb 1.03 103.00
Fort Worth, Texas 76133 100' Sidewalk 4.07 407.00 $1,257,00
Ivy Leaf Lane intersects
West Point 1 27 123' Side lot adjusted to:
Development Corp. Res. 100' Pavement $7.47 $747.00
P.O. Box 16545 100' Curb 1.03 103.00
Fort Worth, Texas 76133 100' Sidewalk 4.07 407 .00 $1,257.00
T.O. MOODY SURVEY
West Point Part of Tr. 1 360' Pavement $7 .47 $2,689.20
Development Corp. Res. 360' Curb 1.03 370.80 $3,060.00
P.O. Box 16545
Fort Worth, Texas 76133
West Point Part of Tr. 1 510' Pavement $24.19 $12,336.70
Development Corp. Comm. 510' Curb 1.03 525.30 $12,862.20
P.O. Box 16545
Fort Worth, Texas 76133
White Settlement Road intersects
EAST SIDE T.O. MOODY SURVEY
S4 Regional Financial & Tr. 2 467 .75' Pavement $24. 19 $11,314.87
Management Corp. , Trustee Comm. 467 .75' Curb 1.03 481.78 $11,796.65
611 Ryan Plaza, Suite 103
Arlington, Texas 76011
6.
PROJECT NO. 104-36000-413, ALEMEDA BOULEVARD, continued
BLOCK
OWNER ZONING FRONTAGE RATE AMOUNT ASSESSMENT
EAST SIDE T.O. MOODY SURVEY
Southwest Regional Tract 3 1,004.8' Pavement $24.19 $24,306.11
Properties, Inc. Comm. 1,004.8' Curb 1.03 1,034.94
611 Ryan Plaza, Suite 103 $25,341.05
Arlington, Texas 76011
Southwest Regional Tract 4 1,087.41' Pavement $24.19 $26,304.45
Financial & Management Comm. 1,087.41' Curb 1.03 1,120.03
Corp. Trustee $27,424.48
611 Ryan Plaza, Suite 103
Arlington, Texas 76011
Western Hills Fifty Tract 5 170.1' adjusted to (Drainage easement)
Partnership, Comm. 110.1' Pavement $24.19 $ 2,663.32
C/O Southwest Regional 110.1' Curb 1.03 113.40
Properties, Inc. $ 2,776.72
611 Ryan Plaza, Suite 103
Arlington, Texas 76011
J. W. OXFORD SURVEY
Western Hills Fifty Tract 3 300' Pavement $24.19 $ 7,257.00
Partnership Comm. 300' Curb 1.03 309.00
C/O Southwest Regional $ 7,566.00
Properties, Inc.
611 Ryan Plaza, Suite 103
Arlington, Texas 76011
DR. HARRIS ROAD INTERSECTS
Western Hills Fifty Tract--3 1,010' Pavement $24.19 $24,431.90
Partnership Comm. 1,010' Curb 1.03 1,040.30
C/O Southwest Regional $25,472.20
Properties, Inc.
611 Ryan Plaza, Suite 103
Arlington, Texas 76011
West Point Tract 1 440.37' Pavement $24.19 $10,652.55
Development Corp. Comm. 440.37' Curb 1.03 453.58
P. 0. Box 16545 $11,106.13
Fort Worth, Texas 76133
TOTAL COST TO PROPERTY OWNERS (ASSESSMENTS) . . . . . . . .$162,378.86
TOTAL COST CITY OF FORT WORTH (STORM DRAIN) . . . . . . . .$140,569.89
TOTAL COST CITY OF FORT WORTH (STREETS) . . . . . . . . . . . .$193,380.74
DEVELOPER'S COST (STREETS) . . . . . . . . . . . . . . . . . . . . . . . . .$ 65,643.46
TOTAL CONSTRUCTION COST. . . . . . . . . . . . . . . . . . . . . . . . . . . .$561,972.95
7.
City of Fort Worth, Texas
HERCHERT
BAIUFF Mayor and Council Communication
sYITH
DATE REFERENCE sUBJECT:Final Payment - Assessment Paving PAGE
NUMBER NU2
9/26/78 BERFP- 6 of Alemeda Boulevard Project No. 1 o
104-36413
Final Council action is requested ou the project described below.
Project Description
Name: Assessment Pavj-ng of Alemeda Boulevard. Project No. 104-36413
Contract No 9119 dated 12-20-76
Contractor: J. L. Bertram Construction Company
Contract Awarded: December 20, 1976 (M&C C-3622)
Work Order Issued. May 16, 1977
Work Order Effective: March 21, 1977
Work Began: March 21, 1977
Project Substantially Complete and Final Inspection Made: June 1, 1978
Final Construction Approval: September 7, 1978
Working Time Bid: 130 Working Days
Working Time Used: 136 Working Days
Project Cost and Financing
Original Bid Price: $498,429.28
Change Order No. 1: -1.100.00 (A.R. 1-15 2.3.1)
Na, 2: +7,859.16 (A.R. 1-15 2.3.1)
Revised Bid Price: $505,!88.54
Final Contract Cost: $510,884.50
Less Six Days Liquidated damages at $100: -$600
Partial Payments Previously Made: 13 Amount: $449,428.60
Final Payment Due: $ 60,855.90
Contract Time
The contractor used six working days in addition to the 130 days allotted.
A charge of $100 per day for the additional six days has been deducted
from the final payment as liquidated damages as provided in the contract.
Final payment is to be made from Project Number 104-36413. A bond fund
transfer is needed in the amount of $500.
Deviation from Bid Price: The final contract cost of this project
is $5,695.96 or 1.1% over final bid vrice. This cost difference resulted
due to minor deviations between quantities estimated in the contract
documents and quanities measured and used at the job site.
DATE REFERENCE SU13JECT: Final Payment - Assessment Paving PAGE
NUMBER
of Alemeda Boulevard Project No. 2 2
9, 26{78 FP-•1336 104-36413 of
Compliance with Specifications
Tests made during construction show materials used and required thick-
nesses were in compliance with contract specifications.
Recommendations
It is recommended that:
to A bond fund transfer in the amount of $500 be made from Streets
in New Additions Unspecified, 0.13-036-901-00, to Assessment
Paving of Alemeda Boulevard, 013-036-413-00; and,
2. The project described be accepted by the adoption of an
ordinance and final paymeLic of §bU,855.9U be maue to J. L.
Bertram Construction and Engineering Co. , Inc.
GG:jc
SUBMI D BY: DISPOSITION COUNCIL: PROCY
PPROVED ❑ OTHER (DESCRIBE)
ADOPTED NPP «�N lC I 4DEZ:
CITY MANAGER q _