HomeMy WebLinkAboutOrdinance 7914 ORDINANCE NO. 7 ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF BANKS STREET AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS; DECLARING THE CONTRACT WITH AUSTIN ROAD COMPANY FOR THE CONSTRUCTION OF SAID IMPROVEMENTS FULLY COMPLETED AND PERFORMED; DIRECTING THE ISSUANCE, EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF SPECIAL ASSESSMENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS HEREIN AUTHORIZED AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS; DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL OF FORT WORTH, TEXAS, AND BY FILING THE COMPLETE ORDINANCE IN APPROPRIATE ORDINANCE RECORDS OF SAID CITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City of Fort Worth, Texas, has heretofore entered into a contract with Austin Road Company , for the making and construction of certain street improvements on the hereinafter described portions of streets, avenues and public places in said City, to- wit-UNIT 1: BANKS STREET From 148' south of Tidwell Drive to Tidwell Drive, known and designated as Project No. 104-24000-272, Unit 1, a five-inch thick hot- mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade with seven- inch high concrete curb and eighteen-inch wide concrete gutter on a thirty-foot roadway. UNIT 2: SHEPHEARD DRIVE From Glenwick Drive to Montrose Drive, known and designated as Project No. 104-24000-272, Unit 2, a five-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch high con- crete curb and eighteen-inch wide concrete gutter on a thirty-foot roadway. Six-inch thick concrete driveways will be constructed where specified. L,jHEHEAS, by sundry proceedings heretofore passed by the City Council of the City of Fort Worth, Texas, including Ordinance No. 7730 , a portion of the cost of said improvements was levied and assessed against the respective properties abutting on each of the above described portions of streets, avenues and public places and against the real and true owners thereof; and, V,HEREA3, the City Council of the City of Fort V-orth, Texas, has, upon review, found and determined that, in some instances, in order to effect substantial justice and equality, it is desirable and necessary to grant and issue certain credits against some one or more of the assessments levied by Ordinance No. 7730 , and VJHEREA3, the street improvements hereinabove mentioned have been completed upon each of the portions of streets, avenues and public places hereinabove described, and have been inspected and found to be in complete accordance with the contract therefor; NOW, THE hLFORE, BE IN ORDAINLD BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TE,"3, THAT: I. The improvements on each of the portions of streets, avenues and public places hereinabove described be, and they are hereby, accepted; and the contract with reference thereto be, and it is hereby, found and declared fully completed and performed. II. The Mayor, be, and he is hereby, directed to issue and execute in the name of the City, certificates in evidence of the special assessments levied against abutting property and the owner thereof for such improvements, and the City Secretary is directed to attest same and impress thereon the corporate seal of the City, all in accordance with the proceedings relating to such improvements and assessments. The certificates shall be numbered, shall describe the property against which the assessment has been levied, shall, where known, state the name or names of the true owners of the respective parcels of pro- perty assessed andshall be issued in an amount equal to the difference between the principal amount of the assessment and the amounts of any credit issued thereon. The numbers of the certificates, with the property descriptions to be shown on the respective certificates, together with the names of the owners of said property, the principal amount of the assessment, the respective credits, if any which are hereby authorized, granted and allowed against the principal amount of some one or more of the assessments heretofore levied, and the principal amount for which each certificate is to be issued after giving effect to such credit, if any, are hereby enumerated and itemized as follows: III. When each of the certificates has been duly executed as hereinabove provided, same shall be delivered to the Tax Assessor-Collector as part payment of the contract price. IV. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas, and by filing the complete ordinance in the appropriate Ordinance Records of said City. V. This ordinance shall take effect and be in full force and effect from and after the date of its passage. PASSED AND APPROVED THIS � -= day of j u P.4 APPROVED AS TO FORM AND LEGALITY: City Attorney PROJECT NO. 104-24000-272, UNIT 1: BANKS STREET FROM 148' SOUTH OF TIDWELL DRIVE TO TIDWELL DRIVE, to be improved by constructing a five-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade with seven-inch high concrete curb and eighteen- inch wide concrete gutter on thirty-foot roadway. ZONING OWNER LOT BLOCK FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE WESTSIDE ACRES Albert F. Ozuna 3 & 4 F 128.2' Pavement $3.09 $396.14 4021 Tidwell Res. $ 396.14 Fort Worth, Texas 76114 TIDWELL intersects EAST SIDE Dorothea D. Spencer 1 & 2 F 128' Pavement $3.09 $395.52 949 Banks Street Res. $ 395.52 Fort Worth, Texas 76114 UNIT 1: TOTAL COST TO PROPERTY OWNERS (ASSESSMENTS) . . . . . . . . . . . . . . .$ 791.66 TOTAL COST TO CITY OF FORT WORTH. . . . . . . . . . . . . . . . . . . . . . . . . .$ 11,834.42 TOTAL CONSTRUCTION COST. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 12,626.08 1. PROJECT NO. 104-24000-272L UNIT 2: SHEPHEARD DRIVE FROM GLENWICK DRIVE TO MONTROSE DRIVE, to be improved by constructing a five-inch thick hot-mix asphaltic concrete pavement on a six- inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a thirty-foot roadway. Six-inch thick concrete driveways will be con- structed where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE SKYLINE TERRACE ADDITION Pete Gonzales 8 5 195' Side lot adjusted to 1801 Shepheard Drive Res. 100' Pavement $3.09 $309.00 Fort Worth, Texas 100' Curb & gutter 5.41 541.0() 76114 85 S.F. Driveway 2.23 189.55 $1,039.55 Mrs. Flora Perryman 9 5 136.4' Converging lot adjusted to 1809 Shepheard Drive Res. 90' Pavement $3.09 $278.10 Fort Worth, Texas 90' Curb & gutter 5.41 486.90 76114 85 S.F. Driveway 2.23 189.55 $ 954.55 C. L. McLemore 10 5 120.6' Irregular lot adjusted to 1815 Shepheard Res. 115' Pavement $3.09 $355.35 Fort Worth, Texas 115' Curb & gutter 5.41 622.15 76114 85 S.F. Driveway 2.23 189.55 $1,167.05 Rufus H. Earl 11 5 110' Pavement $3.09 $339.90 4812 Camp Bowie Res. 110' Curb & gutter 5.41 595.10 Fort Worth, Texas 85 S.F. Driveway 2.23 189.55 76107 $1,124.55 Edgar N. Mobley 12 5 80' Pavement $3.09 $247.20 1823 Shepheard Drive Res. 80' Curb & gutter 5.41 432.80 Fort Worth, Texas 85 S.F. Driveway 2.23 189.55 76114 S 869.55 2. PROJECT NO. 104-24000-272, UNIT 2: SHEPHEARD DRIVE FROM GLENWICK DRIVE TO MONTROSE DRIVE, continued BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE SKYLINE TERRACE ADDITION Henry C. Fuller 13 5 80' Pavement $3.09 $247.20 1827 Shepheard Drive Res. 80' Curb & gutter 5.41 432.8r) Fort Worth, Texas 85 S. F. Driveway 2.23 189.55 76114 $ 869.55 Ralph E. Houp 14 5 125.6' Pavement $3.09 $388.10 5001 Montrose Res. $ 388.10 Fort Worth, Texas 76114 MONTROSE DRIVE intersects EAST SIDE Helen G. Wells 12 4 100.9' Pavement $3.09 $311.78 C/O Veterans Administration Res. $ 311.78 1400 N. Valley Mills Waco, Texas 76710 Ronald Dillow 11 4 110' Pavement $3.09 $339.9 1828 Shepheard Drive Res. $ 339.90 Fort Worth, Texas 76114 R. L. Dunaway 10 4 105' Pavement $3.09 $324.45 1824 Shepheard Drive Res. 105' Curb & gutter 5.41 568.05 Fort Worth, Texas 140 S.F. Driveway 2.23 312.20 76114 $1,204.70 Donald B. Noble 9 4 109.2' Pavement $3.09 $337.43 1820 Shepheard Drive 109.2' Curb & gutter 5.41 590.77 Fort Worth, Texas 140 S.F. Driveway 2.23 312.20 76114 $1,240.40 3. PROJECT NO. 104-24000-272, UNIT 2: SHEPHEARD DRIVE FROM GLENWICK DRIVE TO MONTROSE DRIVE, continued ZONING OWNER LOT BLOCK FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE SKYLINE TERRACE ADDITION Randy P. Jordan 8 4 105' Pavement $3.09 $324.45 1816 Shepheard Drive Res. 105' Curb & gutter 5.41 568.05 Fort Worth, Texas 76114 139 S.F. Driveway 2.23 309.97 $1,202.47 Charles D. Barnett 7 4 90' Pavement $3.09 $278.10 1812 Shepheard Drive Res. 54 S.F. Driveway 2.23 120.42 Fort Worth, Texas 76114 $398.52 George Renfro 6 4 80' Pavement $3.09 $247.20 1808 Shepheard Drive Res. 54 S.F. Driveway 2.23 120.42 Fort Worth, Texas 76114 $367.62 James & Gloria Stokes 5 4 60' Pavement $3.09 $185.40 1804 Shepheard Drive Res. $185.40 Fort Worth, Texas 76114 Mary N. Banfield 4 4 118.2' Side lot adjusted to: C/O A. L. Purvis Res. 100' Pavement $3.09 $309.00 3605 Dexter 100' Curb & gutter 5.41 541.00 Fort Worth, Texas 76107 $850.00 UNIT 2: TOTAL COST TO PROPERTY OWNERS (ASSESSMENTS) . . . . . . . . . . . . . . . . .$ 12,513.69 TOTAL COST TO CITY OF FORT WORTH. . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 56,472.17 TOTAL CONSTRUCTION COST. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 68,985.86 BOTH UNITS: TOTAL COST TO PROPERTY OWNERS (ASSESSMENTS) . . . . . . . . . . . . . . . . .$ 13,305.35 TOTAL COST TO CITY OF FORT WORTH. . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 68,306.58 TOTAL CONSTRUCTION COST. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 81,611.94 4. �' FILE City of bort Worth, Texas VERCHERT BAIUFF Mayor and Council Communication SM1717 DATE REFERENCE SUBJECT: Final Payment - PAGE NUMBER Assessment Paving at Two Locations 6/5/79 FPR iof �_ Banks Street & She heard Drive Final Council action is requested on the project described below. Project Description Name: Assessment Paving at 2 Locations, Banks Street & Shepheard Drive, Project No. 104-24272, Contract No. 9789 dated Wrrh 21, 1978. Contractor: Austin Road Company Contract Awarded: March 21, 1978 (ffi&C C-4128) Work Order Issued: August 28, 1978 Work Order Effective: September 11, 1978 Work Began: September 11, 1978 Project Substantially Complete and Final Inspection Made: March 20, 1979 Final Construction Approval: May 25, 1)19 Working Time Bid: 24 Days Working Time used: 23 days Project Cost and FiMcing Original Bid Price: $77,663.98 Change Order No. 1: 1,428.64 (M&C C-4455 December 19, 1978) Revised Bid Price. $79,092.62 Final Contract Coat: $74,192.67 Partial Payments Previously Made: 7 Amount: $65,336.99 Final Payment Due: $ 8,855.68 Deviation from Bid Ptica The final contract cost of this project is $4,899.95 under the revised bid price. The savings resulted because it was not necessary to construct subdrains. Financing Sufficient funds are available for the final payment to be made from Project ®• DATE REFERENCE SUBJECT: Final Payment- PAGE NUMBER Assessment Paving at Two Locations 2 of 2 6/5/79 FP-1375 Banks Street & She heard Drive Number 104-24272. Recommendation It is recommended that the project described be accepted by the adoption of an ordinance and final payment of $8,855.68 be made to Austin Road Company. WRH:plg SUBMITTED FOR THE CITY MANAGER'S DISPOSITION OUNCIL PROCESSED BY OFFICE BY: WAPPROVED ORIGINIP ATING HEAD: Keith A. Smith A PTED ORM I e,QtlQT � (p cRIB� DEPARTMENT `1 CITY SECRETARY FOR ADDITIONAL INFORMATION CONTACT: John Jones, Ext. 7901 DATE