HomeMy WebLinkAboutOrdinance 6319 bl
ORDINANCE1oTq
AN ORDINANCE APPROVING AND ADOPTING ESTIMATES OF.THE COST OF,IMPROVE.„ .
MENTS AND OF AMOUNTS TO BE ASSESSED FOR IMPROVEMENTS ON A. PORTION OF
TRAVIS AVENUE-FROM DREW STREET TO PAFFORD STREET
AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN':THE':.
CITY OF'.FORT WORTH, TEXAS; FIXING TIME AND>-PLACE .FOR.. HEARING TO THE
OWNERS OF ABUTTING PROPERTY AND TO ALL OTHERS INTERESTED;. DIRECTING
.THE CITY SECRETARY TO GIVE NOTICE OF SUCH HEADING; AND DIRECTING THE
CITY. SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE
CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL'AND B' FILMING
THE COMPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS.OF"'THE
CITY; AND PROVIDING AN'EFFECTIVE .DATE.
WHEREAS, the City Council of the City of FortWorth,Worth, Texas, has heretofore'ordered that,each®f the
hereinafter described portions of.streets, avenues and public places in the City of.Fort Worth, Texas, be
proved by raising, grading and filling same and by constructing thereon .the following, to wit:: I
UNIT 1: TRAVIS AVENUE From Drew Street to. Pafford Street, :known
and designated as Unit 1, Project No.
104-24000-210, to be improved with six-inch
thick hot-mix asphaltic concrete pavement on
a six-inch .thick lime stabilized subgrade.
i
with seven-inch high concrete curb and . .
eighteen-inch wide ,concrete gutter, so that
the finished roadway will be thirty feet
wide and by constructing four-foo.t wide.
concrete sidewalks and six-inch deep concrete
driveways where specified.
"
UNIT 2: WEST LOWDEN STREET From Willing- Avenue to Ryan Avenue, known
and designated as Unit 2, Project-No.; ,,
104-24000-210, to be improved with si.X-inch
thick hot-mi.k asphaltic concrete pavement on i
a six-inch thick lime stabilized subg"rade
with- seven-inch high concrete curb and j
two=foot wide concrete gutter,
so that' the. .
finished roadway will be thirty feet wide;
UNIT 3:. BOYCE AVENUE From Wellview Avenue to McCart .Street, known . ,
and designated as Unit 3, Project No.
104-24000-210, to be improved with six-inch
thick hot-mix asphaltic. concrete pavement
on a six-inch thick lime stabilized. subgrade
with seven-inch high concrete curb and.
eighteen-inch wide concrete gutter, so that i
the finished roadway. will be thirty feet wide
and by constructing six-inch thick concrete
driveways where specified.
' i
together with concrete curbs, gutters, driveways and incidentals to such improvements
on proper grade and line where same are not already so constructed, together with storm
sewers and drains and other necessary incidentals and appurtenances; all of said 'im-
provements to be constructed as and where shown on the Plans and in strict accordance
with the Plans and Specifications therefor; contract therefore has been made and
entered into with Austin Road Company
and
WHEREAS, the City Council of the City of Fort Worth, Texas, has caused the Public
Works Director to prepare and file estimates of the cost of such improvements and
estimates of the amount per front foot proposed to be assessed against abutting property i
and the owners thereof, and such estimates have been examined, NOW, THEREFORE,
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT:
I.
Such estimates be, and they are hereby adopted and approved.
I
II:
It is hereby found and determined that the cost of improvements on each portion of
streets, avenues, and public places hereinafter described, with the amount or amounts
per front foot proposed to be assessed for such improvements against abutting pro-
perty and the owners thereof, are as follows., to-wit:
i
UNIT 1° TRAVIS AVENUE From Drew Street to Pafford Street,
known and designated as Unit 1,
Project No. 104-24000-210
The estimated cost of improvements is $ $ 6 , 92 the estimated amount
per front foot to be assessed against abutting property and the owners thereof for
concrete curb and gutter is $ .72 ; the estimated. amount per front foot to i
be assessed against abutting property and the owners thereof for pavement is $ 5.87
the estimated amount per front foot to be assessed against abutting property and the
owners thereof for four-foot wide concrete sidewalk is $ 2.76 the estimated
amount per square foot to be assessed against abutting property and the owners thereof for
six-inch thick concrete driveway is $ .85 per square foot; the total
estimated amount per front foot to be assessed against abutting property and the owners
thereof is $ 11.35 , plus the cost incurred for concrete driveway construction
where specified.
u - i
• , I
III.
i
A hearing be given and held by and before the City Council of the City
of Fort Worth, Texas, to all owning or claiming any property abutting upon said
portions of highways, streets, avenues and public places, as well as to all
owning or claiming. any interest in any such property. Such hearing shall be
given and held on the 13th day of July , 19 70 , at 9:30 A.M. ,
in the Council Chamber in the City Hall in the City of Fort Worth, Texas, and
the City Secretary is hereby directed to give or cause to be given notice of the
time and place of such hearing and of other matters and facts in accordance with I
the terms and provisions of an Act passed at the First Called Session of the
Fortieth Legislature of the State of Texas, and known as Chapter 106 of the Acts
of said Session, now being known as Article 1105b of Vernon's Texas Civil Statutes
as amended by Acts 1967, 60th Legislature, Page 365, Chapter 176, Section 1,
emergency effective May 12, 1967® Such notice shall be by advertisement inserted
at least three (3) times in a newspaper published in the City of Fort Worth,
Texas, the first publication to be made at least twenty-one (21) days before
the date of said hearing. Said notice shall comply with and be in accordance with
the terms and provisions of said Act as amended. The City Secretary is further
directed to give or cause to be given personal notice of the time and place of
such hearing to all owning or claiming any property abutting on said portions of
highways, streets, avenues and public places, as well as to all owning or claiming
any interest in any such property. Such personal notice shall be in writing and
shall be given or caused to be given by the City Secretary by depositing such
written notice in the United States Mail at least fourteen (14) days before the
date of the hearing, postage prepaid, in envelopes addressed to all persons
owning or claiming any interest in the respective properties abutting the high-
ways, streets, avenues and public places or portions thereof to be improved, as
the names of such persons are shown on the current rendered tax rolls of the City
of Fort Worth and at the addresses so shown, or if the name of such respective
owners do not appear on such rendered tax rolls, then address to such owners as
their names are shown on the current unrendered tax rolls of the City of Fort Worth
at the addresses shown thereon. In those cases in which an owner of property
abutting a highway, street, avenue or public place or portion or portions there-
of which is to be improved is listed as 01unknown" on the then current City of
Fort Worth tax rolls, or the name of an owner is shown on the City of Fort Worth
tax rolls but no address for such owner is shown, no notice need be mailed. In
those cases where the owner is shown to be an estate, the mailed notice may be
addressed to such estate. In this connection, the City Secretary shall prepare
and file or cause to be prepared and filed with these proceedings a list of the
properties to be assessed, the names of those persons owning or claiming any
interest in said properties to whom the notice was mailed, together with the last
known addresses determined as aforesaid of the respective owners and those per-
sons owning or claiming any interest in said property.
The City Secretary shall certify that each of the parties in said list whose
address is shown on the then current rendered or unrendered tax rolls of the City
of Fort Worth was mailed a copy of the notice, of hearing and shall further certify
the date or dates on which said notice was mailed. A copy of each notice shall be
attached to such certificate. The certificate of the City Secretary will be con- �
clusive evidence of the facts therein recited.
4 1
n
IV.
The City Secretary is hereby directed to engross and enroll this ordinance
by copying the caption of same in the Minute Book of the City Council and by
filing the complete ordinance in the appropriate"Ordinance Records of this City.
V.
This ordinance shall take effect and be in full force and effect from and
after the date of its passage.
Passed and approved this s day of 19 .
APPROVED AS TO FORM AND LEGALITY: r
r
i
r
City Attorney
r
i
I
f
i
UNIT 2: WEST LOWDEN STREET
From Willing Avenue 'to Ryan Avenue;known
and designated as Unit 2, Project No.
104-24000®210
The estimated cost of improvements is $ 6,851.79 the estimated amount
per front foot .to be assessed against abutting property and the owners thereof for
concrete curb and gutter is $ 2.90 the estimated amount per front foot to be
assessed against abutting property and the owners thereof for pavement is $ 5.87;
the estimated amount per front foot to be assessed against abutting property and
the owners thereof for -0- wide concrete sidewalk is $ -0- ; the estimated i
amount per square- foot to be assessed against abutting property and the owners
thereof for 6-inch thick concrete driveway is $ -0- per square foot; the total
estimated amount per front foot to be assessed against abutting property and the .
owners thereof is $ 8.77 , plus the cost incurred for concrete driveway con-
struction where specified.
i
UNIT 3: BOYCE AVENUE From Wellview Avenue to McCart Street,
known and designated as Unit 3, Project
No. 104-24000-210
The estimated cost of improvements is $ 16,579.90 the estimated amount
per front foot to be assessed against abutting property and the owners thereof for
concrete curb and gutter is $ 2.72 the estimated amount per front foot to be.
assessed against abutting property and the owners thereof for pavement is $ 5,87
the estimated amount per front foot to be assessed against abutting property and
the owners thereof for -0- wide concrete sidewalk is $ -0- the estimated
amount per square foot to be assessed against abutting property and the owners
thereof for 6-inch thick concrete driveway is $ .85 per square foot; the total
estimated amount per front foot to be assessed against abutting property and the
owners thereof is $ 8.59 plus the cost incurred for concrete driveway con-
struction where specified.
i
i
UNIT 4: BOYCE AVENUE From McCart Street to G.C. & S.F.
Railroad, known and designated as
Unit 4, Project No. 104-24000-210
The estimated cost of improvements is $ 10,294.90 ; the estimated amount
per front foot to be assessed against abutting property and the owners thereof for
concrete curb and gutter is $ 2.72 ; the estimated amount per front foot to be
assessed against abutting property and the owners thereof for pavement is $5.87 ;
the estimated amount per front foot to be assessed against abutting property and
the owners thereof for -0- wide concrete sidewalk is $ -0m the estimated !
amount per square foot to be assessed against abutting property and the owners
thereof for 6-inch thick concrete driveway is $ .85 per square foot; the total
'estimated amount per front foot to be assessed against abutting property and the
owners thereof is $ 8.59 , plus the cost incurred for concrete driveway con-
struction where specified.
I
z D
UNIT 4: BOYCE AVENUE From McCart Streetto G.C. & S.F. Railroad,
known and designated as Unit 4, .Project No.
104-24000-210, to be improved with six-inch
thick hot-mix asphaltic concrete pavement on
a six-inch thick lime stabilized subgrade with
seven-inch high concrete curb and eighteen—inch
wide concrete gutter, so that the finished
roadway will be thirty feet wide and by'
constructing six-inch thick concrete driveways
where specified.
I
i
t
i
i
I
i
1
I
I
I
4
i
I
i
I
t
I
I
i
I
I
' 19
TO THE HONORABLE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS.
I
Gentlemen:
In accordance with the proceedings of your Honorable Body, I have prepared
estimated of the cost of street improvements 'as shown belows
i
Estimates of the total cost of improvements on a portion of TRAVIS AVENUE FROM
DREW STREET TO PAFFORD STREET and portions of sundry other streets, avenues and public
place# in the, City of. Fort Worth, Texas, and estimated amounts per front foot to be
assessed against abutting property and the owners thereof, on each portion of street,
avenue, and public place are as follows, to-wit:
PROJECT N0, 104-24000-210, UNIT 1: TRAVIS AVENUE FROM DREW STREET TO PAFFORD STREET, to
be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick
lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete
gutter, so that the finished roadway will be thirty feet wide and by constructing -four-foot 4
wide concrete sidewalks and six-inch deep concrete driveways where specified. i
The following assessment rates have been established:
Seven-inch curb and eighteen-inch gutter . . . . . . . . . .$2.72/ L.F.
Six-inch thick hot-mix asphaltic concrete pavement i
(Residential Zoning) . . 2.68/ L.F.
Five-inch thick concrete sidewalk . . . . . . . . . . . 2.76/ L.F.
Six-inch thick concrete driveway . . . . . . . . . . . . .85/ Sq. Ft.
PROJECT NO. 104-24000-210, UNIT 2: WEST LOWDEN STREET FROM WILLING AVENUE TO RYAN AVENUE,
to'be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick
lime stabilized subgrade with seven-inch high concrete curb and two-foot wide' concrete
gutter, .so that the finished roadway will be thirty feet wide, `
The following assessment rates have been established:
Seven-inch curb and two-foot gutter . . . . . . . . - . 4 . .$2.90/ L.F. i
Six-inch thick hot-mix asphaltic concrete pavement
(Residential Zoning) . 2.50/ .L.F.
PROJECT -NO. 104-24000-210, UNIT 3: BOYCE.AVENUE FROM WELLVIEW AVENUE TO McCART STREET, to I
be improved with s,ik-inch thick hot` mix asphaltic concrete pavement on a six-inch thick
lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete
gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch j
thick concrete driveways where specified. j
The following assessment rates have been established: f
Seven-inch curb and eighteen-inch gutter . .,,$2.72/ L.F. '
Six-inch thick hot-mix asphaltic concrete pavement
(Residential Zoning) . . . . . .. . . 2.68/ L.1.
Six-incl} thick concrete driveway . . . . . . . . . . . . . .85/ .Sq. Ft.
INC TON mIREY ¢
W OWD 3t m o ¢
W LO DEN � ST � E
w =
dOW E oT ¢ BO IEJ ST
z � x o I
SERF Yc o
2500 'L 15100 00 0 500 I
ti
20 0jBE
Y I
w f'm ¢ o t o p IT STa c
0 3 J N m .c s N
SH W � '¢ SH W z
EBRD R G AVE�ST ¢ ST O.L.VEICWICK AVE ¢
8ff DIS
ON STf
ID IS H N o ='
Q i a ¢z RIP m d o
IP ¢ ST o z I
o ooz go cT R
B TLE ¢WDICKSON 3 dDI KS DIXON
ST I
y w WAGGOMAN z ICK ON W GGIIMAJ IyI ST >
AFf RD - h
PA FOD � �� Si
� r � .
'a m o DEW CD t--- DR[ � ST �
ST z j
ST t. MA
r = MA ON ST BOLT j
Y BO T. BLT -Q N °° BOT
AVEMA
UTA 1'.AAm 2t
J c c�Lu I LIN FL NT ST
o> ANTHON $
N 2000 ..NT's _ 1
v, CD
ROSEMONT THOR
25 {' �+ Jr.HIGH BRO DUS I
3 �rti
fir�: 3 M BED ELL
•� LL GAM RELL o I
SEMINARY W o
AL BOYCE AVE a BOYCEI AVE "" CD
SPUR E o SPURG ON W a P:
W AVE a FELIX F' _
c.v BILG D H ¢ AV > ��p� m
VE
YDON U AVE
CORDONE v z zo
YATESCD
"' c
SABLE R z o w FO 9 W TK 3EN RAL DE OT
i
4
I
I
I
LOCATIONS ON
THE SOUTH SIDE �i
f
PROJECT NO. 104 . 24000. 210
I
•d
I
CITY OF FORT WORTH
PUBLIC WORKS DEPARTMENT i
ENGINEERING DIVISION
ASSESSMENT PAVING AT 4 LOCATIONS ON TEE SOUTH SIDE
PROJECT NO. 104-24000-210
i
i
'I
A Neighborhood Blearing was conducted by the Engineering (Division of the Public Works
Department at the South Mills Eelmentary School on June 1, 1970 at 7030 p.m. , for the
Assessment Paving of 4 Locations on the South Side.
i
Procedures concerning owner participation in the cost, method and policies of deter-
mining assessments, street construction standards and methods of payment were explain—
ed by Mr. Schmidt to the thirteen (13) persons present,
I
Unit 1, Travis Avenue.- Mrs. Julia Y. Etsel, Shot 6, Block 38, South Fort Worth Add- i
itiorn was happy about the whole paving project as she had waited a long while for it
to become a reality°
i
Unit 2, Lowden Streeto E. C. Walsh, Lot 13, Block 23, Ryan South Addition in this
project as it would eliminate practically all dust stirred up by the 00hot-rod"
enthusiasts. He also was very surprised that the city would replace existing con-
crete driveways, at no cost, if they were not at the right grade level.
Unit 3 Boyce Avenue from Wellview to MicCart° games F. Boyd, Lot 2 Plock 71
Seminary Hill Addition representing himself and Mr. Donald Hoover of Lot 1, Block 63,
Seminary Hill Addition was interested primarily in location of driveways, Mr. Hoover
has no driveway and one has been proposed by the Engineering ]Divisi®ng however Mr.
Hoover plans on building an addition on the back of his home and also plans to build
a double garage. He, Mr. Hoover, is to punt in writing to the Engineering Department
just where he wants a drive to be placed° i
i
Alvin M. Paulson, Lot 3, Block. 71, Seminary Hill Addition was interested in knowing i
if he might get some credit on his existing driveway which he says is constructed of,
asphaltic concrete. Mr. Schmidt assured him that an inspector would examine .it and
credit would be given if such is the case.
Herman Stolz, Sr. , Bot 2, Block 70, Seminary Hill Addition and Agnes Stolz, Lot 1, Block 64, j
Seminary Mill Addition were satisfied and wanted to know how soon work would begin.
Unit 4° Boyce Avenune from McCart to G.C. & S.F. Rai lroad_° J. B. Echols, Lots 1,, 2, , 3
and 4, Block 66, Seminary Hill Addition asked questions as to the difference in prices
of pavement on different zoned property. This was explained.
i
The meeting_:was unique in that everyone was in full agreement with the entire paving j
project. After every issue was discussed fully to the satisfaction of the property ' G
owners, the meeting was adjourned,
i
i
i
i
i
• i
I
-� z
I
LIPSCOMB ST2EET
6e •e toGe a le a
0 Ge f6e 2
N
e• O a � o �' � o I W `11
A ;
03u
o a a ew o m U o A U v
fa
n r•e a. bo I rab , me
TRA WS poll
�G �c �V r r to ae N e �a ae •• V a ,•e 2 _ 'I
I
IN N J N 5 N
W
FIAI
V u
o
p•I.4n + N 'I N oLOm. a �' 4iA + wN o m nwI+' iWN = o iadlsN °
a10
o �
CO
O50 000 Mo.
HEMPHILL STREET
aS6 a•re' 3
^1
I
,
I
4
'I
UNIT I : TRAVIS AVENUE
I
FROM : Drew Street
TO : Pafford Street
i
19 G 19 6 19
ID 7
O CE � I
IG 9 16 9 16
IS 10 5 10 IS 10
Q' oar
14 II 14 It
19 12 o O' — 13 -- IL 19 12
s
L.O\VD.EN ST.
1 24 1 24I t4 1
N
2 29 2 23
0 3
t2
Z�J 3 - --- -- -3- 22 ----3- --
20 I
4 � 21 4 21- 4_-
---� 5 205 20 5 a ZO
19 6 19 6 Z
t8 18 7 Z 18 z 18 --IZ7
11 b l; 17 8 Cl 17 8CY
16 q 9 16 9 C� 16 9 i 16
IS 10 = 15 10 15 10 15 10
C9 - --- - —
II
1
f
UNIT 2 : LOWDEN STREET
FROM : Willing Avenue
TO : Ryan Avenue
I
i
f
I
I
V
_ _``
.• n ,
I
• N
7 cl '
« I
AVE.
yUj YLU is
y
j 2 II 2 ---�I--- 6
16
4
4
5 e 5 d 7 + 11
I
Y 6 � •e � ,� 4 W w � 7 yY Lo Y Iff 4
s SPURGEON p U AVE.
W Z u
I
I
i
UNIT 3 : BOYCE AVENUE
1
FROM : wel (view Avenue !
TO : McCart Street
i
I
y
k i
AI
v
e !r t !r F !► Go 7-e t7
'
n
\ II
!• V !J W
V v O
• .e O • I J Ap N
ArN !I !r
N i
OVA
SOVCE AVE -mKWAM
LW is so - so 7. i
> iis v> s k
_ 4
n Q N t u Q c I3 s ' F
3 +0 io
3 - 7 I
�' _9 a 265
s e s a
It {: 13
o° I
6 7 w W Ge
to w �( {
Ib .s (.e �.—` No �S _!fa r (10 �! G. be LD ,/
PURGEON p u AVE. 0
Z u
Q
I
_ E
s
i
I
UNIT 4 : BOYCE AVENUE '{
}
4
FROM : McCart Street
i
TO : G. C. & S. F. R a i I ro a d
i
f
19 j
1
TO WE HONORABLE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS.
Gen��emen:
In accordance with the proceedings of your Honorable Body, I have prepared f
esttfpated of the cost of street improvements as shown below:
i
Estimates of the total cost of improvements on a portion of TRAVIS AVENUE FROM
DREW STREET TO PAFFORD STREET and portions of sundry other streets, avenues and -public j
places in the City of Fort Worth, Texas, and estimated amounts per front foot to be f
assessed against abutting property and the owners thereof, on each portion of street,
avenue, and -public place are as follows, to-wit:
r,
PROJECT NO. 104-24000-210, UNIT 1: TRAVIS AVENUE FROM DREW STREET TO PAFFORD STREET, to
be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick
lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete
gutter, so that the finished roadway will be thirty feet wide and by constructing four-foot
wide concrete -sidewalks and six-inch deep concrete driveways where specified,
i
The following assessment rates have been established:
Seven-inch curb and eighteen-inch gutter . . . . . . . . . .$2.72/ L.F.
Six-inch thick hot-mix asphaltic concrete pavement
(Residential Zoning) . . . . . . . . 2.68/ L.F.
Five-inch thick concrete sidewalk . . . . . . . . . . . . . 2.76/ L.F.
Six-inch thick concrete driveway . . . . . . . . . . . . . .85/ Sq. Ft.
i
f
PROJECT NO. 104-24000-210, UNIT 2: WEST LOWDEN STREET FROM WILLING AVENUE TO RYAN AVENUE,
to<'be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick
lime stabilized subgrade with seven-inch high concrete curb and two-foot wide' concrete
gutter, so that the finished roadway will be thirty feet wide.
The following assessment rates have been established:
Seven-inch curb and two-foot gutter . . . . . . . . . . . $2.90/ L.F.
Six-inch .thick hot-mix asphaltic concrete pavement
(Residential Zoning) . . . . . . . . 2.50/ L.F.
I
PROJECT NO. 104-24000-210, UNIT 3: BOYCE AVENUE FROM WELLVIEW AVENUE TO McCART STREET, to
be improved with six-inch thick hot=mix asphaltic concrete pavement on a six-inch thick
lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete
gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch
thick concrete driveways where specified.
The following assessment rates have been established:
Seven-inch curb and eighteen-inch gutter . . . . .. . . . $2.72/ L.F.
Six-inch thick hot-mix asphaltic concrete pavement
(Residential Zoning) . . . . . . 2..68/ L.F.
Six-inch thick concrete driveway . . . . . . . . . . . . . . .85/ .Sq. Ft.
I
I
I
I
I
i I
i
y
i
PROJECT NO. 104-24000-210, UNIT 4: BOYCE AVENUE FROM McCART STREET TO G.C. & S.F. RAILROAD,
to be improved with six-inch thick hot-mix asphaltic concrete pavement on a sik-inch thick
lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete I
gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch
thick. concrete driveways where specified.
The following assessment rates have been established;
I
Seven-inch curb and eighteen-inch gutter . . . . . . . . $2.72/ L.F.
Six-inch thick hot-mix asphaltic concrete pavement E
(Residential Zoning) . . . . . . . 2,68/ L.F.
Six-inch thick hot-mix asphaltic concrete pavement I
(Industrial Zoning) - Owner Occupied. 4.27/ L.F.
Six-inch thick hot-mix asphaltic-concrete pavement
(Industrial Zoning) . . . . . . . . 5.87/ L.7.
Six-inch thickconcrete driveway. . . . . .85 Sq. .Ft. ,
The assessments result in the following division of costs:
TOTAL PROPERTY OWNERS' COST FOR PAVEMENT . . . . . . . . . .$ 7,869.03
TOTAL PROPERTY OWNERS' COST FOR CURB, GUTTER, DRIVEWAYS,
and SIDEWALKS. . . . . . . . 8,719.52
I
TOTAL PROPERTY OWNERS' COST . . . . . . . . . . . . .$16,.588.55 t
i
I
TOTAL CITY OF FORT WORTH',S COST . . . . 4 . . . . . . 41,845.76
I
TOTAL ESTIMATED COST . . . . . . . . . . . . . . . $58,434.3.1
t
I
1
A
I
Y
I
't
I1
I
i
i
E
I
I
PROJECT NO, 104-24000-210,. UNIT la TRAVIS AVENUE FROM DREW STREET TO PAFFORD STREET, to be
improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime
stabilized subgr°ade with seven-inch high concrete curb and eighteen-inch wide concrete
gutter, so that the finished roadway will be thirty feet wide and by constructing four-foot
wide concrete sidewalks and six-inch deep concrete driveways where specified.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
BEGINNING AT NORTHWEST CORNER OF DREW STREET AND TRAVIS AVENUE
i
WEST SIDE-OF STREET SOUTH FORT WORTH ADDITION
Lela Mae Little 7 38 140' Side Lot Credit
800 W. Drew Street Res. 100' Pavement $2.68 $268:00
100' Curb & Gutter 2.72 272.00
118 Sq. Ft. Driveway.85 100.30
$ 640.30
1 Julia Y. Etzel 6 38 140' Side Lot Credit
1104 W. Fogg Street Res. 100' Pavement $2.68 $268.00
j 100' Curb & Gutter -2.72 272.00
194 Sq. Ft. Driveway.85 164.90
$ 704.90
FOGG STREET INTERSECTS
South Fort Worth Baptist 7 33 140' Side Lot Credit
Church Res. 100' Pavement $2.68 $268.00
800 W. Fogg Street 100' Curb & Gutter 2.72 272.00
100' Sidewalk 2.76 276.00
$ 816.00
Edra Joy Schutze E. 59.2' 33 140' Side Lot Credit
609 W. Jack Street of 6 Res. 100' Pavement $2.68 $268.00
Baytown, Texas 77520 100° Curb & Gutter 2.72 272.00
194 Sq. Ft. Driveway,85 164.90
$ 704.90
PAFFORD STREET INTERSECTS
EAST SIDE OF STREET
Leonard Beserra 1 32 140' Side Lot Credit
723 W. Pafford St. Res. 100' Pavement $2.68. $268.00
100' Curb & Gutter 2,72 272.00
118 Sq. Ft. Driveway.85 100.30
$ 640..30
_ 1
PROJECT NO. 104-24000-210, UNIT to TRAVIS AVENUE FROM DREW STREET TO 'PAFFORD -STREET,
CONTINUED
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
EAST SIDE OF STREET SOUTH FORT WORTH ADDITION
Violet Lucille Bice Garrettl8 32 140' Side Lot Credit
722 W. Fogg Street Res. 100' Pavement $2.68 $268.00
76110 100' Curb & Gutter 2.72 272.00
118Sq. Ft. Driveway.85 100.30
$ 640.30
FOGG STREET INTERSECTS
i
Jim Dobbs 1 39 140' Side Lot Credit
721 W. Fogg St. Res. 100' Pavement $2.68 $268:00
76110 100' Curb & Gutter 2.72 272.00
118 Sq. Ft. Driveway.85 100.30
$ 640.30
Gladys W. Rollins N. 34' 39 34' Pavement $2.68 $ 91.12
3911 Travis Avenue of 18 Res. 34' Curb & Gutter 2.72 92.48
118 Sq. Ft. Driveway.85 100.30
$ 283.90
i
George A. Trojacek S. 106' 39 106' Side Lot Credit
Rt. 1, Box 96-C of 18 Res. 100' Pavement $2;68 $268.00 G
Whitney, Texas Z00' Curb & Gutter 2.72 272.00
76692 118 Sq. Ft. Driveway.85 100.30
$ 640.30
I
COST TO PROPERTY OWNERS - ASSESSMENTS. . . $ 5,711.20
COST TO CITY OF FORT WORTH . . . . . . . 13,057.72 I
I
TOTAL ESTIMATED CONSTRUCTION COST, UNIT 1. . . $18,768.92
2
p P _ . --
PROJECT NO 104-24000-210, UNIT 2: WEST LOWDEN STREET .FROM WILLING AVENUE TO RYAN AVENUE,
to be improved with six in thick hot-mix as .haltic concrete : avement on a sisC' inch thick.
Ume!stabilized subgrade with 'seven-inch high concrete curb ,and, two-foot wide' concrete
gutter, so that the finished ,ruadway will be thirty feet wide.
BLOCK
OWNER LOT ZONING FRONTAGE . RATE AMOUNT ASSESSMENT
BEGINNING AT THE SOUTHEAST CORNER OF WILLIW AVENUE AND-WEST LOWDEN STREET
SOUTH SIDE OF STREET RYAN SOUTH ADDITION
Miss Belle ,Austin 1 17 125f' Side Lot Credit
2900 Willing .Avenue Res. 100' Pavement $2.50 $250.00
250,00
Dan C: Harper 24 17 .125' Side Lot Crd4it
2901 Ryan Avenue Res. 100' Pavement $2.50 $250::00
100' Curb & Gutter 2.90 290.00
$ 540.00
RYAN AVENUE' INTERSECTS
NORTH SIDE OF STREET
i
E. C. Walsh, Jr. 13 23 125'. Side Lot Credit
2849 Ryan Avenue Res. 100' Pavement $2.50 $250.00
100' Curb & Gutter . 2._90 290.00
. $ 540.00.
Eugene A. Oswalt 12 23 125' Side Lot Credit
2844 Willing-.Avenue Res. 100' Pavement $2.50 $250.00
$ 250.00
COST TO PROPERTY OWNERS - ASSESSMENT .. . . . . . . $1,5$0.00
COST TO CITY OF FORT WORTH. . . 5.271.79
TOTAL, ESTIMATED CONSTRUCTION COST, UNIT 26 851.79
3
PROJECT N0, 104-24000=210. UNIT 3: . B CE AVENUE FROG[ WELLVIEW AVENUE TO McCART STREET, to be
improved with six-inch thick hot-mix asphaltic concrete pavement' oh a six-inch thick lime
stabilized subgrade with seven=inch -high concrete curb and eighteen-inch wide concrete gutter,
so that the finished-roadway will be thirty feet wide and by constructing six-inch thick
concrete driveways where specified.'
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
BEGINNING AT THE NORTHEAST CORNER OF .WELLVIEW AVENUE AND BOYCE AVENUE
NORTH 'SIDE OF STREET SEMINARY HILL ADDITION
Jack Long 2 72 145° Side Lot ,Credit
4544 Merida Res. 100' Pavement $2,68 $268.00
100® Garb & Gutter 2,72 272.00
$ 540.00 .
- I
- I
MERIDA STREET INTERSECTS
James F. Boyd 2 71 1.40° Side Lot Credit
4545 Merida Res. 1008 Pavement. $2.68 $268:00 .
1008 Curb & Gutter 2,72 272.00
118 Sq. Ft. Driveway'.85 100.30
$: 640.30 .
i
Alvin M. Paulson 3 71 1408 Side Lot Credit
4544 Sandage Reams. 1008 Pavement $2.68 $268.00
1008 Curb & Gutter. 2.72 272.00
194 Sq. Ft. Driveway.85 164.90
$ 704.90
i
SANDAGE STREET INTERSECTS
i
Herman Stolz, Sr. 2 . 70 140° Side Lot Credit
4545 Sandage. Res. 1008 Pavement $2,68 $268400
1008 Curb & Gutter 2.72 272.00
$ '540.00
Jimmy Brazell 3 70 1408 Side Lot Credit
j Rt. 3, Box. 34 A Res. 1008 Pavement $2;68 $268.00
1008 Curb & Gutter 2.72 272.00
$ 540.00
4
i
PROJECT NO. 104-24000-210, UNIT 3.o BOYCE AVENUE, FROM WELLVIEW AVENUE TO McCART STREET
CONTINUED
I
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
McCART STREET INTERSECTS
SOUTH SIDE OF STREET SEMINARY HILL ADDITION
Roy Lee Muncy N. 37' of 65 140' Side Lot Credit.
Box 227 . 11 .& all Rea. 100' Pavement $2.68 $268.00
Magdalena, New Mexico of 12 100' Curb &: Gutter 2.72. 272.00 :
87825 $ 540.00
i
i
Joe Diaz 1 65 140' Side Lot Credit ,
c/o Bucy-Ingram Co. Rea. 100' Pavement $2.68 $268.00 j
P.O. Box 1477 100' Curb & Gutter .2.72 272.00 iI
86 Sq. Ft. Drivreway.85 73.10
$ 613.10
i
i
SA14DAGE STREET INTERSECTS ►
D. E. McClure 12 64 140' Side Lot Credit
4600 Sandage Res. 100"Pavement $2;68 $268.00
100' Curb & Gutter 2.72 272.00 4
118 Sq. Ft. Driveway.85 100.30
$ .640.30
Agnes F. Stolz 1 64 140' Side Lot Credit
' 4545 Sandage Res. 100' Pavement $2.68 $268.00 �
100' Curb & Gutter 2.72 272,00
$ 540.00
MERIDA STREET INTERSECTS
Donald F. Hower 1 63 140' Side Lot Credit I
4600 Merida Res.. 100' Pavement $2,;68 $268.00
100' Curb & Gutter 2.72 272.00
118 Sq.. Ft. Driv eway.85 . 100.30
$' 640'.30
COST TO PROPERTY OWNERS m ASSESSMENT . . . . . . . . . $ 5,938.90
COST TO CITY `OF FORT WORTH . 16.579.80
TOTAL ESTIMATED CONSTRUCTION COST, UNIT 3 . . . . . . .$22,518.70
5
i
tea. --
PROJECT NO. 104-24000-210, UNIT 4- BOYCE AVENUE FROM McCART STREET TO G.C, a& S.F. RAI`LROAD,.
to be improved with ,six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick
lime stabilized subgrade with seven,-inch high concrete curb and eighteen-inch wide concrete
gutter, so that! the. finished roadway will be thirty feet wide and by constructing six-inch
thick concrete driveways where specified.
BLOCK
i
OWNER LOT ZONING FRONTAGE RATE AMOUNTASSESSMENT
BEGINNING AT NORTHEAST CORNER OF McCART STREET AND BOYCE AVENUE
i
NORTH .SIDE OF STREET SEMINARY HILL ADDITION
Ruth L. Ballard 12 68 140' Side Lot Credit
3245 Greens Res. 100' Pavement $2.68 $268.00
100' Curb & Gutter 2.72 272.00
118 Sq. Ft, Driveway.85 100,30
$ 640.30
I
I
L. A. Hinckley 3 68 140' Side Lot Credit
Rt. 1, Box 504 Res. 100' Pavement $2.68 $268.00
Burleson, Texas 100' Curb & Gutter 2.72 272,00
76028 194 Sq. Ft. Driveway.85 164.90
i $ 704.90
I -
WAYSIDE STREET INTERSECTS
C. V. Donnelly 7 67 31' Pavement $2.68 $ 83.08
3566 Cromart Ct. S. Res. 312 . Curb & Gutter 2.72 84.32
$ 167.40
G. C. & S. F. RAILROAD INTERSECTS
I
SOUTH SIDE OF STREET
J. B. Echols 1 & 2 66 120' Side Lot Credit
2313 Boyce Ind. 109' Pavement $5.87 $639.83
109' Curb & Gutter 2.72 296.48
118 Sep. Ft. Driveway.85 100.30
$1,036.61
J. B. Echols 3 & 4 66 100' Owner Occupied
2313 Boyce Ind. 100' Pavement $4.27 $427.00
29' Curb & Gutter 2.72 78,88
$ 505.88
6
s
PROJECT NO. 104-24000-210, UNIT 4: BOYCE AVENUE FROM McCART STREET TO G.C. & S.F. RAILROAD, i
CONTINUED
T�
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
SOUTH SIDE OF STREET SEMINARY HILL ADDITION
Robert A. B. English 5 66 140' Side Lot Credit
4601 McCart Street Res. 100' Pavement $2.68 $268.00
13 Curb & Gutter 2.72 35.36
$ 303.36
COST TO PROPERTY OWNERS - ASSESSMENT ® $ 39358.45
COST TO CITY ,OF FORT WORTH.. . . . . . . . . . . 6,936.45
TOTAL E STIMATED CONSTRUCTION COST, UNIT 4 . . . .,10,294.90
i
i
I
7
i
E
i
i
McMAHA City' of Fort Worth, Texas
UNE
Mayor -,or and Council Communication -
MORPHIS
R. & B. DATE REFERENCE SUBJECT: Award,of Contract - Assessment PAGE
GRAHAM NUwsEN. Paving at 4 Locations on the _South Side i of 2
6/15/70 C-1756
City Council action is requested on,the project described below.
Project Description
Nature of-Work; Assessment Paving at 4 Locations on the South Side.
Roadway-
Unit Street Limits Width., Oeet) R.O.W. (feet)
1 Travis Avenue Drew Street to 30 60
Pafford Street
2 West Lowden Willing Avenue to 30 60
Street Ryan Avenue
3 Boyce Avenue. Wellview Avenue to 30 60
McCart Street ,
4 Boyce Avenue McCart Street to 30 60
G.C.&S.F. Railroad
Petitions have been received from property owners for the paving of all .units
of .this project;
Sidewalks are included on the east side only, of Lot:7, ,,Block 33, .South Fort
Worth Addition which is the ,property .of South Fort Worth Baptist Church. '
Submission of Bids
The following bids, have been received:
Bidder Amount Bid
Austin Road Company $53,122,10
General Construction Company $54,345.50
Ernest Loyd $56,548.60
Glade, 'Inc. $58,008,20
Texas Bitulithic $58,929075
-SRO'Asphal,t.., ,Inc. . $66,744.50 :
Bids Received: May'21, 1970
Time Bid: 50 Working Days
Project Cost and Financing '
Based on 'the low .net bid; approximately $16,5188.5-5 will be assessed_against
DATE REFERENCE SUBJECT: Award of Contract - Assessment PAGE
NUMBER ,
6/15/70 C-1756 Paving at 4 Locations on, the South Side 2 of 2
abutting property owners. The cost to the City-at-large will be approximately
$42,000, including engineering expenses, inspection and miscellaneous expenses.
A Bond Fund Transfer from Unspecified Funds is proposed to provide for the
City's portion of the cost of the project.
Recommendations
It is recommended that:
1) The following Bond Fund Transfer be approved:
Amount From To Reason
$16,588.55 Unspecified 4 Locations Property owners' portion
042-09724-901 on South Side of construction cost.
042-10424-210
$42,000.00 Unspecified 4 Locations To provide for the City's
104-24000-901 on South Side share of construction cost,
104-24000-210 Inspection, engineering
andmiscellaneous expenses.
2) An Ordinance be adopted:
a) Declaring the necessity for ordering the improvement;
b) Making provisions for levying of assessments;
c) Directing the Public Works Department to prepare estimates of costs
and amounts to be assessed;
d) Awarding a contract to Austin Road Company in the amount of $53,122.10;
and,
e) Making appropriations to cover indebtedness thereby incurred for
improvements of the project. named above.
3) An Ordinance be adopted:
a) Approving the estimates of cost and amounts proposed to be assessed;
and
b) Setting July 13, 1970, as the date for the Benefit Hearing.
HDM/mh
Attachments:
"A" - Project Map
"B" - Resume and Location Maps
"C" - Engineers' Preliminary Assessment Rolls
SUBMITTED BY: DISPOS TI BY COUNCIL: PROCESSED BY
APPROVED /❑ OTHER (DESCRIBE)
AdoptedOrdinanceNo. DeGlaririg,-- CITY SECRETARY
s Necessity and Ordering Paving and. Ordinance DATE
CITY MANAGER No. ) Setting Date Of Benefit Hearin
PROJECT NO. 104-24000-210, .UNIT 4: BOYCE AVENUE FROM McCART STREET TO G.C. & S.F. RAILROAD,
to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick
lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete
gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch
thick concrete driveways where specified.
The following assessment rates have been established:
Seven-inch curb and eighteen-inch gutter. . . . . . . . $2.72/ L.F.
Six-inch thick hot-mix asphaltic concrete pavement
(Residential Zoning) . . . . . . . 2.68/ L.F.
Six-inch thick hot-mix asphaltic concrete pavement
(Industrial Zoning) - Owner Occupied. 4.27/ L.F.
Six-inch thick hot-mix asphaltic -concrete pavement
(Industrial Zoning) . . . . . . . . 5.87/ L;F.
Six-ipch thick concrete driveway, . . . . . . . . . . . . .85/ Sq. ..Ft.
The assessments result in the following division of costs:
TOTAL PROPERTY OWNERS' COST FOR PAVEMENT , . . .$ 73,869.03
TOTAL PROPERTY OWNERS' COST FOR CURB, GUTTER. DRIVEWAYS,
and SIDEWALKS. . . . . . . . 8,719.52
i
TOTAL PROPERTY OWNERS' COST . . . . . .$16,588.55
TOTAL CITY OF FORT WORTH'S COST . . . . . . . . . . . 419845.76
I
� TOTAL ESTIMATED COST . . . . . . . . . . . . .
. $589434.3.1
i
I
i
1
r
I
JACK M. GRAHAM, P.E.
r LIC WORKS DIRECTOR
t