Loading...
HomeMy WebLinkAboutOrdinance 5520 ORDINANCE NO. AN ORDINANCE APPROVING AND ADOPTING ESTIMATES OF THE COST OF IMPROVE. MENTS AND OF AMOUNTS TO BE ASSESSED FOR IMPROVEMENTS ON A PORTION OF BISHOP STREET AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS; FIXING TIME AND PLACE FOR HEARING TO THE OWNERS OF ABUTTING PROPERTY AND TO ALL OTHERS INTERESTED; DIRECTING THE CITY SECRETARY TO GIVE NOTICE OF SUCH HEARING; AND DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL AND BY FILLING THE COMPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THE CITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City Council of the City of Fort Worth, Texas, has heretofore ordered that each of the hereinafter described portions of streets, avenues and public places in the City of Fort Worth, Texas, be im- proved by raising, grading and filling same and by constructing thereon the following, to-wit: 1. BISHOP STREET: From the north line of Lois Street to the south line of Hanger Street, known and designated as Unit No. 1, Project No. 094-27000-118,a 1-" hot mix asphaltic surface on a 7" cement stabilized base on a 36 foot roadway. 2. COLLARD STREET: From the north line of East Rosedale Street to the south line of East Vickery Blvd., known and designated as Unit No. 29 Project No. 09427000- 118, a 1i" hot mix asphaltic surface on a 7" cement stabilized base on a 32 foot roadway. 3. WESTRIDGE AVENUE: From Karen Circle to the north to Edgehill Road, known and designated as Unit No. 39 Project No. 09427000-1189 a 1-" hot mix asphaltic surface on a 7" cement stabilized base on a 30 foot roadway. 4. BELLAIRE DRIVE NORTH: From the west line of Alton Road to the east line of Bellaire Drive West, known and designated as Unit No. 49 Project No. 094-35000-1389 a 17" hot mix asphaltic surface on a 7" cement stabilized base on a 32 foot roadway. r r t � together with combined concrete curbs and gutters on proper grade and line where same are not already so constructed, together with storm sewers and drains and other necessary incidentals and appurtenances; all of said improvements to be constructed as and where shown on the Plans and in strict accordance with the Plans and Specifications therefor; and contract therefor has been made and entered into with TEXAS BITULITHIC CO. ; and WHEREAS, the City Council of the City of Fort Worth, Texas, has caused the Public Works Director to prepare and file estimates of the cost of such improvements and estimates of the amounts per front foot proposed to be assessed against abutting property and the owners thereof, and such estimates have been ex- amined. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: I. Such estimates be, and they are hereby adopted and approved. II. It is hereby found and determined that the cost of improvements on each portion of street, avenue and public place hereinafter described, with the amount or amounts per front foot proposed to be assessed for such improvements against abutting property and the owners thereof, are as follows, to-wit: 1. BISHOP STREET: From the north line of Lois Street to the south line of Hanger ,Street, known and designated as Unit No. 19 Project No, 094-27000-118. The estimated cost of improvements is $ 462518*01 _ the estimated,amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $-2,*12- __; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $.61 - _; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 2.73 2, COLLARD STREET: From the north line of East Rosedale Street to the south line of East Vickery Blvd., known and designated as Unit No. 29 Project No. 094-27000- 118. 19,756.88 _; the estimated amount per front The estimated cost of improvements is $_ foot to be asseird against abutting property and the owners thereof for combined concrete curb and g 2 utter is $ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $ X20 ; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 2.32 3. WESTRIDGE AVENUE: From Karen Circle to the north to Edgehill Road, known and designated as Unit No. 39 Project No. 094-27000-118. The estimated cost of improvements is $ 512565.75 the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $ 2.12 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $— 0.00 ; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $-2,19 4. Bellaire Drive Norths From the west line of Alton Road to the east line of Bellaire Drive Westy known and designated as Unit No. 4. Project No. 094-35000-138. The estimated cost of improvements is $ 122056.22 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $ 2.12 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $ 0000 ; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 2.12 The estimated cost of improvements is $ the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $ ; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is The estimated cost of improvements is $ the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $ ; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is III. A hearing be given and held by and before the City Council of the City of Fort Worth, Texas, to all own- ing or claiming any property abutting upon said portions of streets, avenues and public places, as well as to all owning or claiming any interest in any such property. Such hearing shall be given and held on the 28th day of February 66 9:30 A.M. 19 , at , in the Council Chamber in the City Hall in the City of Fort Worth, Texas, and the City Secretary is hereby directed to give notice of the time and place of such hearing and of other matters and facts in accordance with the terms and provisions of an Act passed at the First Called Session of the Fortieth Legislature of the State of Texas, and known as Chapter 106 of the Acts of said Ses- sion, now benig shown as Article 1105b of Vernon's Texas Civil Statutes. Such notice shall be by advertisement at least three times in a newspaper published in the City of Fort Worth, Texas, the first publication to be made at least ten days before the date of said hearing. Said notice shall comply with and be in accordance with the terms and provisions of said Act. The City Secretary is further directed to'give personal notice of the time and place of such hearing to all owning or claiming any property abutting on said portions of streets, avenues and public places, as well as to all owning or claiming any interest in any such property. Such personal notice shall be given by the City Secretary mailing said notice postage prepaid, to the respective owners of record of the properties to be assessed, and to any person owning or claiming any interest in said properties, to the last known address of said owner or persons. It shall not be necessary for the City Secretary to mail said notices to any owner or other person claiming an interest in the property to be assessed when the addess of such owner or other person claiming an interest in the property to be assessed is unknown to the City Secretary and cannot be determined by the City Secretary after reasonable investigation. In this connection the City Secretary shall prepare and file with these proceedings a list of the properties to be assessed, the names of.those persons own- ing or claiming any, interest in said properties to whom the notice was mailed, together with the last known address of the respective owners and those persons owning or claiming any interest in said property. The City Secretary shall certify that each of the parties named in said list whose address was known to him, was mailed a copy of the notice of hearing and shall further certify the date or dates on which said notice was mailed. A copy of the notice shall be attached to such certificate. The certificate of the City Secretary will be conclusive evidence of the facts therein recited. Failure of the City Secretary to give notice of hearing by mail as herein provided for, or failure of the owners or other persons interested to receive said notice, shall in nowise invalidate said hearing or any assessments levied pursuant to said hearing, but notice of hearing shall be sufficient, valid and binding upon all owning or claiming such abutting property or any interest therein when same shall have been given by newspaper advertisement as first hereinabove provided. IV. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council and by filing the complete ordinance in the appropriate Ordinance Records of this City. V. This ordinance shall take effectiLnd be in full force and effect from and after the date of its passage. Passed and approved this__ _ day of1j __. ____ __ __ _._______, 19( APPROVED AS TO FORM AND LEGALITY: City Attorney ffi City of Fort Worth, Texas Mayor and Council Communication DATE REFERENCE SUBJECT: Reconstruction at 4 Locations, PAGE NUMBER Project Nos.094-27000-118 094-35000-13 2/7/66 C-646 ' i of 3 and 097-28000-190 CIP A-209) Council action on the project described below is requested; Project Description Nature of work: Reconstruction at Four Locations, as follows: Unit Street Limits Roadway Width R.O.W. 1 Bishop Street Poly Freeway to Hanger Street 36 feet 50 feet 2 Collard Street East Rosedale Street to East 32 feet 60 feet Vickery Boulevard 3 Westridge Avenue Karen Circle to Edgehill Road 30 feet 80 feet 4 Bellaire Drive,. Alton Road to Bellaire Drive, 32 feet 70 feet North East The project for reconstruction of Bishop Street, Unit 1, includes the exten- sion of the Bishop Street Storm Drain System from Berry Street to the Poly Freeway. Submission of Bids Bidder Amount Bid Working Days Texas Bitulithic Company $124,986.55 120 Glade Construction Company 133,203.94 120 General Construction Company 135,108.75 120 Worth Construction Company 135,684.40 120 W. E. Brittain, Inc. 137,909.29 120 R. W. Gibbins, Inc. 143,279.95 120 Project Cost and Financing The project costs will be financed from the following bond fund project accounts : Project Aec6unt--Mimber, For Bid Price 1) 094-270-00-118 and Reconstruction, Units $ 90,367.81 104-27000-118 "Recanstruc- 1, 2, & 3 tion" 2) 094-35000-138 "Miscl.Street Reconstruction, Unit 4 80543.40 Improvements" � REOORO OFF�O�A AIWI DATE REFERENCE SUBJECT: Reconstruction at cations, PAGE NUMBER Project Nos.094-26000-118, 094-35000-13 2/7/66 C-646 and 097-28000-190 (CIP A-209) 2 or 3 Project Account Number For Bid Price 3) 097-28000-190 "Storm Bishop Street Storm Drain $ , 6,898.50 Drains." 4) 042-09427-118 "Revolving Property Owners' Share of 19,176.84 Fund" Paving Cost Total Bid Price $:_124,986.55 Based on the low bid, approximately $19,176 will be assessed against abutting property owners. The cost to the City-at-large for the paving improvements will be approximately $110,720, including engineering and miscellaneous expenses. The cost to the City for drainage improvements on Bishop Street will be approximately $7,500, including engineering and miscellaneous expenses. Funds for the property owners ' share of the paving costs will be provided by a transfer from the Revolving Fuad. Sufficient funds are available in Project 094-27000-118 and 104-27000-118 to finance the reconstruction of Units 1, 2 and 3, and in Project 094-35000-138 to finance reconstruction of Unit 4. Funds for the Bishop Street Storm Drain Extension are available in Project 097- 28000-190. Recommendations 0 It is recommended: 1) That the following bond fund transfer be approved: Amount From To For $192176.84 Revolving Fund 042-09427-118 Property owners ' portion of construction costs 2) That an ordinance be adopted: a. Declaring the necessity for and ordering the improvements ; b. Making provisions for levying of assessments ; c. Ordering the Public Works Department to prepare estimates of costs and amounts to be assessed; d. Awarding the contract to Texas Bitulithic Company on its low bid of $124,986.55; and 3. Making appropriations to cover the indebtedness thereby incurred. �I DATE REFERENCE SUBJECT: RECONSTRUCTION AT 4 LOCATIONS, PAGE ® 2-7-66 NUMBER PROJECT NOS. 094-27000-118,094-35000-13 3 3 C-646 and 097-28000-190. (CIP A-'209) — of 3) That an ordinance be Adopted: a.. Approving the estimates and amounts proposed to be assessed; and, b. Setting February 28, 1966 as the date of the Benefit Hearing. JLB:eln Attached are the following summaries: "A"" - Resume of the project "B" - Distribution of costs and assessments and result of post card survey "C" - Assessment Rolls in alphabetical order SUBMITTED BY: DISPOSITION BY COUNCIL: PROCESSED BY X_APPROVED OTHER (DESCRIBE) /ITY)OSCRETARY DATE CITY MANAGER �/J