HomeMy WebLinkAboutOrdinance 8020 ORDINANCE NO. O 0 0 ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF w0oD X DRIVE _ AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT W7ORTH, TEXAS; DECLARING THE CONTRACT WITH _TEXAS BITULITHIC COMPANY FOR THE CONSTRUCTION OF SAID IMPROVEMENTS FULLY COMPLETED AND PERFORMED; DIRECTING THE ISSUANCE, EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF SPECIAL ASSESSMENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS HEREIN AUTHORIZED AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS; DIRECTING THE CITY SECRETARY TO.ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SANE IN THE MINUTE BOOR OF THE CITY COUNCIL OF FORT WORTH, TEXAS, AND BY FILING THE COMPLETE ORDINANCE IN APPROPRIATE ORDINANCE RECORDS OF SAID CITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City of Fort Worth, Texas, has heretofore entered into a contract with TP_3c;;-_ R;tnl; bi o=any , for the making and construction of certain street improvements on the hereinafter described portions of streets, avenues and public places in said City, to_ Wit: UNIT IA: WOODWAY DRIVE From 97' south of Wedgeway Drive to 'Trail Lake Drive, known and designated as Project No. 104-22000-151, Unit 1A, a seven-inch thick hot-mix asphaltic concrete pave- ment on a six-inch thick lime stabilized subgrade on a forty-eight foot roadway. Seven-inch high concrete curb and eighteen-inch wide concrete gutter will be replaced where necessary. Four-foot wide concrete sidewalk and w, six-inch thick concrete driveways will be constructed where specified. UNIT 1B: TRAIL LAKE DRIVE From Woodway Drive to Loop 820, known and designated as Project No. 104-22000-151, Unit 1B, a seven-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade on a forty-eight foot roadway. Seven-inch high concrete curb and eighteen-inch wide con- crete gutter will be .replaced where necessary. Four-foot wide concrete sidewalk and six-inch thick concrete drive- ways will be constructed where specified. 6vHEREAS, by sundry proceedings heretofore passed by the City Council of the City of Fort Worth, Texas, including Ordinance No.; •77n5_, a portion of the cost of said improvements was levied and assessed against the respective properties abutting on each of the above described portions of streets, avenues and public places and against the real and true owners thereof; and, WHEREAS, the City Council of the City of Fort Vyorth, Texas, has, upon review, found and determined that, in some instances, in order to effect substantial justice and equality, it is desirable and necessary to grant and issue certain credits against some one or more of the assessments levied by Ordinance No, ; ,77ns J. and WHEREAS, the street improvements hereinabove mentioned have been completed upon each of the portions of streets, avenues and public places hereinabove described, and have been inspected and found to be in complete accordance with the contract therefor; NOU'', THE,1�EFORE, BE IN ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: Ie The improvements on each of the portions of streets, avenues and public places hereinabove described be, and they are hereby, accepted; and the contract with reference thereto be, and it is hereby, found and declared fully completed and performed. II. The Mayor, be, and he is hereby, directed to issue and execute in the name of the City, certificates in evidence of the special assessments levied against abutting property and the owner thereof for such improvements, and the City Secretary is directed to attest same and impress thereon the corporate seal of the City, all in accordance with the proceedings relating to such improvements and assessments. The certificates shall be numbered, shall describe the property against which the assessment has been levied, shall, where known, state the name or names of the true owners of the respective parcels of pro- perty assessed andshall be issued in an amount equal to the difference between the principal amount of the assessment and the amounts of any credit issued thereon. The numbers of the certificates, with the property descriptions to be shown on the respective certificates, together with the names of the owners of said property, the principal amount of the assessment, the respective credits, if any which are hereby authorized, granted and allowed against the principal amount of some one or more of the assessments heretofore levied, and the principal amount for which each certificate is to be issued after giving effect to such credit, if any, are hereby enumerated and itemized as follows: aaa. When each of the certificates has been duly executed as hereinabove provided, same shall be delivered to the Tax Assessor-Collector as part payment of the contract price. IV, The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council of Fort Worths Texas, and by filing the complete ordinance in the appropriate Ordinance Records of said City, V. This ordinance shall take effect and be in full force and effect from and after the date of its passage. PASSED AND APPROVED THIS day of d , 19-7 4 APPROVED AS TO FORM AND LEGALITY: Ci Attorney PROJECT NO. 104--22000-151: RECONSTRUCTION OF TRAIL LAKE DRIVE, UNIT 1A, WOODWAY DRIVE FROM 97' SOUTH OF WEDGWAY DRIVE TO TRAIL LAKE DRIVE, to be improved by constructing a seven-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade on a forty- eight foot roadway. Seven-inch high concrete curb and eighteen-inch wide concrete gutter will be replaced where necessary. Four-foot wide concrete sidewalk and six-inch thick concrete driveways will be constructed where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE WEDGWOOD ADDITION Olan Watkins 10 29 87' Existing facilities -0- 5420 Woodway Res. Fort Worth, Texas 76133 Wedgway Drive intersects Dr. Glenn C. McGouirk 7 30 5412-A Woodway Comm. Fort Worth, Texas 76133 100' Sidewalk 7.00 700.00 $700.00 Dr. Julian Haber 8 30 5408 Woodway Comm. Fort Worth, Texas 76133 58' Sidewalk 7.00 406.00 $406.00 Wedgwood, Ltd. 10-R 30 198' Existing facilities -0- C/O Haydn Cutler Comm. 2108 W. Freeway Fort Worth, ,Texas 76102 Trail Lake Drive intersects EAST SIDE McKinney Memorial 13-R 39 310' Sidewalk $ 7.00 $2,170.00 Bible Church C.F. $2,170.00 5401 Woodway Fort Worth, Texas 76133 1. PROJECT NO. 104-22000-151: RECONSTRUCTION OF TRAIL LAKE DRIVES UNIT 1B TRAIL LAKE DRIVE FROM WOODWAY DRIVE TO LOOP 820, to be improved by constrncting. a seven-inch thick hot-mix asphaltic . concrete pavement on a six-inch thick lime stabilized subgrade. on a forty-eight foot roadway. Seven-inch high concrete curb.and eighteen-inch wide concrete. gutter will be replaced where necessary. Four-foot wide concrete sidewalk and six,inch thick concrete driveways will be constructed where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE WEDGWOOD ADDITION Haydn Cutler Tract 3-A 19 125' Existing facilities -0- 2108 W. Freeway Comm. Fort Worth, Texas 76102 E. L. Baker, Trustee Tract 6-A 19 940' Existing facilities -0- 303 Baker Bldg. Comm. Fort Worth, Texas 76102 H. G. Reedy 2-A 19 59' Sidewalk $7.00 $413.00 Exxon-Company, U.S.A. Comm. $413.00 171 Rowan Bldg. 6000 Camp _Bowie Fort Worth, TX 7611-6_" EAST SIDE Gulf Oil Corp. Tract B 40 145' Existing facilities -0- P. 0. Box 285 Comm Houston, Texas 77001 Mobil Oil Corp. Tract E 40-C 120' Existing facilities -0- P. 0. Box 900 Comm. Dallas, Texas 75221 E. L. Baker Tract A 40-C 245' Existing facilities -0- 303 Baker Bldg. Comm. Fort Worth, Texas 76102 2. PROJECT NO. 104-22000-151: UNIT 1B TRAIL LAKE DRIVE FROM WOODWNY-DRIVE TO LOOP '820 cont. BLOCK OWNER LOT 'ZONING ' 'FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE WEDGWOOD 'ADDITION City of Fort Worth 11 68 120' _0_ Library Kimberly Avenue intersects First Assembly of God TR. A-R-1 270' Sidewalk $7.00 $1,890.00 of Fort Worth 40 $1,890.00 5051 Trail Lake Drive CF Fort Worth, TX 76133 Wooten intersects McKinney Memorial 13-R 39 175' Sidewalk $7.00 $1,225.00 Bible Church CF .$1,225.00 5401 Woodway Fort Worth, TX 76133 TOTAL COST TO PROPERTY OWNERS (ASSESSMENTS) ....$ 6,804.00 TOTAL COST To CITY" 03f.FORT WOR'i T .. .. .. ...... .$549,'846'.145 TOTAL CONSTRUCTION COST ..... ... .... ..... .. . . . .$556,650.45 3. FILE HERCHERT City of Fort Worth, Eexas BAILIFF Mayor and or d C®Il1l nc l Communication SMITH �+Y�/ JONES DATE REFERENCE SUBJECT: Final Payment - Trail Lake Drive PAGE NUMBER Unit 1-M Storm Drain; Unit 1-K Storm 2 12/18/79 ^*FP-1409 Drain Extension i °I Final Council action is requested on the project described below. Project Description Name: Reconstruction of Trail Lake Drive, Unit 1-M Storm Drain & Unit 1-K Storm Drain Extension, Project No. 104-22151 per Contract No. 9715 Contractor: Texas Bitulithic Company Contract Awarded: January 31, 1978 (M&C C-4072) Work Order Issued: August 4, 1978 Work Order Effective: August 14, 1978 Work Began: September 1, 1978 Project Substantially Complete and Final Inspection Made: August 29, 1979 Final Construction Approval: November 27, 1979 Working Time Bid: 166 Days Working Time Used: 162 Days Project Cost Original Bid Price: $475,808.95 Change Order No. 1: $ 2,472.25 A.R. 1-15 2.3.1 Change Order No. 2: 19,1+6.25 October 10, 1978 (M&C C-4378) Change Order No. 3: - 42.00 A.R. 1-15 2.2 Change Order No. 4: 295.00 A.R. 1-15 2.3.1 Change Order No. 5: 10,999.50 May 22, 1979 (M&C C-4654) Revised Bid Price: $508,679.95 Final Contract Cost: $520,234.07 Partial Payments Previously Made: 11 Amount: $447,638.48 Final Payment Due: $ 72,595.59 DATE REFE ERCE SUBJECT: Final Payment - Trail Lake Drive PAGE NUM Unit 1-M Storm Drain; Unit 1-K Storm 2 2 12/11/79 **FP-1409 of Deviation from Bid Price The final contract cost of this project exceeded the revised bid price by $11,554.12. The cost is the result of differences between estimated quan- tities of the contract documents and actual quantities required to construct theproject per specifications. Financing Sufficient funds are available for the final payment to be made from Project Account No. 104-22151. A bond fund transfer is required in the amount of $15,000 to properly cover the cost of construction. Compliance with Spefications The project has been completed in accordance with the requirements of the contract. Recommendations It is recommended that: 1. The following bond fund transfersbe approved: From To Amount Reason 013-095-901-00 013-022-151-00 $ 2,000 To provide additional funds Engineering Unspecified Trail Lake Drive in order to make final pay- ment to contractor and pro- vide additional inspection funds 013-022-901-00 013-022-151-00 13,000 To provide additional funds Arterial Streets Trail Lake Drive in order to make final pay- Unspecified ment to contractor and pro- vide additional inspection funds 2. The project described above be accepted and final payment of $72,595.59 be made to Texas Bitulithic Company. VS:plg SUBMITTED FOR THE- CITY HE CITY MANAGER'S' DISPOSITION COUNCIL: PROCESSED BY OFFICE BY: nl^PPROVED f h ORIGINATING �A q�+OTHER DESCRIB(EE) �V DEPARTMENT HEAD: Keith A. Smith ADOPTED OPDII)A ®�� ®, CITY SECRETARY FOR ADDITIONAL INFORMATION /v CONTACT: John Jones Ext. 7901 DATE )S J G