HomeMy WebLinkAboutOrdinance 8020 ORDINANCE NO. O 0 0
ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF w0oD X DRIVE _
AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES
IN THE CITY OF FORT W7ORTH, TEXAS; DECLARING THE CONTRACT WITH
_TEXAS BITULITHIC COMPANY FOR THE CONSTRUCTION OF
SAID IMPROVEMENTS FULLY COMPLETED AND PERFORMED; DIRECTING THE
ISSUANCE, EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF
SPECIAL ASSESSMENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS
HEREIN AUTHORIZED AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS;
DIRECTING THE CITY SECRETARY TO.ENGROSS AND ENROLL THIS ORDINANCE
BY COPYING THE CAPTION OF SANE IN THE MINUTE BOOR OF THE CITY
COUNCIL OF FORT WORTH, TEXAS, AND BY FILING THE COMPLETE ORDINANCE
IN APPROPRIATE ORDINANCE RECORDS OF SAID CITY; AND PROVIDING AN
EFFECTIVE DATE.
WHEREAS, the City of Fort Worth, Texas, has heretofore entered into a contract
with TP_3c;;-_ R;tnl; bi o=any , for the making and construction of
certain street improvements on the hereinafter described portions of streets, avenues and
public places in said City, to_
Wit:
UNIT IA: WOODWAY DRIVE From 97' south of Wedgeway Drive to 'Trail Lake Drive,
known and designated as Project No. 104-22000-151, Unit
1A, a seven-inch thick hot-mix asphaltic concrete pave-
ment on a six-inch thick lime stabilized subgrade on a
forty-eight foot roadway. Seven-inch high concrete curb
and eighteen-inch wide concrete gutter will be replaced
where necessary. Four-foot wide concrete sidewalk and
w, six-inch thick concrete driveways will be constructed
where specified.
UNIT 1B: TRAIL LAKE DRIVE From Woodway Drive to Loop 820, known and designated as
Project No. 104-22000-151, Unit 1B, a seven-inch thick
hot-mix asphaltic concrete pavement on a six-inch thick
lime stabilized subgrade on a forty-eight foot roadway.
Seven-inch high concrete curb and eighteen-inch wide con-
crete gutter will be .replaced where necessary. Four-foot
wide concrete sidewalk and six-inch thick concrete drive-
ways will be constructed where specified.
6vHEREAS, by sundry proceedings heretofore passed by the City Council of the
City of Fort Worth, Texas, including Ordinance No.; •77n5_, a portion of the cost of
said improvements was levied and assessed against the respective properties abutting
on each of the above described portions of streets, avenues and public places and against
the real and true owners thereof; and,
WHEREAS, the City Council of the City of Fort Vyorth, Texas, has, upon review,
found and determined that, in some instances, in order to effect substantial justice
and equality, it is desirable and necessary to grant and issue certain credits against
some one or more of the assessments levied by Ordinance No, ; ,77ns J. and
WHEREAS, the street improvements hereinabove mentioned have been completed
upon each of the portions of streets, avenues and public places hereinabove described,
and have been inspected and found to be in complete accordance with the contract therefor;
NOU'', THE,1�EFORE,
BE IN ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH,
TEXAS, THAT:
Ie
The improvements on each of the portions of streets, avenues and public
places hereinabove described be, and they are hereby, accepted; and the contract with
reference thereto be, and it is hereby, found and declared fully completed and performed.
II.
The Mayor, be, and he is hereby, directed to issue and execute in the name
of the City, certificates in evidence of the special assessments levied against abutting
property and the owner thereof for such improvements, and the City Secretary is directed
to attest same and impress thereon the corporate seal of the City, all in accordance with
the proceedings relating to such improvements and assessments. The certificates shall be
numbered, shall describe the property against which the assessment has been levied, shall,
where known, state the name or names of the true owners of the respective parcels of pro-
perty assessed andshall be issued in an amount equal to the difference between the
principal amount of the assessment and the amounts of any credit issued thereon. The
numbers of the certificates, with the property descriptions to be shown on the respective
certificates, together with the names of the owners of said property, the principal amount
of the assessment, the respective credits, if any which are hereby authorized, granted and
allowed against the principal amount of some one or more of the assessments heretofore
levied, and the principal amount for which each certificate is to be issued after giving
effect to such credit, if any, are hereby enumerated and itemized as follows:
aaa.
When each of the certificates has been duly executed as hereinabove provided,
same shall be delivered to the Tax Assessor-Collector as part payment of the contract
price.
IV,
The City Secretary is hereby directed to engross and enroll this ordinance by
copying the caption of same in the Minute Book of the City Council of Fort Worths Texas,
and by filing the complete ordinance in the appropriate Ordinance Records of said City,
V.
This ordinance shall take effect and be in full force and effect from and after
the date of its passage.
PASSED AND APPROVED THIS day of d , 19-7 4
APPROVED AS TO FORM AND LEGALITY:
Ci Attorney
PROJECT NO. 104--22000-151: RECONSTRUCTION OF TRAIL LAKE DRIVE, UNIT 1A, WOODWAY DRIVE FROM 97'
SOUTH OF WEDGWAY DRIVE TO TRAIL LAKE DRIVE, to be improved by constructing a seven-inch thick
hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade on a forty-
eight foot roadway. Seven-inch high concrete curb and eighteen-inch wide concrete gutter will
be replaced where necessary. Four-foot wide concrete sidewalk and six-inch thick concrete
driveways will be constructed where specified.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
WEST SIDE WEDGWOOD ADDITION
Olan Watkins 10 29 87' Existing facilities -0-
5420 Woodway Res.
Fort Worth, Texas 76133
Wedgway Drive intersects
Dr. Glenn C. McGouirk 7 30
5412-A Woodway Comm.
Fort Worth, Texas 76133 100' Sidewalk 7.00 700.00
$700.00
Dr. Julian Haber 8 30
5408 Woodway Comm.
Fort Worth, Texas 76133 58' Sidewalk 7.00 406.00
$406.00
Wedgwood, Ltd. 10-R 30 198' Existing facilities -0-
C/O Haydn Cutler Comm.
2108 W. Freeway
Fort Worth, ,Texas 76102
Trail Lake Drive intersects
EAST SIDE
McKinney Memorial 13-R 39 310' Sidewalk $ 7.00 $2,170.00
Bible Church C.F. $2,170.00
5401 Woodway
Fort Worth, Texas 76133
1.
PROJECT NO. 104-22000-151: RECONSTRUCTION OF TRAIL LAKE DRIVES UNIT 1B TRAIL LAKE DRIVE FROM
WOODWAY DRIVE TO LOOP 820, to be improved by constrncting. a seven-inch thick hot-mix asphaltic .
concrete pavement on a six-inch thick lime stabilized subgrade. on a forty-eight foot roadway.
Seven-inch high concrete curb.and eighteen-inch wide concrete. gutter will be replaced where
necessary. Four-foot wide concrete sidewalk and six,inch thick concrete driveways will be
constructed where specified.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
WEST SIDE WEDGWOOD ADDITION
Haydn Cutler Tract 3-A 19 125' Existing facilities -0-
2108 W. Freeway Comm.
Fort Worth, Texas 76102
E. L. Baker, Trustee Tract 6-A 19 940' Existing facilities -0-
303 Baker Bldg. Comm.
Fort Worth, Texas 76102
H. G. Reedy 2-A 19 59' Sidewalk $7.00 $413.00
Exxon-Company, U.S.A. Comm. $413.00
171 Rowan Bldg.
6000 Camp _Bowie
Fort Worth, TX 7611-6_"
EAST SIDE
Gulf Oil Corp. Tract B 40 145' Existing facilities -0-
P. 0. Box 285 Comm
Houston, Texas 77001
Mobil Oil Corp. Tract E 40-C 120' Existing facilities -0-
P. 0. Box 900 Comm.
Dallas, Texas 75221
E. L. Baker Tract A 40-C 245' Existing facilities -0-
303 Baker Bldg. Comm.
Fort Worth, Texas 76102
2.
PROJECT NO. 104-22000-151: UNIT 1B TRAIL LAKE DRIVE FROM WOODWNY-DRIVE TO LOOP '820 cont.
BLOCK
OWNER LOT 'ZONING ' 'FRONTAGE RATE AMOUNT ASSESSMENT
EAST SIDE WEDGWOOD 'ADDITION
City of Fort Worth 11 68 120' _0_
Library
Kimberly Avenue intersects
First Assembly of God TR. A-R-1 270' Sidewalk $7.00 $1,890.00
of Fort Worth 40 $1,890.00
5051 Trail Lake Drive CF
Fort Worth, TX 76133
Wooten intersects
McKinney Memorial 13-R 39 175' Sidewalk $7.00 $1,225.00
Bible Church CF .$1,225.00
5401 Woodway
Fort Worth, TX 76133
TOTAL COST TO PROPERTY OWNERS (ASSESSMENTS) ....$ 6,804.00
TOTAL COST To CITY" 03f.FORT WOR'i T .. .. .. ...... .$549,'846'.145
TOTAL CONSTRUCTION COST ..... ... .... ..... .. . . . .$556,650.45
3.
FILE
HERCHERT City of Fort Worth, Eexas
BAILIFF Mayor
and or d C®Il1l nc l Communication
SMITH �+Y�/
JONES DATE REFERENCE SUBJECT: Final Payment - Trail Lake Drive PAGE
NUMBER
Unit 1-M Storm Drain; Unit 1-K Storm 2
12/18/79 ^*FP-1409 Drain Extension i °I
Final Council action is requested on the project described below.
Project Description
Name: Reconstruction of Trail Lake Drive, Unit 1-M Storm
Drain & Unit 1-K Storm Drain Extension, Project
No. 104-22151 per Contract No. 9715
Contractor: Texas Bitulithic Company
Contract Awarded: January 31, 1978 (M&C C-4072)
Work Order Issued: August 4, 1978
Work Order Effective: August 14, 1978
Work Began: September 1, 1978
Project Substantially Complete and Final Inspection Made: August 29, 1979
Final Construction Approval: November 27, 1979
Working Time Bid: 166 Days
Working Time Used: 162 Days
Project Cost
Original Bid Price: $475,808.95
Change Order No. 1: $ 2,472.25 A.R. 1-15 2.3.1
Change Order No. 2: 19,1+6.25 October 10, 1978 (M&C C-4378)
Change Order No. 3: - 42.00 A.R. 1-15 2.2
Change Order No. 4: 295.00 A.R. 1-15 2.3.1
Change Order No. 5: 10,999.50 May 22, 1979 (M&C C-4654)
Revised Bid Price: $508,679.95
Final Contract Cost: $520,234.07
Partial Payments Previously Made: 11 Amount: $447,638.48
Final Payment Due: $ 72,595.59
DATE REFE ERCE SUBJECT: Final Payment - Trail Lake Drive PAGE
NUM
Unit 1-M Storm Drain; Unit 1-K Storm 2 2
12/11/79 **FP-1409 of
Deviation from Bid Price
The final contract cost of this project exceeded the revised bid price by
$11,554.12. The cost is the result of differences between estimated quan-
tities of the contract documents and actual quantities required to construct
theproject per specifications.
Financing
Sufficient funds are available for the final payment to be made from Project
Account No. 104-22151. A bond fund transfer is required in the amount of $15,000
to properly cover the cost of construction.
Compliance with Spefications
The project has been completed in accordance with the requirements of the
contract.
Recommendations
It is recommended that:
1. The following bond fund transfersbe approved:
From To Amount Reason
013-095-901-00 013-022-151-00 $ 2,000 To provide additional funds
Engineering Unspecified Trail Lake Drive in order to make final pay-
ment to contractor and pro-
vide additional inspection
funds
013-022-901-00 013-022-151-00 13,000 To provide additional funds
Arterial Streets Trail Lake Drive in order to make final pay-
Unspecified ment to contractor and pro-
vide additional inspection
funds
2. The project described above be accepted and final payment of $72,595.59 be
made to Texas Bitulithic Company.
VS:plg
SUBMITTED FOR THE-
CITY
HE
CITY MANAGER'S' DISPOSITION COUNCIL: PROCESSED BY
OFFICE BY: nl^PPROVED f h
ORIGINATING �A q�+OTHER DESCRIB(EE) �V
DEPARTMENT HEAD: Keith A. Smith ADOPTED OPDII)A ®�� ®, CITY SECRETARY
FOR ADDITIONAL INFORMATION /v
CONTACT: John Jones Ext. 7901 DATE )S J G