Loading...
HomeMy WebLinkAboutContract 47172 R ' Developer and Project Information Cover Sheet: Developer Company Name: Summer Creek South Development, Ltd. Address, State, Zip Code: 3045 Lackland Rd, Fort Worth, TX 76116 Phone &Email: 817-717-7133,fleet @lacklandholdings.com Authorized Signatory, Title: Tim Fleet, General Manger Project Name and Brief Summer Creek South Phase 4 Description: Project Location: 9000 Summer Creek Rd Plat Case Number: FP-13-020 Plat Name: Summer Creek South Phase 4 Mapsco: <Mapsco> Council District: 6 City Project Number: 02220 CFA Number: 2015-078 DOE Number: 7179 To be completed by staff.- ; � Received by: Awl Date: C" City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 v Page 1 of 11 f , I' o.n J STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, Summer Creek South Development, Ltd, ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Summer Creek South Phase 4 ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ('Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date:07.30.2015 Page 2 of 11 to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) ®, Sewer (A-1) ©, Paving (B) FA, Storm Drain (B-1) ®, Street Lights & Signs (C) `NX E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s) pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date:07.30.2015 Page 3 of 11 maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state- approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 4 of 11 I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date:07.30.2015 Page 5 of 11 construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 6 of 11 the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 7 of 11 Cost Summary Sheet Project Name: Summer Creek South Phase 4 CFA No.: 2015-078 DOE No.: 7179 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 215,929.50 2.Sewer Construction $ 215,116.00 Water and Sewer Construction Total $ 431,045.50 B. TPW Construction 1.Street $ 575,321.44 2.Storm Drain $ 91,857.00 3.Street Lights Installed by Developer $ 75,800.25 4. Signals $ - TPW Construction Cost Total $ 742,978.69 Total Construction Cost(excluding the fees): $ 1,174,024.19 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 8,620.91 D. Water/Sewer Material Testing Fee(2%) $ 8,620.91 Sub-Total for Water Construction Fees $ 17,241.82 E. TPW Inspection Fee(4%) $ 26,687.14 F. TPW Material Testing(2%) $ 13,343.57 G. Street Light Inspsection Cost $ 3,032.01 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 43,062.72 Total Construction Fees: $ 60,304.54 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% $ 1,174,024.19 Completion Agreement=100%/Holds Plat $ 1,174,024.19 x Cash Escrow Water/San itar Sewer=125% $ 538,806.88 Cash Escrow Paving/Storm Drain=125% $ 928,723.36 Letter of Credit=125%w/2 r expiration period $ 1,467,530.24 City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date:07.30.2015 Page 8 of 11 ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER Summer Creek South Development,Ltd. Jesus J. Cha a Assistant City Manager N me: Tim Fleet Title: General Manager Date � Date: Recommended ley: ATTEST: (Only if required by Developer) ` WI)1V Wendy Ch'-Babulal, EMBA, P.E. Development Engineering Manager Signature Water Department Name: Douglas 4 . Wiersig, P.E. Director Transportation &Public Works Department F Op Approved as to Form &Legality: ATTEST: Douglas W. Black Mary J. a ser" � Assistant City Attorney City Secretary M&C No. Date: C)1-1"I IAL RE,,"til' City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 9 of 11 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment © Attachment 1 - Changes to Standard Community Facilities Agreement ® Location Map ® Exhibit A: Water Improvments OX Water Cost Estimate © Exhibit A-1: Sewer Improvements ® Sewer Cost Estimate Exhibit B: Paving Improvements ® Paving Cost Estimate © Exhibit B-1: Storm Drain Improvements rX Storm Drain Cost Estimate Exhibit C: Street Lights and Signs Improvements ® Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 02220 None City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 11 of 11 OU90'ON 1081OAd 4110 03WOS1SOL-Wd'ON 10e10M JeMeS f HSYNd-RIMS X33W d3WY'U1S anise 01 eluewenoxluq 14811 tea1S Pue 8836-M'ON el OLU'ON 70'0 033aO918O9.999d'ON 1Oe(ad a3eM. Je1eM'JQMeS AMMURS'65MU 0'Byned 10 u0p0nN1euOO 041 JO1 eueid K er ac o•� ex ea�e�eu F I 7 7� R« I T— 34 E s i�ee � 1 @� it BBB 0 a i LL O� \f' V¢dV F �i�i O Z c3 � H •� 4 z fi ROM wv En V � U W ` a: Z c W icc � a 0 ul F-4 z V1 3 m NJ ; N n cc A In H �+ g o o a Z � H az°z b � tlqgc��� Rg@@ogt� Y. 0 ggg3 :q @� wl x �m . vGGG!� I 6 lillull ry FF80R Ix 49% a 1 Est O °n .a O s 111W w 8! -H W ci ss Ps s Iss �dHSSSCS x"� 3 :t j I a ZZI6 30l7S Y f7N/BY.J 9L901 3017S Y 13N/BY.� K�AJi'?I A��21� NIIYWOS K�NdU al�3�U? ?/`�`lYff'lIS � // � � 8 I A ` .°, I «I & I 8 I x ' •^, I « � a � I 31I <' o� o ( g'� °� 8 � a I ° �e� ° � � � k ssivs' as:..uos { ' ! HIM Hxtwazasae ( - ` e ' All t ! ^y�i F ; �'! •� « : SIIw s' A 1 gA DA 11 \ C;WWN zed l l �'yY 1'• k v'>.~ f �a� tM I- �h •D15R 1 1 -� i Ct.d � !v {. oA _ IIE $ S ti� n \ + \\ \�: ^ \\\ / \ °u \ '�� A 9 s� ° • a ' I W R / UDYdAY 1 i \\��\ ;' '\\ i \ °S \ " / 'a-�� � •`�s'>}�,�, ;+s�,�, 'I�� I � �zm r�fi «s C ptuvE i \\ \\ ` \ \ � R \ V ��"H ��t�„��•�iE ■ fi � f � I Y a � n as �9 /° vs C/DUDYAAY DANE CLOUD � 'WCWh z�/ � 11�� ! °,°r.�t — — s, s� 3'• �•�yBa S° B^ P,� G '���Y a x 1 � g n RDA t k a t gUN MEA cAts%I'DAD s;, COMPANY. 090.1 _ 1 OEV£ E0 6008 +G g •S 1 •di 1 CHESMEAKC.0 rX --[02 1 1 D.R.LC fW 50 PAR 0.D2R x'7 CC C. 1 1 C flCE 0. i 1 p COLUMBUS 1RAI oQ O Q' 0o U Wlf pFL0 WA Y D Z D CE rRalL SUMMER PARK WH/Sp N.T.S. c CEO AR BRUSH c) -- W RISINGER ROAD X BR r EEZWIND LN rn � D Y \� PROJECT LOCATION D.O.E. NO. 7179 WATER N . P265-60615020 LOCATION MAP SANITARYN 2 SEWER O. 75 7061302220 "SUMMER CREEK SOUTH, PHASE 4" CITY PRO EOCTMNO.A02220' w-2299 X-22536 WEI—CH ENGu*4FFj Nc;, INC. CONSUL TING ENGINEERS /CE J)Li BRUSH N 1 1 COURTI \ , c• �""1 ���\ o CEDAR BR~1S 1 — EX 20-w i�' \ \ \ \ f�. i 1 _Z ..._ o I PROP,BW C EX 8 W\V�l OAR( i �AAIIY/J� EX ON _ EX kW 1 � I II ►I \. --- Q _- j _ P OP 'w —1 1J — — PROP or C11 1 I^-- � GAS Y HILL LANE• 1 -_ "100%W DEVELOPER'S COST 8 8" WATER LINES, FIRE HYDRANTS, GATE VALVES AND ASSOCIATED APPURTENANCES SCALE: 1"=300' EXHIBIT "A" D.O.E. NO. 7179 WATER NO. P265-6061502220 WATER IMPROVEMENTS SANITARY SEWER NO. P275-7061302220 "SUMMER CREEK SOUTH, PHASE 4" CITY PROJECT NO.A02220 W-2299 X-22536 WELCH ENGINEERING, I NC. CONSUL TING ENGINEERS CEDAR BRUSH ' ' I i — --- � COURT` \ O C D6�R BRUSH DRIVE 1 � 40� oEX B-SS 17/7 J 1 �•-T-z EX e- —� 1-3'TLT SS i S' \ O�FZ� i fi I Z G 8 I g6pD It cw Ex s-ss / \ �Y --- --- Ex BSS -- � � 1► II �� ��iQ��;--, I t boa, \ / 1 , 1 -- J, 1 aaoP a-' — r „�� ` / Rjl �� 1 III T()p Irli I -- I PROP SS�-^ GRASSY HILL LANE• -- vaov ass 1007. DEVELOPER'S COST --;---- 8" SANITARY SEWER UNES AND ASSOCIATED APPURTENANCES SCALE- 1"=300' EXHIBIT "A—I" D.O.E. NO. 7179 WATER NO. P265-6061502220 SEWER IMPROVEMENTS SANITARY SEWER NO. P275-7061302220 STREESTORM"SUMMER CREEK SOUTH, PHASE 4" CITY PROJECT NO.A02220' w-2299 X-22536 WELCH ENGINEERING, I NC. CONSUL T/NG ENGWEERS B�2USFI— COURT \ CEDAR BRUS DRIVF� us 700 n / I o O —G 2s'e_a �' \ pvR -- o.c o SuN� �-__ - I -CO- ED w — 9 At m m Qv — N GRASSY HILL LANE 8' —I— —(50'R.O.W.) -- 1003 DEVELOPER'S COST 6" PAVEMENT W/2% CROSS SLOPE ON 6" LIME SUBGRADE SCALE: 1"=300' EXHIBIT "B" D.O.E. NO. 7179 WATER NO. P265-6061502220 PAVING IMPROVEMENTS SANITARY SEWER NO. P275-7061302220 "SUMMER CREEK SOUTH, PHASE 4" STREET/STORM PROJECT NO. 02Z20. w-229s X-22536 WELCH ENGINEERING, INC. CONSUL T/NG 0VG 11VEERS �CEDIR 131USIi� - --- N 1 COURTS CED�R BRUSH DRIVE ,, Lu EX WR Ld -En� ► '\ y1r'T I i o t o I i 1 1 0 ` ��\ p00 GG�R �� -- �-+-� -- -- 1 50 ��-- --T-m -1 - rn c ir. t�-RCp 27 RCP --- 9 o I z t - - GRASS Y HILL LAN=F E t -_ - 10'. 15. OR 20' INLET- 100% DEVELOPER'S COST STORM SEWER AND INLET AND ASSOCIATED APPURTENANCES SCALE: V-300' EXHIBIT "B--1" D.O.E. NO. 7179 WATER NO. P265-6061502220 DRAINAGE IMPROVEMENTS SANITARY SEWER NO. P275-7061302220 "SUMMER CREEK SOUTH, PHASE 4" CITY PROJECT NO.DRAIN 2220 W-22ss X-22536 WELCH IB WOW ElBPX-4G, I NC. CONSUL 7-ING ENGINEERS /CE �i -- G� COUR'T� \ , 10 mOW ���"� '� \ 0— T—a O _- t I ! GRASSY HI L IANE -- *-- PROPOSED STREET UGHT (10OX DEVELOPER'S COST) A-- PROPOSED STREET SIGN (100X DEVELOPER'S COST) ■-- PROPOSED GROUND BOX (10OX DEVELOPER'S COST) *-- EXISTING STREET UGHT SCALE: 1"=300' EXHIBIT stcof D.O.E. NO. 7179 WATER NO. P265-6061502220 STREET LIGHTS SANITARY SEWER NO. P275-7061302220 "SUMMER CREEK SOUTH, PHASE 4" CITY PRO ECTMNO.A02220' w-2299 X-22536 WELCH ENGINEERING, I NC. CONSUL T//VG ENGINEERS 00 42 43 DAP-BID PROPOSAL Page I of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM 8/24/2015 SUMMER CREEK SOUTH,PHASE 4 UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item No Description Specification Unit of Bid Unit Price Bid Value Section No. Measure Quantity UNIT I:WATER IMPROVEMENTS 3311.0161 6"PVC Water Pipe 33 1112 LF 50 $20.00 $1,000.0 3311.0261 8"PVC Water Pipe 33 1112 LF 3,795 $31.00 $117,645.0 3312.3002 6"Gate Valve 33 1220 EA 5 $800.0 $4,0000 3312.3003 8"Gate Valve 331220 EA 9 $1,100.0 $9,900.0 3312.0117 Connect.to Existing 4-12"Water Main 33 1225 EA 2 $1,000.0 $2,000.0 3312.0001 Fire Hydrant 33 1240 EA 5 $2,700.0 $13,500.0 3311.0001 Ductile Iron Water Fittings 33 11 11 TON 3 $2,000.0 $6,000.0 3305.0109 Trench Safety 3305 10 LF 3,845 $0.10 $384.5 3312.2003 1"Water Service 33 1210 EA 90 $650.0 $58,500.0 3312.2004 l"Water Service to HOA lots 33 12 10 EA 4 $750.00 $3,000.0 TOTAL UNIT I:WATER IMPROVEMENT $215,929.50 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS 00 42 43 Bid Proposal DAP SUMIvfER CREEK SOUTH PHASE 4-I156C-08-24-I5 Form Version April 2,2014 00 42 43 DAP-BID PROPOSAL Page 2 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM 8/2412015 SUMMER CREEK SOUTH,PHASE 4 UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bid]ist Item No Description Specification Unit of Bid Unit Price Bid Value Section No. I Measure Quantity UNIT II:SANITARY SEWER IMPROVEMENTS 3331.4115 8"PVC Sewer Pipe 33 31 20 LF 3,272 $28.00 $91,616.0 3331.4116 8"PVC Sewer Pipe,CSS Backfill 33 11 10 LF 128 $50.0 $6,400.0 3339.1001 4'Manhole 33 39 20 EA 21 $2,700.0 $56,700.0 3339.1003 4'Extra Depth Manhole 333920 VF 25 $150.0 $3,750.0 3339.0001 Epoxy Manhole Line 33 39 60 VF 16 $225.00 $3,600.0 3331.3102 4"Sewer Service,Two-way cleanout 33 31 50 EA 90 $400.00 $36,000.0 3301.0002 Post-CCTV Inspection 33 01 31 LF 3,400 $3.00 $10,200.0 3339.0002 Manhole Vacuum Testing 33 01 30 EA 21 $150.00 $3,150.0 3305.0109 Trench Safety 3305 10 LF 3,400 $0.50 $1,700.0 3305.0113 Trench Water Stops 3305 10 EA 5 $400.0 $2,000.0 TOTAL UNIT II:SANITARY SEWER IMPROVEMENT $215,116.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUhMNTS-DEVELOPER AWARDED PROJECTS 00 42 43 Bid Proposal DAP SUMMER CREEK SOUTH PHASE 4-1158C-08-24-15 Form Version April 2,2014 00 42 43 DAP-BID PROPOSAL Page 3 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM 8/24/2015 SUMMER CREEK SOUTH,PHASE 4 UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Item No Description Specification Unit of Bid Unit Price FBid Value Section No. Measure Quantity UNIT 111:DRAINAGE IMPROVEMENTS 3305.0109 Trench Safety 3305 10 LF 424 $0.50 $212.0 3341.0309 36"RCP,Class III 3341 10 LF 140 $185.0 $25,900.0 3341.0208 27"RCP,Class III 3341 10 LF 188 $155.0 $29,140.0 3341.0205 24"RCP,Class III 3341 10 LF 55 $135.0 $7,425.0 3341.0201 21"RCP,Class III 3341 10 LF 41 $130.0 $5,330.0 3349.0001 4'Storm Junction Manhole Box 33 49 10 EA 1 $4,600.0 $4,600.0 3349.5001 10'Curb Inlet 33 49 20 EA 3 $3,250.0 $9,750.0 3349.5003 20'Curb Inlet 33 49 20 EA 2 $4,750.0 $9,500.0 TOTAL UNIT III:DRAINAGE IMPROVEMENT $91,857.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS 00 42 43 Bid Proposal DAP SUtvBdER CREEK SOUTH PHASE 4-1158C-O8-24-1 S Form Version April 2,2014 00 42 43 DAP-BID PROPOSAL Page 4 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM 8/24/2015 SUMMER CREEK SOUTH,PHASE 4 UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item No Description Specification Unit of Bid Unit Price Bid Value Section No. Measure Quantity UNIT IV:PAVING IMPROVEMENTS 3213.0101 6"Cone Pvmt 3213 13 Sy 13,593 $35.73 $485,677.8 3211.0501 6"Lime Treatment(8%) 32 1129 Sy 14,477 $2.15 $31,125.5 3211.0400 Hydrate Lime 321129 TN 217 $159.00 $34,503.0 3213.0301 4"Concrete Sidewalk 32 13 20 SF 1820 $4.75 $8,645.0 3213.0501 Barrier Free Ramp-Type R-1 32 1320 EA 8 $1,405.00 $11,240.0 3441.4003 Furnish&Install Ground Mount Sign Post and Sign 34 41 30 EA 5 $475.00 $2,375.0 3471.0001 Traffic Control 3471 13 MO 3 $585.00 $1,755.0 TOTAL UNIT IV:PAVING IMPROVEMENT $575,321.44 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROTECTS 00 42 43 Bid Proposal DAP SUMAMIX CREEK SOUTH PHASE 4-1158C-08-24-15 Form Version April 2,2014 00 42 43 DAP-BID PROPOSAL Page 5 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM 8/24/2015 SUMMER CREEK SOUTH,PHASE 4 UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Specification Unit of Bid Unit Price T Bid Value Bidlist Item No Description Section No. Measure Quantity UNIT V:STREET LIGHTING IMPROVEMENTS 3441.1502 Fumish/Install Ground Box,Type B 34 41 10 EA 16 $525.00 $8,400.0 9999.0000 Rdwy Ilium Assembly TY D-25,70W LED Signle 34 41 20 EA 16 $2,765.00 $44,240.0 3441.3301 Furnish/Install Rdwy Ilium Foundation TY 1,2 and 4 34 4120 EA 16 $835.00 $13,360.0 2605.3015 2 Inch Conduit PVC SCH 80(T) 26 05 33 LF 1095 $5.85 $6,405.7 3441.3401 6-6-6 Triplex Alum Electric Conductor 3441 10 CLF 1095 $3.10 $3,394.5 TOTAL UNIT V:STREET LIGHTING IMPROVEMENT $75,800.25 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS 00 42 43 Bid Proposal DAP SUMMER CREEK SOUTH PHASE 4-1158C-08-24-15 Form Version April 2,2014 00 42 43 DAP-BID PROPOSAL Page 7 or 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM 8/24/2015 SUMMER CREEK SOUTH,PHASE 4 UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Item No Description Specification Unit of Bid Unit Price Bid Value Section No. Measure Quantity Bid Summary UNIT I:WATER IMPROVEMENTS $215,929.50 UNIT II:SANITARY SEWER IMPROVEMENTS $215,116.00 UNIT III:DRAINAGE IMPROVEMENTS $91,857.00 UNIT IV:PAVING IMPROVEMENTS $575,321.44 UNIT V:STREET LIGHTING IMPROVEMENTS $75,800.25 Total Construction Bid $1,174,024.19 Contractor agrees to complete WORK for FINAL ACCEPTANCE #,days,i calendar days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROTECTS Fonn Version April 2,2014 00 42 43 Bid Proposal DAP SUMNMR CREEK SOUTH PHASE 4-1158C-08-24-15