Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 47194
ComTElA(','-,,'r0R'S IriONDING11" (,'0NTRACTN0.�-L 'rll ( PROJECT MANUAL FOR THE CONSTRUCTION OF Park Improvements at Terry Park, City Project No. 02263 Northside Park, City Project No. 02264 High Crest Park, City Project No. 02265 Summerfields Park, City Project No. 02266 Betsy Price David Cooke Mayor City Manager Richard Zavala Director, Parks and Community Service Prepared for The City of Fort Worth Parks and Community Services Department 2015 Baird, Hampton & Brown 4550 SH 360, Suite 180 Grapevine, TX 76051 �C 'IC11�Gflr ,. IN �� FORTWORTH, City of Fort Worth Standard Construction Specification Documents Adopted September 2011 00 00 00-1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 1 of 3 SECTION 00 00 00 TABLE OF CONTENTS Division 00-General Conditions 0005 10 Mayor and Council Communication 0005 15 Addenda 00 10 00 Seals Page 00 11 13 Invitation to Bidders 0021 13 Instructions to Bidders 0035 13 Conflict of Interest Affidavit 0041 00 Bid Form n00 42 43 Proposal Form 917 43 43 Bid Band 00 43 37 Vendor Compliance to State Law Non Resident Bidder 00 45 26 Contractor Compliance with Workers'Compensation Law 00 45 40 Small Business Enterprise Goal 00 52 43 Agreement 0061 13 Performance Bond 0061 14 Payment Bond 0061 19 Maintenance Bond 0061 25 Certificate of Insurance 00 72 00 General Conditions 00 73 00 Supplementary Conditions Division 01-General Requirements 01 11 00 Summary of Work 01 2500 Substitution Procedures 01 31 19 Preconstruction Meeting 01 31 20 Project Meetings 01 32 16 Construction Progress Schedule 01 3233 Preconstruction Video 01 33 00 Submittals 01 35 13 Special Project Procedures 01 4523 Testing and Inspection Services 01 5000 Temporary Facilities and Controls 01 5526 Street Use Permit and Modifications to Traffic Control 01 57 13 Storm Water Pollution Prevention Plan 01 58 13 Temporary Project Signage 01 6000 Product Requirements 01 6600 Product Storage and Handling Requirements 01 7000 Mobilization and Remobilization 01 71 23 Construction Staking and Survey 01 7423 Cleaning 01 7719 Closeout Requirements 01 7823 Operation and Maintenance Data 01 7839 Project Record Documents Technical Specifications which have been modified by the Engineer specifically for this Project; hard copies are included in the Project's Contract Documents CITY OF FORT WORTH Park Improvements at Tem,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised November 22,2013 6 M&C Review Page 1 of 4 Official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA ORT Ok°I If COUNCIL ACTION: Approved on 9/15/2015 -Ordinance No. 21892-09-2015 DATE: 9/15/2015 NO.: ENCE REFER --27469 NAME: 80FOUR_PARK_SITE_IM PROVE MENTS_ CODE: C TYPE: NON- PUBLIC NO CONSENTHEAING: SUBJECT: Authorize Execution of a Construction Contract with Northstar Construction, LLC, in the Amount of$715,283.35 for the Construction of Park Improvements at Terry Park, Northside Park, High Crest Park and Summerfields Park and Provide for Staff Costs and Contingencies in the Amount of$48,682.85 for a Total Project Construction Cost of $763,966.20 and a Total Project Cost, Including Design, of$877,851.20 and Adopt Appropriation Ordinance (2014 BOND PROGRAM) (COUNCIL DISTRICTS 2 and 4) RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached appropriation ordinance increasing the estimated receipts and appropriations in the Parks Gas Lease Capital Project Fund in the amount of$90,161.06 from Restricted Parks Gas Lease Royalties; and 2. Authorize execution of a construction contract with Northstar Construction, LLC, in the amount of $715,283.35 for construction of park improvements at Terry Park, Northside Park, High Crest Park and Summerfields Park. DISCUSSION: The purpose of this Mayor and Council Communication (M&C) is to authorize the award and execution of a construction contract to Northstar Construction, LLC, in the amount of$715,283.35 for the construction of park improvements at Terry Park(CD 2), Northside Park (CD 2), High Crest Park (CD 2) and Summerfields Park(CD 4). On August 26, 2014, the City Council authorized an Engineering Agreement with Baird, Hampton & Brown, Inc., (M&C C-26935, City Secretary No. 45910) in the amount of$94,985.00 for design and preparation of construction documents for park improvements at Terry Park, Northside Park, High Crest Park and Summerfields Park. The resulting project was advertised on April 30, 2015, and May 7, 2015, in the Fort Worth Star-Telegram. On May 28, 2015, the following bids were received and tabulated as follows: Bidders Base Bid Northstar Construction, L.L.C. $715,283.35 North Rock Construction L.L.C. $727,833.94 RLM Earthco, Inc $780,611.94 2L Construction 1 $790,484.00 C. Green Scaping L.P. $817,502.05 SOI Group, Inc. $883,667.05 http://apps . cfwnet.org/council_packet/mc_review.asp?ID=2 . . . 9/29/2015 M&C Review Page 2 of 4 The Base Bid items include: Terry Park: Demolition and removal of existing sidewalks, playground equipment and site furnishings, installation of new playground, picnic shelter, site furnishings and walks. Northside Park: Site grading and accessible walks. High Crest Park: Site grading, new playground, picnic shelter, site furnishings and walks. Summerfields Park: Demolition and removal of existing playground equipment, site grading, new playground, site furnishings and sidewalks. It is recommended that the Base Bid in the amount of$715,283.35 as submitted by Northstar Construction, LLC, be approved for award of contract. Associated construction administration, inspection, testing and change order contingency funding are in the amount of$48,682.85 for a total construction phase cost of$763,966.20. Project costs are summarized as follows: Terry Park Northside High Summerfields Parks #02263 Park#02264 Crest Park Park #02266 Total #02265 Engineering Agreement (Baird, Hampton $22,796.40 $29,445.35 $22,743.25 $20,000.00 $94,985.00 &Brown, Inc.) M&C C-26935 Project Administration, $2,000.00 $6,500.00 $6,700.00 $3,700.00 $18,900.00 etc. Design Phase $24,796.40 $35,945.35 $29,443.25 $23,700.00 $113,885.00 Total Construction Contract (Northstar $236,504.03 $83,230.13 $230,632.04 $164,917.15 $715,283.35 Construction, LLC) Testing, Inspection, $18,900.00 $11,750.00 $8,650.00 $9,382.85 $48,682.85 Contingencies, etc. C Phase Total onstruction $255,404.03 $94,980.13 $239,282.04 $174,300.00 $763,966.20 Project Total $280,200.43 $130,925.48 $268,725.29 $1-98,000.00 $877,851.20 These projects are funded by 2000 Certificates of Obligation, Gas Revenue, Park Dedication Fees, 2004 Capital Improvement Project Funds and 2014 Capital Improvement Project Funds. In March of 2014, Macy's Department Stores partnered with the National Recreation and Park Association to help raise funds for local parks nationwide. The Heart Your Park Program allowed Macy's customers to make donations to a local park of Macy's employees' choosing and Macy's Ridgmar(Store No. 681) chose Northside Park. A donation of$250.00 was received on June 9, 2014 which was appropriated as part of anticipated gifts in the annual budget ordinance. http://apps . cfwnet.org/council_packet/mc_review.asp?ID=2 . . . 9/29/2015 M&C Review Page 3 of 4 Upon approval of this M&C, appropriations and funding are summarized in the table below: Terry Park Northside High Summerfields Parks #02263 Park#02264 Crest Park Park #02266 Total #02265 Cerificates of $68,970.00 $0.00 $0.00 $52,800.00 $121,770.00 Obligation(C301) Previously Appropriated Gas $1,459.33 $127,357.48 $0.00 $0.00 $128,816.81 Revenue Appropriations(C282) (G-18135) (G-17586) Additional Gas Revenue $46,478.10 $43,682.96 $0.00 $0.00 $90,161.06 Appropriations(C282) Park Dedication Fees(C281) 1 $0.00 $0.00 $268,725.29 $0.00 $268,725.29 2004 CIP(C280) $18,093.00 $20,000.00 $0.00 $0.00 $38,093.00 2014 C1(C210) $145,200.00 $145,200.00 $0.00 $145,200.00 $435,600.00 Other Donations(C282) 1 $0.00 $250.00 $0.00 $0.00 $250.00 Project Total $280,200.43 $336,490.44 $268,725.29 $198,000.00 $1,083,416.16 H '1 The balance for Northside Park in the amount of$205,564.96 will provide for the direct purchase and installation of new playground equipment and poured-in-place playground surfacing via an existing Purchase Agreement(M&C P-11623). Three of these projects are included in the 2014 Bond Program. Available resources within the General Fund will be used to provide interim financing until debt is issued. Once debt associated with these projects is sold, bond proceeds will reimburse the General Fund in accordance with the statement expressing official Intent to Reimburse that was adopted as part of the ordinance canvassing the bond election (Ordinance No. 21241-05-2014). M/WBE OFFICE- Northstar Construction, LLC, is in compliance with the City's Business Diversity Ordinance by committing to 14 percent MBE participation on the PACSD base bid price only. The City's MBE goal on this base bid contract is 14 percent. Construction is anticipated to commence in September 2015 and will be completed by March 2016. The contract period is 180 calendar days. The maintenance impact is expected to begin in April of 2016 and estimated to be $1,900.00 for Terry Park, $2,140.00 for Northside Park, $2,349.70 for High Crest Park and $1,539.70 for Summerfields Park in FY 2016. Beginning in FY 2017, the operating impact is anticipated to be $3,800.00 for Terry Park, $4,280.00 for Northside Park, $4,699.40 for High Crest Park and $3,079.40 for Summerfields Park annually. There is no FF&E associated with this project scope. Terry Park is located in COUNCIL DISTRICT 2, Northside Park is located in COUNCIL DISTRICT 2, High Crest Park is located in COUNCIL DISTRICT 2 and Summerfields Park is located in COUNCIL DISTRICT 4. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that appropriations are available in the current capital budget for this construction contract, as appropriated, of the Park Gas Leases Fund, the Park Dedication Fees Fund, the 2014 Bond Program, the General Capital Projects Fund and the PACS http://apps . cfwnet.org/council_packet/mc_review.asp?ID=2 . . . 9/29/2015 M&C Review Page 4 of 4 Improvement Fund. Restricted Parks Gas Lease Royalties have Unappropriated Revenues of$2,745,656.86. Upon approval of the above recommendations and adoption of the attached appropriation ordinance in the amount of$90,161.06, the remaining balance of unappropriated Restricted Parks Gas Lease Royalties will be $2,655,495.80. TO Fund/Account/Centers FROM Fund/Account/Centers 1) 0282 541600 802480226380 $46,478.10 2) C280 541600 802580226480 $20,000.00 1) C282 446200 801929990300 $90,161.06 2) C281 541600 802490226580 $230,632.04 1) C282 541600 802490226480 $43,682.96 2) Q280 541600 802580226380 $18,093.00 2) C282 541600 802480226380 $47,937.43 2) C282 541600 802490226480 $63,230.13 2) C301 541600 804490226680 $25,904.96 2) Q210 541600 802480226380 $131,354.96 2) C210 541600 804480226680 $139,012.19 2) C301 541600 802490226380 $39,118.64 Submitted for City Manager's Office by: Susan Alanis (8180) Originating Department Head: Richard Zavala (5704) Additional Information Contact: David Creek (5744) ATTACHMENTS 80FOLJR PARK SFTE NPROVEMENTS C282 A015.docx Eli hcrest Park Site Locafioll.Majj ff ocatio i Mapj;��,pr ff S.-A.-e-1.1, --.-j-_-- .S-,-u-r -e-hd--s.--P.-,-a-,-r k,-,S-,A...e.-I...o,...aq.a..—ti pfl,lLi ,p p 'a CC1,.p ocation M jf http://apps . cfwnet.org/council_packet/mc_review.asp?ID=2 . . . 9/29/2015 0005 15-1 ADDENDA Page 1 of 7 I SECTION 00 05 15 2 ADDENDA 3 CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUC'T'ION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised July 1,2011 ADDENDUM #1 PARK IMPROVEMENTS AT TERRY PARK, NORTHSIDE PARK, HIGH CREST PARK & SUMMERFIELDS Park May 11, 2015 TO ALL BIDDERS: Please attach to your specifications. This addendum is hereby made a part of the Contract Documents and is issued to modify, explain or correct the original drawings and/or project manual. CONSTRUCTION DRAWINGS Sheet L1-02 Terry Park Demolition and Tree Protection Plan 1. Added notes about saw cutting sidewalk for drain pipe installation. Sheet L1-04 Summerfields Park Demolition and Tree Protection Plan 1. Added note about curb cut at street. Sheet 1-2-01 Terry Park Site Development Plan 1. Changed landscape edging from steel to composite plastic. 2. Edited note pertaining to drain through curb. Note now says landscape architect shall approve method of construction. Sheet 1-2-03 High Crest Park Site Development Plan 1. Added note about saw cutting existing partial driveway apron. Sheet 11-2-04 Summerfields Park Site Development Plan 1. Removed section of sidewalk. 2. Changed location of litter receptacle. Sheet 1-3-01 Terry Park Site Dimension Control Plan 1. Edited labels which made reference to steel landscape edging. Edging has changed to composite plastic. Sheet 1-3-03 Summerfields Park Site Dimension Control Plan 1. Clouded areas where sidewalk was removed and litter receptacle was relocated. Sheet L5-01 Terry Park Grading 1. For note pertaining to drain pipe through curb, changed sheet reference from TP- 2 to 1-2-01. Sheet 1-5-04 Summerfields Park Grading and Drainage Plan_ 1. Clouded areas where sidewalk was removed and litter receptacle was relocated. Sheet C1-04 Summerfields Park Erosion Control Plan 1. Clouded areas where sidewalk was removed and litter receptacle was relocated. Sheet D1-01 Site Details 1. Revised Drain Pipe Headwall detail. Sheet D1-02 Site Details 1. Added note to Detectable Warning Surface detail. 2. Minor revisions to Split Rail Fence detail —footings and notes. Sheet D1-04 Pavilion Details 1. Removed Detail C — Steel Column Footing. Added note to Detail A. Structural design of column footings shall be as per stamped structural drawings from manufacturer/engineer. 2. Changed Pavilion Grade Beam detail reference from "D" to "C." Changed detail reference on site development plans. Sheet EQ-1 Equipment Schedule 1. Revised lists of vendors. PROJECT MANUAL REFER TO SECTION 00 42 43 — PROPOSAL FORM Terry Park: Changed from steel landscape edging to plastic composite edging. Summerfields Park: Changed quantity of concrete paving; changed quantity of grass sod. END OF ADDENDUM #1 Bid Opening Date: May 28, 2015 Acknowledge the receipt of this Addendum on your Proposal. B *Onda Y• Rice, Project Manager Release Date: May 11, 2015 ADDENDUM #2 PARK IMPROVEMENTS AT TERRY PARK, NORTHSIDE PARK, HIGH CREST PARK & SUMMERFIELDS PARK May 27, 2015 TO ALL BIDDERS: Please attach to your specifications. This addendum is hereby made a part of the Contract Documents and is issued to modify, explain or correct the original drawings and/or project manual. PROJECT MANUAL REFER TO SECTION 00 21 13 — INSTRUCTIONS TO BIDDERS Page 1: "3. Prime Bidder Qualification Requirements"was revised. Note that there is a reference to Section 00 45 14. This is a new section, and is included in this Addendum. Page 5: Item 6.1. Names and contact information was added. REFER TO SECTION 00 42 43 — PROPOSAL FORM Terry Park: Changed Item No. 1.8 — Unclassified Excavation from 34 CY to 186 CY. Northside Park: Added Item No. 2.2A—3123.0101 Unclassified Excavation, 220 CY. High Crest Park: Changed Item No. 3.1 — Unclassified Excavation from 71 CY to 196 CY. Summerfields Park: Changed Item No. 4.5—Unclassified Excavation from 12 CY to 245 CY. Northside Park: Changed Item 2.7— Block Sod Placement quantity from 21,145 to 2,349. High Crest Park: Changed Item 3.9— Block Sod Placement quantity from 9,880 to 1,098. Summerfields Park: Changed Item 4.12 — Block Sod Placement quantity from 11,960 to 1,329. NEW SECTION: 00 45 14 - BIDDERS STATEMENT OF QUALIFICATIONS This specification section is new as per this Addendum. CLARIFICATIONS REFER TO SECTION 31 23 16 — UNCLASSIFIED EXCAVATION Page 2, Line 7 through 13 A. Definitions Unclassified Excavation —Without regard to materials, all excavations shall be considered unclassified and shall include all materials excavated. Any reference to Rock or other materials on the Drawings or in the specifications is solely for the City and the Contractor's information and is not to be taken as a classification of the excavation. REFER TO SECTION 31 23 23— BORROW Refer to full specification for information on Borrow. Also refer to related sections: 31 23 16 Unclassified Excavation, and 31 24 00 Embankments. REFER TO SECTION 31 24 00 — EMBANKMENTS Page 1, Line 5 through 12 A. Section Includes: 1. Transporting and placement of Acceptable Fill Material within the boundaries of the Site for construction of: Roadways Embankments Drainage Channels Site Grading Any other operation involving the placement of on-site materials END OF ADDENDUM #2 Bid Opening Date: May 28, 2015 Acknowledge the receipt of this Addendum on your Proposal. B / onda Rice, Project Manager Release Date: May 27, 2015 000515-7 ADDENDA Page 7 of 7 1 END OF SECTION CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised Jule 1,2011 This page is intentionally blank. SECTION 00 10 00 SEALS PAGE Baird HamTton&Brown, Inc. I I 0241 13 Selective Site Demolition 0241 15 Paving Removal 03 30 00 Cast-in-Place Concrete 12 93 00 Site Furnishings 1293 10 Cast in Place ADA Tile 31 1000 Site Clearing 3123 16 Unclassified Excavation 31 23 23 Borrow 3124 00 Embankments 31 25 00 Erosion and Sediment Control 32 13 13 Concrete Paving 32 13 20 Concrete Sidewalks Driveways and Barrier Free Ramps 321373 Concrete Paving Joint Sealants 3216 13 Curb and Gutters and Valley Gutters 3231 13 Chain Link Fence and Gates 323129 Wood Fence and Gates 32 92 13 Hydromulching, Seeding and Sodding 3305 10 Utility Trench Excavation, Embedment and Backfill 33 05 26 Utility Markers-Locators 33 05 30 Location of Existing Utilities 33 46 00 Subdrainage MULTATECH Engineering, Inc. 26 05 00 Common Work Results for Electrical 26 05 33 Raceway and Boxes for Electrical Systems ... ......... ...............� MARTIN R. TORRES . / 97916... ;:. 1225 .�Q �(P�.�' CE F OF '�� ' This page is intentionally blank. 00 11 13- 1 INVITATION TO BIDDERS Page 1 of 2 1 SECTION 00 11 13 2 INVITATION TO BIDDERS 3 4 RECEIPT OF BIDS 5 Sealed bids for the construction of Park Improvements at Terry Park,Northside Park,High Crest 6 Park,and Summerfields Park will be received by the City of Fort Worth Purchasing Office: 7 8 City of Fort Worth 9 Purchasing Division 10 1000 Throckmorton Street 11 Fort Worth,Texas 76102 12 until 1:30 P.M. CST,Thursday, May 28,2015,and bids will be opened publicly and read aloud 13 at 2:00 PM CST in the Council Chambers. 14 15 GENERAL DESCRIPTION OF WORK 16 The major work will consist of the(approximate)following: new playgrounds and picnic shelters 17 at three of the four parks; concrete sidewalks; benches; picnic tables; grading;wood fence and 18 basketball court renovation at one of the four parks; and grass sodding. 19 20 DOCUMENT EXAMINATION AND PROCUREMENTS 21 The Bidding and Contract Documents may be examined or obtained on-line by visiting the City 22 of Fort Worth's Purchasing Division website at http://www.fortworth og v.org(purchasing/and 23 clicking on the Buzzsaw link to the advertised project folders on the City's BUZZSaw site. The 24 Contract Documents may be downloaded,viewed, and printed by interested contractors and/or 25 suppliers. 26 27 PREBID CONFERENCE 28 A prebid conference may be held as described in Section 00 21 13 -INSTRUCTIONS TO 29 BIDDERS at the following location, date, and time: 30 DATE: Tuesday,May 12, 2015 31 TIME: 1:30 pm 32 PLACE: Parks and Community Services Department, 33 4200 South Freeivay, 34 Suite 2200 Conf. Room IJ 35 Fort Worth Texas 76115-5759 36 LOCATION: La Grand Plaza, second floor Conference Room#1 37 38 CITY'S RIGHT TO ACCEPT OR REJECT BIDS 39 City reserves the right to waive irregularities and to accept or reject bids. 40 41 INQUIRIES 42 All inquiries relative to this procurement should be addressed to the following: 43 Attn: Tonda Rice, City of Fort Worth 44 Email: Tonda.Rice @fortworthtexas.gov 45 Phone: 817-392-5759 46 AND/OR 47 Attn: Tom Kellogg; Baird,Hampton & Brown, Inc. 48 Email: tkellogg @bhbinc.com 49 Phone: 817-251-8550010 CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 0226102264,02265,02266 Revised July L 2011 00 11 13-2 INVITATION TO BIDDERS Page 2 of 2 1 2 ADVERTISEMENT DATES 3 First date for advertisement, Thursday,April 30, 2015 4 Second date for advertisement, Thursday, May 7, 2015 5 6 END OF SECTION CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised July 1,2011 0021 13- 1 INSTRUCTIONS TO BIDDERS Page 1 of 10 1 SECTION 00 21 13 2 INSTRUCTIONS TO BIDDERS 3 4 1. Defined Terms 5 6 1.1. Terms used in these INSTRUCTIONS TO BIDDERS,which are defined in Section 00 7 72 00 -GENERAL CONDITIONS. 8 9 1.2. Certain additional terms used in these INSTRUCTIONS TO BIDDERS have the 10 meanings indicated below which are applicable to both the singular and plural thereof. 11 12 1.2.1. Bidder: Any person,firm, partnership, company, association, or corporation acting 13 directly through a duly authorized representative, submitting a bid for performing 14 the work contemplated under the Contract Documents. 15 16 1.2.2. Nonresident Bidder: Any person,firm,partnership, company, association,or 17 corporation acting directly through a duly authorized representative,submitting a 18 bid for performing the work contemplated under the Contract Documents whose 19 principal place of business is not in the State of Texas. 20 21 1.2.3. Successful Bidder: The lowest responsible and responsive Bidder to whom City 22 (on the basis of City's evaluation as hereinafter provided)makes an award. 23 24 2. Copies of Bidding Documents 25 26 2.1. Neither City nor Engineer shall assume any responsibility for errors or 27 misinterpretations resulting from the Bidders use of incomplete sets of Bidding 28 Documents. 29 30 2.2. City and Engineer in making copies of Bidding Documents available do so only for the 31 purpose of obtaining Bids for the Work and do not authorize or confer a license or grant 32 for any other use. 33 34 3. Prime Bidder Qualification Requirements 35 36 3.1. The City will evaluate all submitted bids based on criteria and qualifications. 00 45 14 37 Bidder's Statement of Qualifications are to be submitted and received by the Parks and 38 Community Service Department Project Manager no later than 5:00 P.M.,five(5)City 39 business days after the bid opening date,exclusive of the bid opening date. 40 In general: 41 a. The Prime Bidder, as general contractor or sub-contractor,must demonstrate similar 42 project scope experience on three(3)projects within the last three(3)years.All 43 subcontractors intended for use on this project shall also demonstrate similar project 44 scope experience necessary to successfully perform on their respective portion of 45 work on this project. 46 b. The Prime Bidder must provide a list the surety company(s)which issued bonds for 47 projects listed above.Additionally,the Prime bidder shall list the surety company 48 intended for use on this project. CITY OF FORT WORTH Park Improvements at Terry.Northside.High Crest and Sunmterftelds Park STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.02269.02265.02266 Revised May 19,2015 0021 13-2 INSTRUCTIONS TO BIDDERS Page 2 of 10 1 c. The Prime Bidder must submit a current certified financial statement prepared by an 2 independent Certified Public Accountant. 3 4 3.2. The City reserves the right to reject any or all bids and waive any or all formalities. 5 The City will award one contract with a combination of base bids and/or alternates 6 which is most advantageous to the City. 7 8 3.3. Additional requirements for qualification may be required within various sections of the 9 Contract Documents. 10 11 12 4. Examination of Bidding and Contract Documents, Other Related Data,and Site 13 14 4.1. Before submitting a Bid, each Bidder shall: 15 16 4.1.1. Examine and carefully study the Contract Documents and other related data 17 identified in the Bidding Documents(including"technical data" referred to in 18 Paragraph 4.2. below).No information given by City or any representative of the 19 City other than that contained in the Contract Documents and officially 20 promulgated addenda thereto, shall be binding upon the City. 21 22 4.1.2. Visit the site to become familiar with and satisfy Bidder as to the general, local and 23 site conditions that may affect cost, progress,performance or furnishing of the 24 Work. 25 26 4.1.3. Consider federal,state and local Laws and Regulations that may affect cost, 27 progress,performance or furnishing of the Work. 28 29 4.1.4. Study all: (i)reports of explorations and tests of subsurface conditions at or 30 contiguous to the Site and all drawings of physical conditions relating to existing 31 surface or subsurface structures at the Site(except Underground Facilities)that 32 have been identified in the Contract Documents as containing reliable "technical 33 data" and(ii)reports and drawings of Hazardous Environmental Conditions, if any, 34 at the Site that have been identified in the Contract Documents as containing 35 reliable "technical data." 36 37 4.1.5. Be advised that the Contract Documents on file with the City shall constitute all of 38 the information which the City will furnish. All additional information and data 39 which the City will supply after promulgation of the formal Contract Documents 40 shall be issued in the form of written addenda and shall become part of the Contract 41 Documents just as though such addenda were actually written into the original 42 Contract Documents.No information given by the City other than that contained in 43 the Contract Documents and officially promulgated addenda thereto, shall be 44 binding upon the City. 45 CITY OF FORT WORTH Park hnproremenis at Teary.Nordiside.High Crest and Summerfields Park STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.02264.02265.02266 Revised May 19,2015 0021 13-3 INSTRUCTIONS TO BIDDERS Page 3 of 10 1 4.1.6. Perform independent research, investigations,tests, borings,and such other means 2 as may be necessary to gain a complete knowledge of the conditions which will be 3 encountered during the construction of the project. On request, City may provide 4 each Bidder access to the site to conduct such examinations, investigations, 5 explorations,tests and studies as each Bidder deems necessary for submission of a 6 Bid. Bidder must fill all holes and clean up and restore the site to its former 7 conditions upon completion of such explorations, investigations,tests and studies. 8 9 4.1.7. Determine the difficulties of the Work and all attending circumstances affecting the 10 cost of doing the Work,time required for its completion, and obtain all information 11 required to make a proposal. Bidders shall rely exclusively and solely upon their 12 own estimates, investigation,research,tests,explorations, and other data which are 13 necessary for full and complete information upon which the proposal is to be based. 14 It is understood that the submission of a proposal is prima-facie evidence that the 15 Bidder has made the investigation, examinations and tests herein required. Claims 16 for additional compensation due to variations between conditions actually 17 encountered in construction and as indicated in the Contract Documents will not be 18 allowed. 19 20 4.1.8. Promptly notify City of all conflicts,errors, ambiguities or discrepancies in or 21 between the Contract Documents and such other related documents. The Contractor 22 shall not take advantage of any gross error or omission in the Contract Documents, 23 and the City shall be permitted to make such corrections or interpretations as may 24 be deemed necessary for fulfillment of the intent of the Contract Documents. 25 26 4.2. Reference is made to Section 00 73 00—Supplementary Conditions for identification 27 of: 28 29 4.2.1. those reports of explorations and tests of subsurface conditions at or contiguous to 30 the site which have been utilized by City in preparation of the Contract Documents. 31 The logs of Soil Borings, if any, on the plans are for general information only. 32 Neither the City nor the Engineer guarantee that the data shown is representative of 33 conditions which actually exist. 34 35 4.2.2. those drawings of physical conditions in or relating to existing surface and 36 subsurface structures(except Underground Facilities)which are at or contiguous to 37 the site that have been utilized by City in preparation of the Contract Documents. 38 39 4.2.3. copies of such reports and drawings will be made available by City to any Bidder 40 on request. Those reports and drawings may not be part of the Contract 41 Documents,but the "technical data" contained therein upon which Bidder is entitled 42 to rely as provided in Paragraph 4.02. of the General Conditions has been identified 43 and established in Paragraph SC 4.02 of the Supplementary Conditions. Bidder is 44 responsible for any interpretation or conclusion drawn from any "technical data" or 45 any other data, interpretations, opinions or information. 46 CITY OF FORT WORTH Park Improvements at Teri),.Northside,High Crest and Stnnmerftelds Park STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.02264.02265.02266 Revised May 19,2015 0021 13-4 INSTRUCTIONS TO BIDDERS Page 4 of 10 1 4.3. The submission of a Bid will constitute an incontrovertible representation by Bidder(i) 2 that Bidder has complied with every requirement of this Paragraph 4, (ii)that without 3 exception the Bid is premised upon performing and furnishing the Work required by the 4 Contract Documents and applying the specific means,methods,techniques,sequences or 5 procedures of construction(if any)that may be shown or indicated or expressly required 6 by the Contract Documents, (iii)that Bidder has given City written notice of all 7 conflicts,errors, ambiguities and discrepancies in the Contract Documents and the 8 written resolutions thereof by City are acceptable to Bidder,and when said conflicts, 9 etc.,have not been resolved through the interpretations by City as described in 10 Paragraph 6., and (iv)that the Contract Documents are generally sufficient to indicate 11 and convey understanding of all terms and conditions for performing and furnishing the 12 Work. 13 14 4.4. The provisions of this Paragraph 4, inclusive, do not apply to Asbestos,Polychlorinated 15 biphenyls(PCBs),Petroleum,Hazardous Waste or Radioactive Material covered by 16 Paragraph 4.06. of the General Conditions,unless specifically identified in the Contract 17 Documents. 18 19 5. Availability of Lands for Work,Etc. 20 21 5.1. The lands upon which the Work is to be performed,rights-of-way and easements for 22 access thereto and other lands designated for use by Contractor in performing the Work 23 are identified in the Contract Documents. All additional lands and access thereto 24 required for temporary construction facilities, construction equipment or storage of 25 materials and equipment to be incorporated in the Work are to be obtained and paid for 26 by Contractor. Easements for permanent structures or permanent changes in existing 27 facilities are to be obtained and paid for by City unless otherwise provided in the 28 Contract Documents. 29 30 5.2. Outstanding right-of-way, easements, and/or permits to be acquired by the City are listed 31 in Paragraph SC 4.01 of the Supplementary Conditions. In the event the necessary right- 32 of-way, easements, and/or permits are not obtained,the City reserves the right to cancel 33 the award of contract at any time before the Bidder begins any construction work on the 34 project. 35 36 5.3. The Bidder shall be prepared to commence construction without all executed right-of- 37 way, easements, and/or permits, and shall submit a schedule to the City of how 38 construction will proceed in the other areas of the project that do not require permits 39 and/or easements. 40 41 6. Interpretations and Addenda 42 CITY OF FORT WORTH Park Improvements at Terry.Northside,High Crest and Sunnnetfelds Park STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.02264.02265.02266 Revised May 19,2015 0021 13-5 INSTRUCTIONS TO BIDDERS Page 5 of 10 1 6.1. All questions about the meaning or intent of the Bidding Documents are to be directed to 2 City and/or Engineer in writing on or before 2 p.m.,the Friday prior to the Bid opening. 3 Questions received after this day may not be responded to. Interpretations or 4 clarifications considered necessary by City and/or Engineer in response to such 5 questions will be issued by Addenda delivered to all parties recorded by City and/or 6 Engineer as having received the Bidding Documents. Only questions answered by 7 formal written Addenda will be binding. Oral and other interpretations or clarifications 8 will be without legal effect. 9 10 Address questions to: 11 12 Attn: Tonda Rice 13 Parks&Community Services 14 City of Fort Worth 15 1000 Throckmorton Street 16 Fort Worth,TX 76102, 17 Email: Tonda.Rice @fortworthtexas.gov 18 Phone: 817-392-5759 19 Fax: 817-392-5724 20 21 AND/OR 22 23 Attn: Tom Kellogg, RLA 24 Baird,Hampton&Brown,Inc. 25 4550 SH 360 26 Suite 180 27 Grapevine,Texas 76051 28 Email: tkellogg @bhbinc.com 29 Phone: 817-251-8550 x 310 30 Fax: 817-251-8810 31 32 6.2. Addenda may also be issued to modify the Bidding Documents as deemed advisable by 33 City. Bidders are responsible for obtaining all addenda to the contract documents and 34 acknowledging receipt of the addenda by initialing the appropriate spaces on the 35 Proposal form. Bids that do not acknowledge receipt of all addenda may be rejected as 36 being non-responsive.All addenda will be made available on-line with the contract 37 documents. Contractors and/or suppliers are requested to register as plan holders on-line 38 (on Buzzsaw site)in order to receive notifications regarding the issuance of addenda. It 39 shall be the bidding contractor's sole responsibility to verify they have received and 40 considered addenda prior to submitting a bid. 41 42 43 7. Bid Security 44 45 7.1. Each Bid must be accompanied by Bid Bond made payable to City in an amount of five 46 (5)percent of Bidder's maximum Bid price on form attached, issued by a surety meeting 47 the requirements of Paragraphs 5.01 of the General Conditions. 48 CITY OF FORT WORTH Park Improvements at Ten).Northside,High Crest and Saumnelfields Park STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.0226.1.02265.02266 Revised May 19,2015 0021 13-6 INSTRUCTIONS TO BIDDERS Page 6 of 10 1 7.2. The Bid Bond of all Bidders will be retained until the conditions of the Notice of Award 2 have been satisfied. If the Successfill Bidder fails to execute and deliver the complete 3 Agreement within 10 days after the Notice of Award, City may consider Bidder to be in 4 default, rescind the Notice of Award,and the Bid Bond of that Bidder will be forfeited. 5 Such forfeiture shall be City's exclusive remedy if Bidder defaults. The Bid Bond of all 6 other Bidders whom City believes to have a reasonable chance of receiving the award 7 will be retained by City until final contract execution. 8 9 7.3. To be an acceptable surety on the bid bond,the surety must be authorized to do business 10 in the state of Texas. In addition,the surety must(1)hold a certificate of authority from 11 the United States secretary of the treasury to qualify as a surety on obligations permitted 12 or required under federal law; or(2)have obtained reinsurance for any liability in excess 13 of$100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of 14 Texas and is the holder of a certificate of authority from the United States secretary of 15 the treasury to qualify as a surety on obligations permitted or required under federal law. 16 Satisfactory proof of any such reinsurance shall be provided to the City upon request. 17 The City, in its sole discretion,will determine the adequacy of the proof required herein. 18 19 8. Contract Times 20 21 The number of days within which, or the dates by which,Milestones are to be achieved in 22 accordance with the General Requirements and the Work is to be completed and ready for 23 Final Acceptance is set forth in the Agreement or incorporated therein by reference to the 24 attached Bid Form. 25 26 9. Liquidated Damages 27 28 Provisions for liquidated damages are set forth in the Agreement. 29 30 10. Substitute and "Or-Equal" Items 31 32 The Contract, if awarded,will be on the basis of]materials and equipment described in the 33 Bidding Documents without consideration of possible substitute or"or-equal" items. 34 Whenever it is indicated or specified in the Bidding Documents that a"substitute" or"or- 35 equal" item of material or equipment may be furnished or used by Contractor if acceptable to 36 City,application for such acceptance will not be considered by City until after the Effective 37 Date of the Agreement. The procedure for submission of any such application by Contractor 38 and consideration by City is set forth in Paragraphs 6.05A., 6.05B. and 6.05C. of the General 39 Conditions and is supplemented in Section 01 25 00 of the General Requirements. 40 41 11. Subcontractors,Suppliers and Others 42 CITY OF FORT WORTH Park Improvements al Teny.Northside.High Crest and Summerfrelds Park STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.02264,02265.02266 Revised May 19,2015 0021 13-7 INSTRUCTIONS TO BIDDERS Page 7 of 10 1 11.1. In accordance with the City's Business Diversity Enterprise Ordinance No. 20020- 2 12-2011 (as amended),the City has goals for the participation of minority business 3 and/or small business enterprises in City contracts. A copy of the Ordinance can be 4 obtained from the Office of the City Secretary. The Bidder shall submit the MBE and 5 SBE Utilization Form, Subcontractor/Supplier Utilization Form,Prime Contractor 6 Waiver Form and/or Good Faith Effort Form with documentation and/or Joint 7 Venture Form as appropriate. The Forms including documentation must be received 8 by the City no later than 5:00 P.M. CST,five(5)City business days after the bid 9 opening date. The Bidder shall obtain a receipt from the City as evidence the 10 documentation was received. Failure to comply shall render the bid as non- 11 responsive. 12 13 11.2. No Contractor shall be required to employ any Subcontractor, Supplier,other person 14 or organization against whom Contractor has reasonable objection. 15 16 12. Bid Form 17 18 12.1. The Bid Form is included with the Bidding Documents; additional copies may be 19 obtained from the City. 20 21 12.2. All blanks on the Bid Form must be completed by printing in ink and the Bid Form 22 signed in ink. Erasures or alterations shall be initialed in ink by the person signing 23 the Bid Form. A Bid price shall be indicated for each Bid item, alternative, and unit 24 price item listed therein. In the case of optional alternatives,the words "No Bid," 25 "No Change," or"Not Applicable" may be entered.Bidder shall state the prices, 26 written in ink in both words and numerals, for which the Bidder proposes to do the 27 work contemplated or furnish materials required.All prices shall be written legibly. 28 In case of discrepancy between price in written words and the price in written 29 numerals,the price in written words shall govern. 30 31 12.3. Bids by corporations shall be executed in the corporate name by the president or a 32 vice-president or other corporate officer accompanied by evidence of authority to 33 sign. The corporate seal shall be affixed. The corporate address and state of 34 incorporation shall be shown below the signature. 35 36 12.4. Bids by partnerships shall be executed in the partnership name and signed by a 37 partner, whose title must appear under the signature accompanied by evidence of 38 authority to sign. The official address of the partnership shall be shown below the 39 signature. 40 41 12.5. Bids by limited liability companies shall be executed in the name of the firm by a 42 member and accompanied by evidence of authority to sign. The state of formation of 43 the firm and the official address of the firm shall be shown. 44 45 12.6. Bids by individuals shall show the Bidder's name and official address. 46 47 12.7. Bids by joint ventures shall be executed by each joint venturer in the manner 48 indicated on the Bid Form. The official address of the joint venture shall be shown. 49 CITY OF FORT WORTH Park bnprorentents at Terry.Northside.High Crest and Sunnneifields Park STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.02264.02265.02266 Revised May 19,2015 0021 13-8 INSTRUCTIONS TO BIDDERS Page 8 of 10 1 12.8. All names shall be typed or printed in ink below the signature. 2 3 12.9. The Bid shall contain an acknowledgement of receipt of all Addenda,the numbers of 4 which shall be filled in on the Bid Form. 5 6 12.10. Postal and e-mail addresses and telephone number for communications regarding the 7 Bid shall be shown. 8 9 12.11. Evidence of authority to conduct business as a Nonresident Bidder in the state of 10 Texas shall be provided in accordance with Section 00 43 37—Vendor Compliance 11 to State Law Non Resident Bidder. 12 13 13. Submission of Bids 14 15 Bids shall be submitted on the prescribed Bid Form,provided with the Bidding Documents, 16 at the time and place indicated in the Advertisement or INVITATION TO BIDDERS, 17 addressed to City Manager of the City,and shall be enclosed in an opaque sealed envelope, 18 marked with the City Project Number,Project title,the name and address of Bidder, and 19 accompanied by the Bid security and other required documents. If the Bid is sent through the 20 mail or other delivery system,the sealed envelope shall be enclosed in a separate envelope 21 with the notation 'BID ENCLOSED" on the face of it. 22 23 14. Modification and Withdrawal of Bids 24 25 14.1. Bids addressed to the City Manager and filed with the Purchasing Office cannot be 26 withdrawn prior to the time set for bid opening. A request for withdrawal must be 27 made in writing by an appropriate document duly executed in the manner that a Bid 28 must be executed and delivered to the place where Bids are to be submitted at any 29 time prior to the opening of Bids.After all Bids not requested for withdrawal are 30 opened and publicly read aloud,the Bids for which a withdrawal request has been 31 properly filed may, at the option of the City,be returned unopened. 32 33 14.2. Bidders may modify their Bid by electronic communication at any time prior to the 34 time set for the closing of Bid receipt. 35 36 15. Opening of Bids 37 38 15.1 After proposals have been opened and read aloud,the proposals will be tabulated 39 on the basis of the quoted prices,the quantities shown in the proposal, and the 40 application of such formulas or other methods of bringing items to a common 41 basis as may be established in the Contract Documents. 42 43 15.2 The total obtained by taking the sum of the products of unit prices quoted and the 44 estimated quantities plus any lump sum items and such other quoted amounts as 45 may enter into the cost of the completed project will be considered as the amount 46 of the bid. 47 48 15.3 Until the award of the contract is made by the Owner,the right will be reserved to 49 reject any or all proposals and waive technicalities,to re-advertise for new 50 proposals, or to proceed with the work in any manner as maybe considered for the CITY OF FORT WORTH Park Improvements at Ten),,Nordiside,High Crest and Simnnerfields Park STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.02264.02265.02266 Revised May 19,2015 0021 13-9 INSTRUCTIONS TO BIDDERS Page 9 of 10 1 best interest of the Owner. 2 3 15.4 The quantities of work and materials to be furnished as may be listed in the 4 proposal forms or other parts of the Contract Documents will be considered as 5 approximate only and will be used for the purpose of comparing bids on a 6 uniform basis. Payment will be made to the Contractor for only the actual 7 quantities of work performed or materials furnished in strict accordance with the 8 Contract Documents and Plans. The quantities of work to be performed and 9 materials to be furnished may be increased or decreased as hereinafter provided, 10 without in any way invalidating the unit prices bid or any other requirements of I 1 the Contract Documents. 12 13 16. Bids to Remain Subject to Acceptance 14 15 All Bids will remain subject to acceptance for the time period specified for Notice of Award 16 and execution and delivery of a complete Agreement by Successful Bidder. City may, at 17 City's sole discretion,release any Bid and nullify the Bid security prior to that date. 18 19 17. Evaluation of Bids and Award of Contract 20 21 17.1. City reserves the right to reject any or all Bids, including without limitation the rights 22 to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids 23 and to reject the Bid of any Bidder if City believes that it would not be in the best 24 interest of the Project to make an award to that Bidder,whether because the Bid is 25 not responsive or the Bidder is unqualified or of doubtful financial ability or fails to 26 meet any other pertinent standard or criteria established by City. City also reserves 27 the right to waive informalities not involving price,contract time or changes in the 28 Work with the Successful Bidder. Discrepancies between the multiplication of units 29 of Work and unit prices will be resolved in favor of the unit prices. Discrepancies 30 between the indicated sum of any column of figures and the correct sum thereof will 31 be resolved in favor of the correct sum. Discrepancies between words and figures 32 will be resolved in favor of the words. 33 34 17.1.1. Any or all bids will be rejected if City has reason to believe that collusion exists 35 among the Bidders, Bidder is an interested party to any litigation against City, 36 City or Bidder may have a claim against the other or be engaged in litigation, 37 Bidder is in arrears on any existing contract or has defaulted on a previous 38 contract, Bidder has performed a prior contract in an unsatisfactory manner,or 39 Bidder has uncompleted work which in the judgment of the City will prevent or 40 hinder the prompt completion of additional work if awarded. 41 42 17.2. City may consider the qualifications and experience of Subcontractors, Suppliers, and 43 other persons and organizations proposed for those portions of the Work as to which 44 the identity of Subcontractors, Suppliers, and other persons and organizations must 45 be submitted as provided in the Contract Documents or upon the request of the City. 46 City also may consider the operating costs, maintenance requirements,performance 47 data and guarantees of major items of materials and equipment proposed for 48 incorporation in the Work when such data is required to be submitted prior to the 49 Notice of Award. 50 CITY OF FORT WORTH Park Improvements ai Teny,Northside.High Crest and Sununerfrelds Park STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.02269.02265.02266 Revised May 19,2015 0021 13- 10 INSTRUCTIONS TO BIDDERS Page 10 of 10 1 17.3. City may conduct such investigations as City deems necessary to assist in the 2 evaluation of any Bid and to establish the responsibility, qualifications, and financial 3 ability of Bidders,proposed Subcontractors, Suppliers and other persons and 4 organizations to perform and furnish the Work in accordance with the Contract 5 Documents to City's satisfaction within the prescribed time. 6 7 17.4. Contractor shall perform with his own organization, work of a value not less than 8 35%of the value embraced on the Contract,unless otherwise approved by the City. 9 10 17.5. If the Contract is to be awarded, it will be awarded to lowest responsible and i l responsive Bidder whose evaluation by City indicates that the award will be in the 12 best interests of the City. 13 14 17.6. Pursuant to Texas Government Code Chapter 2252.001,the City will not award 15 contract to a Nonresident Bidder unless the Nonresident Bidder's bid is lower than 16 the lowest bid submitted by a responsible Texas Bidder by the same amount that a 17 Texas resident bidder would be required to underbid a Nonresident Bidder to obtain a 18 comparable contract in the state in which the nonresident's principal place of 19 business is located. 20 21 17.7. A contract is not awarded until formal City Council authorization. If the Contract is 22 to be awarded,City will award the Contract within 90 days after the day of the Bid 23 opening unless extended in writing. No other act of City or others will constitute 24 acceptance of a Bid.Upon the contractor award a Notice of Award will be issued by 25 the City. 26 27 17.8. Failure or refusal to comply with the requirements may result in rejection of Bid. 28 29 18. Signing of Agreement 30 31 When City issues a Notice of Award to the Successful Bidder, it will be accompanied by the 32 required number of unsigned counterparts of the Agreement. Within 14 days thereafter 33 Contractor shall sign and deliver the required number of counterparts of the Agreement to 34 City with the required Bonds, Certificates of Insurance, and all other required documentation. 35 City shall thereafter deliver one fully signed counterpart to Contractor. 36 37 END OF SECTION 38 Revision Log DATE NAME SUMMARY OF CHANGE 05/27/2015 PACS- Adapting PACS Policies Tonda Rice 39 40 CITY OF FORT WORTH Park/ntprovemenis at Ten)%1Vorihside.High Crest and Smntnetflelds Park STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.02264.02265.02266 Revised May 19,2015 003513-1 CONFLICT OF INTEREST AFFIDAVIT Page 1 of 1 1 SECTION 00 35 13 2 CONFLICT OF INTEREST AFFIDAVIT 3 4 Each bidder, offeror,or respondent(hereinafter also referred to as "you")to a City of Fort Worth 5 (also referred to as"City")procurement are required to complete Conflict of Interest 6 Questionnaire(the attached CIQ Form) and Local Government Officer Conflicts Disclosure 7 Statement(the attached CIS Form)below pursuant to state law. This affidavit will certify that the 8 Bidder has on file with the City Secretary the required documentation and is eligible to bid on 9 City Work. The referenced forms may be downloaded from the website links provided below. 10 11 http://www.ethics.state.tx.us/forms/CIQ_pdf 12 13 http://www.ethics.state.tx.us/forms/CIS.pdf 14 15 F--] CIQ Form is on file with City Secretary 16 17 CIQ Form is being provided to the City Secretary 18 19 0 CIS Form is on File with City Secretary 20 21 0 CIS Form is being provided to the City Secretary 22 23 24 25 BIDDER: 26 27 By: 28 Company (Please Print) 29 30 Signature: 31 Address 32 33 Title: 34 City/State/Zip (Please Print) 35 36 37 END OF SECTION CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264.02265.02266 Revised March 27,2012 This page is intentionally blank. _ 00 41 00 BID FORM Page 1 of 3 SECTION 00 41 00 BID FORM TO: The City Manager c/o:The Purchasing Department 1000 Throckmorton Street City of Fort Worth, Texas 76102 FOR: Park Improvements at Terry, Northside, High Crest, and Summerfields Parks City Project No.: 02263, 02264, 02265, 02266 1. Enter Into Agreement The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with City in the form included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. 2. BIDDER Acknowledgements and Certification 2.1. In submitting this Bid, Bidder accepts all of the terms and conditions of the INVITATION TO BIDDERS and INSTRUCTIONS TO BIDDERS, including without limitation those dealing with the disposition of Bid Bond. 2.2. Bidder is aware of all costs to provide the required insurance, will do so pending contract award, and will provide a valid insurance certificate meeting all requirements within 14 days of notification of award. 2.3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation. 2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid. 2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding. 2.6. Bidder has not engaged in corrupt,fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph: a. "corrupt practice"means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process. b. "fraudulent practice"means an intentional misrepresentation of facts made(a)to influence the bidding process to the detriment of City(b)to establish Bid prices at artificial non-competitive levels, or(c)to deprive City of the benefits of free and open competition. c. "collusive practice"means a scheme or arrangement between two or more Bidders,with or without the knowledge of City, a purpose of which is to establish Bid prices at artificial, non- competitive levels. d. "coercive practice"means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Park Improvements at Terry,Northside,High Crest,and Summerfelds Parks Form Revised 20120327 02263,02264,02265,02266 00 41 00 BID FORM Page 2 of 3 3. Prequalification The Bidder acknowledges that the following work types must be performed only by prequalified contractors and subcontractors: a. b. C. d. 4. Time of Completion 4.1. The Work will be complete for Final Acceptance within 180 days after the date when the the Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. 4.2. Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work(and/or achievement of Milestones)within the times specified in the Agreement. 5. Attached to this Bid The following documents are attached to and made a part of this Bid: a. This Bid Form, Section 00 41 00 b. Required Bid Bond, Section 00 43 13 issued by a surety meeting the requirements of Paragraph 5.01 of the General Conditions. c. Proposal Form, Section 00 42 43 d. Vendor Compliance to State Law Non Resident Bidder, Section 00 43 37 e. MWBE Forms(optional at time of bid) f. Prequalification Statement, Section 00 45 12 g. Conflict of Interest Affidavit, Section 00 35 13 *If necessary, CIQ or CIS forms are to be provided directly to City Secretary h. Any additional documents that may be required by Section 12 of the Instructions to Bidders CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Park Improvements at Terry,Northside,High Crest,and Summe�elds Parks Form Revised 20120327 02263,02264,02265,02266 0041 00 BID FORM _., Page 3 of 3 6. Total Bid Amount 6.1. Bidder will complete the Work in accordance with the Contract Documents for the following bid amount. In the space provided below, please enter the total bid amount for this project. Only this figure will be read publicly by the City at the bid opening. 6.2. It is understood and agreed by the Bidder in signing this proposal that the total bid amount entered below is subject to verification and/or modification by multiplying the unit bid prices for each pay item by the respective estimated quantities shown in this proposal and then totaling all of the extended amounts. 6.3. Total Base Bid $715,283.35 _ Additive Alternate $157,186.00 Total Bid $872,469.35 7. Bid Submittal This Bid is submitted on May 28, 2015 by the entity named below. Respectfully su itted Receipt is acknowledged of the d following Addenda: Initial-J�By: "' Addendum No. 1: (Signature) Addendum No. 2: Addendum No. 3: Michael A. Heimlich JAddendum No.4: (Printed Name) Title: President Company: Northstar Construction, LLC Corporate Seal: Address: 2112 Solona Street - Fort Worth, Texas 76117 State of Incorporation: Texas Email: mike @ northstar93.com Phone: 817-244-8885 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Park Improvements at Terry,Northside,High Crest,and Summertieids Parks Form Revised 20120327 02263,02264,02265,02266 SECTION 00 42 43 00 42 43 PROPOSALFORM PROPOSAL FORM Pagel of7 UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Unit of Bid Item No. Description Unit Price Bid Value Specifications No. Measure Quantity BASE BIDS UNIT 1 BASE BID ITEMS-TERRY PARK - 1.1 0241.0100 Remove Sidewalk(1-1-02) 024113 SF 1,426 $1.35 $1,925.10 1.2 0241.0500 Remove Fence(remove bollard fence)(Li-02) 024113 LF 220 $10.00 $2,200.00 1.3 0241.0600 Remove Wall<4'(remove wood bollards/wall)(1.1-02) 024114 LF 130 $15.501 $2,015.00 1.4 0241.0900 Remove Misc Conc Structure(remove ground level and partially - buried concrete edge)(1.1-02) 024113 LS 1 $1,450.00 $1,450.00 1.5 0241.903 Remove Trash Can and Post;Remove Wood Mulch(1-1-02) 024113 LS 1 $950.00 $950.00 1.6 0241.904 Remove Benches and Picnic Tables(1.3-02) 024113 LS 1 $320.00 $320.00 1.7 0241.905 Remove Playground Equipment(including all sand)(L1-02) 02 4113 LS 1 $13,200.00 - $13,200.00 1.8 3123.0101 Unclassified Excavation(1-5-01) 312316 CY 186 $24.75 $4,603.50 1.9 3124.0101 Embankment by Plan(1-5-01) - 312400 CY 151 $27.501 $4,152.50 1.10 3125.0101 SWPPP>1(Cl-01) 312500 IS 1 $3,250.00 $3,250.00 1.11 9999.0000 Tree Protection Sock(1.1-01,1.1-02) 311000 LF 220 $2.50 $550.00 1.12 3213.0302 5"Concrete Sidewalk(1.2-01,Di-01) 321320 SF1 635 $6.00 $3,810.00 1.13 3213.0304 5"Concrete Pad Under Picnic Shelter,including pads for trash receptacles and BBQ grill(1.2-01,D1-02,D1-03) 32 13 20 SF 757 $10.10 $7,645.70 1.14 3213.0504 Barrier Free Ramp at Playground Border.Includes detectable warning surface.(L2-01,D1-02) 321320 EA 1 $1,225.00 $1,225.00 1.15 3213.0700 Joint Sealant(D1-01) 321373 LF 119 $3.30 $392.70 1.16 3231.0414 Split Rail Fence(1.2-01,D1-02) 323129 LF 218 $18.56 $4,046.08 1.17 3292.0100 Block Sod Placement(1-2-01) 329213 SY 1,057 $5.65 $5,972.05 1.18 9999.0000 Install 24'by 24'Pavilion(1-2-01,Dl-03,D1-04) LS 1 $42,800.00 $42,800.00 9999.0000 Install Shelter Amenities:One handicap picnic table,two standard 1.19 picnic tables,two benches,one litter receptacle,and one BBQ grill(supplied by others)(1-2-01,D1-03) L5 1 $6,900.001 $6,900.00 1.20 9999.0000 Install two benches at playground(1-1-02,D1-03) 1 $2,050.00 $2,050.00 9999.0000 Install playground:Play structure,concrete border,all sub- 1.21 surface drainage(including work related to draining through existing street curb),footings,safety surface,filter fabric separator,and gravel(1-1-02,Dl- 01,D1-02) LS 1 $121,000.00 $121,000.00 1.22 9999.0000 Install 2"-4"depth double shredded hardwood mulch(1.1-02) SF 2,555 $1.60 $4,088.00 1.23 9999.0000 Install 4"plastic composite edging (1.1-02) LF 288 $6.80 $1,958.40 UNIT 1 TOTAL[_ $236,504.03 STANDARD OF FORT WORTH Park Improvements at Teny,Nonhside,High Crest,and Summerfelds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02269,02265.02266 EotmVersionApri12,2014 vrrnrncet cnona 00 42 43 SECTION 00 42 43 PROPOSAL FORM PROPOSAL FORM Page of7 UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Description Unit of Bid Item No. P Measure Quantity Unit Price Bid Value Specifications No. Q ty UNIT 2 BASE BID ITEMS-NORTHSIDE PARK 2.1 0241.0100 Remove Sidewalk(1-1-03) 024113 SF 2,662 $1.25 $3,327.50 2.2 3214.0101 Embankment by Plan(L5-02) 312400 CY 220 $21.75 $4,785.00 2.2A 3123.0101 Unclassified Excavation(1-5-02) 312316 Cyl 220 $21.75 $4,785.00 2.3 3123.0103 Borrow by Plan(1-5-02) — 312323 CY 719 $35.68 $25,653.92 2.4 3125.0101 SWPPP>1(C1-02) 312500 LS 1 $5,300.00 $5,300.00 _ 2.5 3213.0302 5"Concrete Sidewalk(1-2-02,D1-01) 321320 SF1 4,172 $5.33 $22,236.76 2.6 3213.0700 Joint Sealant(D1-01) 321373 LF 122 $3.30 $402.60 23 3292.0100 Block Sod Placement(1-2-02) 329213 SY 2,349 $5.65 $13,271.85 2.8 9999.0000 Tree Protection Sock 311000 LF1 867 $2.50 $2,167.50 9999.0000 Handicap Parking Spaces(1-5-02)Includes demolition,paint 2.9 stripes and symbols,signs,detectable warning surface,concrete paving and ramp,concrete curbs,and wheelstop. LS 1 $1,300.00 $1,300.00 UNIT 2 TOTALI $83,230.13 CITY OF FORT WORTH Park hnpmvements at Terty,Nonhside,High Crest,and Summerfields Pads STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Fotm Version April 2,2014 PROPOSAL FORM SECTION 00 42 43 004243 PROPOSAL FORM PROPOSAL FORM Page 3of7 UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Unit of Bid Item No. Description Unit Price Bid Value Specifications No. Measure Quantity UNIT 3 BASE BID ITEMS-HIGH CREST PARK 3.1 3123.0101 Unclassified Excavation(1-5-03) 312316 CY 196 $23.25 $4,557.00 3.2 3124.0101 Embankment by Plan(1-5-03) 312400 CY 125 $32.50 $4,062.50 3.3 3125.0101 SWPPP>1 acre(C1-03) 312500 LS 1 $3,350.00 $3,350.00 3.4 9999.0000 Tree Protection Sock(1-1-01,1-2-03) 311000 LF 387 $2.50 $967.50 3.5 3213.0302 5"Concrete Sidewalk(1.2-03,D1-01) 321320 SF 1,1271 $5.82 $6,559.14 3.6 3213.0304 5"Concrete Pad under Picnic Shelter,including pads for trash receptacle and BBQ grill(1.2-03,D1-02,D1-03) 32 13 20 SF 757 $10.00 $7,570.00 3.7 3213.0511 Barrier Free Ramp at Playground Border(1-2-03,D1-02) 321320 EA 1 $1,120.00 $1,120.00 3.8 3213.0700 Joint Sealant(DS-01) 321373 LF 134 $3.30 $442.20 3.9 3292.0100 Block Sod Placement(1.2-03) 329213 SY 1,098 $5.65 $6,203.70 3.10 9999.0000 Detectable Warning Surface 129310 EA 1 $300.00 $300.00 3.11 9999.0000 Install 24'by 24'Pavilion(1.2-03,Di-03,D1-04) LS 1 $42,850.00 $42,850.00 9999.0000 Install Shelter Amenities:One handicap picnic table,two standard 3.12 picnic tables,two benches,one litter receptacle,and one BBQ grill(1-2-03,D1 03) LS 1 $6,900.00 $6,900.00 3.13 9999.0000 Install two benches at playground(1.2-03,D1-03) LS 1 $2,050.00 $2,050.00 9999.0000 Install playground:Play structure,concrete border,all sub- 3.14 surface drainage(including pop-up emitter and pipe),footings,safety surface,filter fabric separator,and gravel(1-2-03,D1-01,D1-02) LS 1 $143,700.001 $143,700.00 UNIT 3 TOTALI $230,632.04 CRY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Form Version April 2,2014 PROPOSAL FORM 00 42 43 SECTION 00 42 43 PROPOSAL FORM PROPOSAL FORM Paee4 of7 UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Unit of Bid Item No. Description Unit Price Bid Value Specifications No. Measure Quantity UNIT 4 BASE BID ITEMS-SUMMERFIELDS PARK 4.1 0241.0900 Remove Misc Conc Structure(1-1-04) 024113 LS 1 $250.00 $250.00 4.2 9999.0000 Remove Existing Playground Equipment,Concrete Border,and Surfacing(1-1-04) 024113 LS 1 $2,225.00 $2,225.00 4.3 0330.0003 Drain Pipe Headwall(L2-04,D1-02) 03 30 00 LS 1 $330.00 $330.00 4.4 3125.0101 SWPPP>1 acre(C1-04) 312500 LS 1 $4,800.00 $4,800.00 4.5 3123.0101 Unclassified Excavation(LS-04) 312316 CY 24S $26.85 $6,578.25 4.6 3124.0101 Embankment by Plan(1-5-04) 312400 CY 233 $24.35 $5,673.55 4.7 9999.0000 Tree Protection Sock(1-1-01,1.1-04) 31 10 00 LF 359 $2.50 $897.50 4.8 3213.0302 5"Concrete Sidewalk(1-2-04,D1-01) 321320 SF 2,200 $5.20 $11,440.00 4.9 3213.0504 Barrier Free Ramp,Type M-2(including curb cut)(1-2-04,Di-02) 32 13 20 EA 1 $750.00 $750.00 4.10 3213.0511 Barrier Free Ramp at Playground Border(1-2-04,D1-02) 321320 EA 1 $1,165.00 $1,165.00 4.11 3213.0700 Joint Sealant(D1-01) 321373 LF 92 $3.25 $299.00 4.12 3292.0100 Block Sod Placement(including electrical trench repair)(1-2-04) 329213 SY 1,329 $5.65 $7,508.85 4.13 9999.0000 Detectable Warning Surface - 12 93 10 EA 1 $350.00 $350.00 4.14 9999.0000 Install two benches at playground(1.2-04,Di-02) L5 1 $2,050.00 $2,050.00 9999.0000 Install playground:Play structure,concrete border,all sub- 4.15 surface drainage,footings,safety surface,filter fabric separator,and gravel (1.2-04,D1-01,D1-02) LS1 1 $120,600.001 $120,600.00 UNIT 4 TOTALI $164,917.15 CITY OF FORT WORTH Park Improvements at Terry,Noalsside,High Cmt,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Form Version April 2,2014 PROPOSAL FORM SECTION 00 42 43 004243 PROPOSALFORM PROPOSAL FORM Page of7 UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Unit of Bid Item No. Description Unit Price Bid Value iSpecificationsNo. Measure Quantity ADD ALTERNATE BIDS UNIT 1 ADD ALTERNATE BID ITEMS-TERRY PARK(ADD ALTERNATES#1,#2 AND#3 ON PLANS) 5.1 0241.0901 Remove Chain Link Fence Fabric(1.1-02) 024113 1 LS 1 $640.00 $640.00 5.2 0241.0902 Remove Basketball Goal&Volleyball Posts(L1-02) 024113 LS 1 $950.00 $950.00 5.3 2605.0111 Elec Sery Ped(E1) 260500 EA 1 $1,225.00 $1,225.00 5.4 2605.3015 2"Condt PVC SCH 80(T)(E1) 26 05 33 LF 58 $40.50 $2,349.00 5.5 3231.0116 10'Chain Link,Steel,Fabric and Hardware only(1.2-01) 323113 LF1 140 $25.50 $3,570.00 5.6 9999.0000 Existing basketball court:prepare existing surface and install new surfacing and striping(1-2-01,D1-02) LS 1 $4,350.00 $4,350.00 5.7 9999.0000 Install two basketball goals(1-2-01,D1-02) LS 1 $3,560.00 $3,560.00 5.8 9999.0000 Install Skate Park(1.2-01) LS 1 $31,700.00 $31,700.00 5.9 3441.3312 Contact Enclosure,Pad Mount(Ei) 344120 EA 1 $5,750.00 $5,750.00 5.10 3441.34016-6-6 Triplex Alum Elec Conductor(E1) 344120 LF1 89 $2.501 $222.50 5.11 9999.0000 Receptacle WP GFI(E1) EA 1 $310.00 $310.00 5.12 9999.0000 EMT 1"Conduit(E1) LF 23 $21.50 $494.50 5.13 9999.0000 Shelter Lighting(E1) EA 1 $750.00 $750.00 UNIT 1 ALTERNATE TOTAL[_ $55,871.00 UNIT 2 ADD ALTERNATE BID ITEMS-HIGH CREST PARK(ADD ALTERNATE#4 ON PLANS) _ 6.1 2605.0111 Elec Sery Pad(E2) 260500 EA 1 $1,225.00 $1,225.00 6.2 2605.3015 2"Condt PVC SCH 80(T)(E2) 26 05 33 LF 94 $40.50 $3,807.00 6.3 3441.3312 Contact Enclosure,Pad Mount(E2) 344120 EAI 1 $5,760.00 $5,760.00 6.4 3441.34016-6-6 Triplex Alum Elec Conductor(E2) 344120 LF 129 $2.50 $322.50 6.5 9999.0000 Receptacle WP GFI(E2) EA 1 $310.00 $310.00 6.6 9999.0000 EMT 1"Conduit(E2) LF1 23 $21.50 $494.50 6.7 9999.0000 Shelter Lighting(E2) EA 1 $750.00 $750.00 UNIT 2 ALTERNATE TOTAL $12,669.00 CITY OF FORT WORTH Park Improvements at Tcrry,Nonhside,High Crest,and Summer&elds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,0?264,02265,02266 Form Version April 2,2014 PROPOSAL FORM SECTION 00 4243 004243 PROPOSALFORM PROPOSAL FORM Page 6 of 7 UNIT PRICE BID Bidder's Application F- Project Item Information Bidder's Proposal Bidlist FUnit of Bid Item No. Description Unit Price Bid Value Specifications No. easure Quantity UNIT 3 ADD ALTERNATE BID ITEMS-SUMMERFIELDS PARK(ADD ALTERNATES#5 AND#6 ON PLANS) 7.1 2605.0111 Elec Sery Pad(E3) 26 05 00 EA 1 $7,000.00 $7,000.00 7.2 2605.3015 2"Condt PVC SCH 80(T)(E3) - 260533 LFJ 522 $40.50 $21,141.00 7.3 3213.0304 5"Concrete Pad under Picnic Shelter,including pads for trash receptacle and BBQ grill(1.2-04,D1-02,Di-03) 321320 SF 784 $10.00 $7,840.00 7.4 3213.0302 5"Concrete Sidewalk-2 sections of sidewalk leading to shelter (L2-04,D1-01) 321320 SF 255 $5.10 $1,300.50 7.5 9999.0000 Install 24'by 24'Pavilion(1.2-04,01-03,D1-04) LS 1 $40,400.00 $40,400.00 9999.0000 Install Shelter Amenities:One handicap picnic table,two standard 7.6 picnic tables,two benches,one litter receptacle,and one BBQ grill(L2-04,D1 03) LS 1 $6,600.001 $6,600.00 7.7 3441.1502 Ground Box Type B,w/Apron(E3) 344110 EA 2 $640.00 $1,280.00 7.8 3441.34016-6-6 Triplex Alum Elec Conductor(E3) 344120 LF 600 $2.55 $1,530.00 7.9 9999.0000 Receptacle WP GFI(E3) EA 1 $310.00 $310.00 7.10 9999.0000 EMT 1"Conduit(E3) LF 23 $21.50 $494.50 7.11 9999.0000 Shelter Lighting(E3) EA i $750.00 $750.00 UNIT 3 ALTERNATE TOTALI $88,646.00 UNIT 4 ADD ALTERNATE BID ITEM-NORTHSIDE PARK 8.1 9999.0000 Install Playground and panels LSJ 1 No Bid No Bid UNIT 4 ALTERNATE TOTAL No Bid CITY OF FORT NORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264.02265.02266 Form Version April 2,2014 PROPOSAL FORM SECTION 00 42 43 00 42 43 PROPOSAL FORM PROPOSAL FORM Page 7of7 UNIT PRICE I i t®s Application Project Item Information Bidder's Proposal Bidlist Unit of Bid — Item No. Description Unit Price �Valp S No. Measure Quantity BIDS SUMMARY BASE BIDS UNIT 1 BASE BID-TERRY PARK -- UNIT 2 BASE BID-NORTHSIDE PARK $236,504.03$83,230.13 UNIT 3 BASE BID-HIGH CREST PARK $230,632.04 UNIT4 BASE BID-SUMMERFIELDS PARK $164,917.15 - BASE BIDS TOTAL $715,283.35 ALTERNATE BIDS UNIT 1 ALTERNATE BID-TERRY PARK $55,871.00 - UNIT 2 ALTERNATE BID-HIGH CREST PARK $12,669.00 UNIT 3 ALTERNATE BID-SUMMERFIELDS PARK $88,646.00 UNIT 4 ALTERNATE BID-NORTHSIDE PARK No Bid — ALTERNATE BIDS TOTAL $157,186.00 BIDS TOTAL $872,469.35 END OF SECTION CITY OF FORT WORTH Park Improvements at Terry,Nonhside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Version April 2,2014 02263,02264,02265,02266 PROPOSAL FORM 00 43 37 VENDOR COMPLIANCE TO STATE LAW Page 1 of 1 SECTION 00 43 37 VENDOR COMPLIANCE TO STATE LAW NON RESIDENT BIDDER Texas Government Code Chapter 2252 was adopted for the award of contracts to nonresident bidders. This law provides that, in order to be awarded a contract as low bidder, nonresident bidders (out-of-state contractors whose corporate offices or principal place of business are outside the State of Texas) bid projects for construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder in order to obtain a comparable contract in the State which the nonresident's principal place of business is located. The appropriate blanks in Section A must be filled out by all nonresident bidders in order for your bid to meet specifications. The failure of nonresident bidders to do so will automatically disqualify that bidder. Resident bidders must check the box in Section B. A. Nonresident bidders in the State of State Here or Blank;, our principal place of business, are required to be %Here percent lower than resident bidders by State Law. A copy of the statute is attached. Nonresident bidders in the State of State Here or'Blank , our principal place of business, are not required to underbid resident bidders. B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. ❑ BIDDER: Company Name Here By: Printed Name Here Address Here Address Here or Space (Signature) City, State Zip Code Here Title: Title Here Date: END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Park Improvements at Terry,Northside,High Crest,and Summerfields Parks Form Revised 20110627 02263,02264,02265,02266 00 45 26- I com7nAcx/xcnwpuxmcswnx WORKER'S rowpemsx/ION!xx p�c / vr| } SECTION 084526 2 CONTRACTOR COMPLIANCE WITH WORKER'S COMP2W8/\T|ONLAW 3 Pursuant to Texas 1.,abor Code Section 406.096(a),as arriended, Contractor certifies that il 4 provides worker's compensation insurance coverage for all of its employees employed on City 5 Project No, 0236l02264'02265, U226d. Contractor further certifies that, pursuau11oTcnas d Lu6or Code, Section 406.096(&), *a amended, d will provide to City its subcontractor's 7 certificates of compliance wi�t6 worker's compaosaziomcoverage. 8 9 CONTRA( ���&&� |0 |\ Northstar Construction, By� 12 Company (Please Pd 8 2112 SOlUD@St[e8t N Signature: 4 Y." U Address )8 Fort Worth, T�X8� �8117 President|7 ' lU/u: 18 City/State/zip (Please BimA }9 21 THE STATE OPTEXAS § B COUNTY OPTARRANT § 24 25 BEFORE ME,the undersigned authority, oil this day personally appeared 26 -Michael A. HeirD1iCh known 0umeto6o the person wbuounamo is 27 subscribed to the foregoing instrUillent,and acknowledged to Ille that Ile/She Mouted the same uu 28 the act and deed uf NOrth8t8rC0031[UCt0D LLC for the purpouoand 29 consideration therein expressed and in the capacity therein stated. 30 31 GIVEN UNDER K4Y HAND AND SEAL OP OFFICE this — clay of 32 2815 33 34 ~- 35 36 NoturyyuN/c gnd for z of Texas 37 38 END OF SECTION 39 CITY or FOR] WORTH ,".Lwp^," .^". I ,""/.".o,,m"^c.""..""uo"==~n.u°Park STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 022631L 02264,02265.02260 fUV1SQd.lL11\' 1.2011 00 45 41 -I SMALL BUSINESS ENTERPRISE GOAL Page I of I 1 SECTION 00 45 41 2 SMALL BUSINESS ENTERPRISE GOAL 3 4 APPLICATION OF POLICY 5 If the total dollar value of the contract is greater than $50,000,then the SBE subcontracting goal may 6 be applicable. If the total dollar value of the contract is$50,000 or less,the SBE subcontracting goal 7 is not applicable. 8 9 POLICY STATEMENT 10 It is the policy of the City of Fort Worth to ensure the full and equitable participation by Small 11 Business Enterprises (SBE) in the procurement of all goods and services. All requirements and 12 regulations stated in the City's current Business Diversity Enterprise Ordinance apply to this bid. 13 14 SBE PROJECT GOAL 15 The City's SBE goal on this project isl4% (fourteen percent) of the total bid (Base bid applies to 16 Parks and Community Services). Note: If both MBE and SBE subcontracting goals are established 17 for this project, then an Offeror must submit both a MBE Utilization Form and a SBE Utilization 18 Form to be deemed responsive. 19 20 COMPLIANCE TO BID SPECIFICATIONS 21 On City contracts greater than $50,000 where a SBE subcontracting goal is applied, bidders are 22 required to comply with the intent of the City's Business Diversity Ordinance by one of the 23 following: 24 1. Meet or exceed the above stated SBE goal through SBE subcontracting participation,or 25 2. Meet or exceed the above stated SBE goal through SBE Joint Venture participation,or 26 3. Good Faith Effort documentation, or; 27 4. Waiver documentation. 28 Failure to comply with the City's Business Diversity Ordinance, shall result in the Bid being 29 considered non-responsive.Any questions,please contact the M/WBE Office at(817) 392-6104. 30 31 SUBMITTAL OF REQUIRED DOCUMENTATION 32 The applicable documents must be received by the Managing Department, within the following 33 times allocated, in order for the entire bid to be considered responsive to the specifications. The 34 Offeror shall deliver the SBE docutrteritation in person to the appropriate employee of the IVlanag1, 35 Department and obtain a dateltime receipt_ Sucfi receipfishall be evidence that the City received the 36 documentation in the time allocated; A faced c0 will not;be acce ted 1. Subcontractor Utilization Form,if goal is received by 2:00 p.m.,on the second City business days after met or exceeded: the bid opening date,exclusive of the bid opening date. 2. Good Faith Effort and Subcontractor received by 2:00 p.m.,on the second City business days after Utilization Form, if participation is less than the bid opening date,exclusive of the bid opening date. stated goal: 3. Good Faith Effort and Subcontractor received by 2:00 p.m.,on the second City business days after Utilization Form, if no MBE participation: the bid opening date,exclusive of the bid opening date. 4. Prime Contractor Waiver Form,if firm will received by 2:00 p.m.,on the second City business days after perform all subcontracting/supplier work: the bid opening date,exclusive of the bid opening date. 5. Joint Venture Form, if utilizing a joint received by 2:00 p.m.,on the second City business days after venture to meet or exceed goal. the bid opening date,exclusive of the bid opening date. 37 END OF SECTION CITY OF FORT WORTH Park Improvements at Terry.Northside.High Crest.and Summerfields Parks STANDARD CONSTRUCfION SPECIFICATION DOCUMENTS 02263.02264.02265.02266 -1 Agreement CUNTRACT Page of 4 AGREEMENT TI0KS AGREEMIENT, authorized on September 15,2015 is made by and between the City of Fort Wodb, a Texas home rule municipality,aothnuhvand through its duly authorized City Manager,/'�Chv`l, and Northstar Construction, LLC., authorized 0odo business in Texas, acting by and through its duly authorized representative, (°Cuobautor"). City and Contractor, in consideration of the mutual covenants hereinafter set forth, agree uufollows: Article 1.WORK Contractor abuU complete all Work as upnoiDud or indicated in the Contract I)oououeutu for the Project identified herein. Article 2.PROJE CT The project for vvbiob the Work under the Contract Documents may be the whole or only u pd is generally described uofollows: Construction of Park Improvements at Ten Park,Northside Park, High Crest Park and Summerfields Park City Project Numbers: 02263, 02264, 02265,and 02266 Article 3. CONTRACT TBIE 3.1 Time imnf the essence. All time limits for Milestones, if any, and Final Acceptance as stated in the Contract Documents are of the essence tothis Contract. 3.2 Final Acceptance. The Work will hn complete for Final Acceptance within 11801 One Hundred Eigh1Y days after the date when the Contract Time oonoroeu000 to run as provided in Paragraph 2.03 of the General Conditions. 3.3 Liquidated damages Contractor recognizes that time is of the cmaeocn of this Agreement and that City will suffer financial loss if the Work is not completed within the times specified in Paragraph 3.2 above,plus any extension tbe,cu[ allowed in accordance with Article 12 of the General Conditions. The Contractor also recognizes the delays, oupsnoo and difficulties involved in proving in e legal proceeding the actual |oam suffered by the City if the Work is not completed on time. Accordingly, instead of requiring any such proof, Contractor agrees that as liquidated damages for delay (but not as npeuulty), Contractor shall pay oUmm ( for each day that cspizoa after the time specified in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter ofAcceptance. Article 4. CONTRACT PRICE City agrees W pay Contractor for performance ofthe Work in accordance with the Contract Documents an in funds of Seven Hundred Fifteen Thousand Two Hundred Eighly Three and oA4icle 5. CONTRACT DOCUMENTS 5. CONTENTS: F111, A.The Contract Documents which comprise the entire agreement between City and Contractor concerning the Work consist of the following: Y OF FORT WORTH Park Improvements at Terry,Northside,High Crest and Sunimerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENT 02263,02264,02265,02266 Revised August l7,2Ol2 _2 Agreement Page 2 of 4 1. This Agreement. 2. Attachments to this Agreement: a. Bid Form 1) Proposal Form 2) Vendor Compliance to State Law Non-Resident Bidder 3) Prequalification Statement 4) State and Federal documents(project specific) b. Current Prevailing Wage Rate Table c. Insurance ACORD Form(s) d. Payment Bond e. Performance Bond f. Maintenance Bond g. Power of Attorney for the Bonds h. Worker's Compensation Affidavit i. MBE and/or SBE Commitment Form 3. General Conditions. 4. Supplementary Conditions. 5. Specifications specifically made a part of the Contract Documents by attachment or, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents. 6. Drawings. 7. Addenda. 8. Documentation submitted by Contractor prior to Notice of Award. 9. The following which may be delivered or issued after the Effective Date of the Agreement and, if issued,become an incorporated part of the Contract Documents: a. Notice to Proceed. b. Field Orders. c. Change Orders. d. Letter of Final Acceptance. CITY OF FORT WORTH Park bnprovements at Terry,Northside,High Crest and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENT 02263,02264,02265,02266 Revised August 17,2012 -3 Agreement Page 3 of 4 Article 6.MEMNII+'ICATION 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the city, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licenses or invitees under this contract. This indemnification provision is specifically intended to operate and be effective even if it is alleged or proven that all or some of the damages being sought were caused, in whole or in part, by any act, omission or negligence of the city. This indemnity provision is intended to include,without limitation, indemnity for costs,expenses and legal fees incurred by the city in defending against such claims and causes of actions. 6.2 Contractor covenants and agrees to indemnify and hold harmless,at its own expense,the city, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the city, arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licensees or invitees under this contract. This indemnification provision is specifically intended to operate and be effective even if it is alleged or proven that all or some of the damages being sought were caused,in whole or in part,by any act,omission or negligence of the city. Article 7.MISCELLANEOUS 7.1 Terms. Terms used in this Agreement which are defined in Article 1 of the General Conditions will have the meanings indicated in the General Conditions. 7.2 Assignment of Contract. This Agreement, including all of the Contract Documents may not be assigned by the Contractor without the advanced express written consent of the City. 7.3 Successors and Assigns. City and Contractor each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, in respect to all covenants, agreements and obligations contained in the Contract Documents. 7.4 Severability. Any provision or part of the Contract Documents held to be unconstitutional,void or unenforceable by a court of competent jurisdiction shall be deemed stricken and all remaining provisions shall continue to be valid and binding upon CITY and CONTRACTOR. 7.5 Governing Law and Venue. This Agreement, including all of the Contract Documents is performable in the State of Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the Northern District of Texas,Fort Worth Division. 7.6 Other Provisions. The Contractor agrees to pay at least minimum wage per hour for all labor as the same is classified, promulgated and set out by the City, a copy of which is attached hereto and made a part hereof the same as if it were copied verbatim herein. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENT 02263,02264,02265,02266 Revised August 17,2012 -4 Agreement Page 4 of 4 7.7 Authority to Sign. Contractor shall attach evidence of authority to sign Agreement, if other than duly authorized signatory of the Contractor. IN WITNESS WHEREOF,City and Contractor have executed this Agreement in multiple counterparts. This Agreement is effective as of the last date signed by the Parties("Effective Date"). r Contractor: City of Fort Worth Northstar Construction, LLC ( � By: � �4✓ Susan Alanis ' Bu Assistant City Manager (Signature) Date l ° Michael A. Heimlich R 4 Q Attest: , (Printed Name) City Se retaly � (Seal) µ Title: president �wx Address: 2112 Solona St, M&C C - 2 r 14 y Date: 9��s-is- Fort Worth,TX 76117 A prove s to Form and Legality: October 09, 2015 Date uglas W.Black Assistant City Attorney RO G ffD: Rich rd Zavala D TOR, Par nd Community Service CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest and Sumnterj?elds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENT 02263,02264,02265,02266 Revised August 17,2012 » 006/ 13-1 \ PERFORMANCE BOND » Page/orz SE���8�/00�� �� \ Bond # 1039803 ^ PERFORMANCE BOND � 4 THE' STATE 0F TEXkS � � 5 M KNOW ALL BY THESE PRESFNT8: 6 COUNTY 0F TARRANT W 7 That we,Northstar Construction,LL Q., kuovmi um"Priooipa|"herein and 8 The Hanover Insurance Company �uorpootonoreh(uucednu, if more than 9 one)duly authori7xd to do business in the State of'rexas,known as"Surety"herein (whether one ^ lO nr/noro)^are held and 800|ybound onto the City nf Fort Worth, u municipal corporation created }l pursuant to the laws of Texas,known xp^�City"herein, (n the penal slim of, X 12 Dollars 13 ( lawful money of the United States,to be paid in Fort Worth,Tarrant County, � 14 Texas for the payment of wbiob sum well and truly&ohe made,vve bind ourselves, out-heirs, 15 executors,administrators,successors and assignsJointly and severally, firmly by these presents. x 16 WHEREAS,the Principal has entered into a(,ertain written contract with the City 17 awarded the of Septerqb r,20l1,which Contract iv hereby referred ho and made apart { 18 hereof for all purposes un fully set forth herein,tofbrniah all materials,equipment labor and 19 other accessories defined bv law, in the prosecution ofthe Work,including any Change Orders, U 20 uu provided for io said Contract designated uo Cons U Z} C�es p rk atiLd Summerfields Park. f, Pro'ect Numbers: 02263 02264 22 02265,and 02266. 23 NOW THE1,1IFFORE,the condition of this obligation is such that if the said Principal | 24 shall faithfully perform it obligations under the Contract and shall bn all respects duly and 29 faithfully perform the Work, including Change Orders, Linder the ContraO, according to the plans, � 26 specifications,and contract documents therein referred to, and as we]I during ally period of � 27 extension of the Contract that may be granted on.the part of the City,then this obligation shall be 28 and become null and void,otherwise hununaininGu||force and effect, 29 PROVIDED FU&TE0EM`that ifany legal action bxfi|edon this Bond,venue shall lie in » 30 Tarrant County,Texas or the United States District Court for tbo��d��nnI) x 31 Worth Division. CITY OFroR] W0n7k Turty Park,w^ah,m*Pak,)-~~ � STANDARD cOH87RU{T|nwSPECIF,ICxrmnVOouwswTS 02263,02264,022 65,02266 Revised I uly 1,2011 OU6t 13-z pvgG 2 oft I This bond is made and exreuted in compliance with the provisions of Chapter 2253 of the 2 Texas Government Code, as amended,and alt liabilities on this bond shall be determined in 3 accordance with the provisions of said statue. 4 INWITNESS WHEREOF,the Principal and ffie Surety have SIGNED and SEALED 5 this instrument by duly authorized agents and officers tan this the-15" -day of_5"ember,2015, 6 'PRINCIPAL 7 __Narthstar Q_Qnstl*AJ_Pj1Q(),_LL_Q__ 9 BY: 10 I I Signature, 12 Armsn% 13 14 A. Heirnlich, President 15 (Prineip l)Secretary 'Name and Title 16 17 Address: 2112 Solona Street 19C 20 21 win, 22 SURETY: 23 The Hanover Insurance Company 24 25 26 BY:` 2-7 'ign tore 28 29 -Julie Srn'jk�torney-in-Fact 30 Name and Tide 31 32 Addm, 5910 North Central Expressway#300 33 Dallas' TX 75206 - 34 3 5 36 _V rfiness as to Sur�ety Tolophone Nturnber: (214) 750-3908 37 39 40 *Note; 111'sighed by an officer of the Stgoty Company, there roust be ou file a certified extract 41 frorn the by-laws showing,that this person has authority to sign such obligation, If 42 Surety physical address is different from its mailing address, both must be provided, 43 The date of the bolid shall not be prior to the date the Contract is a I w",fitf�d:............. 014"HWAL 1N 44 CITY `3 T. Wilro At CITY OF PORT WORTH Terry Park,Noribside Park,fligil Crest park wd stimnlerfields park STANDARD CONSTRUCUON SPECIFICATION DOCUMENTS 02263,0220,02263,02206 Revised July 1,2011 006114-I PAYMENT BOND Page I of 2 SECTION 00 61 14 2 PAYMENT BOND Bond# 1039803 3 4 THE STATE OF TE,XA:3 § 5 § KNOW ALL BYTV[ESE PRES ENT S: 6 COUNTY OF TAIMANT § 7 That we, Iiorthstal- Co11strtLCfiQ_n_, LLQ. known as "Principal" herein, and a The Hanover Insurance Company 'a coq)orate surety 9 (sureties), duly authorized to do business in the State of Texas, known as "Surety" herein 10 (whether one or more), arc held and firmly bound unto the City of Foil Worth, a municipal I I corporation created pursuant to the laws of the State of Texas, known as "City" herein, in the 12 penal sum of aq_v_en_L1nndreL1 Fifteen -tL .�_ _-IlLquAqdT�yoELiLtiAre�d.Lig4ty—ireeA.nA.35/100 ...Dollal 13 ($i75,283.35), lawful money of the United States, to be paid in Fort Worth, Tarrant County, 14 Texas, for the payment of which sum well and truly be made, we bind ourselves, our heirs, 15 executors,administrators,successors and assigns,jointly and severally, firrnly by these presents: 16 MUREAS,Principal has entered into a certain written Contract with City, awarded the 17 151h day of Se qL -act is hereby referred to and made a part hereof for all teenier 5, which Conti 201� 18 Purposes as if fully set forth herein, to furnish all materials, equipment, labor and other 19 accessories as defined by law, in the prosecution of the Work as provided for in Said Contract and 20 desipated as Q istruction.of Park I I 01 k L hxr 4t �4rk, 21 And S Ga11nneriiel0s Pirk C4,.; Proion IN!unfibers: 0"263, 02264, Qti265, (12266 22 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if 23 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in 24 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of tile Work under 25 the Contract then this obligation shall be and become null and void; otherwise to remain in (till 26 force and effect, 27 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 28 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 29 accordance with the provisions of said statute. 30 tl V 3 ,U1 MY OF FORT wowrii rfm Id Park STANDAIM CONSMOCNOWSPLCIFICATION DOCUMENTS 02263,02264,172263.02266 Revised bly 4.2011 0061 14-2 PAYMIENTBOND Page 2 of 2 I IN WITNESS WHEREGF, the Principal and Surety have each SIGNED and SE,ALED 2 this instrument by duly authorized agents and officers on this the 15'h day of September,20x5. 3 PRINCIPAL: Northstar Construction, LLC ATTEST: BY: V, Signature Michael A. Heirnlich President (Principal) Secretary Name and Address, 2112 Solona Street Pri Wita Cs-s 11 iT C.) n cip"I SUUUTY: The Hanover Insurance Company ATTEST: Julie Smith, Attorney-in-Fact (Surety) Secretary Name and'Title Ad(Itess: 5910 North Central Expressway#300 itness as to Surety Telephone Number: (2.14).750-3908 4 5 Note: If signed by an officer of the Surety, there must be on file a certified extract from the 6 bylaws showing that this person has authority to sign such obligation. If Surety's physical 7 address is different from its mailing address, both must be provided, 9 The date of the bond steal I not be prior to the date the Contract is awarded, to END OF SECTION .......... Fcl, CITY OF FORT WORTJ1 ('rasp hark .1dPark STANDARD CONSTRUCTION SPECIFICAMN['10C11MENTS 02263,02264,02265,02266 Revised July 1,241 1 0061 19-1 MAINTENANCE BOND Pa&c I of 3 SECTION 00 6119 2 MAINTENANCE BOND Bond # 1039803 3 4 TBE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS, 6 COTJNTY OF TARRANT § 7 8 That we Northstar Construction ,I L�Q. known as"Principal"herein and 9 The Hanover Insurance Company a corporate surety(sureties, if more than 10 one)duly authorized to do business in the State of Texas,known as"Surety"herein (whether one I I or more),are held and firmly bound unto the City of Fort Worth,a municipal corporation created 12 Pursuant to the laws of the State of'fexas,known as"City"herein, in the sum ofl—Seven-Bundred 13 Fifteen Thousand Two HundrgijEi h -three and 35/100......................... ......... Dollars 14 ($L/L5.283.35 lawful money of the United States,to be paid in Fort Worth,Tarrant County, 15 Texas,for payment of which sum well and truly be made unto the City and its successors,we 16 bind ourselves,our heirs, executors,administrators,successors and assigns,jointly and severally, 17 firmly by these presents. 19 WHEREAS,the Principal has entered into a certain written Contract with the City awarded 20 thel5th day of-.September.,2015, which Contract is hereby referred to and a made part hereof for 21 all purposes as if fully set forth herein,to furnish all materials,equipment labor and other 22 accessories as defined by law, in the prosecution of the Work, including any Work resulting from 23 a duly authorized Change Order(collectively herein,the"Work")as provided for in said contract 24 and designated as Construct_ipp of-Park.imp ovemqnts aLf P__ark,_North.qLtde Park,High Crest 25 PAdk_and Surnmerfields Park 01 jAq eg NILm _Ue a, 0226_3 _92Z 402265 arced.02266;and 26 27 WEW RE,AS,Principal binds itself to use such materials and to so construct the Work in 29 accordance with the plans, specifications and Contract Documents that the Work is and will 29 remain free from defects in materials or workmanship for and during the period of two(2) yeah 30 after the date of Final Acceptance of the Work by the City("Maintenance Period");and 31 32 VVHE REAS,Principal binds itself to repair or reconstruct the Work in whole or in part "a, .7, 33 upon,receiving notice from the City of the need therefor at any time within the Maintenance QI 34 Period. CITY OF r0IZT WORTH Terry Park,Norihside Park,High Crest Park Summerfloicts Park STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02263,02266 Revised hily 1,2011 0061 19-2 MAINTENANCE BOND Paige 2 of 3 t 2 NOW THEREFORE,the condition of this obligation is such that if Principal shall 3 remedy any defective Work,for which tiniely notice was provided by City,to a completion 4 satisfactory to the City,then this obligation shall become null and void; otherwise to remain in 5 lull force and effect. 6 7 PROVIDED,HOWEVER, if Principal shall fail so to repair or reconstruct any timely 8 .noticed defective Work, it is agreed that the City may cause any and all such defective Work to 9 be repaired and/or reconstructed with all associated costs thereof being borne by the Principal and 10 the Surety under this Maintenance bond; and 1t 12 PROVIDED FOIE-"HER, that if any legal action be filed on this Bond, venue shall lie in 13 Tarrant County,Texas or the United States District Court for the Northern District of Texas,Fort 14 Worth Division; and 15 Ifr PROVIDED FTJR'I'HEIR,that this obligation shall be continuous in nature and _ I7 successive recoveries may be had hereon for successive breaches. - 18 19 20 CITY OF FORT WORTH 7'erry Park,Norihside Park,Nigh Cre_vt Park Summe>fetds Par* STANDARD CONSTRUCTION SPKIF1CATION M)CUtvMENTS 02261 t12164.OZZ65,02266 Revised July 1,2011 0061 19-3 MAINTENANCE SOND Page 3 of 3 I IN WITNESS W11EIRE OF,the Principal and the Surety crave each SIGNED and SEALED this 2 instrument by duly authorized agents and officers on this the 15th day of_5ep ir L eqlLer,_ 2015, 3 4 111UNCUIAL: 5 Northstar Construction, LLC 6 7 Signature 10 AT MST: ld 2 Michael A. Heirnlich, President Name and Title i fl 15 Address: 2112 Solona Street 16 - 6 19 Witness as to incipal 19 20 S RETY, he Hanover Insurance Company 22 23 24 BY11. 25 S'k gn,fure 26 27 Julie Smite Attorne -in-Fact 28 ATTEST: Name-and Title 29 30 _ Addrcss: 5910 North Central Expressway#300 3] (Surety)Secretary P as, T : (O_ 12 33 34 Witness as to Surety TclephoneNumber: (.214)150-3908 35 36 *Note; If signed by an offi.cer of the Surety Company, there triust be ojj file a certified exh-act 37 from the by•laws showing that this pensor) has authority to :Sign Such Obligation, If 38 Surety's physical address is different frorn its mailing address, both inust be provided. 39 'rhe date of the bond shall not be prior to the date the Contract is awarded. 40 ............................ 11111 IVY, "V, CrryO,r rORTIVORTH 7'crry Pank•jVorihjide Par' Nigh C resi park Park STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised July 1,2011 . . . THE HANOVER INSURANCE COMPANY MASSACHUSETTS BAY INSURANCE COMPANY CITIZENS INSURANCE COMPANY OF AMERICA POWERS OF A TTORNEY CERTIFIED COPY t kmDVV�LL�Em ' and ,�Iww� --- —'– - -----~^~~E' ^~~^ ^~~~~~`"=""°"A"`'"=/'"nmy corporations_ �~. ~~ .~~~~~.~=~= "=""=. INSURANCE COMPANY op AMERICA,acorporation organized and existing under the laws of the State of Michigan,do hereby constitute and appoint k Staci Gross,Julie Smith and/or Josh xmusjauk : of Boley Fea@erstno true and lawful Amv in-fa to sign,execute,seal,knowledge and deliver for,and on its behalf,and as its act and deed any place within the United States,or,if the following fine be filled in,only within the area therein designated any and all bonds,recognizances,undertakings,contracts of indemnity or other writings obligatory in the nature thereof,as follows: Any such obligations In the United States,not to exceed Thirty Million and No/100($30,000,000)in any single instance and said companies hen'hyna+Vynndounfinnauanuwhomnvm,,saiu*oomvywH*-factmoylawfullywomtxep,amieesbvvirtuwvrtheso presents. | These appointments uema4nun$ermndtyouthuhtyoYtAehz||mwingReuo|uUonpaxeodbythe800rdofDimctomnfoaidOompan(oowh|ch reuu|uhnno l are still|neffect: ,RESOLVED,Thatthe President or any Vice President,in conjunctionwith anyVlce President,be and theyare hereby authorized and empowered to appoint Aftomays-In-fact of the Company,in its name and as Its acts,toexecute and acknowledge forand on its behalf as Suretyanyand all bonds,recognizance$. contractsof Indemnity,waivers ofeitation and all other writings obligatory In the naturethereof,with powerto attach thereto thesealof theCompany,Anysuch writings so executed by such Attorneys-in-fact shall be as binding upon the Company as If they had been duty executed and acknowledged by the regularly elected officers of the Company In their own proper persons.'(Adopted October 7, 1981-The Hanover Insurance Company;Adopted April 14,1982 Massachusetts Say Insurance Company:Adopted September 7,2001-Citizens Insurance Company of America) IN WITNESS WHEREOF, THE HANOVER INSURANCE COMPANY, MASSACHUSETTS BAY INSURANCE COMPANY and CITIZENS INSURANCE n U COMPANY OF AMERICA have caused theoepneoantsWbeomu|ed*i|hthairoaopectiveonqpurateoom|a'duly oMostedby two Vice Pnaoidents ' this12tnuayvrM*vemberoo14. THE HANCVER INSURANCE COMpANy MASSACHUSEM BAY INSURANCE COMPANY CITIZENS SURA3NCELOMPANY OF AMERICA 1974 mident Robert Thomas,Vice THE COMMONWEALTH oFMASSACHUSETTS ) COUNTY OFvvDRuEaTER >*�� �*8xwmam�.�WNenideno ----- � On this 12th dayof November 2014 before me came the above named Vice Presidents of The Hanover Insurance Company,Massachusetts Bay Insurance Company and Citizens Insurance Company of America,to me personally known to be the individuals and officers described herein,and acknowledged thatthe seals affixed to the preceding instrument are the corporate seals of The Hanover Insurance Company,Massachusetts Bay Insurance Company and Citizens Insurance Company of America, respectively,and that the said corporate seals and their signatures as officers were duty affixed and subscribed to said U Barbara A.Garlick,Notary pm| My Commission Expires September 21.2U1O undersigned 1,the Hanover Insurance Company,Massachusetts B Insurance Company and Citizens Insurance Company of � » ndmnegvmgiaa�| mn��copy nf the Ong|na|Power off�omaymoueduy said Oompumoo.and 6o hereby mn6e� � certify that the said Powers of Attorney are still in force and effect. This may be signed hy facsimile under and by authority of the following resolution of the Board of Directors v,The Hanover Insurance Company, Massachusetts Bay Insurance Company and Citizens Insurance Company of America. | Certified bythe President orany Vice President in conjunction with any Vice President of the Company,shall be binding on the Companyto the same extent as If all signatures therein were manually affixed,even though one or more of any such signatures thereon may be facsimile.' (Adopted October 7,1981-The Hanover Insurance Company;AdoptedApdl 14,1982-Massachusetts Bay Insurance company;Adopted September7,2001-Citizens Insurance Company of / GIVEN under my hand and the seals ov said Companies,atWorcester,Massachusetts,this_15th day nfS*Ptembo FIAABAY RA SCE PA *Tt CON 'SF CE OFAMER" C,T EN H,4ilce .8 i Texas Complaint Notice Commercial Lines IMPORTANT NOTICE AVISO IMPORTANTE To obtain information or make a complaint: Para obtener informacion o para someter una queja: You may call The Hanover insurance Company/ Usted puede Ilamar al numeeo de telefono gratis de Citizens Insurance Company of America's toil-free The Hanover Insurance Company/Citizens Insurance telephone number for Information or to make a Company of America's para informacion o para complaint at: someter una queja al: 1-800-343-6044 1-.800-343-6044 You may also write to The Hanover Insurance Company/ Usted tamblen puede escribir a The Hanover Insurance Citizens Insurance Company of America at: Company/Citizens Insurance Company of America al: 440 Lincoln Street 440 Lincoln Street Worcester,MA 01653 Worcester,MA 01653 You may contact the Texas Department of Insurance Puede comunicarse con el Departamento de Seguros to obtain information on companies,coverages, de Texas para obtener informacion acerca de rights or complaints at: companias,coberturas,derechos o quejas al: 1-800-252-3439 1-800-252-3439 You may write the Texas Department of Insurance: Puede escribir al Departamento de Seguros de Texas: P.O.Box 149104 P.O.Box 149104 Austin,TX 78714-9104 Austin,TX 78714-9104 Fax:(512)475-1771 Fax:(512)475-1771 Web:http://Www.tdi.texas.gov Web.http://www.tdi.texas.gov E-mail:ConsumerProtection @tdi.texas.gov E-mail:ConsumerProtection @tdi.texas.gov PREMIUM OR CLAIM DISPUTES: DISPUTAS SOBRE PRIMAS O RECLAMOS: Should you have a dispute concerning your premium Si tiene una disputa concerniente a su prima o a un or about a claim you should contact the agent or the reclamo,debe comunicarse con el agente o la com- company first.If the dispute is not resolved,you may pania primero,Si no se resuelve la disputa,puede contact the Texas Department of Insurance. entonces comunicarse con el departamento(TDI). ATTACH THIS NOTICE TO YOUR POLICY: This UNA ESTE AVISO A SU POLIZA: Este aviso es solo notice is for information only and does not become para proposito de informacion y no se convierte en a part or condition of the attached document, parte o condicion del documento adjunto. The Hanover insurance company 1440 Lincoln Street Worcester,MA 01653 181.145702(13}Page 1 oft Citizens Insurance company ofAmerica 1808 North Highlander Way,Howell,MI 48843 hanover.com 0061 25- 1 CERTIFICATE OF INSURANCE Page 1 of I 1 SECTION 00 6125 2 CERTIFICATE OF INSURANCE - 3 4 5 6 7 8 9 10 I1 12 13 14 15 16 17 18 19 20 21 22 END OF SECTION CITY OF FORT WORTH Park Improvements at Tern'.Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264.02265,02266 Revised Jtily 1.2011 DATE(MMIDDIYYYY) AC"RDF CERTIFICATE OF LIABILITY INSURANCE 1 10/1/2015 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). NT CT PRODUCER NC AD M P Allen Sparks/Maria Patton Independent Insurance Group HONE., AX (AIC,No): (A/C.N Extl:972-231-8277 3010 LBJ Freeway Ste. 920 E�Mfidl- A REss:mariap&indinsqrp.com Dallas TX 75234-7004 INSURER(S)AFFORDING COVERAGE NAIC# INSURER A:America First LLQyds Ins Go 11526 INSURED NORTH03 INSURER BNETHERLANDS INS CO THE 24171 Northstar Construction, LLC INSURER C:AIVIERICA FIRST INS CO 12696 H37 Holdings, LLC INSURER D:TEXAS MUT INS CO 2112 Solona Street Haltom City TX 76117 INSURER E INSURER F: COVERAGES CERTIFICATE NUMBER:468139264 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADDLISUBIR POLICY EFF POLICY EXP LTR. TYPE OF INSURANCE INSR WVD POLICY NUMBER (MM/DDfYYYY) (MM/DDIYYYY) LIMITS A GENERAL LIABILITY Y Y CBP8398167 12/31/2014 12/31/2015 EACH OCCURRENCE $1,000,000 DAMAGE TO RENTED X COMMERCIAL GENERAL LIABILITY PREMISES(",occurrence) $100,000 CLAIMS-MADE lxl OCCUR MED EXP(Any one person) $5,000 X X'C'U PERSONAL&ADV INJURY $1,000,000 GENERAL AGGREGATE $2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG $2,000,000 RO POLICY[X I JPECj F] LOC $ B AUTOMOBILE LIABILITY Y Y COMBINED-91NGLE LIMIT BA8128157 12/31/2014 12/31?2015 IF .ident) $1,000,000 X ANYAUTO BODILY INJURY(Per person) $ ALL OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS AUTOS X NON-OWNED PR P.ERT DAMAGE X HIRED AUTOS AUTOS (Peor d an t) $ C X UMBRELLA LIAB OCCUR Y Y CU8128857 12/31/2014 12/31/2015 EACH OCCURRENCE $1,000,000 EXCESS LIAB CLAIMS-MADE AGGREGATE $1,000,000 DIED JX I RETENTION$10,000 X I WC STATU JOTH- $ D WORKERS COMPENSATION y TSF0001 231613 12/31/2014 12/31/2015 - 1 AND EMPLOYERS'LIABILITY YIN TORY LIMITS ER ANY PROPRIETORIPARTNERIEXECUTIVE F E.L.EACH ACCIDENT $1,000,000 OFFICER/MEMBER EXCLUDED? N/A (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $1,'000,000 If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $1,000,000 A Equipment Floater N N CBP8398167 12/31/2014 12/31/2015 Leased/Rented $250,000 Deductible $1,000 DESCRIPTION OF OPERATIONS f LOCATIONS VEHICLES (Attach ACORD 101,Additional Remarks Schedule,if more space is required) The checked ADDL INSR and SUBIR WVD boxes refer to the following specific endorsements, copies attached: General Liability:Additional Insured-Automatic Status When Required In Construction Agreement With You-Contractors(Completed Operations)Form 22-135TX 05/12. General Liability Extension Form 22-45TX 05/12 which provides Additional Insured-By Contract, Agreement,or Permit; Construction Project(s)-General Aggregate Limit(Per Project)Form 22-127 01/08;Waiver Of Transfer Of Rights Of Recovry Against Others To Us When Required In A Contract or Agreement With You Form 22-126 01/08;Texas Changes-Amendment of See Attached... CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. City of Fort Worth kmorton Str�ef/;'/ 1000 Throc "V� Fort Worth TX 76102 f ,/,'�"""" / AUTHORIZED REPRESENTATIVE 'X v 1988-2010 ACORD CORPORATION. All rights reserved. _J ACORD 25(2010/05) The ACORD name and logo are registered marks of ACORD AGENCY CUSTOMER ID: NORTH03 LOC#: AC"R" ADDITIONAL REMARKS SCHEDULE Page 1 of AGENCY NAMED INSURED Independent Insurance Group Northstar Construction, LLC H37 Holdings, LLC POLICY NUMBER 2112 Solona Street Haltom City TX 76117 CARRIER NAIC CODE EFFECTIVE DATE: ADDITIONAL REMARKS THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, FORM NUMBER: 25 FORM TITLE: CERTIFICATE OF LIABILITY INSURANCE Cancellation Provisions or Coverage Change Form CG0205 01/96*Auto Liability: Business Auto Extension Endorsement Form 16-59f 05/04 which provides Additional Insured By Contract,Agreement Or Permit;Waiver Of Transfer Of Rights Of Recovery Against Others To Us Form 16-87 11/09*Workers Compensation:Texas Waiver Of Our Right To Recover From Other Endorsement Form WC420304A 01/00;TX Notice of Material Change WC420601 01/94 PARK IMPROVEMENTS PROJECT: 02263-Terry Park 02264-Northside Park 02265-High Crest Park 02266-Summerfields Park ADDITIONAL INSURED AS INTEREST MAY APPEAR: (1)City of Fort Worth (2)Baird, Hampton& Brown ACORD 101 (2008/01) 2008 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - AUTOMATIC STATUS WHEN REQUIRED IN CONSTRUCTION AGREEMENT WITH YOU - CONTRACTORS - COMPLETED OPERATIONS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART A. Paragraph 2. under Section II — Who Is An Insured is amended to include as an insured any person or organization whom you have agreed to add as an additional insured in a written contract or written agreement. Such person or organization is an additional insured but only with respect to liability for "bodily injury"or"property damage": 1. Caused by "your work" performed for that additional insured that is the subject of the written contract or written agreement; and 2. Included in the"products-completed operations hazard". The insurance provided by this endorsement applies only if the written contract or written agreement is signed prior to the"bodily injury"or"property damage". We have no duty to defend an additional insured under this endorsement until we receive written notice of a "suit" by the additional insured as required in Paragraph b. of Condition 2. Duties In The Event Of Occurrence, Offense,Claim Or Suit under Section IV—Commercial General Liability Conditions. - However, if you have entered into a construction contract subject to Subchapter C of Chapter 151 of Subtitle C of Title 2 of the Texas Insurance Code with the additional insured, the insurance afforded to such person or organization only applies to the extent permitted by Subchapter C of Chapter 151 of Subtitle C of Title 2 of the Texas Insurance Code. B. With respect to the insurance provided by this endorsement, the following are added to Paragraph 2. Exclusions under Section I—Coverage A—Bodily Injury And Property Damage Liability: This insurance does not apply to: 1. "Bodily injury"or"property damage"that occurs prior to you commencing operations at the location where such "bodily injury" or"property damage"occurs. 2. "Bodily injury" or "property damage" arising out of the rendering of, or the failure to render, any professional architectural, engineering or surveying services including: a. The preparing, approving or failure to prepare or approve, maps, shop drawings, opinions, reports, surveys,field orders, change orders or drawing and specifications; and b. Supervisory, inspection, architectural or engineering activities. C. The limits of insurance applicable to the additional insured are those specified in a written contract or written agreement or the limits of insurance as stated in the declarations of this policy and defined Section III—Limits " of Insurance of this policy, whichever are less. These limits are inclusive of and not in addition to the limits of insurance available under this policy. D. With respect to the insurance afforded by this endorsement, Section IV — Commercial General Liability Conditions is amended as follows: 1. The following is added to Paragraph 2. Duties In The Event Of Occurrence, Offense, Claims Or Suit: An additional insured under this endorsement will as soon as practicable: a. Give written notice of an "occurrence" or an offense that may result in a claim or "suit" under this insurance to us; ©2011 Liberty Mutual Insurance Company.All rights reserved. Includes copyrighted material of Insurance Services Office,Inc.,with its permission. 22-135TX(05112) Page 1 of 2 b. Tender the defense and indemnity of any claim or "suit" to all insurers whom also have insurance available to the additional insured; and c. Agree to make available any other insurance which the additional insured has for a loss we cover under this Coverage Part. d. We have no duty to defend or indemnify an additional insured under this endorsement until we receive written notice of a"suit" by the additional insured. 2. Paragraph 4.of Section IV—Commercial General Liability Conditions is amended as follows: a. The following is added to Paragraph a. Primary Insurance: If an additional insured's policy has an Other Insurance provision making its policy excess, and you have agreed in a written contract or written agreement to provide the additional insured coverage on a primary and noncontributory basis, this policy shall be primary and we will not seek contribution from the additional insured's policy for damages we cover. b. The following is added to Paragraph b. Excess Insurance: When a written contract or written agreement, other than a premises lease, facilities rental contract or agreement, an equipment rental or lease contract or agreement, or permit issued by a state or political subdivision between you and an additional insured does not require this insurance to be primary or primary and non-contributory, this insurance is excess over any other insurance for which the additional insured is designated as a Named Insured. Regardless of the written agreement between you and an additional insured, this insurance is excess over any other insurance whether primary, excess, contingent or on any other basis for which the additional insured has been added as an additional insured on other policies. ©2011 Liberty Mutual Insurance Company.All rights reserved. Includes copyrighted material of Insurance Services Office, Inc.,with its permission. 22-135TX(05/12) Page 2 of 2 Forming a part of Policy Number: CBP 8398167 Coverage Is Provided In AMERICA FIRST LLOYD' S INSURANCE CO. Named Insured: Agent: NORTHSTAR CONSTRUCTION, LLC INDEPENDENT INSURANCE GROUP I Agent Code: 3222948 Agent Phone: 972-231-8277 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. COMMERCIAL GENERAL LIABILITY EXTENSION ENDORSEMENT This endorsement modifies insurance under the COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE The following endorsement provision does not apply when"X"is shown in the space provided below: Provision B. PROPERTY DAMAGE—BORROWED EQUIPMENT does not apply Provision C. PROPERTY DAMAGE—CUSTOMERS' GOODS does not apply Provision F. MEDICAL PAYMENTS EXTENSION does not apply Provision H.ADDITIONAL INSUREDS—BY CONTRACT,AGREEMENT OR PERMIT does not apply Provision I.ADDITIONAL INSUREDS—VENDORS does not apply Provision J. BROAD FORM NAMED INSURED does not apply Provision K. FAILURE TO DISCLOSE HAZARDS AND PRIOR OCCURRENCES does not apply Provision L. KNOWLEDGE OF OCCURRENCE, OFFENSE, CLAIM OR SUIT does not apply (If no entry appears above, information required to complete this endorsement will be shown in the Declarations as applicable to this endorsement) With respect to coverage afforded by this endorsement, the provisions of the policy apply unless modified by the endorsement. A. NON-OWNED WATERCRAFT Under paragraph 2. Exclusions of COVERAGE A BODILY INJURY AND PROPERTY DAMAGE LIABILITY (SECTION 1), provision (2)(a) of exclusion g.Aircraft,Auto Or Watercraft is replaced by the following: This exclusion does not apply to: (2) A watercraft you do not own that is: (a) Less than 51 feet long; and B. PROPERTY DAMAGE—BORROWED EQUIPMENT 1. Under paragraph 2. Exclusions of COVERAGE A BODILY INJURY AND PROPERTY DAMAGE LIABILITY (SECTION 1), provision (4) of exclusion j. Damage To Property does not apply to "property damage" to borrowed equipment while that equipment is not being used to perform operations at the job site. _ Includes copyrighted material of Insurance Services Office,Inc.with its permission. Copyright,Insurance Services Office,Inc.,2000 22-45TX(05/12) 2. Under SECTION IV — COMMERCIAL GENERAL LIABILITY CONDITIONS, the following is added to Condition 4. Other Insurance, paragraph b. Excess Insurance: The insurance afforded by provision B. in the Commercial General Liability Extension Endorsement is excess over any of the other insurance,whether primary, excess, contingent or on any other basis, that is property insurance. 3. This endorsement provision B. does not apply when it is shown in the Schedule as not applicable. C. PROPERTY DAMAGE—CUSTOMERS' GOODS 1. Under paragraph 2. Exclusions of COVERAGE A BODILY INJURY AND PROPERTY DAMAGE LIABILITY (SECTION 1), provisions (3), (4) and (6) of exclusion j. Damage To Property do not apply to "property damage"to"customers' goods"while on your premises. 2. Under SECTION IV — COMMERCIAL GENERAL LIABILITY CONDITIONS, the following is added to Condition 4. Other Insurance, paragraph b. Excess Insurance: The insurance afforded by provision C. in the Commercial General Liability Extension Endorsement is excess over any of the other insurance,whether primary, excess, contingent or on any other basis,that is property insurance. 3. The following is added to SECTION V—DEFINITIONS: "Customers'goods"means property of your customer on your premises for the purpose of being worked on or used in your manufacturing process. 4. This endorsement provision C. does not apply when it is shown in the Schedule as not applicable. D. PROPERTY DAMAGE LIABILITY—ELEVATORS 1. Under paragraph 2. Exclusions of COVERAGE A BODILY INJURY AND PROPERTY DAMAGE LIABILITY (SECTION 1), provisions (3), (4) and (6)of exclusion j. Damage To Property do not apply if such "property damage" results from the use of elevators. 2. The following is added to SECTION IV—COMMERCIAL GENERAL LIABILITY CONDITIONS, Condition 4. Other Insurance, paragraph b. Excess Insurance: The insurance afforded by provision D. in the Commercial General Liability Extension Endorsement is excess over any of the other insurance,whether primary, excess, contingent or on any other basis, that is property insurance. E. DAMAGE BY FIRE, LIGHTNING, EXPLOSION, SMOKE OR LEAKAGE If Damage To Premises Rented To You is not otherwise excluded from this Coverage Part: 1. Under subsection 2. Exclusions of COVERAGE A BODILY INJURY AND PROPERTY DAMAGE LIABILITY (SECTION 1): a. The fourth from the last paragraph of exclusion j. Damage To Property is replaced by the following: Paragraphs(1), (3)and(4)of this exclusion do not apply to"property damage"(other than damage by fire, lightning, explosion, smoke, or leakage from automatic fire protection systems) to premises, including the contents of such premises, rented to you for a period of 7 or fewer consecutive days. A separate limit of insurance applies to Damage To Premises Rented To You as described in SECTION III—LIMITS OF INSURANCE. b. The last paragraph of subsection 2. Exclusions is replaced by the following: Exclusions c. through n. do not apply to damage by fire, lightning, explosion, smoke, or leakage from automatic fire protection systems to premises while rented to you or temporarily occupied by you with permission of the owner. A separate limit of insurance applies to Damage To Premises Rented To You as described in SECTION III—LIMITS OF INSURANCE. ©2012 Liberty Mutual Insurance Company.All rights reserved. Includes copyrighted material of Insurance Services Office, Inc.,with its permission. 22-115NY(04/12) 2. Paragraph 6. under SECTION III—LIMITS OF INSURANCE is replaced by the following: 6. Subject to 5. above, the Damage To Premises Rented To You Limit is the most we will pay under Coverage A for damages because of"property damage"to any one premises,while rented to you, or in the case of damage by fire, lightning, explosion, smoke, or leakage from automatic protection systems,while rented to you or temporarily occupied by you with permission of the owner.This limit is the greater of: a. $300,000; or b. The amount shown in the Declarations for Damage To Premises Rented To You Limit. 3. The word "fire" is changed to "fire, lightning, explosion, smoke, or leakage from automatic fire protection systems"where it appears in: a. SECTION IV — COMMERCIAL GENERAL LIABILITY CONDITIONS, Condition 4. Other Insurance, paragraph b. Excess Insurance, subparagraph (1)(b); and b. SECTION V—DEFINITIONS, paragraph 9.a. F. MEDICAL PAYMENTS EXTENSION 1. SECTION III—LIMITS OF INSURANCE, paragraph 7. is replaced by the following: 7. Subject to 5. above, the Medical Expense Limit is the most we will pay under Coverage C. for all medical expenses because of"bodily injury"sustained by any one person. The Medical Expense Limit is the greater of: a. $15,000; or b. The Medical Expense Limit shown in the Declarations. 2. Under provision 1. Insuring Agreement of COVERAGE C MEDICAL PAYMENTS (SECTION 1), the second subparagraph (2)of paragraph a. is replaced by the following: (2) The expenses are incurred and reported to us within three years of the date of the accident; and 3. This endorsement provision F. does not apply when: a. It is shown in the Schedule as not applicable; or b. COVERAGE C. MEDICAL PAYMENTS(SECTION 1) is otherwise excluded from this Coverage Part. G. EXTENSION OF SUPPLEMENTARY PAYMENTS—COVERAGES A AND B Under SUPPLEMENTARY PAYMENTS—COVERAGES A AND B: 1. Paragraph 1.b. is replaced by the following: b. Up to$2500 for cost of bail bonds required because of accidents or traffic law violations arising out of the use of any vehicle to which the Bodily Injury Liability Coverage applies. We do not have to furnish these bonds. 2. Paragraph 1.d. is replaced by the following: d. All reasonable expenses incurred by the insured at our request to assist us in the investigation or defense of the claim or"suit", including actual loss of earnings up to $300 a day because of time off from work. H. ADDITIONAL INSUREDS—BY CONTRACT,AGREEMENT OR PERMIT 1. Paragraph 2. under SECTION 11—WHO IS AN INSURED is amended to include as an insured any person or organization when you and such person or organization have agreed in writing in a contract, agreement or permit that such person or organization be added as an additional insured on your policy to provide insurance such as is afforded under this Coverage Part. Such person or organization is an additional insured only with respect to liability arising out of: a. Your ongoing operations performed for that person or organization; or b. Premises or facilities owned or used by you. With respect to provision 1.a. above, a person's or organization's status as an insured under this endorsement ends when your operations for that person or organization are completed. Includes copyrighted material of Insurance Services Office,Inc.with its permission. Copyright,Insurance Services Office,Inc.,2000 22-45TX(05/12) With respect to provision 1.b. above, a person's or organization's status as an insured under this endorsement ends when their contract or agreement with you for such premises or facilities ends. However, if you have entered into a construction contract subject to Subchapter C of Chapter 151 of Subtitle C of Title 2 of the Texas Insurance Code with the additional insured, the insurance afforded to such person or organization only applies to the extent permitted by Subchapter C of Chapter 151 of Subtitle C of Title 2 of the Texas Insurance Code. 2. This endorsement provision H. does not apply: a. Unless the written contract or agreement has been executed, or permit has been issued, prior to the "bodily injury", "property damage" or"personal and advertising injury"; b. To"bodily injury" or"property damage"occurring after: (1) All work, including materials, parts or equipment furnished in connection with such work, in the project (other than service, maintenance or repairs) to be performed by or on behalf of the additional insured(s)at the site of the covered operations has been completed; or (2) That portion of"your work"out of which the injury or damage arises has been put to its intended use by any person or organization other than another contractor or subcontractor engaged in performing operations for a principal as a part of the same project; c. To the rendering of or failure to render any professional services including, but not limited to, any professional architectural, engineering or surveying services such as: (1) The preparing, approving, or failing to prepare or approve, maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifications; and (2) Supervisory, inspection, architectural or engineering activities; d. To "bodily injury", "property damage" or"personal and advertising injury" arising out of any act, error or omission that results from the additional insured's sole negligence or wrongdoing; e. To any person or organization included as an insured under provision I. of this endorsement; f. To any person or organization included as an insured by a separate additional insured endorsement issued by us and made a part of this policy; or g. When it is shown in the Schedule as not applicable. I. ADDITIONAL INSURED—VENDORS Paragraph 2. under SECTION II —WHO IS AN INSURED is amended to include as an insured any person or organization (referred to below as "vendor")with whom you agreed, in a written contract or agreement to provide insurance such as is afforded under this policy, but only with respect to"bodily injury"or"property damage"arising out of"your products" which are distributed or sold in the regular course of the vendor's business, subject to the following additional exclusions: 1. The insurance afforded the vendor does not apply to: a. "Bodily injury" or"property damage" for which the vendor is obligated to pay damages by reason of the assumption of liability in a contract or agreement. This exclusion does not apply to liability for damages that the vendor would have in the absence of the contract or agreement; b. Any express warranty unauthorized by you; c. Any physical or chemical change in the product made intentionally by the vendor; d. Repackaging, unless unpacked solely for the purpose of inspection, demonstration, testing, or substitution of parts under instructions from the manufacturer, and then repackaged in the original container; e. Any failure to make such inspections, adjustments,tests or servicing as the vendor has agreed to make or normally undertakes to make in the course of business, in connection with the distribution or sale of the products; f. Demonstration, installation, servicing or repair operations, except such operations performed at the vendor's premises in connection with the sale of the product; ©2012 Liberty Mutual Insurance Company.All rights reserved. Includes copyrighted material of Insurance Services Office,Inc.,with its permission. 22-115NY(04/12) g. Products which, after distribution or sale by you, have been labeled or relabeled or used as a container, part or ingredient of any other thing or substance by or for the vendor; or h. To "bodily injury" or "property damage" arising out of any act, error or omission that results from the additional insured's sole negligence or wrongdoing. 2. This insurance does not apply to any insured person or organization, from whom you have acquired such products, or any ingredient, part or container, entering into, accompanying or containing such products. _ 3. This endorsement provision I. does not apply when it is shown in the Schedule as not applicable. J. BROAD FORM NAMED INSURED 1. SECTION II—WHO IS AN INSURED is amended to include as an insured any legally incorporated entity of which you own more than 50 percent of the voting stock during the policy period. 2. Under SECTION IV — COMMERCIAL GENERAL LIABILITY CONDITIONS, the following is added to Condition 4. Other Insurance, paragraph b. Excess Insurance: This insurance is excess over any of the other insurance,whether primary, excess, contingent or on any other basis, that is available to an insured solely by reason of ownership by you of more than 50 percent of the voting stock. 3. Paragraph 2. of this endorsement provision J. does not apply to a policy written to apply specifically in excess of this policy. 4. This endorsement provision J. does not apply when it is shown in the Schedule as not applicable. K. FAILURE TO DISCLOSE HAZARDS AND PRIOR OCCURRENCES _ 1. Under SECTION IV — COMMERCIAL GENERAL LIABILITY CONDITIONS, the following is added to Condition 6. Representations: Your failure to disclose all hazards or prior"occurrences"existing as of the inception date of the policy shall not prejudice the coverage afforded by this policy provided such failure to disclose all hazards or prior"occurrences" is not intentional. 2. This endorsement provision K. does not apply when it is shown in the Schedule as not applicable. L. KNOWLEDGE OF OCCURRENCE, OFFENSE, CLAIM OR SUIT 1. Under SECTION IV — COMMERCIAL GENERAL LIABILITY CONDITIONS, the following is added to Condition 2. Duties in the Event of Occurrence, Offense, Claim Or Suit: _ Knowledge of an "occurrence", offense, claim or"suit' by an agent, servant or"employee" of any insured shall not in itself constitute knowledge of the insured unless an insured listed under paragraph 1. of SECTION II—WHO IS AN INSURED or a person who has been designated by them to receive reports of occurrences, offenses, claims and "suits" shall have received such notice from the agent, servant or "employee". 2. This endorsement provision L. does not apply when it is shown in the Schedule as not applicable. M. LIBERALIZATION CLAUSE If we revise this Commercial General Liability Extension Endorsement to provide more coverage without additional premium charge, your policy will automatically provide the coverage as of the day the revision is effective in your state. This does not apply to provisions that are shown in the Schedule as not applicable. N. BODILY INJURY REDEFINED Under SECTION V—DEFINITIONS, definition 3. is replaced by the following: 3. "Bodily Injury" means physical injury, sickness or disease sustained by a person. This includes mental anguish, mental injury,shock,fright or death that results from such physical injury, sickness or disease. Includes copyrighted material of Insurance Services Office,Inc.with its permission. Copyright,Insurance Services Office, Inc.,2000 2245TX(05/12) THIS ENDORSEMENT CHANGES THE POLICY.PLEASE READ IT CAREFULLY. CONSTRUCTION PROJECT(S)- GENERAL AGGREGATE LIMIT(PER PROJECT) This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART A. For all sums which the insured becomes legally obligated to pay as damages caused by"occurrences" under COVERAGE A(SECTION 1), and for all medical expenses caused by accidents under COVERAGE C(SECTION 1), which can be attributed only to ongoing operations at a single construction project away from premises owned by or rented to you: 1. A separate Construction Project General Aggregate Limit applies to each construction project, and that limit is equal to the amount of the General Aggregate Limit shown in the Declarations. 2. The Construction Project General Aggregate Limit is the most we will pay for the sum of all damages under COVERAGE A,except damages because of"bodily injury"or"property damage"included in the"products- completed operations hazard",and for medical expenses under COVERAGE C regardless of the number of: a. Insureds; b. Claims made or"suits"brought, or c. Persons or organizations making claims or bringing"suits". 3. Any payments made under COVERAGE A for damages or under COVERAGE C for medical expenses shall reduce the Construction Project General Aggregate Limit for that construction project. Such payments shall not reduce the General Aggregate Limit shown in the Declarations nor shall they reduce any other Construction Project General Aggregate Limit for any other construction project. 4. The limits shown in the Declarations for Each Occurrence, Fire Damage and Medical Expense continue to apply. However, instead of being subject to the General Aggregate Limit shown in the Declarations, such limits will be subject to the applicable Construction Project General Aggregate Limit. B. For all sums which the insured becomes legally obligated to pay as damages caused by`occurrences"under COVERAGE A(SECTION 1), and for all medical expenses caused by accidents under COVERAGE C(SECTION 1), which cannot be attributed only to ongoing operations at a single construction project away from premises owned by or rented to you: 1. Any payments made under COVERAGE A for damages or under COVERAGE C for medical expenses shall reduce the amount available under the General Aggregate Limit or the Products-Completed Operations Aggregate Limit,whichever is applicable; and 2. Such payments shall not reduce any Construction Project General Aggregate Limit. C. When coverage for liability arising out of the"products-completed operations hazard"is provided,any payments for damages because of"bodily injury"or"property damage" included in the"products-completed operations hazard"will reduce the Products-Completed Operations Aggregate Limit,and not reduce the General Aggregate Limit nor the Construction Project General Aggregate Limit. Includes copyrighted material of Insurance Services Office, Inc.,with its permission. 22-127(01/08) Page 1 of 2 D. If the applicable construction project has been abandoned,delayed, or abandoned and then restarted, or if the authorized contracting parties deviate from plans, blueprints, designs, specifications or timetables,the project will still be deemed to be the same construction project. E. The provisions of Limits Of Insurance(SECTION III) not otherwise modified by this endorsement shall continue to apply. Includes copyrighted material of Insurance Services Office, Inc.,with its permission, 22-127(01/08) Page 2 of 2 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US -WHEN REQUIRED IN A CONTRACT OR AGREEMENT WITH YOU This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART The TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US Condition (Section IV — COMMERCIAL GENERAL LIABILITY CONDITIONS)is amended by the addition of the following: We waive any right of recovery we may have against a person or organization because of payments we make for injury or damage arising out of your ongoing operations or"your work"done under a contract with that person or organization and included in the "products-completed operations hazard"provided: 1. You and that person or organization have agreed In writing in a contract or agreement that you waive such rights against that person or organization; and 2. The injury or damage occurs subsequent to the execution of the written contract or agreement. Includes copyrighted material of Insurance Services Office, Inc.,with its permission. 22-126(01108) Pagel of 1 Forming a part of I Poiicy Number: CBP8398167 777 i Coverage Is Provided In AMERICA FIRST LLOYD'S INSURANCE CO. Named Insured: Agent: NORTHSTAR CONSTRUCTION INC ' INDEPENDENT INSURANCE GROUP I REFER TO NAMED INSURED SCHEDULE Agent Code: 3222948 Agent Phone: (972)-231-8277 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. TEXAS CHANGES - AMENDMENT OF CANCELLATION PROVISIONS OR COVERAGE CHANGE This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART OWNERS AND CONTRACTORS PROTECTIVE LIABILITY COVERAGE PART POLLUTION LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART RAILROAD PROTECTIVE LIABILITY COVERAGE PART In the event of cancellation or material change that reduces or restricts the insurance afforded by this Coverage Part,we agree to mall prior written notice of cancellation or material change to: SCHEDULE 1. Name: BLANKET AS REQUIRED BY WRITTEN CONTRACT 2. Address: 3. Number of days advance notice: 30 (If no entry appears above, information required to complete this endorsement will be shown in the Declarations as applicable to this endorsement.) CG 02 06(01196) Copyright, Insurance Services Office,Inc., 1994 INSURED COPY 12/31/2011 9398167 NTCODMMD512 PGDM060D J03418 ACAOPPN 00006957 Page 57 THIS ENDORSEMENT CHANGES THE POLICY.PLEASE READ IT CAREFULLY. BUSINESS AUTO EXTENSION ENDORSEMENT COVERAGEINDEX Description Page TEMPORARY SUBSTITUTE AUTO PHYSICAL DAMAGE 1 BROAD FORM INSURED 2 EMPLOYEES AS INSUREDS 2 ADDITIONAL INSURED BY CONTRACT,AGREEMENT OR PERMIT 2 SUPPLEMENTARY PAYMENTS 2 AMENDED FELLOW EMPLOYEE EXCLUSION 3 HIRED AUTO PHYSICAL DAMAGE 3 TOWING AND LABOR 3 PHYSICAL DAMAGE-ADDITIONAL TRANSPORTATION EXPENSE COVERAGE 3 RENTAL REIMBURSEMENT 4 EXTRA EXPENSE-BROADENED COVERAGE 4 PERSONAL EFFECTS COVERAGE 4 AIRBAG COVERAGE 4 LEASE GAP 4 GLASS REPAIR-WAIVER OF DEDUCTIBLE 5 DRIVE OTHER CAR FOR EXECUTIVE OFFICERS 6 UNINTENTIONAL FAILURE TO DISCLOSE HAZARDS 7 AMENDED DUTIES IN THE EVENT OF ACCIDENT, CLAIM, SUIT,OR LOSS 7 BODILY INJURY REDEFINED 7 EXTENDED CANCELLATION CONDITION 7 The following modifies insurance under the: BUSINESS AUTO COVERAGE FORM 1. TEMPORARY SUBSTITUTE AUTO PHYSICAL DAMAGE SECTION I-COVERED AUTOS, paragraph C. is changed by adding the following: If Physical Damage Coverage is provided under the Business Auto Coverage Form for an"auto"you own,the Physical Damage coverages provided for that owned"auto"are extended to any"auto"you do not own while used with the permission of its owner as a temporary substitute for the covered "auto"you own that is out of service because of its breakdown, repair,servicing,"loss",or destruction. Includes copyrighted material of insurance Services Office, Inc.with its permission. Copyright, Insurance Services Office,Inc., 1997 16-59f(05104) Page 1 of 7 2. BROAD FORM INSURED SECTION II -LIABILITY COVERAGE-WHO IS AN INSURED is amended to include as an insured: 1. Any legally Incorporated entity of which you own more than 50 percent of the voting stock during = the period for which this endorsement is effective, if there is no similar insurance available to that organization. However, the Named Insured does not include any organization: a. that is a partnership or joint venture,or b. that is an insured under any other policy,or has exhausted its Limit of Insurance under any other policy. 2. Paragraph 1. b.above does not apply to a policy written to apply specifically in excess of this policy. 3. Coverage for newly acquired or formed organizations is afforded only for 180 days from the date of acquisition or formation. 4. Coverage does not apply to"bodily injury"or"property damage"that results from an"accident" that occurred before you formed or acquired that organization. 3. EMPLOYEES AS INSUREDS SECTION II -LIABILITY COVERAGE-WHO 1S AN INSURED is amended to include as an insured: Any employee of yours while using a covered"auto"you do not own, hire or borrow in your business or your personal affairs. 4. ADDITIONAL INSURED BY CONTRACT,AGREEMENT OR PERMIT SECTION 11-LIABILITY COVERAGE-WHO IS AN INSURED is amended to include as an insured any person or organization with whom you have agreed in writing in a contract, agreement or permit, to provide insurance such as is afforded under this policy. This provision 4.does not apply unless the written contract or agreement has been executed, or permit has been issued, prior to the"bodily injury"or"property damage." 5. SUPPLEMENTARY PAYMENTS SECTION II -LIABILITY COVERAGE, 2.a. Supplementary Payments, items(2)and(4)are replaced by the following: (2) Up to$2500 for cost of bail bonds(including bonds for related traffic violations) required because of an"accident"we cover.We do not have to furnish these bonds. (4) All reasonable expenses incurred by the insured at our request, including actual loss of earnings up to$300 a day because of time off from work. 6. AMENDED FELLOW EMPLOYEE EXCLUSION Includes copyrighted material of Insurance Services Office,Inc.with its permission. Copyright,Insurance Services Office, Inc., 1997 16-59f(05/04) Page 2 of 7 Forming a part of Policy Number: BA 8128157 Coverage Is Provides!In THE NETHERLANDS INSURANCE COMPANY-A STOCK COMPANY Named Insured: Agent: NORTHSTAR CONSTRUCTION INC INDEPENDENT INSURANCE GROUP I i REFER TO NAMED INSURED SCHEDULE Agent Code: 3222948 Agent Phone: (972)-231-8277 THIS ENDORSEMENT CHANGES YOUR POLICY. PLEASE READ IT CAREFULLY. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US The endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM GARAGE COVERAGE FORM The Transfer Of Rights of Recovery Against Others To Us Condition does not apply to the person(s), or organization(s) shown in the Schedule, but only to the extent that subrogation Is waived prior to the "accident'or the'loss"under a contract with that person or organization. SCHEDULE Name(s)of Person(s)or Organization(s): BLANKET AS REQUIRED BY WRITTEN CONTRACT (If no name appears above, the information required to complete this endorsement will be shown in the Declarations as applicable to this endorsement). 16-87(11/09) INSURED COPY 12(31/2011 8128157 NTCODMMD512 PGDMO60D J03410 ACAOPPN 00006783 Page 37 Forming a part of Policy Number: BA 8128157 Coverage Is Provided In THE NETHERLANDS INSURANCE COMPANY-A STOCK COMPANY Named Insured: Agent: NORTHSTAR CONSTRUCTION LLC INDEPENDENT INSURANCE GROUP Agent Code: Agent Phone: THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. TEXAS CANCELLATION PROVISION OR COVERAGE CHANGE ENDORSEMENT This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM GARAGE COVERAGE FORM MOTOR CARRIER COVERAGE FORM TRUCKERS COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by the endorsement. This endorsement changes the policy effective on the inception date of the policy unless another date is indicated below. Endorsement Effective: Countersigned By: Named Insured: (Authorized Representative) SCHEDULE Number of Days'Notice 30 Name Of Person Or Organization SEE 17-59CA Address SEE 17-59CA Number of Days'Notice 30 Name Of Person Or Organization BLANKET PER AGENTS APPLICATION Address 3010 LYNDON B JOHNSON FWY DALLAS TX 75234 If this policy is canceled or materially changed to reduce or restrict coverage, we will mail notice of cancellation or change to the person or organization named in the Schedule. We will give the number of day's notice indicated in the Schedule. ©ISO Properties, Inc.,2003 16130 (01/11) INSURED COPY 12/31/2013 8128157 NN174056 1405 PGDM060D J19518 ACAFPPN 00004222 Page 7 ® WORKERS' COMPENSATION AND EMPLOYERS Texasmutua LIABILITY INSURANCE POLICY Insurance Company WC 42 03 04 A TEXAS WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT This endorsement applies only to the insurance provided by the policy because Texas is shown in Item 3.A. of the Information Page. We have the right to recover our payments from anyone liable for an injury covered by this policy.We will not enforce our right against the person or organization named in the Schedule, but this waiver applies only with respect to bodily injury arising out of the operations described in the Schedule where you are required by a written contract to obtain this waiver from us. This endorsement shall not operate directly or indirectly to benefit anyone not named in the Schedule. The premium for this endorsement is shown in the Schedule. Schedule 1. ( ) Specific Waiver Name of person or organization ( X ) Blanket Waiver Any person or organization for whom the Named Insured has agreed by written contract to furnish this waiver. 2. Operations: ALL TEXAS OPERATIONS 3. Premium The premium charge for this endorsement shall be 2.00 percent of the premium developed on payroll in connection with work performed for the above person(s) or organization(s) arising out of the operations described. 4. Advance Premium INCLUDED, SEE INFORMATION PAGE, This endorsement changes the policy to which it is attached effective on the inception date of the policy unless a different date is indicated below. (The following"attaching clause"need be completed only when this endorsement is issued subsequent to preparation of the policy.) This endorsement,effective on at 12:01 A.M.standard time,forms a part of Policy No. TSF-0001231613 20131231 of the Texas Mutual Insurance Company Issued to NORTHSTAR CONSTRUCTION LLC Endorsement No. Premium$ /"WS-6� l Authorized Representative WC420304A(ED.1-01-2000) AGENT'S COPY OUSER 12-23-2013 jo-V X M UtUar WORKERS' COMPENSATION AND EMPLOYERS LIABILITY INSURANCE POLICY 0 TEXAS NOTICE {]F MATERIAL CHANGE ENDORSEMENT This endorsement applies only to the insurance provided by the policy because Texas is shown in |h:m 1& of the Information Page. ' in the event of nanoaUehnn or other motoho| change of the pnUcy, we will mail advance notice to the person or � organization named in the Schedule, The number of days advance notice is shown in the Schedule. This endorsement shall not operate directly or indirectly to benefit anyone not named in the Schedule, 0 Schedule � 1. Number of days advance notice: 30 � 2. Notice will be mailed to: PER LIST ON FILE This endorsement changes the policy m which nmattached effective on the inception date of the policy unless a different date is indicated below, (The following"attaching clause"need be completed only when this endorsement is issued subsequent to preparation of the policy,) This endorsement,effective vo May 12 , 2014 wt12:01AM.standard time,forms a part or Policy No. TGF-0001231613 20131231 of the Texas K4utvu| Insurance Company Issued to NORTHSTAR CONSTRUCTION LLC Endorsement No. 2 K Pmmium$ 0.00 '^ _-- _ AuthohzedRapesontaUvm � vvo420601(ED.1-94) (NSURED'Q COPY WASENDRS 5-12-2014 STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l.2012 This page is intentionally blank. STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT TABLE OF CONTENTS Page Article 1 —Definitions and Terminology..........................................................................................................l 1.01 Defined Terms...............................................................................................................................l 1.02 Terminology..................................................................................................................................6 Article2—Preliminary Matters.........................................................................................................................7 2.01 Copies of Documents....................................................................................................................7 2.02 Commencement of Contract Time;Notice to Proceed................................................................7 2.03 Starting the Work..........................................................................................................................8 2.04 Before Starting Construction........................................................................................................8 2.05 Preconstruction Conference..........................................................................................................8 2.06 Public Meeting..............................................................................................................................8 2.07 Initial Acceptance of Schedules....................................................................................................8 Article 3—Contract Documents: Intent, Amending, Reuse............................................................................8 3.01 Intent..............................................................................................................................................8 3.02 Reference Standards......................................................................................................................9 3.03 Reporting and Resolving Discrepancies.......................................................................................9 3.04 Amending and Supplementing Contract Documents.................................................................10 3.05 Reuse of Documents...................................................................................................................10 3.06 Electronic Data............................................................................................................................l l Article 4—Availability of Lands; Subsurface and Physical Conditions;Hazardous Environmental Conditions; Reference Points...........................................................................................................11 4.01 Availability of Lands ..................................................................................................................11 4.02 Subsurface and Physical Conditions ..........................................................................................12 4.03 Differing Subsurface or Physical Conditions.............................................................................12 4.04 Underground Facilities ...............................................................................................................13 4.05 Reference Points .........................................................................................................................14 4.06 Hazardous Environmental Condition at Site..............................................................................14 Article 5—Bonds and Insurance.....................................................................................................................16 5.01 Licensed Sureties and Insurers...................................................................................................16 5.02 Performance, Payment, and Maintenance Bonds.......................................................................16 5.03 Certificates of Insurance.............................................................................................................16 5.04 Contractor's Insurance................................................................................................................18 5.05 Acceptance of Bonds and Insurance; Option to Replace...........................................................19 Article 6—Contractor's Responsibilities........................................................................................................19 6.01 Supervision and Superintendence............................................................................................... 19 CITY OF FORT WORTTT STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision-December2l,2012 6.02 Labor; Working Hours................................................................................................................20 6.03 Services, Materials, and Equipment...........................................................................................20 6.04 Project Schedule..........................................................................................................................21 6.05 Substitutes and "Or-Equals".......................................................................................................21 6.06 Concerning Subcontractors, Suppliers, and Others....................................................................24 6.07 Wage Rates..................................................................................................................................25 6.08 Patent Fees and Royalties...........................................................................................................26 6.09 Permits and Utilities....................................................................................................................27 6.10 Laws and Regulations.................................................................................................................27 6.11 Taxes ...........................................................................................................................................28 6.12 Use of Site and Other Areas .......................................................................................................28 6.13 Record Documents......................................................................................................................29 6.14 Safety and Protection..................................................................................................................29 6.15 Safety Representative..................................................................................................................30 6.16 Hazard Communication Programs .............................................................................................30 6.17 Emergencies and/or Rectification...............................................................................................30 6.18 Submittals....................................................................................................................................31 6.19 Continuing the Work...................................................................................................................32 6.20 Contractor's General Warranty and Guarantee..........................................................................32 6.21 Indemnification.........................................................................................................................33 6.22 Delegation of Professional Design Services ..............................................................................34 6.23 Right to Audit..............................................................................................................................34 6.24 Nondiscrimination.......................................................................................................................35 Article7-Other Work at the Site...................................................................................................................35 7.01 Related Work at Site...................................................................................................................35 7.02 Coordination................................................................................................................................36 Article 8-City's Responsibilities...................................................................................................................36 8.01 Communications to Contractor...................................................................................................36 8.02 Furnish Data................................................................................................................................36 8.03 Pay When Due ............................................................................................................................36 8.04 Lands and Easements; Reports and Tests...................................................................................36 8.05 Change Orders.............................................................................................................................36 8.06 Inspections, Tests, and Approvals..............................................................................................36 8.07 Limitations on City's Responsibilities.......................................................................................37 8.08 Undisclosed Hazardous Environmental Condition....................................................................37 8.09 Compliance with Safety Program...............................................................................................37 Article 9-City's Observation Status During Construction...........................................................................37 9.01 City's Project Representative .....................................................................................................37 9.02 Visits to Site................................................................................................................................37 9.03 Authorized Variations in Work..................................................................................................38 9.04 Rejecting Defective Work..........................................................................................................38 9.05 Determinations for Work Performed..........................................................................................38 9.06 Decisions on Requirements of Contract Documents and Acceptability of Work.....................38 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 Article 10-Changes in the Work; Claims;Extra Work................................................................................38 10.01 Authorized Changes in the Work...............................................................................................38 10.02 Unauthorized Changes in the Work...........................................................................................39 10.03 Execution of Change Orders.......................................................................................................39 10.04 Extra Work..................................................................................................................................39 10.05 Notification to Surety..................................................................................................................39 10.06 Contract Claims Process.............................................................................................................40 Article 11 -Cost of the Work; Allowances; Unit Price Work; Plans Quantity Measurement......................41 11.01 Cost of the Work.........................................................................................................................41 11.02 Allowances..................................................................................................................................43 11.03 Unit Price Work..........................................................................................................................44 11.04 Plans Quantity Measurement......................................................................................................45 Article 12-Change of Contract Price; Change of Contract Time.................................................................46 12.01 Change of Contract Price............................................................................................................46 12.02 Change of Contract Time............................................................................................................47 12.03 Delays..........................................................................................................................................47 Article 13 -Tests and Inspections; Correction,Removal or Acceptance of Defective Work......................48 13.01 Notice of Defects ........................................................................................................................48 13.02 Access to Work...........................................................................................................................48 13.03 Tests and Inspections..................................................................................................................48 13.04 Uncovering Work........................................................................................................................49 13.05 City May Stop the Work.............................................................................................................49 13.06 Correction or Removal of Defective Work................................................................................50 13.07 Correction Period........................................................................................................................50 13.08 Acceptance of Defective Work...................................................................................................51 13.09 City May Correct Defective Work.............................................................................................51 Article 14-Payments to Contractor and Completion....................................................................................52 14.01 Schedule of Values......................................................................................................................52 14.02 Progress Payments......................................................................................................................52 14.03 Contractor's Warranty of Title...................................................................................................54 14.04 Partial Utilization........................................................................................................................55 14.05 Final Inspection...........................................................................................................................55 14.06 Final Acceptance.........................................................................................................................55 14.07 Final Payment..............................................................................................................................56 14.08 Final Completion Delayed and Partial Retainage Release ........................................................56 14.09 Waiver of Claims........................................................................................................................57 Article 15-Suspension of Work and Termination........................................................................................57 15.01 City May Suspend Work......................................... 15.02 City May Terminate for Cause...................................................................................................58 15.03 City May Terminate For Convenience.......................................................................................60 Article 16-Dispute Resolution......................................................................................................................61 16.01 Methods and Procedures.............................................................................................................61 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l.2012 Article17—Miscellaneous..............................................................................................................................62 17.01 Giving Notice..............................................................................................................................62 17.02 Computation of Times................................................................................................................62 17.03 Cumulative Remedies.................................................................................................................62 17.04 Survival of Obligations...............................................................................................................63 17.05 Headings......................................................................................................................................63 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December 21.2012 00 72 00-1 General Conditions Page 1 of 63 ARTICLE 1 –DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed-defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Addenda—Written or graphic instruments issued prior to the opening of Bids which clarify, correct, or change the Bidding Requirements or the proposed Contract Documents. 2. Agreement—The written instrument which is evidence of the agreement between City and Contractor covering the Work. 3. Application for Payment—The form acceptable to City which is to be used by Contractor during the course of the Work in requesting progress or final payments and which is to be accompanied by such supporting documentation as is required by the Contract Documents. 4. Asbestos—Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 5. Aivard–Authorization by the City Council for the City to enter into an Agreement. 6. Bid—The offer or proposal of a Bidder submitted on the prescribed form setting forth the prices for the Work to be performed. 7. Bidder—The individual or entity who submits a Bid directly to City. 8. Bidding Documents—The Bidding Requirements and the proposed Contract Documents (including all Addenda). 9. Bidding Requirements—The advertisement or Invitation to Bid, Instructions to Bidders, Bid security of acceptable form, if any, and the Bid Form with any supplements. 10. Business Day – A business day is defined as a day that the City conducts normal business, generally Monday through Friday,except for federal or state holidays observed by the City. 11. Buzzsmv–City's on-line, electronic document management and collaboration system. 12. Calendar Day–A day consisting of 24 hours measured from midnight to the next midnight. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 2 of 63 13. Change Order—A document, which is prepared and approved by the City, which is signed by Contractor and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 14. City— The City of Fort Worth, Texas, a home-rule municipal corporation, authorized and chartered under the Texas State Statutes, acting by its governing body through its City Manager, his designee, or agents authorized under his behalf, each of which is required by Charter to perform specific duties with responsibility for final enforcement of the contracts involving the City of Fort Worth is by Charter vested in the City Manager and is the entity with whom Contractor has entered into the Agreement and for whom the Work is to be performed. 15. City Attorney– The officially appointed City Attorney of the City of Fort Worth, Texas, or his duly authorized representative. 16. City Council - The duly elected and qualified governing body of the City of Fort Worth, Texas. 17. City Manager – The officially appointed and authorized City Manager of the City of Fort Worth, Texas, or his duly authorized representative. 18. Contract Claim—A demand or assertion by City or Contractor seeking an adjustment of Contract Price or Contract Time, or both, or other relief with respect to the terms of the Contract.A demand for money or services by a third party is not a Contract Claim. 19. Contract—The entire and integrated written document between the City and Contractor concerning the Work. The Contract contains the Agreement and all Contract Documents and supersedes prior negotiations, representations, or agreements, whether written or oral. 20. Contract Documents—Those items so designated in the Agreement. All items listed in the Agreement are Contract Documents. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 21. Contract Price—The moneys payable by City to Contractor for completion of the Work in accordance with the Contract Documents as stated in the Agreement (subject to the provisions of Paragraph 11.03 in the case of Unit Price Work). 22. Contract Time—The number of days or the dates stated in the Agreement to: (i) achieve Milestones, if any and (ii)complete the Work so that it is ready for Final Acceptance. 23. Contractor—The individual or entity with whom City has entered into the Agreement. 24. Cost of the Work—See Paragraph 11.01 of these General Conditions for definition. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Decerober2L 2012 007200-1 General Conditions Page 3 of 63 25. Damage Claims – A demand for money or services arising from the Project or Site from a third party, City or Contractor exclusive of a Contract Claim. 26. Day or day–A day, unless otherwise defined, shall mean a Calendar Day. 27. Director of Aviation – The officially appointed Director of the Aviation Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 28. Director of Parks and Community Services– The officially appointed Director of the Parks and Community Services Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 29. Director of Planning and Development– The officially appointed Director of the Planning and Development Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 30. Director of Transportation Public Works – The officially appointed Director of the Transportation Public Works Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 31. Director of Water Department– The officially appointed Director of the Water Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 32. Drawings—That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 33. Effective Date of the Agreement—The date indicated in the Agreement on which it becomes effective, but if no such date is indicated, it means the date on which the Agreement is signed and delivered by the last of the two parties to sign and deliver. 34. Engineer—The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the City. 35. Extra Work – Additional work made necessary by changes or alterations of the Contract Documents or of quantities or for other reasons for which no prices are provided in the Contract Documents. Extra work shall be part of the Work. 36. Field Order—A written order issued by City which requires changes in the Work but which does not involve a change in the Contract Price, Contract Time, or the intent of the Engineer. Field Orders are paid from Field Order Allowances incorporated into the Contract by funded work type at the time of award. 37. Final Acceptance – The written notice given by the City to the Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 4 of 63 38. Final Inspection – Inspection carried out by the City to verify that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 39. General Requirements—Sections of Division 1 of the Contract Documents. 40. Hazardous Environmental Condition—The presence at the Site of Asbestos, PCBs, Petroleum, Hazardous Waste, Radioactive Material, or other materials in such quantities or circumstances that may present a substantial danger to persons or property exposed thereto. 41. Hazardous Waste—Hazardous waste is defined as any solid waste listed as hazardous or possesses one or more hazardous characteristics as defined in the federal waste regulations, as amended from time to time. 42. Laws and Regulations Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 43. Liens—Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 44. Major Item–An Item of work included in the Contract Documents that has a total cost equal to or greater than 5%of the original Contract Price or$25,000 whichever is less. 45. Milestone—A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 46. Notice of Award—The written notice by City to the Successful Bidder stating that upon timely compliance by the Successful Bidder with the conditions precedent listed therein, City will sign and deliver the Agreement. 47. Notice to Proceed—A written notice given by City to Contractor fixing the date on which the Contract Time will commence to run and on which Contractor shall start to perform the Work specified in Contract Documents. 48. PCBs—Polychlorinated biphenyls. 49. Petroleum—Petroleum, including crude oil or any fraction thereof which is liquid at standard conditions of temperature and pressure (60 degrees Fahrenheit and 14.7 pounds per square inch absolute), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline, kerosene, and oil mixed with other non-Hazardous Waste and crude oils. 50. Plans–See definition of Drawings. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 00 72 00-1 General Conditions Page 5 of 63 51. Project Schedule—A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Time. 52. Project—The Work to be performed under the Contract Documents. 53. Project Representative—The authorized representative of the City who will be assigned to the Site. 54. Public Meeting — An announced meeting conducted by the City to facilitate public participation and to assist the public in gaining an informed view of the Project. 55. Radioactive Material—Source, special nuclear, or byproduct material as defined by the Atomic Energy Act of 1954(42 USC Section 2011 et seq.) as amended from time to time. 56. Regular Working Hours — Hours beginning at 7:00 a.m. and ending at 6:00 p.m., Monday thru Friday(excluding legal holidays). 57. Samples—Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. 58. Schedule of Submittals—A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 59. Schedule of Values—A schedule, prepared and maintained by Contractor, allocating portions of the Contract Price to various portions of the Work and used as the basis for reviewing Contractor's Applications for Payment. 60. Site—Lands or areas indicated in the Contract Documents as being furnished by City upon which the Work is to be performed, including rights-of-way, permits, and easements for access thereto, and such other lands furnished by City which are designated for the use of Contractor. 61. Specifications—That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made a part of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 62. Subcontractor—An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of a part of the Work at the Site. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 6 of63 63. Submittals--All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 64. Successful Bidder—The Bidder submitting the lowest and most responsive Bid to whom City makes an Award. 65. Superintendent– The representative of the Contractor who is available at all times and able to receive instructions from the City and to act for the Contractor. 66. Supplementary Conditions—That part of the Contract Documents which amends or supplements these General Conditions. 67. Supplier—A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. 68. Underground Facilities—All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals,or traffic or other control systems. 69. Unit Price Work—See Paragraph 11.03 of these General Conditions for definition. 70. Weekend Working Hours–Hours beginning at 9:00 a.m. and ending at 5:00 p.m., Saturday, Sunday or legal holiday, as approved in advance by the City. 71. Work—The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction including any Change Order or Field Order, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 72. Working Day–A working day is defined as a day, not including Saturdays, Sundays, or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p.m. 1.02 Terminology A. The words and terms discussed in Paragraph 1.023 through E are not defined but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. Intent of Certain Terms or Adjectives: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 7 of 63 1. The Contract Documents include the terms "as allowed," "as approved," "as ordered," "as directed" or teens of like effect or import to authorize an exercise of judgment by City. In addition, the adjectives "reasonable," "suitable," "acceptable," "proper," "satisfactory," or adjectives of like effect or import are used to describe an action or determination of City as to the Work. It is intended that such exercise of professional judgment, action, or determination will be solely to evaluate, in general, the Work for compliance with the information in the Contract Documents and with the design concept of the Project as a functioning whole as shown or indicated in the Contract Documents (unless there is a specific statement indicating otherwise). C. Defective: 1. The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory, faulty, or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been damaged prior to City's written acceptance. D. Furnish, Install, Perform, Provide: 1. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. E. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. ARTICLE 2—PRELIMINARY MATTERS 2.01 Copies of Documents City shall furnish to Contractor one (1) original executed copy and one (1) electronic copy of the Contract Documents, and four (4) additional copies of the Drawings. Additional copies will be furnished upon request at the cost of reproduction. 2.02 Commencement of Contract Time;Notice to Proceed The Contract Time will commence to run on the day indicated in the Notice to Proceed. A Notice to Proceed may be given at any time within 14 days after the Effective Date of the Agreement. CPFY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 3 of 63 2.03 Starting the Work Contractor shall start to perform the Work on the date when the Contract Time commences to run. No Work shall be done at the Site prior to the date on which the Contract Time commences to run. 2.04 Before Starting Construction Baseline Schedules: Submit in accordance with the Contract Documents, and prior to starting the Work. 2.05 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.06 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. 2.07 Initial Acceptance of Schedules No progress payment shall be made to Contractor until acceptable schedules are submitted to City in accordance with the Schedule Specification as provided in the Contract Documents. ARTICLE 3—CONTRACT DOCUMENTS: INTENT,AMENDING,REUSE 3.01 Intent A. The Contract Documents are complementary; what is required by one is as binding as if required by all. B. It is the intent of the Contract Documents to describe a functionally complete project (or part thereof) to be constructed in accordance with the Contract Documents. Any labor, documentation, services, materials, or equipment that reasonably may be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the indicated result will be provided whether or not specifically called for, at no additional cost to City. C. Clarifications and interpretations of the Contract Documents shall be issued by City. D. The Specifications may vary in form, format and style. Some Specification sections may be written in varying degrees of streamlined or declarative style and some sections may be relatively narrative by comparison. Omission of such words and phrases as "the Contractor shall," "in conformity with," "as shown," or "as specified" are intentional in streamlined sections. Omitted words and phrases shall be supplied by inference. Similar types of provisions may appear in various parts of a section or articles within a part depending on the format of the CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l_2012 00 72 00-1 General Conditions Page 9 of 63 section. The Contractor shall not take advantage of any variation of form, format or style in making Contract Claims. E. The cross referencing of specification sections under the subparagraph heading "Related Sections include but are not necessarily limited to:" and elsewhere within each Specification section is provided as an aid and convenience to the Contractor. The Contractor shall not rely on the cross referencing provided and shall be responsible to coordinate the entire Work under the Contract Documents and provide a complete Project whether or not the cross referencing is provided in each section or whether or not the cross referencing is complete. 3.02 Reference Standards A. Standards, Specifications, Codes,Laws, and Regulations 1. Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision of any such standard, specification, manual, or code, or any instruction of a Supplier, shall be effective to change the duties or responsibilities of City, Contractor, or any of their subcontractors, consultants, agents, or employees, from those set forth in the Contract Documents. No such provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.03 Reporting and Resolving Discrepancies A. Reporting Discrepancies: 1. Contractor's Review of Contract Documents Before Starting Work: Before undertaking each part of the Work, Contractor shall carefully study and compare the Contract Documents and check and verify pertinent figures therein against all applicable field measurements and conditions. Contractor shall promptly report in writing to City any conflict, error, ambiguity, or discrepancy which Contractor discovers, or has actual knowledge of, and shall obtain a written interpretation or clarification from City before proceeding with any Work affected thereby. 2. Contractor's Review of Contract Documents During Performance of Work: If, during the performance of the Work, Contractor discovers any conflict, error, ambiguity, or discrepancy within the Contract Documents, or between the Contract Documents and (a) any applicable Law or Regulation , (b) any standard, specification, manual, or code, or (c) any instruction of any Supplier, then Contractor shall promptly report it to City in writing. Contractor shall not proceed with the Work affected thereby (except in an emergency as required by Paragraph CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 10 of63 6.17.A) until an amendment or supplement to the Contract Documents has been issued by one of the methods indicated in Paragraph 3.04. 3. Contractor shall not be liable to City for failure to report any conflict, error, ambiguity, or discrepancy in the Contract Documents unless Contractor had actual knowledge thereof. B. Resolving Discrepancies: 1. Except as may be otherwise specifically stated in the Contract Documents, the provisions of the Contract Documents shall take precedence in resolving any conflict, error, ambiguity, or discrepancy between the provisions of the Contract Documents and the provisions of any standard, specification, manual, or the instruction of any Supplier(whether or not specifically incorporated by reference in the Contract Documents). 2. In case of discrepancies, figured dimensions shall govern over scaled dimensions, Plans shall govern over Specifications, Supplementary Conditions shall govern over General Conditions and Specifications, and quantities shown on the Plans shall govern over those shown in the proposal. 3.04 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Change Order. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized, by one or more of the following ways: 1. A Field Order; 2. City's review of a Submittal (subject to the provisions of Paragraph 6.18.C); or 3. City's written interpretation or clarification. 3.05 Reuse of Documents A. Contractor and any Subcontractor or Supplier shall not: 1. have or acquire any title to or ownership rights in any of the Drawings, Specifications, or other documents (or copies of any thereof) prepared by or bearing the seal of Engineer, including electronic media editions; or 2. reuse any such Drawings, Specifications, other documents, or copies thereof on extensions of the Project or any other project without written consent of City and specific written verification or adaptation by Engineer. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 00 72 00-1 General Conditions Page I I of 63 B. The prohibitions of this Paragraph 3.05 will survive final payment, or termination of the Contract. Nothing herein shall preclude Contractor from retaining copies of the Contract Documents for record purposes. 3.06 Electronic Data A. Unless otherwise stated in the Supplementary Conditions, the data furnished by City or Engineer to Contractor, or by Contractor to City or Engineer, that may be relied upon are limited to the printed copies included in the Contract Documents (also known as hard copies) and other Specifications referenced and located on the City's Buzzsaw site. Files in electronic media format of text, data, graphics, or other types are furnished only for the convenience of the receiving party. Any conclusion or information obtained or derived from such electronic files will be at the user's sole risk. If there is a discrepancy between the electronic files and the hard copies,the hard copies govern. B. When transferring documents in electronic media format, the transferring party makes no representations as to long term compatibility, usability, or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by the data's creator. ARTICLE 4—AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; HAZARDOUS ENVIRONMENTAL CONDITIONS; REFERENCE POINTS 4.01 Availability of Lands A. City shall furnish the Site. City shall notify Contractor of any encumbrances or restrictions not of general application but specifically related to use of the Site with which Contractor must comply in performing the Work. City will obtain in a timely manner and pay for easements for permanent structures or permanent changes in existing facilities. 1. The City has obtained or anticipates acquisition of and/or access to right-of-way, and/or easements. Any outstanding right-of-way and/or easements are anticipated to be acquired in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding right-of-way, and/or easements. 2. The City has or anticipates removing and/or relocating utilities, and obstructions to the Site. Any outstanding removal or relocation of utilities or obstructions is anticipated in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding utilities or obstructions to be removed, adjusted, and/or relocated by others. B. Upon reasonable written request, City shall furnish Contractor with a current statement of record legal title and legal description of the lands upon which the Work is to be performed. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l.2012 00 72 00-1 General Conditions Page 12 of63 C. Contractor shall provide for all additional lands and access thereto that may be required for construction facilities or storage of materials and equipment. 4.02 Subsurface and Physical Conditions A. Reports and Drawings: The Supplementary Conditions identify: 1. those reports known to City of explorations and tests of subsurface conditions at or contiguous to the Site; and 2. those drawings known to City of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities). B. Limited Reliance by Contractor on Technical Data Authorized: Contractor may rely upon the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Contractor may not make any Contract Claim against City, or any of their officers, directors, members, partners, employees, agents, consultants, or subcontractors with respect to: 1. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions, and information contained in such reports or shown or indicated in such drawings; or 3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such other data, interpretations, opinions, or information. 4.03 Differing Subsurface or Physical Conditions A. Notice: If Contractor believes that any subsurface or physical condition that is uncovered or revealed either: 1. is of such a nature as to establish that any"technical data" on which Contractor is entitled to rely as provided in Paragraph 4.02 is materially inaccurate;or 2. is of such a nature as to require a change in the Contract Documents; or 3. differs materially from that shown or indicated in the Contract Documents; or 4. is of an unusual nature, and differs materially from conditions ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents; CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 00 72 00-1 General Conditions Page 13 of 63 then Contractor shall, promptly after becoming aware thereof and before further disturbing the subsurface or physical conditions or performing any Work in connection therewith (except in an emergency as required by Paragraph 6.17.A), notify City in writing about such condition. B. Possible Price and Time Adjustments Contractor shall not be entitled to any adjustment in the Contract Price or Contract Time if: 1. Contractor knew of the existence of such conditions at the time Contractor made a final commitment to City with respect to Contract Price and Contract Time by the submission of a Bid or becoming bound under a negotiated contract; or 2. the existence of such condition could reasonably have been discovered or revealed as a result of the examination of the Contract Documents or the Site; or 3. Contractor failed to give the written notice as required by Paragraph 4.03.A. 4.04 Underground Facilities A. Shown or Indicated: The information and data shown or indicated in the Contract Documents with respect to existing Underground Facilities at or contiguous to the Site is based on information and data furnished to City or Engineer by the owners of such Underground Facilities, including City, or by others. Unless it is otherwise expressly provided in the Supplementary Conditions: 1. City and Engineer shall not be responsible for the accuracy or completeness of any such information or data provided by others; and 2. the cost of all of the following will be included in the Contract Price, and Contractor shall have full responsibility for: a. reviewing and checking all such information and data; b. locating all Underground Facilities shown or indicated in the Contract Documents; c. coordination and adjustment of the Work with the owners of such Underground Facilities, including City, during construction; and d. the safety and protection of all such Underground Facilities and repairing any damage thereto resulting from the Work. B. Not Shown or Indicated: 1. If an Underground Facility which conflicts with the Work is uncovered or revealed at or contiguous to the Site which was not shown or indicated, or not shown or indicated with reasonable accuracy in the Contract Documents, Contractor shall, promptly after becoming aware thereof and before further disturbing conditions affected thereby or performing any CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December21,2012 007200-1 General Conditions Page 14 of 63 Work in connection therewith (except in an emergency as required by Paragraph 6.17.A), identify the owner of such Underground Facility and give notice to that owner and to City. City will review the discovered Underground Facility and determine the extent, if any, to which a change may be required in the Contract Documents to reflect and document the consequences of the existence or location of the Underground Facility. Contractor shall be responsible for the safety and protection of such discovered Underground Facility. 2. If City concludes that a change in the Contract Documents is required, a Change Order may be issued to reflect and document such consequences. 3. Verification of existing utilities, structures, and service lines shall include notification of all utility companies a minimum of 48 hours in advance of construction including exploratory excavation if necessary. 4.05 Reference Points A. City shall provide engineering surveys to establish reference points for construction, which in City's judgment are necessary to enable Contractor to proceed with the Work. City will provide construction stakes or other customary method of marking to establish line and grades for roadway and utility construction, centerlines and benchmarks for bridgework. Contractor shall protect and preserve the established reference points and property monuments, and shall make no changes or relocations. Contractor shall report to City whenever any reference point or property monument is lost or destroyed or requires relocation because of necessary changes in grades or locations. The City shall be responsible for the replacement or relocation of reference points or property monuments not carelessly or willfully destroyed by the Contractor. The Contractor shall notify City in advance and with sufficient time to avoid delays. B. Whenever, in the opinion of the City, any reference point or monument has been carelessly or willfully destroyed, disturbed, or removed by the Contractor or any of his employees, the full cost for replacing such points plus 25% will be charged against the Contractor, and the full amount will be deducted from payment due the Contractor. 4.06 Hazardous Environmental Condition at Site A. Reports and Drmvings: The Supplementary Conditions identify those reports and drawings known to City relating to Hazardous Environmental Conditions that have been identified at the Site. B. Limited Reliance by Contractor on Technical Data Authorized: Contractor may rely upon the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Contractor may not make any Contract Claim against City, or any of their officers, directors, members, partners, employees, agents, consultants, or subcontractors with respect to: 1. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences and procedures of CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December21.2012 00 72 00-1 General Conditions Page 15 of 63 construction to be employed by Contractor and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions and information contained in such reports or shown or indicated in such drawings; or 3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such other data, interpretations, opinions or information. C. Contractor shall not be responsible for any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work. Contractor shall be responsible for a Hazardous Environmental Condition created with any materials brought to the Site by Contractor, Subcontractors, Suppliers, or anyone else for whom Contractor is responsible. D. If Contractor encounters a Hazardous Environmental Condition or if Contractor or anyone for whom Contractor is responsible creates a Hazardous Environmental Condition, Contractor shall immediately: (i) secure or otherwise isolate such condition; (ii) stop all Work in connection with such condition and in any area affected thereby (except in an emergency as required by Paragraph 6.17.A); and (iii) notify City (and promptly thereafter confirm such notice in writing). City may consider the necessity to retain a qualified expert to evaluate such condition or take corrective action, if any. E. Contractor shall not be required to resume Work in connection with such condition or in any affected area until after City has obtained any required permits related thereto and delivered written notice to Contractor: (i) specifying that such condition and any affected area is or has been rendered suitable for the resumption of Work; or (ii) specifying any special conditions under which such Work may be resumed. F. If after receipt of such written notice Contractor does not agree to resume such Work based on a reasonable belief it is unsafe, or does not agree to resume such Work under such special conditions, then City may order the portion of the Work that is in the area affected by such condition to be deleted from the Work. City may have such deleted portion of the Work performed by City's own forces or others. G. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City,from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to a Hazardous Environmental Condition created by Contractor or by anyone for whom Contractor is responsible. Nothing in this Paragraph 4.06G shall obligate Contractor to indemnify any individual or entity from and against the consequences of that individual's or entity's own negligence. H. The provisions of Paragraphs 4.02, 4.03, and 4.04 do not apply to a Hazardous Environmental Condition uncovered or revealed at the Site. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2I.2012 007200-1 General Conditions Page 16 of 63 ARTICLE 5—BONDS AND INSURANCE 5.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from Surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverages so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided in the Supplementary Conditions. 5.02 Performance, Payment, and Maintenance Bonds A. Contractor shall furnish performance and payment bonds, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of"Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney-in-fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney-in-fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of Paragraph 5.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 5.01 and 5.02.C. 5.03 Certificates of Insurance Contractor shall deliver to City, with copies to each additional insured and loss payee identified in the Supplementary Conditions, certificates of insurance (and other evidence of insurance requested by City or any other additional insured) which Contractor is required to purchase and maintain. 1. The certificate of insurance shall document the City, and all identified entities named in the Supplementary Conditions as"Additional Insured" on all liability policies. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l_2012 00 72 00-1 General Conditions Page 17 of 63 2. The Contractor's general liability insurance shall include a, "per project" or "per location", endorsement, which shall be identified in the certificate of insurance provided to the City. 3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Property& Casualty Guide 4. The insurers for all policies must be licensed and/or approved to do business in the State of Texas. Except for workers' compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required,written approval of City is required. 5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in the Supplementary Conditions 6. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor's obligation to maintain such lines of insurance coverage. 7. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 8. Unless otherwise stated, all required insurance shall be written on the"occurrence basis". If coverage is underwritten on a claims-made basis,the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is claims-made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 9. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 10. Any self-insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l.2012 007200-1 General Conditions Page 13 of 63 lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups, must also be approved by City. 11. Any deductible in excess of$5,000.00, for any policy that does not provide coverage on a first-dollar basis, must be acceptable to and approved by the City. 12. City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage's and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 13. City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either party or the underwriter on any such policies. 14. City shall not be responsible for the direct payment of insurance premium costs for Contractor's insurance. 5.04 Contractor's Insurance A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers' Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers' compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. B. Commercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations, personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l_2012 007200-1 General Conditions Page 19 of 63 insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project (if identified in the Supplementary Conditions). C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto", defined as autos owned, hired and non-owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the requirements identified in the Supplementary Conditions. E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has been procured. There shall be no time credit for days not worked pursuant to this section. 5.05 Acceptance of Bonds and Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required by the Contract Documents, the City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 6—CONTRACTOR'S RESPONSIBILITIES 6.01 Supervision and Superintendence A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods,techniques, sequences, and procedures of construction. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l.2012 007200-1 General Conditions Page 20 of 63 B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor's representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent shall be binding on Contractor. C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of construction. 6.02 Labor; Working Hours A. Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City's written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication)to perform Work: 1. for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2. for Weekend Working Hours request must be made by noon of the preceding Thursday 3. for legal holidays request must be made by noon two Business Days prior to the legal holiday. 6.03 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, Contractor required testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l_2012 007200-1 General Conditions Page 21 of 63 C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. D. All items of standard equipment to be incorporated into the Work shall be the latest model at the time of bid, unless otherwise specified. 6.04 Project Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.07 and the General Requirements as it may be adjusted from time to time as provided below. 1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.07 and the General Requirements) proposed adjustments in the Project Schedule that will not result in changing the Contract Time. Such adjustments will comply with any provisions of the General Requirements applicable thereto. 2. Contractor shall submit to City a monthly Project Schedule with a monthly progress payment for the duration of the Contract in accordance with the schedule specification 01 32 16. 3. Proposed adjustments in the Project Schedule that will change the Contract Time shall be submitted in accordance with the requirements of Article 12. Adjustments in Contract Time may only be made by a Change Order. 6.05 Substitutes and "Or-Equals" A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or "or-equal" item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. 1. "Or-Equal"Items: If in City's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by City as an "or-equal" item, in which case review and approval of the proposed item may, in City's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 6.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if- a. the City determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 22 of 63 2) it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3) it has a proven record of performance and availability of responsive service; and b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time; and 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2. Substitute Items: a. If in City's sole discretion an item of material or equipment proposed by Contractor does not qualify as an "or-equal" item under Paragraph 6.05.A.1, it may be submitted as a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow City to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c. Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section 01 25 00 and: 1) shall certify that the proposed substitute item will: a) perform adequately the filnctions and achieve the results called for by the general design; b) be similar in substance to that specified; c) be suited to the same use as that specified; and 2) will state: a) the extent, if any, to which the use of the proposed substitute item will prejudice Contractor's achievement of final completion on time; b) whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with City for other work on the Project) to adapt the design to the proposed substitute item; CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l_2012 00 72 00-1 General Conditions Page 23 of 63 c) whether incorporation Or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3) will identify: a) all variations of the proposed substitute item from that specified; b) available engineering, sales, maintenance, repair, and replacement services; and 4) shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B. Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph 6.05.A.2. C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 6.05.A and 6.05.13. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. No "or-equal" or substitute will be ordered, installed or utilized until City's review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an "or-equal."City will advise Contractor in writing of its determination. D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall indemnify and hold harmless City and anyone directly or indirectly employed by them from and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 6.05.A.2 and 6.05.13. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City for the charges for making changes in the Contract Documents (or in the provisions of any other direct contract with City)resulting from the acceptance of each proposed substitute. F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or "or-equal"at Contractor's expense. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l_2012 007200-1 General Conditions Page 24 of63 G. City Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Change Order. H. Time Extensions:No additional time will be granted for substitutions. 6.06 Concerning Subcontractors, Suppliers, and Others A. Contractor shall perform with his own organization, work of a value not less than 35% of the value embraced on the Contract,unless otherwise approved by the City. B. Contractor shall not employ any Subcontractor, Supplier, or other individual or entity, whether initially or as a replacement, against whom City may have reasonable objection. Contractor shall not be required to employ any Subcontractor, Supplier, or other individual or entity to furnish or perform any of the Work against whom Contractor has reasonable objection (excluding those. acceptable to City as indicated in Paragraph 6.06.C). C. The City may from time to time require the use of certain Subcontractors, Suppliers, or other individuals or entities on the project, and will provide such requirements in the Supplementary Conditions. D. Business Diversity Enterprise Ordinance Compliance: It is City policy to ensure the full and equitable participation by Minority and Small Business Enterprises (MBE)(SBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for a MBE and/or SBE goal, Contractor is required to comply with the intent of the City's Business Diversity Ordinance (as amended) by the following: 1. Contractor shall, upon request by the City, provide complete and accurate information regarding actual work performed by a MBE and/or SBE on the Contract and payment therefor. 2. Contractor will not make additions, deletions, or substitutions of accepted MBE without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debarment in accordance with the procedures outlined in the Ordinance. 3. Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by an MBE and/or SBE. Material misrepresentation of any nature may be grounds for termination of the Contract in accordance with Paragraph 15.02.A. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. E. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or fiimishing any of the Work just as Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract Documents: CITY OF FORT WORT}l STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2I.2012 00 72 00-1 General Conditions Page 25 of 63 1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2. shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. F. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. G. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. H. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of the Contract Documents for the benefit of City. 6.07 Wage Rates A. Duty to pay Prevailing Wage Rates, The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. C. Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall make an initial determination, before the 31 st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City's determination that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 00 72 00-1 General Conditions Page 26 of 63 D. Arbitration Required if Violation Not Resolved An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial detennination pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 11th day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i)the name and occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (ii)the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F. Progress Payments. With each progress payment or payroll period, whichever is less, the Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code. G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. 6.08 Patent Fees and Royalties A. Contractor shall pay all license fees and royalties and assume all costs incident to the use in the performance of the Work or the incorporation in the Work of any invention, design, process, product, or device which is the subject of patent rights or copyrights held by others. If a particular invention, design, process, product, or device is specified in the Contract Documents for use in the performance of the Work and if, to the actual knowledge of City, its use is subject to patent rights or copyrights calling for the payment of any license fee or royalty to others, the existence of such rights shall be disclosed by City in the Contract Documents. Failure of the City to disclose such information does not relieve the Contractor from its obligations to pay for the use of said fees or royalties to others. B. To the fidlest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City,from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l_2012 00 72 00-1 General Conditions Page 27 of 63 the incorporation in the Work of any invention, design,process,product, or device not specified in the Contract Documents. 6.09 Permits and Utilities A. Contractor obtained permits and licenses. Contractor shall obtain and pay for all construction permits and licenses except those provided for in the Supplementary Conditions or Contract Documents. City shall assist Contractor, when necessary, in obtaining such permits and licenses. Contractor shall pay all governmental charges and inspection fees necessary for the prosecution of the Work which are applicable at the time of opening of Bids, or, if there are no Bids, on the Effective Date of the Agreement, except for permits provided by the City as specified in 6.09.13. City shall pay all charges of utility owners for connections for providing permanent service to the Work. B. City obtained permits and licenses. City will obtain and pay for all permits and licenses as provided for in the Supplementary Conditions or Contract Documents. It will be the Contractor's responsibility to carry out the provisions of the permit. If the Contractor initiates changes to the Contract and the City approves the changes, the Contractor is responsible for obtaining clearances and coordinating with the appropriate regulatory agency. The City will not reimburse the Contractor for any cost associated with these requirements of any City acquired permit. The following are permits the City will obtain if required: 1. Texas Department of Transportation Permits 2. U.S.Army Corps of Engineers Permits 3. Texas Commission on Environmental Quality Permits 4. Railroad Company Permits C. Outstanding permits and licenses. The City anticipates acquisition of and/or access to permits and licenses. Any outstanding permits and licenses are anticipated to be acquired in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding permits and licenses. 6.10 Laws and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's compliance with any Laws or Regulations. B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December21.2012 007200-1 General Conditions Page 28 of 63 court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor's responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's obligations under Paragraph 3.02. C. Changes in Laws or Regulations not known at the time of opening of Bids having an effect on the cost or time of performance of the Work may be the subject of an adjustment in Contract Price or Contract Time. 6.11 Taxes A. On a contract awarded by the City, an organization which qualifies for exemption pursuant to Texas Tax Code, Subchapter H, Sections 151.301-335 (as amended), the Contractor may purchase, rent or lease all materials, supplies and equipment used or consumed in the performance of this contract by issuing to his supplier an exemption certificate in lieu of the tax, said exemption certificate to comply with State Comptroller's Ruling .007. Any such exemption certificate issued to the Contractor in lieu of the tax shall be subject to and shall comply with the provision of State Comptroller's Ruling .011, and any other applicable rulings pertaining to the Texas Tax Code, Subchapter H. B. Texas Tax permits and information may be obtained from: 1. Comptroller of Public Accounts Sales Tax Division Capitol Station Austin,TX 78711; or 2. http://www.window.state.tx.us/taxinfo/taxfonns/93-forms.html 6.12 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas: 1. Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is commenced on any additional area of the Site. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 00 72 00-1 General Conditions Page 29 of 63 3. Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim. 4. Pursuant to Paragraph 6.21, Contractor shall indemnify and hold harmless City,from and against all claims, costs, losses, and damages arising out of or relating to any claim or action, legal or equitable, brought by any such oil ner or occupant against City. B. Removal of Debris During Performance of the Work: During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the City, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and the costs of such direct action, plus 25 % of such costs, shall be deducted from the monies due or to become due to the Contractor. D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent property owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all property disturbed by the Work. E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 6.13 Record Documents A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate locations for buried and imbedded items. 6.14 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l.2012 007200-1 General Conditions Page 30 of 63 take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who may be affected by the Work; 2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City's safety programs, if any. D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any, with which City's employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 6.14.A.2 or 6.14.A.3 caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and City has accepted the Work. 6.15 Safety Representative Contractor shall inform City in writing of Contractor's designated safety representative at the Site. 6.16 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 6.17 Emergencies and/or Rectification A. In emergencies affecting the safety or protection of persons or the Work or property at the Site or adjacent thereto, Contractor is obligated to act to prevent threatened damage, injury, or loss. Contractor shall give City prompt written notice if Contractor believes that any significant CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l.2012 007200-1 General Conditions Page 31 of 63 changes in the Work or variations from the Contract Documents have been caused thereby or are required as a result thereof. If City determines that a change in the Contract Documents is required because of the action taken by Contractor in response to such an emergency, a Change Order may be issued. B. Should the Contractor fail to respond to a request from the City to rectify any discrepancies, omissions, or correction necessary to conform with the requirements of the Contract Documents, the City shall give the Contractor written notice that such work or changes are to be performed. The written notice shall direct attention to the discrepant condition and request the Contractor to take remedial action to correct the condition. In the event the Contractor does not take positive steps to fulfill this written request, or does not show just cause for not taking the proper action, within 24 hours, the City may take such remedial action with City forces or by contract. The City shall deduct an amount equal to the entire costs for such remedial action, plus 25%, from any funds due or become due the Contractor on the Project. 6.18 Submittals A. Contractor shall submit required Submittals to City for review and acceptance in accordance with the accepted Schedule of Submittals (as required by Paragraph 2.07). Each submittal will be identified as City may require. 1. Submit number of copies specified in the General Requirements. 2. Data shown on the Submittals will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limited purposes required by Paragraph 6.18.C. 3. Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5. For-Information-Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 6.18.C. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l.2012 007200-1 General Conditions Page 32 of 63 B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City's review and acceptance of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. City's Review: 1. City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City's review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. 2. City's review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. 3. City's review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section 01 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City's review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 6.19 Continuing the Work Except as otherwise provided, Contractor shall carry on the Work and adhere to the Project Schedule during all disputes or disagreements with City. No Work shall be delayed or postponed pending resolution of any disputes or disagreements, except as City and Contractor may otherwise agree in writing. 6.20 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor's warranty and guarantee. B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by: 1. abuse, modification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l.2012 00 72 00-1 General Conditions Page 33 of 63 2. normal wear and tear under normal usage. C. Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: 1. observations by City; 2. recommendation or payment by City of any progress or final payment; 3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acceptance of a Submittal by City; 6. any inspection,test, or approval by others; or 7. any correction of defective Work by City. D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of Article 5.02.13. The City will give notice of observed defects with reasonable promptness. 6.21 Indemnification A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED IN WHOLE OR IN PART BY ANY ACT OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the City in defending against such claims and causes of actions. B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l_2012 00 72 00-1 General Conditions Page 34 of 63 SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED IN WHOLE OR IN PART BY ANY ACT OMISSION OR NEGLIGENCE OF THE CITY. 6.22 Delegation of Professional Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carry out Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, and Submittals prepared by such professional. Submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to City. C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 6.22, City's review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City's review and acceptance of Submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 6.18.C. 6.23 Right to Audit A. The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. B. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and further, that City shall have access during Regular Working Hours to all CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 35 of 63 Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. C. Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 6.24 Nondiscrimination A. The City is responsible for operating Public Transportation Programs and implementing transit- related projects, which are funded in part with Federal financial assistance awarded by the U.S. Department of Transportation and the Federal Transit Administration (FTA), without discriminating against any person in the United States on the basis of race, color, or national origin. B. Title V1, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. ARTICLE 7—OTHER WORK AT THE SITE 7.01 Related Work at Site A. City may perform other work related to the Project at the Site with City's employees, or other City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to starting any such other work; and B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility owner, and City, if City is performing other work with City's employees or other City contractors, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C. If the proper execution or results of any part of Contractor's Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects in the work provided by others. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l.2012 007200-1 General Conditions Page 36 of 63 7.02 Coordination A. If City intends to contract with others for the performance of other work on the Project at the Site,the following will be set forth in Supplementary Conditions: 1. the individual or entity who will have authority and responsibility for coordination of the activities among the various contractors will be identified; 2. the specific matters to be covered by such authority and responsibility will be itemized; and 3. the extent of such authority and responsibilities will be provided. B. Unless otherwise provided in the Supplementary Conditions, City shall have authority for such coordination. ARTICLE 8—CITY'S RESPONSIBILITIES 8.01 Communications to Contractor Except as otherwise provided in the Supplementary Conditions, City shall issue all communications to Contractor. 8.02 Furnish Data City shall timely furnish the data required under the Contract Documents. 8.03 Pay When Due City shall make payments to Contractor in accordance with Article 14. 8.04 Lands and Easements;Reports and Tests City's duties with respect to providing lands and easements and providing engineering surveys to establish reference points are set forth in Paragraphs 4.01 and 4.05. Paragraph 4.02 refers to City's identifying and making available to Contractor copies of reports of explorations and tests of subsurface conditions and drawings of physical conditions relating to existing surface or subsurface structures at or contiguous to the Site that have been utilized by City in preparing the Contract Documents. 8.05 Change Orders City shall execute Change Orders in accordance with Paragraph 10.03. 8.06 Inspections, Tests, and Approvals City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 13.03. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December-21-2012 007200-1 General Conditions Page 37 of 63 8.07 Limitations on City's Responsibilities A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 6.14. 8.08 Undisclosed Hazardous Environmental Condition City's responsibility with respect to an undisclosed Hazardous Environmental Condition is set forth in Paragraph 4.06. 8.09 Compliance with Safety Program While at the Site, City's employees and representatives shall comply with the specific applicable requirements of Contractor's safety programs of which City has been informed pursuant to Paragraph 6.14. ARTICLE 9—CITY'S OBSERVATION STATUS DURING CONSTRUCTION 9.01 City's Project Representative City will provide one or more Project Representative(s) during the construction period. The duties and responsibilities and the limitations of authority of City's representative during construction are set forth in the Contract Documents. The Project Representative(s) will be as provided in the Supplementary Conditions. 9.02 Visits to Site A. City's Project Representative will make visits to the Site at intervals appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the quality of the various aspects of Contractor's executed Work. Based on information obtained during such visits and observations, City's Project Representative will determine, in general, if the Work is proceeding in accordance with the Contract Documents. City's Project Representative will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City's Project Representative's efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B. City's Project Representative's visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents including those set forth in Paragraph 8.07. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Decanber2l,2012 007200-1 General Conditions Page 38 of 63 9.03 Authorized Variations in Work City's Project Representative may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City and also on Contractor, who shall perform the Work involved promptly. 9.04 Rejecting Defective Work City will have authority to reject Work which City's Project Representative believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. City will have authority to conduct special inspection or testing of the Work as provided in Article 13, whether or not the Work is fabricated, installed, or completed. 9.05 Determinations for Work Performed Contractor will determine the actual quantities and classifications of Work performed. City's Project Representative will review with Contractor the preliminary determinations on such matters before rendering a written recommendation. City's written decision will be final (except as modified to reflect changed factual conditions or more accurate data). 9.06 Decisions on Requirements of Contract Documents and Acceptability of Work A. City will be the initial interpreter of the requirements of the Contract Documents and judge of the acceptability of the Work thereunder. B. City will render a written decision on any issue referred. C. City's written decision on the issue referred will be final and binding on the Contractor, subject to the provisions of Paragraph 10.06. ARTICLE 10—CHANGES IN THE WORK; CLAIMS; EXTRA WORK 10.01 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Change Order which may or may not precede an order of Extra work. B. For minor changes of Work not requiring changes to Contract Time or Contract Price, a Field Order may be issued by the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 39 of 63 10.02 Unauthorized Changes in the Work Contractor shall not be entitled to an increase in the Contract Price or an extension of the Contract Time with respect to any work performed that is not required by the Contract Documents as amended, modified, or supplemented as provided in Paragraph 3.04, except in the case of an emergency as provided in Paragraph 6.17. 10.03 Execution of Change Orders A. City and Contractor shall execute appropriate Change Orders covering: 1. changes in the Work which are: (i) ordered by City pursuant to Paragraph 10.01.A, (ii) required because of acceptance of defective Work under Paragraph 13.08 or City's correction of defective Work under Paragraph 13.09, or(iii) agreed to by the parties; 2. changes in the Contract Price or Contract Time which are agreed to by the parties, including any undisputed sum or amount of time for Work actually performed. 10.04 Extra Work A. Should a difference arise as to what does or does not constitute Extra Work, or as to the payment thereof, and the City insists upon its performance, the Contractor shall proceed with the work after making written request for written orders and shall keep accurate account of the actual reasonable cost thereof. Contract Claims regarding Extra Work shall be made pursuant to Paragraph 10.06. B. The Contractor shall furnish the City such installation records of all deviations from the original Contract Documents as may be necessary to enable the City to prepare for permanent record a corrected set of plans showing the actual installation. C. The compensation agreed upon for Extra Work whether or not initiated by a Change Order shall be a full, complete and final payment for all costs Contractor incurs as a result or relating to the change or Extra Work, whether said costs are known, unknown, foreseen or unforeseen at that time, including without limitation, any costs for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged work as a result of the change or Extra Work. 10.05 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time), the giving of any such notice will be Contractor's responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. CI'T'Y OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 40 of 63 10.06 Contract Claims Process A. City's Decision Required: All Contract Claims, except those waived pursuant to Paragraph 14.09, shall be referred to the City for decision. A decision by City shall be required as a condition precedent to any exercise by Contractor of any rights or remedies he may otherwise have under the Contract Documents or by Laws and Regulations in respect of such Contract Claims. B. Notice: 1. Written notice stating the general nature of each Contract Claim shall be delivered by the Contractor to City no later than 15 days after the start of the event giving rise thereto. The responsibility to substantiate a Contract Claim shall rest with the party making the Contract Claim. 2. Notice of the amount or extent of the Contract Claim, with supporting data shall be delivered to the City on or before 45 days from the start of the event giving rise thereto (unless the City allows additional time for Contractor to submit additional or more accurate data in support of such Contract Claim). 3. A Contract Claim for an adjustment in Contract Price shall be prepared in accordance with the provisions of Paragraph 12.01. 4. A Contract Claim for an adjustment in Contract Time shall be prepared in accordance with the provisions of Paragraph 12.02. 5. Each Contract Claim shall be accompanied by Contractor's written statement that the adjustment claimed is the entire adjustment to which the Contractor believes it is entitled as a result of said event. 6. The City shall submit any response to the Contractor within 30 days after receipt of the claimant's last submittal (unless Contract allows additional time). C. City's Action: City will review each Contract Claim and, within 30 days after receipt of the last submittal of the Contractor, if any,take one of the following actions in writing: 1. deny the Contract Claim in whole or in part; 2. approve the Contract Claim; or 3. notify the Contractor that the City is unable to resolve the Contract Claim if, in the City's sole discretion, it would be inappropriate for the City to do so. For purposes of further resolution of the Contract Claim, such notice shall be deemed a denial. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 00 72 00-1 General Conditions Page 41 of 63 D. City's written action under Paragraph 10.06.0 will be final and binding, unless City or Contractor invoke the dispute resolution procedure set forth in Article 16 within 30 days of such action or denial. E. No Contract Claim for an adjustment in Contract Price or Contract Time will be valid if not submitted in accordance with this Paragraph 10.06. ARTICLE 11—COST OF THE WORK; ALLOWANCES; UNIT PRICE WORK; PLANS QUANTITY MEASUREMENT 11.01 Cost of the Work A. Costs Included: The term Cost of the Work means the sum of all costs, except those excluded in Paragraph 11.01.13, necessarily incurred and paid by Contractor in the proper performance of the Work. When the value of any Work covered by a Change Order, the costs to be reimbursed to Contractor will be only those additional or incremental costs required because of the change in the Work. Such costs shall not include any of the costs itemized in Paragraph 11.01.13, and shall include but not be limited to the following items: 1. Payroll costs for employees in the direct employ of Contractor in the performance of the Work under schedules of job classifications agreed upon by City and Contractor. Such employees shall include, without limitation, superintendents, foremen, and other personnel employed full time on the Work. Payroll costs for employees not employed full time on the Work shall be apportioned on the basis of their time spent on the Work. Payroll costs shall include; a. salaries with a 55%markup, or b. salaries and wages plus the cost of fringe benefits, which shall include social security contributions, unemployment, excise, and payroll taxes, workers' compensation, health and retirement benefits, bonuses, sick leave, vacation and holiday pay applicable thereto. The expenses of performing Work outside of Regular Working Hours, Weekend Working Hours, or legal holidays, shall be included in the above to the extent authorized by City. 2. Cost of all materials and equipment furnished and incorporated in the Work, including costs of transportation and storage thereof, and Suppliers' field services required in connection therewith. 3. Rentals of all construction equipment and machinery, and the parts thereof whether rented from Contractor or others in accordance with rental agreements approved by City, and the costs of transportation, loading, unloading, assembly, dismantling, and removal thereof. All such costs shall be in accordance with the terms of said rental agreements. The rental of any such equipment, machinery, or parts shall cease when the use thereof is no longer necessary for the Work. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 007200-1 General Conditions Page 42 of 63 4. Payments made by Contractor to Subcontractors for Work performed by Subcontractors. If required by City, Contractor shall obtain competitive bids from subcontractors acceptable to City and Contractor and shall deliver such bids to City, who will then determine, which bids, if any, will be acceptable. If any subcontract provides that the Subcontractor is to be paid on the basis of Cost of the Work plus a fee, the Subcontractor's Cost of the Work and fee shall be determined in the same manner as Contractor's Cost of the Work and fee as provided in this Paragraph 11.01. 5. Costs of special consultants (including but not limited to engineers, architects, testing laboratories, surveyors, attorneys, and accountants) employed for services specifically related to the Work. 6. Supplemental costs including the following: a. The proportion of necessary transportation, travel, and subsistence expenses of Contractor's employees incurred in discharge of duties connected with the Work. b. Cost, including transportation and maintenance, of all materials, supplies, equipment, machinery, appliances, office, and temporary facilities at the Site, and hand tools not owned by the workers, which are consumed in the performance of the Work, and cost, less market value, of such items used but not consumed which remain the property of Contractor. c. Sales, consumer, use, and other similar taxes related to the Work, and for which Contractor is liable not covered under Paragraph 6.11, as imposed by Laws and Regulations. d. Deposits lost for causes other than negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, and royalty payments and fees for permits and licenses. e. Losses and damages (and related expenses) caused by damage to the Work, not compensated by insurance or otherwise, sustained by Contractor in connection with the performance of the Work, provided such losses and damages have resulted from causes other than the negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable. Such losses shall include settlements made with the written consent and approval of City. No such losses, damages, and expenses shall be included in the Cost of the Work for the purpose of determining Contractor's fee. f. The cost of utilities, fuel, and sanitary facilities at the Site. g. Minor expenses such as telegrams, long distance telephone calls, telephone and communication services at the Site, express and courier services, and similar petty cash items in connection with the Work. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 00 72 00-1 General Conditions Page 43 of 63 h. The costs of premiums for all bonds and insurance Contractor is required by the Contract Documents to purchase and maintain. B. Costs Excluded: The term Cost of the Work shall not include any of the following items: 1. Payroll costs and other compensation of Contractor's officers, executives, principals (of partnerships and sole proprietorships), general managers, safety managers, engineers, architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents, expediters, timekeepers, clerks, and other personnel employed by Contractor, whether at the Site or in Contractor's principal or branch office for general administration of the Work and not specifically included in the agreed upon schedule of job classifications referred to in Paragraph 11.O1.A.1 or specifically covered by Paragraph 11.O1.A.4, all of which are to be considered administrative costs covered by the Contractor's fee. 2. Expenses of Contractor's principal and branch offices other than Contractor's office at the Site. 3. Any part of Contractor's capital expenses, including interest on Contractor's capital employed for the Work and charges against Contractor for delinquent payments. 4. Costs due to the negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including but not limited to, the correction of defective Work, disposal of materials or equipment wrongly supplied, and making good any damage to property. 5. Other overhead or general expense costs of any kind. C. Contractor's Fee: When all the Work is performed on the basis of cost-plus, Contractor's fee shall be determined as set forth in the Agreement. When the value of any Work covered by a Change Order for an adjustment in Contract Price is determined on the basis of Cost of the Work, Contractor's fee shall be determined as set forth in Paragraph 12.01.C. D. Documentation: Whenever the Cost of the Work for any purpose is to be determined pursuant to Paragraphs I LOLA and 11.01.13, Contractor will establish and maintain records thereof in accordance with generally accepted accounting practices and submit in a form acceptable to City an itemized cost breakdown together with supporting data. 11.02 Allowances A. Specified Allowance: It is understood that Contractor has included in the Contract Price all allowances so named in the Contract Documents and shall cause the Work so covered to be performed for such sums and by such persons or entities as may be acceptable to City. B. Pre-bid Allowances: 1. Contractor agrees that: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l,2012 00 72 00-1 General Conditions Page 44 of 63 a. the pre-bid allowances include the cost to Contractor of materials and equipment required by the allowances to be delivered at the Site, and all applicable taxes; and b. Contractor's costs for unloading and handling on the Site, labor, installation, overhead, profit, and other expenses contemplated for the pre-bid allowances have been included in the allowances, and no demand for additional payment on account of any of the foregoing will be valid. C. Contingency Allowance: Contractor agrees that a contingency allowance, if any, is for the sole use of City. D. Prior to final payment, an appropriate Change Order will be issued to reflect actual amounts due Contractor on account of Work covered by allowances, and the Contract Price shall be correspondingly adjusted. 11.03 Unit Price Work A. Where the Contract Documents provide that all or part of the Work is to be Unit Price Work, initially the Contract Price will be deemed to include for all Unit Price Work an amount equal to the sum of the unit price for each separately identified item of Unit Price Work times the estimated quantity of each item as indicated in the Agreement. B. The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the purpose of comparison of Bids and determining an initial Contract Price. Determinations of the actual quantities and classifications of Unit Price Work performed by Contractor will be made by City subject to the provisions of Paragraph 9.05. C. Each unit price will be deemed to include an amount considered by Contractor to be adequate to cover Contractor's overhead and profit for each separately identified item. Work described in the Contract Documents, or reasonably inferred as required for a functionally complete installation, but not identified in the listing of unit price items shall be considered incidental to unit price work listed and the cost of incidental work included as part of the unit price. D. City may make an adjustment in the Contract Price in accordance with Paragraph 12.01 i£ 1. the quantity of any item of Unit Price Work performed by Contractor differs materially and significantly from the estimated quantity of such item indicated in the Agreement; and 2. there is no corresponding adjustment with respect to any other item of Work. E. Increased or Decreased Quantities: The City reserves the right to order Extra Work in accordance with Paragraph 10.01. 1. If the changes in quantities or the alterations do not significantly change the character of work under the Contract Documents, the altered work will be paid for at the Contract unit price. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December21_2012 00 72 00-1 General Conditions Page 45 of 63 2. If the changes in quantities or alterations significantly change the character of work, the Contract will be amended by a Change Order. 3. If no unit prices exist, this will be considered Extra Work and the Contract will be amended by a Change Order in accordance with Article 12. 4. A significant change in the character of work occurs when: a. the character of work for any Item as altered differs materially in kind or nature from that in the Contract or b. a Major Item of work varies by more than 25% from the original Contract quantity. 5. When the quantity of work to be done under any Major Item of the Contract is more than 125% of the original quantity stated in the Contract, then either party to the Contract may request an adjustment to the unit price on the portion of the work that is above 125%. 6. When the quantity of work to be done under any Major Item of the Contract is less than 75% of the original quantity stated in the Contract, then either party to the Contract may request an adjustment to the unit price. 11.04 Plans Quantity Measurement A. Plans quantities may or may not represent the exact quantity of work performed or material moved, handled, or placed during the execution of the Contract. The estimated bid quantities are designated as final payment quantities, unless revised by the governing Section or this Article. B. If the quantity measured as outlined under"Price and Payment Procedures" varies by more than 25% (or as stipulated under "Price and Payment Procedures" for specific Items) from the total estimated quantity for an individual Item originally shown in the Contract Documents, an adjustment may be made to the quantity of authorized work done for payment purposes. The party to the Contract requesting the adjustment will provide field measurements and calculations showing the final quantity for which payment will be made. Payment for revised quantity will be made at the unit price bid for that Item, except as provided for in Article 10. C. When quantities are revised by a change in design approved by the City, by Change Order, or to correct an error, or to correct an error on the plans, the plans quantity will be increased or decreased by the amount involved in the change, and the 25% variance will apply to the new plans quantity. D. If the total Contract quantity multiplied by the unit price bid for an individual Item is less than $250 and the Item is not originally a plans quantity Item, then the Item may be paid as a plans quantity Item if the City and Contractor agree in writing to fix the final quantity as a plans quantity. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December21.2012 007200-1 General Conditions Page 46 of 63 E. For callout work or non-site specific Contracts, the plans quantity measurement requirements are not applicable. ARTICLE 12—CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 12.01 Change of Contract Price A. The Contract Price may only be changed by a Change Order. B. The value of any Work covered by a Change Order will be determined as follows: 1. where the Work involved is covered by unit prices contained in the Contract Documents, by application of such unit prices to the quantities of the items involved (subject to the provisions of Paragraph 11.03); or 2. where the Work involved is not covered by unit prices contained in the Contract Documents, by a mutually agreed lump sum or unit price (which may include an allowance for overhead and profit not necessarily in accordance with Paragraph 12.0l.C.2), and shall include the cost of any secondary impacts that are foreseeable at the time of pricing the cost of Extra Work; or 3. where the Work involved is not covered by unit prices contained in the Contract Documents and agreement to a lump sum or unit price is not reached under Paragraph 12.01.B.2, on the basis of the Cost of the Work (determined as provided in Paragraph 11.01) plus a Contractor's fee for overhead and profit(determined as provided in Paragraph 12.01.C). C. Contractor's Fee: The Contractor's additional fee for overhead and profit shall be determined as follows: 1. a mutually acceptable fixed fee; or 2. if a fixed fee is not agreed upon, then a fee based on the following percentages of the various portions of the Cost of the Work: , a. for costs incurred under Paragraphs 11.01.A.1, 11.0l.A.2. and 11.0l.A.3, the Contractor's additional fee shall be 15 percent except for: 1) rental fees for Contractor's own equipment using standard rental rates; 2) bonds and insurance; b. for costs incurred under Paragraph 11.01.A.4 and 11.01.A.5, the Contractor's fee shall be five percent(5%); 1) where one or more tiers of subcontracts are on the basis of Cost of the Work plus a fee and no fixed fee is agreed upon, the intent of Paragraphs 12.0l.C.2.a and 12.0l.C.2.b is that the Subcontractor who actually performs the Work, at whatever CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l_2012 00 72 00-1 General Conditions Page 47 of 63 tier, will be paid a fee of 15 percent of the costs incurred by such Subcontractor under Paragraphs 11.0l.A.1 and 11.0l.A.2 and that any higher tier Subcontractor and Contractor will each be paid a fee of five percent (5%) of the amount paid to the next lower tier Subcontractor, however in no case shall the cumulative total of fees paid be in excess of 25%; c. no fee shall be payable on the basis of costs itemized under Paragraphs 11.01.A.6, and 11.01.13; d. the amount of credit to be allowed by Contractor to City for any change which results in a net decrease in cost will be the amount of the actual net decrease in cost plus a deduction in Contractor's fee by an amount equal to five percent (5%) of such net decrease. 12.02 Change of Contract Time A. The Contract Time may only be changed by a Change Order. B. No extension of the Contract Time will be allowed for Extra Work or for claimed delay unless the Extra Work contemplated or claimed delay is shown to be on the critical path of the Project Schedule or Contractor can show by Critical Path Method analysis how the Extra Work or claimed delay adversely affects the critical path. 12.03 Delays A. Where Contractor is reasonably delayed in the performance or completion of any part of the Work within the Contract Time due to delay beyond the control of Contractor,the Contract Time may be extended in an amount equal to the time lost due to such delay if a Contract Claim is made therefor. Delays beyond the control of Contractor shall include, but not be limited to, acts or neglect by City, acts or neglect of utility owners or other contractors performing other work as contemplated by Article 7, fires, floods, epidemics, abnormal weather conditions, or acts of God. Such an adjustment shall be Contractor's sole and exclusive remedy for the delays described in this Paragraph. B. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. C. Contractor shall not be entitled to an adjustment in Contract Price or Contract Time for delays within the control of Contractor. Delays attributable to and within the control of a Subcontractor or Supplier shall be deemed to be delays within the control of Contractor. D. The Contractor shall receive no compensation for delays or hindrances to the Work, except when direct and unavoidable extra cost to the Contractor is caused by the failure of the City to provide information or material, if any, which is to be furnished by the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l.2012 007200-1 General Conditions Page 48 of 63 ARTICLE 13—TESTS AND INSPECTIONS; CORRECTION,REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 13.01 Notice of'Defects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work may be rejected, corrected, or accepted as provided in this Article 13. 13.02 Access to Work City, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor's safety procedures and programs so that they may comply therewith as applicable. 13.03 Tests and Inspections A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR) inspections,which shall be paid as described in the Supplementary Conditions. C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re-tests, or approvals required for City's acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment Submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such inspections, tests, re-tests, or approvals shall be performed by organizations acceptable to City. D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to perform any inspections or tests ("Testing") for any part of the Work, as determined solely by City. 1. City will coordinate such Testing to the extent possible,with Contractor; 2. Should any Testing under this Section 13.03 D result in a "fail", "did not pass" or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Contractor's cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l.2012 007200-1 General Conditions Page 49 of 63 3. Any amounts owed for any retest under this Section 13.03 D shall be paid directly to the Testing Lab by Contractor. City will forward all invoices for retests to Contractor. 4. If Contractor fails to pay the Testing Lab, City will not issue Final Payment until the Testing Lab is paid. E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for observation. F. Uncovering Work as provided in Paragraph 13.03.E shall be at Contractor's expense. G. Contractor shall have the right to make a Contract Claim regarding any retest or invoice issued under Section 13.03 D. 13.04 Uncovering Work A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City's observation and replaced at Contractor's expense. B. If City considers it necessary or advisable that covered Work be observed by City or inspected or tested by others, Contractor, at City's request, shall uncover, expose, or otherwise make available for observation, inspection, or testing as City may require, that portion of the Work in question, furnishing all necessary labor, material, and equipment. 1. If it is found that the uncovered Work is defective, Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such uncovering, exposure, observation, inspection, and testing, and of satisfactory replacement or reconstruction (including but not limited to all costs of repair or replacement of work of others); or City shall be entitled to accept defective Work in accordance with Paragraph 13.08 in which case Contractor shall still be responsible for all costs associated with exposing, observing, and testing the defective Work. 2. If the uncovered Work is not found to be defective, Contractor shall be allowed an increase in the Contract Price or an extension of the Contract Time, or both, directly attributable to such uncovering, exposure,observation, inspection,testing, replacement, and reconstruction. 13.05 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December21,2012 007200-1 General Conditions Page 50 of 63 Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 13.06 Correction or Removal of Defective Work A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court'or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B. When correcting defective Work under the terms of this Paragraph 13.06 or Paragraph 13.07, Contractor shall take no action that would void or otherwise impair City's special warranty and guarantee, if any, on said Work. 13.07 Correction Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor's use by City or permitted by Laws and Regulations as contemplated in Paragraph 6.10.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City's written instructions: 1. repair such defective land or areas; or 2. correct such defective Work; or 3. if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective, and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B. If Contractor does not promptly comply with the terms of City's written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others)will be paid by Contractor. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l.2012 007200-1 General Conditions Page 51 of 63 C. In special circumstances where a particular item of equipment is placed in continuous service before Final Acceptance of all the Work, the correction period for that item may start to run from an earlier date if so provided in the Contract Documents. D. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 13.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor should such additional warranty coverage be required. Contractor may dispute this requirement by filing a Contract Claim, pursuant to Paragraph 10.06. E. Contractor's obligations under this Paragraph 13.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 13.07 shall not be construed as a substitute for, or a waiver of,the provisions of any applicable statute of limitation or repose. 13.08 Acceptance of Defective Work If, instead of requiring correction or removal and replacement of defective Work, City prefers to accept it, City may do so. Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) attributable to City's evaluation of and determination to accept such defective Work and for the diminished value of the Work to the extent not otherwise paid by Contractor. If any such acceptance occurs prior to Final Acceptance, a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work, and City shall be entitled to an appropriate decrease in the Contract Price, reflecting the diminished value of Work so accepted. 13.09 City May Correct Defective Work A. If Contractor fails within a reasonable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 13.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven (7)days written notice to Contractor, correct, or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 13.09, City shall proceed expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor's services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants, employees, and City's other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l_2012 007200-1 General Conditions Page 52 of 63 costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City's rights and remedies under this Paragraph 13.09. ARTICLE 14—PAYMENTS TO CONTRACTOR AND COMPLETION 14.01 Schedule of Values The Schedule of Values for lump sum contracts established as provided in Paragraph 2.07 will serve as the basis for progress payments and will be incorporated into a form of Application for Payment acceptable to City. Progress payments on account of Unit Price Work will be based on the number of units completed. 14.02 Progress Payments A. Applications for Payments: 1. Contractor is responsible for providing all information as required to become a vendor of the City. 2. At least 20 days before the date established in the General Requirements for each progress payment, Contractor shall submit to City for review an Application for Payment filled out and signed by Contractor covering the Work completed as of the date of the Application and accompanied by such supporting documentation as is required by the Contract Documents. 3. If payment is requested on the basis of materials and equipment not incorporated in the Work but delivered and suitably stored at the Site or at another location agreed to in writing, the Application for Payment shall also be accompanied by a bill of sale, invoice, or other documentation warranting that City has received the materials and equipment free and clear of all Liens and evidence that the materials and equipment are covered by appropriate insurance or other arrangements to protect City's interest therein, all of which must be satisfactory to City. 4. Beginning with the second Application for Payment, each Application shall include an affidavit of Contractor stating that previous progress payments received on account of the Work have been applied on account to discharge Contractor's legitimate obligations associated with prior Applications for Payment. 5. The amount of retainage with respect to progress payments will be as stipulated in the Contract Documents. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Deceinber2l_2012 007200-1 General Conditions Page 53 of63 B. Revieu,ofApplications: 1. City will, after receipt of each Application for Payment, either indicate in writing a recommendation of payment or return the Application to Contractor indicating reasons for refusing payment. In the latter case, Contractor may make the necessary corrections and resubmit the Application. 2. City's processing of any payment requested in an Application for Payment will be based on City's observations of the executed Work, and on City's review of the Application for Payment and the accompanying data and schedules,that to the best of City's knowledge: a. the Work has progressed to the point indicated; b. the quality of the Work is generally in accordance with the Contract Documents (subject to an evaluation of the Work as a functioning whole prior to or upon Final Acceptance, the results of any subsequent tests called for in the Contract Documents, a final determination of quantities and classifications for Work performed under Paragraph 9.05, and any other qualifications stated in the recommendation). 3. Processing any such payment will not thereby be deemed to have represented that: a. inspections made to check the quality or the quantity of the Work as it has been performed have been exhaustive, extended to every aspect of the Work in progress, or involved detailed inspections of the Work beyond the responsibilities specifically assigned to City in the Contract Documents; or b. there may not be other matters or issues between the parties that might entitle Contractor to be paid additionally by City or entitle City to withhold payment to Contractor, or c. Contractor has complied with Laws and Regulations applicable to Contractor's performance of the Work. 4. City may refuse to process the whole or any part of any payment because of subsequently discovered evidence or the results of subsequent inspections or tests, and revise or revoke any such payment previously made, to such extent as may be necessary to protect City from loss because: a. the Work is defective, or the completed Work has been damaged by the Contractor or his subcontractors, requiring correction or replacement; b. discrepancies in quantities contained in previous applications for payment; c. the Contract Price has been reduced by Change Orders; d. City has been required to correct defective Work or complete Work in accordance with Paragraph 13.09; or CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l.2012 007200-1 General Conditions Page 54 of 63 e. City has actual knowledge of the occurrence of any of the events enumerated in Paragraph 15.02.A. C. Retainage: 1. For contracts less than $400,000 at the time of execution, retainage shall be ten percent (10%). 2. For contracts greater than $400,000 at the time of execution, retainage shall be five percent (5%). D. Liquidated Damages. For each calendar day that any work shall remain uncompleted after the time specified in the Contract Documents, the sum per day specified in the Agreement, will be deducted from the monies due the Contractor, not as a penalty, but as liquidated damages suffered by the City. E. Payment: Contractor will be paid pursuant to the requirements of this Article 14 and payment will become due in accordance with the Contract Documents. F. Reduction in Payment: 1. City may refuse to make payment of the amount requested because: a. Liens have been filed in connection with the Work, except where Contractor has delivered a specific bond satisfactory to City to secure the satisfaction and discharge of such Liens; b. there are other items entitling City to a set-off against the amount recommended; or c. City has actual knowledge of the occurrence of any of the events enumerated in Paragraphs 14.02.B.4.a through 14.02.B.4.e or Paragraph 15.02.A. 2. If City refuses to make payment of the amount requested, City will give Contractor written notice stating the reasons for such action and pay Contractor any amount remaining after deduction of the amount so withheld. City shall pay Contractor the amount so withheld, or any adjustment thereto agreed to by City and Contractor, when Contractor remedies the reasons for such action. 14.03 Contractor's Warranty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment, whether incorporated in the Project or not, will pass to City no later than the time of payment free and clear of all Liens. CITY OF FORT WORTI I STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l.2012 007200-1 General Conditions Page 55 of 63 14.04 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed part of the Work which has specifically been identified in the Contract Documents, or which City, determines constitutes a separately functioning and usable part of the Work that can be used by City for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready for its intended use, subject to the following conditions: 1. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. 2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and Contractor shall make an inspection of that part of the Work to determine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3. Partial Utilization will not constitute Final Acceptance by City. 14.05 Final bnspection A. Upon written notice from Contractor that the entire Work is complete in accordance with the Contract Documents: 1. within 10 days, City will schedule a Final Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Worlc is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. B. No time charge will be made against the Contractor between said date of notification of the City and the date of Final Inspection. Should the City determine that the Work is not ready for Final Inspection, City will notify the Contractor in writing of the reasons and Contract Time will resume. 14.06 Final Acceptance Upon completion by Contractor to City's satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision_Deceinber2l_2012 007200-1 General Conditions Page 56 of 63 14.07 Final Payment A. Application fir Payment: 1. Upon Final Acceptance, and in the opinion of City, Contractor may make an application for final payment following the procedure for progress payments in accordance with the Contract Documents. 2. The final Application for Payment shall be accompanied (except as previously delivered) by: a. all documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; b. consent of the surety, if any,to final payment; c. a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and d. affidavits of payments and complete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. B. Payment Becomes Due: 1. After City's acceptance of the Application for Payment and accompanying documentation, requested by Contractor, less previous payments made and any sum City is entitled, including but not limited to liquidated damages, will become due and payable. 2. After all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Claim has been reported to Contractor's insurance provider for resolution. 3. The making of the final payment by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. 14.08 Final Completion Delayed and Partial Retainage Release A. If final completion of the Work is significantly delayed, and if City so confirms, City may, upon receipt of Contractor's final Application for Payment, and without terminating the Contract, make payment of the balance due for that portion of the Work fully completed and accepted. If the remaining balance to be held by City for Work not fully completed or corrected is less than the retainage stipulated in Paragraph 14.02.C, and if bonds have been furnished as required in Paragraph 5.02, the written consent of the surety to the payment of the balance due for that CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l.2012 007200-1 General Conditions Page 57 of 63 portion of the Work frilly completed and accepted shall be submitted by Contractor to City with the Application for such payment. Such payment shall be made under the terms and conditions governing final payment, except that it shall not constitute a waiver of Contract Claims. B. Partial Retainage Release. For a Contract that provides for a separate vegetative establishment and maintenance, and test and performance periods following the completion of all other construction in the Contract Documents for all Work locations, the City may release a portion of the amount retained provided that all other work is completed as determined by the City. Before the release, all submittals and final quantities must be completed and accepted for all other work. An amount sufficient to ensure Contract compliance will be retained. 14.09 Waiver of Claims The acceptance of final payment will constitute a release of the City from all claims or liabilities under the Contract for anything done or furnished or relating to the work under the Contract Documents or any act or neglect of City related to or connected with the Contract. ARTICLE 15—SUSPENSION OF WORK AND TERMINATION 15.01 City May Suspend Work A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will make no extra payment for stand-by time of construction equipment and/or construction crews. B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be determined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not available within a reasonable period of time, Contractor may request an extension in Contract Time, directly attributable to any such suspension. C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall store all materials in such a manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. D. Contractor may be reimbursed for the cost of moving his equipment off the job and returning the necessary equipment to the job when it is determined by the City that construction may be resumed. Such reimbursement shall be based on actual cost to the Contractor of moving the equipment and no profit will be allowed. Reimbursement may not be allowed if the equipment is moved to another construction project for the City. CITY OF FORT WORTI I STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l.2012 007200-1 General Conditions Page 58 of 63 15.02 City Nlcry Tei-nfinate f)i-Cause A. The occurrence of any one or more of the following events by way of example, but not of limitation, may justify termination for cause: 1. Contractor's persistent failure to perform the Work in accordance with the Contract Documents (including, but not limited to, failure to supply sufficient skilled workers or suitable materials or equipment, failure to adhere to the Project Schedule established under Paragraph 2.07 as adjusted from time to time pursuant to Paragraph 6.04, or failure to adhere to the City's Business Diversity Enterprise Ordinance #20020-12-2011 established under Paragraph 6.06.D); 2. Contractor's disregard of Laws or Regulations of any public body having jurisdiction; 3. Contractor's repeated disregard of the authority of City;or 4. Contractor's violation in any substantial way of any provisions of the Contract Documents; or 5. Contractor's failure to promptly make good any defect in materials or workmanship, or defects of any nature,the correction of which has been directed in writing by the City; or 6. Substantial indication that the Contractor has made an unauthorized assignment of the Contract or any funds due therefrom for the benefit of any creditor or for any other purpose; or 7. Substantial evidence that the Contractor has become insolvent or bankrupt, or otherwise financially unable to carry on the Work satisfactorily;or 8. Contractor commences legal action in a court of competent jurisdiction against the City. B. If one or more of the events identified in Paragraph 15.02A. occur, City will provide written notice to Contractor and Surety to arrange a conference with Contractor and Surety to address Contractor's failure to perform the Work. Conference shall be held not later than 15 days, after receipt of notice. 1. If the City, the Contractor, and the Surety do not agree to allow the Contractor to proceed to perform the construction Contract, the City may, to the extent pennitted by Laws and Regulations, declare a Contractor default and formally terminate the Contractor's right to complete the Contract. Contractor default shall not be declared earlier than 20 days after the Contractor and Surety have received notice of conference to address Contractor's failure to perform the Work. 2. If Contractor's services are terminated, Surety shall be obligated to take over and perform the Work. If Surety does not commence performance thereof within 15 consecutive calendar days after date of an additional written notice demanding Surety's performance of its CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l.2012 00 72 00-1 General Conditions Page 59 of 63 obligations, then City, without process or action at law, may take over any portion of the Work and complete it as described below. a. If City completes the Work, City may exclude Contractor and Surety from the site and take possession of the Work, and all materials and equipment incorporated into the Work stored at the Site or for which City has paid Contractor or Surety but which are stored elsewhere, and finish the Work as City may deem expedient. 3. Whether City or Surety completes the Work, Contractor shall not be entitled to receive any further payment until the Work is finished. If the unpaid balance of the Contract Price exceeds all claims, costs, losses and damages sustained by City arising out of or resulting from completing the Work, such excess will be paid to Contractor. If such claims, costs, losses and damages exceed such unpaid balance, Contractor shall pay the difference to City. Such claims, costs, losses and damages incurred by City will be incorporated in a Change Order, provided that when exercising any rights or remedies under this Paragraph, City shall not be required to obtain the lowest price for the Work performed. 4. Neither City, nor any of its respective consultants, agents, officers, directors or employees shall be in any way liable or accountable to Contractor or Surety for the method by which the cornpletion of the said Work, or any portion thereof, may be accomplished or for the price paid therefor. 5. City, notwithstanding the method used in completing the Contract, shall not forfeit the right to recover damages from Contractor or Surety for Contractor's failure to timely complete the entire Contract. Contractor shall not be entitled to any claim on account of the method used by City in completing the Contract. 6. Maintenance of the Work shall continue to be Contractor's and Surety's responsibilities as provided for in the bond requirements of the Contract Documents or any special guarantees provided for under the Contract Documents or any other obligations otherwise prescribed by law. C. Notwithstanding Paragraphs 15.02.13, Contractor's services will not be terminated if Contractor begins within seven days of receipt of notice of intent to terminate to correct its failure to perform and proceeds diligently to cure such failure within no more than 30 days of receipt of said notice. D. Where Contractor's services have been so terminated by City, the termination will not affect any rights or remedies of City against Contractor then existing or which may thereafter accrue. Any retention or payment of moneys due Contractor by City will not release Contractor from liability. E. If and to the extent that Contractor has provided a performance bond under the provisions of Paragraph 5.02, the termination procedures of that bond shall not supersede the provisions of this Article. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l.2012 007200-1 General Conditions Page 60 of 63 15.03 City Mcry Ter minute For Convenience A. City may, without cause and without prejudice to any other right or remedy of City, terminate the Contract. Any termination shall be effected by mailing a notice of the tennination to the Contractor specifying the extent to which performance of Work under the contract is terminated, and the date upon which such tennination becomes effective. Receipt of the notice shall be deemed conclusively presumed and established when the letter is placed in the United States Postal Service Mail by the City. Further, it shall be deemed conclusively presumed and established that such termination is made with just cause as therein stated; and no proof in any claim, demand or suit shall be required of the City regarding such discretionary action. B. After receipt of a notice of termination, and except as otherwise directed by the City, the Contractor shall: 1. Stop work under the Contract on the date and to the extent specified in the notice of termination; 2. place no further orders or subcontracts for materials, services or facilities except as may be necessary for completion of such portion of the Work under the Contract as is not terminated; 3. terminate all orders and subcontracts to the extent that they relate to the performance of the Work terminated by notice of termination; 4. transfer title to the City and deliver in the manner, at the times, and to the extent, if any, directed by the City: a. the fabricated or unfabricated parts, Work in progress, completed Work, supplies and other material produced as a part of, or acquired in connection with the performance of, the Work terminated by the notice of the termination; and b. the completed, or partially completed plans, drawings, information and other property which, if the Contract had been completed, would have been required to be furnished to the City. 5. complete performance of such Work as shall not have been tenninated by the notice of termination; and 6. take such action as may be necessary, or as the City may direct, for the protection and preservation of the property related to its contract which is in the possession of the Contractor and in which the owner has or may acquire the rest. C. At a time not later than 30 days after the tennination date specified in the notice of termination, the Contractor may submit to the City a list, certified as to quantity and quality, of any or all items of termination inventory not previously disposed of, exclusive of items the disposition of which has been directed or authorized by City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l.2012 00 72 00-1 General Conditions Page 61 of 63 D. Not later than 15 days thereafter, the City shall accept title to such items provided, that the list submitted shall be subject to verification by the City upon removal of the items or, if the items are stored, within 45 days from the date of submission of the list, and any necessary adjustments to correct the list as submitted, shall be made prior to final settlement. E. Not later than 60 days after the notice of termination, the Contractor shall submit his termination claim to the City in the form and with the certification prescribed by the City. Unless an extension is made in writing within such 60 day period by the Contractor, and granted by the City, any and all such claims shall be conclusively deemed waived. F. In such case, Contractor shall be paid for(without duplication of any items): 1. completed and acceptable Work executed in accordance with the Contract Documents prior to the effective date of termination, including fair and reasonable sums for overhead and profit on such Work; 2. expenses sustained prior to the effective date of termination in performing services and furnishing labor, materials, or equipment as required by the Contract Documents in connection with uncompleted Work, plus fair and reasonable sums for overhead and profit on such expenses; and 3. reasonable expenses directly attributable to termination. G. In the event of the failure of the Contractor and City to agree upon the whole amount to be paid to the Contractor by reason of the termination of the Work, the City shall determine, on the basis of information available to it, the amount, if any, due to the Contractor by reason of the termination and shall pay to the Contractor the amounts.determined. Contractor shall not be paid on account of loss of anticipated profits or revenue or other economic loss arising out of or resulting from such termination. ARTICLE 16—DISPUTE RESOLUTION 16.01 Methods and Procedures A. Either City or Contractor may request mediation of any Contract Claim submitted for a decision under Paragraph 10.06 before such decision becomes final and binding. The request for mediation shall be submitted to the other party to the Contract. Timely submission of the request shall stay the effect of Paragraph 10.06.E. B. City and Contractor shall participate in the mediation process in good faith. The process shall be commenced within 60 days of filing of the request. C. If the Contract Claim is not resolved by mediation, City's action under Paragraph 10.06.0 or a denial pursuant to Paragraphs 10.06.C.3 or 10.06.13 shall become final and binding 30 days after termination of the mediation unless, within that time period, City or Contractor: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:Decennber21.2012 00 72 00-1 General Conditions Page 62 of 63 1. elects in writing to invoke any other dispute resolution process provided for in the Supplementary Conditions; or 2. agrees with the other party to submit the Contract Claim to another dispute resolution process; or 3. gives written notice to the other party of the intent to submit the Contract Claim to a court of competent jurisdiction. ARTICLE 17—MISCELLANEOUS 17.01 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given if: 1. delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended;or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. B. Business address changes must be promptly made in writing to the other party. C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receiving party. 17.02 Computation of Times When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day of the period. 17.03 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l.2012 007200-1 General Conditions Page 63 of 63 17.04 Survival of Obligations All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 17.05 Headings Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision:December2l.2012 This page is intentionally blank. 00 73 00-1 SUPPLEMENTARY CONDITIONS Page I of 5 1 SECTION 00 73 00 2 SUPPLEMENTARY CONDITIONS 3 TO 4 GENERAL CONDITIONS 5 6 Supplementary Conditions 7 8 These Supplementary Conditions modify and supplement Section 00 72 00-General Conditions,and other 9 provisions of the Contract Documents as indicated below. All provisions of the General Conditions that are 10 modified or supplemented remain in full force and effect as so modified or supplemented. All provisions 11 of the General Conditions which are not so modified or supplemented remain in full force and effect. 12 13 Defined Terms 14 15 The terms used in these Supplementary Conditions which are defined in the General Conditions have the 16 meaning assigned to them in the General Conditions,unless specifically noted herein. 17 18 Modifications and Supplements 19 20 The following are instructions that modify or supplement specific paragraphs in the General Conditions and 21 other Contract Documents. 22 23 SC-3.03B.2,"Resolving Discrepancies" 24 25 Plans govern over Specifications. 26 27 SC-4.01A 28 29 Easement limits shown on the Drawing are approximate and were provided to establish a basis for bidding. 30 Upon receiving the final easements descriptions,Contractor shall compare them to the lines shown on the 31 Contract Drawings. 32 33 SC-4.01A.1.,"Availability of Lands" 34 35 The following is a list of known outstanding right-of-way,and/or easements to be acquired,if any as of 36 April 29,2015. 37 38 Outstanding Right-Of-Way,and/or Easements to Be Acquired PARCEL OWNER TARGET DATE NUMBER OF POSSESSION NONE 39 The Contractor understands and agrees that the dates listed above are estimates only, are not guaranteed, 40 and do not bind the City. 41 42 If Contractor considers the final easements provided to differ materially from the representations on the 43 Contract Drawings, Contractor shall within five (5) Business Days and before proceeding with the Work, 44 notify City in writing associated with the differing easement line locations. 45 46 SC-4.01A.2,"Availability of Lands" 47 CITY OF FORT WORTI-1 Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised April I;2013 007300-2 SUPPLEMENTARY CONDITIONS Page 2 of 5 1 Utilities or obstructions to be removed,adjusted,and/or relocated 2 3 The following is list of utilities and/or obstructions that have not been removed,adjusted,and/or relocated 4 as of May 12,2015. 5 EXPECTED UTILITY AND LOCATION TARGET DATE OF OWNER ADJUSTMENT NONE 6 The Contractor understands and agrees that the dates listed above are estimates only,are not guaranteed, 7 and do not bind the City. 8 9 SC-4.02A.,"Subsurface and Physical Conditions" 10 I 1 The following are reports of explorations and tests of subsurface conditions at the site of the Work: 12 NONE 13 14 The following are drawings of physical conditions in or relating to existing surface and subsurface 15 structures(except Underground Facilities)which are at or contiguous to the site of the Work: 16 NONE 17 18 SC-4.06A.,"Hazardous Environmental Conditions at Site" 19 20 The following are reports and drawings of existing hazardous environmental conditions known to the City: 21 NONE 22 23 SC-5.03A.,"Certificates of Insurance" 24 25 The entities listed below are"additional insureds as their interest may appear" including their respective 26 officers, directors,agents and employees. 27 28 (1) City 29 (2) Consultant: Baird,Hampton&Brown,Inc. 30 (3) Other: NONE 31 32 SC-5.04A.,"Contractor's Insurance" 33 34 The limits of liability for the insurance required by Paragraph GC-5.04 shall provide the following 35 coverages for not less than the following amounts or greater where required by laws and regulations: 36 37 5.04A.Workers'Compensation,under Paragraph GC-5.04A. 38 39 Statutory limits 40 Employer's liability 41 $100,000 each accident/occurrence 42 $100,000 Disease-each employee 43 $500,000 Disease-policy limit 44 45 SC-5.04B.,"Contractor's Insurance" 46 47 5.04B.Commercial General Liability,under Paragraph GC-5.04B. Contractor's Liability Insurance 48 under Paragraph GC-5.04B.,which shall be on a per project basis covering the Contractor with 49 minimum limits of: CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Pala STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264-02265,02266 Revised April 1,2013 007300-3 SUPPLEMENTARY CONDITIONS Page 3 of 5 1 2 $1,000,000 each occurrence 3 $2,000,000 aggregate limit 4 5 The policy must have an endorsement(Amendment—Aggregate Limits of Insurance)making the 6 General Aggregate Limits apply separately to each job site. 7 8 The Commercial General Liability Insurance policies shall provide"X","C",and"U"coverage's. 9 Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. 10 11 SC 5.04C.,"Contractor's Insurance" 12 5.04C. Automobile Liability,under Paragraph GC-5.04C. Contractor's Liability Insurance under 13 Paragraph GC-5.04C.,which shall be in an amount not less than the following amounts: 14 15 (1) Automobile Liability-a commercial business policy shall provide coverage on"Any Auto", 16 defined as autos owned,hired and non-owned. 17 18 $1,000,000 each accident on a combined single limit basis. Split limits are acceptable if limits are at 19 least: 20 21 $250,000 Bodily Injury per person/ 22 $500,000 Bodily Injury per accident/ 23 $100,000 Property Damage 24 25 SC-5.04D.,"Contractor's Insurance" 26 27 The Contractor's construction activities will require its employees,agents,subcontractors,equipment,and 28 material deliveries to cross railroad properties and tracks.NONE. 29 30 The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, 31 hinder,or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains 32 or other property. Such operations on railroad properties may require that Contractor to execute a"Right of 33 Entry Agreement"with the particular railroad company or companies involved,and to this end the 34 Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute 35 the right-of-entry(if any)required by a railroad company.The requirements specified herein likewise relate 36 to the Contractor's use of private and/or construction access roads crossing said railroad company's 37 properties. 38 39 The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide 40 coverage for not less than the following amounts,issued by companies satisfactory to the City and to the 41 Railroad Company for a term that continues for so long as the Contractor's operations and work cross, 42 occupy,or touch railroad property: 43 44 (1) General Aggregate: NONE 45 46 (2) Each Occurrence: NONE 47 48 _Required for this Contract X Not required for this Contract 49 50 With respect to the above outlined insurance requirements,the following shall govern: 51 52 1. Where a single railroad company is involved,the Contractor shall provide one insurance policy in 53 the name of the railroad company. However, if more than one grade separation or at-grade 54 crossing is affected by the Project at entirely separate locations on the line or lines of the same 55 railroad company,separate coverage may be required,each in the amount stated above. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised April L 2013 007300-4 SUPPLEMENTARY CONDITIONS Page 4 of 5 1 2 2. Where more than one railroad company is operating on the same right-of-way or where several 3 railroad companies are involved and operated on their own separate rights-of-way,the Contractor 4 may be required to provide separate insurance policies in the name of each railroad company. 5 6 3. If, in addition to a grade separation or an at-grade crossing,other work or activity is proposed on a 7 railroad company's right-of-way at a location entirely separate from the grade separation or at- 8 grade crossing, insurance coverage for this work must be included in the policy covering the grade 9 separation. 10 11 4. If no grade separation is involved but other work is proposed on a railroad company's right-of- 12 way,all such other work may be covered in a single policy for that railroad,even though the work 13 may be at two or more separate locations. 14 15 No work or activities on a railroad company's property to be performed by the Contractor shall be 16 commenced until the Contractor has furnished the City with an original policy or policies of the insurance 17 for each railroad company named,as required above. All such insurance must be approved by the City and 18 each affected Railroad Company prior to the Contractor's beginning work. 19 20 The insurance specified above must be carried until all Work to be performed on the railroad right-of-way 21 has been completed and the grade crossing,if any,is no longer used by the Contractor. In addition, 22 insurance must be carried during all maintenance and/or repair work performed in the railroad right-of-way. 23 Such insurance must name the railroad company as the insured,together with any tenant or lessee of the 24 railroad company operating over tracks involved in the Project. 25 26 SC-6.04.,"Project Schedule" 27 28 Project schedule shall be tier I,2,3,4,or 5 for the project. Contractor must submit the project schedule at 29 the Pre-Bid Meeting. 30 31 SC-6.07.,"Wage Rates" 32 33 The following is the prevailing wage rate table(s)applicable to this project and is provided in the 34 Appendixes: 35 36 Buzzsaw location,Resources/02-Construction Documents/Specifications/Div 00-General Conditions/CFW 37 Wage Rate Table 20080708.pdf 38 39 SC-6.09.,"Permits and Utilities" 40 41 SC-6.09A.,"Contractor obtained permits and licenses" 42 The following are known permits and/or licenses required by the Contract to be acquired by the Contractor: 43 44 Contractor will be responsible for obtaining all required permits. 45 46 SC-6.0913."City obtained permits and licenses" 47 The following are known permits and/or licenses required by the Contract to be acquired by the City: 48 49 NONE 50 51 SC-6.09C."Outstanding permits and licenses" 52 53 The following is a list of known outstanding permits and/or licenses to be acquired,if any as of April 29, 54 2015. 55 CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264.02265,02266 Revised April L 2013 007300-5 SUPPLEMENTARY CONDITIONS Page 5 of 5 1 Outstanding Permits and/or Licenses to Be Acquired OWNER PERMIT OR LICENSE AND LOCATION TARGET DATE OF POSSESSION Contractor will be responsible for obtaining all required permits. 2 SC-7.02.,"Coordination" 3 4 The individuals or entities listed below have contracts with the City for the performance of other work at 5 the Site: 6 Vendor Scope of Work Coordination Authority NONE NONE NONE 7 8 9 SC-8.01,"Communications to Conti-actor" 10 11 NONE 12 13 SC-9.01.,"City's Project Representative" 14 15 The following firm is a consultant to the City responsible for construction management of this Project: 16 17 NONE 18 19 SC-13.03C.,"Tests and Inspections" 20 21 NONE 22 23 SC-16.01C.1,"Methods and Procedures" 24 25 NONE 26 27 28 END OF SECTION CITY OF FORT WORTI I Park Improvements at Terry,Northside,High Crest,and Summer6elds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised April 17 2013 This page is intentionally blank. 01 11 00- 1 SUMMARY OF WORK Page I of'3 1 SECTION 01 1100 2 SUMMARY OF WORK 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Summary of Work to be performed in accordance with the Contract Documents 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include,but are not necessarily limited to: 10 1. Division 0-Bidding Requirements, Contract Forms, and Conditions of the Contract 11 2. Division I -General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS 18 A. Work Covered by Contract Documents 19 1. Work is to include furnishing all labor,materials, and equipment,and performing 20 all Work necessary for this construction project as detailed in the Drawings and 21 Specifications. 22 B. Subsidiary Work 23 l. Any and al l Work specifically governed by documentary requirements for the 24 project, such as conditions imposed by the Drawings or Contract Documents in 25 which no specific item for bid has been provided for in the Proposal and the item is 26 not a typical unit bid item included on the standard bid item list,then the item shall 27 be considered as a subsidiary item of Work,the cost of which shall be included in 28 the price bid in the Proposal for various bid items. 29 C. Use of Premises 30 1. Coordinate uses of premises under direction of the City. 31 2. Assume full responsibility for protection and safekeeping of materials and 32 equipment stored on the Site. 33 3. Use and occupy only portions of the public streets and alleys, or other public places 34 or other rights-of-way as provided for in the ordinances of the City,as shown in the 35 Contract Documents, or as may be specifically authorized in writing by the City. 36 a. A reasonable amount of tools, materials,and equipment for construction 37 purposes may be stored in such space,but no more than is necessary to avoid 38 delay in the construction operations. CITY OF FORT WORTH Park Improvements at Terrv,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20.2012 O1 11 00-2 SUMMARY OF WORK Page 2 of 3 1 b. Excavated and waste materials shall be stored in such a way as not to interfere 2 with the use of spaces that may be designated to be left free and unobstructed 3 and so as not to inconvenience occupants of adjacent property. 4 c. If the street is occupied by railroad tracks, the Work shall be carried on in such 5 manner as not to interfere with the operation of the railroad. 6 1) All Work shall be in accordance with railroad requirements set forth in 7 Division 0 as well as the railroad permit. 8 D. Work within Easements 9 1. Do not enter upon private property for any purpose without having previously 10 obtained permission from the owner of such property. 11 2. Do not store equipment or material on private property unless and until the 12 specified approval of the property owner has been secured in writing by the 13 Contractor and a copy furnished to the City. 14 3. Unless specifically provided otherwise, clear all rights-of-way or easements of 15 obstructions which must be removed to make possible proper prosecution of the 16 Work as a part of the project construction operations. 17 4. Preserve and use every precaution to prevent damage to, all trees,shrubbery,plants, 18 lawns,fences, culverts, curbing, and all other types of structures or improvements, 19 to all water, sewer, and gas lines,to all conduits, overhead pole lines, or 20 appurtenances thereof, including the construction of temporary fences and to all 21 other public or private property adjacent to the Work. 22 5. Notify the proper representatives of the owners or occupants of the public or private 23 lands of interest in lands which might be affected by the Work. 24 a. Such notice shall be made at least 48 hours in advance of the beginning of the 25 Work. 26 b. Notices shall be applicable to both public and private utility companies and any 27 corporation, company, individual, or other, either as owners or occupants, 28 whose land or interest in land might be affected by the Work. 29 c. Be responsible for all damage or injury to property of any character resulting 30 from any act, omission,neglect, or misconduct in the manner or method or 31 execution of the Work, or at any time due to defective work,material,or 32 equipment. 33 6. Fence 34 a. Restore all fences encountered and removed during construction of the Project 35 to the original or a better than original condition. 36 b. Erect temporary fencing in place of the fencing removed whenever the Work is 37 not in progress and when the site is vacated overnight,and/or at all times to 38 provide site security. 39 c. The cost for all fence work within easements, including removal,temporary 40 closures and replacement, shall be subsidiary to the various items bid in the 41 project proposal,unless a bid item is specifically provided in the proposal. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265.02266 Revised December 20.2012 01 11 00-3 SUMMARY OF WORK Page 3 of 3 l 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE,AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2 - PRODUCTS [NOT USED] 10 PART 3- EXECUTION [NOT USED] I I END OF SECTION 12 Revision Log DATE NAME SUMMARY OF CHANGE 13 CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265.02266 Revised December 20.2012 This page is intentionally blank. 01 25 00- 1 SUBSTITUTION PROCEDURES Page 1 o4`4 1 SECTION 0125 00 2 SUBSTITUTION PROCEDURES 3 PARTI - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. The procedure for requesting the approval of substitution of a product that is not 7 equivalent to a product which is specified by descriptive or performance criteria or 8 defined by reference to 1 or more of the following: 9 a. Name of manufacturer 10 b. Name of vendor 11 c. Trade name 12 d. Catalog number 13 2. Substitutions are not"or-equals". 14 B. Deviations from this City of Fort Worth Standard Specification 15 1. None. 16 C. Related Specification Sections include, but are not necessarily limited to: 17 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 18 2. Division 1 —General Requirements 19 1.2 PRICE AND PAYMENT PROCEDURES 20 A. Measurement and Payment 21 1. Work associated with this Item is considered subsidiary to the various items bid. 22 No separate payment will be allowed for this Item. 23 1.3 REFERENCES [NOT USED] 24 1.4 ADMINISTRATIVE REQUIREMENTS 25 A. Request for Substitution-General 26 1. Within 30 days after award of Contract(unless noted otherwise),the City will 27 consider formal requests from Contractor for substitution of products in place of 28 those specified. 29 2. Certain types of equipment and kinds of material are described in Specifications by 30 means of references to names of manufacturers and vendors,trade names, or 31 catalog numbers. 32 a. When this method of specifying is used, it is not intended to exclude from 33 consideration other products bearing other manufacturer's or vendor's names, 34 trade names, or catalog numbers,provided said products are "or-equals," as 35 determined by City. 36 3. Other types of equipment and kinds of material may be acceptable substitutions 37 under the following conditions: 38 a. Or-equals are unavailable due to strike,discontinued production of products 39 meeting specified requirements,or other factors beyond control of Contractor; 40 or, CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised July I,2011 012500-2 SUBSTITUTION PROCEDURES Page 2 of 4 1 b. Contractor proposes a cost and/or time reduction incentive to the City. 2 1.5 SUBMITTALS 3 A. See Request for Substitution Form (attached) 4 B. Procedure for Requesting Substitution 5 1. Substitution shall be considered only: 6 a. After award of Contract 7 b. Under the conditions stated herein 8 2. Submit 3 copies of each written request for substitution,including: 9 a. Documentation 10 1) Complete data substantiating compliance of proposed substitution with 11 Contract Documents 12 2) Data relating to changes in construction schedule,when a reduction is 13 proposed 14 3) Data relating to changes in cost 15 b. For products 16 1) Product identification 17 a) Manufacturer's name 18 b) Telephone number and representative contact name 19 c) Specification Section or Drawing reference of originally specified 20 product, including discrete name or tag number assigned to original 21 product in the Contract Documents 22 2) Manufacturer's literature clearly marked to show compliance of proposed 23 product with Contract Documents 24 3) Itemized comparison of original and proposed product addressing product 25 characteristics including, but not necessarily limited to: 26 a) Size 27 b) Composition or materials of construction 28 c) Weight 29 d) Electrical or mechanical requirements 30 4) Product experience 31 a) Location of past projects utilizing product 32 b) Name and telephone number of persons associated with referenced 33 projects knowledgeable concerning proposed product 34 c) Available field data and reports associated with proposed product 35 5) Samples 36 a) Provide at request of City. 37 b) Samples become the property of the City. 38 c. For construction methods: 39 1) Detailed description of proposed method 40 2) Illustration drawings 41 C. Approval or Rejection 42 1. Written approval or rejection of substitution given by the City 43 2. City reserves the right to require proposed product to comply with color and pattern 44 of specified product if necessary to secure design intent. 45 3. In the event the substitution is approved,the resulting cost and/or time reduction 46 will be documented by Change Order in accordance with the General Conditions. CITY OF FORT WOR`FH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised July 1,2011 012500-3 SUBSTITUTION PROCEDURES Page 3 of 4 1 4. No additional contract time will be given for substitution. 2 5. Substitution will be rejected if: 3 a. Submittal is not through the Contractor with his stamp of approval 4 b. Request is not made in accordance with this Specification Section 5 c. In the City's opinion, acceptance will require substantial revision of the original 6 design 7 d. In the City's opinion,substitution will not perform adequately the function 8 consistent with the design intent 9 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 10 1.7 CLOSEOUT SUBMITTALS [NOT USED] 11 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 12 1.9 QUALITY ASSURANCE 13 A. In making request for substitution or in using an approved product,the Contractor 14 represents that the Contractor: 15 1. Has investigated proposed product,and has determined that it is adequate or 16 superior in all respects to that specified, and that it will perform function for which 17 it is intended 18 2. Will provide same guarantee for substitute item as for product specified 19 3. Will coordinate installation of accepted substitution into Work,to include building 20 modifications if necessary, making such changes as may be required for Work to be 21 complete in all respects 22 4. Waives all claims for additional costs related to substitution which subsequently 23 arise 24 1.10 DELIVERY,STORAGE,AND HANDLING [NOT USED] 25 1.11 FIELD [SITE] CONDITIONS [NOT USED] 26 112 WARRANTY [NOT USED] 27 PART 2- PRODUCTS [NOT USED] 28 PART 3- EXECUTION [NOT USED] 29 END OF SECTION 30 Revision Log DATE NAME SUMMARY OF CHANGE 31 CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.02264.02265.02266 Revised July 1,2011 01 2500-4 SUBSTITUTION PROCEDURES Page 4 of 4 1 EXHIBIT A 2 REQUEST FOR SUBSTITUTION FORM: 3 4 TO: 5 PROJECT: DATE: 6 We hereby submit for your consideration the following product instead of the specified item for 7 the above project: 8 SECTION PARAGRAPH SPECIFIED ITEM 9 10 11 Proposed Substitution: 12 Reason for Substitution: 13 Include complete information on changes to Drawings and/or Specifications which proposed 14 substitution will require for its proper installation. 15 16 Fill in Blanks Below: 17 A. Will the undersigned contractor pay for changes to the building design, including engineering 18 and detailing costs caused by the requested substitution? 19 20 21 B. What effect does substitution have on other trades? 22 23 24 C. Differences between proposed substitution and specified item? 25 26 27 D. Differences in product cost or product delivery time? 28 29 30 E. Manufacturer's guarantees of the proposed and specified items are: 31 32 Equal Better(explain on attachment) 33 The undersigned states that the function, appearance and quality are equivalent or superior to the 34 specified item. 35 Submitted By: For Use by City 36 37 Signature Recommended Recommended 38 as noted 39 40 Firm Not recommended _Received late 41 Address By 42 Date 43 Date Remarks 44 Telephone 45 46 For Use by City: 47 48 Approved Rejected 49 City Date CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised July 1,2011 01 31 19- 1 PRECONSTRUCTION MEETING Page I of 3 l SECTION 01 31 19 2 PRECONSTRUCTION MEETING 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Provisions for the preconstruction meeting to be held prior to the start of Work to 7 clarify construction contract administration procedures 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include,but are not necessarily limited to: 11 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 12 2. Division l —General Requirements 13 1.2 PRICE AND PAYMENT PROCEDURES 14 A. Measurement and Payment 15 1. Work associated with this Item is considered subsidiary to the various items bid. 16 No separate payment will be allowed for this Item. 17 1.3 REFERENCES [NOT USED] 18 1.4 ADMINISTRATIVE REQUIREMENTS 19 A. Coordination 20 1. Attend preconstruction meeting. 21 2. Representatives of Contractor, subcontractors and suppliers attending meetings 22 shall be qualified and authorized to act on behalf of the entity each represents. 23 3. Meeting administered by City may be tape recorded. 24 a. If recorded,tapes will be used to prepare minutes and retained by City for 25 future reference. 26 B. Preconstruction Meeting 27 1. A preconstruction meeting will be held within 14 days after the execution of the 28 Agreement and before Work is started. 29 a. The meeting will be scheduled and administered by the City. 30 2. The Project Representative will preside at the meeting,prepare the notes of the 31 meeting and distribute copies of same to all participants who so request by fully 32 completing the attendance form to be circulated at the beginning of the meeting. 33 3. Attendance shall include: 34 a. Project Representative 35 b. Contractor's project manager 36 c. Contractor's superintendent 37 d. Any subcontractor or supplier representatives whom the Contractor may desire 38 to invite or the City may request CITY OF FORT WORTH Park Improvements at'rerry,Northside,High Crest,and Summertields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265.02266 Revised August 17,2012 01 31 19-2 PRECONSTRUCTION MEETING Page 2 of 3 1 e. Other City representatives 2 f. Others as appropriate 3 4. Construction Schedule 4 a. Prepare baseline construction schedule in accordance with Section 01 32 16 and 5 provide at Preconstruction Meeting. 6 b. City will notify Contractor of any schedule changes upon Notice of 7 Preconstruction Meeting. 8 5. Preliminary Agenda may include: 9 a. Introduction of Project Personnel 10 b. General Description of Project 11 c. Status of right-of-way, utility clearances, easements or other pertinent permits 12 d. Contractor's work plan and schedule 13 e. Contract Time 14 f. Notice to Proceed 15 g. Construction Staking 16 h. Progress Payments 17 i. Extra Work and Change Order Procedures 18 j. Field Orders 19 k. Disposal Site Letter for Waste Material 20 1. Insurance Renewals 21 m. Payroll Certification 22 n. Material Certifications and Quality Control Testing 23 o. Public Safety and Convenience 24 p. Documentation of Pre-Construction Conditions 25 q. Weekend Work Notification 26 r. Legal Holidays 27 s. Trench Safety Plans 28 t. Confined Space Entry Standards 29 u. Coordination with the City's representative for operations of existing water 30 systems 31 v. Storm Water Pollution Prevention Plan 32 w. Coordination with other Contractors 33 x. Early Warning System 34 y. Contractor Evaluation 35 z. Special Conditions applicable to the project 36 aa. Damages Claims 37 bb. Submittal Procedures 38 cc. Substitution Procedures 39 dd. Correspondence Routing 40 ee. Record Drawings 41 ff. Temporary construction facilities 42 gg. M/WBE or MBE/SBE procedures 43 hh. Final Acceptance 44 ii. Final Payment 45 J. Questions or Comments CITY OF FORT WORTH Park Improvements at Tern,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised August 17,2012 0131 19-3 PRECONSTRUCTION MEETING Page 3 of 3 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY,STORAGE,AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2- PRODUCTS [NOT USED] 10 PART 3- EXECUTION [NOT USED] 11 END OF SECTION 12 Revision Log DATE NAME SUMMARY OF CHANGE 13 CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised August 17,2012 This page is intentionally blank. 01 31 20- 1 PROJECT MEETINGS Page 1 of 3 1 SECTION 01 31 20 2 PROJECT MEETINGS 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Provisions for project meetings throughout the construction period to enable orderly 7 review of the progress of the Work and to provide for systematic discussion of 8 potential problems 9 B. Deviations this City of Fort Worth Standard Specification 10 1. None. 11 C. Related Specification Sections include,but are not necessarily limited to: 12 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 13 2. Division I —General Requirements 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Work associated with this Item is considered subsidiary to the various items bid. 17 No separate payment will be allowed for this Item. 18 1.3 REFERENCES [NOT USED] 19 1.4 ADMINISTRATIVE REQUIREMENTS 20 A. Coordination 21 1. Schedule, attend and administer as specified,periodic progress meetings, and 22 specially called meetings throughout progress of the Work. 23 2. Representatives of Contractor,subcontractors and suppliers attending meetings 24 shall be qualified and authorized to act on behalf of the entity each represents. 25 3. Meetings administered by City may be tape recorded. 26 a. If recorded,tapes will be used to prepare minutes and retained by City for 27 future reference. 28 4. Meetings, in addition to those specified in this Section,may be held when requested 29 by the City, Engineer or Contractor. 30 B. Pre-Construction Neighborhood Meeting 31 1. After the execution of the Agreement, but before construction is allowed to begin, 32 attend 1 Public Meeting with affected residents to: 33 a. Present projected schedule, including construction start date 34 b. Answer any construction related questions 35 2. Meeting Location 36 a. Location of meeting to be determined by the City. 37 3. Attendees 38 a. Contractor CITY OF FORT WORTH Park Improvements at Terry.Northside,High Crest,and Summerfields Parks S'T'ANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised July 1,2011 01 31 20-2 PROJECT MEETINGS Page 2 of 3 1 b. Project Representative 2 c. Other City representatives 3 4. Meeting Schedule 4 a. In general,the neighborhood meeting will occur within the 2 weeks following 5 the pre-construction conference. 6 b. In no case will construction be allowed to begin until this meeting is held. 7 C. Progress Meetings 8 1. Formal project coordination meetings will be held periodically. Meetings will be 9 scheduled and administered by Project Representative. 10 2. Additional progress meetings to discuss specific topics will be conducted on an as- 11 needed basis. Such additional meetings shall include, but not be limited to: 12 a. Coordinating shutdowns 13 b. Installation of piping and equipment 14 c. Coordination between other construction projects 15 d. Resolution of construction issues 16 e. Equipment approval 17 3. The Project Representative will preside at progress meetings,prepare the notes of 18 the meeting and distribute copies of the same to all participants who so request by 19 fully completing the attendance form to be circulated at the beginning of each 20 meeting. 21 4. Attendance shall include: 22 a. Contractor's project manager 23 b. Contractor's superintendent 24 c. Any subcontractor or supplier representatives whom the Contractor may desire 25 to invite or the City may request 26 d. Engineer's representatives 27 e. City's representatives 28 f. Others, as requested by the Project Representative 29 5. Preliminary Agenda may include: 30 a. Review of Work progress since previous meeting 31 b. Field observations,problems, conflicts 32 c. Items which impede construction schedule 33 d. Review of off-site fabrication, delivery schedules 34 e. Review of construction interfacing and sequencing requirements with other 35 construction contracts 36 f. Corrective measures and procedures to regain projected schedule 37 g. Revisions to construction schedule 38 h. Progress, schedule, during succeeding Work period 39 i. Coordination of schedules 40 j. Review submittal schedules 41 k. Maintenance of quality standards 42 1. Pending changes and substitutions 43 m. Review proposed changes for: 44 1) Effect on construction schedule and on completion date 45 2) Effect on other contracts of the Project 46 n. Review Record Documents 47 o. Review monthly pay request 48 p. Review status of Requests for Information CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised July L 2011 013120-3 PROJECT MEETINGS Page 3 of 3 1 6. Meeting Schedule 2 a. Progress meetings will be held periodically as determined by the Project 3 Representative. 4 1) Additional meetings may be held at the request of the: 5 a) City 6 b) Engineer 7 c) Contractor 8 7. Meeting Location 9 a. The City will establish a meeting location. 10 1) To the extent practicable,meetings will be held at the Site. 11 1.5 SUBMITTALS [NOT USED] 12 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 13 1.7 CLOSEOUT SUBMITTALS [NOT USED] 14 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 15 1.9 QUALITY ASSURANCE [NOT USED] 16 1.10 DELIVERY, STORAGE,AND HANDLING [NOT USED] 17 1.11 FIELD [SITE] CONDITIONS [NOT USED] 18 1.12 WARRANTY [NOT USED] 19 PART 2- PRODUCTS [NOT USED] 20 PART 3- EXECUTION [NOT USED] 21 END OF SECTION 22 Revision Log DATE NAME SUMMARY OF CHANGE 23 CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICA'T'ION DOCUMENTS 02263,02264,02265,02266 Revised July 1,2011 This page is intentionally blank. 01 32 16- 1 CONSTRUCTION PROGRESS SCHEDULE Page 1 of 5 1 SECTION 0132 16 2 CONSTRUCTION PROGRESS SCHEDULE 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. General requirements for the preparation, submittal, updating,status reporting and 7 management of the Construction Progress Schedule 8 2. Specific requirements are presented in the City of Fort Worth Schedule Guidance 9 Document 10 B. Deviations from this City of Fort Worth Standard Specification 11 1. None. 12 C. Related Specification Sections include,but are not necessarily limited to: 13 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 14 2. Division I —General Requirements 15 1.2 PRICE AND PAYMENT PROCEDURES 16 A. Measurement and Payment 17 1. Work associated with this Item is considered subsidiary to the various items bid. 18 No separate payment will be allowed for this Item. 19 1.3 REFERENCES 20 A. Definitions 21 1. Schedule Tiers 22 a. Tier 1 -No schedule submittal required by contract. Small,brief duration 23 projects 24 b. Tier 2-No schedule submittal required by contract,but will require some 25 milestone dates. Small, brief duration projects 26 c. Tier 3 -Schedule submittal required by contract as described in the 27 Specification and herein.Majority of City projects, including all bond program 28 projects 29 d. Tier 4-Schedule submittal required by contract as described in the 30 Specification and herein.Large and/or complex projects with long durations 31 1) Examples: large water pump station project and associated pipeline with 32 interconnection to another governmental entity 33 e. Tier 5-Schedule submittal required by contract as described in the 34 Specification and herein. Large and/or very complex projects with long 35 durations,high public visibility 36 1) Examples might include a water or wastewater treatment plant 37 2. Baseline Schedule-Initial schedule submitted before work begins that will serve 38 as the baseline for measuring progress and departures from the schedule. 39 3. Progress Schedule-Monthly submittal of a progress schedule documenting 40 progress on the project and any changes anticipated. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised July 1,2011 01 32 16-2 CONSTRUCTION PROGRESS SCHEDULE Page 2 of 5 1 4. Schedule Narrative-Concise narrative of the schedule including schedule 2 changes,expected delays, key schedule issues, critical path items, etc 3 B. Reference Standards 4 1. City of Fort Worth Schedule Guidance Document 5 1.4 ADMINISTRATIVE REQUIREMENTS 6 A. Baseline Schedule 7 1. General 8 a. Prepare a cost-loaded baseline Schedule using approved software and the 9 Critical Path Method(CPM)as required in the City of Fort Worth Schedule 10 Guidance Document. 11 b. Review the draft cost-loaded baseline Schedule with the City to demonstrate 12 understanding of the work to be performed and known issues and constraints 13 related to the schedule. 14 c. Designate an authorized representative(Project Scheduler)responsible for 15 developing and updating the schedule and preparing reports. 16 B. Progress Schedule 17 1. Update the progress Schedule monthly as required in the City of Fort Worth 18 Schedule Guidance Document. 19 2. Prepare the Schedule Narrative to accompany the monthly progress Schedule. 20 3. Change Orders 21 a. Incorporate approved change orders,resulting in a change of contract time, in 22 the baseline Schedule in accordance with City of Fort Worth Schedule 23 Guidance Document. 24 C. Responsibility for Schedule Compliance 25 1. Whenever it becomes apparent from the current progress Schedule and CPM Status 26 Report that delays to the critical path have resulted and the Contract completion 27 date will not be met,or when so directed by the City,make some or all of the 28 following actions at no additional cost to the City 29 a. Submit a Recovery Plan to the City for approval revised baseline Schedule 30 outlining: 31 1) A written statement of the steps intended to take to remove or arrest the 32 delay to the critical path in the approved schedule 33 2) Increase construction manpower in such quantities and crafts as will 34 substantially eliminate the backlog of work and return current Schedule to 35 meet projected baseline completion dates 36 3) Increase the number of working hours per shift, shifts per day,working 37 days per week,the amount of construction equipment,or any combination 38 of the foregoing, sufficiently to substantially eliminate the backlog of work 39 4) Reschedule activities to achieve maximum practical concurrency of 40 accomplishment of activities, and comply with the revised schedule 41 2. If no written statement of the steps intended to take is submitted when so requested 42 by the City,the City may direct the Contractor to increase the level of effort in 43 manpower(trades), equipment and work schedule(overtime,weekend and holiday 44 work, etc.)to be employed by the Contractor in order to remove or arrest the delay 45 to the critical path in the approved schedule. 46 a. No additional cost for such work will be considered. CITY OF FORT WORTH Park Improvements at Terrv,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised July 1,2011 01 32 16-3 CONSTRUCTION PROGRESS SCHEDULE Page 3 of 5 1 D. The Contract completion time will be adjusted only for causes specified in this 2 Contract. 3 a. Requests for an extension of any Contract completion date must be 4 supplemented with the following: 5 1) Furnish justification and supporting evidence as the City may deem 6 necessary to determine whether the requested extension of time is entitled 7 under the provisions of this Contract. 8 a) The City will,after receipt of such justification and supporting 9 evidence,make findings of fact and will advise the Contractor, in 10 writing thereof. 11 2) If the City finds that the requested extension of time is entitled,the City's 12 determination as to the total number of days allowed for the extensions 13 shall be based upon the approved total baseline schedule and on all data 14 relevant to the extension. 15 a) Such data shall be included in the next updating of the Progress 16 schedule. 17 b) Actual delays in activities which, according to the Baseline schedule, 18 do not affect any Contract completion date shown by the critical path in 19 the network will not be the basis for a change therein. 20 2. Submit each request for change in Contract completion date to the City within 30 21 days after the beginning of the delay for which a time extension is requested but 22 before the date of final payment under this Contract. 23 a. No time extension will be granted for requests which are not submitted within 24 the foregoing time limit. 25 b. From time to time, it may be necessary for the Contract schedule or completion 26 time to be adjusted by the City to reflect the effects of job conditions, weather, 27 technical difficulties, strikes, unavoidable delays on the part of the City or its 28 representatives, and other unforeseeable conditions which may indicate 29 schedule adjustments or completion time extensions. 30 1) Under such conditions,the City will direct the Contractor to reschedule the 31 work or Contract completion time to reflect the changed conditions and the 32 Contractor shall revise his schedule accordingly. 33 a) No additional compensation will be made to the Contractor for such 34 schedule changes except for unavoidable overall contract time 35 extensions beyond the actual completion of unaffected work, in which 36 case the Contractor shall take all possible action to minimize any time 37 extension and any additional cost to the City. 38 b) Available float time in the Baseline schedule may be used by the City 39 as well as by the Contractor. 40 3. Float or slack time is defined as the amount of time between the earliest start date 41 and the latest start date or between the earliest finish date and the latest finish date 42 of a chain of activities on the Baseline Schedule. 43 a. Float or slack time is not for the exclusive use or benefit of either the 44 Contractor or the City. 45 b. Proceed with work according to early start dates, and the City shall have the 46 right to reserve and apportion float time according to the needs of the project. CITY OF FORT WORTH Park Improvements at Tern'.Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised July 1,2011 01 32 16-4 CONSTRUCTION PROGRESS SCHEDULE Page 4 of 5 1 c. Acknowledge and agree that actual delays, affecting paths of activities 2 containing float time,will not have any effect upon contract completion times, 3 providing that the actual delay does not exceed the float time associated with 4 those activities. 5 E. Coordinating Schedule with Other Contract Schedules 6 1. Where work is to be performed under this Contract concurrently with or contingent 7 upon work performed on the same facilities or area under other contracts,the 8 Baseline Schedule shall be coordinated with the schedules of the other contracts. 9 a. Obtain the schedules of the other appropriate contracts from the City for the 10 preparation and updating of Baseline schedule and make the required changes 11 in his schedule when indicated by changes in corresponding schedules. 12 2. In case of interference between the operations of different contractors,the City will 13 determine the work priority of each contractor and the sequence of work necessary 14 to expedite the completion of the entire Project. 15 a. In such cases,the decision of the City shall be accepted as final. 16 b. The temporary delay of any work due to such circumstances shall not be 17 considered as justification for claims for additional compensation. 18 1.5 SUBMITTALS 19 A. Baseline Schedule 20 1. Submit Schedule in native file fonnat and pdf format as required in the City of Fort 21 Worth Schedule Guidance Document. 22 a. Native file format includes: 23 1) Primavera(P6 or Primavera Contractor) 24 2. Submit draft baseline Schedule to City prior to the pre-construction meeting and 25 bring in hard copy to the meeting for review and discussion. 26 B. Progress Schedule 27 1. Submit progress Schedule in native file format and pdf format as required in the 28 City of Fort Worth Schedule Guidance Document. 29 2. Submit progress Schedule monthly no later than the last day of the month. 30 C. Schedule Narrative 31 1. Submit the schedule narrative in pdf format as required in the City of Fort Worth 32 Schedule Guidance Document. 33 2. Submit schedule narrative monthly no later than the last day of the month. 34 D. Submittal Process 35 1. The City administers and manages schedules through Buzzsaw. 36 2. Contractor shall submit documents as required in the City of Fort Worth Schedule 37 Guidance Document. 38 3. Once the project has been completed and Final Acceptance has been issued by the 39 City,no further progress schedules are required. CITY OF FORT WORTH Park Improvements at Terrv.Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised July L 2011 01 32 16-5 CONSTRUCTION PROGRESS SCHEDULE Page 5 of 5 1 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 2 1.7 CLOSEOUT SUBMITTALS [NOT USED] 3 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 4 1.9 QUALITY ASSURANCE 5 A. The person preparing and revising the construction Progress Schedule shall be 6 experienced in the preparation of schedules of similar complexity. 7 B. Schedule and supporting documents addressed in this Specification shall be prepared, 8 updated and revised to accurately reflect the performance of the construction. 9 C. Contractor is responsible for the quality of all submittals in this section meeting the 10 standard of care for the construction industry for similar projects. 11 1.10 DELIVERY,STORAGE,AND HANDLING [NOT USED] 12 1.11 FIELD [SITE] CONDITIONS [NOT USED] 13 1.12 WARRANTY [NOT USED] 14 PART 2- PRODUCTS [NOT USED] 15 PART 3- EXECUTION [NOT USED] 16 END OF SECTION 17 Revision Log DATE NAME SUMMARY OF CHANGE 18 CITY OF FORT WORTH Park Improvements at'rerry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised July L 2011 This page is intentionally blank. 01 32 33-1 PRECONSTRUCTION VIDEO Page 1 of2 1 SECTION 0132 33 2 PRECONSTRUCTION VIDEO 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Administrative and procedural requirements for: 7 a. Preconstruction Videos 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include,but are not necessarily limited to: 11 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 12 2. Division 1 —General Requirements 13 1.2 PRICE AND PAYMENT PROCEDURES 14 A. Measurement and Payment 15 1. Work associated with this Item is considered subsidiary to the various items bid. 16 No separate payment will be allowed for this Item. 17 1.3 REFERENCES [NOT USED] 18 1.4 ADMINISTRATIVE REQUIREMENTS 19 A. Preconstruction Video 20 1. Produce a preconstruction video of the site/alignment, including all areas in the 21 vicinity of and to be affected by construction. 22 a. Provide digital copy of video upon request by the City. 23 2. Retain a copy of the preconstruction video until the end of the maintenance surety 24 period. 25 1.5 SUBMITTALS [NOT USED] 26 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 20 1.9 QUALITY ASSURANCE [NOT USED] 30 1.10 DELIVERY, STORAGE,AND HANDLING [NOT USED] 31 1.11 FIELD [SITE] CONDITIONS [NOT USED] 32 1.12 WARRANTY [NOT USED] 33 PART 2 - PRODUCTS [NOT USED] CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised July 1.2011 01 3233-2 PRECONSTRUCTION VIDEO Page 2 of 2 1 PART 3 - EXECUTION [NOT USED] 2 END OF SECTION 3 Revision Log DATE NAME SUMMARY OF CHANGE 4 CITY OF FORT WORTH Park improvements at Terry.Northside,High Crest.and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS ()2263-02264,02265,02266 Revised JLily 1,2011 01 33 00- 1 SUBMITTALS Page 1 of 8 1 SECTION 0133 00 2 SUBMITTALS 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. General methods and requirements of submissions applicable to the following 7 Work-related submittals: 8 a. Shop Drawings 9 b. Product Data(including Standard Product List submittals) 10 c. Samples 11 d. Mock Ups 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include, but are not necessarily limited to: 15 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 16 2. Division 1 —General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS 23 A. Coordination 24 1. Notify the City in writing, at the time of submittal, of any deviations in the 25 submittals from the requirements of the Contract Documents. 26 2. Coordination of Submittal Times 27 a. Prepare,prioritize and transmit each submittal sufficiently in advance of 28 performing the related Work or other applicable activities, or within the time 29 specified in the individual Work Sections, of the Specifications. 30 b. Contractor is responsible such that the installation will not be delayed by 31 processing times including, but not limited to: 32 a) Disapproval and resubmittal (if required) 33 b) Coordination with other submittals 34 c) Testing 35 d) Purchasing 36 e) Fabrication 37 f) Delivery 38 g) Similar sequenced activities 39 c. No extension of time will be authorized because of the Contractor's failure to 40 transmit submittals sufficiently in advance of the Work. CITY OF FORT WORTH Park Improvements at Terrv,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20.2012 013300-2 SUBMITTALS Page 2 of 8 1 d. Make submittals promptly in accordance with approved schedule, and in such 2 sequence as to cause no delay in the Work or in the work of any other 3 contractor. 4 B. Submittal Numbering 5 1. When submitting shop drawings or samples, utilize a 9-character submittal cross- 6 reference identification numbering system in the following manner: 7 a. Use the first 6 digits of the applicable Specification Section Number. 8 b. For the next 2 digits number use numbers 01-99 to sequentially number each 9 initial separate item or drawing submitted under each specific Section number. 10 c. Last use a letter,A-Z, indicating the resubmission of the same drawing(i.e. 11 A=2nd submission,B=3rd submission,C=4th submission, etc.). A typical 12 submittal number would be as follows: 13 14 03 30 00-08-B 15 16 1) 03 30 00 is the Specification Section for Concrete 17 2) 08 is the eighth initial submittal under this Specification Section 18 3) B is the third submission(second resubmission) of that particular shop 19 drawing 20 C. Contractor Certification 21 1. Review shop drawings,product data and samples, including those by 22 subcontractors,prior to submission to determine and verify the following: 23 a. Field measurements 24 b. Field construction criteria 25 c. Catalog numbers and similar data 26 d. Conformance with the Contract Documents 27 2. Provide each shop drawing,sample and product data submitted by the Contractor 28 with a Certification Statement affixed including: 29 a. The Contractor's Company name 30 b. Signature of submittal reviewer 31 c. Certification Statement 32 1) `By this submittal, I hereby represent that I have determined and verified 33 field measurements, field construction criteria, materials, dimensions, 34 catalog numbers and similar data and I have checked and coordinated each 35 item with other applicable approved shop drawings." 36 D. Submittal Format 37 1. Fold shop drawings larger than 8 %inches x 11 inches to 8 '/2 inches x 1 l inches. 38 2. Bind shop drawings and product data sheets together. 39 3. Order 40 a. Cover Sheet 41 1) Description of Packet 42 2) Contractor Certification 43 b. List of items/Table of Contents 44 c. Product Data/Shop Drawings/Samples/Calculations 45 E. Submittal Content 46 1. The date of submission and the dates of any previous submissions CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20.2012 01 3300-3 SUBMITTALS Page 3 of 8 1 2. The Project title and number 2 3. Contractor identification 3 4. The names of- 4 a. Contractor 5 b. Supplier 6 c. Manufacturer 7 5. Identification of the product,with the Specification Section number,page and 8 paragraph(s) 9 6. Field dimensions, clearly identified as such 10 7. Relation to adjacent or critical features of the Work or materials 11 8. Applicable standards,such as ASTM or Federal Specification numbers 12 9. Identification by highlighting of deviations from Contract Documents 13 10. Identification by highlighting of revisions on resubmittals 14 11. An 8-inch x 3-inch blank space for Contractor and City stamps 15 F. Shop Drawings 16 1. As specified in individual Work Sections includes,but is not necessarily limited to: 17 a. Custom-prepared data such as fabrication and erection/installation(working) 18 drawings 19 b. Scheduled information 20 c. Setting diagrams 21 d. Actual shopwork manufacturing instructions 22 e. Custom templates 23 f. Special wiring diagrams 24 g. Coordination drawings 25 h. Individual system or equipment inspection and test reports including: 26 1) Performance curves and certifications 27 i. As applicable to the Work 28 2. Details 29 a. Relation of the various parts to the main members and lines of the structure 30 b. Where correct fabrication of the Work depends upon field measurements 31 1) Provide such measurements and note on the drawings prior to submitting 32 for approval. 33 G. Product Data 34 1. For submittals of product data for products included on the City's Standard Product 35 List,clearly identify each item selected for use on the Project. 36 2. For submittals of product data for products not included on the City's Standard 37 Product List, submittal data may include, but is not necessarily limited to: 38 a. Standard prepared data for manufactured products(sometimes referred to as 39 catalog data) 40 1) Such as the manufacturer's product specification and installation 41 instructions 42 2) Availability of colors and patterns 43 3) Manufacturer's printed statements of compliances and applicability 44 4) Roughing-in diagrams and templates 45 5) Catalog cuts 46 6) Product photographs CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 013300-4 SUBMITTALS Page 4 of 8 1 7) Standard wiring diagrams 2 8) Printed performance curves and operational-range diagrams 3 9) Production or quality control inspection and test reports and certifications 4 10) Mill reports 5 11) Product operating and maintenance instructions and recommended 6 spare-parts listing and printed product warranties 7 12) As applicable to the Work 8 H. Samples 9 1. As specified in individual Sections, include, but are not necessarily limited to: 10 a. Physical examples of the Work such as: 11 1) Sections of manufactured or fabricated Work 12 2) Small cuts or containers of materials 13 3) Complete units of repetitively used products color/texture/pattern swatches 14 and range sets 15 4) Specimens for coordination of visual effect 16 5) Graphic symbols and units of Work to be used by the City for independent 17 inspection and testing, as applicable to the Work 18 I. Do not start Work requiring a shop drawing, sample or product data nor any material to 19 be fabricated or installed prior to the approval or qualified approval of such item. 20 1. Fabrication performed, materials purchased or on-site construction accomplished 21 which does not conform to approved shop drawings and data is at the Contractor's 22 risk. 23 2. The City will not be liable for any expense or delay due to corrections or remedies 24 required to accomplish conformity. 25 3. Complete project Work,materials, fabrication,and installations in conformance 26 with approved shop drawings, applicable samples,and product data. 27 J. Submittal Distribution 28 1. Electronic Distribution 29 a. Confirm development of Project directory for electronic submittals to be 30 uploaded to City's Buzzsaw site, or another external FTP site approved by the 31 City. 32 b. Shop Drawings 33 1) Upload submittal to designated project directory and notify appropriate 34 City representatives via email of submittal posting. 35 2) Hard Copies 36 a) 3 copies for all submittals 37 b) If Contractor requires more than 1 hard copy of Shop Drawings 38 returned, Contractor shall submit more than the number of copies listed 39 above. 40 c. Product Data 41 1) Upload submittal to designated project directory and notify appropriate 42 City representatives via email of submittal posting. 43 2) Hard Copies 44 a) 3 copies for all submittals 45 d. Samples 46 1) Distributed to the Project Representative 47 2. Hard Copy Distribution(if required in lieu of electronic distribution) CITY OF FORT WORTH Park Improvements at Terry,Northside_High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20.2012 01 3300-5 SUBMITTALS Page 5 of 8 1 a. Shop Drawings 2 1) Distributed to the City 3 2) Copies 4 a) 8 copies for mechanical submittals 5 b) 7 copies for all other submittals 6 c) If Contractor requires more than 3 copies of Shop Drawings returned, 7 Contractor shall submit more than the number of copies listed above. 8 b. Product Data 9 1) Distributed to the City 10 2) Copies 11 a) 4 copies 12 c. Samples 13 1) Distributed to the Project Representative 14 2) Copies 15 a) Submit the number stated in the respective Specification Sections. 16 3. Distribute reproductions of approved shop drawings and copies of approved 17 product data and samples,where required,to the job site file and elsewhere as 18 directed by the City. 19 a. Provide number of copies as directed by the City but not exceeding the number 20 previously specified. 21 K. Submittal Review 22 1. The review of shop drawings, data and samples will be for general conformance 23 with the design concept and Contract Documents. This is not to be construed as: 24 a. Permitting any departure from the Contract requirements 25 b. Relieving the Contractor of responsibility for any errors, including details, 26 dimensions,and materials 27 c. Approving departures from details furnished by the City,except as otherwise 28 provided herein 29 2. The review and approval of shop drawings, samples or product data by the City 30 does not relieve the Contractor from his/her responsibility with regard to the 31 fulfillment of the terms of the Contract. 32 a. All risks of error and omission are assumed by the Contractor, and the City will 33 have no responsibility therefore. 34 3. The Contractor remains responsible for details and accuracy, for coordinating the 35 Work with all other associated work and trades, for selecting fabrication processes, 36 for techniques of assembly and for performing Work in a safe manner. 37 4. If the shop drawings, data or samples as submitted describe variations and show a 38 departure from the Contract requirements which City finds to be in the interest of 39 the City and to be so minor as not to involve a change in Contract Price or time for 40 performance,the City may return the reviewed drawings without noting an 41 exception. 42 5. Submittals will be returned to the Contractor under 1 of the following codes: 43 a. Code 1 44 1) "NO EXCEPTIONS TAKEN" is assigned when there are no notations or 45 comments on the submittal. 46 a) When returned under this code the Contractor may release the 47 equipment and/or material for manufacture. 48 b. Code 2 CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 013300-6 SUBMITTALS Page 6 of 8 1 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of 2 the notations and comments IS NOT required by the Contractor. 3 a) The Contractor may release the equipment or material for manufacture; 4 however, all notations and comments must be incorporated into the 5 final product. 6 c. Code 3 7 1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is 8 assigned when notations and comments are extensive enough to require a 9 resubmittal of the package. 10 a) The Contractor may release the equipment or material for manufacture; 11 however, all notations and comments must be incorporated into the 12 final product. 13 b) This resubmittal is to address all comments, omissions and 14 non-conforming items that were noted. 15 c) Resubmittal is to be received by the City within 15 Calendar Days of 16 the date of the City's transmittal requiring the resubmittal. 17 d. Code 4 18 1) "NOT APPROVED" is assigned when the submittal does not meet the 19 intent of the Contract Documents. 20 a) The Contractor must resubmit the entire package revised to bring the 21 submittal into conformance. 22 b) It may be necessary to resubmit using a different manufacturer/vendor 23 to meet the Contract Documents. 24 6. Resubmittals 25 a. Handled in the same manner as first submittals 26 1) Corrections other than requested by the City 27 2) Marked with revision triangle or other similar method 28 a) At Contractor's risk if not marked 29 b. Submittals for each item will be reviewed no more than twice at the City's 30 expense. 31 1) All subsequent reviews will be performed at times convenient to the City 32 and at the Contractor's expense, based on the City's or City 33 Representative's then prevailing rates. 34 2) Provide Contractor reimbursement to the City within 30 Calendar Days for 35 all such fees invoiced by the City. 36 c. The need for more than 1 resubmission or any other delay in obtaining City's 37 review of submittals, will not entitle the Contractor to an extension of Contract 38 Time. 39 7. Partial Submittals 40 a. City reserves the right to not review submittals deemed partial, at the City's 41 discretion. 42 b. Submittals deemed by the City to be not complete will be returned to the 43 Contractor, and will be considered "Not Approved" until resubmitted. 44 c. The City may at its option provide a list or mark the submittal directing the 45 Contractor to the areas that are incomplete. 46 8. If the Contractor considers any correction indicated on the shop drawings to 47 constitute a change to the Contract Documents,then written notice must be 48 provided thereof to the City at least 7 Calendar Days prior to release for 49 manufacture. CITY OF FORT WORTH Park Improvements at Terry.Northside,High Crest,and Smnmerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264.02265,02266 Revised December 20,2012 013300-7 SUBMITTALS Page 7 of 8 1 9. When the shop drawings have been completed to the satisfaction of the City,the 2 Contractor may carry out the construction in accordance therewith and no further 3 changes therein except upon written instructions from the City. 4 10. Each submittal, appropriately coded, will be returned within 30 Calendar Days 5 following receipt of submittal by the City. 6 L. Mock ups 7 1. Mock Up units as specified in individual Sections, include, but are not necessarily 8 limited to,complete units of the standard of acceptance for that type of Work to be 9 used on the Project. Remove at the completion of the Work or when directed. 10 M. Qualifications 11 1. If specifically required in other Sections of these Specifications, submit a P.E. 12 Certification for each item required. 13 N. Request for Information(RFI) 14 1. Contractor Request for additional information 15 a. Clarification or interpretation of the contract documents 16 b. When the Contractor believes there is a conflict between Contract Documents 17 c. When the Contractor believes there is a conflict between the Drawings and 18 Specifications 19 1) Identify the conflict and request clarification 20 2. Use the Request for Information(RFI)form provided by the City. 21 3. Numbering of RFI 22 a. Prefix with"RFI"followed by series number, "-xxx",beginning with"01"and 23 increasing sequentially with each additional transmittal. 24 4. Sufficient information shall be attached to permit a written response without further 25 information. 26 5. The City will log each request and will review the request. 27 a. If review of the project information request indicates that a change to the 28 Contract Documents is required,the City will issue a Field Order or Change 29 Order, as appropriate. 30 1.5 SUBMITTALS [NOT USED] 31 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 32 1.7 CLOSEOUT SUBMITTALS [NOT USED] 33 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 34 1.9 QUALITY ASSURANCE [NOT USED] 35 1.10 DELIVERY,STORAGE,AND HANDLING [NOT USED] 36 1.11 FIELD [SITE] CONDITIONS [NOT USED] 37 1.12 WARRANTY [NOT USED] CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summer6elds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02261 02264,02265,02266 Revised December 20.2012 01 3300-8 SUBMITTALS Page 8 of 8 I PART 2 - PRODUCTS [NOT USED] 2 PART 3- EXECUTION [NOT USED] 3 END OF SECTION 4 Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D.Johnson 1.4.K.8.Working Days modified to Calendar Days 5 CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest_and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263-02264.02265,02266 Revised December 20,2012 013513-I SPECIAL PROJECT PROCEDURES Page I of 8 1 SECTION 0135 13 2 SPECIAL PROJECT PROCEDURES 3 GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. The procedures for special project circumstances that includes, but is not limited to: 7 a. Coordination with the Texas Department of Transportation 8 b. Work near High Voltage Lines 9 c. Confined Space Entry Program 10 d. Air Pollution Watch Days 11 e. Use of Explosives,Drop Weight,Etc. 12 f. Water Department Notification 13 g. Public Notification Prior to Beginning Construction 14 h. Coordination with United States Army Corps of Engineers 15 i. Coordination within Railroad permits areas 16 j. Dust Control 17 k. Employee Parking 18 B. Deviations from this City of Fort Worth Standard Specification 19 1. None. 20 C. Related Specification Sections include,but are not necessarily limited to: 21 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 22 2. Division 1 —General Requirements 23 3. Section 33 12 25—Connection to Existing Water Mains 24 1.2 PRICE AND PAYMENT PROCEDURES 25 A. Measurement and Payment 26 1. Coordination within Railroad permit areas 27 a. Measurement 28 1) Measurement for this Item will be by lump sum. 29 b. Payment 30 1) The work performed and materials furnished in accordance with this Item 31 will be paid for at the lump sum price bid for Railroad Coordination. 32 c. The price bid shall include: 33 l) Mobilization 34 2) Inspection 35 3) Safety training 36 4) Additional Insurance 37 5) Insurance Certificates 38 6) Other requirements associated with general coordination with Railroad, 39 including additional employees required to protect the right-of-way and 40 property of the Railroad from damage arising out of and/or from the 41 construction of the Project. 42 2. Railroad Flagmen CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summer6elds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264.02265,02266 Revised December 20.2012 01 35 13-2 SPECIAL PROJECT PROCEDURES Page 2 of 8 1 a. Measurement 2 1) Measurement for this Item will be per working day. 3 b. Payment 4 1) The work performed and materials furnished in accordance with this Item 5 will be paid for each working day that Railroad Flagmen are present at the 6 Site. 7 c. The price bid shall include: 8 1) Coordination for scheduling flagmen 9 2) Flagmen 10 3) Other requirements associated with Railroad 11 3. All other items 12 a. Work associated with these Items is considered subsidiary to the various Items 13 bid. No separate payment will be allowed for this Item. 14 1.3 REFERENCES 15 A. Reference Standards 16 1. Reference standards cited in this Specification refer to the current reference 17 standard published at the time of the latest revision date logged at the end of this 18 Specification,unless a date is specifically cited. 19 2. Health and Safety Code,Title 9. Safety, Subtitle A.Public Safety, Chapter 752. 20 High Voltage Overhead Lines. 21 3. North Central Texas Council of Governments(NCTCOG)—Clean Construction 22 Specification 23 1.4 ADMINISTRATIVE REQUIREMENTS 24 A. Coordination with the Texas Department of Transportation 25 1. When work in the right-of-way which is under the jurisdiction of the Texas 26 Department of Transportation(TxDOT): 27 a. Notify the Texas Department of Transportation prior to commencing any work 28 therein in accordance with the provisions of the permit 29 b. All work performed in the TxDOT right-of-way shall be performed in 30 compliance with and subject to approval from the Texas Department of 31 Transportation 32 B. Work near High Voltage Lines 33 1. Regulatory Requirements 34 a. All Work near High Voltage Lines(more than 600 volts measured between 35 conductors or between a conductor and the ground)shall be in accordance with 36 Health and Safety Code,Title 9, Subtitle A, Chapter 752. 37 2. Warning sign 38 a. Provide sign of sufficient size meeting all OSHA requirements. 39 3. Equipment operating within 10 feet of high voltage lines will require the following 40 safety features 41 a. Insulating cage-type of guard about the boom or arm 42 b. Insulator links on the lift hook connections for back hoes or dippers 43 c. Equipment must meet the safety requirements as set forth by OSHA and the 44 safety requirements of the owner of the high voltage lines 45 4. Work within 6 feet of high voltage electric lines CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265-02266 Revised December 20,2012 01 35 13-3 SPECIAL PROJECT PROCEDURES Page 3 of 8 1 a. Notification shall be given to: 2 1) The power company(example: ONCOR) 3 a) Maintain an accurate log of all such calls to power company and record 4 action taken in each case. 5 b. Coordination with power company 6 1) After notification coordinate with the power company to: 7 a) Erect temporary mechanical barriers, de-energize the lines, or raise or 8 lower the lines 9 c. No personnel may work within 6 feet of a high voltage line before the above 10 requirements have been met. 11 C. Confined Space Entry Program 12 1. Provide and follow approved Confined Space Entry Program in accordance with 13 OSHA requirements. 14 2. Confined Spaces include: 15 a. Manholes 16 b. All other confined spaces in accordance with OSHA's Permit Required for 17 Confined Spaces 18 D. Air Pollution Watch Days 19 1. General 20 a. Observe the following guidelines relating to working on City construction sites 21 on days designated as"AIR POLLUTION WATCH DAYS". 22 b. Typical Ozone Season 23 1) May 1 through October 31. 24 c. Critical Emission Time 25 1) 6:00 a.m.to 10:00 a.m. 26 2. Watch Days 27 a. The Texas Commission on Environmental Quality(TCEQ), in coordination 28 with the National Weather Service, will issue the Air Pollution Watch by 3:00 29 p.m. on the afternoon prior to the WATCH day. 30 b. Requirements 31 1) Begin work after 10:00 a.m. whenever construction phasing requires the 32 use of motorized equipment for periods in excess of I hour. 33 2) However,the Contractor may begin work prior to 10:00 a.m. if: 34 a) Use of motorized equipment is less than 1 hour, or 35 b) If equipment is new and certified by EPA as "Low Emitting", or 36 equipment burns Ultra Low Sulfur Diesel (ULSD), diesel emulsions, or 37 alternative fuels such as CNG. 38 E. TCEQ Air Permit 39 1. Obtain TCEQ Air Permit for construction activities per requirements of TCEQ. 40 F. Use of Explosives,Drop Weight,Etc. 41 1. When Contract Documents permit on the project the following will apply: 42 a. Public Notification 43 1) Submit notice to City and proof of adequate insurance coverage, 24 hours 44 prior to commencing. 45 2) Minimum 24 hour public notification in accordance with Section 01 31 13 46 G. Water Department Coordination CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summertields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.02264,02265,02266 Revised December 20 2012 01 35 13-4 SPECIAL PROJECT PROCEDURES Page 4 of 8 1 1. During the construction of this project, it will be necessary to deactivate,for a 2 period of time, existing lines. The Contractor shall be required to coordinate with 3 the Water Department to determine the best times for deactivating and activating 4 those lines. 5 2. Coordinate any event that will require connecting to or the operation of an existing 6 City water line system with the City's representative. 7 a. Coordination shall be in accordance with Section 33 12 25. 8 b. If needed, obtain a hydrant water meter from the Water Department for use 9 during the life of named project. 10 c. In the event that a water valve on an existing live system be turned off and on i l to accommodate the construction of the project is required, coordinate this 12 activity through the appropriate City representative. 13 1) Do not operate water line valves of existing water system. 14 a) Failure to comply will render the Contractor in violation of Texas Penal 15 Code Title 7, Chapter 28.03 (Criminal Mischief)and the Contractor 16 will be prosecuted to the full extent of the law. 17 b) In addition,the Contractor will assume all liabilities and 18 responsibilities as a result of these actions. 19 H. Public Notification Prior to Beginning Construction 20 1. Prior to beginning construction on any block in the project, on a block by block 21 basis, prepare and deliver a notice or flyer of the pending construction to the front 22 door of each residence or business that will be impacted by construction. The notice 23 shall be prepared as follows: 24 a. Post notice or flyer 7 days prior to beginning any construction activity on each 25 block in the project area. 26 1) Prepare flyer on the Contractor's letterhead and include the following 27 information: 28 a) Name of Project 29 b) City Project No(CPN) 30 c) Scope of Project(i.e.type of construction activity) 31 d) Actual construction duration within the block 32 e) Name of the contractor's foreman and phone number 33 f) Name of the City's inspector and phone number 34 g) City's after-hours phone number 35 2) A sample of the `pre-construction notification' flyer is attached as Exhibit 36 A. 37 3) Submit schedule showing the construction start and finish time for each 38 block of the project to the inspector. 39 4) Deliver flyer to the City Inspector for review prior to distribution. 40 b. No construction will be allowed to begin on any block until the flyer is 41 delivered to all residents of the block. 42 1. Public Notification of Temporary Water Service Interruption during Construction 43 1. In the event it becomes necessary to temporarily shut down water service to 44 residents or businesses during construction,prepare and deliver a notice or flyer of 45 the pending interruption to the front door of each affected resident. 46 2. Prepared notice as follows: 47 a. The notification or flyer shall be posted 24 hours prior to the temporary 48 interruption. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summertields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.02264.02265.02266 Revised December 20,2012 01 35 13-5 SPECIAL PROJECT PROCEDURES Page 5 of 8 1 b. Prepare flyer on the contractor's letterhead and include the following 2 information: 3 1) Name of the project 4 2) City Project Number 5 3) Date of the interruption of service 6 4) Period the interruption will take place 7 5) Name of the contractor's foreman and phone number 8 6) Name of the City's inspector and phone number 9 c. A sample of the temporary water service interruption notification is attached as 10 Exhibit B. I d. Deliver a copy of the temporary interruption notification to the City inspector 12 for review prior to being distributed. 13 e. No interruption of water service can occur until the flyer has been delivered to 14 all affected residents and businesses. 15 f. Electronic versions of the sample flyers can be obtained from the Project 16 Construction Inspector. 17 J. Coordination with United States Army Corps of Engineers(USACE) 18 1. At locations in the Project where construction activities occur in areas where 19 USACE permits are required, meet all requirements set forth in each designated 20 permit. 21 K. Coordination within Railroad Permit Areas 22 1. At locations in the project where construction activities occur in areas where 23 railroad permits are required, meet all requirements set forth in each designated 24 railroad permit. This includes,but is not limited to, provisions for: 25 a. Flagmen 26 b. Inspectors 27 c. Safety training 28 d. Additional insurance 29 e. Insurance certificates 30 f. Other employees required to protect the right-of-way and property of the 31 Railroad Company from damage arising out of and/or from the construction of 32 the project. Proper utility clearance procedures shall be used in accordance 33 with the permit guidelines. 34 2. Obtain any supplemental information needed to comply with the railroad's 35 requirements. 36 3. Railroad Flagmen 37 a. Submit receipts to City for verification of working days that railroad flagmen 38 were present on Site. 39 L. Dust Control 40 1. Use acceptable measures to control dust at the Site. 41 a. If water is used to control dust, capture and properly dispose of waste water. 42 b. If wet saw cutting is performed, capture and properly dispose of slurry. 43 M. Employee Parking 44 1. Provide parking for employees at locations approved by the City. 45 N. {Coordination with North Central Texas Council of Governments(NCTCOG)Clean 46 Construction Specification [if required for the project—verify with City] CITY OF FORT WORTH Park Improvements at Terry,Norihside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.02264,02265.02266 Revised December 20,2012 01 35 13-6 SPECIAL PROJECT PROCEDURES Page 6 of 8 1 1. Comply With equipment,operational,reporting and enforcement requirements set 2 forth in NCTCOG's Clean Construction Specification.) 3 1S SUBMITTALS [NOT USED] 4 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 5 1.7 CLOSEOUT SUBMITTALS [NOT USED] 6 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 7 1.9 QUALITY ASSURANCE [NOT USED] 8 1.10 DELIVERY, STORAGE,AND HANDLING [NOT USED] 9 1.11 FIELD [SITE] CONDITIONS [NOT USED] 10 1.12 WARRANTY [NOT USED] 11 PART 2- PRODUCTS [NOT USED] 12 PART 3 - EXECUTION [NOT USED] 13 END OF SECTION 14 Revision Log DATE NAME SUMMARY OF CHANGE 1.4.13—Added requirement of compliance With Health and Safety Code,Title 9. 8/31/2012 D.Johnson Safety,Subtitle A.Public Safety,Chapter 752.High Voltage Overhead Lines. 1.4.E—Added Contractor responsibility for obtaining a TCEQ Air Permit 15 CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 0226302264,02265-02266 Revised December 20,2012 01 35 13-7 SPECIAL PROIECFPROCEDURES Page 7 of 8 1 EXHIBIT A 2 (To be printed on Contractor's Letterhead) 3 4 5 6 Date: 7 8 CPN No.: 9 Project Name: 10 Mapsco Location: 11 Limits of Construction: 12 13 14 15 16 17 THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT 18 WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR 19 PROPERTY. 20 21 CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE 22 OF THIS NOTICE. 23 24 IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER 25 ISSUE, PLEASE CALL: 26 27 28 Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> 29 30 OR 31 32 Mr. <CITY INSPECTOR> AT< TELEPHONE NO.> 33 34 AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 35 36 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL 37 CITY OF FORT WORTH Park Improvements at Terry,Northside,Hieh Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 01 35 13-8 SPECIAL PROJECT PROCEDURES Page 8 of 8 t EXHIBIT B 2 FORT WORTH Date: DoE HO.XXXX Project name: NOTICE OF TEMPORARY WATER SERVICE INTERRUPTION DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON BETWEEN THE HOURS OF AND IF YOU HAVE QUESTIONS ABOUT THIS SHUT-OUT,PLEASE CALL: MR. AT (CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER) OR MR. AT (CITY INSPECTOR) (TELEPHONE NUMBER) THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE. THANK YOU, ,CONTRACTOR 3 - --- 4 CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 01 4523- 1 TESTING AND INSPECTION SERVICES Page 1 of 2 1 SECTION 0145 23 2 TESTING AND INSPECTION SERVICES 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Testing and inspection services procedures and coordination 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include,but are not necessarily limited to: 10 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1 —General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various Items bid. 15 No separate payment will be allowed for this Item. 16 a. Contractor is responsible for performing, coordinating, and payment of all 17 Quality Control testing. 18 b. City is responsible for performing and payment for first set of Quality 19 Assurance testing. 20 1) If the first Quality Assurance test performed by the City fails,the 21 Contractor is responsible for payment of subsequent Quality Assurance 22 testing until a passing test occurs. 23 a) Final acceptance will not be issued by City until all required payments 24 for testing by Contractor have been paid in full. 25 1.3 REFERENCES [NOT USED] 26 1.4 ADMINISTRATIVE REQUIREMENTS 27 A. Testing 28 1. Complete testing in accordance with the Contract Documents. 29 2. Coordination 30 a. When testing is required to be performed by the City, notify City, sufficiently 31 in advance, when testing is needed. 32 b. When testing is required to be completed by the Contractor, notify City, 33 sufficiently in advance,that testing will be performed. 34 3. Distribution of Testing Reports 35 a. Electronic Distribution 36 1) Confirm development of Project directory for electronic submittals to be 37 uploaded to City's Buzzsaw site, or another external FTP site approved by 38 the City. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Surnmerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised July 1,2011 014523-2 TESTING AND INSPECTION SERVICES Page 2 of 2 1 2) Upload test reports to designated project directory and notify appropriate 2 City representatives via email of submittal posting. 3 3) Hard Copies 4 a) 1 copy for all submittals submitted to the Project Representative 5 b. Hard Copy Distribution(if required in lieu of electronic distribution) 6 1) Tests performed by City 7 a) Distribute 1 hard copy to the Contractor 8 2) Tests performed by the Contractor 9 a) Distribute 3 hard copies to City's Project Representative 10 4. Provide City's Project Representative with trip tickets for each delivered load of 11 Concrete or Lime material including the following information: 12 a. Name of pit 13 b. Date of delivery 14 c. Material delivered 15 B. Inspection 16 1. Inspection or lack of inspection does not relieve the Contractor from obligation to 17 perform work in accordance with the Contract Documents. 18 1.5 SUBMITTALS [NOT USED] 19 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 20 1.7 CLOSEOUT SUBMITTALS [NOT USED] 21 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 22 1.9 QUALITY ASSURANCE [NOT USED] 23 1.10 DELIVERY, STORAGE,AND HANDLING [NOT USED] 24 1.11 FIELD [SITE] CONDITIONS [NOT USED] 25 1.12 WARRANTY [NOT USED] 26 PART 2- PRODUCTS [NOT USED] 27 PART 3- EXECUTION [NOT USED] 28 END OF SECTION 29 Revision Log DATE NAME SUMMARY OF CHANGE 30 CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest.and Summerftelds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264-02265.02266 Revised.luly I,2011 01 50 00- 1 TEMPORARY FACILITIES AND CONTROLS Page I of 4 1 SECTION 0150 00 2 TEMPORARY FACILITIES AND CONTROLS 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Provide temporary facilities and controls needed for the Work including, but not 7 necessarily limited to: 8 a. Temporary utilities 9 b. Sanitary facilities 10 c. Storage Sheds and Buildings 11 d. Dust control 12 e. Temporary fencing of the construction site 13 B. Deviations from this City of Fort Worth Standard Specification 14 1. None. 15 C. Related Specification Sections include, but are not necessarily limited to: 16 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 17 2. Division 1 —General Requirements 18 1.2 PRICE AND PAYMENT PROCEDURES 19 A. Measurement and Payment 20 1. Work associated with this Item is considered subsidiary to the various Items bid. 21 No separate payment will be allowed for this Item. 22 1.3 REFERENCES [NOT USED] 23 1.4 ADMINISTRATIVE REQUIREMENTS 24 A. Temporary Utilities 25 1. Obtaining Temporary Service 26 a. Make arrangements with utility service companies for temporary services. 27 b. Abide by rules and regulations of utility service companies or authorities 28 having jurisdiction. 29 c. Be responsible for utility service costs until Work is approved for Final 30 Acceptance. 31 1) Included are fuel,power, light,heat and other utility services necessary for 32 execution, completion,testing and initial operation of Work. 33 2. Water 34 a. Contractor to provide water required for and in connection with Work to be 35 performed and for specified tests of piping,equipment,devices or other use as 36 required for the completion of the Work. 37 b. Provide and maintain adequate supply of potable water for domestic 38 consumption by Contractor personnel and City's Project Representatives. 39 c. Coordination 40 l) Contact City I week before water for construction is desired CITY OF FORT WORTH Park Improvements at Terry,Northside,I figh Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264-02265,02266 Revised July 1,2011 01 5000-2 TEMPORARY FACILITIES AND CONTROLS Page 2 of 4 I d. Contractor Payment for Construction Water 2 1) Obtain construction water meter from City for payment as billed by City's 3 established rates. 4 3. Electricity and Lighting 5 a. Provide and pay for electric powered service as required for Work, including 6 testing of Work. 7 1) Provide power for lighting, operation of equipment, or other use. 8 b. Electric power service includes temporary power service or generator to 9 maintain operations during scheduled shutdown. 10 4. Telephone 11 a. Provide emergency telephone service at Site for use by Contractor personnel 12 and others performing work or furnishing services at Site. 13 5. Temporary Heat and Ventilation 14 a. Provide temporary heat as necessary for protection or completion of Work. 15 b. Provide temporary heat and ventilation to assure safe working conditions. 16 B. Sanitary Facilities 17 1. Provide and maintain sanitary facilities for persons on Site. 18 a. Comply with regulations of State and local departments of health. 19 2. Enforce use of sanitary facilities by construction personnel at job site. 20 a. Enclose and anchor sanitary facilities. 21 b. No discharge will be allowed from these facilities. 22 c. Collect and store sewage and waste so as not to cause nuisance or health 23 problem. 24 d. Haul sewage and waste off-site at no less than weekly intervals and properly 25 dispose in accordance with applicable regulation. 26 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 27 4. Remove facilities at completion of Project 28 C. Storage Sheds and Buildings 29 1. Provide adequately ventilated, watertight,weatherproof storage facilities with floor 30 above ground level for materials and equipment susceptible to weather damage. 31 2. Storage of materials not susceptible to weather damage may be on blocks off 32 ground. 33 3. Store materials in a neat and orderly manner. 34 a. Place materials and equipment to permit easy access for identification, 35 inspection and inventory. 36 4. Equip building with lockable doors and lighting, and provide electrical service for 37 equipment space heaters and heating or ventilation as necessary to provide storage 38 environments acceptable to specified manufacturers. 39 5. Fill and grade site for temporary structures to provide drainage away from 40 temporary and existing buildings. 41 6. Remove building frorn site prior to Final Acceptance. 42 D. Temporary Fencing 43 1. Provide and maintain for the duration or construction when required in contract 44 documents 45 E. Dust Control CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised July 1,2011 01 5000-3 TEMPORARY FACILITIES AND CONTROLS Page 3 of 4 1 1. Contractor is responsible for maintaining dust control through the duration of the 2 project. 3 a. Contractor remains on-call at all times 4 b. Must respond in a timely manner 5 F. Temporary Protection of Construction 6 1. Contractor or subcontractors are responsible for protecting Work from damage due 7 to weather. 8 1.5 SUBMITTALS [NOT USED] 9 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 10 1.7 CLOSEOUT SUBMITTALS [NOT USED] 11 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 12 1.9 QUALITY ASSURANCE [NOT USED] 13 1.10 DELIVERY,STORAGE,AND HANDLING [NOT USED] 14 1.11 FIELD [SITE] CONDITIONS [NOT USED] 15 1.12 WARRANTY [NOT USED] 16 PART 2- PRODUCTS [NOT USED] 17 PART 3- EXECUTION [NOT USED] 18 3.1 INSTALLERS [NOT USED] 19 3.2 EXAMINATION [NOT USED] 20 3.3 PREPARATION [NOT USED] 21 3.4 INSTALLATION 22 A. Temporary Facilities 23 1. Maintain all temporary facilities for duration of construction activities as needed. 24 3.5 [REPAIR] / [RESTORATION] 25 3.6 RE-INSTALLATION 26 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 27 3.8 SYSTEM STARTUP [NOT USED] 28 3.9 ADJUSTING [NOT USED] 29 3.10 CLEANING [NOT USED] 30 3.11 CLOSEOUT ACTIVITIES 31 A. Temporary Facilities CITY OF FORT WORTH Park Improvements at Terry,Norihside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263-02264,02265-02266 Revised July 1,2011 01 5000-4 TEMPORARY FACILITIES AND CONTROLS Page 4 of 4 1 1. Remove all temporary facilities and restore area after completion of the Work,to a 2 condition equal to or better than prior to start of Work. 3 3.12 PROTECTION [NOT USED] 4 3.13 MAINTENANCE [NOT USED] 5 3.14 ATTACHMENTS [NOT USED] 6 END OF SECTION 7 Revision Log DATE NAME SUMMARY OF CHANGE 8 CITY OF FORT WORTH Park Improvements at Terry.Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265.02266 Revised.11115' 1,2011 01 55 26- 1 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page l of 3 1 SECTION 0155 26 2 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Administrative procedures for: 7 a. Street Use Permit 8 b. Modification of approved traffic control 9 c. Removal of Street Signs 10 B. Deviations from this City of Fort Worth Standard Specification 11 1. None. 12 C. Related Specification Sections include,but are not necessarily limited to: 13 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 14 2. Division 1 —General Requirements 15 3. Section 34 71 13—Traffic Control 16 1.2 PRICE AND PAYMENT PROCEDURES 17 A. Measurement and Payment 18 1. Work associated with this Item is considered subsidiary to the various Items bid. 19 No separate payment will be allowed for this Item. 20 1.3 REFERENCES 21 A. Reference Standards 22 1. Reference standards cited in this specification refer to the current reference standard 23 published at the time of the latest revision date logged at the end of this 24 specification, unless a date is specifically cited. 25 2. Texas Manual on Uniform Traffic Control Devices(TMUTCD). 26 1.4 ADMINISTRATIVE REQUIREMENTS 27 A. Traffic Control 28 1. General 29 a. When traffic control plans are included in the Drawings, provide Traffic 30 Control in accordance with Drawings and Section 34 71 13. 31 b. When traffic control plans are not included in the Drawings,prepare traffic 32 control plans in accordance with Section 34 71 13 and submit to City for 33 review. 34 1) Allow minimum 10 working days for review of proposed Traffic Control. 35 B. Street Use Permit 36 1. Prior to installation of Traffic Control, a City Street Use Permit is required. 37 a. To obtain Street Use Permit, submit Traffic Control Plans to City 38 Transportation and Public Works Department. CITY OF FORT WORTH Park Improvements at Terrv,Northside,High Crest,and Summefields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised July I,2011 01 5526-2 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 2 of 3 1 1) Allow a minimum of 5 working days for permit review. 2 2) Contractor's responsibility to coordinate review of Traffic Control plans for 3 Street Use Permit, such that construction is not delayed. 4 C. Modification to Approved Traffic Control 5 1. Prior to installation traffic control: 6 a. Submit revised traffic control plans to City Department Transportation and 7 Public Works Department. 8 1) Revise Traffic Control plans in accordance with Section 34 71 13. 9 2) Allow minimum 5 working days for review of revised Traffic Control. 10 3) It is the Contractor's responsibility to coordinate review of Traffic Control 11 plans for Street Use Permit,such that construction is not delayed. 12 D. Removal of Street Sign 13 1. If it is determined that a street sign must be removed for construction,then contact 14 City Transportation and Public Works Department, Signs and Markings Division to 15 remove the sign. 16 E. Temporary Signage 17 1. In the case of regulatory signs, replace permanent sign with temporary sign meeting 18 requirements of the latest edition of the Texas Manual on Uniform Traffic Control 19 Devices(MUTCD). 20 2. Install temporary sign before the removal of permanent sign. 21 3. When construction is complete,to the extent that the permanent sign can be 22 reinstalled,contact the City Transportation and Public Works Department, Signs 23 and Markings Division,to reinstall the permanent sign. 24 F. Traffic Control Standards 25 1. Traffic Control Standards can be found on the City's Buzzsaw website. 26 1.5 SUBMITTALS [NOT USED] 27 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 28 1.7 CLOSEOUT SUBMITTALS [NOT USED] 29 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 30 1.9 QUALITY ASSURANCE [NOT USED] 31 1.10 DELIVERY, STORAGE,AND HANDLING [NOT USED] 32 1.11 FIELD [SITE] CONDITIONS [NOT USED] 33 1.12 WARRANTY [NOT USED] 34 PART 2 - PRODUCTS [NOT USED] 35 PART 3 - EXECUTION [NOT USED] 36 END OF SECTION CITY OF FORT WORTH Park Improvements at Terrv,Northside,High Crest,and Summertields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265.02266 Revised July L 2011 015526-3 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 3 of 3 I Revision Log DATE NAME SUMMARY OF CHANGE 2 CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264.02265.02266 Revised.luly 1,2011 This page is intentionally blank. 01 57 13- 1 STORM WATER POLLUTION PREVENTION Page 1 of 3 1 SECTION 0157 13 2 STORM WATER POLLUTION PREVENTION 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Procedures for Storm Water Pollution Prevention Plans 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include,but are not necessarily limited to: 10 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the 11 Contract 12 2. Division 1 —General Requirements 13 3. Section 31 25 00—Erosion and Sediment Control 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Construction Activities resulting in less than 1 acre of disturbance 17 a. Work associated with this Item is considered subsidiary to the various Items 18 bid. No separate payment will be allowed for this Item. 19 2. Construction Activities resulting in greater than 1 acre of disturbance 20 a. Measurement and Payment shall be in accordance with Section 3125 00. 21 1.3 REFERENCES 22 A. Abbreviations and Acronyms 23 1. Notice of Intent:NOI 24 2. Notice of Termination:NOT 25 3. Storm Water Pollution Prevention Plan: SWPPP 26 4. Texas Commission on Environmental Quality: TCEQ 27 5. Notice of Change:NOC 28 A. Reference Standards 29 1. Reference standards cited in this Specification refer to the current reference 30 standard published at the time of the latest revision date logged at the end of this 31 Specification,unless a date is specifically cited. 32 2. Integrated Storm Management(iSWM)Technical Manual for Construction 33 Controls 34 1.4 ADMINISTRATIVE REQUIREMENTS 35 A. General 36 1. Contractor is responsible for resolution and payment of any fines issued associated 37 with compliance to Stormwater Pollution Prevention Plan. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264A2265-02266 Revised.Iuly I,2011 01 57 13-2 STORM WATER POLLUTION PREVENTION Page 2 of 3 1 B. Construction Activities resulting in: 2 1. Less than I acre of disturbance 3 a. Provide erosion and sediment control in accordance with Section 31 25 00 and 4 Drawings. 5 2. 1 to less than 5 acres of disturbance 6 a. Texas Pollutant Discharge Elimination System(TPDES)General Construction 7 Permit is required 8 b. Complete SWPPP in accordance with TCEQ requirements 9 1) TCEQ Small Construction Site Notice Required under general permit 10 TXR150000 11 a) Sign and post at job site 12 b) Prior to Preconstruction Meeting,send 1 copy to City Department of 13 Transportation and Public Works,Environmental Division, (817)392- 14 6088. 15 2) Provide erosion and sediment control in accordance with: 16 a) Section 31 25 00 17 b) The Drawings 18 c) TXR150000 General Permit 19 d) SWPPP 20 e) TCEQ requirements 21 3. 5 acres or more of Disturbance 22 a. Texas Pollutant Discharge Elimination Systern(TPDES)General Construction 23 Permit is required 24 b. Complete SWPPP in accordance with TCEQ requirements 25 1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee 26 a) Sign and post at job site 27 b) Send copy to City Department of Transportation and Public Works, 28 Environmental Division,(817)392-6088. 29 2) TCEQ Notice of Change required if making changes or updates to NOI 30 3) Provide erosion and sediment control in accordance with: 31 a) Section 31 25 00 32 b) The Drawings 33 c) TXR150000 General Permit 34 d) SWPPP 35 e) TCEQ requirements 36 4) Once the project has been completed and all the closeout requirements of 37 TCEQ have been met a TCEQ Notice of Termination can be submitted. 38 a) Send copy to City Department of Transportation and Public Works, 39 Environmental Division,(817)392-6088. 40 1.5 SUBMITTALS 41 A. SWPPP 42 1. Submit in accordance with Section 01 33 00,except as stated herein. 43 a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City 44 as follows: 45 l) l copy to the City Project Manager 46 a) City Project Manager will forward to the City Department of 47 Transportation and Public Works,Environmental Division for review CITY Of-FORT WORTH Park Improvements at Term',Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised.luly 1.2011 01 57 13-3 STORM WATER POLLUTION PREVENTION Page 3 of 3 1 B. Modified SWPPP 2 1. If the SWPPP is revised during construction,resubmit modified SWPPP to the City 3 in accordance with Section 01 33 00. 4 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 5 1.7 CLOSEOUT SUBMITTALS [NOT USED] 6 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 7 1.9 QUALITY ASSURANCE [NOT USED] 8 1.10 DELIVERY, STORAGE,AND HANDLING [NOT USED] 9 1.11 FIELD [SITE] CONDITIONS [NOT USED] 10 1.12 WARRANTY [NOT USED] 11 PART 2 - PRODUCTS [NOT USED] 12 PART 3 - EXECUTION [NOT USED] 13 END OF SECTION 14 Revision Log DATE NAME SUMMARY OF CHANGE 15 CITY OF FORT WORTH Park Improvements at Terry,Norlhside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265.02266 Revised Jule I.2011 This page is intentionally blank. 015813- I TEMPORARY PROJECT SIGNAGE Page I of 3 1 SECTION 0158 13 2 TEMPORARY PROJECT SIGNAGE 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Temporary Project Signage Requirements 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include,but are not necessarily limited to: 10 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1 —General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various Items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 18 1.5 SUBMITTALS [NOT USED] 19 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 20 1.7 CLOSEOUT SUBMITTALS [NOT USED] 21 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 22 1.9 QUALITY ASSURANCE [NOT USED] 23 1.10 DELIVERY, STORAGE,AND HANDLING [NOT USED] 24 1.11 FIELD [SITE] CONDITIONS [NOT USED] 25 1.12 WARRANTY [NOT USED] 26 PART 2 - PRODUCTS 27 2.1 OWNER-FURNISHED 10R] OWNER-SUPPLIEDPRODUCTS [NOT USED] 28 2.2 EQUIPMENT,PRODUCT TYPES,AND MATERIALS 29 A. Design Criteria 30 1. Provide free standing Project Designation Sign in accordance with City's Standard 31 Details for project signs. CITY OF FORT WORTH Park Improvements at Terry.Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265..02266 Revised hily 1,2011 01 58 13-2 TEMPORARY PROJECT SIGNAGE Page 2 of 3 1 B. Materials 2 1. Sign 3 a. Constructed of 3/4-inch fir plywood, grade A-C (exterior)or better 4 2.3 ACCESSORIES [NOT USED] 5 2.4 SOURCE QUALITY CONTROL [NOT USED] 6 PART 3 - EXECUTION 7 3.1 INSTALLERS [NOT USED] 8 3.2 EXAMINATION [NOT USED] 9 3.3 PREPARATION [NOT USED] 10 3.4 INSTALLATION 11 A. General 12 1. Provide vertical installation at extents of project. 13 2. Relocate sign as needed,upon request of the City. 14 B. Mounting options 15 a. Skids 16 b. Posts 17 c. Barricade 18 3.5 REPAIR/RESTORATION [NOT USED] 19 3.6 RE-INSTALLATION [NOT USED] 20 3.7 FIELD [OR] SITE QUALITY CONTROL[NOT USED] 21 3.8 SYSTEM STARTUP [NOT USED] 22 3.9 ADJUSTING [NOT USED] 23 3.10 CLEANING [NOT USED] 24 3.11 CLOSEOUT ACTIVITIES [NOT USED] 25 3.12 PROTECTION [NOT USED] 26 3.13 MAINTENANCE 27 A. General 28 1. Maintenance will include painting and repairs as needed or directed by the City. 29 3.14 ATTACHMENTS [NOT USED] 30 END OF SECTION 31 CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised.luly 1.201 1 01 58 13-3 TEMPORARY PROJECT SIGNAGE Page 3 of 3 1 Revision Log DATE NAME SUMMARY OF CHANGE 2 CITY OF FORT FORTH Park Improvements at Terry,Northside,High Crest,and Surrmerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised July L 2011 This page is intentionally blank. 01 6000-1 PRODUCT REQUIREMENTS Page I of 2 1 SECTION 0160 00 2 PRODUCT REQUIREMENTS 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. References for Product Requirements and City Standard Products List 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include,but are not necessarily limited to: 10 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division I —General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED] 13 1.3 REFERENCES [NOT USED] 14 1.4 ADMINISTRATIVE REQUIREMENTS 15 A. A list of City approved products for use is located on Buzzsaw as follows: 16 1. Resources\02 -Construction Documents\Standard Products List 17 B. Only products specifically included on City's Standard Product List in these Contract 18 Documents shall be allowed for use on the Project. 19 1. Any subsequently approved products will only be allowed for use upon specific 20 approval by the City. 21 C. Any specific product requirements in the Contract Documents supersede similar 22 products included on the City's Standard Product List. 23 1. The City reserves the right to not allow products to be used for certain projects even 24 though the product is listed on the City's Standard Product List. 25 D. Although a specific product is included on City's Standard Product List, not all 26 products from that manufacturer are approved for use, including but not limited to,that 27 manufacturer's standard product. 28 E. See Section 01 33 00 for submittal requirements of Product Data included on City's 29 Standard Product List. 30 1.5 SUBMITTALS [NOT USED] 31 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 32 1.7 CLOSEOUT SUBMITTALS [NOT USED] 33 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 34 1.9 QUALITY ASSURANCE [NOT USED] CITY OF FORT WORTH Park Improvements at Tem,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263;02264,02265,02266 Revised December 20.2012 016000-2 PRODUCT REQUIREMENTS Page 2 of 2 1 1.10 DELIVERY, STORAGE,AND HANDLING [NOT USED] 2 1.11 FIELD [SITE] CONDITIONS [NOT USED] 3 1.12 WARRANTY [NOT USED] 4 PART 2- PRODUCTS [NOT USED] 5 PART 3- EXECUTION [NOT USED] 6 END OF SECTION 7 Revision Log DATE NAME SUMMARY OF CHANGE 10/12/12 D.Johnson Modified Location of City's Standard Product List 8 CITY OF FORT WORTH Park Improvements at Terry,Northsfde,High Crest-and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 01 6600- 1 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 1 of 4 1 SECTION 0166 00 2 PRODUCT STORAGE AND HANDLING REQUIREMENTS 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Scheduling of product delivery 7 2. Packaging of products for delivery 8 3. Protection of products against damage from: 9 a. Handling 10 b. Exposure to elements or harsh environments 11 B. Deviations from this City of Fort Worth Standard Specification 12 1. None. 13 C. Related Specification Sections include, but are not necessarily limited to: 14 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 15 2. Division 1 —General Requirements 16 1.2 PRICE AND PAYMENT PROCEDURES 17 A. Measurement and Payment 18 1. Work associated with this Item is considered subsidiary to the various Items bid. 19 No separate payment will be allowed for this Item. 20 1.3 REFERENCES [NOT USED] 21 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 22 1.5 SUBMITTALS [NOT USED] 23 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 24 1.7 CLOSEOUT SUBMITTALS [NOT USED] 25 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 26 1.9 QUALITY ASSURANCE [NOT USED] 27 1.10 DELIVERY AND HANDLING 28 A. Delivery Requirements 29 1. Schedule delivery of products or equipment as required to allow timely installation 30 and to avoid prolonged storage. 31 2. Provide appropriate personnel and equipment to receive deliveries. 32 3. Delivery trucks will not be permitted to wait extended periods of time on the Site 33 for personnel or equipment to receive the delivery. CITY OF FORT WORTH Park Improvements at Terry.Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised July L 2011 01 6600-2 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 2 of 4 1 4. Deliver products or equipment in manufacturer's original unbroken cartons or other 2 containers designed and constructed to protect the contents from physical or 3 environmental damage. 4 5. Clearly and fully mark and identify as to manufacturer, item and installation 5 location. 6 6. Provide manufacturer's instructions for storage and handling. 7 B. Handling Requirements 8 1. Handle products or equipment in accordance with these Contract Documents and 9 manufacturer's recommendations and instructions. 10 C. Storage Requirements 11 1. Store materials in accordance with manufacturer's recommendations and 12 requirements of these Specifications. 13 2. Make necessary provisions for safe storage of materials and equipment. 14 a. Place loose soil materials and materials to be incorporated into Work to prevent 15 damage to any part of Work or existing facilities and to maintain free access at 16 all times to all parts of Work and to utility service company installations in 17 vicinity of Work. 18 3. Keep materials and equipment neatly and compactly stored in locations that will 19 cause minimum inconvenience to other contractors, public travel, adjoining owners, 20 tenants and occupants. 21 a. Arrange storage to provide easy access for inspection. 22 4. Restrict storage to areas available on construction site for storage of material and 23 equipment as shown on Drawings, or approved by City's Project Representative. 24 5. Provide off-site storage and protection when on-site storage is not adequate. 25 a. Provide addresses of and access to off-site storage locations for inspection by 26 City's Project Representative. 27 6. Do not use lawns, grass plots or other private property for storage purposes without 28 written permission of owner or other person in possession or control of premises. 29 7. Store in manufacturers' unopened containers. 30 8. Neatly, safely and compactly stack materials delivered and stored along line of 31 Work to avoid inconvenience and damage to property owners and general public 32 and maintain at least 3 feet from fire hydrant. 33 9. Keep public and private driveways and street crossings open. 34 10. Repair or replace damaged lawns,sidewalks, streets or other improvements to 35 satisfaction of City's Project Representative. 36 a. Total length which materials may be distributed along route of construction at 37 one time is 1,000 linear feet,unless otherwise approved in writing by City's 38 Project Representative. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summer(elds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised July 1,2011 01 6600-3 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 3 of 4 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2- PRODUCTS [NOT USED] 4 PART 3- EXECUTION 5 3.1 INSTALLERS [NOT USED] 6 3.2 EXAMINATION [NOT USED] 7 3.3 PREPARATION [NOT USED] 8 3.4 ERECTION [NOT USED] 9 3.5 REPAIR/RESTORATION [NOT USED] 10 3.6 RE-INSTALLATION [NOT USED] 11 3.7 FIELD [OR] SITE QUALITY CONTROL 12 A. Tests and Inspections 13 1. Inspect all products or equipment delivered to the site prior to unloading. 14 B. Non-Conforming Work 15 1. Reject all products or equipment that are damaged, used or in any other way 16 unsatisfactory for use on the project. 17 3.8 SYSTEM STARTUP [NOT USED] 18 3.9 ADJUSTING [NOT USED] 19 3.10 CLEANING [NOT USED] 20 3.11 CLOSEOUT ACTIVITIES [NOT USED] 21 3.12 PROTECTION 22 A. Protect all products or equipment in accordance with manufacturer's written directions. 23 B. Store products or equipment in location to avoid physical damage to items while in 24 storage. 25 C. Protect equipment from exposure to elements and keep thoroughly dry if required by 26 the manufacturer. 27 3.13 MAINTENANCE [NOT USED] 28 3.14 ATTACHMENTS [NOT USED] 29 END OF SECTION 30 CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.02264,02265,02266 Revised Ady 1,2011 016600-4 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 4 of 4 Revision Log DATE NAME SUMMARY OF CHANGE 1 CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest.and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised July 1,2011 01 70 00- 1 MOBILIZATION AND REMOBILIZATION Page I of 4 1 SECTION 0170 00 2 MOBILIZATION AND REMOBILIZATION 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Mobilization and Demobilization 7 a. Mobilization 8 1) Transportation of Contractor's personnel,equipment, and operating supplies 9 to the Site 10 2) Establishment of necessary general facilities for the Contractor's operation I 1 at the Site 12 3) Premiums paid for performance and payment bonds 13 4) Transportation of Contractor's personnel,equipment,and operating supplies 14 to another location within the designated Site 15 5) Relocation of necessary general facilities for the Contractor's operation 16 from 1 location to another location on the Site. 17 b. Demobilization 18 1) Transportation of Contractor's personnel, equipment, and operating supplies 19 away from the Site including disassembly 20 2) Site Clean-up 21 3) Removal of all buildings and/or other facilities assembled at the Site for this 22 Contract 23 c. Mobilization and Demobilization do not include activities for specific items of 24 work that are for which payment is provided elsewhere in the contract. 25 2. Remobilization 26 a. Remobilization for Suspension of Work specifically required in the Contract 27 Documents or as required by City includes: 28 1) Demobilization 29 a) Transportation of Contractor's personnel,equipment, and operating 30 supplies from the Site including disassembly or temporarily securing 31 equipment,supplies, and other facilities as designated by the Contract 32 Documents necessary to suspend the Work. 33 b) Site Clean-up as designated in the Contract Documents 34 2) Remobilization 35 a) Transportation of Contractor's personnel, equipment, and operating 36 supplies to the Site necessary to resume the Work. 37 b) Establishment of necessary general facilities for the Contractor's 38 operation at the Site necessary to resume the Work. 39 3) No Payments will be made for: 40 a) Mobilization and Demobilization from one location to another on the 41 Site in the normal progress of performing the Work. 42 b) Stand-by or idle time 43 c) Lost profits 44 3. Mobilizations and Demobilization for Miscellaneous Projects 45 a. Mobilization and Demobilization CITY OF FORT WORTI I Park Improvements at Terry,Northside,High Crest,and Sutnmer6elds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263„02264,02265,02266 Revised December 20.2012 01 7000-2 MOBILIZATION AND REMOBILIZATION Page 2 of 4 1 1) Mobilization shall consist of the activities and cost on a Work Order basis 2 necessary for: 3 a) Transportation of Contractor's personnel,equipment, and operating 4 supplies to the Site for the issued Work Order. 5 b) Establishment of necessary general facilities for the Contractor's 6 operation at the Site for the issued Work Order 7 2) Demobilization shall consist of the activities and cost necessary for: 8 a) Transportation of Contractor's personnel, equipment, and operating 9 supplies from the Site including disassembly for each issued Work 10 Order 11 b) Site Clean-up for each issued Work Order 12 c) Removal of all buildings or other facilities assembled at the Site for 13 each Work Oder 14 b. Mobilization and Demobilization do not include activities for specific items of 15 work for which payment is provided elsewhere in the contract. 16 4. Emergency Mobilizations and Demobilization for Miscellaneous Projects 17 a. A Mobilization for Miscellaneous Projects when directed by the City and the 18 mobilization occurs within 24 hours of the issuance of the Work Order. 19 B. Deviations from this City of Fort Worth Standard Specification 20 1. None. 21 C. Related Specification Sections include,but are not necessarily limited to: 22 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 23 2. Division 1 —General Requirements 24 1.2 PRICE AND PAYMENT PROCEDURES 25 A. Measurement and Payment 26 1. Mobilization and Demobilization 27 a. Measure 28 1) This Item is considered subsidiary to the various Items bid. 29 b. Payment 30 1) The work performed and materials furnished in accordance with this Item 31 are subsidiary to the various Items bid and no other compensation will be 32 allowed. 33 2. Remobilization for suspension of Work as specifically required in the Contract 34 Documents 35 a. Measurement 36 1) Measurement for this Item shall be per each remobilization performed. 37 b. Payment 38 1) The work performed and materials furnished in accordance with this Item 39 and measured as provided under"Measurement"will be paid for at the unit 40 price per each "Specified Remobilization"in accordance with Contract 41 Documents. 42 c. The price shall include: 43 1) Demobilization as described in Section 1.I.A.2.a.1) 44 2) Remobilization as described in Section I.1.A.2.a.2) 45 d. No payments will be made for standby, idle time, or lost profits associated this 46 Item. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest.and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,.02264,02265,02266 Revised December 20.2012 017000-3 MOBILIZATION AND REMOBILIZATION Page 3 of 4 1 3. Remobilization for suspension of Work as required by City 2 a. Measurement and Payment 3 1) This shall be submitted as a Contract Claim in accordance with Article 10 4 of Section 00 72 00. 5 2) No payments will be made for standby, idle time, or lost profits associated 6 with this Item. 7 4. Mobilizations and Demobilizations for Miscellaneous Projects 8 a. Measurement 9 1) Measurement for this Item shall be for each Mobilization and 10 Demobilization required by the Contract Documents 11 b. Payment 12 1) The Work performed and materials furnished in accordance with this Item 13 and measured as provided under"Measurement"will be paid for at the unit 14 price per each"Work Order Mobilization" in accordance with Contract 15 Documents. Demobilization shall be considered subsidiary to mobilization 16 and shall not be paid for separately. 17 c. The price shall include: 18 1) Mobilization as described in Section I.1.A.3.a.1) 19 2) Demobilization as described in Section 1.1.A.3.a.2) 20 d. No payments will be made for standby, idle time, or lost profits associated this 21 Item. 22 5. Emergency Mobilizations and Demobilizations for Miscellaneous Projects 23 a. Measurement 24 1) Measurement for this Item shall be for each Mobilization and 25 Demobilization required by the Contract Documents 26 b. Payment 27 1) The Work performed and materials furnished in accordance with this Item 28 and measured as provided under"Measurement"will be paid for at the unit 29 price per each "Work Order Emergency Mobilization"in accordance with 30 Contract Documents. Demobilization shall be considered subsidiary to 31 mobilization and shall not be paid for separately. 32 c. The price shall include 33 1) Mobilization as described in Section I.1.A.4.a) 34 2) Demobilization as described in Section 1.1.A.3.a.2) 35 d. No payments will be made for standby, idle time, or lost profits associated this 36 Item. 37 1.3 REFERENCES [NOT USED] 38 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 39 1.5 SUBMITTALS [NOT USED] 40 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 41 1.7 CLOSEOUT SUBMITTALS [NOT USED] 42 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 43 1.9 QUALITY ASSURANCE [NOT USED] 44 1.10 DELIVERY, STORAGE,AND HANDLING [NOT USED] CITY OF FORT WORTH Park Improvements at Terry.Northside.High Crest.and Smnmer6elds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,,02264,02265,02266 Revised December 20.2012 017000-4 MOBILIZATION AND REMOBILIZATION Page 4 of 4 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2- PRODUCTS [NOT USED] 4 PART 3- EXECUTION [NOT USED] 5 END OF SECTION 6 Revision Log DATE NAME SUMMARY OF CHANGE 7 CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest.and Sumnrerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263„02264,02265,02266 Revised December 20,2012 01 71 23-1 CONSTRUCTION STAKING AND SURVEY Page 1 o1`4 1 SECTION 01 71 23 2 CONSTRUCTION STAKING AND SURVEY 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Requirements for construction staking and construction survey 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include,but are not necessarily limited to: 10 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division I —General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Construction Staking 15 a. Measurement 16 1) This Item is considered subsidiary to the various Items bid. 17 b. Payment 18 1) The work performed and the materials furnished in accordance with this 19 Item are subsidiary to the various Items bid and no other compensation will 20 be allowed. 21 2. Construction Survey 22 a. Measurement 23 1) This Item is considered subsidiary to the various Items bid. 24 b. Payment 25 1) The work performed and the materials furnished in accordance with this 26 Item are subsidiary to the various Items bid and no other compensation will 27 be allowed. 28 1.3 REFERENCES [NOT USED] 29 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 30 1.5 SUBMITTALS 31 A. Submittals, if required, shall be in accordance with Section 0133 00. 32 B. All submittals shall be approved by the City prior to delivery. 33 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS 34 A. Certificates 35 1. Provide certificate certifying that elevations and locations of improvements are in 36 conformance or non-conformance with requirements of the Contract Documents. 37 a. Certificate must be sealed by a registered professional land surveyor in the 38 State of Texas. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20.2012 01 71 23-2 CONSTRUCTION STAKING AND SURVEY Page 2 of 4 1 B. Field Quality Control Submittals 2 1. Documentation verifying accuracy of field engineering work. 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE 6 A. Construction Staking 7 1. Construction staking will be performed by the contractor. 8 2. Coordination 9 a. Contact City's Project Representative at least 2 weeks in advance for 10 scheduling of Construction Staking. 11 b. It is the Contractor's responsibility to coordinate staking such that construction 12 activities are not delayed or negatively impacted. 13 3. General 14 a. Contractor is responsible for preserving and maintaining stakes furnished by 15 City. 16 b. If in the opinion of the City, a sufficient number of stakes or markings have 17 been lost, destroyed or disturbed,by Contractor's neglect,such that the 18 contracted Work cannot take place,then the Contractor will be required to pay 19 the City for new staking with a 25 percent markup. The cost for staking will be 20 deducted from the payment due to the Contractor for the Project. 21 B. Construction Survey 22 1. Construction Survey will be performed by the contractor. 23 2. Coordination 24 a. Contractor to verify that control data established in the design survey remains 25 intact. 26 b. Coordinate with the City prior to field investigation to determine which 27 horizontal and vertical control data will be required for construction survey. 28 c. It is the Contractor's responsibility to coordinate Construction Survey such that 29 construction activities are not delayed or negatively impacted. 30 d. Notify City if any control data needs to be restored or replaced due to damage 31 caused during construction operations. 32 1) City shall perform replacements and/or restorations. 33 3. General 34 a. Construction survey will be performed in order to maintain complete and 35 accurate logs of control and survey work as it progresses for Project Records. 36 b. The Contractor will need to ensure coordination is maintained with the City to 37 perform construction survey to obtain construction features, including but not 38 limited to the following: 39 1) All Utility Lines 40 a) Rim and flowline elevations and coordinates for each manhole or 41 junction structure 42 2) Water Lines 43 a) Top of pipe elevations and coordinates for waterlines at the following 44 locations: 45 (1) Every 250 linear feet CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263-02264,02265,02266 Revised December 20-2012 017123-3 CONSTRUCTION STAKING AND SURVEY Page 3 of 4 1 (2) Horizontal and vertical points of inflection,curvature,etc. (All 2 Fittings) 3 (3) Cathodic protection test stations 4 (4) Sampling stations 5 (5) Meter boxes/vaults(All sizes) 6 (6) Fire lines 7 (7) Fire hydrants 8 (8) Gate valves 9 (9) Plugs, stubouts, dead-end lines 10 (10) Air Release valves (Manhole rim and vent pipe) 11 (11) Blow off valves (Manhole rim and valve lid) 12 (12) Pressure plane valves 13 (13) Cleaning wyes 14 (14) Casing pipe(each end) 15 b) Storm Sewer 16 (1) Top of pipe elevations and coordinates at the following locations: 17 (a) Every 250 linear feet 18 (b) Horizontal and vertical points of inflection, curvature, etc. 19 c) Sanitary Sewer 20 (1) Top of pipe elevations and coordinates for sanitary sewer lines at 21 the following locations: 22 (a) Every 250 linear feet 23 (b) Horizontal and vertical points of inflection,curvature,etc. 24 (c) Cleanouts 25 c. Construction survey will be performed in order to maintain complete and 26 accurate logs of control and survey work associated with meeting or exceeding 27 the line and grade required by these Specifications. 28 d. The Contractor will need to ensure coordination is maintained with the City to 29 perform construction survey and to verify control data, including but not 30 limited to the following: 31 1) Established benchmarks and control points provided for the Contractor's 32 use are accurate 33 2) Benchmarks were used to furnish and maintain all reference lines and 34 grades for tunneling 35 3) Lines and grades were used to establish the location of the pipe 36 4) Submit to the City copies of field notes used to establish all lines and 37 grades and allow the City to check guidance system setup prior to 38 beginning each tunneling drive. 39 5) Provide access for the City to verify the guidance system and the line and 40 grade of the carrier pipe on a daily basis. 41 6) The Contractor remains fully responsible for the accuracy of the work and 42 the correction of it, as required. 43 7) Monitor line and grade continuously during construction. 44 8) Record deviation with respect to design line and grade once at each pipe 45 joint and submit daily records to City. 46 9) If the installation does not meet the specified tolerances, immediately notify 47 the City and correct the installation in accordance with the Contract 48 Documents. 49 1.10 DELIVERY, STORAGE,AND HANDLING [NOT USED] CITY OF FORT WORTH Park Improvements at Terry.Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20.2012 01 71 23-4 CONSTRUCTION STAKING AND SURVEY Page 4 of 4 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2- PRODUCTS [NOT USED] 4 PART 3- EXECUTION 5 3.1 INSTALLERS [NOT USED] 6 3.2 EXAMINATION [NOT USED] 7 3.3 PREPARATION [NOT USED] 8 3.4 APPLICATION 9 3.5 REPAIR/RESTORATION [NOT USED] 10 3.6 RE-INSTALLATION [NOT USED] 11 3.7 FIELD [OR] SITE QUALITY CONTROL 12 A. It is the Contractor's responsibility to maintain all stakes and control data placed by the 13 City in accordance with this Specification. 14 B. Do not change or relocate stakes or control data without approval from the City. 15 3.8 SYSTEM STARTUP [NOT USED] 16 3.9 ADJUSTING [NOT USED] 17 3.10 CLEANING [NOT USED] 18 3.11 CLOSEOUT ACTIVITIES [NOT USED] 19 3.12 PROTECTION [NOT USED] 20 3.13 MAINTENANCE [NOT USED] 21 3.14 ATTACHMENTS [NOT USED] 22 END OF SECTION 23 Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D.Johnson 24 CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summer6elds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263-02264,02265,02266 Revised December 20,2012 01 7423-1 CLEANING Page 1 of 4 I SECTION 0174 23 2 CLEANING 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Intermediate and final cleaning for Work not including special cleaning of closed 7 systems specified elsewhere 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include,but are not necessarily limited to: 11 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 12 2. Division 1 —General Requirements 13 3. Section 32 92 13—Hydro-Mulching, Seeding and Sodding 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Work associated with this Item is considered subsidiary to the various Items bid. 17 No separate payment will be allowed for this Item. 18 1.3 REFERENCES [NOT USED] 19 1.4 ADMINISTRATIVE REQUIREMENTS 20 A. Scheduling 21 1. Schedule cleaning operations so that dust and other contaminants disturbed by 22 cleaning process will not fall on newly painted surfaces. 23 2. Schedule final cleaning upon completion of Work and immediately prior to final 24 inspection. 25 1.5 SUBMITTALS [NOT USED] 26 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 1.9 QUALITY ASSURANCE [NOT USED] 30 1.10 STORAGE,AND HANDLING 31 A. Storage and Handling Requirements 32 1. Store cleaning products and cleaning wastes in containers specifically designed for 33 those materials. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264702265-02266 Revised July 1,2011 01 7423-2 CLEANING Page 2 o1`4 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2- PRODUCTS 4 2.1 OWNER-FURNISHED loR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 5 2.2 MATERIALS 6 A. Cleaning Agents 7 1. Compatible with surface being cleaned 8 2. New and uncontaminated 9 3. For manufactured surfaces 10 a. Material recommended by manufacturer 11 2.3 ACCESSORIES [NOT USED] 12 2.4 SOURCE QUALITY CONTROL [NOT USED] 13 PART 3- EXECUTION 14 3.1 INSTALLERS [NOT USED] 15 3.2 EXAMINATION [NOT USED] 16 3.3 PREPARATION [NOT USED] 17 3.4 APPLICATION [NOT USED] 18 3.5 REPAIR/RESTORATION [NOT USED] 19 3.6 RE-INSTALLATION [NOT USED] 20 3.7 FIELD [oR] SITE QUALITY CONTROL [NOT USED] 21 3.8 SYSTEM STARTUP [NOT USED] 22 3.9 ADJUSTING [NOT USED] 23 3.10 CLEANING 24 A. General 25 1. Prevent accumulation of wastes that create hazardous conditions. 26 2. Conduct cleaning and disposal operations to comply with laws and safety orders of 27 governing authorities. 28 3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in 29 storm or sanitary drains or sewers. 30 4. Dispose of degradable debris at an approved solid waste disposal site. 31 5. Dispose of nondegradable debris at an approved solid waste disposal site or in an 32 alternate manner approved by City and regulatory agencies. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265.02266 Revised July 1,2011 017423-3 CLEANING Page 3 of 4 1 6. Handle materials in a controlled manner with as few handlings as possible. 2 7. Thoroughly clean, sweep,wash and polish all Work and equipment associated with 3 this project. 4 8. Remove all signs of temporary construction and activities incidental to construction 5 of required permanent Work. 6 9. If project is not cleaned to the satisfaction of the City,the City reserves the right to 7 have the cleaning completed at the expense of the Contractor. 8 10. Do not burn on-site. 9 B. Intermediate Cleaning during Construction 10 1. Keep Work areas clean so as not to hinder health, safety or convenience of 11 personnel in existing facility operations. 12 2. At maximum weekly intervals,dispose of waste materials, debris and rubbish. 13 3. Confine construction debris daily in strategically located container(s): 14 a. Cover to prevent blowing by wind 15 b. Store debris away from construction or operational activities 16 c. Haul from site at a minimum of once per week 17 4. Vacuum clean interior areas when ready to receive finish painting. 18 a. Continue vacuum cleaning on an as-needed basis,until Final Acceptance. 19 5. Prior to storm events,thoroughly clean site of all loose or unsecured items,which 20 may become airborne or transported by flowing water during the storm. 21 C. Interior Final Cleaning 22 1. Remove grease,mastic,adhesives, dust, dirt,stains, fingerprints, labels and other 23 foreign materials from sight-exposed surfaces. 24 2. Wipe all lighting fixture reflectors, lenses, lamps and trims clean. 25 3. Wash and shine glazing and mirrors. 26 4. Polish glossy surfaces to a clear shine. 27 5. Ventilating systems 28 a. Clean permanent filters and replace disposable filters if units were operated 29 during construction. 30 b. Clean ducts, blowers and coils if units were operated without filters during 31 construction. 32 6. Replace all burned out lamps. 33 7. Broom clean process area floors. 34 8. Mop office and control room floors. 35 D. Exterior(Site or Right of Way)Final Cleaning 36 1. Remove trash and debris containers from site. 37 a. Re-seed areas disturbed by location of trash and debris containers in accordance 38 with Section 32 92 13. 39 2. Sweep roadway to remove all rocks, pieces of asphalt,concrete or any other object 40 that may hinder or disrupt the flow of traffic along the roadway. 41 3. Clean any interior areas including,but not limited to, vaults,manholes, structures, 42 junction boxes and inlets. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised July 1,2011 017423-4 CLEANING Page 4 of 4 1 4. If no longer required for maintenance of erosion facilities, and upon approval by 2 City,remove erosion control from site. 3 5. Clean signs, lights, signals, etc. 4 3.11 CLOSEOUT ACTIVITIES [NOT USED] 5 3.12 PROTECTION [NOT USED] 6 3.13 MAINTENANCE [NOT USED] 7 3.14 ATTACHMENTS [NOT USED] 8 END OF SECTION 9 Revision Log DATE NAME SUMMARY OF CHANGE 10 CITY OF FORT WORTH Park Improvements at Terrv,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised July 1,2011 01 77 19- 1 CLOSEOUT REQUIREMENTS Page I of 3 1 SECTION 0177 19 2 CLOSEOUT REQUIREMENTS 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. The procedure for closing out a contract 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division I —General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various Items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS 18 A. Guarantees,Bonds and Affidavits 19 1. No application for final payment will be accepted until all guarantees, bonds, 20 certificates, licenses and affidavits required for Work or equipment as specified are 21 satisfactorily filed with the City. 22 B. Release of Liens or Claims 23 1. No application for final payment will be accepted until satisfactory evidence of 24 release of liens has been submitted to the City. 25 1.5 SUBMITTALS 26 A. Submit all required documentation to City's Project Representative. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,0226 ,02266 Revised July 1,2011 01 77 19-2 CLOSEOUT REQUIREMENTS Page 2 of 3 1 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 2 1.7 CLOSEOUT SUBMITTALS [NOT USED] 3 PART 2- PRODUCTS [NOT USED] 4 PART 3 - EXECUTION 5 3.1 INSTALLERS [NOT USED] 6 3.2 EXAMINATION [NOT USED] 7 3.3 PREPARATION [NOT USED] 8 3.4 CLOSEOUT PROCEDURE 9 A. Prior to requesting Final Inspection, submit: 10 1. Project Record Documents in accordance with Section 01 78 39 11 2. Operation and Maintenance Data, if required, in accordance with Section 01 78 23 12 B. Prior to requesting Final Inspection,perform final cleaning in accordance with Section 13 01 7423. 14 C. Final Inspection 15 1. After final cleaning,provide notice to the City Project Representative that the Work 16 is completed. 17 a. The City will make an initial Final Inspection with the Contractor present. 18 b. Upon completion of this inspection,the City will notify the Contractor, in 19 writing within 10 business days, of any particulars in which this inspection 20 reveals that the Work is defective or incomplete. 21 2. Upon receiving written notice from the City, immediately undertake the Work 22 required to remedy deficiencies and complete the Work to the satisfaction of the 23 City. 24 3. Upon completion of Work associated with the items listed in the City's written 25 notice,inform the City,that the required Work has been completed. Upon receipt 26 of this notice,the City, in the presence of the Contractor,will make a subsequent 27 Final Inspection of the project. 28 4. Provide all special accessories required to place each item of equipment in full 29 operation. These special accessory items include,but are not limited to: 30 a. Specified spare parts 31 b. Adequate oil and grease as required for the first lubrication of the equipment 32 c. Initial fill up of all chemical tanks and fuel tanks 33 d. Light bulbs 34 e. Fuses 35 f. Vault keys 36 g. Handwheels 37 h. Other expendable items as required for initial start-up and operation of all 38 equipment 39 D. Notice of Project Completion CITY OF FORT WORTH Park Improvements at Terrv,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised July 1,2011 01 77 19-3 CLOSEOUT REQUIREMENTS Page 3 of 3 1 1. Once the City Project Representative finds the Work subsequent to Final Inspection 2 to be satisfactory,the City will issue a Notice of Project Completion(Green Sheet). 3 E. Supporting Documentation 4 1. Coordinate with the City Project Representative to complete the following 5 additional forms: 6 a. Final Payment Request 7 b. Statement of Contract Time 8 c. Affidavit of Payment and Release of Liens 9 d. Consent of Surety to Final Payment 10 e. Pipe Report(if required) 11 f. Contractor's Evaluation of City 12 g. Performance Evaluation of Contractor 13 F. Letter of Final Acceptance 14 1. Upon review and acceptance of Notice of Project Completion and Supporting 15 Documentation, in accordance with General Conditions, City will issue Letter of 16 Final Acceptance and release the Final Payment Request for payment. 17 3.5 REPAIR/RESTORATION [NOT USED] 18 3.6 RE-INSTALLATION [NOT USED] 19 3.7 FIELD[OR] SITE QUALITY CONTROL [NOT USED] 20 3.8 SYSTEM STARTUP [NOT USED] 21 3.9 ADJUSTING [NOT USED] 22 3.10 CLEANING [NOT USED] 23 3.11 CLOSEOUT ACTIVITIES [NOT USED] 24 3.12 PROTECTION[NOT USED] 25 3.13 MAINTENANCE [NOT USED] 26 3.14 ATTACHMENTS [NOT USED] 27 END OF SECTION 28 Revision Log DATE NAME SUMMARY OF CHANGE 29 CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised July 1,2011 This page is intentionally blank. 01 7823-1 OPERATION AND MAINTENANCE DATA Page] o1`5 I SECTION 01 78 23 2 OPERATION AND MAINTENANCE DATA 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Product data and related information appropriate for City's maintenance and 7 operation of products furnished under Contract 8 2. Such products may include,but are not limited to: 9 a. Traffic Controllers 10 b. Irrigation Controllers(to be operated by the City) 1 I c. Butterfly Valves 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include,but are not necessarily limited to: 15 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 16 2. Division 1 —General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various Items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS 23 A. Schedule 24 1. Submit manuals in final form to the City within 30 calendar days of product 25 shipment to the project site. 26 1.5 SUBMITTALS 27 A. Submittals shall be in accordance with Section 01 33 00 . All submittals shall be 28 approved by the City prior to delivery. 29 1.6 INFORMATIONAL SUBMITTALS 30 A. Submittal Form 31 1. Prepare data in form of an instructional manual for use by City personnel. 32 2. Format 33 a. Size: 8 %2 inches x I 1 inches 34 b. Paper 35 l) 40 pound minimum, white,for typed pages 36 2) Holes reinforced with plastic, cloth or metal 37 c. Text: Manufacturer's printed data, or neatly typewritten CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 01 7823-2 OPERATION AND MAINTENANCE DATA Page 2 of 5 1 d. Drawings 2 1) Provide reinforced punched binder tab, bind in with text 3 2) Reduce larger drawings and fold to size of text pages. 4 e. Provide fly-leaf for each separate product, or each piece of operating 5 equipment. 6 1) Provide typed description of product, and major component parts of 7 equipment. 8 2) Provide indexed tabs. 9 f. Cover 10 1) Identify each volume with typed or printed title "OPERATING AND 11 MAINTENANCE INSTRUCTIONS". 12 2) List: 13 a) Title of Project 14 b) Identity of separate structure as applicable 15 c) Identity of general subject matter covered in the manual 16 3. Binders 17 a. Commercial quality 3-ring binders with durable and cleanable plastic covers 18 b. When multiple binders are used,correlate the data into related consistent 19 groupings. 20 4. If available,provide an electronic form of the O&M Manual. 21 B. Manual Content 22 1. Neatly typewritten table of contents for each volume, arranged in systematic order 23 a. Contractor,name of responsible principal, address and telephone number 24 b. A list of each product required to be included, indexed to content of the volume 25 c. List,with each product: 26 1) The name, address and telephone number of the subcontractor or installer 27 2) A list of each product required to be included, indexed to content of the 28 volume 29 3) Identify area of responsibility of each 30 4) Local source of supply for parts and replacement 31 d. Identify each product by product name and other identifying symbols as set 32 forth in Contract Documents. 33 2. Product Data 34 a. Include only those sheets which are pertinent to the specific product. 35 b. Annotate each sheet to: 36 1) Clearly identify specific product or part installed 37 2) Clearly identify data applicable to installation 38 3) Delete references to inapplicable information 39 3. Drawings 40 a. Supplement product data with drawings as necessary to clearly illustrate: 41 1) Relations of component parts of equipment and systems 42 2) Control and flow diagrams 43 b. Coordinate drawings with information in Project Record Documents to assure 44 correct illustration of completed installation. 45 c. Do not use Project Record Drawings as maintenance drawings. 46 4. Written text, as required to supplement product data for the particular installation: 47 a. Organize in consistent format under separate headings for different procedures. 48 b. Provide logical sequence of instructions of each procedure. CITY OF FORT WORTH Park Improvements at Tem,.Northside,High Crest,and Summerfields Parlor STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 01 7823-3 OPERATION AND MAINTENANCE DATA Page 3 of 5 1 5. Copy of each warranty, bond and service contract issued 2 a. Provide information sheet for City personnel giving: 3 1) Proper procedures in event of failure 4 2) Instances which might affect validity of warranties or bonds 5 C. Manual for Materials and Finishes 6 1. Submit 5 copies of complete manual in final form. 7 2. Content,for architectural products, applied materials and finishes: 8 a. Manufacturer's data,giving full information on products 9 1) Catalog number, size, composition 10 2) Color and texture designations 11 3) Information required for reordering special manufactured products 12 b. Instructions for care and maintenance 13 1) Manufacturer's recommendation for types of cleaning agents and methods 14 2) Cautions against cleaning agents and methods which are detrimental to 15 product 16 3) Recommended schedule for cleaning and maintenance 17 3. Content,for moisture protection and weather exposure products: 18 a. Manufacturer's data,giving full information on products 19 1) Applicable standards 20 2) Chemical composition 21 3) Details of installation 22 b. Instructions for inspection,maintenance and repair 23 D. Manual for Equipment and Systems 24 1. Submit 5 copies of complete manual in final form. 25 2. Content, for each unit of equipment and system, as appropriate: 26 a. Description of unit and component parts 27 1) Function, normal operating characteristics and limiting conditions 28 2) Performance curves, engineering data and tests 29 3) Complete nomenclature and commercial number of replaceable parts 30 b. Operating procedures 31 1) Start-up, break-in,routine and normal operating instructions 32 2) Regulation, control,stopping, shut-down and emergency instructions 33 3) Summer and winter operating instructions 34 4) Special operating instructions 35 c. Maintenance procedures 36 1) Routine operations 37 2) Guide to "trouble shooting" 38 3) Disassembly,repair and reassembly 39 4) Alignment, adjusting and checking 40 d. Servicing and lubrication schedule 41 1) List of lubricants required 42 e. Manufacturer's printed operating and maintenance instructions 43 f. Description of sequence of operation by control manufacturer 44 1) Predicted life of parts subject to wear 45 2) Items recommended to be stocked as spare parts 46 g. As installed control diagrams by controls manufacturer 47 h. Each contractor's coordination drawings 48 l) As installed color coded piping diagrams CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 01 7823-4 OPERATION AND MAINTENANCE DATA Page 4 of 5 1 i. Charts of valve tag numbers, with location and function of each valve 2 j. List of original manufacturer's spare parts, manufacturer's current prices, and 3 recommended quantities to be maintained in storage 4 k. Other data as required under pertinent Sections of Specifications 5 3. Content,for each electric and electronic system, as appropriate: 6 a. Description of system and component parts 7 1) Function, normal operating characteristics, and limiting conditions 8 2) Performance curves, engineering data and tests 9 3) Complete nomenclature and commercial number of replaceable parts 10 b. Circuit directories of panelboards 11 1) Electrical service 12 2) Controls 13 3) Communications 14 c. As installed color coded wiring diagrams 15 d. Operating procedures 16 1) Routine and normal operating instructions 17 2) Sequences required 18 3) Special operating instructions 19 e. Maintenance procedures 20 1) Routine operations 21 2) Guide to "trouble shooting" 22 3) Disassembly,repair and reassembly 23 4) Adjustment and checking 24 f. Manufacturer's printed operating and maintenance instructions 25 g. List of original manufacturer's spare parts, manufacturer's current prices,and 26 recommended quantities to be maintained in storage 27 h. Other data as required under pertinent Sections of Specifications 28 4. Prepare and include additional data when the need for such data becomes apparent 29 during instruction of City's personnel. 30 1.7 CLOSEOUT SUBMITTALS [NOT USED] 31 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 32 1.9 QUALITY ASSURANCE 33 A. Provide operation and maintenance data by personnel with the following criteria: 34 1. Trained and experienced in maintenance and operation of described products 35 2. Skilled as technical writer to the extent required to communicate essential data 36 3. Skilled as draftsman competent to prepare required drawings CITY OF FORM-WORTH Park Improvements at Terry,Norihside,High Crest,and Summer6elds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 01 7823-5 OPERATION AND MAINTENANCE DATA Page 5 of 5 1 1.10 DELIVERY, STORAGE,AND HANDLING [NOT USED] 2 1.11 FIELD [SITE] CONDITIONS [NOT USED] 3 1.12 WARRANTY [NOT USED] 4 PART 2- PRODUCTS [NOT USED] 5 PART 3- EXECUTION [NOT USED] 6 END OF SECTION 7 Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D.Johnson 1.5.A.1—title of section removed 8 CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 This page is intentionally blank. 01 78 39- 1 PROJECT RECORD DOCUMENTS Page 1 of 4 1 SECTION 0178 39 2 PROJECT RECORD DOCUMENTS 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Work associated with the documenting the project and recording changes to project 7 documents, including: 8 a. Record Drawings 9 b. Water Meter Service Reports 10 c. Sanitary Sewer Service Reports 11 d. Large Water Meter Reports 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include,but are not necessarily limited to: 15 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 16 2. Division 1 —General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various Items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 23 1.5 SUBMITTALS 24 A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to 25 City's Project Representative. 26 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 1.9 QUALITY ASSURANCE 30 A. Accuracy of Records 31 1. Thoroughly coordinate changes within the Record Documents, making adequate 32 and proper entries on each page of Specifications and each sheet of Drawings and 33 other Documents where such entry is required to show the change properly. 34 2. Accuracy of records shall be such that future search for items shown in the Contract 35 Documents may rely reasonably on information obtained from the approved Project 36 Record Documents. CITY OF FORT WORTH Park Improvements at Terrv,Northside,High Crest,and Summerfietds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised.luly 1,2011 017839-2 PROJECT RECORD DOCUMENTS Page 2 of 4 1 3. To facilitate accuracy of records,make entries within 24 hours after receipt of 2 information that the change has occurred. 3 4. Provide factual information regarding all aspects of the Work, both concealed and 4 visible,to enable future modification of the Work to proceed without lengthy and 5 expensive site measurement, investigation and examination. 6 1.10 STORAGE AND HANDLING 7 A. Storage and Handling Requirements 8 1. Maintain the job set of Record Documents completely protected from deterioration 9 and from loss and damage until completion of the Work and transfer of all recorded 10 data to the final Project Record Documents. 11 2. In the event of loss of recorded data, use means necessary to again secure the data 12 to the City's approval. 13 a. In such case,provide replacements to the standards originally required by the 14 Contract Documents. 15 1.11 FIELD [SITE] CONDITIONS [NOT USED] 16 1.12 WARRANTY [NOT USED] 17 PART 2- PRODUCTS 18 2.1 OWNER-FURNISHED [OR] OWNER-SUPPLIED PRODUCTS [NOT USED] 19 2.2 RECORD DOCUMENTS 20 A. Job set 21 1. Promptly following receipt of the Notice to Proceed, secure from the City,at no 22 charge to the Contractor, I complete set of all Documents comprising the Contract. 23 B. Final Record Documents 24 1. At a time nearing the completion of the Work and prior to Final Inspection,provide 25 the City 1 complete set of all Final Record Drawings in the Contract. 26 2.3 ACCESSORIES [NOT USED] 27 2.4 SOURCE QUALITY CONTROL [NOT USED] 28 PART 3- EXECUTION 29 3.1 INSTALLERS [NOT USED] 30 3.2 EXAMINATION [NOT USED] 31 3.3 PREPARATION [NOT USED] 32 3.4 MAINTENANCE DOCUMENTS 33 A. Maintenance of Job Set 34 1. Immediately upon receipt of the job set, identify each of the Documents with the 35 title, "RECORD DOCUMENTS -JOB SET". CITY OF FORT WORTH Park Improvements at Tem,.Nonhside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised July 1,2011 01 7839-3 PROJECT RECORD DOCUMENTS Page 3 of 4 1 2. Preservation 2 a. Considering the Contract completion time,the probable number of occasions 3 upon which the job set must be taken out for new entries and for examination, 4 and the conditions under which these activities will be performed, devise a 5 suitable method for protecting the job set. 6 b. Do not use the job set for any purpose except entry of new data and for review 7 by the City, until start of transfer of data to final Project Record Documents. 8 c. Maintain the job set at the site of work. 9 3. Coordination with Construction Survey 10 a. At a minimum, in accordance with the intervals set forth in Section 01 71 23, 11 clearly mark any deviations from Contract Documents associated with 12 installation of the infrastructure. 13 4. Making entries on Drawings 14 a. Record any deviations from Contract Documents. 15 b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the 16 change by graphic line and note as required. 17 c. Date all entries. 18 d. Call attention to the entry by a "cloud" drawn around the area or areas affected. 19 e. In the event of overlapping changes,use different colors for the overlapping 20 changes. 21 5. Conversion of schematic layouts 22 a. In some cases on the Drawings, arrangements of conduits, circuits,piping, 23 ducts,and similar items, are shown schematically and are not intended to 24 portray precise physical layout. 25 1) Final physical arrangement is determined by the Contractor,subject to the 26 City's approval. 27 2) However, design of future modifications of the facility may require 28 accurate information as to the final physical layout of items which are 29 shown only schematically on the Drawings. 30 b. Show on the job set of Record Drawings, by dimension accurate to within 1 31 inch,the centerline of each run of items. 32 1) Final physical arrangement is determined by the Contractor,subject to the 33 City's approval. 34 2) Show,by symbol or note,the vertical location of the Item ("under slab", "in 35 ceiling plenum", "exposed", and the like). 36 3) Make all identification sufficiently descriptive that it may be related 37 reliably to the Specifications. 38 c. The City may waive the requirements for conversion of schematic layouts 39 where,in the City's judgment, conversion serves no useful purpose. However, 40 do not rely upon waivers being issued except as specifically issued in writing 41 by the City. 42 B. Final Project Record Documents 43 1. Transfer of data to Drawings 44 a. Carefully transfer change data shown on the job set of Record Drawings to the 45 corresponding final documents,coordinating the changes as required. 46 b. Clearly indicate at each affected detail and other Drawing a full description of 47 changes made during construction,and the actual location of items. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised July I,2011 017839-4 PROJECT RECORD DOCUMENTS Page 4 of 4 1 c. Call attention to each entry by drawing a "cloud" around the area or areas 2 affected. 3 d. Make changes neatly, consistently and with the proper media to assure 4 longevity and clear reproduction. 5 2. Transfer of data to other Documents 6 a. If the Documents, other than Drawings,have been kept clean during progress of 7 the Work, and if entries thereon have been orderly to the approval of the City, 8 the job set of those Documents, other than Drawings,will be accepted as final 9 Record Documents. 10 b. If any such Document is not so approved by the City, secure a new copy of that 11 Document from the City at the City's usual charge for reproduction and 12 handling, and carefully transfer the change data to the new copy to the approval 13 of the City. 14 3.5 REPAIR/RESTORATION [NOT USED] 15 3.6 RE-INSTALLATION [NOT USED] 16 3.7 FIELD loR] SITE QUALITY CONTROL [NOT USED] 17 3.8 SYSTEM STARTUP [NOT USED] 18 3.9 ADJUSTING [NOT USED] 19 3.10 CLEANING [NOT USED] 20 3.11 CLOSEOUT ACTIVITIES [NOT USED] 21 3.12 PROTECTION [NOT USED] 22 3.13 MAINTENANCE [NOT USED] 23 3.14 ATTACHMENTS [NOT USED] 24 END OF SECTION 25 Revision Log DATE NAME SUMMARY OF CHANGE 26 CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised.hdv L 2011 0241 13- 1 SELECTIVE SITE DEMOLITION Page I of 5 1 SECTION 02 41 13 2 SELECTIVE SITE DEMOLITION 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Removing sidewalks and steps 7 2. Removing ADA ramps and landings 8 3. Removing driveways 9 4. Removing fences 10 5. Removing guardrail 11 6. Removing retaining walls(less than 4 feet tall) 12 7. Removing mailboxes 13 8. Removing rip rap 14 9. Removing miscellaneous concrete structures including porches and foundations 15 10. Disposal of removed materials 16 B. Deviations this from City of Fort Worth Standard Specification 17 1. None. 18 C. Related Specification Sections include,but are not necessarily limited to: 19 1. Division 0—Bidding Requirements, Contract Forms, and Conditions of the 20 Contract 21 2. Division 1 —General Requirements 22 3. Section 3123 23—Borrow 23 1.2 PRICE AND PAYMENT PROCEDURES 24 A. Measurement and Payment 25 1. Measurement 26 a. Remove Sidewalk: Measure by square foot. 27 b. Remove Steps:measure by the square foot as seen in the plan view only. 28 c. Remove ADA Ramp: measure by each. 29 d. Remove Driveway: measure by the square foot by type. 30 e. Remove Fence: measure by the linear foot. 31 f. Remove Guardrail: measure by the linear foot along the face of the rail in place 32 including metal beam guard fence transitions and single guard rail terminal 33 sections from the center of end posts. 34 g. Remove Retaining Wall (less than 4 feet tall): measure by the linear foot 35 h. Remove Mailbox:measure by each. 36 i. Remove Rip Rap: measure by the square foot. 37 j. Remove Miscellaneous Concrete Structure: measure by the lump sum. 38 2. Payment CITY OF FORT WORTH Park Improvements at Terry.Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 0241 13-2 SELECTIVE SITE DEMOLITION Page 2 of 5 1 a. Remove Sidewalk:full compensation for saw cutting, removal,hauling, 2 disposal,tools,equipment, labor and incidentals needed to execute work. 3 Sidewalk adjacent to or attached to retaining wall (including sidewalk that acts 4 as a wall footing)shall be paid as sidewalk removal. For utility projects,this 5 Item shall be considered subsidiary to the trench and no other compensation 6 will be allowed. 7 b. Remove Steps: full compensation for saw cutting, removal, hauling,disposal, 8 tools, equipment, labor and incidentals needed to execute work. For utility 9 projects,this Item shall be considered subsidiary to the trench and no other 10 compensation will be allowed. I 1 c. Remove ADA Ramp and landing: full compensation for saw cutting, removal, 12 hauling, disposal,tools, equipment, labor and incidentals needed to execute 13 work. Work includes ramp landing removal. For utility projects,this Item shall 14 be considered subsidiary to the trench and no other compensation will be 15 allowed. 16 d. Remove Driveway: full compensation for saw cutting,removal,hauling, 17 disposal,tools,equipment, labor and incidentals needed to remove improved 18 driveway by type. For utility projects,this Item shall be considered subsidiary 19 to the trench and no other compensation will be allowed. 20 e. Remove Guardrail: full compensation for removing materials, loading,hauling, 21 unloading,and storing or disposal; furnishing backfill material; backfilling the 22 portholes;and equipment,labor,tools, and incidentals. For utility projects,this 23 Item shall be considered subsidiary to the trench and no other compensation 24 will be allowed. 25 f. Remove Retaining Wall (less than 4 feet tall): full compensation for saw 26 cutting,removal,hauling, disposal,tools,equipment, labor and incidentals 27 needed to execute work. Sidewalk adjacent to or attached to retaining wall 28 (including sidewalk that acts as a wall footing)shall be paid as sidewalk 29 removal.For utility projects,this Item shall be considered subsidiary to the 30 trench and no other compensation will be allowed. 31 g. Remove Rip Rap: full compensation for saw cutting,removal,hauling, 32 disposal,tools, equipment, labor and incidentals needed to execute work. For 33 utility projects,this Item shall be considered subsidiary to the trench and no 34 other compensation will be allowed. 35 h. Remove Miscellaneous Concrete Structure: full compensation for saw cutting, 36 removal,hauling, disposal,tools, equipment, labor and incidentals needed to 37 execute work. For utility projects,this Item shall be considered subsidiary to 38 the trench and no other compensation will be allowed. 39 1.3 REFERENCES 40 A. ASTM International (ASTM): D698 Standard Test Methods for Laboratory 41 Compaction characteristics of soil using standard effort(12,400 ft-lbf/ft3(600 kN- 42 m/m3)) 43 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 44 1.5 SUBMITTALS [NOT USED] 45 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 46 1.7 CLOSEOUT SUBMITTALS [NOT USED] 47 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] CITY OF FORT WORTH Park Improvements at Terry.Northside.high Crest.and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20.2012 0241 13-3 SELECTIVE SITE DEMOLITION Page 3 of 5 1 1.9 QUALITY ASSURANCE [NOT USED] 2 1.10 DELIVERY, STORAGE,AND HANDLING [NOT USED] 3 1.11 FIELD [SITE] CONDITIONS [NOT USED] 4 1.12 WARRANTY [NOT USED] 5 PART 2- PRODUCTS 6 2.1 OWNER-FURNISHED PRODUCTS [NOT USED] 7 2.2 MATERIALS 8 A. Fill Material: See Section 31 23 23. 9 2.3 ACCESSORIES [NOT USED] 10 2.4 SOURCE QUALITY CONTROL [NOT USED] 11 PART 3 - EXECUTION 12 3.1 INSTALLERS [NOT USED] 13 3.2 EXAMINATION [NOT USED] 14 3.3 PREPARATION [NOT USED] 15 3.4 REMOVAL 16 A. Remove Sidewalk 17 1. Remove sidewalk to nearest existing dummy, expansion or construction joint. 18 2. Sawcut when removing to nearest joint is not practical. See 3A.K. 19 B. Remove Steps 20 1. Remove step to nearest existing dummy,expansion or construction joint. 21 2. Sawcut when removing to nearest joint is not practical. See 3A.K. 22 C. Remove ADA Ramp 23 1. Sawcut existing curb and gutter and pavement prior to wheel chair ramp removal. 24 See 3.4.K. 25 2. Remove ramp to nearest existing dummy,expansion or construction joint on 26 existing sidewalk. 27 D. Remove Driveway 28 1. Sawcut existing drive,curb and gutter and pavement prior to drive removal. See 29 3A.K. 30 2. Remove drive to nearest existing dummy, expansion or construction joint. 31 3. Sawcut when removing to nearest joint is not practical. See 3A.K. 32 4. Remove adjacent sidewalk to nearest existing dummy, expansion or construction 33 joint on existing sidewalk. 34 E. Remove Fence 35 1. Remove all fence components above and below ground and backfill with acceptable 36 fill material. CITY OF FORT WORTH Park Improvements at Teiry,Northside,High Crest,and Smnmerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 0241 13-4 SELECTIVE SITE DEMOLITION Page 4 of 5 1 2. Use caution in removing and salvaging fence materials. 2 3. Salvaged materials may be used to reconstruct fence as approved by City or as 3 shown on Drawings. 4 4. Contractor responsible for keeping animals(livestock, pets,etc.) within the fenced 5 areas during construction operation and while removing fences. 6 F. Remove Guardrail 7 1. Remove rail elements in original lengths. 8 2. Remove fittings from the posts and the metal rail and then pull the posts. 9 3. Do not mar or damage salvageable materials during removal. 10 4. Completely remove posts and any concrete surrounding the posts. 11 5. Furnish backfill material and backfill the hole with material equal in composition 12 and density to the surrounding soil unless otherwise directed. 13 6. Cut off or bend down eyebolts anchored to the dead man to an elevation at least 1- 14 foot below the new subgrade elevation and leave in place along with the dead man. 15 G. Remove Retaining Wall(less than 4 feet tall) 16 1. Remove wall to nearest existing joint. 17 2. Sawcut when removing to nearest joint is not practical. See 3A.K. 18 3. Removal includes all components of the retaining wall including footings. 19 4. Sidewalk adjacent to or attached to retaining wall: See 3.4.A 20 H. Remove Mailbox 21 1. Salvage existing materials for reuse. Mailbox materials may need to be used for 22 reconstruction. 23 I. Remove Rip Rap 24 1. Remove rip rap to nearest existing dummy,expansion or construction joint. 25 2. Sawcut when removing to nearest joint is not practical. See 3A.K. 26 J. Remove Miscellaneous Concrete Structure 27 1. Remove portions of miscellaneous concrete structures including foundations and 28 slabs that do not interfere with proposed construction to 2 feet below the finished 29 ground line. 30 2. Cut reinforcement close to the portion of the concrete to remain in place. 31 3. Break or perforate the bottom of structures to remain to prevent the entrapment of 32 water. 33 K. Sawcut 34 1. Sawing Equipment 35 a. Power-driven 36 b. Manufactured for the purpose of sawing pavement 37 c. In good operating condition 38 d. Shall not spall or fracture the pavement to the removal area 39 2. Sawcut perpendicular to the surface completely through existing pavement. CITY OF FORT WORTH Park Improvements at Terry.Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 0241 13-5 SELECTIVE SITE DEMOLITION Page 5 of 5 1 3.5 REPAIR [NOT USED] 2 3.6 RE-INSTALLATION [NOT USED] 3 3.7 SITE QUALITY CONTROL [NOT USED] 4 3.8 SYSTEM STARTUP [NOT USED] 5 3.9 ADJUSTING [NOT USED] 6 3.10 CLEANING [NOT USED] 7 3.11 CLOSEOUT ACTIVITIES [NOT USED] 8 3.12 PROTECTION [NOT USED] 9 3.13 MAINTENANCE [NOT USED] 10 3.14 ATTACHMENTS [NOT USED] 11 END OF SECTION 12 Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D.Johnson 1.2.A.2.Modified Payment-Items will be subsidiary to trench on utility projects 13 CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20.2012 This page is intentionally blank. 0241 15- 1 PAVING REMOVAL Page I of 6 I SECTION 02 41 15 2 PAVING REMOVAL 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Removing concrete paving, asphalt paving and brick paving 7 2. Removing concrete curb and gutter 8 3. Removing concrete valley gutter 9 4. Milling roadway paving 10 5. Pulverization of existing pavement 11 6. Disposal of removed materials 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include,but are not necessarily limited to: 15 1. Division 0-Bidding Requirements, Contract Forms, and Conditions of the Contract 16 2. Division 1 -General Requirements 17 3. Section 32 11 33 -Cement Treated Base Courses 18 1.2 PRICE AND PAYMENT PROCEDURES 19 A. Measurement and Payment 20 1. Measurement 21 a. Remove Concrete Paving: measure by the square yard from back-to-back of 22 curbs. 23 b. Remove Asphalt Paving: measure by the square yard between the lips of 24 gutters. 25 c. Remove Brick Paving: measure by the square yard. 26 d. Remove Concrete Curb and Gutter: measure by the linear foot. 27 e. Remove Concrete Valley Gutter: measure by the square yard 28 f. Wedge Milling: measure by the square yard for varying thickness. 29 g. Surface Milling: measure by the square yard for varying thickness. 30 h. Butt Milling: measured by the linear foot. 31 i. Pavement Pulverization: measure by the square yard. 32 j. Remove Speed Cushion: measure by each. 33 2. Payment 34 a. Remove Concrete Paving: full compensation for saw cutting, removal, hauling, 35 disposal,tools, equipment, labor and incidentals needed to execute work. For 36 utility projects,this Item shall be considered subsidiary to the trench and no 37 other compensation will be allowed. 38 b. Remove Asphalt Paving: full compensation for saw cutting, removal, hauling, 39 disposal,tools,equipment, labor and incidentals needed to execute work. For 40 utility projects,this Item shall be considered subsidiary to the trench and no 41 other compensation will be allowed. For utility projects,this Item shall be 42 considered subsidiary to the trench and no other compensation will be allowed. CITY OF FORT WORTH Park Improvements at Terry.Northside,High Crest.and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20 2012 0241 15-2 PAVING REMOVAL Page 2 of 6 1 c. Remove Brick Paving: full compensation for saw cutting, removal, salvaging, 2 cleaning, hauling,disposal,tools, equipment, labor and incidentals needed to 3 execute work. For utility projects,this Item shall be considered subsidiary to 4 the trench and no other compensation will be allowed. 5 d. Remove Concrete Curb and Gutter: full compensation for saw cutting, removal, 6 hauling, disposal,tools, equipment, labor and incidentals needed to execute 7 work. For utility projects,this Item shall be considered subsidiary to the trench 8 and no other compensation will be allowed. 9 e. Remove Concrete Valley Gutter: full compensation for saw cutting, removal, 10 hauling, disposal,tools, equipment, labor and incidentals needed to execute I l work. 12 f. Wedge Milling: full compensation for all milling,hauling milled material to 13 salvage stockpile or disposal,tools, labor, equipment and incidentals necessary 14 to execute the work. 15 g. Surface Milling: full compensation for all milling, hauling milled material to 16 salvage stockpile or disposal,tools, labor, equipment and incidentals necessary 17 to execute the work. 18 h. Butt Milling: full compensation for all milling, hauling milled material to 19 salvage stockpile or disposal,tools, labor, equipment and incidentals necessary 20 to execute the work. 21 i. Pavement Pulverization: full compensation for all labor,material, equipment, 22 tools and incidentals necessary to pulverize, remove and store the pulverized 23 material,undercut the base,mixing,compaction,haul off,sweep,and dispose 24 of the undercut material. 25 j. Remove speed cushion: full compensation for removal,hauling, disposal, 26 tools,equipment, labor, and incidentals needed to execute the work. For utility 27 projects,this Item shall be considered subsidiary to the trench and no other 28 compensation will be allowed. 29 k. No payment for saw cutting of pavement or curbs and gutters will be made 30 under this section.Include cost of such work in unit prices for items listed in 31 bid form requiring saw cutting. 32 1. No payment will be made for work outside maximum payment limits indicated 33 on plans, or for pavements or structures removed for CONTRACTOR'S 34 convenience. 35 1.3 REFERENCES 36 A. ASTM International(ASTM): 37 a. D698, Standard Test Methods for Laboratory Compaction Characteristics of 38 Soil Using Standard Effort(12 400 ft-Ibf/ft3 (600 kN-m/m3)) 39 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 40 1.5 SUBMITTALS [NOT USED] 41 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 42 1.7 CLOSEOUT SUBMITTALS [NOT USED] 43 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 44 1.9 QUALITY ASSURANCE [NOT USED] 45 1.10 DELIVERY, STORAGE,AND HANDLING [NOT USED] CITY OF FORT WORTH Park Improvements at Terry,Northside.High Crest.and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20.2012 0241 15-3 PAVING REMOVAL Page 3 of 6 1 1.11 FIELD CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2- PRODUCTS 4 2.1 OWNER-FURNISHED PRODUCTS [NOT USED] 5 2.2 EQUIPMENT [NOT USED] 6 2.3 ACCESSORIES [NOT USED] 7 2.4 SOURCE QUALITY CONTROL [NOT USED] 8 PART 3- EXECUTION 9 3.1 EXAMINATION [NOT USED] 10 3.2 INSTALLERS [NOT USED] 11 3.3 PREPARATION 12 A. General: 13 1. Mark paving removal limits for City approval prior to beginning removal. 14 2. Identify known utilities below grade- Stake and flag locations. 15 3.4 PAVEMENT REMOVAL 16 A. General. 17 1. Exercise caution to minimize damage to underground utilities. 18 2. Minimize amount of earth removed. 19 3. Remove paving to neatly sawed joints. 20 4. Use care to prevent fracturing adjacent, existing pavement. 21 B. Sawing 22 1. Sawing Equipment. 23 a. Power-driven. 24 b. Manufactured for the purpose of sawing pavement. 25 c. In good operating condition. 26 d. Shall not spall or fracture the pavement structure adjacent to the removal area. 27 2. Sawcut perpendicular to the surface to full pavement depth, parallel and 28 perpendicular to existing joint. 29 3. Sawcut parallel to the original Sawcut in square or rectangular fashion. 30 4. If a Sawcut falls within 5 feet of an en existing dummy joint, construction joint, saw 31 joint, cold joint,expansion joint, edge of paving or gutter lip, remove paving to that 32 joint,edge or lip. 33 5. If a pavement edge of a cut is damaged subsequent to saw cutting, saw to a new, 34 neat,straight line for the purpose of removing the damaged area. 35 C. Remove Concrete Paving and Concrete Valley Gutter 36 1. Sawcut: See 3.4.13. 37 2. Remove concrete to the nearest expansion joint or vertical saw cut. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Smnmerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20 2012 0241 15-4 PAVING REMOVAL Page 4 of 6 1 D. Remove Concrete Curb and Gutter 2 1. Sawcut: See 3.4.13. 3 2. Minimum limits of removal: 30 inches in length. 4 E. Remove Asphalt Paving 5 1. Sawcut: See 3.4.13. 6 2. Remove pavement without disturbing the base material. 7 3. When shown on the plans or as directed,stockpile materials designated as 8 salvageable at designated sites. 9 4. Prepare stockpile area by removing vegetation and trash and by providing for 10 proper drainage. 11 F. Milling 12 1. General 13 a. Mill surfaces to the depth shown in the plans or as directed. 14 b. Do not damage or disfigure adjacent work or existing surface improvements. 15 c. If milling exposes smooth underlying pavement surfaces, mill the smooth 16 surface to make rough. 17 d. Provide safe temporary transition where vehicles or pedestrians must pass over 18 the milled edges. 19 e. Remove excess material and clean milled surfaces. 20 f. Stockpiling of planed material will not be permitted within the right of way 21 unless approved by the City. 22 g. If the existing base is brick and cannot be milled,remove a 5 foot width of the 23 existing brick base. See 3.3.G. for brick paving removal. 24 2. Milling Equipment 25 a. Power operated milling machine capable of removing,in one pass or two 26 passes,the necessary pavement thickness in a five-foot minimum width. 27 b. Self-propelled with sufficient power,traction and stability to maintain accurate 28 depth of cut and slope. 29 c. Equipped with an integral loading and reclaiming means to immediately 30 remove material cut from the surface of the roadway and discharge the cuttings 31 into a truck, all in one operation. 32 d. Equipped with means to control dust created by the cutting action. 33 e. Equipped with a manual system providing for uniformly varying the depth of 34 cut while the machine is in motion making it possible to cut flush to all inlets, 35 manholes, or other obstructions within the paved area. 36 f. Variable Speed in order to leave the specified grid pattern. 37 g. Equipped to minimize air pollution. 38 3. Wedge Milling and Surface Milling 39 a. Wedge Mill existing asphalt, concrete or brick pavement from the lip of gutter 40 at a depth of 2 inches and transitioning to match the existing pavement (0-inch 41 cut)at a minimum width of 5 feet. 42 b. Surface Mill existing asphalt pavement to the depth specified, 43 c. Provide a milled surface that provides a uniform surface free from gouges, 44 ridges, oil film, and other imperfections of workmanship with a uniform 45 textured appearance. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest.and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.02264,02265,02266 Revised December 20,2012 0241 15-5 PAVING REMOVAL Page 5 of 6 1 d. In all situations where the existing H.M.A.C. surface contacts the curb face,the 2 wedge milling includes the removal of the existing asphalt covering the gutter 3 up to and along the face of curb. 4 e. Perform wedge or surface milling operation in a continuous manner along both 5 sides of the street or as directed. 6 4. Butt Joint Milling 7 a. Mill butt joints into the existing surface, in association with the wedge milling 8 operation. 9 b. Butt joint will provide a full width transition section and a constant depth at the 10 point where the new overlay is terminated. I 1 c. Typical locations for butt joints are at all beginning and ending points of streets 12 where paving material is removed. Prior to the milling of the butt joints, 13 consult with the City for proper location and limits of these joints. 14 d. Butt Milled joints are required on both sides of all railroad tracks and concrete 15 valley gutters,bridge decks and culverts and all other items which transverse 16 the street and end the continuity of the asphalt surface. 17 e. Make each butt joint 20 feet long and milled out across the full width of the 18 street section to a tapered depth of 2 inch. 19 f. Taper the milled area within the 20-feet to a depth from 0-inch to 2-inch at a 20 line adjacent to the beginning and ending points or intermediate transverse 21 items. 22 g. Provide a temporary wedge of asphalt at all butt joints to provide a smooth ride 23 over the bump. 24 G. Remove Brick Paving 25 1. Remove masonry paving units to the limits specified in the plans or as directed by 26 the City. 27 2. Salvage existing bricks for re-use, clean,palletize, and deliver to the City Stock pile 28 yard at 3300 Yuma Street or as directed. 29 H. Pavement Pulverization 30 1. Pulverization 31 a. Pulverize the existing pavement to depth of 8 inches. See Section 32 11 33. 32 b. Temporarily remove and store the 8-inch deep pulverized material,then cut the 33 base 2 inches. 34 c. Start 2-inch base cut at a depth of 8 inches from the existing pulverized surface. 35 2. Cement Application 36 a. Use 3.5%Portland cement. 37 b. See Section 32 11 33. 38 3. Mixing: see Section 32 11 33. 39 4. Compaction: see Section 32 11 33. 40 5. Finishing: see Section 32 11 33. 41 6. Curing: see Section 32 11 33. 42 7. If the existing pavement has a combination of 10 inches of H.M.A.C. and crushed 43 stone/gravel: 44 a. Undercut not required 45 b. Pulverize 10 inches deep. 46 c. Remove 2-inch the total pulverized amount. CITY OF FORT WOR fI-I Part:Improvements at Terry,Northside,High Crest,and Su nmerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20.2012 0241 Ii-6 PAVING REMOVAL Page 6 of 6 1 I. Remove speed cushion 2 1. Scrape or sawcut speed cushion from existing pavement without damaging existing 3 pavement. 4 3.5 REPAIR [NOT USED] 5 3.6 RE-INSTALLATION [NOT USED] 6 3.7 FIELD QUALITY CONTROL [NOT USED] 7 3.8 SYSTEM STARTUP [NOT USED] 8 3.9 ADJUSTING [NOT USED] 9 3.10 CLEANING [NOT USED] 10 3.11 CLOSEOUT ACTIVITIES [NOT USED] 11 3.12 PROTECTION [NOT USED] 12 3.13 MAINTENANCE [NOT USED] 13 3.14 ATTACHMENTS [NOT USED] 14 END OF SECTION 15 Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D.Johnson 1.2.A—modified payment requirements on utility projects 16 CITY OF FORT WORTH Park Improvements at Terry,Northside.High Crest.and Sunnnerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.02264-02265,02266 Revised December 20,2012 03 30 00- 1 CAST--IN-PLACE CONCRETE Pagel of 25 1 SECTION 03 30 00 2 CAST-IN-PLACE CONCRETE 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Cast-in place concrete, including formwork,reinforcement, concrete materials, 7 mixture design,placement procedures and finishes, for the following: 8 a. Piers 9 b. Footings 10 c. Slabs-on-grade 11 d. Foundation walls 12 e. Retaining walls(non TxDOT) 13 f. Suspended slabs 14 g. Blocking 15 h. Cast-in-place manholes 16 i. Concrete vaults for meters and valves 17 j. Concrete encasement of utility lines 18 B. Deviations from this City of Fort Worth Standard Specification 19 1. None. 20 C. Related Specification Sections include,but are not necessarily limited to: 21 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 22 2. Division 1 —General Requirements 23 1.2 PRICE AND PAYMENT PROCEDURES 24 A. Cast-in-Place Concrete 25 1. Measurement 26 a. This Item is considered subsidiary to the structure or Items being placed. 27 2. Payment 28 a. The work performed and the materials furnished in accordance with this Item 29 are subsidiary to the structure or Items being placed and no other compensation 30 will be allowed. 31 1.3 REFERENCES 32 A. Definitions 33 1. Cementitious Materials 34 a. Portland cement alone or in combination with 1 or more of the following: 35 1) Blended hydraulic cement 36 2) Fly ash 37 3) Other pozzolans 38 4) Ground granulated blast-furnace slag CITY OF FORT WORTH Park Improvements at Teary.Northside,High Crest.and Smnrnerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 033000-2 CAST-IN-PLACE CONCRETE Page 2 of 25 l 5) Silica fume 2 b. Subject to compliance with the requirements of this specification 3 B. Reference Standards 4 1. Reference standards cited in this Specification refer to the current reference 5 standard published at the time of the latest revision date logged at the end of this 6 Specification,unless a date is specifically cited. 7 2. American Association of State Highway and Transportation (AASHTO): 8 a. M182,Burlap Cloth Made from Jute or Kena£ 9 3. American Concrete Institute(ACI): 10 a. ACI 117 Specification for Tolerances for Concrete Construction and Materials i l b. ACI 301 Specifications for Structural Concrete 12 c. ACI 305.1 Specification for Hot Weather Concreting 13 d. ACI 306.1 Standard Specification for Cold Weather Concreting 14 e. ACI 308.1 Standard Specification for Curing Concrete 15 f. ACI 318 Building Code Requirements for Structural Concrete 16 g. ACI 347 Guide to Formwork for Concrete 17 4. American Institute of Steel Construction(AISC): 18 a. 303,Code of Standard Practice for Steel Buildings and Bridges. 19 5. ASTM International (ASTM): 20 a. A36, Standard Specification for Carbon Structural Steel. 21 b. A 153, Standard Specification for Zinc Coating(Hot-Dip) on Iron and Steel 22 Hardware. 23 c. A193, Standard Specification for Alloy-Steel and Stainless Steel Bolting 24 Materials for High-Temperature Service and Other Special Purpose 25 Applications. 26 d. A615, Standard Specification for Deformed and Plain Carbon-Steel Bars for 27 Concrete Reinforcement. 28 e. A706, Standard Specification for Low-Alloy Steel Deformed and Plain Bars for 29 Concrete Reinforcement. 30 f. C3 1, Standard Practice for Making and Curing Concrete Test Specimens in the 31 Field. 32 g. C33, Standard Specification for Concrete Aggregates. 33 h. C39, Standard Test Method for Compressive Strength of Cylindrical Concrete 34 Specimens. 35 i. C42, Standard Test Method for Obtaining and Testing Drilled Cores and Sawed 36 Beams of Concrete. 37 j. C94, Standard Specification for Ready-Mixed Concrete. 38 k. C 109, Standard Test Method for Compressive Strength of Hydraulic Cement 39 Mortars(Using 2-inch or {50-milimeter] Cube Specimens) 40 1. C 143, Standard Test Method for Slump of Hydraulic-Cement Concrete. 41 m. C171, Standard Specification for Sheet Materials for Curing Concrete. 42 n. C150, Standard Specification for Portland Cement. 43 o. C172, Standard Practice for Sampling Freshly Mixed Concrete. 44 p. C219, Standard Terminology Relating to Hydraulic Cement. 45 q. C231, Standard Test Method for Air Content of Freshly Mixed Concrete by the 46 Pressure Method. CITY OF FORT WORTH Park improvements at Terry,Northside,High Crest,and Smnmerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264..02265.02266 Revised December 20.2012 033000-3 CAST-IN-PLACE CONCRETE Page 3 of 25 1 r. C260, Standard Specification for Air-Entraining Admixtul•eS for Concrete. 2 s. C309, Standard Specification for Liquid Membrane-Forming Compounds for 3 Curing Concrete. 4 t. C494, Standard Specification for Chemical Admixtures for Concrete. 5 U. C618, Standard Specification for Coal Fly Ash and Raw or Calcined Natural 6 Pozzolan for Use in Concrete. 7 v. C881, Standard Specification for Epoxy-Resin-Base Bonding Systems for 8 Concrete. 9 w. C989, Standard Specification for Ground Granulated Blast-Furnace Slag for 10 Use in Concrete and Mortars. 11 x. C1017, Standard Specification for Chemical Admixtures for Use in Producing 12 Flowing Concrete. 13 y. C1059, Standard Specification for Latex Agents for Bonding Fresh to Hardened 14 Concrete. 15 z. C1064, Standard Test Method for Temperature of Freshly Mixed Hydraulic- 16 Cement Concrete. 17 aa. C 1240, Standard Specification for Silica Fume Used in Cementitious Mixtures. 18 bb. E1155, Standard Test Method for Determining FF Floor Flatness and FL Floor 19 Levelness Numbers. 20 cc. F436, Standard Specification for Hardened Steel Washers. 21 6. American Welding Society(AWS). 22 a. D1.1, Structural Welding Code-Steel. 23 b. DI A, Structural Welding Code-Reinforcing Steel. 24 7. Concrete Reinforcing Steel Institute(CRSI) 25 a. Manual of Standard Practice 26 8. Texas Department of Transportation 27 a. Standard Specification for Construction and Maintenance of Highways, Streets 28 and Bridges 29 1.4 ADMINISTRATIVE REQUIREMENTS 30 A. Work Included 31 1. Design,fabrication,erection and stripping of formwork for cast-in-place concrete 32 including shoring,reshoring, falsework, bracing, proprietary forming systems, 33 prefabricated forms,void forms,permanent metal forms,bulkheads,keys, 34 blockouts, sleeves,pockets and accessories. 35 a. Erection shall include installation in formwork of items furnished by other 36 trades. 37 2. Furnish all labor and materials required to fabricate, deliver and install 38 reinforcement and embedded]petal assemblies for cast-in-place concrete, including 39 steel bars,welded steel wire fabric,ties, supports and sleeves. 40 3. Furnish all labor and materials required to perform the following: 41 a. Cast-in-place concrete 42 b. Concrete mix designs 43 c. Grouting CITY OF FORT WORT]-I Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.02264.02265.02266 Revised December 20.2012 033000-4 CAST-IN-PLACE CONCRETE Page 4 o1`25 1 1.5 SUBMITTALS 2 A. Submittals shall be in accordance with Section 01 33 00. 3 B. All submittals shall be approved by the City prior to delivery and/or fabrication for 4 specials. 5 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS 6 A. Product Data 7 1. Required for each type of product indicated 8 B. Design Mixtures 9 1. For each concrete mixture submit proposed mix designs in accordance with ACI 10 318, chapter 5. 11 2. Submit each proposed mix design with a record of past performance. 12 3. Submit alternate design mixtures when characteristics of materials,Project condi- 13 tions,weather,test results or other circumstances warrant adjustments. 14 4. Indicate amounts of mixing water to be withheld for later addition at Project site. 15 a. Include this quantity on delivery ticket. 16 C. Steel Reinforcement Submittals for Information 17 1. Mill test certificates of supplied concrete reinforcing, indicating physical and chem- 18 ical analysis. 19 1.7 CLOSEOUT SUBMITTALS [NOT USED] 20 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 21 1.9 QUALITY ASSURANCE 22 A. Manufacturer Qualifications 23 1. A firm experienced in manufacturing ready-mixed concrete products and that com- 24 plies with ASTM C94 requirements for production facilities and equipment 25 2. Manufacturer certified according to NRMCA's "Certification of Ready Mixed 26 Concrete Production Facilities" 27 B. Source Limitations 28 1. Obtain each type or class of cementitious material of the same brand from the same 29 manufacturer's plant, obtain aggregate from 1 source and obtain admixtures through 30 1 source from a single manufacturer. 31 C. ACI Publications 32 1. Comply with the following unless modified by requirements in the Contract Docu- 33 ments: 34 a. ACI 301 Sections 1 through 5 35 b. ACI 117 36 D. Concrete Testing Service 37 1. Engage a qualified independent testing agency to perform material evaluation tests. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Suomnerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265.02266 Revised December 20,2012 033000-5 CAST-IN-PLACE CONCRETE Page 5 of 25 1 1.10 DELIVERY, STORAGE,AND HANDLING 2 A. Steel Reinforcement 3 1. Deliver,store, and handle steel reinforcement to prevent bending and damage. 4 2. Avoid damaging coatings on steel reinforcement. 5 B. Waterstops 6 1. Store waterstops under cover to protect from moisture,sunlight, dirt, oil and other 7 contaminants. 8 1.11 FIELD CONDITIONS [NOT USED] 9 1.12 WARRANTY [NOT USED] 10 PART 2- PRODUCTS 11 2.1 OWNER-FURNISHED OR OWNER-SUPPLIED PRODUCTS [NOT USED] 12 2.2 PRODUCT TYPES AND MATERIALS 13 A. Manufacturers 14 1. In other Part 2 articles where titles below introduce lists,the following requirements 15 apply to product selection: 16 a. Available Products: Subject to compliance with requirements,products that 17 may be incorporated into the Work include,but are not limited to, products 18 specified. 19 b. Available Manufacturers: Subject to compliance with requirements, 20 manufacturers offering products that may be incorporated into the Work 21 include, but are not limited to, manufacturers specified. 22 B. Form-Facing Materials 23 1. Rough-Formed Finished Concrete 24 a. Plywood, lumber, metal or another approved material 25 b. Provide lumber dressed on at least 2 edges and l side for tight fit. 26 2. Chamfer Strips 27 a. Wood, metal,PVC or rubber strips 28 b. 3/4-inch x3/4-inch,minimum 29 3. Rustication Strips 30 a. Wood,metal,PVC or rubber strips 31 b. Kerfed for ease of form removal 32 4. Form-Release Agent 33 a. Commercially formulated form-release agent that will not bond with, stain or 34 adversely affect concrete surfaces 35 b. Shall not impair subsequent treatments of concrete surfaces 36 c. For steel form-facing materials, formulate with rust inhibitor. 37 5. Form Ties CITY OF FORT WORTH Park Improvements at'rerry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264.02265,02266 Revised December 20.2012 033000-6 CAST-TN-PLACE CONCRETE Page 6 of 25 I a. Factory-fabricated,removable or snap-off metal or glass-fiber-reinforced 2 plastic form ties designed to resist lateral pressure of fresh concrete on forms 3 and to prevent spalling of concrete on removal. 4 b. Furnish units that will leave no corrodible metal closer than I inch to the plane 5 of exposed concrete surface. 6 c. Furnish ties that, when removed,will leave holes no larger than I inch in 7 diameter in concrete surface. 8 d. Furnish ties with integral water-barrier plates to walls indicated to receive 9 dampproofing or waterproofing. 10 C. Steel Reinforcement 11 1. Reinforcing Bars 12 a. ASTM A615, Grade 60, deformed 13 D. Reinforcement Accessories 14 1. Smooth Dowel Bars 15 a. ASTM A615, Grade 60,steel bars(smooth) 16 b. Cut bars true to length with ends square and free of burrs. 17 2. Bar Supports 18 a. Bolsters, chairs, spacers and other devices for spacing, supporting and fastening 19 reinforcing bars and welded wire reinforcement in place 20 b. Manufacture bar supports from steel wire,plastic or precast concrete according 21 to CRSI's "Manual of Standard Practice," of greater compressive strength than 22 concrete and as follows: 23 1) For concrete surfaces exposed to view where legs of wire bar supports 24 contact forms,use CRSI Class 1 plastic-protected steel wire or CRSI 25 Class 2 stainless-steel bar supports. 26 2) For slabs-on-grade,provide sand plates,horizontal runners or precast 27 concrete blocks on bottom where base material will not support chair legs 28 or where vapor barrier has been specified. 29 E. Embedded Metal Assemblies 30 1. Steel Shapes and Plates: ASTM A36 31 2. Headed Studs: Heads welded by full-fusion process,as furnished by TRW Nelson 32 Stud Welding Division or approved equal 33 F. Expansion Anchors 34 1. Available Products 35 a. Wej-it Bolt, Wej-it Corporation,Tulsa, Oklahoma 36 b. Kwik Bolt II,Hilti Fastening Systems,Tulsa, Oklahoma 37 c. Trubolt, Ramset Fastening Systems,Paris,Kentucky 38 G. Adhesive Anchors and Dowels 39 1. Adhesive anchors shall consist of threaded rods anchored with an adhesive system 40 into hardened concrete or grout-filled masonry. 41 a. The adhesive system shall use a 2-component adhesive mix and shall be 42 injected with a static mixing nozzle following manufacturer's instructions. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 0226102264A2265_02266 02266 Revised December 20.2012 03 3000-7 CAST-IN-PLACE CONCRETE Page 7 of 25 1 b. The embedment depth of the rod shall provide a minimum allowable bond 2 strength that is equal to the allowable yield capacity of the rod, unless otherwise 3 specified. 4 2. Available Products 5 a. Hilti HIT HY 150 Max 6 b. Simpson Acrylic-Tie 7 c. Powers Fasteners AC 100+Gold 8 3. Threaded Rods: ASTM A 193 9 a. Nuts: ASTM A563 hex carbon steel 10 b. Washers: ASTM F436 hardened carbon steel I i c. Finish: Hot-dip zinc coating,ASTM A153, Class C 12 H. Inserts 13 1. Provide metal inserts required for anchorage of materials or equipment to concrete 14 construction where not supplied by other trades: 15 a. In vertical concrete surfaces for transfer of direct shear loads only, provide 16 adjustable wedge inserts of malleable cast iron complete with bolts,nuts and 17 washers. 18 1) Provide'/4-inch bolt size, unless otherwise indicated. 19 b. In horizontal concrete surfaces and whenever inserts are subject to tension 20 forces, provide threaded inserts of malleable cast iron furnished with full depth 21 bolts. 22 1) Provide 3/4-inch bolt size,unless otherwise indicated. 23 1. Concrete Materials 24 1. Cementiti0uS Material 25 a. Use the following cementitious materials, of the same type,brand,and source, 26 throughout Project: 27 1) Portland Cement 28 a) ASTM C150,Type I/II, gray 29 b) Supplement with the following: 30 (1) Fly Ash 31 (a) ASTM C618,Class C or F 32 (2) Ground Granulated Blast-Furnace Slag 33 (a) ASTM C989,Grade 100 or 120. 34 2) Silica Fume 35 a) ASTM C1240, amorphous silica 36 3) Normal-Weight Aggregates 37 a) ASTM C33, Class 3S coarse aggregate or better,graded 38 b) Provide aggregates from a single source. 39 4) Maximum Coarse-Aggregate Size 40 a) 3/4-inch nominal 41 5) Fine Aggregate 42 a) Free of materials with deleterious reactivity to alkali in cement 43 6) Water 44 a) ASTM C94 and potable 45 J. Admixtures CITY OF FORT WORTH Park Improvements at Terry,Nortbside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264.02265,02266 Revised December 20,2012 033000-8 CAST-IN-PLACE CONCRETE Page 8 of 25 1 1. Air-Entraining Admixture 2 a. ASTM C260 3 2. Chemical Admixtures 4 a. Provide admixtures certified by manufacturer to be compatible with other ad- 5 mixtures and that will not contribute water-soluble chloride ions exceeding 6 those permitted in hardened concrete. 7 b. Do not use calcium chloride or admixtures containing calcium chloride. 8 c. Water-Reducing Admixture 9 1) ASTM C494, Type A 10 d. Retarding Admixture 11 1) ASTM C494,Type B 12 e. Water-Reducing and Retarding Admixture 13 1) ASTM C494,Type D 14 f. High-Range, Water-Reducing Admixture 15 1) ASTM C494,Type F 16 g. High-Range, Water-Reducing and Retarding Admixture 17 1) ASTM C494,Type G 18 h. Plasticizing and Retarding Admixture 19 1) ASTM C1017,Type II 20 K. Waterstops 21 1. Self-Expanding Butyl Strip Waterstops 22 a. Manufactured rectangular or trapezoidal strip, butyl rubber with sodium 23 bentonite or other hydrophilic polymers,for adhesive bonding to concrete,3/4— 24 inch x I-inch. 25 b. Available Products 26 1) Colloid Environmental Technologies Company; Volclay Waterstop-RX 27 2) Concrete Sealants Inc.; Conseal CS-231 28 3) Greenstreak; Swellstop 29 4) Henry Company, Sealants Division; Hydro-Flex 30 5) JP Specialties, Inc.;Earthshield Type 20 31 6) Progress Unlimited, Inc.; Superstop 32 7) TCMiraDRI; Mirastop 33 L. Curing Materials 34 1. Absorptive Cover 35 a. AASHTO M 182, Class 2,burlap cloth made from jute or kenaf,weighing 36 approximately 9 ounces/square yard when dry 37 2. Moisture-Retaining Cover 38 a. ASTM C171, polyethylene film or white burlap-polyethylene sheet 39 3. Water 40 a. Potable 41 4. Clear, Waterborne,Membrane-Forming Curing Compound 42 a. ASTM C309,Type 1, Class B, dissipating 43 b. Available Products 44 1) Anti-Hydro International, Inc.; AH Curing Compound#2 DR WB 45 2) Burke by Edoco;Aqua Resin Cure 46 3) ChemMasters; Safe-Cure Clear CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest.and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265.02266 Revised December 20.2012 033000-9 CAST-IN-PLACE CONCRETE Page 9 of 25 1 4) Conspec Marketing&Manufacturing Co., Inc., a Dayton Superior 2 Company; W.B. Resin Cure 3 5) Dayton Superior Corporation; Day Chem Rez Cure(J-I 1-W) 4 6) Euclid Chemical Company(The);Kurez DR VOX 5 7) Kaufman Products, Inc.; Thinfilm 420 6 8) Lambert Corporation;Aqua Kure-Clear 7 9) L&M Construction Chemicals, Inc.; L&M Cure R 8 10) Meadows, W. R.,Inc.; 1100 Clear 9 11)Nox-Crete Products Group,Kinsman Corporation; Resin Cure E 10 12) Symons Corporation,a Dayton Superior Company; Resi-Chem Clear Cure 11 13) Tamms Industries,Inc.;Horncure WB 30 12 14) Unitex; Hydro Cure 309 13 15) US Mix Products Company; US Spec Maxcure Resin Clear 14 16) Vexcon Chemicals, Inc.; Certi-Vex Enviocure 100 15 M. Related Materials 16 1. Bonding Agent 17 a. ASTM C1059,Type II,non-redispersible, acrylic emulsion or styrene 18 butadiene 19 2. Epoxy Bonding Adhesive 20 a. ASTM C881,2-component epoxy resin, capable of humid curing and bonding 21 to damp surfaces, of class suitable for application temperature and of grade to 22 suit requirements,and as follows: 23 1) Types I and Il, non-load bearing 24 2) IV and V,load bearing, for bonding 25 3) Hardened or freshly mixed concrete to hardened concrete 26 3. Reglets 27 a. Fabricate reglets of not less than 0.0217-inch thick,galvanized steel sheet 28 b. Temporarily fill or cover face opening of reglet to prevent intrusion of concrete 29 or debris. 30 4. Sleeves and Blockouts 31 a. Formed with galvanized metal, galvanized pipe,polyvinyl chloride pipe, fiber 32 tubes or wood 33 5. Nails, Spikes, Lag Bolts,Through Bolts,Anchorages 34 a. Sized as required 35 b. Shall be of strength and character to maintain formwork in place while placing 36 concrete 37 N. Repair Materials 38 1. Repair Underlayment 39 a. Cement-based, polymer-modified,self-leveling product that can be applied in 40 thicknesses of 118 inch or greater 41 1) Do not feather. 42 b. Cement Binder 43 1) ASTM C150,portland cement or hydraulic or blended hydraulic cement as 44 defined in ASTM C219 45 c. Primer CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summer6elds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265.02266 Revised December 20,2012 03 30 00-10 CAST-IN-PLACE CONCRETE Page 10 of25 1 1) Product of underlayment manufacturer recommended for substrate, condi- 2 tions, and application 3 d. Aggregate 4 1) Well-graded, washed gravel, 1/8 to 1/4 inch or coarse sand as 5 recommended by underlayment manufacturer 6 e. Compressive Strength 7 1) Not less than 4100 psi at 28 days when tested according to 8 ASTM C 109/C 109M 9 2. Repair Overlayment 10 a. Cement-based, polymer-modified, self-leveling product that can be applied in 11 thicknesses of 1/8 inch or greater 12 1) Do not feather. 13 b. Cement Binder 14 1) ASTM C150, portland cement or hydraulic or blended hydraulic cement as 15 defined in ASTM C219 16 c. Primer 17 1) Product of topping manufacturer recommended for substrate, conditions, 18 and application 19 d. Aggregate 20 1) Well-graded, washed gravel, 1/8 to 1/4 inch or coarse sand as recommend- 21 ed by topping manufacturer 22 e. Compressive Strength 23 1) Not less than 5000 psi at 28 days when tested according to ASTM C109 24 O. Concrete Mixtures, General 25 1. Prepare design mixtures for each type and strength of concrete,proportioned on the 26 basis of laboratory trial mixture or field test data,or both, according to ACI 301. 27 a. Required average strength above specified strength 28 1) Based on a record of past performance 29 a) Determination of required average strength above specified strength 30 shall be based on the standard deviation record of the results of at least 31 30 consecutive strength tests in accordance with ACI 318, Chapter 5.3 32 by the larger amount defined by formulas 5-1 and 5-2. 33 2) Based on laboratory trial mixtures 34 a) Proportions shall be selected on the basis of laboratory trial batches 35 prepared in accordance with ACI 318,Chapter 5.3.3.2 to produce an 36 average strength greater than the specified strength Pc by the amount 37 defined in table 5.3.2.2. 38 3) Proportions of ingredients for concrete mixes shall be determined by an in- 39 dependent testing laboratory or qualified concrete supplier. 40 4) For each proposed mixture, at least 3 compressive test cylinders shall be 41 made and tested for strength at the specified age. 42 a) Additional cylinders maybe made for testing for infonnation at earlier 43 ages. 44 2. Cementitious Materials 45 a. Limit percentage, by weight, of cementitious materials other than portland ce- 46 ment in concrete as follows, unless specified otherwise: 47 1) Fly Ash: 25 percent CITY OF FORT WORTH Park hnprovenrents at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264-02265,02266 Revised December 20,2012 03 30 00- 11 CAST-IN-PLACE CONCRETE Page 1 1 of 25 1 2) Combined Fly Ash and Pozzolan: 25 percent 2 3) Ground Granulated Blast-Furnace Slag: 50 percent 3 4) Combined Fly Ash or Pozzolan and Ground Granulated Blast-Furnace 4 Slag: 50 percent 5 5) Portland cement minimum, with fly ash or pozzolan not exceeding 25 per- 6 cent 7 6) Silica Fume: 10 percent 8 7) Combined Fly Ash, Pozzolans, and Silica Fume: 35 percent with fly ash or 9 pozzolans not exceeding 25 percent and silica fume not exceeding 10 per- 10 cent 11 8) Combined Fly Ash or Pozzolans, Ground Granulated Blast-Furnace Slag, 12 and Silica Fume: 50 percent with fly ash or pozzolans not exceeding 25 13 percent and silica fume not exceeding 10 percent 14 3. Limit water-soluble, chloride-ion content in hardened concrete to: 15 a. 0.30 percent by weight of cement if concrete will have no exposure to chlorides 16 (typical) 17 b. 0.15 percent by weight if concrete will be exposed to chlorides 18 c. 1.0 percent by weight if concrete will have no exposure to chlorides and will be 19 continually dry and protected. 20 4. Admixtures 21 a. Use admixtures according to manufacturer's written instructions. 22 b. Do not use admixtures which have not been incorporated and tested in accepted 23 mixes. 24 c. Use water-reducing high-range water-reducing or plasticizing admixture in 25 concrete, as required,for placement and workability. 26 d. Use water-reducing and retarding admixture when required by high 27 temperatures, low humidity or other adverse placement conditions. 28 e. Use water-reducing admixture in pumped concrete, concrete for heavy-use 29 industrial slabs and parking structure slabs, concrete required to be watertight, 30 and concrete with a water-cementitious materials ratio below 0.50. 31 f. Use corrosion-inhibiting admixture in concrete mixtures where indicated. 32 P. Concrete Mixtures 33 1. Refer to TxDOT"Standard Specifications for Construction and Maintenance of 34 Highways, Streets, and Bridges"for: 35 a. Culverts 36 b. Headwalls 37 c. Wingwalls 38 2. Proportion normal-weight concrete mixture as follows: 39 a. Minimum Compressive Strength: 3,000 psi at 28 days 40 b. Maximum Water-Cementitious Materials Ratio: 0.50 41 c. Slump Limit: 5 inches or 8 inches for concrete with verified slump of 2 to 4 42 inches before adding high-range water-reducing admixture or plasticizing 43 admixture,plus or minus I inch 44 d. Air Content: 6 percent,plus or minus 1.5 percent at point of delivery for 3/4- 45 inch nominal maximum aggregate size 46 Q. Fabricating Reinforcement CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest.and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265.02266 Revised December 20,2012 03 30 00- 12 CAST-IN-PLACE CONCRETE Page 12 of25 1 1. Fabricate steel reinforcement according to CRS I's "Manual of Standard Practice." 2 R. Fabrication of Embedded Metal Assemblies 3 1. Fabricate metal assemblies in the shop. Holes shall be made by drilling or 4 punching. Holes shall not be made by or enlarged by burning. Welding shall be in 5 accordance with AWS D1.1. 6 2. Metal assemblies exposed to earth, weather or moisture shall be hot dip galvanized. 7 All other metal assemblies shall be either hot dip galvanized or painted with an 8 epoxy paint. Repair galvanizing after welding with a Cold Galvanizing compound 9 installed in accordance with the manufacturer's instructions.Repair painted 10 assemblies after welding with same type of paint. I 1 S. Concrete Mixing 12 1. Ready-Mixed Concrete: Measure,batch,mix, and deliver concrete according to 13 ASTM C94, and furnish batch ticket information. 14 a. When air temperature is between 85 and 90 degrees Fahrenheit,reduce mixing 15 and delivery time from 1-1/2 hours to 75 minutes;when air temperature is 16 above 90 degrees Fahrenheit,reduce mixing and delivery time to 60 minutes. 17 2. Project-Site Mixing: Measure, batch, and mix concrete materials and concrete 18 according to ASTM C94/C94M. Mix concrete materials in appropriate drum-type 19 batch machine mixer. 20 a. For mixer capacity of I cubic yard or smaller,continue mixing at least 1-1/2 21 minutes, but not more than 5 minutes after ingredients are in mixer,before any 22 part of batch is released. 23 b. For mixer capacity larger than 1 cubic yard, increase mixing time by 15 24 seconds for each additional 1 cubic yard. 25 c. Provide batch ticket for each batch discharged and used in the Work, indicating 26 Project identification name and number, date,mixture type, mixture time, 27 quantity, and amount of water added. Record approximate location of final 28 deposit in structure. 29 2.3 ACCESSORIES [NOT USED] 30 2.4 SOURCE QUALITY CONTROL [NOT USED] 31 PART 3- EXECUTION 32 3.1 INSTALLERS [NOT USED] 33 3.2 EXAMINATION [NOT USED] 34 3.3 PREPARATION [NOT USED] 35 3.4 INSTALLATION 36 A. Formwork 37 1. Design,erect, shore, brace,and maintain formwork, according to ACI 301,to 38 support vertical,lateral, static, and dynamic loads, and construction loads that might 39 be applied, until structure can support such loads. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Smmnerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265-,02266 Revised December 20,2012 03 30 00- 13 CAST-IN-PLACE CONCRETE Page 13 of 25 1 2. Construct formwork so concrete members and structures are of size,shape, 2 aligmment, elevation, and position indicated, within tolerance limits of ACI 117. 3 a. Vertical alignment 4 l) Lines, surfaces and arises less than 100 feet in height- 1 inch. 5 2) Outside corner of exposed corner columns and control joints in concrete 6 exposed to view less than 100 feet in height- 1/2 inch. 7 3) Lines, surfaces and arises greater than 100 feet in height- IA 000 times the 8 height but not more than 6 inches. 9 4) Outside corner of exposed corner columns and control joints in concrete 10 exposed to view greater than 100 feet in height- 1/2000 times the height 11 but not more than 3 inches. 12 b. Lateral alignment 13 1) Members - l inch. 14 2) Centerline of openings 12 inches or smaller and edge location of larger 15 openings in slabs- 1/2 inch. 16 3) Sawcuts,joints, and weakened plane embedments in slabs-3/4 inch. 17 c. Level alignment 18 1) Elevation of slabs-on-grade-3/4 inch. 19 2) Elevation of top surfaces of formed slabs before removal of shores -3/4 20 inch. 21 3) Elevation of formed surfaces before removal of shores-3/4 inch. 22 d. Cross-sectional dimensions: Overall dimensions of beams,joists, and columns 23 and thickness of walls and slabs. 24 1) 12 inch dimension or less-plus 1/2 inch to minus 1/4 inch. 25 2) Greater than 12 inch to 3 foot dimension-plus 1/2 inch to minus 3/8 inch. 26 3) Greater than 3 foot dimension-plus 1 inch to minus 3/4 inch. 27 e. Relative alignment 28 1) Stairs 29 a) Difference in height between adjacent risers- 1/8 inch. 30 b) Difference in width between adjacent treads - 1/4 inch. 31 c) Maximum difference in height between risers in a flight of stairs -3/8 32 inch. 33 d) Maximum difference in width between treads in a flight of stairs -3/8 34 inch. 35 2) Grooves 36 a) Specified width 2 inches or less- 1/8 inch. 37 b) Specified width between 2 inches and 12 inches- 1/4 inch. 38 3) Vertical alignment of outside corner of exposed corner columns and control 39 joint grooves in concrete exposed to view- 1/4 inch in 10 feet. 40 4) All other conditions-3/8 inch in 10 feet. 41 3. Limit concrete surface irregularities, designated by ACI 347R as abrupt or gradual, 42 as follows: 43 a. Class B, 1/4 inch for smooth-formed finished surfaces. 44 b. Class C, 1/2 inch for rough-formed finished surfaces. 45 4. Construct forms tight enough to prevent loss of concrete mortar. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest.and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 03 30 00- 14 CAST-IN-PLACE CONCRETE Page 14of25 1 5. Fabricate forms for easy removal without hammering or prying against concrete 2 surfaces. Provide crush or wrecking plates where stripping may damage cast 3 concrete surfaces. Provide top forms for inclined surfaces steeper than 1.5 4 horizontal to 1 vertical. 5 a. Install keyways,reglets, recesses, and the like,for easy removal. 6 b. Do not use rust-stained steel form-facing material. 7 6. Set edge forms,bulkheads,and intermediate screed strips for slabs to achieve 8 required elevations and slopes in finished concrete surfaces. Provide and secure 9 units to support screed strips; use strike-off templates or compacting-type screeds. 10 7. Construct formwork to cambers shown or specified on the Drawings to allow for 11 structural deflection of the hardened concrete. Provide additional elevation or 12 camber in formwork as required for anticipated formwork deflections due to weight 13 and pressures of concrete and construction loads. 14 8. Foundation Elements: Form the sides of all below grade portions of beams,pier 15 caps, walls, and columns straight and to the lines and grades specified. Do no earth 16 form foundation elements unless specifically indicated on the Drawings. 17 9. Provide temporary openings for cleanouts and inspection ports where interior area 18 of formwork is inaccessible. Close openings with panels tightly fitted to forms and 19 securely braced to prevent loss of concrete mortar. Locate temporary openings in 20 forms at inconspicuous locations. 21 10. Chamfer exterior corners and edges of permanently exposed concrete. 22 11. Form openings, chases,offsets, sinkages,keyways,reglets,blocking, screeds, and 23 bulkheads required in the Work. Determine sizes and locations from trades 24 providing such items. 25 12. Clean forms and adjacent surfaces to receive concrete. Remove chips,wood, 26 sawdust, dirt, and other debris just before placing concrete. 27 13. Retighten forms and bracing before placing concrete,as required,to prevent mortar 28 leaks and maintain proper alignment. 29 14. Coat contact surfaces of forms with form-release agent,according to manufacturer's 30 written instructions, before placing reinforcement, anchoring devices, and 31 embedded items. 32 a. Do not apply form release agent where concrete surfaces are scheduled to 33 receive subsequent finishes which may be affected by agent. Soak contact 34 surfaces of untreated forms with clean water. Keep surfaces wet prior to 35 placing concrete. 36 B. Embedded Items 37 1. Place and secure anchorage devices and other embedded items required for 38 adjoining work that is attached to or supported by cast-in-place concrete. Use 39 setting drawings, templates,diagrams, instructions, and directions furnished with 40 items to be embedded. 41 a. Install anchor rods, accurately located,to elevations required and complying 42 with tolerances in AISC 303, Section 7.5. 43 1) Spacing within a bolt group: 1/8 inch 44 2) Location of bolt group(center): Yz inch 45 3) Rotation of bolt group: 5 degrees CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Smnmerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265.02266 Revised December 20,2012 03 30 00-15 CAST-IN-PLACE CONCRETE Page 15 of25 1 4) Angle off vertical: 5 degrees 2 5) Bolt projection: f 3/8 inch 3 b. Install reglets to receive waterproofing and to receive through-wall flashings in 4 outer face of concrete frame at exterior walls, where flashing is shown at lintels, 5 shelf angles, and other conditions. 6 C. Removing and Reusing Forms 7 1. Do not backfill prior to concrete attaining 70 percent of its 28-day design 8 compressive strength. 9 2. General: Formwork for sides of beams,walls,columns, and similar parts of the 10 Work that does not support weight of concrete may be removed after cumulatively 11 curing at not less than 50 degrees Fahrenheit for 24 hours after placing concrete, if 12 concrete is hard enough to not be damaged by form-removal operations and curing 13 and protection operations are maintained. 14 a. Leave formwork for beam soffits,joists,slabs, and other structural elements 15 that supports weight of concrete in place until concrete has achieved at least 70 16 percent of its 28-day design compressive strength. 17 b. Do not remove formwork supporting conventionally reinforced concrete until 18 concrete has attained 70 percent of its specified 28 day compressive strength as 19 established by tests of field cured cylinders. In the absence of cylinder tests, 20 supporting formwork shall remain in place until the concrete has cured at a 21 temperature of at least 50 degrees Fahrenheit for the minimum cumulative time 22 periods given in ACI 347, Section 3.7.2.3. Add the period of time when the 23 surrounding air temperature is below 50 degrees Fahrenheit,to the minimum 24 listed time period. Formwork for 2-way conventionally reinforced slabs shall 25 remain in place for at least the minimum cumulative time periods specified for 26 1-way slabs of the same maximum span. 27 c. Immediately reshore 2-way conventionally reinforced slabs after formwork 28 removal. Reshores shall remain until the concrete has attained the specified 28 29 day compressive strength. 30 d. Minimum cumulative curing times may be reduced by the use of high-early 31 strength cement or forming systems which allow form removal without 32 disturbing shores, but only after the Contractor has demonstrated to the 33 satisfaction of the Engineer that the early removal of forms will not cause 34 excessive sag, distortion or damage to the concrete elements. 35 e. Completely remove wood forms. Provide temporary openings if required. 36 f. Provide adequate methods of curing and thermal protection of exposed concrete 37 if forms are removed prior to completion of specified curing time. 38 g. Reshore areas required to support construction loads in excess of 20 pounds per 39 square foot to properly distribute construction loading. Construction loads up 40 to the rated live load capacity may be placed on unshored construction provided 41 the concrete has attained the specified 28 day compressive strength. 42 h. Obtaining concrete compressive strength tests for the purposes of form removal 43 is the responsibility of the Contractor. 44 i. Remove forms only if shores have been arranged to permit removal of forms 45 without loosening or disturbing shores. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Surnmerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264_02265,02266 Revised December 20,2012 03 30 00-16 CAST-IN-PLACE CONCRETE Page 16 of 25 1 3. Clean and repair surfaces of forms to be reused in the Work. Split,frayed, 2 delaminated, or otherwise damaged form-facing material will not be acceptable for 3 exposed surfaces. Apply new form-release agent. 4 4. When forms are reused, clean surfaces,remove fins and laitance,and tighten to 5 close joints. Align and secure joints to avoid offsets. Do not use patched forms for 6 exposed concrete surfaces unless approved by Engineer. 7 D. Shores and Reshores 8 1. The Contractor is solely responsible for proper shoring and reshoring. 9 2. Comply with ACI 318 and ACI 301 for design, installation,and removal of shoring 10 and reshoring. 11 a. Do not remove shoring or reshoring until measurement of slab tolerances is 12 complete. 13 3. Plan sequence of removal of shores and reshore to avoid damage to concrete. 14 Locate and provide adequate reshoring to support construction without excessive 15 stress or deflection. 16 E. Steel Reinforcement 17 1. General: Comply with CRSI's "Manual of Standard Practice" for placing 18 reinforcement. 19 a. Do not cut or puncture vapor retarder. Repair damage and reseal vapor retarder 20 before placing concrete. 21 2. Clean reinforcement of loose rust and mill scale,earth, ice,and other foreign 22 materials that would reduce bond to concrete. 23 3. Accurately position,support, and secure reinforcement against displacement. 24 Locate and support reinforcement with bar supports to maintain minimum concrete 25 cover. Do not tack weld crossing reinforcing bars. 26 a. Weld reinforcing bars according to AWS DI A,where indicated. Only steel 27 conforming to ASTM A706 may be welded. 28 4. Installation tolerances 29 a. Top and bottom bars in slabs, girders,beams and joists: 30 1) Members 8 inches deep or less:f3/8 inch 31 2) Members more than 8 inches deep:t1/2 inch 32 b. Concrete Cover to Formed or Finished Surfaces:f3/8 inches for members 8 33 inches deep or less;±1/2 inches for members over 8 inches deep,except that 34 tolerance for cover shall not exceed 1/3 of the specified cover. 35 5. Concrete Cover 36 a. Reinforcing in structural elements deposited against the ground: 3 inches 37 b. Reinforcing in formed beams, columns and girders: 1-1/2 inches 38 c. Grade beams and exterior face of formed walls and columns exposed to 39 weather or in contact with the ground:2 inches 40 d. Interior faces of walls: I inches 41 e. Slabs: 3/4 inches 42 6. Splices: Provide standard reinforcement splices by lapping and tying ends. Comply 43 with ACI 318 for minimum lap of spliced bars where not specified on the 44 documents. Do not lap splice no. 14 and 18 bars. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Sunmmerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 03 30 00- 17 CAST-IN-PLACE CONCRETE Page 17 of 25 1 7. Field Welding of Embedded Metal Assemblies 2 a. Remove all paint and galvanizing in areas to receive field welds. 3 b. Field Prepare all areas where paint or galvanizing has been removed with the 4 specified paint or cold galvanizing compound,respectively. 5 F. Joints 6 1. General: Construct joints true to line with faces perpendicular to surface plane of 7 concrete. 8 2. Construction Joints: Install so strength and appearance of concrete are not 9 impaired,at locations indicated or as approved by Engineer. 10 a. Place joints perpendicular to main reinforcement. Continue reinforcement 11 across construction joints,unless otherwise indicated. Do not continue 12 reinforcement through sides of strip placements of floors and slabs. 13 b. Form keyed joints as indicated. Embed keys at least 1-1/2 inches into concrete. 14 c. Locate joints for beams,slabs,joists,and girders in the middle third of spans. 15 Offset joints in girders a minimum distance of twice the beam width from a 16 beam-girder intersection. 17 d. Locate horizontal joints in walls and columns at underside of floors,slabs, 18 beams, and girders and at the top of footings or floor slabs. 19 e. Space vertical joints in walls as indicated. Locate joints beside piers integral 20 with walls, near corners,and in concealed locations where possible. 21 f. Use a bonding agent at locations where fresh concrete is placed against 22 hardened or partially hardened concrete surfaces. 23 3. Doweled Joints: Install dowel bars and support assemblies at joints where 24 indicated. Lubricate or asphalt coat 1-1/2 of dowel length to prevent concrete 25 bonding to I side of joint. 26 G. Waterstops 27 1. Flexible Waterstops: Install in construction joints and at other joints indicated to 28 form a continuous diaphragm. Install in longest lengths practicable. Support and 29 protect exposed waterstops during progress of the Work. Field fabricate joints in 30 waterstops according to manufacturer's written instructions. 31 2. Self-Expanding Strip Waterstops: Install in construction joints and at other 32 locations indicated, according to manufacturer's written instructions, adhesive 33 bonding, mechanically fastening, and firmly pressing into place. Install in longest 34 lengths practicable. 35 H. Adhesive Anchors 36 1. Comply with the manufacturer's installation instructions on the hole diameter and 37 depth required to fully develop the tensile strength of the adhesive anchor or 38 reinforcing bar. 39 2. Properly clean out the hole utilizing a wire brush and compressed air to remove all 40 loose material from the hole,prior to installing adhesive material. 41 I. Concrete Placement 42 1. Before placing concrete, verify that installation of formwork,reinforcement, and 43 embedded items is complete and that required inspections have been performed. CITY OF FORT WORTH Park Improvements at Terry.Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 03 30 00- 18 CAST-IN-PLACE CONCRETE Page 18 o'25 1 2. Do not add water to concrete during delivery,at Project site, or during placement 2 unless approved by Engineer. 3 3. Before test sampling and placing concrete, water may be added at Project site, 4 subject to limitations of ACI 301. 5 a. Do not add water to concrete after adding high-range water-reducing 6 admixtures to mixture. 7 b. Do not exceed the maximum specified water/cement ratio for the mix. 8 4. Deposit concrete continuously in 1 layer or in horizontal layers of such thickness 9 that no new concrete will be placed on concrete that has hardened enough to cause 10 seams or planes of weakness. If a section cannot be placed continuously,provide 11 construction joints as indicated. Deposit concrete to avoid segregation. 12 a. Deposit concrete in horizontal layers of depth to not exceed formwork design 13 pressures, 15 feet maximum and in a manner to avoid inclined construction 14 joints. 15 b. Consolidate placed concrete with mechanical vibrating equipment according to 16 ACI 301. 17 c. Do not use vibrators to transport concrete inside forms. Insert and withdraw 18 vibrators vertically at uniformly spaced locations to rapidly penetrate placed 19 layer and at least 6 inches into preceding layer. Do not insert vibrators into 20 lower layers of concrete that have begun to lose plasticity. At each insertion, 21 limit duration of vibration to time necessary to consolidate concrete and 22 complete embedment of reinforcement and other embedded items without 23 causing mixture constituents to segregate. 24 d. Do not permit concrete to drop freely any distance greater than 10 feet for 25 concrete containing a high range water reducing admixture(superplasticizer)or 26 5 feet for other concrete. Provide chute or tremie to place concrete where longer 27 drops are necessary. Do not place concrete into excavations with standing 28 water. If place of deposit cannot be pumped dry,pour concrete through a tremie 29 with its outlet near the bottom of the place of deposit. 30 e. Discard pump priming grout and do not use in the structure. 31 5. Deposit and consolidate concrete for floors and slabs in a continuous operation, 32 within limits of construction joints, until placement of a panel or section is 33 complete. 34 a. Consolidate concrete during placement operations so concrete is thoroughly 35 worked around reinforcement and other embedded items and into corners. 36 b. Maintain reinforcement in position on chairs during concrete placement. 37 c. Screed slab surfaces with a straightedge and strike off to correct elevations. 38 d. Slope surfaces uniformly to drains where required. 39 e. Begin initial floating using bull floats or darbies to form a uniform and open- 40 textured surface plane, before excess bleedwater appears on the surface. Do not 41 further disturb slab surfaces before starting finishing operations. 42 6. Cold-Weather Placement: Comply with ACI 306.1 and as follows. Protect 43 concrete work from physical damage or reduced strength that could be caused by 44 frost,freezing actions, or low temperatures. 45 a. When average high and low temperature is expected to fall below 40 46 degrees Fahrenheit for 3 successive days,maintain delivered concrete mixture 47 temperature within the temperature range required by ACI 301. CITY OF FORT WORTH Park Improvements at Terry.Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 03 30 00-19 CAST-IN-PLACE CONCRETE Page 19 of25 1 b. Do not use frozen materials or materials containing ice or snow. Do not place 2 concrete on frozen subgrade or on subgrade containing frozen materials. 3 c. Do not use calcium chloride, salt, or other materials containing antifreeze 4 agents or chemical accelerators unless otherwise specified and approved in 5 mixture designs. 6 7. Hot-Weather Placement: Comply with ACI 305.1 and as follows: 7 a. Maintain concrete temperature below 95 degrees Fahrenheit at time of 8 placement. Chilled mixing water or chopped ice may be used to control 9 temperature,provided water equivalent of ice is calculated to total amount of 10 mixing water. Using liquid nitrogen to cool concrete is Contractor's option. 11 b. Fog-spray forms,steel reinforcement,and subgrade just before placing 12 concrete. Keep subgrade uniformly moist without standing water, soft spots, or 13 dry areas. 14 J. Finishing Formed Surfaces 15 1. Rough-Formed Finish: As-cast concrete texture imparted by form-facing material 16 with tie holes and defects repaired and patched. Remove fins and other projections 17 that exceed specified limits on formed-surface irregularities. 18 a. Apply to concrete surfaces not exposed to public view. 19 2. Related Unformed Surfaces: At tops of walls,horizontal offsets,and similar 20 unformed surfaces adjacent to formed surfaces, strike off smooth and finish with a 21 texture matching adjacent formed surfaces. Continue final surface treatment of 22 formed surfaces uniformly across adjacent unformed surfaces,unless otherwise 23 indicated. 24 K. Miscellaneous Concrete Items 25 1. Filling In: Fill in holes and openings left in concrete structures,unless otherwise 26 indicated, after work of other trades is in place. Mix,place, and cure concrete,as 27 specified,to blend with in-place construction. Provide other miscellaneous 28 concrete filling indicated or required to complete the Work. 29 2. Curbs: Provide monolithic finish to interior curbs by stripping forms while 30 concrete is still green and by steel-troweling surfaces to a hard, dense finish with 31 corners, intersections, and terminations slightly rounded. 32 3. Equipment Bases and Foundations: Provide machine and equipment bases and 33 foundations as shown on Drawings. Set anchor bolts for machines and equipment 34 at correct elevations,complying with diagrams or templates from manufacturer 35 furnishing machines and equipment. 36 a. Housekeeping pads:Normal weight concrete(3000 psi),reinforced with 37 #3 @16 inches on center set at middepth of pad. Trowel concrete to a dense, 38 smooth finish. Set anchor bolts for securing mechanical or electrical equipment 39 during pouring of concrete fill. 40 4. Protective slabs("Mud slabs"):Normal weight concrete(2500 psi minimum)with a 41 minimum thickness of 3-1/2 inches. Finish slab to a wood float finish. 42 L. Concrete Protecting and Curing 43 1. General: Protect freshly placed concrete from premature drying and excessive cold 44 or hot temperatures. Comply with ACI 306.1 for cold-weather protection and 45 ACI 305.1 for hot-weather protection during curing. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 033000-20 CAST-IN-PLACE CONCRL-'I'E Page 20 of25 l 2. Formed Surfaces: Cure formed concrete surfaces, including underside of beams, 2 supported slabs, and other similar surfaces. If forms remain during curing period, 3 moist cure after loosening forms. If removing forms before end of curing period, 4 continue curing for the remainder of the curing period. 5 3. Unformed Surfaces: Begin curing immediately after finishing concrete. Cure 6 unformed surfaces, including floors and slabs, concrete floor toppings, and other 7 surfaces. 8 4. Cure concrete according to ACI 308.1,by 1 or a combination of the following 9 methods: 10 a. Moisture Curing: Keep surfaces continuously moist for not less than 7 days 11 with the following materials: 12 1) Water 13 2) Continuous water-fog spray 14 3) Absorptive cover,water saturated, and kept continuously wet. Cover 15 concrete surfaces and edges with 12-inch lap over adjacent absorptive 16 covers 17 b. Moisture-Retaining-Cover Curing: Cover concrete surfaces with moisture- 18 retaining cover for curing concrete,placed in widest practicable width,with 19 sides and ends lapped at least 12 inches, and sealed by waterproof tape or 20 adhesive. Cure for not less than 7 days. Immediately repair any holes or tears 21 during curing period using cover material and waterproof tape. 22 1) Moisture cure or use moisture-retaining covers to cure concrete surfaces to 23 receive floor coverings. 24 2) Moisture cure or use moisture-retaining covers to cure concrete surfaces to 25 receive penetrating liquid floor treatments. 26 3) Cure concrete surfaces to receive floor coverings with either a moisture- 27 retaining cover or a curing compound that the manufacturer certifies will 28 not interfere with bonding of floor covering used on Project. 29 c. Curing Compound: Apply uniformly in continuous operation by power spray 30 or roller according to manufacturer's written instructions. Recoat areas 31 subjected to heavy rainfall within 3 hours after initial application. Maintain 32 continuity of coating and repair damage during curing period. 33 3.5 REPAIR 34 A. Concrete Surface Repairs 35 1. Defective Concrete: Repair and patch defective areas when approved by Engineer. 36 Remove and replace concrete that cannot be repaired and patched to Engineer's 37 approval. 38 2. Patching Mortar: Mix dry-pack patching mortar,consisting of I part portland 39 cement to 2-1/2 parts fine aggregate passing a No. 16 sieve,using only enough 40 water for handling and placing. 41 3. Repairing Formed Surfaces: Surface defects include color and texture 42 irregularities,cracks, spalls, air bubbles,honeycombs, rock pockets,fins and other 43 projections on the Surface,and stains and other discolorations that cannot be 44 removed by cleaning. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summer5elds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20.2012 03 3000-21 CAST-IN-PLACE CONCRETE Page 21 of 25 1 a. Immediately after form removal, cut-out honeycombs,rock pockets, and voids 2 more than 1/2 inch in any dimension in solid concrete, but not less than I inch 3 in depth. Make edges of cuts perpendicular to concrete surface. Clean, dampen 4 with water, and brush-coat holes and voids with bonding agent. Fill and 5 compact with patching mortar before bonding agent has dried. Fill form-tie 6 voids with patching mortar or cone plugs secured in place with bonding agent. 7 b. Repair defects on surfaces exposed to view by blending white portland cement 8 and standard portland cement so that,when dry,patching mortar will match 9 surrounding color. Patch a test area at inconspicuous locations to verify 10 mixture and color match before proceeding with patching. Compact mortar in 11 place and strike off slightly higher than surrounding surface. 12 c. Repair defects on concealed formed surfaces that affect concrete's durability 13 and structural performance as determined by Engineer. 14 4. Repairing Unformed Surfaces: Test unformed surfaces,such as floors and slabs, 15 for finish and verify surface tolerances specified for each surface. Correct low and 16 high areas. Test surfaces sloped to drain for trueness of slope and smoothness;use 17 a sloped template. 18 a. Repair finished surfaces containing defects. Surface defects include spalls,pop 19 outs, honeycombs,rock pockets, crazing and cracks in excess of 0.01 inch wide 20 or that penetrate to reinforcement or completely through unreinforced sections 21 regardless of width,and other objectionable conditions. 22 b. After concrete has cured at least 14 days,correct high areas by grinding. 23 c. Correct localized low areas during or immediately after completing surface 24 finishing operations by cutting out low areas and replacing with patching 25 mortar. Finish repaired areas to blend into adjacent concrete. 26 d. Repair defective areas, except random cracks and single holes 1 inch or less in 27 diameter,by cutting out and replacing with fresh concrete. Remove defective 28 areas with clean, square cuts and expose steel reinforcement with at least a 3/4- 29 inch clearance all around. Dampen concrete surfaces in contact with patching 30 concrete and apply bonding agent. Mix patching concrete of same materials 31 and mixture as original concrete except without coarse aggregate. Place, 32 compact, and finish to blend with adjacent finished concrete. Cure in same 33 manner as adjacent concrete. 34 e. Repair random cracks and single holes 1 inch or less in diameter with patching 35 mortar. Groove top of cracks and cut out holes to sound concrete and clean off 36 dust, dirt, and loose particles. Dampen cleaned concrete surfaces and apply 37 bonding agent. Place patching mortar before bonding agent has dried. 38 Compact patching mortar and finish to match adjacent concrete. Keep patched 39 area continuously moist for at least 72 hours. 40 5. Perform structural repairs of concrete,subject to Engineer's approval, using epoxy 41 adhesive and patching mortar. 42 6. Repair materials and installation not specified above may be used, subject to 43 Engineer's approval. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 033000-22 CAST-IN-PLACE CONCRETE Page 22 o1`25 1 3.6 RE-INSTALLATION [NOT USED] 2 3.7 FIELD QUALITY CONTROL 3 A. Testing and Inspecting: City will engage a special inspector and qualified testing and 4 inspecting agency to perform field tests and inspections and prepare test reports. 5 B. Inspections 6 1. Steel reinforcement placement 7 2. Headed bolts and studs 8 3. Verification of use of required design mixture 9 4. Concrete placement, including conveying and depositing 10 5. Curing procedures and maintenance of curing temperature 11 6. Verification of concrete strength before removal of shores and forms from beams 12 and slabs 13 C. Concrete Tests: Perform testing of composite samples of fresh concrete obtained 14 according to ASTM C 172 according to the following requirements: 15 1. Testing Frequency: Obtain 1 composite sample for each day's pour of each 16 concrete mixture exceeding 5 cubic yard,but less than 25 cubic yard,plus 1 set for 17 each additional 50 cubic yard or fraction thereof. 18 2. Slump: ASTM C143; 1 test at point of placement for each composite sample, but 19 not less than 1 test for each day's pour of each concrete mixture. Perform additional 20 tests when concrete consistency appears to change. 21 3. Air Content: ASTM C231,pressure method,for normal-weight concrete; I test for 22 each composite sample, but not less than I test for each day's pour of each concrete 23 mixture. 24 4. Concrete Temperature: ASTM C 1064; 1 test hourly when air temperature is 40 25 degrees Fahrenheit and below and when 80 degrees Fahrenheit and above,and 1 26 test for each composite sample. 27 5. Compression Test Specimens: ASTM C31. 28 a. Cast and laboratory cure 4 cylinders for each composite sample. 29 1) Do not transport field cast cylinders until they have cured for a 30 minimum of 24 hours. 31 6. Compressive-Strength Tests: ASTM C39; 32 a. Test 1 cylinder at 7 days. 33 b. Test 2 cylinders at 28 days. 34 c. Hold 1 cylinder for testing at 56 days as needed. 35 7. When strength of field-cured cylinders is less than 85 percent of companion 36 laboratory-cured cylinders, evaluate operations and provide corrective procedures 37 for protecting and curing in-place concrete. 38 8. Strength of each concrete mixture will be satisfactory if every average of any 3 39 consecutive compressive-strength tests equals or exceeds specified compressive 40 strength and no compressive-strength test value falls below specified compressive 41 strength by more than 500 psi. CITY OF FORT WORTH Park Improvements at Terry.Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 033000-23 CAST-IN-PLACE CONCRETE Page 23 of 25 l 9. Report test results in writing to Engineer, concrete manufacturer, and Contractor 2 within 48 hours of testing. Reports of compressive-strength tests shall contain 3 Project identification name and number, date of concrete placement,name of 4 concrete testing and inspecting agency, location of concrete batch in Work, design 5 compressive strength at 28 days, concrete mixture proportions and materials, 6 compressive breaking strength, and type of break for both 7-and 28-day tests. 7 10. Additional Tests: Testing and inspecting agency shall make additional tests of 8 concrete when test results indicate that slump, air entrainment, compressive 9 strengths, or other requirements have not been met,as directed by Engineer. 10 Testing and inspecting agency may conduct tests to determine adequacy of concrete 11 by cored cylinders complying with ASTM C42 or by other methods as directed by 12 Engineer. 13 a. When the strength level of the concrete for any portion of the structure, as 14 indicated by cylinder tests,falls below the specified requirements,provide 15 improved curing conditions and/or adjustments to the mix design as required to 16 obtain the required strength. If the average strength of the laboratory control 17 cylinders falls so low as to be deemed unacceptable,follow the core test 18 procedure set forth in ACI 301, Chapter 17. Locations of core tests shall be 19 approved by the Engineer. Core sampling and testing shall be at Contractors 20 expense. 21 b. If the results of the core tests indicate that the strength of the structure is 22 inadequate, any replacement, load testing, or strengthening as may be ordered 23 by the Engineer shall be provided by the Contractor without cost to the City. 24 11. Additional testing and inspecting, at Contractor's expense, will be performed to 25 determine compliance of replaced or additional work with specified requirements. 26 12. Correct deficiencies in the Work that test reports and inspections indicate does not 27 comply with the Contract Documents. 28 D. Measure floor and slab flatness and levelness according to ASTM E1155 within 48 29 hours of finishing. 30 E. Concrete Finish Measurement and Tolerances 31 1. All floors are subject to measurement for flatness and levelness and comply with 32 the following: 33 a. Slabs shall be flat within a tolerance of 5/16 inches in 10 feet when tested with 34 a 10 foot long straightedge.Apply straightedge to the slab at 3 foot intervals in 35 both directions, lapping straightedge 3 feet on areas previously checked. Low 36 spots shall not exceed the above dimension anywhere along the straightedge. 37 Flatness shall be checked the next work day after finishing. 38 b. Slabs shall be level within a tolerance oft 1/4 inch in 10 feet, not to exceed 3/4 39 inches total variation,anywhere on the floor, from elevations indicated on the 40 Drawings. Levelness shall be checked on a 10 foot grid using a level after 41 removal of forms. 42 c. Measurement Standard:All floors are subject to measurement for flatness and 43 levelness, according to ASTM E1155. 44 2. 2 Tiered Measurement Standard 45 a. Each floor test section and the overall floor area shall conform to the 2-tiered 46 measurement standard as specified herein. CITY OF FORT WORTH Park Improvements at Terr)�.Ntorthside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 033000-24 CAST-IN-PLACE CONCRETE Page 24 of 25 1 1) Minimum Local Value: The minimum local FF/FL values represent the ab- 2 solute minimum surface profile that will be acceptable for any I test sample 3 (line of measurements)anywhere within the test area. 4 2) Specified Overall Value: The specified overall FF/FL values represent the 5 minimum values acceptable for individual floor sections as well as the floor 6 as a whole. 7 3. Floor Test Sections 8 a. A floor test section is defined as the smaller of the following areas: 9 1) The area bounded by column and/or wall lines 10 2) The area bounded by construction and/or control joint lines 11 3) Any combination of column lines and/or control joint lines 12 b. Test sample measurement lines within each test section shall be 13 multidirectional along 2 orthogonal lines,as defined by ASTM E1155,at a 14 spacing to be determined by the City's testing agency. 15 c. The precise layout of each test section shall be determined by the City's testing 16 agency. 17 4. Concrete Floor Finish Tolerance 18 a. The following values apply before removal of shores.Levelness values(FL)do 19 not apply to intentionally sloped or cambered areas,nor to slabs poured on 20 metal deck or precast concrete. 21 1) Slabs 22 Overall Value FF45/FL30 23 Minimum Local Value FF301FL20 24 5. Floor Elevation Tolerance Envelope 25 a. The acceptable tolerance envelope for absolute elevation of any point on the 26 slab surface,with respect to the elevation shown on the Drawings, is as follows: 27 1) Slab-on-Grade Construction:::L3/4 inch 28 2) Top surfaces of formed slabs measured prior to removal of supporting 29 shores:±3/4 inch 30 3) Top surfaces of all other slabs:�t,3/4 inch 31 4) Slabs specified to slope shall have a tolerance from the specified slope of 32 3/8 inch in 10 feet at any point,up to 3/4 inch from theoretical elevation at 33 any point. 34 3.8 SYSTEM STARTUP [NOT USED] 35 3.9 ADJUSTING [NOT USED] 36 3.10 CLEANING 37 A. Defective Work 38 1. Imperfect or damaged work or any material damaged or determined to be defective 39 before final completion and acceptance of the entire job shall be satisfactorily re- 40 placed at the Contractor's expense, and in conformity with all of the requirements of 41 the Drawings and Specifications. 42 2. Perform removal and replacement of concrete work in such manner as not to impair 43 the appearance or strength of the structure in any way. 44 B. Cleaning CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Smmnerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20.2012 033000-25 CAST-IN-PLACE CONCRETE Page 25 of 25 1 1. Upon completion of the work remove from the site all forms, equipment,protective 2 coverings and any rubbish resulting therefrom. 3 2. After sweeping floors,wash floors with clean water. 4 3. Leave finished concrete surfaces in a clean condition,satisfactory to the City. 5 3.11 CLOSEOUT ACTIVITIES [NOT USED] 6 3.12 PROTECTION [NOT USED] 7 3.13 MAINTENANCE [NOT USED] 8 3.14 ATTACHMENTS [NOT USED] 9 END OF SECTION 10 Revision Log DATE NAME SUMMARY OF CHANGE 2.2.0.3—Removed Blue Text/Added Descriptions for water-soluble, 12/20/2012 D.Johnson chloride-ion content 3.4.C.1—Changed 75%to 70% 11 CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 This page is intentionally blank. 12 93 00- 1 FURNISHINGS Page I of 5 1 SECTION 12 93 00 2 SITE FURNISHINGS 3 PART 1 GENERAL 4 1.1 RELATED DOCUMENTS 5 A. Provisions established within the General and Supplementary General Conditions of the 6 Contract,Division 1 —General Requirements, and the Drawings are collectively applicable to 7 the Section. 8 1.2 SCOPE 9 A. Work included:the work includes, but is not necessarily limited to: 10 1. Furnish and install exterior benches, litter receptacles,picnic grills,picnic tables. 11 2. Furnish and install basketball goal with back board and netting. 12 3. Furnish and install pre-manufactured pavilion. 13 4. Warranty and replacements 14 5. Provide touch-up paint 15 1.3 REFERENCES 16 A. Requirements of Regulatory Agencies: 17 1. Perform work in accordance with all applicable laws, codes and regulations required. 18 B. American Association of State Highway and Transportation Officials(AASHTO): 19 1. ASSHTO LTS-4—Standard Specifications for Structural Supports for Highway Signs, 20 Luminaires and Traffic Signals 21 C. ASTM International (Formerly known as American Society for Testing and Materials): 22 1. ASTM A123—Specification for Zinc(Hot-Dip Galvanized)Coatings on Iron and Steel 23 Products 24 2. ASTM A325—Standard Specification for Structural Bolts, Steel,Heat Treated, 120/105 25 ksi Minimum Tensile Strength 26 3. ASTM A507—Standard Specification for Drawing Alloy Steel, Sheet and Strip,Hot- 27 Rolled and Cold-Rolled 28 4. ASTM 1326/1326M—Standard Specification for Aluminum-Alloy Sand Castings 29 5. ASTM B85—Standard Specification for Aluminum-Alloy Die Castings 30 6. ASTM B 137—Standard Test Method for Measurement of Coating Mass per Unit Area 31 on Anodically Coated Aluminum 32 7. ASTM B209—Standard Specification for Aluminum and Aluminum-Alloy Sheet and 33 Plate 34 8. ASTM B221 —Standard Specification for Aluminum and Aluminum-Alloy Extruded 35 Bars,Rods, Wire, Profiles, and Tubes 36 9. ASTM D635—Standard Test Method for Rate of Burning and/or Extent and Time of 37 Burning of Plastics in a Horizontal Position 38 10. ASTM D1056—Standard Specification for Flexible Cellular Materials—Sponge or 39 Expanded Rubber 40 11. ASTM D1400—Standard Test Method for Nondestructive Measurement of Dry Film 41 Thickness of Nonconductive Coatings Applied to a Nonferrous Metal Base CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest.and SmmnerBelds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENT 02263,2264,02265,02266 12 93 00-2 FURNISHINGS Page 2 of 5 42 12. ASTM D2240—Standard Test Method for Rubber Property—Durometer Hardness 43 D. National Fire Protection Association (NFPA):NFPA 70—National Electric Code (NEC) 44 E. The Society for Protective Coatings (Formerly known as Steel Structures Painting Council) 45 (SSPC): SSPC-SP 10—Near-White Blast Cleaning 46 F. Underwriters Laboratories,Inc. (UL); 47 a. UL 496—UL Standard for Safety Edison-Base Lampholders 48 b. UL 508—UL Standard for Safety Industrial Control Equipment 49 c. UL 542—UL Standard for Safety Lampholders, Starters and Starter Holders Fluorescent 50 Lamps 51 d. UL 935—UL Standard for Safety Fluorescent-Lamp Ballasts 52 e. UL 1029—UL Standard for Safety High-Intensity-Discharge Lamp Ballasts 53 f. UL 1598—UL Standard for Safety Luminaires 54 1.4 QUALITY ASSURANCE 55 A. Installer qualifications: minimum of 5 years of experience in installation of site furnishings, 56 and premanufactured pavilions. Provide documentation of specific project experience and 57 references as required by Owner. 58 1.5 SUBMITTALS 59 A. Submit manufacturer's product data and warranty for each type of furniture or material 60 specified, including finish and color indicated including light pole and fixture. Submit cut 61 sheets for ADA signage. 62 B. Submit footing detail as recommended by the manufacturer for each type of site furniture 63 including pavilion. 64 C. Submit manufacturer's installation instructions. 65 D. Samples: 66 1. Submit two samples 2x2 inch in size illustrating finish material and color for 67 substitutions. 68 E. Submittals to be submitted to Landscape Architect for review and approval no less than 30 69 days prior to installation. 70 1.6 DELIVERY,STORAGE,AND HANDLING 71 A. Furnish all materials in manufacturer's unopened, original containers,bearing original labels 72 showing quantity, description and name of manufacturer. 73 B. Deliver and unload at the site on pallets and bound in such a manner that no damage occurs to 74 the product. 75 C. Store products in a manner which will preclude all damages. Damaged materials will be 76 rejected. Remove all damaged materials from the job site immediately, and replace at no cost 77 to the Owner. CITY OF FORT WORTH Park Improvements at Terry,Northside,I Iigh Crest.and Sammer6elds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENT 02263,2264,02265,02266 12 93 00-3 FURNISHINGS Page 3 of 5 78 D. Furnish suitable equipment and locate all site furnishing materials carefully and efficiently. 79 Lift materials using lifting inserts provided by the manufacturer where applicable. 80 E. Protect site furniture and accessories from damage until final acceptance. Owner reserves the 81 right to reject site furniture damaged prior to and during and after installation. 82 83 PART 2 PRODUCTS 84 2.1 MANUFACTURERS OF EQUIPMENT, SITE FURNITURE AND ACCESSORIES 85 A. Acceptable Manufacturers are listed on the drawings. 86 B. Substitutions: Under provisions of General and Special Conditions and Drawings. 87 Substitutions must be of equal quality of material and finish specified. All substitutions must 88 be approved by Parks and Community Services and Landscape Architect prior to bid 89 submittal with explanation of variances to specified items. 90 2.2 CONCRETE 91 A. ASTM C94 ready mixed concrete,minimum 28 day compressive strength of 3,000 psi, air- 92 entrained 2%to 45. 93 B. Grout: Section 03305, "Portland Cement Concrete", nonshrink. Where recommended by 94 manufacturer. Prime surfaces to be grouted 95 2.3 FINISHES 96 A. Specified on drawings. 97 PART 3 EXECUTION 98 3.1 INSPECTION 99 A. Examine final grades and installation conditions. Do not proceed with work until 100 unsatisfactory conditions are corrected. 101 B. Beginning of installation means acceptance of existing conditions. 102 3.2 PREPARATION 103 A. Remove foreign substances from surfaces to receive metal items. 104 B. Locate and layout all site furniture and site accessories. Obtain Landscape Architect's 105 acceptance of layout prior to installation. 106 C. Coordinate setting drawings, diagrams, templates, instructions and directions for the 107 installation of items having integral anchors which are to be embedded in concrete 108 construction. Coordinate delivery of such items with concrete work. 109 D. Restore protective covering that have been damaged in shipment or in the installation of the 110 item. Remove protective covering from surfaces only when there is no possibility of damage 111 from work yet to be performed after installation. Retain covering on all similarly finished CITY OF FORT WORTH Park Improvements at Terry.Northside.High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENT 02263.2264,02265,02266 12 93 00-4 FURNISHINGS Page 4 of 5 112 items and remove only when all are in place to preclude non-uniform oxidation and 113 discoloration. 114 3.3 INSTALLATION OF SITE FURNISHINGS 115 A. Install where as shown on plans and details. Install per Manufacturer's directions. Install all 116 pieces level and plumb. 117 B. Provide and install vandal-proof anchors into pavement to secure the site furnishings. 118 C. Paint exposed installation hardware to match furnishing color. 119 D. Shim and level furnishings as required at approved locations. 120 E. Guard against staining or damaging of existing pavements and plantings where site 121 furnishings are to be installed. 122 F. Provide Owner with manufacturer's touch-up paint(I pint minimum) for each painted 123 furnishing. Supply literature necessary for ordering touch-up paint at a later date. 124 G. Installation of Light Poles: 125 1.Form concrete base as shown, in accordance with Division 32 for Concrete work. Use 126 templates provided by the pole manufacturer for setting anchor bolts. 127 2.Install mounting pole of type shown. Use double nuts to erect poles plumb.Pack void 128 between concrete base and pole base plate with non-shrink grout, and install per 129 manufacturer's requirements. 130 3.4 TOLERANCES 131 A. Maximum Variation From Plumb: 1/32 inch per foot. 132 3.5 CLEANING 133 A. Perform cleaning during installation of the work and upon completion of the work. Maintain 134 clean surfaces until final acceptance. Remove from site all debris and equipment. Repair all 135 damage resulting from play fields and equipment installation. 136 3.6 CLEANING/TOUCH-UP 137 A. As Work proceeds, promptly remove concrete where spilled,splashed, or splattered onto site 138 furniture. 139 B. During progress of Work maintain premises free of unnecessary accumulation of tools, 140 equipment,surplus materials, and debris. 141 C. Perform cleaning during installation of the work and upon completion of the work. Maintain 142 clean surfaces until final acceptance. Remove from site all debris and equipment. Repair all 143 damage resulting from furniture and equipment installation. Replace damaged furniture as 144 requested by the Owner's Representative. 145 CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENT 02263,2264,02265,02266 12 93 00-5 FURNISHINGS Page 5 of 5 146 END OF SECTION 147 CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfietds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENT 02263.2263,02265,02266 This page is intentionally blank. 1293 10-1 DETECTABLE WARNING TILE Page 1 of 6 1 SECTION 12 93 10 2 3 ADA CAST-TN-PLACE DETECTABLE/TACTILE WARNING TILE 4 C J 6 PART GENERAL 7 8 9 1. RELATED DOCUMENTS 10 11 A. Drawings and general provisions of Contract,including General and Special Conditions and 12 Division 1 Specifications Section, apply to this Section. 13 14 2. DESCRIPTION 15 16 A. This Section specifies furnishing and installing Cast-In-Place Detectable/Tactile Warning 17 Tiles where indicated. 18 19 3. SUBMITTALS 20 21 A. Product Data: Submit manufacturer's literature describing products,installation procedures 22 and routine maintenance. 23 24 4. QUALITY ASSURANCE 25 26 A. Provide cast-in-place detectable/tactile warning tiles and accessories as produced by a single 27 manufacturer. 28 29 B. Installer's Qualifications: Engage an experienced Installer certified in writing by tactile 30 flooring manufacturer as qualified for installation,who has successfully completed tile 31 installations similar in material,design,and extent to that indicated for Project. 32 33 C. Americans with Disabilities Act(ADA): Provide detectable/tactile warning surfaces which 34 comply with the detectable warnings on walking surfaces section of the Americans with 35 Disabilities Act(Title 49 CFR TRANSPORTATION,Part 37.9 STANDARDS FOR 36 ACCESSIBLE TRANSPORTATION FACILITIES,Appendix A,Section 4.29.2 37 DETECTABLE WARNINGS ON WALKING SURFACES.In addition products must 38 comply with CALIFORNIA TITLE 24 requirements regarding patterns,color and sound on 39 cane contact. 40 41 D. Vitrified Polymer Composite(VPC)Cast-in-Place Detectable/Tactile Warning tiles shall be 42 an epoxy polymer composition with an ultra-violet coating employing aluminum oxide 43 particles in the truncated domes: 44 45 E. Dimensions: 46 Tile:Nominal 2 ft. By 52 ft.by 1.375 inches thick; 1.575 inches thick at the domes,with l- 47 3/8"inch deep perimeter flange and seven 1 3/8"deep internal flanges. 48 CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks 02263,02264,02265,02266 1293 10-2 DETECTABLE WARNING TILE Page 2 of6 49 Assembly: shall be held within the following dimensions and tolerances: 50 Length and Width: 24"x 60"nominal Depth 1.400"±5%max. Face Thickness 0.125'-t-5%max. Warpage of Edge ±0.5%max. 51 52 53 F. Vitrified Polymer Composite(VPC)Cast-in-Place Detectable/Tactile Warning Tiles adhered 54 to concrete shall meet or exceed the following test criteria: 55 56 1. Water Absorption of Tile when tested by ASTM D 570-98 not to exceed 0.05%, 57 58 2. Slip Resistance of Tile when tested by ASTM C 1028-96 Wet/Dry Static Co-efficient of 59 Friction values are not to be less than 0.80 on top of domes and field area. 60 61 3. Compressive Strength of Tile when tested by ASTM D 695-02 not to be less than 28,000 62 psi. 63 64 4. Tensile Strength of Tile when tested by ASTM D 638-03 not to be Iess than 19,000 psi. 65 66 5. Flexural Strength of Tile when tested by ASTM D 790-03 not to be less than 25,000 psi. 67 68 6. Chemical Stain Resistance of Tile when tested by ASTM D 543-95 (re approved 2001)to 69 withstand without discoloration or staining- 10%hydrochloric acid,urine,saturated 70 calcium chloride,black stamp pad ink,cheering gum,red aerosol paint, 10%ammonium 71 hydroxide, I%soap solution,turpentine,Urea 5%,diesel fuel and motor oil. 72 73 7. Abrasive Wear of Tile when tested by BYK-Gardner Tester ASTM D 2486-00* (*ATX- 74 G-U Standard)with reciprocating linear motion of 37f cycles per minute over a 10" 75 travel. The abrasive medium,a 40 grit Norton Metallite sand paper,to be fixed and 76 leveled to a holder. The combined mass of the sled,weight and wood block is to be 3.2 lb. 77 Average wear depth shall not exceed 0.06 after 1000 abrasion cycles measured on the top 78 surface of the dome representing the average of six measurement locations per sample. 79 80 8. Resistance to wear of unglazed ceramic tile by Taber Abrasion per ASTM C501-84(re 81 approved 2002)shall not be less than 500. 82 83 9. Fire Resistance of Tile when tested to ASTM E 84-05 flame spread be less than 15. 84 85 10. Gardner Impact to Geometry "GE" of the standard when tested by ASTM D 5420-04 to 86 have a mean failure energy expressed as a function of specimen thickness of not less than 87 550 in, lbf/in. A failure is noted when a crack is visible on either surface or when any 88 brittle splitting is observed on the bottom plaque in the specimen. 89 CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks 02263,2264,02265,02266 1293 10-3 DETECTABLE WARNING TILE Page 3 of 6 90 11. Accelerated Weathering of Tile when tested by ASTM G 155-05a for 3000 hours shall 91 exhibit the following result—AE<4.5,as well as no deterioration,fading or chalking of 92 surface of tile color No 33538. 93 94 12. Accelerated Aging and Freeze Thaw Test of Tile and Structural Embedment Flange 95 System when tested to ASTM D 1037-99 shall show no evidence of cracking, 96 delamination,warpage,checking, blistering,color change, loosening of tiles or other 97 detrimental defects. 98 99 13. Salt and Spray Performance of Tile and Structural Embedment Flange System when tested 100 to ASTM B l 17-03 not to show any deterioration or other defects after 200 hours of 101 exposure. 102 103 5. DELIVERY,STORAGE AND HANDLING 104 105 A. Tiles shall be suitably packaged or crated to prevent damage in shipment or handling. 106 Finished surfaces shall be protected by sturdy wrappings,and tile type shall be identified by 107 part number. 108 109 B. Tiles shall be delivered to location at building site for storage prior to installation. 110 111 6. SITE CONDITIONS 112 113 A. Environmental Conditions and Protection: Maintain minimum temperature of 40 degrees F 114 in spaces to receive tactile tiles for at least 48 hours prior to installations,during installation, 115 and for not less than 48 hours after installation. Store the detectable/tactile tiles material in 116 spaces where they will be installed for at least 48 hours before beginning installation. 117 Subsequently,maintain minimum temperature of 40 degrees F in areas where work is 118 completed. 119 120 B. The use of water for work,cleaning or dust control,etc.shall be in contained and controlled 121 and shall not be allowed to come into contact with the passengers or public. Provide 122 barricades or screens to protect passengers or public. 123 124 C. Disposal of any liquids or other materials of possible contamination shall be made in 125 accordance with federal state and local laws and ordinances. 126 127 D. Cleaning materials shall have code acceptable low VOC solvent content and low 128 flammability if used on the site. 129 130 E. Contractor shall coordinate phasing,traffic barriers and flagging personnel operations as 131 specified elsewhere. 132 133 8. GUARANTEE 134 135 A. Cast-in-Place Detectable/Tactile Warning Tiles shall be guaranteed in writing for a period of 136 (10)ten years from date of final completion. The guarantee includes defective work, breakage, 137 deformation,fading and chalking of finishes, and loosening of panels. CrrY OF FORT WORTH Park Improvements at Terry.Northside.High Crest,and Summerfields Parks 02263,2264,02265,02266 12 93 10-4 DETECTABLE WARNING TILE. Page 4 of 6 138 139 140 Part 2 PRODUCTS 141 142 143 1. MANUFACTURERS 144 145 A. Available Manufacturers: Subject to compliance with requirements,manufacturers offering 146 products that may be incorporated in the Work include, but are not limited to,the following: 147 148 B. The Vitrified Polymer Composite(VPC)Cast-in-Place Detectable/Tactile Warning Tiles 149 specified is based on Armor-Tile manufactured by Engineered Plastics Inc. (800-682-2525). 150 Existing engineered ADA and California Title 24 field tested products in service for a 151 minimum of 2 years which are subject to compliance with requirements,may be incorporated 152 in the work and shall meet or exceed the specified test criteria and characteristics. 153 154 C. Color: Brick Red conforming to Federal Color No. 22144. Color shall be homogeneous 155 throughout the tile. 156 157 D. Substitutions: Substitutions shall be made only under provisions of the contract and must 158 meet all applicable standards for compliance with Americans with Disabilities Act(ADA). 159 Any proposed substitution must meet standards specified in paragraph 1,4 D, 1.4 E and must 160 be equivalent in appearance and function to the tile specified herein. 161 162 2. MATERIALS 163 164 A. Heavy duty elastomeric polyurethane sealant as manufactured by Boiardi,Mapei,Bostik or 165 approved equal. 166 167 168 PART 3 EXECUTION 169 170 1. INSTALLATION 171 172 A. During Cast-In-Place Detectable/Tactile Warning Tile installation procedures,ensure 173 adequate safety guidelines are in place and that they are in accordance with the applicable 174 industry and government standards. 175 176 B. The specifications of the structural embedment flange system and concrete sealants and 177 related materials shall be in strict accordance with the contract documents and the guidelines 178 set by their respective manufacturers. 179 180 C, The physical characteristics of the concrete shall be consistent with the contract specifications 181 while maintaining a slump range of 4 -7 to permit solid placement of the Cast-In-Place 182 Detectable/Tactile Warning Tile system. An overly wet mix will cause the tile to float, 183 therefore under all conditions,suitable weights such as concrete blocks or sandbags(25 lb) 184 shall be placed on each 2' x 2' tile module. 185 CITY OF FORT WORTH Park Improvements al Terry,Norlhside,High Crest,and Summerfields Parks 02263,2264,02265,02266 1293 10-5 DETECTABLE WARNING TILE Page 5 of6 186 D. Prior to placement of the Cast In Place Detectable/Tactile Warning Tile system,the contract 187 drawings shall be reviewed and a layout drawing prepared by the installation contractor to 188 resolve the issues related to pattern repeat,tile cuts,expansion joints,control joints,platform 189 curves,platform end returns and platform surface interferences. 190 191 E. The concrete pouring and finishing operations require typical mason's tools,however,a 192 mason's line,radius edge(1/8 x 3/16"return)tool,4' long x 2"wide x 1/8"thick steel 193 straight edge,25 lb.weights,vibrator wand and small sledge hammer with 2"x 6"x 20 194 wood tamping plate are specific to the installation of the Cast-In-Place System. 195 196 F. The concrete shall be poured and finished level,true and smooth to the required dimensions 197 prior to tile placement. Immediately after pouring concrete,a mason's line should be strung 198 parallel to track to act as a reference line for placement of tile,and then the tile assembly shall 199 be placed true to the platform edge and to each other on the concrete. The Cast-In-Place tiles 200 shall be tamped or vibrated into the fresh concrete to ensure that the field level of the is flush 201 to the adjacent concrete or platform edge surface. The shop drawings indicate that the tile 202 field level(base of truncated dome)is flush to adjacent surfaces to permit proper water 203 drainage and eliminate tripping hazards between adjacent finishes. The tolerance for 204 elevation differences between the and adjacent surface is 1/16". 205 206 G. Immediately after the placement,the tile elevation is to be checked to adjacent concrete or 207 rubbing board heights with a steel straight edge. The tile elevation should be set consistent 208 with shop drawings to permit water drainage to or away from track as the platform design 209 dictates. 210 211 H. While concrete is workable steel edging trowel 1/8"radius x 3/16"return is to be used to 212 edge the tile to adjacent concrete surfaces running parallel to track: While edging,ensure that 213 a clean edge definition is created between tile and adjacent concrete and that the to concrete 214 elevations meet the shop drawing tolerances. 215 216 1. The placement of Cast-In-Place Tile assemblies to each other and to the mason's line or form 217 edge shall be true and parallel to develop a true line consistent with the platform edge. A 218 tight tile to tile placement can best be achieved by raking out the concrete at the butting edge 219 to avoid trapping concrete or aggregate between tiles and/or form edge. 220 221 J. During and after the the installation and the concrete curing stage,it is imperative that there is 222 no walking,leaning or external force placed on the tile to rock the tile,causing a void 223 between the underside of tile and concrete. 224 225 K. Following tile placement,review installation tolerances to shop drawings and adjust tile 226 before the concrete sets,suitable weights of 25 lb. shall be placed on each tile and additional 227 weights at the to tile assemblies as necessary to ensure solid contact of tile underside to 228 concrete. 229 230 L. Following the curing of the concrete,the protective plastic wrap is to be removed from the 231 tile face by cutting the plastic with a sharp knife tight to the concrete/tile 232 233 CITY OF FORT WORTH Park Improvements at Terry.Northside.High Crest.and Summerfields Parks 02263,2264.02265,02266 1293 10-6 DETECTABLE WARNING TILE Page 6 or6 234 interface. if concrete bleeding occurs between tiles,a wire brush will clean the residue 235 without damage to the the surface. 236 237 M. An elastomeric polyurethane sealant can be applied(not typical)to the tile edges running 238 parallel to the track or curb. Proper surface preparation requires that the the and adjacent 239 surfaces are mechanically etched with sandpaper or a carbide burr and wiped clean and dry 240 with acetone. Applications of the polyurethane sealant shall be level to the adjacent surface 241 and a straight line formed to the the edge. A quality installation of the sealant may require 242 that the the face be masked off with duct tape to ensure a clean definition of sealant to the 243 adjacent surfaces. 244 245 N. Following the concrete curing stage,protective plastic wrap is to be removed from the tile 246 surface by cutting the plastic with a sharp knife,tight to the concrete/tile interface.If concrete 247 bled under the plastic,a soft brass wire brush will clean the residue without damage to the tile 248 surface. 249 250 2. CLEANING AND PROTECTING 251 252 A. Protect tiles against damage during construction period to comply with Cast-in-Place 253 detectable/tactile warning tile manufacturer's specification. 254 255 B. Protect Cast-in-Place detectable/tactile warning tiles against damage from rolling loads 256 following installation by covering with plywood. 257 258 C. Clean Cast-in-Place detectable/tactile warning tiles not more than four days prior to date 259 scheduled for inspection intended to establish date of substantial completion in each area of 260 project. Clean Cast-in-Place detectable/tactile tiles by method specified by the manufacturer. 261 262 ---End of Section--- CITY OF FORT WORTH Park Improvements at Terry,Norihside.High Crest,and Summerfields Parks 02263,2264,02265,02266 26 05 00-1 COMMON WORK RESULTS FOR ELECTRICAL Page] of 5 1 SECTION 26 05 00 2 COMMON WORK RESULTS FOR ELECTRICAL 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. All labor,materials and equipment required to install,test and provide an 7 operational,electrical system as specified and as shown on the Drawings 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include, but are not necessarily limited to: 11 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 12 2. Division I —General Requirements 13 1.2 PRICE AND PAYMENT PROCEDURES 14 A. Measurement and Payment 15 1. Electrical Facilities 16 a. Measurement 17 1) Measurement for this Item shall be by lump sum. 18 b. Payment 19 1) The work performed and materials furnished in accordance to this Item 20 shall be paid for at the lump sum price bid for"Electrical Facilities". 21 c. The price bid shall include: 22 1) Furnishing and installing a complete electrical system 23 2) Wire 24 3) Cable 25 4) Conduit and related hardware 26 5) Supports 27 6) Excavation 28 7) Furnishing,placement and compaction of backfrll 29 8) Hauling 30 9) Clean-up 31 2. Furnish and Install Electrical Service 32 a. Measurement 33 1) Measurement for electrical service shall be per each type and size furnished 34 and installed. 35 b. Payment 36 1) The work performed and the materials furnished in accordance with this 37 Item shall be paid for at the unit price bid for"Furnish/Install Electrical 38 Service"shall be made at the price bid per each type and size installed. 39 c. The price bid shall include all aspects of cornpleting the installation of electrical 40 service including, but not limited to: 41 1) Conduit CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Smnmerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264.02265,02266 Revised November 22,2013 260500-2 COMMON WORK RESULTS FOR ELECTRICAL, Page 2 of 5 1 2) Poo r 2 3)2).___.Meter base 3 4)3) Breaker box 4 5)4.)__Breakers 5 5) ) Coordination with Electrical Service Provider 6 3. Install Electrical Service 7 a. Measurement 8 1) Measurement for electrical service shall be per each type and size installed. 9 b. Payment 10 1) The work performed and the materials furnished in accordance with this 11 Item shall be paid for at the unit price bid for"Install Electrical Service" 12 shall be made at the price bid per each type and size installed. 13 c. The price bid shall include all aspects of completing the installation of electrical 14 service including,but not limited to: 15 1) Conduit 16 m Pole 17 -141.3 REFERENCES 18 A. Reference Standards 19 1. Reference standards cited in this Specification refer to the current reference 20 standard published at the time of the latest revision date logged at the end of this 21 Specification,unless a date is specifically cited. 22 2. Underwriters Laboratories,Inc. (UL) 23 11.4 ADMINISTRATIVE REQUIREMENTS 24 A. Coordination 25 1. Where references are made to the Related Work paragraph in each Specification 26 Section,referring to other Sections and other Divisions of the Specifications,the 27 Contractor shall provide such information or Work as may be required in those 28 references, and include such information or Work as may be specified. 29 2. Division 26 requirements apply to electrical work provided under any division of 30 the Specifications 31 B. Service and Metering 32 1. Obtain service from the electric service provider at 120/240 Volts, Single Phase, 33 Three Wire,60 Hz from transformer equipment furnished and installed by the 34 power company. 35 2. Power company responsibilities 36 a. Furnishing and installing the primary overhead conductors and pole line 37 b. Furnishing and installing the transformer or riser pole,primary cutouts, 38 lightning arresters and grounding 39 c. Furnishing and installing primary conduits and cables up to 300 linear ft. 40 d. Furnishing and installing the transformer pad and grounding(if pad-mounted 41 transformer) 42 e. Furnishing and installing transformer 43 f. Terminating underground primary cables 44 g. Furnishing metering current transformers(CT's), meter and meter wiring 45 h. Terminating secondary cables to the service transformer CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Sumnterfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265-02266 Revised November 22.2013 260500-3 COMMON WORK RESULTS FOR ELECTRICAL Page 3 of 5 1 i. Furnishing meter base and enclosure 2 3. Contractor responsibilities 3 a. Furnishing and installing secondary conduits and cables 4 b. Furnishing and installing power company approved metering current 5 transformer enclosure(if required by power company) 6 c. Installing meter base 7 d. Furnishing and installing an empty conduit with pull line from the metering 8 current transformer enclosure to the meter enclosure. Conduit size and type 9 approved by the power company 10 e. Coordinating electrical service installation with power company 11 4. City responsibilities 12 a. Negotiating with power company for the costs of new or revised services 13 b. Making payment directly to power company for such costs 14 C. Codes,Inspections and Fees 15 1. Obtain all necessary permits and pay all fees required for permits and inspections. 16 1.61.5 SUBMITTALS [NOT USED] 17 11.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 18 1:81.7 CLOSEOUT SUBMITTALS [NOT USED] 19 1 91.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 20 1:101.9 QUALITY ASSURANCE 21 A. Materials and Equipment 22 1. New, except where specifically identified on the Drawings to be reused. 23 2. UL listed,where such listing exists. 24 3. Electrical service 25 a. Service type shall be as shown on the Drawings. 26 1-141.10 _ aDELIVERY, STORAGE,AND HANDLING [NOT USED] 27 1:121.11 FIELD CONDITIONS [NOT USED] 28 1-131.12 WARRANTY 29 A. Manufacturer Warranty 30 1. Manufacturer's warranties are specified in each of the Specification Sections. 31 PART 2 - PRODUCTS [NOT USED] 32 PART 3 - EXECUTION 33 3.1 INSTALLERS [NOT USED] 34 3.2 EXAMINATION 35 A. Interpretation of Drawings CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Sunnnerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265;02266 Revised November 22,2013 260500-4 COMMON WORK RESULTS FOR ELECTRICAL Page 4 of 5 1 1. Coordinate the conduit installation with other trades and the actual supplied 2 equipment. 3 2. Where circuits are shown as home runs: Provide fittings and boxes for complete 4 raceway installation. 5 3. Verify exact locations and mounting heights of lighting fixtures, switches and 6 receptacles prior to installation. 7 3.3 PREPARATION [NOT USED] 8 3.4 INSTALLATION 9 A. Phase Balancing 10 1. Connect circuits on motor control centers and panelboards to result in evenly 11 balanced loads across all phases. 12 3.5 REPAIR/RESTORATION [NOT USED] 13 3.6 RE-INSTALLATION [NOT USED] 14 3.7 FIELD [oR] SITE QUALITY CONTROL [NOT USED] 15 3.8 SYSTEM STARTUP 16 A. Tests and Settings 17 1. Test systems and equipment furnished under Division 26. 18 2. Repair or replace all defective work. 19 3. Make adjustments to the systems as specified and/or required. 20 4. Prior to energizing electrical equipment, make all tests required by the individual 21 Specification sections. 22 a. Submit a sample test form or procedure. 23 b. Submit the required test reports and data within 30 days after the test. 24 c. Include names of all test personnel. 25 d. Initial each test. 26 5. Check wire and cable terminations for tightness. 27 6. Verify all terminations at transformers,equipment, capacitor connections,panels, 28 and enclosures by producing a 1 2 3 rotation on a phase sequence motor when 29 connected to A,B,and C phases. 30 7. Inspect,set, and test mechanical operation for circuit breakers, disconnect switches, 31 motor starters, and control equipment. 32 8. Check interlocking, control and instrument wiring for each system and/or part of a 33 system to prove that the system will function properly as indicated by schematic 34 and wiring diagrams. 35 9. Schedule and coordinate testing with the City at least 2 weeks in advance. 36 10. Provide qualified test personnel, instruments and test equipment. 37 11. Refer to the individual equipment Sections for additional specific testing 38 requirements. CITY OF FORT WORTH Park Improvements at Teny,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263_02264.02265.02266 Revised November 22,2013 260500-5 COMMON WORK RESULTS FOR ELECTRICAL Page 5 of 5 1 3.9 ADJUSTING [NOT USED] 2 3.10 CLEANING [NOT USED] 3 3.11 CLOSEOUT ACTIVITIES [NOT USED] 4 3.12 PROTECTION [NOT USED] 5 3.13 MAINTENANCE [NOT USED] 6 3.14 ATTACHMENTS [NOT USED] 7 END OF SECTION 8 Revision Log DATE NAME SUMMARY OF CHANGE 11/22/13 S.Arnold Added installation only pay item for electrical services 9 CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Sununer6elds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.02264.02265,02266 Revised November 22,2013 This page is intentionally blank. 26 05 33-1 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS Page I of 12 1 SECTION 26 05 33 2 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Furnish and install complete raceway systems as shown on the Drawings and as 7 specified herein. 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include, but are not necessarily limited to: 11 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 12 2. Division 1 —General Requirements 13 3. Section 26 05 43—Underground Ducts and Raceways for Electrical Systems 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Conduits and Related Hardware,when a bid item for Electrical Facilities exists 17 a. Measurement 18 1) This Item is considered subsidiary to Electrical Facilities. 19 b. Payment 20 1) The work performed and the materials furnished in accordance with this 21 Item are subsidiary to Electrical Facilities and shall be subsidiary to the 22 lump sum price bid for Electrical Facilities, and no other compensation will 23 be allowed. 24 2. Conduits and Related Hardware,when no bid item for Electrical Facilities exists 25 a. Measurement 26 1) Measurement for conduit shall be per linear foot of the size, installation 27 method,and type of conduit installed. 28 2) Limits of measurement for conduit are from center to center between 29 ground boxes or poles,a combination of the two or to the termination point. 30 b. Payment 31 1) Payment for conduit shall be made at the price bid per linear foot of the 32 size, installation method,and type of conduit installed. 33 c. The price bid shall include: 34 1) Installation of Conduit and Related Hardware including, but not limited to: 35 a) Elbows 36 b) Couplings 37 c) Weatherheads 38 3. Conduit Boxes,when a bid item for Electrical Facilities exists 39 a. Measurement 40 1) This Item is considered subsidiary to Electrical Facilities. 41 b. Payment CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265..02266 Revised December 20.2012 260533-2 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS Page 2 of 12 1 1) The work performed and the materials furnished in accordance with this 2 Item are subsidiary to Electrical Facilities and shall be subsidiary to the 3 lump sum price bid for Electrical Facilities, and no other compensation will 4 be allowed. 5 4. Conduit Boxes, when no bid item for Electrical Facilities exists 6 a. Measurement 7 1) Measurement for this Item shall be per each Conduit Box installed per 8 location of installation. 9 b. Payment 10 1) The work performed and materials furnished in accordance to this Item 11 shall be paid for at the unit price bid for"Conduit Box" installed. 12 c. The price bid shall include: 13 1) Furnishing and installing the Conduit Box 14 2) Excavation 15 3) Furnishing,placement and compaction of backfrll 16 4) Clean-up 17 1.3 REFERENCES 18 A. Reference Standards 19 1. Reference standards cited in this Specification refer to the current reference 20 standard published at the time of the latest revision date logged at the end of this 21 Specification,unless a date is specifically cited. 22 2. American National Standards Institute,Inc. (ANSI). 23 a. ANSI C80.5,American National Standard for Electrical Rigid Aluminum 24 Conduit(ERAC). 25 3. National Electrical Manufacturers Association (NEMA). 26 a. 250,Enclosures for Electrical Equipment(1000 Volt Maximum). 27 b. C80.1,Electrical Rigid Steel Conduit. 28 c. TC-2,Electrical Polyvinyl Chloride(PVC)Tubing and Conduit. 29 d. TC-3, Polyvinyl Chloride(PVC)Fittings for Use with Rigid PVC Conduit and 30 Tubing. 31 e. TC-7, Smooth-Walled Coilable Electrical Polyethylene Conduit. 32 4. National Fire Protection Association(NFPA) 33 a. 70—National Electrical Code(NEC). 34 1) Article 350,Liquidtight Flexible Metal Conduit:Type LFMC. 35 2) Chapter 9, Tables. 36 5. Underwriters Laboratories(UL) 37 a. 6,Electrical Rigid Metal Conduit—Steel. 38 b. 514B, Conduit,Tubing and Cable Fittings. 39 c. 651, Standard for Schedule 40 and 80 Rigid PVC Conduit. 40 B. All equipment components and completed assemblies specified in this Section of the 41 Specifications shall bear the appropriate label of UL. 42 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 43 1.5 SUBMITTALS [NOT USED] 44 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS CITY OF FORT WORTH Park Improvements at Tem.Northside,High Crest,and Swmnerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 260533-3 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS Page 3 of 12 1 A. Product Data 2 1. Submit to the City, in accordance with Division 1,the manufacturers'names and 3 product designation or catalog numbers of all materials specified. 4 1.7 CLOSEOUT SUBMITTALS [NOT USED] 5 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 6 1.9 QUALITY ASSURANCE 7 A. Qualifications 8 1. Manufacturers 9 a. Refer to Specification Section 01 60 00 for listing of approved manufacturers 10 for all materials. 11 1.10 DELIVERY,STORAGE,AND HANDLING 12 A. Storage and Handling Requirements 13 1. Handling: In accordance with manufacturer's instructions. 14 2. Storage 15 a. In accordance with manufacturer's instructions 16 b. Not exposed to sunlight 17 c. Completely covered 18 3. Materials showing signs of previous or jobsite exposure will be rejected. 19 1.11 FIELD [SITE] CONDITIONS [NOT USED] 20 1.12 WARRANTY 21 A. No separate warranty on conduit. 22 PART 2- PRODUCTS 23 2.1 OWNER-FURNISHED [OR] OWNER-SUPPLIED PRODUCTS [NOT USED] 24 2.2 CONDUIT 25 A. Liquidtight Steel Flexible Metal Conduit 26 1. Interlocked steel core 27 2. PVC jacket rated for 80 degrees Celsius 28 3. Complies with NEC Article 350 29 4. Fittings 30 5. Extruded from 6063 T-1 alloy 31 6. Maximum 0.1 percent copper content 32 7. Conform to: 33 a. ANSI C80.5 34 b. UL-6 35 B. Rigid Steel Conduit 36 1. Hot dip galvanized 37 2. Threads: Hot galvanized after cutting CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest.and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 260533-4 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS Page 4 of 12 1 3. Conforms to: 2 a. NEMA C80.1 3 C. Rigid PVC Schedule 80 Conduit 4 1. Designed for use above ground and underground as described in the NEC 5 2. Resistant to sunlight 6 3. UL Labeled 7 4. Conforms to: 8 a. NEMA TC-2 9 b. UL 651 10 5. Fittings conform to: 11 a. NEMA TC-3 12 b. UL 514B 13 D. Rigid PVC Schedule 40 Conduit 14 1. Designed for use underground as described in the NEC 15 2. Resistant to sunlight 16 3. UL Labeled. 17 4. Conforms to: 18 a. NEMA TC-2 19 b. UL 651 20 5. Fittings conform to: 21 a. NEMA TC-3 22 b. UL 514B 23 E. High Density Polyethylene(HDPE)Conduit 24 1. Designed for use underground as described in the NEC 25 2. Resistant to sunlight 26 3. UL Labeled 27 4. Conforms to: 28 a. UL 651A 29 b. UL 651 B 30 c. NEMA TC-7 31 F. Raceway Boxes 32 1. Use: Exposed raceway systems only 33 2. Boxes for underground systems: Refer to Section 26 05 43. 34 3. Box size 35 a. Distance between each raceway entry inside the box and the opposite wall:Not 36 be less than 6 times the trade size of the largest raceway in a row. 37 b. Distance shall be increased for additional entries by the amount of the sum of 38 the diameters of all other raceway entries in the same row on the same wall of 39 the box. 40 c. Each row calculated individually, and the single row that provides the 41 maximum distance used to size box. 42 2.3 ACCESSORIES 43 A. Conduit Outlet Bodies CITY OF FORT WORTH Park Improvements at Terry.Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264.02265,02266 Revised December 20,2012 260533-5 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS Page 5 of 12 1 l. Up to and including 2-1/2 inches 2 a. Conduit outlet bodies and covers: Galvanized steel 3 b. Captive screw-clamp cover 4 c. Neoprene gasket 5 d. Stainless steel screws and clamps 6 2. Larger than 2-1/2 inches 7 a. Use junction boxes. 8 B. Conduit Hubs 9 1. Watertight 10 2. Threaded galvanized steel 11 3. Insulated throat 12 4. Stainless steel grounding screw 13 C. Grounding Bushings 14 1. Insulated lay-in lug grounding bushings 15 2. Tin-plated copper grounding path 16 3. Integrally molded noncombustible phenolic insulated surfaces rated 150 degrees 17 Celsius 18 4. Plastic insert cap each bushing 19 5. Lug size: Sufficient to accommodate maximum ground wire size required by the 20 NEC for the application 21 D. Raceway Sealant 22 1. Use for sealing of raceway hubs, entering or terminating in boxes or enclosures 23 where shown or specified 24 E. Conduit Penetration Seals 25 1. Use for conduit wall and floor seals 26 F. Conduit and related hardware 27 1. All polyvinyl chloride conduits, including elbows and couplings shall be schedule 28 40 PVC conduit,conforming to Federal Specification W-C-1094 and Underwriters' 29 Laboratories, Inc. Standard UL-651. All conduit sizes shall be as indicated on the 30 Drawings. 31 2. Rigid metal conduit shall be steel,hot-dipped galvanized inside and outside. 32 3. Weather heads shall be made of aluminum and may be the threaded or the clamp on 33 type. 34 G. Expansion/Deflection Fittings 35 1. Use 36 a. Embedded in concrete 37 b. Exposed 38 2. Description 39 a. Internal grounding 40 b. 4 inch movement 41 c. Stainless steel/cast iron 42 H. Expansion Fittings CITY OF FORT WORTH Park Improvements at Terry,Noithside,High Crest.and Sunnnerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.02264,02265.02266 Revised December 20,2012 260533-6 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS Page 6 of 12 1 1. Galvanized steel 2 2. 8 inch movement 3 3. Internal grounding 4 2.4 SOURCE QUALITY CONTROL [NOT USED] 5 PART 3 - EXECUTION 6 3.1 INSTALLERS [NOT USED] 7 3.2 EXAMINATION [NOT USED] 8 3.3 PREPARATION [NOT USED] 9 3.4 APPLICATION 10 A. Interface with Other Work 11 1. Coordinate the placement of conduit and related components with other trades and 12 existing installations. 13 B. Unless shown on the Drawings or specified otherwise,the conduit type installed with 14 respect to the location shall be as follows: 15 1. Underground, 18 inches or more cover: Rigid PVC Schedule 40 or HDPE 16 2. Underground, less than 18 inches cover:Rigid PVC Schedule 80 or HDPE 17 3. Exposed: Rigid galvanized steel 18 4. Final connection to equipment subject to vibration: Liquidtight Steel Flexible Metal 19 Conduit 20 C. Box Applications 21 1. Furnish raceway junction,pull and terminal boxes with NEMA ratings for the 22 location in which they are installed. 23 2. Exposed switch,receptacle and lighting outlet boxes and conduit fittings: 24 Galvanized steel 25 3. Furnish boxes with factory mounting lugs. Drilling through the back of any box or 26 enclosure is prohibited 27 D. Conduit Outlet Bodies Applications 28 1. Conduits up to and including 2-1/2 inches: Conduit outlet bodies may be used, 29 except where junction boxes are shown or otherwise specified 30 2. Conduits larger than 2-1/2 inches: Use junction boxes 31 E. Conduit Hub Applications 32 1. Unless specifically stated herein or described on the Drawings,all raceways shall 33 terminate at an outlet with a conduit hub.Locknut or double locknut terminations 34 will not be permitted. 35 F. Insulated Grounding Bushing Applications 36 1. Use: Terminate raceways at bottom entry to pad-mounted electrical equipment or 37 switchgear, if there is no wall or floor pan on which to anchor or terminate the 38 raceway. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Smnmerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265-02266 Revised December 20,2012 260533-7 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS Page 7 of 12 l 2. Other raceways: Terminate on enclosures with a conduit hub. 2 3. Grounding bushing caps: Remain on the bushing until the wire is ready to be 3 pulled. 4 G. Conduit Fittings Applications 5 1. Combination expansion deflection fittings: Install where conduits cross structure 6 expansion joints, on conduit transitions from underground to above ground, and 7 where installed in exposed conduit runs such that the distance between expansion- 8 deflection fittings does not exceed 150 feet of conduit run. 9 2. Expansion fittings: Install in lieu of a combination expansion-deflection fitting, on 10 the exposed side of conduit transitions from underground to above ground, where 11 the earth has been disturbed to a depth of more than 10 feet. 12 H. Conduit Penetration Seals Applications 13 1. Conduit wall seals: Use where underground conduits penetrate walls or at other 14 locations shown on the Drawings 15 2. Conduit sealing bushings:Use to seal conduit ends exposed to the weather and at 16 other locations shown on the Drawings 17 I. Conduit Tag Applications 18 1. Tag all conduits within 1 foot of the entry of equipment, and wall and floor 19 penetrations. 20 2. Tag all underground conduits and ducts at all locations, exiting and entering from 21 underground, including manholes and hndholes. 22 J. Raceway Installation 23 1. No conduit smaller than 1'/4 inch electrical trade size. 24 2. No more than the equivalent of 3 -90 degree bends in any 1 run. 25 3. Do not pull wire until the conduit system is complete in all details. 26 4. Install all underground raceways in accordance with Section 26 05 43. 27 5. Where raceways enter or leave the raceway system,where the raceway origin or 28 termination,could be subjected to the entry of moisture, rain or liquid of any type, 29 particularly where the termination of such raceways terminate in any equipment, 30 new or existing at a lower elevation,such raceways shall be tightly sealed, using 31 watertight sealant(Duxseal or equal), at the higher elevation, both before and after 32 the installation of cables, such that there shall be no entry of water or moisture to 33 the Raceway System at any time.Any damage to new or existing equipment, due to 34 the entrance of moisture from unsealed raceways, shall be corrected by complete 35 replacement of such equipment, at no cost to the City. Cleaning or drying of such 36 damaged equipment will not be acceptable. 37 6. Conduit supports,for other than for underground raceways: Space at intervals of 8 38 feet or less as required to obtain rigid construction. 39 7. Single conduits: Support with 1 hole pipe clamps in combination with 1 screw back 40 plates,to raise conduits from the surface. 41 8. Multiple runs of conduits: Supported on trapeze type hangers with horizontal 42 members and threaded hanger rods not less than 3/8 inch in diameter. 43 9. Surface mounted panel boxes,junction boxes, and conduit: Supported by strut to 44 provide a minimum of 1/2 inch clearance between wall and equipment. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264.02265,02266 Revised December 20,2012 260533-8 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS Page 8 of 12 1 10. Conduit hangers: Attach to structural steel by means of beam or channel clamps. 2 Use concrete inserts of the spot type where attached to concrete surfaces. 3 11. Conduits on exposed work 4 a. Install at right angles to and parallel with the surrounding wall. 5 b. Conform to the form of the ceiling. 6 c. No diagonal runs. 7 d. Provide concentric bends in parallel conduit runs. 8 e. Install conduit perfectly straight and true. 9 12. Conduits terminated into enclosures: Install perpendicular to the walls where 10 flexible liquidtight or rigid conduits are required. 11 a. Do not use short sealtight elbow fittings for such terminations, except for 12 connections to instrumentation transmitters where multiple penetrations are 13 required. 14 13. Use insulated throat grounding bushings for conduits containing equipment 15 grounding conductors and terminating in boxes. Connect grounding conductors to 16 the box. 17 14. Install conduits using threaded fittings.Do not use running threads. 18 15. PVC conduit: Use glued type conduit fittings. 19 16. HDPE conduit:Use fittings by same manufacturer as conduit. 20 17. Liquidtight flexible steel conduit 21 a. Primary and secondary of transformers 22 b. Generator terminations 23 c. Other equipment where vibration is present 24 d. Connections to instrumentation transmitters,where multiple penetrations are 25 required 26 e. Do not use in other locations. 27 f. Maximum length: Not greater than that of a factory manufactured long radius 28 elbow of the conduit size being used 29 g. Maximum bending radius:Not less than that shown in the NEC Chapter 9, 30 Table 2, "Other Bends". 31 h. Do not use BX or AC type prefabricated cables. 32 18. Conduits passing through openings in walls or floor slabs: Seal remaining openings 33 against the passage of flame and smoke. 34 19. Conduit ends exposed to the weather or corrosive gases: Seal with conduit sealing 35 bushings. 36 20. Raceways terminating in Control Panels or boxes containing electrical equipment 37 a. Do not install to enter from the top of the panel or box. 38 b. Seal with a watertight sealant: Duxseal or equal 39 21. Conduit 40 a. The Contractor will be required to coordinate with all local utility companies, 41 long distance communication companies,City utilities, railroad companies, and 42 Dig Tess if applicable,to ascertain exact locations of conflicting underground 43 services. 44 b. The location of conduits and ground boxes are diagrammatic only and may be 45 shifted by the Inspector to accommodate field conditions. 46 c. The maximum allowable overcut shall be 1 inch(25 mm) in diameter for bores. CITY OF FORT WORTH Park Improvements at Terry.Northside.High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 260533-9 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS Page 9 of 12 1 d. The vertical and horizontal tolerances shall not exceed 18 inches(457 mm)as 2 measured from the intended target point for bores. 3 e. The use of a pneumatically driven device for punching holes beneath the 4 pavement(commonly known as a"missile")will not be permitted. 5 f. Conduit installed for future use shall have a non-metallic, nylon type pull string 6 and shall be capped using standard weather tight conduit caps, as approved by 7 the Inspector. 8 g. The Contractor shall place duct seal or foam at the ends of all conduit where 9 conductors and/or cables are present. 10 h. New Conduit 11 1) All underground conduit shall be schedule 40 PVC conduit. 12 2) All conduit or raceways above ground shall be rigid metal. 13 3) All conduit and fittings shall be of the sizes and types shown on the 14 Drawings. 15 4) Each section of conduit shall bear evidence of approval by Underwriter's 16 Laboratories. 17 5) Conduit terminating in posts or pedestal bases shall not extend vertically 18 more than 3 inches above the concrete foundation. 19 6) Field bends in conduit shall have a minimum radius of 12 diameters of the 20 nominal size of the conduit. 21 7) Exposed vertical conduit shall be galvanized rigid metal, and reamed and 22 couplings made tight. PVC conduit shall be joined by the solvent--weld 23 method in accordance with the conduit manufacturer's recommendations. 24 8) No reducer couplings shall be used unless specifically indicated on the 25 Drawings. 26 9) Conduit and fittings shall have burrs and rough places smoothed and shall 27 be clean and free of obstructions before the cable is installed. 28 10) Field cuts shall be made with a hacksaw only, and shall be square and true 29 so that the ends will butt or come together for the full diameter thereof. 30 a) In no case shall a cutting torch be used to cut or join conduit. 31 11) Slip joints or running threads will not be permitted for coupling conduit 32 unless approved by the Inspector. 33 12) When a standard coupling cannot be used, an approved union coupling 34 shall be used and shall provide a water-tight coupling between the conduit. 35 13) Couplings shall be properly installed to bring their ends of connected 36 conduit together to produce a good rigid connection throughout the entire 37 length of the conduit run. 38 14) Where the coating on a rigid metal conduit run has been damaged in 39 handling or installation,such damaged parts shall be thoroughly painted 40 with rust preventive paint. 41 15) Ends of conduits shall be capped or plugged until installation of the wire is 42 complete. 43 16) Upon request by the Inspector,the Contractor shall draw a full-size metal 44 wire brush, attached by swivel joint to a pull tape,through the metal 45 conduit to insure that the conduit is clean and free frorn obstructions. 46 17) Conduits shall be placed in an open trench at a minimum 24 inches(612 47 mm)depth below the curb grade in the sidewalk areas, or 18 inches(450 48 mm)below the finished street grade in the street area. CITY OF FORT WORTH Park Improvements at Tetn,,NorAside,High Crest,and Smnmerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 26 05 33-10 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS Page 10 of 12 1 18) Conduit placed for concrete encasement shall be secured and supported in 2 such a manner that the alignment will not be disturbed during placement of 3 the concrete. 4 a) No concrete shall be placed until all of the conduit ends have been 5 capped and all box openings closed. 6 19) PVC conduit,which is to be placed under existing pavement, sidewalks, 7 and driveways, shall be placed by first providing a void through which the 8 PVC conduit shall be inserted. 9 a) The void may be made by boring. 10 b) Use of water or other fluids in connection with the boring operation 11 will be permitted only to lubricate cuttings. 12 c) Water jetting will not be permitted. 13 20) If it is determined by the Inspector that it is impractical to place the conduit 14 by boring as outlined above due to unforeseen obstructions,written 15 permission may be granted by the Traffic Services Manager or designee for 16 the Contractor to cut the existing pavement. 17 21) Pits for boring shall not be closer than 2 feet(612 mm)to the back of the 18 curb or the outside edge of the shoulder. 19 a) The boring method used shall not interfere with the operation of streets, 20 highways, or other facilities,and shall not weaken or damage any 21 embankment structure, or pavement. 22 22)Backfill -Compaction &Density Test for All Ditchlines 23 a) All ditchlines within paving areas of existing and proposed streets and 24 within 2 feet(600 mm)back of curb are to be mechanically tamped. 25 b) All tamping is to be density controlled to 90 percent standard proctor 26 density at optimum moisture content and no greater than 5 percent 27 optimum or less than 2 percent below optimum. 28 c) All backfill material is to be select native material, 6 inches(150 mm) 29 diameter clods and smaller. 30 d) It is permissible to put backfill in 6 inches to 8 inches (150 mm to 400 31 mm) lifts with densities being taken for each lfeet(300 min) of 32 compacted material on offsetting stations of 50 feet(15.9 M). 33 23) Provide adequately bent conduit and properly excavate so as to prevent 34 damage to the conduit or conductor by a bend radius which is too short. 35 24)All conduit runs shall be continuous and of the same material (metal only 36 or PVC only). 37 25) Where tying into existing conduit,the Contractor must continue with the 38 same material (metal to metal or PVC to PVC). 39 26) Each length of galvanized rigid metal conduit,where used,shall be reamed 40 and threaded on each end and couplings shall be made up tight. 41 27) White-lead paint or equal shall be used on threads of all joints. 42 28) Metal conduit and fittings shall have the burrs and rough places smoothed. 43 29) Where the coating on a metal conduit run has been damaged in handling or 44 installation,such damaged parts shall be thoroughly painted with rust 45 preventive paint. 46 i. Existing Conduit 47 1) Prior to pulling cable in existing underground conduit,the conduit shall be 48 cleaned with a mandrel or cylindrical wire brush and blown Out with 49 compressed air. CITY OF FORT WORTH Park Improvements at Terry,Northside.High Crest,and Smnmerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 260533-1 1 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS Page 1 1 of 12 1 2) If conduit appeals to be blocked,the Contractor shall make an attempt to 2 clear the conduit by rodding(The Contractor will not receive extra 3 compensation for rodding). 4 3) If the existing conduit cannot be used,the Contractor may be required to 5 repair and/or replace this conduit as directed by the Engineer. 6 a) Repair of this conduit will be paid for as "extra work" on a Change 7 Order. 8 4) The Inspector shall be notified prior to disconnection or removal of any 9 existing cable. 10 22. Conduits from external sources entering or leaving a multiple compartment 11 enclosure: Stub up into the bottom horizontal wireway or other manufacturer 12 designated area, directly below the vertical section in which the conductors are to 13 be terminated. 14 23. Conduits entering from cable tray: Stub into the upper section. 15 24. Install conduit sealing and drain fittings in areas designated as NEMA 4X or 16 NEMA 7. 17 25. Conduit identification platens 18 a. Install on all power, instrumentation,alarm and control conduits at each end of 19 the run and at intermediate junction boxes and manholes. 20 b. Install conduit plates before conductors are pulled into conduits. 21 c. Coordinate exact identification plate location with the City at the time of 22 installation to provide uniformity of placement and ease of reading. 23 26. Pull mandrels through all existing conduits that will be reused and through all new 24 conduits 2 inches in diameter and larger prior to installing conductors. 25 27. Install 3/16 inch polypropylene pull lines in all new conduits noted as spares or 26 designated for future equipment. 27 28. Install conduit to drain away from the equipment served. If conduit drainage is not 28 possible,use conduit seals to plug the conduits at the point of attachment to the 29 equipment 30 29. Route conduits to avoid crossing pipe shafts, access hatches or vent duct openings, 31 present or future, in floor or ceiling construction. 32 30. Do not use running threads. 33 31. Conduits passing from heated to unheated spaces, exterior spaces, refrigerated 34 spaces, or cold air plenums: Sealed with watertight sealant: Duxseal or equal 35 32. Locate conduits a minimum of 3 inches from steam or hot water piping. 36 a. Where crossings are unavoidable, locate conduit at least 1 inch from the 37 covering of the pipe crossed. 38 33. Conduits terminating at a cable tray 39 a. Support independently from the cable tray. 40 b. Provide conduit support within l-feet of the cable tray. 41 c. Weight of the conduit not supported by cable tray 42 3.5 REPAIR/RESTORATION [NOT USED] 43 3.6 RE-INSTALLATION [NOT USED] 44 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] CITY OF FORT WORTH Park Improvements at Terry.Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 26 05 33-12 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS Page 12 of 12 1 3.8 SYSTEM STARTUP [NOT USED] 2 3.9 ADJUSTING [NOT USED] 3 3.10 CLEANING [NOT USED] 4 3.11 CLOSEOUT ACTIVITIES [NOT USED] 5 3.12 PROTECTION [NOT USED] 6 3.13 MAINTENANCE [NOT USED] 7 3.11 ATTACHMENTS [NOT USED] 8 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 9 CITY 01 FORT WORTH Park Improvements at Terry,Northside,High Crest,and Smnmerfields Parks- STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 31 1000- 1 SITE CLEARING Page I of 5 I SECTION 3110 00 2 SITE CLEARING 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Preparation of right-of-way and other designated areas for construction operations 7 by removing and disposing of all obstructions including clearing and grubbing and 8 trees,when removal of such obstructions is not specifically shown on the Drawings 9 to be paid by other Sections. The City of Fort Worth's Urban Forestry Ordinance 10 governs all tree removals. 11 B. Deviations from this City of Fort Worth Standard Specification 12 1. None. 13 C. Related Specification Sections include but are not necessarily limited to 14 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 15 2. Division 1 —General Requirements 16 3. Section 02 41 13—Selective Site Demolition 17 4. Section 02 41 14—Utility Removal/Abandonment 18 1.2 PRICE AND PAYMENT PROCEDURES 19 A. Measurement and Payment 20 1. Site Clearing 21 a. Measurement 22 1) Measurement for this Item shall be by lump sum. 23 b. Payment 24 1) The work performed and the materials furnished in accordance with this 25 Item shall be paid for at the lump sum price bid for"Site Clearing". 26 c. The price bid shall include: 27 1) Pruning of designated trees and shrubs 28 2) Removal and disposal of trees, structures and obstructions 29 3) Backfilling of holes 30 4) Clean-up 31 2. Tree Removal (typically included in"Site Clearing", but should be used if"Site 32 Clearing"is not a bid item) 33 a. Measurement 34 1) Measurement for this Item shall be per each. 35 b. Payment 36 1) The work performed and the materials furnished in accordance with this 37 Item shall be paid for at the unit price bid per each"Tree Removal"for: 38 a) Various caliper ranges 39 c. The price bid shall include: 40 1) Pruning of designated trees and shrubs 41 2) Removal and disposal of structures and obstructions CITY OF FORT WORTH Park Improvements at Ter"%Northside,High Crest,and Swnmerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265.02266 Revised December 20,2012 31 1000-2 SITE CLEARING Page 2 of 5 1 3) Grading and backfilling of holes 2 4) Excavation 3 5) Fertilization 4 6) Clean-up 5 3. Tree Removal and Transplantation 6 a. Measurement 7 1) Measurement for this Item shall be per each. 8 b. Payment 9 1) The work performed and the materials furnished in accordance with this 10 Item shall be paid for at the unit price bid per each"Tree Transplant"for: 11 a) Various caliper ranges 12 c. The price bid shall include: 13 1) Pruning of designated trees and shrubs 14 2) Removal and disposal of structures and obstructions 15 3) Moving tree with truck mounted tree spade 16 4) Grading and backfilling of holes 17 5) Replanting tree at temporary location(determined by Contractor) 18 6) Maintaining tree until Work is completed 19 7) Replanting tree into original or designated location 20 8) Excavation 21 9) Fertilization 22 10) Clean-up 23 1.3 REFERENCES [NOT USED] 24 1.4 ADMINSTRATIVE REQUIREMENTS 25 A. Permits 26 1. Contractor shall obtain Tree Removal Permits and Urban Forestry Permits as 27 required by the City's Tree Ordinance. (www.FortWorthTexas.gov) 28 B. Preinstallation Meetings 29 1. Hold a preliminary site clearing meeting and include the Contractor, City Arborist, 30 City Inspector, and the Project Manager for the purpose of reviewing the 31 Contractor's tree removal plan. Clearly mark all trees to remain on the project site 32 prior to the meeting. 33 2. The Contractor will provide the City with a Disposal Letter in accordance to 34 Division 01. 35 1.5 SUBMITTALS [NOT USED] 36 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 37 1.7 CLOSEOUT SUBMITTALS [NOT USED] 38 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 39 1.9 QUALITY ASSURANCE [NOT USED] 40 1.10 DELIVERY,STORAGE,AND HANDLING [NOT USED] 41 1.11 FIELD CONDITIONS [NOT USED] CITY OF FORT WORTI-I Park Improvements at'Ferry.Northside.High Crest.and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20.2012 31 1000-3 SITE CLEARING Page 3 of 5 1 1.12 WARRANTY [NOT USED] 2 PART 2- PRODUCTS [NOT USED] 3 PART 3- EXECUTION 4 3.1 INSTALLERS [NOT USED] 5 3.2 EXAMINATION [NOT USED] 6 3.3 PREPARATION 7 A. All trees identified to be protected and/or preserved should be clearly flagged with 8 survey tape. 9 B. Following taping and prior to any removals or site clearing,the Contractor shall meet 10 with the City,the Engineer and the Landowner, if necessary,to confirm trees to be 11 saved. 12 3.4 INSTALLATION 13 A. Protection of Trees 14 1. Protect designated trees and prune trees and shrubs as shown on the Drawings. 15 Refer to the Drawings for tree protection details. 16 2. If the Drawings do not provide tree protection details,protected trees shall be 17 fenced by placing 6-foot tall metal T-posts in a square around the tree trunk with 18 the corners located on the canopy drip line,unless instructed otherwise. 19 3. When site conditions do not allow for the T-posts to be installed at the drip line,the 20 T-posts may be installed no less than 8 feet from the tree trunk. 4-foot high 12 %2 21 gauge stock fencing or orange plastic snow fence shall be attached to the T-posts to 22 form the enclosure. 23 4. Do not park equipment,service equipment,store materials, or disturb the root area 24 under the branches of trees designated for preservation. 25 5. When shown on the Drawings,treat cuts on trees with an approved tree wound 26 dressing within 20 minutes of making a pruning cut or otherwise causing damage to 27 the tree. 28 6. Trees and brush shall be mulched on-site. 29 a. Burning as a method of disposal is not allowed. 30 B. Hazardous Materials 31 1. The Contractor will notify the Engineer immediately if any hazardous or 32 questionable materials not shown on the Drawings are encountered. This includes; 33 but not limited to: 34 a. Floor tiles 35 b. Roof tiles 36 c. Shingles 37 d. Siding 38 e. Utility piping CITY OF FORT WORTH Park Improvements at Teny.Northside.High Crest,and Su nmerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20.2012 31 1000-4 SrfE CLEARING Page 4 of 5 1 2. The testing, removal, and disposal of hazardous materials will be in accordance 2 with Division 1. 3 C. Site Clearing 4 1. Clear areas shown on the Drawings of all obstructions,except those landscape 5 features that are to be preserved. Such obstructions include,but are not limited to: 6 a. Remains of buildings and other structures 7 b. Foundations 8 c. Floor slabs 9 d. Concrete 10 e. Brick 11 f. Lumber 12 g. Plaster 13 h. Septic tank drain fields 14 i. Abandoned utility pipes or conduits 15 j. Equipment 16 k. Trees 17 1. Fences 18 In. Retaining walls 19 n. Other items as specified on the Drawings 20 2. Remove vegetation and other landscape features not designated for preservation, 21 whether above or below ground, including, but not limited to: 22 a. Curb and gutter 23 b. Driveways 24 c. Paved parking areas 25 d. Miscellaneous stone 26 e. Sidewalks 27 f. Drainage structures 28 g. Manholes 29 h. Inlets 30 i. Abandoned railroad tracks 31 j. Scrap iron 32 k. Other debris 33 3. Remove culverts, storm sewers, manholes, and inlets in proper sequence to 34 maintain traffic and drainage in accordance with Section 02 41 14. 35 4. In areas receiving embankment, remove obstructions not designated for 36 preservation to 2 feet below natural ground. 37 5. In areas to be excavated,remove obstructions to 2 feet below the excavation level. 38 6. In all other areas,remove obstructions to 1 foot below natural ground. 39 7. When allowed by the Drawings or directed by the Engineer,cut trees and stumps 40 off to ground level. 41 a. Removal of existing structures shall be as per Section 02 41 13. 42 D. Disposal 43 1. Dispose of all trees within 24 hours of removal. 44 2. All materials and debris removed becomes the property of the Contractor, unless 45 otherwise stated on the Drawings. 46 3. The Contractor will dispose of material and debris off-site in accordance with local, 47 state, and federal laws and regulations. CITY OF FORT WORTH Park Improvements at Terry,Northside.High Crest.and Sununerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 0226102264,02265,02266 Revised December 20.2012 31 1000-5 SITE CLEARING Page 5 of 5 1 3.5 REPAIR [NOT USED] 2 3.6 RE-INSTALLATION [NOT USED] 3 3.7 FIELD QUALITY CONTROL [NOT USED] 4 3.8 SYSTEM STARTUP [NOT USED] 5 3.9 ADJUSTING [NOT USED] 6 3.10 CLEANING [NOT USED] 7 3.11 CLOSEOUT ACTIVITIES [NOT USED] 8 3.12 PROTECTION [NOT USED] 9 3.13 MAINTENANCE [NOT USED] 10 3.14 ATTACHMENTS [NOT USED] 1 l END OF SECTION 12 Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D.Johnson 1.4.A Permits: Removed ordinance number and added City's website address 13 CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summer5elds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265;02266 Revised December 20.2012 This page is intentionally blank. 31 23 16- 1 UNCLASSIFIED EXCAVATION Page I of 4 1 SECTION 3123 16 2 UNCLASSIFIED EXCAVATION 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Excavate areas as shown on the Drawings or as directed.Removal of materials 7 encountered to the lines,grades,and typical sections shown on the Drawings and 8 removal from site. Excavations may include construction of 9 a. Roadways 10 b. Drainage Channels I 1 c. Site Excavation 12 d. Excavation for Structures 13 e. Or any other operation involving the excavation of on-site materials 14 B. Deviations fi•om this City of Fort Worth Standard Specification 15 1. None. 16 C. Related Specification Sections include, but are not necessarily limited to: 17 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 18 2. Division 1 —General Requirements 19 3. Section 3123 23—Borrow 20 4. Section 3124 00—Embankments 21 1.2 PRICE AND PAYMENT PROCEDURES 22 A. Measurement and Payment 23 1. Excavation by Plan Quantity 24 a. Measurement 25 1) Measurement for this Item shall be by the cubic yard in its final position 26 using the average end area method. Limits of measurement are shown on 27 the Drawings. 28 2) When measured by the cubic yard in its final position,this is a plans 29 quantity measurement Item. The quantity to be paid is the quantity shown 30 in the proposal, unless modified by Article 11.04 of the General 31 Conditions.Additional measurements or calculations will be made if 32 adjustments of quantities are required. 33 b. Payment 34 1) The work performed and materials furnished in accordance with this Item 35 and measured as provided under"Measurement"will be paid for at the unit 36 price bid per cubic yard of"Unclassified Excavation by Plan". No 37 additional compensation will be allowed for rock or shrinkage/swell 38 factors, as these are the Contractor's responsibility. 39 c. The price bid shall include: 40 l) Excavation 41 2) Excavation Safety 42 3) Drying CITY OF FORT WORTH Park Improvements at Terry,Northside.High Crest.and Stnnmerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.02264,02265,02266 Revised January 28,2013 31 23 16-2 UNCLASSIFIED EXCAVATION Page 2 of 4 1 4) Dust Control 2 5) Reworking or replacing the over excavated material in rock cuts 3 6) Hauling 4 7) Disposal of excess material not used elsewhere onsite 5 8) Scarification 6 9) Clean-up 7 1.3 REFERENCES [NOT USED] 8 A. Definitions 9 1. Unclassified Excavation—Without regard to materials, all excavations shall be 10 considered unclassified and shall include all materials excavated. Any reference to 11 Rock or other materials on the Drawings or in the specifications is solely for the 12 City and the Contractor's information and is not to be taken as a classification of 13 the excavation. 14 1.4 ADMINSTRATIVE REQUIREMENTS 15 A. The Contractor will provide the City with a Disposal Letter in accordance to Division 16 01. 17 1.5 SUBMITTALS [NOT USED] 18 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 19 1.7 CLOSEOUT SUBMITTALS [NOT USED] 20 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 21 1.9 QUALITY ASSURANCE 22 A. Excavation Safety 23 1. The Contractor shall be solely responsible for making all excavations in a safe 24 manner. 25 2. All excavation and related sheeting and bracing shall comply with the requirements 26 of OSHA excavation safety standards 29 CFR part 1926 and state requirements. 27 1.10 DELIVERY, STORAGE,AND HANDLING 28 A. Storage 29 1. Within Existing Rights-of-Way(ROW) 30 a. Soil may be stored within existing ROW, easements or temporary construction 31 easements, unless specifically disallowed in the Contract Documents. 32 b. Do not block drainage ways, inlets or driveways. 33 c. Provide erosion control in accordance with Section 31 25 00. 34 d. When the Work is performed in active traffic areas,store materials only in 35 areas barricaded as provided in the traffic control plans. 36 e. In non-paved areas, do not store material on the root zone of any trees or in 37 landscaped areas. 38 2. Designated Storage Areas 39 a. If the Contract Documents do not allow the storage of spoils within the ROW, 40 easement or temporary construction easement,then secure and maintain an 41 adequate storage location. CITY OF FORT WORTH Park Improvements at Terry,Nortlhside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised January 28.2013 31 23 16-3 UNCLASSIFIED EXCAVATION Page 3 of 4 1 b. Provide an affidavit that rights have been secured to store the materials on 2 private property. 3 c. Provide erosion control in accordance with Section 31 25 00. 4 d. Do not block drainage ways. 5 1.11 FIELD CONDITIONS 6 A. Existing Conditions 7 1. Any data which has been or may be provided on subsurface conditions is not 8 intended as a representation or warranty of accuracy or continuity between soils. It 9 is expressly understood that neither the City nor the Engineer will be responsible 10 for interpretations or conclusions drawn there from by the Contractor. 11 2. Data is made available for the convenience of the Contractor. 12 1.12 WARRANTY [NOT USED] 13 PART 2- PRODUCTS [NOT USED] 14 2.1 OWNER-FURNISHED [NOT USED] 15 2.2 PRODUCT TYPES AND MATERIALS 16 A. Materials 17 1. Unacceptable Fill Material 18 a. In-situ soils classified as ML,MH,PT, OL or OH in accordance with ASTM 19 D2487 20 PART 3- EXECUTION 21 3.1 INSTALLERS [NOT USED] 22 3.2 EXAMINATION [NOT USED] 23 3.3 PREPARATION [NOT USED] 24 3.4 CONSTRUCTION 25 A. Accept ownership of unsuitable or excess material and dispose of material off-site 26 accordance with local, state, and federal regulations at locations. 27 B. Excavations shall be performed in the dry, and kept free from water, snow and ice 28 during construction with eh exception of water that is applied for dust control. 29 C. Separate Unacceptable Fill Material from other materials,remove from the Site and 30 properly dispose according to disposal plan. 31 D. Maintain drainage in the excavated area to avoid damage to the roadway sections and 32 proposed or existing structures. 33 E. Correct any damage to the subgrade caused by weather, at no additional cost to the 34 City. 35 F. Shape slopes to avoid loosening material below or outside the proposed grades. 36 Remove and dispose of slides as directed. CITY OF FORT WORTH Park Improvements at Terry.Northside.High Crest.and Smmnerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264.02265,02266 Revised January 28.2013 31 23 16-4 UNCLASSIFIED EXCAVATION Page 4 of 4 1 G. Rock Cuts 2 1. Excavate to finish grades. 3 2. In the event of over excavation due to contractor error below the lines and grades 4 established in the Drawings,use approved embankment material compacted in 5 accordance with Section 31 24 00 to replace the over excavated at no additional 6 cost to City. 7 H. Earth Cuts 8 1. Excavate to finish subgrade 9 2. In the event of over excavation due to contractor error below the lines and grades 10 established in the Drawings, use approved embankment material compacted in 11 accordance with Section 31 24 00 to replace the over excavated at no additional 12 cost to City. 13 3. Manipulate and compact subgrade in accordance with Section 31 24 00. 14 3.5 REPAIR [NOT USED] 15 3.6 RE-INSTALLATION [NOT USED] 16 3.7 FIELD QUALITY CONTROL 17 A. Subgrade Tolerances 18 1. Excavate to within 0.1 foot in all directions. 19 2. In areas of over excavation,Contractor provides fill material approved by the City 20 at no expense to the City. 21 3.8 SYSTEM STARTUP [NOT USED] 22 3.9 ADJUSTING [NOT USED] 23 3.10 CLEANING [NOT USED] 24 3.11 CLOSEOUT ACTIVITIES [NOT USED] 25 3.12 PROTECTION [NOT USED] 26 3.13 MAINTENANCE [NOT USED] 27 3.14 ATTACHMENTS [NOT USED] 28 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D.Johnson 1.2-Measurement and Payment Section modified;Blue Text added for clarification 1/28/13 D.Johnson 1.2—Modified Bid item names in payment section to differentiate between Payment Methods on bid list. 29 CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest.and Sununerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.02264.02265.02266 Revised January 28 2013 31 23 23- 1 BORROW Page 1 of 5 1 SECTION 3123 23 2 BORROW 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Furnish, place and compact Borrow material for grading. 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include,but are not necessarily limited to: 10 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1 —General Requirements 12 3. Section 31 23 16—Unclassified Excavation 13 4. Section 31 24 00—Embankments 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Borrow by Plan Quantity 17 a. Measurement 18 1) Measurement for this Item shall be by the cubic yard in its final position 19 using the average end area method.Limits of measurement are shown on 20 the Drawings. 21 2) When measured by the cubic yard in its final position,this is a plans 22 quantity measurement Item.The quantity to be paid is the quantity shown 23 in the proposal,unless modified by Article 11.04 of the General 24 Conditions.Additional measurements or calculations will be made if 25 adjustments of quantities are required. 26 b. Payment 27 1) The work performed and materials furnished in accordance with this Item 28 and measured as provided under"Measurement"will be paid for at the unit 29 price bid per cubic yard of"Borrow by Plan"for the various borrow 30 materials. No additional compensation will be allowed for rock or 31 shrinkage/swell factors, as these are the Contractor's responsibility. 32 c. The price bid shall include: 33 1) Transporting or hauling material 34 2) Furnishing,placing, compacting and finishing Borrow 35 3) Construction Water 36 4) Dust Control 37 5) Clean-up 38 6) Proof Rolling 39 7) Disposal of excess or waste material 40 8) Reworking or replacement of undercut material 41 2. Borrow by Delivered Quantity—NOT USED 42 a. Measurement CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest.and Swnmerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised January 28,2013 312323-2 BORROW Page 2 of 5 1 1) Measurement for this Item shall be by the cubic yard of loose Borrow 2 material as delivered to the Site and recorded by truck ticket provided to the 3 City. 4 b. Payment 5 1) The work performed and materials furnished in accordance with this Item 6 and measured as provided under"Measurement'will be paid for at the unit 7 price bid per cubic yard of`Borrow by Delivery"delivered to the Site and 8 recorded by truck ticket for: 9 a) Various Borrow materials 10 c. The price bid shall include: 11 l) Transporting or hauling material 12 2) Furnishing,placing, compacting and finishing Borrow 13 3) Construction Water 14 4) Clean-up 15 5) Dust Control 16 6) Proof Rolling 17 7) Disposal of excess or waste material 18 8) Reworking or replacement of undercut material 19 1.3 REFERENCES 20 A. Reference Standards 21 1. Reference standards cited in this Specification refer to the current reference 22 standard published at the time of the latest revision date logged at the end of this 23 Specification,unless a date is specifically cited. 24 2. ASTM Standards 25 a. ASTM D2487, Standard Practice for Classification of Soils for Engineering 26 Purposes(Unified Soil Classification System) 27 b. ASTM D4318-10, Standard Test Methods for Liquid Limit,Plastic Limit, and 28 Plasticity Index of Soils 29 c. ASTM D6913, Standard Test Methods for Particle-Size Distribution 30 (Gradation)of Soils Using Sieve Analysis 31 d. ASTM D698, Standard Test Methods for Laboratory Compaction 32 Characteristics of Soil Using Standard Effort (12,400 ft-lbf/ft3) 33 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 34 1.5 SUBMITTALS 35 A. Submittals shall be in accordance with Section 01 33 00. 36 B. All submittals shall be approved by the City prior to construction. 37 C. Submit laboratory tests reports for each soil borrow source used to supply general 38 borrow and select fill materials. 39 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS 40 A. Shop Drawings 41 1. Stockpiled Borrow material 42 a. Provide a description of the storage of the delivered Borrow material only if the 43 Contract Documents do not allow storage of materials in the right-of-way of the 44 easement. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Sununerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised January 28.2013 312323-3 BORROW Page 3 of 5 1 1.7 CLOSEOUT SUBMITTALS [NOT USED] 2 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 3 1.9 QUALITY ASSURANCE 4 A. Borrow material shall be tested prior to delivery to the Site. 5 1. Provide Proctor Test results, Gradation and Atterberg Limits for Borrow material 6 from each source. 7 a. All testing listed above shall be performed in terms of ASTM D698,ASTM 8 D6913 and ASTM D4318-10 respectively. 9 1.10 DELIVERY, STORAGE,AND HANDLING 10 A. Delivery 11 1. Coordinate all deliveries and haul-off. 12 B. Storage 13 1. Within Existing Rights-of-Way(ROW) 14 a. Borrow materials may be stored within existing ROW,easements or temporary 15 construction easements,unless specifically disallowed in the Contract 16 Documents. 17 b. Do not block drainage ways,inlets or driveways. 18 c. Provide erosion control in accordance with Section 3125 00. 19 d. Store materials only in areas barricaded as provided in the traffic control plans. 20 e. In non-paved areas, do not store material on the root zone of any trees or in 21 landscaped areas. 22 2. Designated Storage Areas 23 a. If the Contract Documents do not allow the storage of Borrow materials within 24 the ROW, easement or temporary construction easement,then secure and 25 maintain an adequate storage location. 26 b. Provide an affidavit that rights have been secured to store the materials on 27 private property. 28 c. Provide erosion control in accordance with Section 31 25 00. 29 d. Do not block drainage ways. 30 e. Only materials used for I working day will be allowed to be stored in the work 31 zone. 32 1.11 FIELD CONDITIONS [NOT USED] 33 1.12 WARRANTY [NOT USED] 34 PART 2 - PRODUCTS 35 2.1 OWNER-FURNISHED [NOT USED] 36 2.2 PRODUCT TYPES AND MATERIALS 37 A. Borrow 38 1. Additional soil beneath pavements,roadways, foundations and other structures 39 required to achieve the elevations shown on the Drawings. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest.and Smnmerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised JanUary 28.2013 312323-4 BORROW Page 4 of 5 1 2. Acceptable Fill Material 2 a. In-situ or imported soils classified as CL, CH, SC or GC in accordance with 3 ASTM D2487 4 b. Free fl•om deleterious materials, boulders over 6 inches in size and organics 5 c. Can be placed free from voids 6 d. Must have 20 percent passing the number 200 sieve 7 3. Blended Fill Material 8 a. In-situ soils classified as SP, SM, GP or GM in accordance with ASTM D2487 9 b. Blended with in-situ or imported Acceptable Fill material to meet the 10 requirements of an Acceptable Fill Material I 1 c. Free from deleterious materials,boulders over 6 inches in size and organics 12 d. Must have 20 percent passing the number 200 sieve 13 4. Select Fill 14 a. Classified as SC or CL in accordance with ASTM D2487 15 b. Liquid limit less than 35 16 c. Plasticity index between 8 and 20 17 5. Cement Stabilized Sand(CSS) 18 a. Sand or silty sand 19 b. Free of clay or plastic material 20 c. Minimum of 4 percent cement content of Type I/11 portland cement 21 d. 100 to 150 psi compressive strength at 2 days in accordance with ASTM 22 D1633,Method A 23 e. 200 to 250 psi compressive strength at 23 days in accordance with ASTM 24 D1633,Method A 25 f. Mix in a stationary pug mill,weigh-batch or continuous mixing plant 26 2.3 ASSEMBLY OR FABRICATION TOLERANCES [NOT USED] 27 2.4 ACCESSORIES [NOT USED] 28 2.5 SOURCE QUALITY CONTROL [NOT USED] 29 PART 3- EXECUTION 30 3.1 INSTALLERS [NOT USED] 31 3.2 EXAMINATION [NOT USED] 32 3.3 PREPARATION [NOT USED] 33 3.4 INSTALLATION 34 A. All Borrow placement shall be performed in accordance to Section 31 24 00. 35 3.5 REPAIR [NOT USED] 36 3.6 RE-INSTALLATION [NOT USED] 37 3.7 FIELD QUALITY CONTROL 38 A. Field quality control will be performed in accordance to Section 31 24 00. 39 3.8 SYSTEM STARTUP [NOT USED] CITY OF FORT WORTII Park Improvements at Terry,Northside.High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265-,02266 Revised January 28,2013 31 2323-5 BORROW Page 5 of 5 1 3.9 ADJUSTING [NOT USED] 2 3.10 CLEANING [NOT USED] 3 3.11 CLOSEOUT ACTIVITIES [NOT USED] 4 3.12 PROTECTION [NOT USED] 5 3.13 MAINTENANCE [NOT USED] 6 3.14 ATTACHMENTS [NOT USED] 7 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D.Johnson 1.2-Measurement and Payment Section modified;Blue Text added for clarification 1/28/13 D.Johnson 1.2—Modified Bid Item names in payment section to differentiate between Payment Methods on bid list. 8 CITY OF FORT WORTH Park Improvements at Terry,Northside.High Crest.and Smmnerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised January 28.2013 This page is intentionally blank. 31 2400- 1 EMBANKMENTS Page I of 9 1 SECTION 3124 00 2 EMBANKMENTS 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Transporting and placement of Acceptable Fill Material within the boundaries of 7 the Site for construction of- 8 a. Roadways 9 b. Embankments 10 c. Drainage Channels 11 d. Site Grading 12 e. Any other operation involving the placement of on-site materials 13 B. Deviations from this City of Fort Worth Standard Specification 14 1. None. 15 C. Related Specification Sections include,but are not necessarily limited to: 16 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 17 2. Division 1 —General Requirements 18 3. Section 31 23 16—Unclassified Excavation 19 4. Section 31 23 23—Borrow 20 1.2 PRICE AND PAYMENT PROCEDURES 21 A. Measurement and Payment 22 1. Embankments by Plan Quantity 23 a. Measurement 24 1) Measurement for this Item shall be by the cubic yard in its final position 25 using the average end area method.Limits of measurement are shown on 26 the Drawings. 27 2) When measured by the cubic yard in its final position,this is a plans 28 quantity measurement Item. The quantity to be paid is the quantity shown 29 in the proposal, unless modified by Article 11.04 of the General 30 Conditions.Additional measurements or calculations will be made if 31 adjustments of quantities are required. 32 b. Payment 33 1) The work performed and materials furnished in accordance with this Item 34 and measured as provided under"Measurement"will be paid for at the unit 35 price bid per cubic yard of"Embankment by Plan". No additional 36 compensation will be allowed for rock or shrinkage/swell factors, as these 37 are the Contractor's responsibility. 38 c. The price bid shall include: 39 1) Transporting or hauling material 40 2) Placing, compacting, and finishing Embankment 41 3) Construction Water 42 4) Dust Control CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264.02265,02266 Revised January 28,2013 312400-2 EMBANKMENTS Page 2 of 9 1 5) Clean-up 2 6) Proof Rolling 3 7) Disposal of excess materials 4 8) Reworking or replacement of undercut material 5 2. Embankments by Surveyed Quantity—NOT USED 6 a. Measurement 7 1) Measurement for this Item shall be by the cubic yard in its final position 8 calculated using the average end area or composite method. 9 a) The City will perform a reference survey once the Site has been cleared 10 to obtain existing ground conditions. 11 b) The City will perform a final post-construction survey. 12 c) The Contractor will be paid for the cubic yardage of Embankment 13 calculated as the difference between the two surveys. 14 d) Partial payments will be based on estimated plan quantity 15 measurements calculated by the Engineer. 16 b. Payment 17 1) The work performed and materials furnished in accordance with this Item 18 and measured as provided under"Measurement"will be paid for at the unit 19 price bid per cubic yard of"Embankment by Survey". 20 c. The price bid shall include: 21 1) Transporting or hauling material 22 2) Placing, compacting, and finishing Embankment 23 3) Construction Water 24 4) Dust Control 25 5) Clean-up 26 6) Proof Rolling 27 7) Disposal of excess materials 28 8) Reworking or replacement of undercut material 29 1.3 REFERENCES 30 A. Reference Standards 31 1. Reference standards cited in this specification refer to the current reference standard 32 published at the time of the latest revision date logged at the end of this 33 specification, unless a date is specifically cited. 34 2. ASTM Standards 35 a. ASTM D4318-10, Test Procedure for Determining Liquid Limit,Plastic Limit, 36 and Plasticity Index of Soils 37 b. ASTM D4943-08, Standard Test Method for Shrinkage Factors of Soils by the 38 Wax Method 39 c. ASTM D698-07e1, Standard Test Methods for Laboratory Compaction 40 Characteristics of Soil Using Standard Effort 41 d. ASTM D1557-09, Standard Test Methods for Laboratory Compaction 42 Characteristics of Soil Using Modified Effort 43 e. ASTM D7382-08, Standard Test for Determination of Maximum Dry Unit 44 Weight and Water Content Range for Effective Compaction of Granular Soils 45 Using a Vibrating Hammer 46 f. ASTM D1556-07, Standard Test for Density and Unit Weight of Soil In-Place 47 by the Sand Cone Method CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summer6elds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265.02266 Revised January 28,2013 312400-3 EMBANKMENTS Page 3 of 9 1 1.4 ADMINSTRATIVE REQUIREMENTS 2 A. Sequencing 3 1. Sequence work such that calls of proctors are complete in accordance with ASTM 4 D698 prior to commencement of construction activities. 5 1.5 SUBMITTALS 6 A. Submittals shall be in accordance with Section 01 33 00. 7 B. All submittals shall be approved by the City prior to construction 8 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS 9 A. Shop Drawings 10 1. Stockpiled material 11 a. Provide a description of the storage of the excavated material only if the 12 Contract Documents do not allow storage of materials in the right-of-way or the 13 easement 14 1.7 CLOSEOUT SUBMITTALS [NOT USED] 15 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 16 1.9 QUALITY ASSURANCE [NOT USED] 17 1.10 DELIVERY, STORAGE,AND HANDLING 18 A. Storage 19 1. Within Existing Rights-of-Way(ROW) 20 a. Soil may be stored within existing ROW, easements or temporary construction 21 easements, unless specifically disallowed in the Contract Documents. 22 b. Do not block drainage ways, inlets or driveways. 23 c. Provide erosion control in accordance with Section 3125 00. 24 d. When the Work is performed in active traffic areas, store materials only in 25 areas barricaded as provided in the traffic control plans. 26 e. In non-paved areas, do not store material on the root zone of any trees or in 27 landscaped areas. 28 2. Designated Storage Areas 29 a. If the Contract Documents do not allow the storage within the ROW, easement 30 or temporary construction easement,then secure and maintain an adequate 31 storage location. 32 b. Provide an affidavit that rights have been secured to store the materials on 33 private property. 34 c. Provide erosion control in accordance with Section 3125 00. 35 d. Do not block drainage ways. 36 1.11 FIELD CONDITIONS 37 A. Existing Conditions 38 1. Any data which has been or may be provided on subsurface conditions is not 39 intended as a representation or warranty of accuracy or continuity between soils. It 40 is expressly understood that neither the City nor the Engineer will be responsible 41 for interpretations or conclusions drawn there from by the Contractor. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised January 28,2013 312400-4 EMBANKMENTS Page 4 of 9 1 2. Data is made available for the convenience of the Contractor. 2 1.12 WARRANTY [NOT USED] 3 PART 2- PRODUCTS 4 2.1 OWNER-FURNISHED [NOT USED] 5 2.2 PRODUCT TYPES AND MATERIALS 6 A. Materials 7 1. Acceptable Fill Material 8 a. In-situ or imported soils classified as CL, CH, SC or GC in accordance with 9 ASTM D2487 10 b. Free from deleterious materials,boulders over 6 inches in size and organics 11 c. Can be placed free from voids 12 d. Must have 20 percent passing the number 200 sieve 13 2. Blended Fill Material 14 a. In-situ soils classified as GW, GP, GM, SW, SP,or SM in accordance with 15 ASTM D2487 16 b. Blended with in-situ or imported acceptable backfill material to meet the 17 requirements of an Acceptable Backfill Material 18 c. Free from deleterious materials, boulders over 6 inches in size and organics 19 d. Must have 20 percent passing the number 200 sieve 20 3. Unacceptable Fill Material 21 a. In-situ soils classified as ML,MH,PT, OL or OH in accordance with ASTM 22 D2487 23 4. Select Fill 24 a. Classified as SC or CL in accordance with ASTM D2487 25 b. Liquid limit less than 35 26 c. Plasticity index between 8 and 20 27 2.3 ASSEMBLY OR FABRICATION TOLERANCES [NOT USED] 28 2.4 ACCESSORIES [NOT USED] 29 2.5 SOURCE QUALITY CONTROL [NOT USED] 30 PART 3- EXECUTION 31 3.1 INSTALLERS [NOT USED] 32 3.2 EXAMINATION [NOT USED] 33 3.3 PREPARATION 34 A. Protection of In-Place Conditions 35 1. Pavement 36 a. Conduct activities in such a way that does not damage existing pavement that is 37 designated to remain. CITY OF FORT WORTH Park Improvements at Terry,Norihside,High Crest,and Smmner6elds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised January 28,2013 312400-5 EMBANKMENTS Page 5 of 9 1 b. Repair or replace any pavement damaged due to the negligence of the 2 contractor outside the limits designated for pavement removal at no additional 3 cost 4 2. Trees 5 a. When operating outside of existing ROW,stake permanent and temporary 6 construction easements. 7 b. Restrict all construction activities to the designated easements and ROW. 8 c. Flag and protect all trees designated to remain in accordance with Section 31 10 9 00. 10 d. Conduct embankments in a manner such that there is no damage to the tree 11 canopy. 12 e. Prune or trim tree limbs as specifically allowed by the Drawings or as 13 specifically allowed by the City. 14 1) Pruning or trimming may only be accomplished with equipment 15 specifically designed for tree pruning or trimming. 16 3. Above ground Structures 17 a. Protect all above ground structures adjacent to the construction. 18 4. Traffic 19 a. Maintain existing traffic, except as modified by the traffic control plan, and in 20 accordance with Section 34 71 13. 21 b. Do not block access to driveways or alleys for extended periods of time unless: 22 1) Alternative access has been provided 23 2) Proper notification has been provided to the property owner or resident 24 3) It is specifically allowed in the traffic control plan 25 3.4 INSTALLATION 26 A. Embankments General 27 1. Placing and Compacting Embankment Material 28 a. Perform fill operation in an orderly and systematic manner using equipment in 29 proper sequence to meet the compaction requirements 30 b. Scarify and loosen the unpaved surface areas, except rock,to a depth of at least 31 6 inches, unless otherwise shown on the Drawings 32 c. Place fill on surfaces free from trees, stumps, roots,vegetation, or other 33 deleterious materials 34 d. Bench slopes before placing material. 35 e. Begin filling in the lowest section or the toe of the work area 36 f. When fill is placed directly or upon older fill,remove debris and any loose 37 material and proof roll existing surface. 38 g. After spreading the loose lifts to the required thickness and adjusting its 39 moisture content as necessary,simultaneously recompact scarified material 40 with the placed embankment material. 41 h. Roll with sufficient number passes to achieve the minimum required 42 compaction. 43 i. Provide water sprinkled as necessary to achieve required moisture levels for 44 specified compaction 45 j. Do not add additional lifts until the entire previous lift is properly compacted. 46 2. Surface Water Control 47 a. Grade surface horizontally but provide with sufficient longitudinal and 48 transverse slope to allow for runoff of surface water from every point. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised January 28,2013 312400-6 EMBANKMENTS Page 6 of 9 1 b. Conduct fills so that no obstruction to drainage from any other sections of fill is 2 created. 3 c. Install temporary dewatering sumps in low areas during filling where excess 4 amounts of runoff collect. 5 d. Compact uniformly throughout. Keep surfaces of fill reasonably smooth and 6 free from humps and hollows that would prevent proper uniform compaction. 7 e. Do not place fill during or shortly after rain events which prevent proper work 8 placement of the material and compaction 9 f. Prior to resuming compaction operations,remove muddy material off the 10 surface to expose firm and compacted materials 11 B. Embankments for Roads 12 1. Only Acceptable Fill Material will be allowed for roadways 13 2. Embankments for roadbeds shall be constructed in layers approximately parallel to 14 the finished grade of the street 15 3. Construct generally to conform to the cross section of the subgrade section as 16 shown in the Drawings. 17 4. Establish grade and shape to the typical sections shown on the Drawings 18 5. Maintain finished sections of embankment to the grade and compaction 19 requirements until the project is accepted. 20 C. Earth Embankments 21 1. Earth embankment is mainly composed of material other than rock. Construct 22 embankments in successive layers,evenly distributing materials in lengths suited 23 for sprinkling and rolling. 24 2. Rock or Concrete 25 a. Obtain approval from the City prior to incorporating rock and broken concrete 26 produced by the construction project in the lower layers of the embankment. 27 b. No Rock or Concrete will be permitted in embankments in any location where 28 future utilities are anticipated. 29 c. When the size of approved rock or broken concrete exceeds the layer thickness 30 place the rock and concrete outside the limits of the proposed structure or 31 pavement. Cut and remove all exposed reinforcing steel from the broken 32 concrete. 33 3. Move the material dumped in piles or windrows by blading or by similar methods 34 and incorporate it into uniform layers. 35 4. Featheredge or mix abutting layers of dissimilar material for at least 100 feet to 36 ensure there are no abrupt changes in the material. 37 5. Break down clods or lumps of material and mix embankment until a uniform 38 material is attained. 39 D. Rock Embankments 40 1. Rock embankment is mainly composed of rock. 41 2. Rock Embankments for roadways are only allowed when specifically designated on 42 the Drawings. 43 3. Construct rock embankments in successive layers for the full width of the roadway 44 cross-section with a depth of 18-inches or less. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264-02265-02266 Revised January 28,2013 312400-7 EMBANKMENTS Page 7 of 9 1 4. The layer depth for large rock sizes shall not exceed a depth of 18-inches in any 2 case. Fill voids created by the large stone matrix with smaller stones during the 3 placement and filling operations. 4 5. Ensure the depth of the embankment layer is greater than the maximum dimension 5 of any rock. 6 6. Do not place rock greater than 18-inches in its maximum dimension. 7 7. Construct the final layer with graded material so that the density and uniformity is 8 in accordance compaction requirements. 9 8. The upper or final layer of rock embankments shall contain no material larger than 10 4 inches in their maximum dimension. 11 E. Density 12 1. Compact each layer until the maximum dry density as determined by ASTM D698 13 is achieved. 14 a. Not Under Roadway or Structure: 15 1) areas to be compacted in the open,not beneath any structure,pavement, 16 flatwork, or is a minimum of 1 foot outside of the edge of any structure, 17 edge of pavement, or back of curb. 18 a) Compact each layer to a minimum of 90 percent Standard Proctor 19 Density. 20 b. Embankments under future paving: 21 1) Compact each layer to a minimum of 95 percent standard proctor density 22 with a moisture content not to exceed+4 percent or-2 percent of optimum 23 moisture or as indicated on the Drawings 24 c. Embankments under structures: 25 1) Compacted each layer as indicated on the Drawings 26 F. Maintenance of Moisture and Reworking 27 1. Maintain the density and moisture content once all requirements are met. 28 2. For soils with a PI greater than 15, maintain the moisture content no lower than 4 29 percentage points below optimum. 30 3. Rework the material to obtain the specified compaction when the material loses the 31 required stability, density, moisture, or finish. 32 4. Alter the compaction methods and procedures on subsequent work to obtain 33 specified density as directed by the City. 34 3.5 REPAIR [NOT USED] 35 3.6 RE-INSTALLATION [NOT USED] 36 3.7 FIELD QUAILITY CONTROL 37 A. Field Tests and Inspections 38 1. Proctors 39 a. The City will perform Proctors in accordance with ASTM D698. 40 b. Test results will generally be available to within 4 calendar days and distributed 41 to: 42 1) Contractor 43 2) City Project Manager 44 3) City Inspector CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest.and Suni nerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264.02265,02266 Revised January 28,2013 312400-8 EMBANKMENTS Page 8 of 9 1 4) Engineer 2 c. Notify the City if the characteristic of the soil changes. 3 d. City will perform new proctors for varying soils: 4 1) When indicated in the geotechnical investigation in the Appendix 5 2) If notified by the Contractor 6 3) At the convenience of the City 7 e. Embankments where different soil types are present and are blended,the 8 proctors shall be based on the mixture of those soils. 9 2. Proof Rolling 10 a. Embankments under Future Pavement I 1 1) City Project Representative must be on-site during proof rolling operations. 12 2) Use equipment that will apply sufficient load to identify soft spots that rut 13 or pump. 14 a) Acceptable equipment includes fully loaded single-axle water truck 15 with a 1500 gallon capacity. 16 3) Make at least 2 passes with the proof roller(down and back= 1 pass). 17 4) Offset each trip by at most 1 tire width. 18 5) If an unstable or non-uniform area is found, correct the area. 19 6) Correct 20 a) Soft spots that rut or pump greater than 3/4 inch. 21 b) Areas that are unstable or non-uniform 22 7) If a non-uniform area is found then correct the area. 23 b. Embankments Not Under Future Paving 24 l) No Proof Rolling is required. 25 3. Density Testing of Embankments 26 a. Density Test shall be in conformance with ASTM D2922. 27 b. For Embankments under future pavement: 28 1) The City will perform density testing twice per working day when 29 compaction operations are being conducted. 30 2) The testing lab shall take a minimum of 3 density tests,but the number of 31 test shall be appropriate for the area being compacted. 32 3) Testing shall be representative of the current lift being compacted. 33 4) Special attention should be placed on edge conditions. 34 c. For Embankments not under future pavement or structures: 35 1) The City will perform density testing once working day when compaction 36 operations are being conducted. 37 2) The testing lab shall take a minimum of 3 density tests. 38 3) Testing shall be representative of the current lift being compacted. 39 d. Make the area where the embankment is being placed available for testing. 40 e. The City will determine the location of the test. 41 f. The City testing lab will provide results to Contractor and the City's Inspector 42 upon completion of the testing. 43 g. A formal report will be posted to the City's Buzzsaw site within 48 hours. 44 h. Test reports shall include: 45 1) Location of test by station number 46 2) Time and date of test 47 3) Depth of testing 48 4) Field moisture 49 5) Dry density CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Sur nerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised January 28,2013 312400-9 EMBANKMENTS Page 9 of 9 1 6) Proctor identifier 2 7) Percent Proctor Density 3 B. Non-Conforming Work 4 1. All non-conforming work shall be removed and replaced. 5 3.8 SYSTEM STARTUP [NOT USED] 6 3.9 ADJUSTING [NOT USED] 7 3.10 CLEANING [NOT USED] 8 3.11 CLOSEOUT ACTIVITIES [NOT USED] 9 3.12 PROTECTION [NOT USED] 10 3.13 MAINTENANCE [NOT USED] 11 3.14 ATTACHMENTS [NOT USED] 12 END OF SECTION 13 Revision Log DATE NAME SUMMARY OF CHANGE 1.2—Added possible measurement and payment procedures and Blue 12/20/2012 D. Johnson text for instructions on how the methods should be applied 2.2.2.a added GW and SW material classifications 1/28/13 D. Johnson 1.2—Modified Bid Item names in payment section to differentiate between Payment Methods on bid list. 14 CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised January 28,2013 This page is intentionally blank. 31 2500- 1 EROSION AND SEDIMENT CONTROL Page I of 8 1 SECTION 3125 00 2 EROSION AND SEDIMENT CONTROL 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Implementation of the project's Storm Water Pollution Prevention Plan(SWPPP) 7 and installation, maintenance and removal of erosion and sediment control devices 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include,but are not necessarily limited to: I 1 1. Division 0—Bidding Requirements,Contract Forms and Conditions of the Contract 12 2. Division I —General Requirements 13 1.2 PRICE AND PAYMENT PROCEDURES 14 A. Measurement and Payment 15 1. Storm Water Pollution Prevention Plan<1 acre 16 a. Measurement 17 1) This Item is considered subsidiary to the various Items bid. 18 b. Payment 19 1) The work performed and the materials furnished in accordance with this 20 Item are subsidiary to the structure or Items being bid and no other 21 compensation will be allowed. 22 2. Storm Water Pollution Prevention Plan> 1 acre 23 a. Measurement for this Item shall be by lump sum. 24 b. Payment 25 1) The work performed and the materials furnished in accordance with this 26 Item shall be paid for at the lump sum price bid for"SWPPP> I acre". 27 c. The price bid shall include: 28 1) Preparation of SWPPP 29 2) Implementation 30 3) Permitting fees 31 4) Installation 32 5) Maintenance 33 6) Removal 34 1.3 REFERENCES 35 A. Reference Standards 36 1. Reference standards cited in this Specification refer to the current reference 37 standard published at the time of the latest revision date logged at the end of this 38 Specification, unless a date is specifically cited. 39 2. ASTM Standard: CITY OF FORT WORTH Park Improvements at Terry.Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264-02265A2266 Revised December 20,2012 312500-2 EROSION AND SEDIMENT CONTROL Page 2 of 8 1 a. ASTM D3786, Standard Test Method for Bursting Strength of Textile 2 Fabrics—Diaphragm Bursting Strength Tester Method 3 b. ASTM D4632, Standard Test Method for Grab Breaking Load and Elongation 4 of Geotextiles 5 c. ASTM D4751, Standard Test Method for Determining Apparent Opening Size 6 of a Geotextile 7 d. ASTM D4833, Standard Test Method for Index Puncture Resistance of 8 Geomembranes and Related Products 9 3. Texas Commission on Environmental Quality(TCEQ)TPDES General Permit No. 10 TXR150000 11 4. TxDOT Departmental Material Specifications(DMS) 12 a. DMS-6230"Temporary Sediment Control Fence Fabric" 13 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 14 1.5 SUBMITTALS 15 A. Storm Water Pollution Prevention Plan(SWPPP) 16 B. Construction Site Notice 17 C. Notice of Change(if applicable) 18 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 19 1.7 CLOSEOUT SUBMITTALS [NOT USED] 20 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 21 1.9 QUALITY ASSURANCE [NOT USED] 22 1.10 DELIVERY, STORAGE AND HANDLING [NOT USED] 23 1.11 FIELD [SITE] CONDITIONS [NOT USED] 24 1.12 WARRANTY [NOT USED] 25 PART 2- PRODUCTS 26 2.1 OWNER-FURNISHED [OR] OWNER-SUPPLIED PRODUCTS [NOT USED] 27 2.2 PRODUCT TYPES AND MATERIALS 28 A. Geotextile Fabric 29 1. Place the aggregate over geotextile fabric meeting the following criteria: 30 a. Tensile Strength of 250 pounds, per ASTM D4632 31 b. Puncture Strength of 135 pounds,per ASTM D4833 32 c. Mullen Burst Rate of 420 psi,per ASTM D3786 33 d. Apparent Opening Size of No. 20 (max), per ASTM D4751 34 B. Sandbag Material 35 1. Furnish sandbags meeting Section 2.5 except that any gradation of aggregate may 36 be used to fill the sandbags. CITY OF FORT WORTH Park Improvements at Terry.Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 312500-3 EROSION AND SEDIMENT CONTROL Page 3 of 8 1 C. Stabilized Construction Entrances 2 1. Provide materials that meet the details shown on the Drawings and this Section. 3 a. Provide crushed aggregate for long and short-term construction exits. 4 b. Furnish aggregates that are clean,hard, durable and free from adherent coatings 5 such as salt, alkali, dirt, clay, loam, shale, soft or flaky materials and organic 6 and injurious matter. 7 c. Use 3 to 5 inch coarse aggregate with a minimum thickness of 12 inches. 8 d. The aggregate shall be placed over a geotextile fabric meeting the following 9 criteria: 10 1) Tensile Strength of 300 pounds, per ASTM D4632 11 2) Puncture Strength of 120 pounds, per ASTM D4833 12 3) Mullen Burst Rate of 600 psi,per ASTM D3786 13 4) Apparent Opening Size of No. 40(max),per ASTM D4751 14 D. Embankment for Erosion Control 15 1. Provide rock, loam, clay,topsoil or other earth materials that will forma stable 16 embankment to meet the intended use. 17 E. Sandbags 18 1. Provide sandbag material of polypropylene, polyethylene or polyamide woven 19 fabric with a minimum unit weight of 4 ounces per square yard,a Mullen burst- 20 strength exceeding 300 psi, and an ultraviolet stability exceeding 70 percent. 21 2. Use natural coarse sand or manufactured sand meeting the gradation given in Table 22 1 to fill sandbags. 23 3. Filled sandbags must be 24 to 30 inches long, 16 to 18 inches wide, and 6 to 8 24 inches thick. 25 Table 1 26 Sand Gradation Sieve# Maximum Retained(% by Weight) 4 3 percent 100 80 percent 200 95 percent 27 F. Temporary Sediment Control Fence 28 1. Provide a net-reinforced fence using woven geo-textile fabric. 29 2. Logos visible to the traveling public will not be allowed. 30 a. Fabric 31 1) Provide fabric materials in accordance with DMS-6230,"Temporary 32 Sediment Control Fence Fabric." 33 b. Posts 34 1) Provide essentially straight wood or steel posts with a minimum length of 35 48 inches, unless otherwise shown on the Drawings. 36 2) Soft wood posts must be at least 3 inches in diameter or nominal 2 x 4 inch 37 3) Hardwood posts must have a minimum cross-section of 1-1/2 x 1-1/2 inch 38 4) T-or L-shaped steel posts must have a minimum weight of 1.3 pounds per 39 foot. 40 c. Net Reinforcement 41 1) Provide net reinforcement of at least 12-1/2 gauge galvanized welded wire 42 mesh, with a maximum opening size of 2 x 4 inch, at least 24 inches wide, 43 unless otherwise shown on the Drawings. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and SunnnerBelds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263_02264,02265,02266 Revised December 20,2012 312500-4 EROSION AND SEDIMENT CONTROL Page 4 of 8 1 d. Staples 2 1) Provide staples with a crown at least 3/4 inch wide and legs 1/2 inch long. 3 2.3 ACCESSORIES [NOT USED] 4 2.4 SOURCE QUALITY CONTROL [NOT USED] 5 PART 3- EXECUTION 6 3.1 INSTALLERS [NOT USED] 7 3.2 EXAMINATION [NOT USED] 8 3.3 PREPARATION [NOT USED] 9 3.4 INSTALLATION 10 A. Storm Water Pollution Prevention Plan 11 1. Develop and implement the project's Storm Water Pollution Prevention Plan 12 (SWPPP) in accordance with the TPDES Construction General Permit TXR150000 13 requirements. Prevent water pollution from storm water runoff by using and 14 maintaining appropriate structural and nonstructural BMPs to reduce pollutants 15 discharges to the MS4 from the construction site. 16 B. Control Measures 17 1. Implement control measures in the area to be disturbed before beginning 18 construction, or as directed. Limit the disturbance to the area shown on the 19 Drawings or as directed. 20 2. Control site waste such as discarded building materials,concrete truck washout 21 water, chemicals, litter and sanitary waste at the construction site. 22 3. If, in the opinion of the Engineer,the Contractor cannot control soil erosion and 23 sedimentation resulting from construction operations,the Engineer will limit the 24 disturbed area to that which the Contractor is able to control.Minimize disturbance 25 to vegetation. 26 4. Immediately correct ineffective control measures. Implement additional controls as 27 directed. Remove excavated material within the time requirements specified in the 28 applicable storm water permit. 29 5. Upon acceptance of vegetative cover by the City, remove and dispose of all 30 temporary control measures,temporary embankments,bridges,matting,falsework, 31 piling, debris, or other obstructions placed during construction that are not a part of 32 the finished work, or as directed. 33 C. Do not locate disposal areas, stockpiles, or haul roads in any wetland,water body, or 34 streambed. 35 D. Do not install temporary construction crossings in or across any water body without the 36 prior approval of the appropriate resource agency and the Engineer. 37 E. Provide protected storage area for paints, chemicals, solvents, and fertilizers at an 38 approved location. Keep paints, chemicals, solvents, and fertilizers off bare ground and 39 provide shelter for stored chemicals. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summeriields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 312500-5 EROSION AND SEDIMENT CONTROL Page 5 of 8 1 F. Installation and Maintenance 2 1. Perform work in accordance with the TPDES Construction General Permit 3 TXR150000. 4 2. When approved, sediments may be disposed of within embankments, or in areas 5 where the material will not contribute to further siltation. 6 3. Dispose of removed material in accordance with federal,state, and local 7 regulations. 8 4. Remove devices upon approval or when directed. 9 a. Upon removal, finish-grade and dress the area. 10 b. Stabilize disturbed areas in accordance with the permit,and as shown on the 11 Drawings or directed. 12 5. The Contractor retains ownership of stockpiled material and must remove it from 13 the project when new installations or replacements are no longer required. 14 G. Rock Filter Dams for Erosion Control 15 1. Remove trees, brush, stumps and other objectionable material that may interfere 16 with the construction of rock filter dams. 17 2. Place sandbags as a foundation when required or at the Contractor's option. 18 3. For Types 1, 2,3, and 5, place the aggregate to the lines, height,and slopes 19 specified, without undue voids. 20 4. For Types 2 and 3, place the aggregate on the mesh and then fold the mesh at the 21 upstream side over the aggregate and secure it to itself on the downstream side with 22 wire ties, or hog rings,or as directed. 23 5. Place rock filter dams perpendicular to the flow of the stream or channel unless 24 otherwise directed. 25 6. Construct filter dams according to the following criteria,unless otherwise shown on 26 the Drawings: 27 a. Type 1 (Non-reinforced) 28 l) Height-At least 18 inches measured vertically from existing ground to top 29 of filter dam 30 2) Top Width-At least 2 feet 31 3) Slopes-At most 2:1 32 b. Type 2 (Reinforced) 33 1) Height-At least 18 inches measured vertically from existing ground to top 34 of filter dam 35 2) Top Width -At least 2 feet 36 3) Slopes-At most 2:1 37 c. Type 3 (Reinforced) 38 1) Height-At least 36 inches measured vertically from existing ground to top 39 of filter darn 40 2) Top Width-At least 2 feet 41 3) Slopes-At most 2:1 42 d. Type 4(Sack Gabions) 43 1) Unfold sack gabions and smooth out kinks and bends. CITY OF FORT WORTH Park Improvements at Terry.Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 312500-6 EROSION AND SEDIMENT CONTROL Page 6 of 8 1 2) For vertical filling, connect the sides by lacing in a single loop—double loop 2 pattern on 4-to 5-inches spacing.At I end, pull the end lacing rod until 3 tight, wrap around the end, and twist 4 times. At the filling end,fill with 4 stone, pull the rod tight, cut the wire with approximately 6 inches 5 remaining, and twist wires 4 times. 6 3) For horizontal filling, place sack flat in a filling trough,fill with stone, and 7 connect sides and secure ends as described above. 8 4) Lift and place without damaging the gabion. 9 5) Shape sack gabions to existing contours. 10 e. Type 5 11 1) Provide rock filter dams as shown on the Drawings. 12 H. Construction Entrances 13 1. When tracking conditions exist,prevent traffic from crossing or exiting the 14 construction site or moving directly onto a public roadway, alley,sidewalk,parking 15 area,or other right of way areas other than at the location of construction entrances. 16 2. Place the exit over a foundation course, if necessary. 17 a. Grade the foundation course or compacted subgrade to direct runoff from the 18 construction exits to a sediment trap as shown on the Drawings or as directed. 19 3. At drive approaches, make sure the construction entrance is the full width of the 20 drive and meets the length shown on the Drawings. 21 a. The width shall beat least 14 feet for 1-way and 24 feet for 2-way traffic for all 22 other points of ingress or egress or as directed by the Engineer. 23 I. Earthwork for Erosion Control 24 1. Perform excavation and embankment operations to minimize erosion and to remove 25 collected sediments from other erosion control devices. 26 a. Excavation and Embankment for Erosion Control Measures 27 1) Place earth dikes, swales or combinations of both along the low crown of 28 daily lift placement, or as directed,to prevent runoff spillover. 29 2) Place swales and dikes at other locations as shown on the Drawings or as 30 directed to prevent runoff spillover or to divert runoff. 31 3) Construct cuts with the low end blocked with undisturbed earth to prevent 32 erosion of hillsides. 33 4) Construct sediment traps at drainage structures in conjunction with other 34 erosion control measures as shown on the Drawings or as directed. 35 5) Where required, create a sediment basin providing 3,600 cubic feet of 36 storage per acre drained, or equivalent control measures for drainage 37 locations that serve an area with 10 or more disturbed acres at 1 time,not 38 including offsite areas. 39 b. Excavation of Sediment and Debris 40 1) Remove sediment and debris when accumulation affects the performance of 41 the devices, after a rain, and when directed. 42 J. Sandbags for Erosion Control 43 1. Construct a berm or dam of sandbags that will intercept sediment-laden storm water 44 runoff from disturbed areas, create a retention pond, detain sediment and release 45 water in sheet flow. 46 2. Fill each bag with sand so that at least the top 6 inches of the bag is unfilled to 47 allow for proper tying of the open end. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summer5elds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 312500-7 EROSION AND SEDIMENT CONTROL Page 7 of 8 1 3. Place the sandbags with their tied ends in the same direction. 2 4. Offset subsequent rows of sandbags 1I2 the length of the preceding row. 3 5. Place a single layer of sandbags downstream as a secondary debris trap. 4 6. Place additional sandbags as necessary or as directed for supplementary support to 5 berms or dams of sandbags or earth. 6 K. Temporary Sediment-Control Fence 7 1. Provide temporary sediment-control fence near the downstream perimeter of a 8 disturbed area to intercept sediment from sheet flow. 9 2. Incorporate the fence into erosion-control measures used to control sediment in 10 areas of higher flow. Install the fence as shown on the Drawings,as specified in this 11 Section, or as directed. 12 a. Post Installation 13 1) Embed posts at least 18 inches deep, or adequately anchor, if in rock,with a 14 spacing of 6 to 8 feet and install on a slight angle toward the run-off source. 15 b. Fabric Anchoring 16 1) Dig trenches along the uphill side of the fence to anchor 6 to 8 inches of 17 fabric. 18 2) Provide a minimum trench cross-section of 6 x 6 inches 19 3) Place the fabric against the side of the trench and align approximately 2 20 inches of fabric along the bottom in the upstream direction. 21 4) Backfill the trench,then hand-tamp. 22 c. Fabric and Net Reinforcement Attachment 23 1) Unless otherwise shown under the Drawings,attach the reinforcement to 24 wooden posts with staples,or to steel posts with T-clips, in at least 4 places 25 equally spaced. 26 2) Sewn vertical pockets may be used to attach reinforcement to end posts. 27 3) Fasten the fabric to the top strand of reinforcement by hog rings or cord 28 every 15 inches or less. 29 d. Fabric and Net Splices 30 1) Locate splices at a fence post with a minimum lap of 6 inches attached in at 31 least 6 places equally spaced, unless otherwise shown under the Drawings. 32 a) Do not locate splices in concentrated flow areas. 33 2) Requirements for installation of used temporary sediment-control fence 34 include the following: 35 a) Fabric with minimal or no visible signs of biodegradation(weak fibers) 36 b) Fabric without excessive patching(more than 1 patch every 15 to 20 37 feet) 38 c) Posts without bends 39 d) Backing without holes CITY OF FORT WORTH Park Improvements at Tem Northside,High Crest,and Sununerfietds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 312500-8 EROSION AND SEDIMENT CONTROL Page 8 of 8 1 3.5 REPAIR/RESTORATION [NOT USED] 2 3.6 RE-INSTALLATION [NOT USED] 3 3.7 FIELD [ox] SITE QUALITY CONTROL [NOT USED] 4 3.8 SYSTEM STARTUP [NOT USED] 5 3.9 ADJUSTING [NOT USED] 6 3.10 CLEANING 7 A. Waste Management 8 1. Remove sediment, debris and litter as needed. 9 3.11 CLOSEOUT ACTIVITIES 10 A. Erosion control measures remain in place and are maintained until all soil disturbing 11 activities at the project site have been completed. 12 B. Establish a uniform vegetative cover with a density of 70 percent on all unpaved areas, 13 on areas not covered by permanent structures, or in areas where permanent erosion 14 control measures(i.e. riprap, gabions, or geotextiles)have been employed. 15 3.12 PROTECTION [NOT USED] 16 3.13 MAINTENANCE 17 A. Install and maintain the integrity of temporary erosion and sedimentation control 18 devices to accumulate silt and debris until earthwork construction and permanent 19 erosion control features are in place or the disturbed area has been adequately stabilized 20 as determined by the Engineer. 21 B. If a device ceases to function as intended,repair or replace the device or portions 22 thereof as necessary. 23 C. Perform inspections of the construction site as prescribed in the Construction General 24 Permit TXR150000. 25 D. Records of inspections and modifications based on the results of inspections must be 26 maintained and available in accordance with the permit. 27 3.14 ATTACHMENTS [NOT USED] 28 END OF SECTION 29 Revision Log DATE NAME SUMMARY OF CHANGE 30 CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265-02266 Revised December 20,2012 321313- I CONCRETE PAVING Page] of 21 1 SECTION 32 13 13 2 CONCRETE PAVING 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section includes: 6 1. Finished pavement constructed of portland cement concrete including 7 monolithically poured curb on the prepared subgrade or other base course. 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include, but are not necessarily limited to: 11 1. Division 0-Bidding Requirements, Contract Forms,and Conditions of the Contract 12 2. Division I -General Requirements 13 3. Section 32 13 73 -Concrete Paving Joint Sealants 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement 16 1. Measurement 17 a. Measurement for this Item shall be by the square yard of completed and 18 accepted Concrete Pavement in its final position as measured from back of curb 19 for various: 20 1) Classes 21 2) Thicknesses 22 2. Payment 23 a. The work performed and materials furnished in accordance with this Item will 24 be paid for at the unit price bid per square yard of Concrete Pavement. 25 3. The price bid shall include: 26 a. Shaping and fine grading the placement area 27 b. Furnishing and applying all water required 28 c. Furnishing, loading and unloading, storing, hauling and handling all concrete 29 ingredients including all freight and royalty involved 30 d. Mixing,placing, finishing and curing all concrete 31 e. Furnishing and installing all reinforcing steel 32 f. Furnishing all materials and placing longitudinal,warping, expansion, and 33 contraction joints, including all steel dowels, dowel caps and load transmission 34 units required,wire and devices for placing, holding and supporting the steel 35 bar, load transmission units, and joint filler material in the proper position; for 36 coating steel bars where required by the Drawings 37 g. Sealing joints 38 h. Monolithically poured curb 39 i. Cleanup CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest.and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265.02266 Revised December 20,2012 32 13 13-2 CONCRETE PAVING Page 2 of 21 1 1.3 REFERENCES 2 A. Reference Standards 3 1. Reference standards cited in this specification refer to the current reference standard 4 published at the time of the latest revision date logged at the end of this 5 specification, unless a date is specifically cited. 6 2. ASTM International (ASTM): 7 a. A615/A615M, Deformed and Plain Billet-Steel Bars for Concrete 8 Reinforcement 9 b. C31, Standard Practice for Making and Curing Concrete Test Specimens in the 10 Field 11 c. C33,Concrete Aggregates 12 d. C39, Standard Test Method for Compressive Strength of Cylindrical Concrete 13 Specimens 14 e. C42, Standard Test Method for Obtaining and Testing Drilled Cores and Sawed 15 Beams of Concrete 16 f. C94/C94M, Standard Specifications for Ready-Mixed Concrete 17 g. C150,Portland Cement 18 h. C156,Water Retention by Concrete Curing Materials 19 i. C172, Standard Practice for Sampling Freshly Mixed Concrete 20 j. C260,Air Entraining Admixtures for Concrete 21 k. C309,Liquid Membrane-Forming Compounds for Curing Concrete,Type 2 22 1. C494, Chemical Admixtures for Concrete, Types "A", "D", "F"and"G" 23 m. C618,Coal Fly Ash and Raw or Calcined Natural Pozzolan for use as a Mineral 24 Admixture in Concrete 25 n. C881, Standard Specification for Epoxy-Resin-Base Bonding Systems for 26 Concrete 27 o. C1064, Standard Test Method for Temperature of Freshly Mixed Hydraulic- 28 Cement Concrete 29 p. C1602, Standard Specification for Mixing Water Used in the Production of 30 Hydraulic Cement Concrete. 31 q. D698, Laboratory Compaction Characteristics of Soil Using Standard Effort 32 (12,400 ft-lbf/ft3) 33 3. American Concrete Institute(ACI): 34 a. ACI 305.1-06 Specification for Hot Weather Concreting 35 b. ACI 306.1-90, Standard Specification for Cold Weather Concreting 36 c. ACI 318 37 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 38 1.5 SUBMITTALS [NOT USED] 39 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS 40 A. Mix Design: submit for approval. See Item 2A.A. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summer8elds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20.2012 32 13 13-3 CONCRETE PAVING Page 3 of 21 1 1.7 CLOSEOUT SUBMITTALS [NOT USED] 2 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 3 1.9 QUALITY ASSURANCE [NOT USED] 4 1.10 DELIVERY, STORAGE,AND HANDLING [NOT USED] 5 1.11 FIELD CONDITIONS 6 A. Weather Conditions 7 1. Place concrete when concrete temperature is between 40 and 100 degrees when 8 measured in accordance with ASTM C 1064 at point of placement. 9 2. Hot Weather Concreting 10 a. Take immediate corrective action or cease paving when the ambient 11 temperature exceeds 95 degrees. 12 b. Concrete paving operations shall be approved by the City when the concrete 13 temperature exceeds 100 degrees. See Standard Specification for Hot Weather 14 Concreting(ACI 305.1-06). 15 3. Cold Weather Concreting 16 a. Do not place when ambient temp in shade is below 40 degrees and falling. 17 Concrete may be placed when ambient temp is above 35 degrees and rising or 18 above 40 degrees. 19 b. Concrete paving operations shall be approved by the City when ambient 20 temperature is below 40 degrees. See Standard Specification for Cold Weather 21 Concreting(ACI 306.1-90). 22 B. Time: Place concrete after sunrise and no later than shall permit the finishing of the 23 pavement in natural light, or as directed by the City. 24 1.12 WARRANTY [NOT USED] 25 PART 2- PRODUCTS 26 2.1 OWNER-FURNISHED PRODUCTS [NOT USED] 27 2.2 MATERIALS 28 A. Cementitious Material: ASTM C 150. 29 B. Aggregates: ASTM C33. 30 C. Water: ASTM C1602. 31 D. Admixtures: When admixtures are used, conform to the appropriate specification: 32 1. Air-Entraining Admixtures for Concrete:ASTM C260. 33 2. Chemical Admixtures for Concrete: ASTM C494, Types"A", "D", "F"and"G." 34 3. Fly Ash 35 a. Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in Concrete: 36 ASTM C618. 37 b. Fly ash may be substituted at one pound per pound of cement up to 25%of the 38 specified cement content when Such batch design is approved by the Engineer. CITY OF FORT WORTH Park Improvements at Terr).Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 32 13 13-4 CONCRETE PAVING Page 4 of 21 I E. Steel Reinforcement: ASTM A615. 2 F. Steel Wire Reinforcement: Not used for concrete pavement. 3 G. Dowels and Tie Bars 4 1. Dowel and tie bars: ASTM A615. 5 2. Dowel Caps 6 a. Provide dowel caps with enough range of movement to allow complete closure 7 of the expansion joint. 8 b. Caps for dowel bars shall be of the length shown on the Drawings and shall 9 have an internal diameter sufficient to permit the cap to freely slip over the bar. 10 c. In no case shall the internal diameter exceed the bar diameter by more 1/8 inch, 11 and one end of the cap shall be rightly closed. 12 3. Epoxy for Dowel and Tie Bars: ASTM C881. 13 a. See following table for approved producers of epoxies and adhesives 14 Pre-Qualified Producers of Epoxies and Adhesives Product Name Producer Concresive 1420 BASF HTE-50 Hilti T 308+ Powers Fasteners P E 1000+ Powers Fasteners C-6 Ramset-Redhead Epcon G-5 Ramset-Redhead Pro-foxy-300 Fast Tube Unitex Shep-foxy TxIII CMC Construction Services Ultrabond 1300 Tubes Adhesives Technology Ultrabone 2300 N.S.A-22-2300 Adhesives Technology Slow Set Dynapoxy EP-430 Pecora Corp. EDOT Simpson Strong Tie ET22 Simpson Strong Tie SET 22 Simpson Strong Tie SpecPoxy 3000FS SpecChem 15 16 b. Epoxy Use, Storage and Handling 17 1) Package components in airtight containers and protect from light and 18 moisture. 19 2) Include detailed instructions for the application of the material and all 20 safety information and warnings regarding contact with the components. 21 3) Epoxy label requirements 22 a) Resin or hardener components 23 b) Brand name 24 c) Name of manufacturer CITY OF FORT WORTH Park Improvements at Terry,Northside.High Crest.and Su nmerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20.2012 32 13 13-5 CONCRETE PAVING Page 5 of 21 1 d) Lot or batch number 2 e) Temperature range for storage 3 f) Date of manufacture 4 g) Expiration date 5 h) Quantity contained 6 4) Store epoxy and adhesive components at temperatures recommended by the 7 manufacturer. 8 5) Do not use damaged or previously opened containers and any material that 9 shows evidence of crystallization, lumps skinning, extreme thickening, or 10 settling of pigments that cannot be readily dispersed with normal agitation. 11 6) Follow sound environmental practices when disposing of epoxy and 12 adhesive wastes. 13 7) Dispose of all empty containers separately. 14 8) Dispose of epoxy by completely emptying and mixing the epoxy before 15 disposal 16 H. Reinforcement Bar Chairs 17 1. Reinforcement bar chairs or supports shall be of adequate strength to support the 18 reinforcement bars and shall not bend or break under the weight of the 19 reinforcement bars or Contractor's personnel walking on the reinforcing bars. 20 2. Bar chairs may be made of metal (free of rust),precast mortar or concrete blocks or 21 plastic. 22 3. For approval of plastic chairs, representative samples of the plastic shall show no 23 visible indications of deterioration after immersion in a 5-percent solution of 24 sodium hydroxide for 120-hours. 25 4. Bar chairs may be rejected for failure to meet any of the requirements of this 26 specification. 27 I. Joint Filler 28 1. Joint filler is the material placed in concrete pavement and concrete structures to 29 allow for the expansion and contraction of the concrete. 30 2. Wood Boards: Used as joint filler for concrete paving. 31 a. Boards for expansion joint filler shall be of the required size, shape and type 32 indicated on the Drawings or required in the specifications. 33 1) Boards shall be of selected stock of redwood or cypress. The boards shall 34 be sound heartwood and shall be free from sapwood, knots, clustered 35 birdseyes, checks and splits. 36 2) Joint filler,boards, shall be smooth,flat and straight throughout, and shall 37 be sufficiently rigid to permit ease of installation. 38 3) Boards shall be furnished in lengths equal to the width between 39 longitudinal joints, and may be furnished in strips or scored sheet of the 40 required shape. 41 3. Dimensions.The thickness of the expansion joint filler shall be shown on the 42 Drawings;the width shall be not less than that shown on the Drawings, providing 43 for the top seal space. 44 4. Rejection. Expansion joint filler may be rejected for failure to meet any of the 45 requirements of this specification. 46 J. Joint Sealants. Provide Joint Sealants in accordance with Section 32 13 73. CITY OF FORT WORTH Park Improvements at Terry,Northside.High Crest,and Sutnmerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 32 13 13-6 CONCRETE PAVING Page 6 of 21 1 K. Curing Materials 2 1. Membrane-Forming Compounds. 3 a. Conform to the requirements of ASTM C309,Type 2,white pigmented 4 compound and be of such nature that it shall not produce permanent 5 discoloration of concrete surfaces nor react deleteriously with the concrete. 6 b. The compound shall produce a firm, continuous uniform moisture-impermeable 7 film free from pinholes and shall adhere satisfactorily to the surfaces of damp 8 concrete. 9 c. It shall,when applied to the damp concrete surface at the specified rate of 10 coverage, dry to touch in 1 hour and dry through in not more than 4 hours under 11 normal conditions suitable for concrete operations. 12 d. It shall adhere in a tenacious film without running off or appreciably sagging. 13 e. It shall not disintegrate, check,peel or crack during the required curing period. 14 f. The compound shall not peel or pick up under traffic and shall disappear from 15 the surface of the concrete by gradual disintegration. 16 g. The compound shall be delivered to the job site in the manufacturer's original 17 containers only,which shall be clearly labeled with the manufacturer's name, 18 the trade name of the material and a batch number or symbol with which test 19 samples may be correlated. 20 h. When tested in accordance with ASTM C156 Water Retention by Concrete 21 Curing Materials,the liquid membrane-forming compound shall restrict the loss 22 of water present in the test specimen at the time of application of the curing 23 compound to not more than 0.01-oz.-per-2 inches of surface. 24 2.3 ACCESSORIES [NOT USED] 25 2.4 SOURCE QUALITY CONTROL 26 A. Mix Design 27 1. Concrete Mix Design and Control 28 a. At least 10 calendar days prior to the start of concrete paving operations,the 29 Contractor shall submit a design of the concrete mix it proposes to use and a 30 full description of the source of supply of each material component. 31 b. The design of the concrete mix shall produce a quality concrete complying with 32 these specifications and shall include the following information: 33 1) Design Requirements and Design Summary 34 2) Material source 35 3) Dry weight of cement/cubic yard and type 36 4) Dry weight of fly ash/cubic yard and type, if used 37 5) Saturated surface dry weight of fine and coarse aggregates/cubic yard 38 6) Design water/cubic yard 39 7) Quantities,type, and name of admixtures with manufacturer's data sheets 40 8) Current strength tests or strength tests in accordance with ACI 318 41 9) Current Sieve Analysis and-200 Decantation of fine and coarse aggregates 42 and date of tests 43 10) Fineness modulus of fine aggregate 44 11) Specific Gravity and Absorption Values of fine and coarse aggregates 45 12) L.A.Abrasion of coarse aggregates 46 c. Once mix design approved by City, maintain intent of mix design and 47 maximum water to cement ratio. CITY OF FORT WORTH Park Improvements at Tetry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 32 13 13-7 CONCRETE PAVING Page 7 of 21 I d. No concrete may be placed on the job site until the mix design has been 2 approved by the City. 3 2. Quality of Concrete 4 a. Consistency 5 1) In general,the consistency of concrete mixtures shall be such that: 6 a) Mortar shall cling to the coarse aggregate 7 b) Aggregate shall not segregate in concrete when it is transported to the 8 place of deposit 9 c) Concrete, when dropped directly from the discharge chute of the mixer, 10 shall flatten out at the center of the pile, but the edges of the pile shall 11 stand and not flow 12 d) Concrete and mortar shall show no free water when removed from the 13 mixer 14 e) Concrete shall slide and not flow into place when transported in metal 15 chutes at an angle of 30 degrees with the horizontal 16 f) Surface of the finished concrete shall be free from a surface film or 17 laitance 18 2) When field conditions are such that additional moisture is needed for the 19 final concrete surface finishing operation,the required water shall be 20 applied to the surface by hand sprayer only and be held to a minimum 21 amount. 22 3) The concrete shall be workable,cohesive,possess satisfactory finishing 23 qualities and be of the stiffest consistency that can be placed and vibrated 24 into a homogeneous mass. 25 4) Excessive bleeding shall be avoided. 26 5) If the strength or consistency required for the class of concrete being 27 produced is not secured with the minimum cement specified or without 28 exceeding the maximum water/cement ratio,the Contractor may use, or the 29 City may require, an approved cement dispersing agent(water reducer); or 30 the Contractor shall furnish additional aggregates, or aggregates with 31 different characteristics,or the Contractor may use additional cement in 32 order to produce the required results. 33 6) The additional cement may be permitted as a temporary measure, until 34 aggregates are changed and designs checked with the different aggregates 35 or cement dispersing agent. 36 7) The Contractor is solely responsible for the quality of the concrete 37 produced. 38 8) The City reserves the right to independently verify the quality of the 39 concrete through inspection of the batch plant,testing of the various 40 materials used in the concrete and by casting and testing concrete cylinders 41 or beams on the concrete actually incorporated in the pavement. 42 b. Standard Class 43 1) Unless otherwise shown on the Drawings or detailed specifications,the 44 standard class for concrete paving for streets and alleys is shown in the 45 following table: 46 CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 32 13 13-8 CONCRETE PAVING Page 8 of 21 1 Standard Classes of Pavement Concrete Class of Minimum 28 Day Min. Maximum Course Concrete' Cementitious, Compressive, Water/ Aggregate Lb./CY Strength' Cementitious, Maximum psi Ratio Size inch P 517 3600 0.49 1-1/2 H 564 4500 0.45 1-1/2 2 1.All exposed horizontal concrete shall have entrained-air. 3 2.Minimum Compressive Strength Required. 4 5 2) Machine-Laid concrete: Class P 6 3) Hand-Laid concrete: Class H 7 c. High Early Strength Concrete(HES) 8 1) When shown on the Drawings or allowed,provide Class HES concrete for 9 very early opening of pavements area or leaveouts to traffic. 10 2) Design class HES to meet the requirements of class specified for concrete 11 pavement and a minimum compressive strength of 2,600 psi in 24 hours, 12 unless other early strength and time requirements are shown on the 13 Drawings allowed. 14 3) No strength overdesign is required. 15 16 Standard Classes of Pavement Concrete Class of Minimum 28 Day Min. Maximum Course Concrete' Cementitious Compressive Water/ Aggregate Lb./CY Strength' Cementitious Maximum psi Ratio Size, inch HES 564 4500 0.45 1-1/2 17 18 d. Slump 19 1) Slump requirements for pavement and related concrete shall be as specified 20 in the following table: 21 22 Concrete Pavement Slump Requirements Concrete Use Recommended Maximum Design Acceptable and Placement Placement Slump, Slump, inch inch Slip-Form/Form-Riding Paving 1-1/2 3 Hand Formed Paving 4 5 Sidewalk, Curb and Gutter, Concrete 4 5 Valley Gutter and Other Miscellaneous Concrete 23 24 2) No concrete shall be permitted with slump in excess of the maximums 25 shown. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20.2012 32 13 13-9 CONCRETE PAVING Page 9 of21 l 3) Any concrete mix failing to meet the above consistency requirements, 2 although meeting the slump requirements, shall be considered 3 unsatisfactory, and the mix shall be changed to correct such unsatisfactory 4 conditions. 5 PART 3- EXECUTION 6 3.1 INSTALLERS [NOT USED] 7 3.2 EXAMINATION [NOT USED] 8 3.3 PREPARATION [NOT USED] 9 3.4 INSTALLATION 10 A. Equipment 11 1. All equipment necessary for the construction of this item shall be on the project. 12 2. The equipment shall include spreading devices(augers), internal vibration, 13 tamping, and surface floating necessary to finish the freshly placed concrete in such 14 a manner as to provide a dense and homogeneous pavement. 15 3. Machine-Laid Concrete Pavement 16 a. Fixed-Form Paver. Fixed-form paving equipment shall be provided with forms 17 that are uniformly supported on a very firm subbase to prevent sagging under 18 the weight of machine. 19 b. Slip-Form Paver 20 1) Slip-form paving equipment shall be provided with traveling side forms of 21 sufficient dimensions, shape and strength so as to support the concrete 22 laterally for a sufficient length of time during placement. 23 2) City may reject use of Slip-Form Paver if paver requires over-digging and 24 impacts trees,mailboxes or other improvements. 25 4. Hand-Laid Concrete Pavement 26 a. Machines that do not incorporate these features, such as roller screeds or 27 vibrating screeds, shall be considered tools to be used in hand-laid concrete 28 construction, as slumps, spreading methods,vibration,and other procedures are 29 more common to hand methods than to machine methods. 30 5. City may reject equipment and stop operation if equipment does not meet 31 requirements. 32 B. Concrete Mixing and Delivery 33 1. Transit Batching: shall not be used—onsite mixing not permitted 34 2. Ready Mixed Concrete 35 a. The concrete shall be produced in an approved method conforming to the 36 requirements of this specification and ASTM C94/C94M. City shall have access 37 ready mix to get samples of materials. 38 b. City shall have access to ready mix plant to obtain material samples. 39 c. When ready-mix concrete is used,sample concrete per ASTM C94 Alternate 40 Procedure 2: 41 1) As the mixer is being emptied, individual samples shall be taken after the 42 discharge of approximately 15 percent and 85 percent of the load. CITY OF FORT WORTH Park Improvements at Terry.Northside,High Crest.and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.02264,02265,02266 Revised December 20,2012 32 13 13-10 CONCRETE PAVING Page 10 of 21 1 2) The method of sampling shall provide that the samples are representative of 2 widely separated portions, but not from the very ends of the batch. 3 d. The mixing of each batch, after all materials are in the drum, shall continue until 4 it produces a thoroughly mixed concrete of uniform mass as determined by 5 established mixer performance ratings and inspection,or appropriate uniformity 6 tests as described in ASTM C94. 7 e. The entire contents of the drum shall be discharged before any materials are 8 placed therein for the succeeding batch. 9 f. Retempering or remixing shall not be permitted. 10 3. Delivery 11 a. Deliver concrete at an interval not exceeding 30 minutes or as determined by 12 City to prevent cold joint. 13 4. Delivery Tickets 14 a. For all operations,the manufacturer of the concrete shall,before unloading, 15 furnish to the purchaser with each batch of concrete at the site a delivery ticket 16 on which is printed, stamped, or written,the following information to determine 17 that the concrete was proportioned in accordance with the approved mix design: 18 1) Name of concrete supplier 19 2) Serial number of ticket 20 3) Date 21 4) Truck number 22 5) Name of purchaser 23 6) Specific designation of job(name and location) 24 7) Specific class, design identification and designation of the concrete in 25 conformance with that employed in job specifications 26 8) Amount of concrete in cubic yards 27 9) Time loaded or of first mixing of cement and aggregates 28 10) Water added by receiver of concrete 29 11) Type and amount of admixtures 30 C. Subgrade 31 1. When manipulation or treatment of subgrade is required on the Drawings,the work 32 shall be performed in proper sequence with the preparation of the subgrade for 33 pavement. 34 2. The roadbed shall be excavated and shaped in conformity with the typical sections 35 and to the lines and grades shown on the Drawings or established by the City. 36 3. All holes,ruts and depressions shall be filled and compacted with suitable material 37 and, if required,the subgrade shall be thoroughly wetted and reshaped. 38 4. Irregularities of more than 1/2 inch.,as shown by straightedge or template, shall be 39 corrected. 40 5. The subgrade shall be uniformly compacted to at least 95 percent of the maximum 41 density as determined by ASTM D698. 42 6. Moisture content shall be within minus 2 percent to plus 4 percent of optimum. 43 7. The prepared subgrade shall be wetted down sufficiently in advance of placing the 44 pavement to ensure its being in a firm and moist condition. 45 8. Sufficient subgrade shall be prepared in advance to ensure satisfactory prosecution 46 of the work. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest.and SurmnerSelds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20.2012 321313- I1 CONCRETE PAVING Page 1 I of 21 1 9. The Contractor shall notify the City at least 24 hours in advance of its intention to 2 place concrete pavement. 3 10. After the specified moisture and density are achieved,the Contractor shall maintain 4 the subgrade moisture and density in accordance with this Section. 5 11. In the event that rain or other conditions may have adversely affected the condition 6 of the subgrade or base, additional tests may be required as directed by the City. 7 D. Placing and Removing Forms 8 1. Placing Forms 9 a. Forms for machine-laid concrete 10 1) The side forms shall be metal, of approved cross section and bracing,of a 11 height no less than the prescribed edge thickness of the concrete section, 12 and a minimum of 10 feet in length for each individual form. 13 2) Forms shall be of ample strength and staked with adequate number of pins 14 capable of resisting the pressure of concrete placed against them and the 15 thrust and the vibration of the construction equipment operating upon them 16 without appreciable springing, settling or deflection. 17 3) The forms shall be free from warps,bends or kinks and shall show no 18 variation from the true plane for face or top. 19 4) Forms shall be jointed neatly and tightly and set with exactness to the 20 established grade and alignment. 21 5) Forms shall be set to line and grade at least 200 feet,where practicable, in 22 advance of the paving operations. 23 6) In no case shall the base width be less than 8 inches for a form 8 inches or 24 more in height. 25 7) Forms must be in firm contact with the subgrade throughout their length 26 and base width. 27 8) If the subgrade becomes unstable, forms shall be reset,using heavy stakes 28 or other additional supports may be necessary to provide the required 29 stability. 30 b. Forms for hand-laid concrete 31 l) Forms shall extend the full depth of concrete and be a minimum of 1-1/2 32 inches in thickness or equivalent when wooden forms are used, or be of a 33 gauge that shall provide equivalent rigidity and strength when metal forms 34 are used. 35 2) For curves with a radius of less than 250 feet, acceptable flexible metal or 36 wood forms shall be used. 37 3) All forms showing a deviation of 1/8 inch in 10 feet from a straight line 38 shall be rejected. 39 2. Settling. When forms settle over 1/8 inch under finishing operations, paving 40 operations shall be stopped the forms reset to line and grade and the pavement then 41 brought to the required section and thickness. 42 3. Cleaning. Forms shall be thoroughly cleaned after each use. 43 4. Removal. 44 a. Forms shall remain in place until the concrete has taken its final set. 45 b. Avoid damage to the edge of the pavement when removing forms. 46 c. Repair damage resulting from form removal and honeycombed areas with a 47 mortar mix within 24 hours after form removal unless otherwise approved. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest.and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20.2012 32 13 13- 12 CONCRETE PAVING Page 12 of2l I d. Clean joint face and repair honeycombed or damaged areas within 24 hours 2 after a bulkhead for a transverse construction joint has been removed unless 3 otherwise approved. 4 e. When forms are removed before 72 hours after concrete placement, promptly 5 apply membrane curing compound to the edge of the concrete pavement. 6 E. Placing Reinforcing Steel,Tie, and Dowel Bars 7 1. General 8 a. When reinforcing steel tie bars, dowels, etc., are required they shall be placed 9 as shown on the Drawings. 10 b. All reinforcing steel shall be clean,free from rust in the form of loose or 11 objectionable scale,and of the type, size and dimensions shown on the 12 Drawings. 13 c. Reinforcing bars shall be securely wired together at the alternate intersections 14 and all splices and shall be securely wired at each intersection dowel and load- 15 transmission unit intersected. 16 d. All bars shall be installed in their required position as shown on the Drawings. 17 e. The storing of reinforcing or structural steel on completed roadway slabs 18 generally shall be avoided and,where permitted, such storage shall be limited 19 to quantities and distribution that shall not induce excessive stresses. 20 2. Splices 21 a. Provide standard reinforcement splices by lapping and tying ends. 22 b. Comply with ACI 318 for minimum lap of spliced bars where not specified on 23 the Drawings. 24 3. Installation of Reinforcing Steel 25 a. All reinforcing bars and bar mats shall be installed in the slab at the required 26 depth below the finished surface and supported by and securely attached to bar 27 chairs installed on prescribed longitudinal and transverse centers as shown by 28 sectional and detailed drawings on the Drawings. 29 b. Chairs Assembly. The chair assembly shall be similar and equal to that shown 30 on the Drawings and shall be approved by the City prior to extensive 31 fabrication. 32 c. After the reinforcing steel is securely installed above the subgrade as specified 33 in Drawings and as herein prescribed,no loading shall be imposed upon the 34 bar mats or individual bars before or during the placing or finishing of the 35 concrete. 36 4. Installation of Dowel Bars 37 a. Install through the predrilled joint filler and rigidly support in true horizontal 38 and vertical positions by an assembly of bar chairs and dowel baskets. 39 b. Dowel Baskets 40 1) The dowels shall be held in position exactly parallel to surface and 41 centerline of the slab,by a dowel basket that is left in the pavement. 42 2) The dowel basket shall hold each dowel in exactly the correct position so 43 firmly that the dowel's position cannot be altered by concreting operations. 44 c. Dowel Caps 45 1) Install cap to allow the bar to move not less than 1-1/4 inch in either 46 direction. 47 5. Tie Bar and Dowel Placement 48 a. Place at mid-depth of the pavement slab, parallel to the surface. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest.and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.02264,02265,02266 Revised December 20,2012 32 13 13-13 CONCRETE PAVING Page 13 of 21 I b. Place as shown on the Drawings. 2 6. Epoxy for Tie and Dowel Bar Installation 3 1) Epoxy bars as shown on the Drawings. 4 2) Use only drilling operations that do not damage the surrounding operations. 5 3) Blow out drilled holes with compressed air. 6 4) Completely fill the drilled hole with approved epoxy before inserting the tie 7 bar into the hole. 8 5) Install epoxy grout and bar at least 6 inches embedded into concrete. 9 F. Joints 10 1. Joints shall be placed where shown on the Drawings or where directed by the City. 11 2. The plane of all joints shall make a right angle with the surface of the pavement. 12 3. No joints shall have an error in alignment of more than 1/2 inch at any point. 13 4. Joint Dimensions 14 a. The width of the joint shall be shown on the Drawings, creating the joint 15 sealant reservoir. 16 b. The depth of the joint shall be shown on the Drawings. 17 c. Dimensions of the sealant reservoir shall be in accordance with manufacturer's 18 recommendations. 19 d. After curing,the joint sealant shall be 1/8 inch to 1/4 inch below the pavement 20 surface at the center of the joint. 21 5. Transverse Expansion Joints 22 a. Expansion joints shall be installed perpendicularly to the surface and to the 23 centerline of the pavement at the locations shown on the Drawings, or as 24 approved by the City. 25 b. Joints shall be of the design width, and spacing shown on the Drawings, or as 26 approved by the City. 27 c. Dowel bars,shall be of the size and type shown on the Drawings, or as 28 approved by the City, and shall be installed at the specified spacing. 29 d. Support dowel bars with dowel baskets. 30 e. Dowels shall restrict the free opening and closing of the expansion join and 31 shall not make planes of weaknesses in the pavement. 32 f. Greased Dowels for Expansion Joints. 33 1) Coat dowels with a thin film of grease or other approved de-bonding 34 material. 35 2) Provide dowel caps on the lubricated end of each dowel bar. 36 g. Proximity to Existing Structures. When the pavement is adjacent to or around 37 existing structures, expansions joints shall be constructed in accordance with 38 the details shown on the Drawings. 39 6. Transverse Contraction Joints 40 a. Contraction or dummy joints shall be installed at the locations and at the 41 intervals shown on the Drawings. 42 b. Joints shall be of the design width,and spacing shown on the Drawings, or as 43 approved by the City. 44 c. Dowel bars,shall be of the size and type shown on the Drawings, or as 45 approved by the City, and shall be installed at the specified spacing. 46 d. Joints shall be sawed into the completed pavement surface as soon after initial 47 concrete set as possible so that some raveling of the concrete is observed in 48 order for the sawing process to prevent uncontrolled shrinkage cracking. CITY OF FORT WORTH Park Improvements at Teny,Northside,High Crest,and Sununer8elds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263-02264,02265,02266 Revised December 20,2012 32 13 13-14 CONCRETE PAVING Page 14 of 21 I e. The joints shall be constructed by sawing to a 1/4 inch width and to a depth of 2 1/3 inch(1/4 inch permitted if limestone aggregate used) of the actual 3 pavement thickness, or deeper if so indicated on the Drawings. 4 f. Complete sawing as soon as possible in hot weather conditions and within a 5 maximum of 24 hours after saw cutting begins under cool weather conditions. 6 g. If sharp edge joints are being obtained,the sawing process shall be sped up to 7 the point where some raveling is observed. 8 h. Damage by blade action to the slab surface and to the concrete immediately 9 adjacent to the joint shall be minimized. 10 i. Any portion of the curing membrane which has been disturbed by sawing 11 operations shall be restored by spraying the areas with additional curing 12 compound. 13 7. Transverse Construction Joints 14 a. Construction joints formed at the close of each day's work or when the placing 15 of concrete has been stopped for 30-minutes or longer shall be constructed by 16 use of metal or wooden bulkheads cut true to the section of the finished 17 pavement and cleaned. 18 b. Wooden bulkheads shall have a thickness of not less than 2-inch stock material. 19 c. Longitudinal bars shall be held securely in place in a plane perpendicular to the 20 surface and at right angles to the centerline of the pavement. 21 d. Edges shall be rounded to 1/4 inch radius. 22 e. Any surplus concrete on the subgrade shall be removed upon the resumption of 23 the work. 24 8. Longitudinal Construction Joints 25 a. Longitudinal construction joints shall be of the type shown on the Drawings. 26 9. Joint Filler 27 a. Joint filler shall be as specified in 2.2.I of the size and shape shown on the 28 Drawings. 29 b. Redwood Board joints shall be used for all pavement joints except for 30 expansion joints that are coincident with a butt joint against existing 31 pavements. 32 c. Boards with less than 25-percent of moisture at the time of installation shall be 33 thoroughly wetted on the job. 34 d. Green lumber of much higher moisture content is desirable and acceptable. 35 e. The joint filler shall be appropriately drilled to admit the dowel bars when 36 required. 37 f. The bottom edge of the filler shall extend to or slightly below the bottom of the 38 slab. The top edge shall be held approximately 1/2 inch below the finished 39 surface of the pavement in order to allow the finishing operations to be 40 continuous. 41 g. The joint filler may be composed of more than one length of board in the 42 length of joint,but no board of a length less than 6 foot may be used unless 43 otherwise shown on the Drawings. 44 h. After the removal of the side forms,the ends of the joints at the edges of the 45 slab shall be carefully opened for the entire depth of the slab. 46 10. Joint Sealing. Routine pavement joints shall be filled consistent with paving details 47 and as specified in Section 32 13 73. Materials shall generally be handled and 48 applied according to the manufacturer's recommendations as specified in Section 49 32 13 73. CITY OF FORT WORTH Park Improvements at Terry,Nor[hside.High Crest.and Summer6elds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20.2012 32 13 13-15 CONCRETE PAVING Page 15 of21 1 G. Placing Concrete 2 1. Unless otherwise specified in the Drawings, the finished pavement shall be 3 constructed monolithically and constructed by machined laid method unless 4 impractical. 5 2. The concrete shall be rapidly deposited on the subgrade in successive batches and 6 shall be distributed to the required depth and for the entire width of the pavement 7 by shoveling or other approved methods. 8 3. Any concrete not placed as herein prescribed within the time limits in the following 9 table will be rejected. Time begins when the water is added to the mixer. 10 Temperature—Time Requirements Concrete Temperature Max Time—minutes Max Time—minutes (at point of placement) (no retarding agent) (with retarding agent)' Non-A itated Concrete All temperatures 45 45 Agitated Concrete Above 90°F Time may be reduced by 75 City Above 75°F thru 90°F 60 90 75°F and Below 60 120 11 1 Normal dosage ofretarder. 12 13 4. Rakes shall not be used in handling concrete. 14 5. At the end of the day, or in case of unavoidable interruption or delay of more than 15 30 minutes or longer to prevent cold joints, a transverse construction joint shall be 16 placed in accordance with 3.4.F.7 of this Section. 17 6. Honeycombing 18 a. Special care shall be taken in placing and spading the concrete against the 19 forms and at all joints and assemblies so as to prevent honeycombing. 20 b. Excessive voids and honeycombing in the edge of the pavement,revealed by 21 the removal of the side forms, may be cause for rejection of the section of slab 22 in which the defect occurs. 23 H. Finishing 24 1. Machine 25 a. Tolerance Limits 26 1) While the concrete is still workable, it shall be tested for irregularities with 27 a 10 foot straightedge placed parallel to the centerline of the pavement so as 28 to bridge depressions and to touch all high spots. 29 2) Ordinates measured from the face of the straightedge to the surface of the 30 pavement shall at no place exceed 1/16 inch-per-foot fi•om the nearest point 31 of contact. 32 3) In no case shall the maximum ordinate to a 10 foot straightedge be greater 33 than 1/8 inch. CITY OF FORT WORTH Park Improvements at Terq,Northside.High Crest.and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 32 13 13-16 CONCRETE PAVING Page 16 of 21 1 4) Any surface not within the tolerance limits shall be reworked and 2 refinished. 3 b. Edging 4 1) The edges of slabs and all joints requiring edging shall be carefully tooled 5 with an edger of the radius required by the Drawings at the time the 6 concrete begins to take its"set"and becomes non-workable. 7 2) All such work shall be left smooth and true to lines. 8 2. Hand 9 a. Hand finishing permitted only in intersections and areas inaccessible to a 10 finishing machine. 11 b. When the hand method of striking off and consolidating is permitted,the 12 concrete, as soon as placed,shall be approximately leveled and then struck off 13 with screed bar to such elevation above grade that,when consolidated and 14 finished,the surface of the pavement shall be at the grade elevation shown on 15 the Drawings. 16 c. A slight excess of material shall be kept in front of the cutting edge at all times. 17 d. The straightedge and joint finishing shall be as prescribed herein. 18 I. Curing 19 1. The curing of concrete pavement shall be thorough and continuous throughout the 20 entire curing period. 21 2. Failure to provide proper curing as herein prescribed shall be considered as 22 sufficient cause for immediate suspension of the paving operations. 23 3. The curing method as herein specified does not preclude the use of any of the other 24 commonly used methods of curing, and the City may approve another method of 25 curing if so requested by the Contractor. 26 4. If any selected method of curing does not afford the desired results,the City shall 27 have the right to order that another method of curing be instituted. 28 5. After removal of the side forms,the sides of the slab shall receive a like coating 29 before earth is banked against them. 30 6. The solution shall be applied,under pressure with a spray nozzle, in such a manner 31 as to cover the entire surfaces thoroughly and completely with a uniform film. 32 7. The rate of application shall be such as to ensure complete coverage and shall not 33 exceed 20-square-yards-per-gallon of curing compound. 34 8. When thoroughly dry, it shall provide a continuous and flexible membrane, free 35 from cracks or pinholes, and shall not disintegrate, check,peel or crack during the 36 curing period. 37 9. If for any reason the seal is broken during the curing period, it shall be immediately 38 repaired with additional sealing solution. 39 10. When tested in accordance with ASTM C156 Water Retention by Concrete Curing 40 Materials,the curing compound shall provide a film which shall have retained 41 within the test specimen a percentage of the moisture present in the specimen when 42 the curing compound was applied according to the following. 43 11. Contractor shall maintain and properly repair damage to curing materials on 44 exposed surfaces of concrete pavement continuously for a least 72 hours. 45 J. Monolithic Curbs CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20.2012 32 13 13-17 CONCRETE PAVING Page 17 of 21 1 1. Concrete for monolithic curb shall be the same as for the pavement and, if carried 2 back from the paving mixer,shall be placed within 20-minutes after being mixed. 3 2. After the concrete has been struck off and sufficiently set,the exposed surfaces 4 shall be thoroughly worked with a wooden flat. 5 3. The exposed edges shall be rounded by the use of an edging tool to the radius 6 indicated on the Drawings. 7 4. All exposed surfaces of curb shall be brushed to a smooth and uniform surface. 8 K. Alley Paving 9 1. Alley paving shall be constructed in accordance with the specifications for concrete 10 paving hereinbefore described, in accordance with the details shown on the 11 Drawings, and with the following additional provisions: 12 a. Alley paving shall be constructed to the typical cross sections shown on the 13 Drawings. 14 b. Transverse expansion joints of the type shown on the Drawings shall be 15 constructed at the property line on each end of the alley with a maximum 16 spacing of 600 feet. 17 c. Transverse contraction and dummy joints shall be placed at the spacing shown 18 on the Drawings. 19 d. Contraction and dummy joints shall be formed in such a manner that the 20 required joints shall be produced to the satisfaction of the City. 21 e. All joints shall be constructed in accordance with this specification and filled 22 in accordance with the requirement of Section 32 13 73. 23 L. Pavement Leaveouts 24 1. Pavement Leaveouts as necessary to maintain and provide for local traffic shall be 25 provided at location indicated on the Drawings or as directed by the City. 26 2. The extent and location of each leaveout required and a suitable crossover 27 connection to provide for traffic movements shall be determined in the field by the 28 city. 29 3.5 REPAIR 30 A. Repair of concrete pavement concrete shall be consistent with the Drawings and as 31 specified in Section 32 01 29. 32 3.6 RE-INSTALLATION [NOT USED] 33 3.7 SITE QUALITY CONTROL 34 A. Concrete Placement 35 1. Place concrete using a fully automated paving machine. Hand paving only 36 permitted in areas such as intersections where use of paving machine is not 37 practical 38 a. All concrete pavement not placed by hand shall be placed using a fully 39 automated paving machine as approved by the City. 40 b. Screeds will not be allowed except if approved by the City. 41 B. Testing of Materials 42 1. Samples of all materials for test shall be made at the expense of the City, unless 43 otherwise specified in the special provisions or in the Drawings. CITY OF FORT WORTH Park Improvements at'Ferry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263-02264-02265,02266 Revised December 20,2012 32 13 13- 18 CONCRETE PAVING Page 18 of 21 1 2. In the event the initial sampling and testing does not comply with the specifications, 2 all subsequent testing of the material in order to determine if the material is 3 acceptable shall be at the Contractor's expense at the same rate charged by the 4 commercial laboratories. 5 3. All testing shall be in accordance with applicable ASTM Standards and concrete 6 testing technician must be ACI certified or equivalent. 7 C. Pavement Thickness Test 8 1. Upon completion of the work and before final acceptance and final payment shall 9 be made,pavement thickness test shall be made by the City. 10 2. The number of tests and location shall be at the discretion of the City, unless 11 otherwise specified in the special provisions or on the Drawings. 12 3. The cost for the initial pavement thickness test shall be the expense of the City. 13 4. In the event a deficiency in the thickness of pavement is revealed during normal 14 testing operations, subsequent tests necessary to isolate the deficiency shall be at 15 the Contractor's expense. 16 5. The cost for additional coring test shall be at the sarne rate charged by commercial 17 laboratories. 18 6. Where the average thickness of pavement in the area found to be deficient in 19 thickness by more than 0.20 inch,but not more than 0.50 inch,payment shall be 20 made at an adjusted price as specified in the following table. 21 Deficiency in Thickness Proportional Part Determined by Cores Of Contract Price Inches Allowed 0.00-0.20 100 percent 0.21-0.30 80 percent 0.31-0.40 70 percent 0.41-0.50 60 percent 22 23 7. Any area of pavement found deficient in thickness by more than 0.50 inch but not 24 more than 0.75 inch or 1/10 of the thickness specified on the Drawings, whichever 25 is greater, shall be evaluated by the City. 26 8. If, in the judgment of the City the area of such deficiency should not be removed 27 and replaced,there shall be no payment for the area retained. 28 9. If, in the judgment of the City,the area of such deficiency warrants removal,the 29 area shall be removed and replaced,at the Contractor's entire expense, with 30 concrete of the thickness shown on the Drawings. 31 10. Any area of pavement found deficient in thickness by more than 0.75 inch or more 32 than 1/10 of the plan thickness,whichever is greater, shall be removed and 33 replaced,at the Contractor's entire expense,with concrete of the thickness shown 34 on the Drawings. 35 11. No additional payment over the contract unit price shall be made for any pavement 36 of a thickness exceeding that required by the Drawings. 37 D. Pavement Strength Test CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest.and Smnmer6elds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263-02264,02265-02266 Revised December 20.2012 32 13 13-19 CONCRETE PAVING Page 19 of 21 1 1. During the progress of the work the City shall provide trained technicians to cast 2 test cylinders for conforming to ASTM C31,to maintain a check on the 3 compressive strengths of the concrete being placed. 4 2. After the cylinders have been cast,they shall remain on the job site and then 5 transported, moist cured, and tested by the City in accordance with ASTM C31 and 6 ASTM C39. 7 3. In each set, l of the cylinders shall be tested at 7 days,2 cylinders shall be tested at 8 28 days, and I cylinder shall be held or tested at 56 days, if necessary. 9 4. If the 28 day test results indicate deficient strength,the Contractor may, at its option 10 and expense,core the pavement in question and have the cores tested by an 11 approved laboratory, in accordance with ASTM C42 and ACI 318 protocol, except 12 the average of all cores must meet 100 percent of the minimum specified strength, 13 with no individual core resulting in less than 90 percent of design strength,to 14 override the results of the cylinder tests. 15 5. Cylinders and/or cores must meet minimum specified strength. If cylinders do not 16 meet minimum specified strength, additional cores shall be taken to identify the 17 limits of deficient concrete pavement at the expense of the Contractor. 18 6. Cylinders and/or cores must meet minimum specified strength. Pavement not 19 meeting the minimum specified strength shall be subject to the money penalties or 20 removal and placement at the Contractor's expense as show in the following table. 21 Percent Deficient Percent of Contract Price Allowed Greater Than 0 percent-Not More Than 10 percent 90-percent Greater Than 10 percent-Not More Than 15 percent 80-percent Greater Than 15 percent 0-percent or removed and replaced at the entire cost and expense of Contractor as directed by City 22 23 7. The amount of penalty shall be deducted from payment due to Contractor; such as 24 penalty deducted is to defray the cost of extra maintenance. 25 8. The strength requirements for structures and other concrete work are not altered by 26 the special provision. 27 9. No additional payment over the contract unit price shall be made for any pavement 28 of strength exceeding that required by the Drawings and/or specifications. 29 E. Cracked Concrete Acceptance Policy 30 1. If cracks exist in concrete pavement upon completion of the project,the Project 31 Inspector shall make a determination as to the need for action to address the 32 cracking as to its cause and recommended remedial work. 33 2. If the recommended remedial work is routing and sealing of the cracks to protect 34 the subgrade,the Inspector shall make the determination as to whether to rout and 35 seal the cracks at the time of final inspection and acceptance or at any time prior to 36 the end of the project maintenance period. The Contractor shall perform the routing 37 and sealing work as directed by the Project Inspector,at no cost to the City, 38 regardless of the cause of the cracking. CITY OF FORT WORTH Park Improvements at Terry,Northside.High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.02264.02265,02266 Revised December 20.2012 32 13 13-20 CONCRETE PAVING Page 20 of 21 1 3. If remedial work beyond routing and sealing is determined to be necessary, the 2 Inspector and the Contractor will attempt to agree on the cause of the cracking. If 3 agreement is reached that the cracking is due to deficient materials or workmanship, 4 the Contractor shall perform the remedial work at no cost to the City. Remedial 5 work in this case shall be limited to removing and replacing the deficient work with 6 new material and workmanship that meets the requirements of the contract. 7 4. If remedial work beyond routing and sealing is determined to be necessary, and the 8 Inspector and the Contractor agree that the cause of the cracking is not deficient 9 materials or workmanship,the City may request the Contractor to provide an 10 estimate of the cost of the necessary remedial work and/or additional work to 11 address the cause of the cracking, and the Contractor will perform that work at the 12 agreed-upon price if the City elects to do so. 13 5. If remedial work is necessary, and the Inspector and the Contractor cannot agree on 14 the cause of the cracking,the City may hire an independent geotechnical engineer 15 to perform testing and analysis to determine the cause of the cracking. The 16 contractor will escrow 50 percent of the proposed costs of the geotechnical contract 17 with the City. The Contractor and the City shall use the services of a geotechnical 18 firm acceptable to both parties. 19 6. If the geotechnical engineer determines that the primary cause of the cracking is the 20 Contractor's deficient material or workmanship,the remedial work will be 21 performed at the Contractor's entire expense and the Contractor will also reimburse 22 the City for the balance of the cost of the geotechnical investigation over and above 23 the amount that has previously been escrowed. Remedial work in this case shall be 24 limited to removing and replacing the deficient work with new material and 25 workmanship that meets the requirements of the contract. 26 7. If the geotechnical engineer determines that the primary cause of the cracking is not 27 the Contractor's deficient material or workmanship,the City will return the 28 escrowed funds to the Contractor. The Contractor, on request,will provide the City 29 an estimate of the costs of the necessary remedial work and/or additional work and 30 will perform the work at the agreed-upon price as directed by the City. 31 3.8 SYSTEM STARTUP [NOT USED] 32 3.9 ADJUSTING [NOT USED] 33 3.10 CLEANING [NOT USED] 34 3.11 CLOSEOUT ACTIVITIES [NOT USED] 35 3.12 PROTECTION [NOT USED] 36 3.13 MAINTENANCE [NOT USED] 37 3.14 ATTACHMENTS [NOT USED] 38 CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.02264,02265_102266 Revised December 20.2012 32 13 13-21 CONCRETE PAVING Page 21 of 21 END OF SECTION 2 Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 1.2.A—Modified items to be included in price bid 05/21/2014 Doug Rademaker 2.2.D—Modified to clarify acceptable fly ash substitution in concrete paving 3 CITY OF FORT WORTH Park Improvements at Terry.Northside,High Crest.and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.02264.02265,02266 Revised December 20.2012 This page is intentionally blank. 32 1320- 1 CONCRETE SIDEWALKS,DRIVEWAYS AND BARRIER FREE RAMPS Page I of 5 i SECTION 32 13 20 2 CONCRETE SIDEWALKS, DRIVEWAYS AND BARRIER FREE RAMPS 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Concrete sidewalks 7 2. Barrier free ramps 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include,but are not necessarily limited to: 11 1. Division 0-Bidding Requirements, Contract Forms, and Conditions of the Contract 12 2. Division 1 -General Requirements 13 3. Section 02 41 13 - Selective Site Demolition 14 4. Section 32 13 13 -Concrete Paving 15 5. Section 32 13 73 -Concrete Paving Joint Sealants 16 1.2 PRICE AND PAYMENT PROCEDURES 17 A. Measurement and Payment 18 1. Concrete Sidewalk 19 a. Measurement 20 l) Measurement for this Item shall be by the square foot of completed and 21 accepted Concrete Sidewalk in its final position for various: 22 a) Thicknesses 23 b) Types 24 b. Payment 25 1) The work performed and materials furnished in accordance with this Item 26 and measured as provided under"Measurement"will be paid for at the unit 27 price bid per square foot of Concrete Sidewalk. 28 c. The price bid shall include: 29 1) Excavating and preparing the subgrade 30 2) Furnishing and placing all materials 31 2. Barrier Free Ramps 32 a. Measurement 33 1) Measurement for this Item shall be per each Barrier Free Ramp completed 34 and accepted for various: 35 a) Types 36 b. Payment 37 1) The work performed and materials furnished in accordance with this Item 38 and measured as provided under"Measurement"will be paid for at the unit 39 price bid per each`Barrier Free Ramp" installed. 40 c. The price bid shall include: 41 1) Excavating and preparing the subgrade 42 2) Furnishing and placing all materials CITY OF FORT WORTH Park Improvements at Terry,Northside.High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264.02265,02266 Revised April 30,2013 321320-2 CONCRETE SIDEWALKS,DRIVEWAYS AND BARRIER FREE RAMPS Page 2 of 5 1 3) Curb Ramp 2 4) Landing and detectable warning surface as shown on the Drawings 3 5) Adjacent flares or side curb 4 1.3 REFERENCES 5 A. Abbreviations and Acronyms 6 1. TAS—Texas Accessibility Standards 7 2. TDLR—Texas Department of Licensing and Regulation 8 B. Reference Standards 9 1. Reference standards cited in this Specification refer to the current reference 10 standard published at the time of the latest revision date logged at the end of this 11 Specification, unless a date is specifically cited. 12 2. American Society for Testing and Materials(ASTM) 13 a. D545,Test Methods for Preformed Expansion Joint Fillers for Concrete 14 Construction(Non-extruding and Resilient Types) 15 b. D698,Test Methods for Laboratory Compaction Characteristics of Soil Using 16 Standard Effort(12,400 ft-lbf/ft3) 17 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 18 1.5 SUBMITTALS [NOT USED] 19 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS 20 A. Mix Design: submit for approval. Section 32 13 13. 21 B. Product Data: submit product data and sample for pre-cast detectable warning for 22 barrier free ramp. 23 1.7 CLOSEOUT SUBMITTALS [NOT USED] 24 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 25 1.9 QUALITY ASSURANCE [NOT USED] 26 1.10 DELIVERY,STORAGE,AND HANDLING [NOT USED] 27 1.11 FIELD CONDITIONS 28 A. Weather Conditions: Placement of concrete shall be as specified in Section 32 13 13. 29 1.12 WARRANTY [NOT USED] 30 PART 2- PRODUCTS 31 2.1 OWNER-FURNISHED PRODUCTS [NOT USED] 32 2.2 EQUIPMENT AND MATERIALS 33 A. Forms: wood or metal straight,free from warp and of a depth equal to the thickness of 34 the finished work. 35 B. Concrete: see Section 32 13 13. 36 1. Unless otherwise shown on the Drawings or detailed specifications,the standard 37 class for concrete sidewalks, driveways and barrier free ramps is shown in the 38 following table: CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest.and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264.02265.02266 Revised April 30,2013 32 13 20-3 CONCRETE SIDEWALKS,DRIVEWAYS AND BARRIER FREE RAMPS Page 3 of 5 1 Standard Classes of Pavement Concrete Class of Minimum 28 Day Min. Maximum Course Concrete' Cementitious, Compressive Water/ Aggregate Lb./CY Strength Cementitious Maximum psi Ratio Size, inch A 470 3000 0.58 1-1/2 2 C. Reinforcement: see Section 32 13 13. 3 1. Sidewalk, driveway and barrier free ramp reinforcing steel shall be#3 deformed 4 bars at 18 inches on-center-both-ways at the center plane of all slabs, unless 5 otherwise shown on the Drawings or detailed specifications. 6 D. Joint Filler 7 1. Wood Filler: see Section 32 13 13. 8 2. Pre-Molded Asphalt Board Filler 9 a. Use only in areas where not practical for wood boards. 10 b. Pre-molded asphalt board filler:ASTM D545. I 1 c. Install the required size and uniform thickness and as specified in Drawings. 12 d. Include 2 liners of 0.016 asphalt impregnated kraft paper filled with a mastic 13 mixture of asphalt and vegetable fiber and/or mineral filler. 14 E. Expansion Joint Sealant: see Section 32 13 73 where shown on the Drawings. 15 2.3 ACCESSORIES [NOT USED] 16 2.4 SOURCE QUALITY CONTROL [NOT USED] 17 PART 3- EXECUTION 18 3.1 INSTALLERS [NOT USED] 19 3.2 EXAMINATION [NOT USED] 20 3.3 PREPARATION 21 A. Surface Preparation 22 1. Excavation: Excavation required for the construction of sidewalks, driveways and 23 barrier free ramps shall be to the lines and grades as shown on the Drawings or as 24 established by the City. 25 2. Fine Grading 26 a. The Contractor shall do all necessary filling, leveling and fine grading required 27 to bring the subgrade to the exact grades specified and compacted to at least 90 28 percent of maximum density as determined by ASTM D698. 29 b. Moisture content shall be within minus 2 to plus 4 of optimum. 30 c. Any over-excavation shall be repaired to the satisfaction of the City. 31 B. Demolition/Removal 32 1. Sidewalk,Driveway and/or Barrier Free Ramp Removal: see Section 02 41 13. 33 3.4 INSTALLATION 34 A. General 35 1. Concrete sidewalks shall have a minimum thickness of 5 inches. CITY OF FORT WORTH Park Improvements at Teary,Northside.High Crest.and Sunnnerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.02264.02265,02266 Revised April 30,2013 321320-4 CONCRETE SIDEWALKS,DRIVEWAYS AND BARRIER FREE RAMPS Page 4 0(5 1 2. Sidewalks constructed in driveway approach sections shall have a minimum 2 thickness equal to that of driveway approach or as called for by Drawings and 3 specifications within the limits of the driveway approach. 4 3. Driveways shall have a minimum thickness of 6 inches. Standard cross-slopes for 5 walks shall be 2 percent max in accordance with current TAS/TDLR guidelines. 6 The construction of the driveway approach shall include the variable height radius 7 curb in accordance with the Drawings. 8 4. All pedestrian facilities shall comply with provisions of TAS including location, 9 slope, width,shapes,texture and coloring. Pedestrian facilities installed by the 10 Contractor and not meeting TAS must be removed and replaced to meet TAS(no I 1 separate pay). 12 B. Forms: Forms shall be securely staked to line and grade and maintained in a true 13 position during the depositing of concrete. 14 C. Reinforcement: see Section 32 13 13. 15 D. Concrete Placement: see Section 32 13 13. 16 E. Finishing 17 1. Concrete sidewalks, driveways and barrier free ramps shall be finished to a true, 18 even surface. 19 2. Trowel and then brush transversely to obtain a smooth uniform brush finish. 20 3. Provide exposed aggregate finish if specified. 21 4. Edge joints and sides shall with suitable tools. 22 F. Joints 23 1. Expansion joints for sidewalks, driveways and barrier free ramps shall be formed 24 using redwood. 25 2. Expansion joints shall be placed at 40 foot intervals for 4 foot wide sidewalk and 50 26 foot intervals for 5 foot wide and greater sidewalk. 27 3. Expansion joints shall also be placed at all intersections, sidewalks with concrete 28 driveways, curbs,formations, other sidewalks and other adjacent old concrete work. 29 Similar material shall be placed around all obstructions protruding into or through 30 sidewalks or driveways. 31 4. All expansion joints shall be 1/2 inch in thickness. 32 5. Edges of all construction and expansion joints and outer edges of all sidewalks shall 33 be finished to approximately a 1/2 inch radius with a suitable finishing tool. 34 6. Sidewalks shall be marked at intervals equal to the width of the walk with a 35 marking tool. 36 7. When sidewalk is against the curb, expansion joints shall match those in the curb. 37 G. Barrier Free Ramp 38 1. Furnish and install brick red color pre-cast detectable warning Dome-Tile, 39 manufactured by StrongGo Industries or approved equal by the City. 40 2. Detectable warning surface shall be a minimum of 24-inch in depth in the direction 41 of pedestrian travel, and extend to a minimum of 48-inch along the curb ramp or 42 landing where the pedestrian access route enters the street. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Smnmerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.02264,02265_02266 Revised April 30,2013 32 13 20-5 CONCRETE SIDEWALKS.DRIVEWAYS AND BARRIER FREE RAMPS Page 5 of 5 1 3. Locate detectable warning surface so that the edge nearest the curb line is a 2 minimum of 6-inch and maximum of 8-inch from the extension of the face of the 3 curb. 4 4. Detectable warning Dome-Tile surface may be curved along the corner radius. 5 5. Install detectable warning surface according to manufacturer's instructions. 6 3.5 REPAIR/RESTORATION [NOT USED] 7 3.6 RE-INSTALLATION [NOT USED] 8 3.7 FIELD QUALITY CONTROL [NOT USED] 9 3.8 SYSTEM STARTUP [NOT USED] 10 3.9 ADJUSTING [NOT USED] 11 3.10 CLEANING [NOT USED] 12 3.11 CLOSEOUT ACTIVITIES [NOT USED] 13 3.12 PROTECTION [NOT USED] 14 3.13 MAINTENANCE [NOT USED] 15 3.14 ATTACHMENTS [NOT USED] 16 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D.Johnson 1.2.A.3—Measurement and Payment for Barrier Free Ramps modified to match updated City Details 4/30/2013 F.Griffin Corrected Part 1, 1.2,A,3,b, 1 to read;from...square foot of Concrete Sidewalk. to...each`Barrier Free Ramp"installed. 17 CITY OF FORT WORTH Park Improvements at Teny.Northside,High Crest.and Smmnerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.02264.02265.02266 Revised April 30,2013 This page is intentionally blank. 32 13 73- 1 CONCRETE PAVING.IOINT SEALANTS Page I of 4 1 SECTION 32 13 73 2 CONCRETE PAVING JOINT SEALANTS 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Specification for silicone joint sealing for concrete pavement and curbs. 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include,but are not necessarily limited to: 10 1. Division 0-Bidding Requirements, Contract Forms, and Conditions of the Contract 11 2. Division 1 -General Requirements 12 3. Section 32 13 13 -Concrete Paving 13 1.2 PRICE AND PAYMENT PROCEDURES 14 A. Measurement and Payment 15 1. Measurement 16 a. Measurement for this Item shall be by the linear foot of Joint Sealant completed 17 and accepted only when specified in the Drawings to be a pay item. 18 2. Payment 19 a. The work performed and materials furnished in accordance with this Item are 20 subsidiary to the various items bid and no other compensation will be allowed, 21 unless specifically specified on Drawings. 22 1.3 REFERENCES 23 A. Reference Standards 24 1. Reference standards cited in this Specification refer to the current reference 25 standard published at the time of the latest revision date logged at the end of this 26 Specification,unless a date is specifically cited. 27 2. ASTM International (ASTM): 28 a. D5893, Standard Specification for Cold Applied, Single Component, 29 Chemically Curing Silicone Joint Sealant for Portland Cement Concrete 30 Pavements 31 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 32 1.5 ACTION SUBMITTALS [NOT USED] 33 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS 34 A. Test and Evaluation Reports 35 1. Prior to installation, furnish certification by an independent testing laboratory that 36 the silicone joint sealant meets the requirements of this Section. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest.and Suunerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20.2012 32 13 73-2 CONCRETE PAVING JOINT SEALANTS Page 2 o1`4 1 2. Submit verifiable documentation that the manufacturer of the silicone joint sealant 2 has a minimum 2-year demonstrated, documented successful field performance 3 with concrete pavement silicone joint sealant systems. 4 1.7 CLOSEOUT SUBMITTALS [NOT USED] 5 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 6 1.9 QUALITY ASSURANCE [NOT USED] 7 1.10 DELIVERY, STORAGE,AND HANDLING [NOT USED] 8 1.11 FIELD CONDITIONS 9 A. Do not apply joint sealant when the air and pavement temperature is less than 35 10 degrees F 11 B. Concrete surface must be clean,dry and frost free. 12 C. Do not place sealant in an expansion-type joint if surface temperature is below 35 13 degrees F or above 90 degrees F. 14 1.12 WARRANTY [NOT USED] 15 PART 2 - PRODUCTS 16 2.1 OWNER FURNISHED PRODUCTS [NOT USED] 17 2.2 MATERIALS& EQUIPMENT 18 A. Materials 19 1. Joint Sealant: ASTM D5893. 20 2. Joint Filler,Backer Rod and Breaker Tape 21 a. The joint filler sop shall be of a closed cell expanded polyethylene foam backer 22 rod and polyethylene bond breaker tape of sufficient size to provide a tight seal. 23 b. The back rod and breaker tape shall be installed in the saw-cut joint to prevent 24 the joint sealant from flowing to the bottom of the joint. 25 c. The backer rod and breaker tape shall be compatible with the silicone joint 26 sealant and no bond or reaction shall occur between them. 27 2.3 ACCESSORIES [NOT USED] 28 2.4 SOURCE QUALITY CONTROL [NOT USED] 29 PART 3 - EXECUTION 30 3.1 INSTALLERS [NOT USED] 31 3.2 EXAMINATION [NOT USED] 32 3.3 PREPARATION [NOT USED] CITY OF FORT WORTH Park Improvements at Terry.Northside,High Crest,and Swnmerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264.02265.02266 Revised December 20,2012 32 13 73-3 CONCRETE PAVING JOINT SEALANTS Page 3 of 4 1 3.4 INSTALLATION 2 A. General 3 1. The silicone sealant shall be cold applied. 4 2. Allow concrete to cure for a minimum of 7 days to ensure it has sufficient strength 5 prior to sealing joints. 6 3. Perform joint reservoir saw cutting,cleaning,bond breaker installation, and joint 7 sealant placement in a continuous sequence of operations. 8 4. See Drawings for the various joint details with their respective dimensions. 9 B. Equipment 10 1. Provide all necessary equipment and keep equipment in a satisfactory working I 1 condition. 12 2. Equipment shall be inspected by the City prior to the beginning of the work. 13 3. The minimum requirements for construction equipment shall be as follows: 14 a. Concrete Saw. The sawing equipment shall be adequate in size and power to 15 complete the joint sawing to the required dimensions. 16 b. Air Compressors. The delivered compressed air shall have a pressure in excess 17 of 90 psi and shall be suitable for the removal of all free water and oil from the 18 compressed air. 19 c. Extrusion Pump. The output shall be capable of supplying a sufficient volume 20 of sealant to the joint. 21 d. Injection Tool. This mechanical device shall apply the sealant uniformly into 22 the joint. 23 e. Sandblaster. The design shall be for commercial use with air compressors as 24 specified in this Section. 25 f. Backer Rod Roller and Tooling Instrument. These devices shall be clean and 26 free of contamination. They shall be compatible with the joint depth and width 27 requirements. 28 C. Sawing Joints: see Section 32 13 13. 29 D. Cleaning joints 30 1. Dry saw in I direction with reverse cutting blade then sand blast. 31 2. Use compressed air to remove the resulting dust from the joint. 32 3. Sandblast joints after complete drying. 33 a. Attach nozzle to a mechanical aiming device so that the sand blast will be 34 directed at an angle of 45 degrees and at a distance of 1 to 2 inches from the 35 face of the joint. 36 b. Sandblast both joint faces sandblasted in separate, 1 directional passes. 37 c. When sandblasting is complete,blow-out using compressed air. 38 d. The blow tube shall fit into the joints. 39 4. Check the blown joint for residual dust or other contamination. 40 a. If any dust or contamination is found,repeat sandblasting and blowing until the 41 joint is cleaned. 42 b. Do not use solvents to remove stains and contamination. 43 5. Place the bond breaker and sealant in the joint immediately upon cleaning. 44 6. Bond Breaker Rod and Tape: install in the cleaned joint prior to the application of 45 the joint sealant. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264_02265,02266 Revised December 20,2012 32 13 73-4 CONCRETE PAVING JOINT SEALANTS Page 4 of 4 1 7. Do not leave open, cleaned joints unsealed overnight. 2 E. Joint Sealant 3 1. Apply the joint sealant upon placement of the bond breaker rod and tape, using the 4 mechanical injection tool. 5 2. Do not seal joints unless they are clean and dry. 6 3. Remove and discard excess sealant left on the pavement surface. 7 a. Do not excess use to seal the joints. 8 4. The pavement surface shall present a clean final condition as determined by City. 9 5. Do not allow traffic on the fresh sealant until it becomes tack-free. 10 F. Approval of Joints 11 1. The City may request a representative of the sealant manufacturer to be present at 12 the job site at the beginning of the final cleaning and sealing of joints. 13 a. The representative shall demonstrate to the Contractor and the City the 14 acceptable method for sealant installation. 15 b. The representative shall approve the clean, dry joints before the sealing 16 operation commences. 17 3.5 REPAIR/RESTORATION [NOT USED] 18 3.6 RE-INSTALLATION [NOT USED] 19 3.7 FIELD QUALITY CONTROL [NOT USED] 20 3.8 SYSTEM STARTUP [NOT USED] 21 3.9 ADJUSTING [NOT USED] 22 3.10 CLEANING [NOT USED] 23 3.11 CLOSEOUT ACTIVITIES [NOT USED] 24 3.12 PROTECTION [NOT USED] 25 3.13 MAINTENANCE [NOT USED] 26 3.14 ATTACHMENTS [NOT USED] 27 END OF SECTION 28 Revision Log DATE NAME SUMMARY OF CHANGE 29 CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Smnmerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20-2012 32 16 13- 1 CONCRETE CURB AND GUTTERS AND VALLEY GUTTERS Page 1 of 5 1 SECTION 32 16 13 2 CONCRETE CURB AND GUTTERS AND VALLEY GUTTERS 3 4 PART1 - GENERAL 5 1.1 SUMMARY 6 A. Section Includes: 7 1. Concrete Curbs and Gutters 8 2. Concrete Valley Gutters 9 B. Deviations from this City of Fort Worth Standard Specification 10 1. None. 11 C. Related Specification Sections include,but are not necessarily limited to: 12 1. Division 0-Bidding Requirements, Contract Forms, and Conditions of the Contract 13 2. Division I -General Requirements 14 3. Section 02 41 13 -Selective Site Demolition 15 4. Section 32 13 13 -Concrete Paving 16 5. Section 32 13 73 -Concrete Paving Joint Sealants 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Concrete Curb and Gutter 20 a. Measurement 21 1) Measurement for this Item shall be by the linear foot of Concrete Curb and 22 Gutter. 23 b. Payment 24 1) The work performed and materials furnished in accordance with this Item 25 and measured as provided under"Measurement"will be paid for at the unit 26 price bid per linear foot of Concrete Curb and Gutter complete and in place 27 by curb height. 28 c. The price bid shall include: 29 1) Preparing the subgrade 30 2) Furnishing and placing all materials, including foundation course, 31 reinforcing steel, and expansion material 32 2. Concrete Valley Gutter 33 a. Measurement 34 1) Measurement for this Item shall be by the square yard of Concrete Valley 35 Gutter. 36 b. Payment 37 1) The work performed and materials furnished in accordance with this Item 38 and measured as provided under"Measurement"will be paid for at the unit 39 price bid per square yard of Concrete Valley Gutter complete and in place 40 for: 41 a) Various street types CITY OF FORT WORTH Park Improvements at Terry.Northside,High Crest and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 32 16 13-2 CONCRETE CURB AND GUTTERS AND VALLEY GUTTERS Page 2 of 5 1 c. The price bid shall include: 2 1) Preparing the subgrade 3 2) Furnishing and placing all materials, including foundation course, 4 reinforcing steel, and expansion material 5 1.3 REFERENCES [NOT USED] 6 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 7 1.5 ACTION SUBMITTALS [NOT USED] 8 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 9 1.7 CLOSEOUT SUBMITTALS [NOT USED] 10 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 11 1.9 QUALITY ASSURANCE [NOT USED] 12 1.10 DELIVERY,STORAGE,AND HANDLING [NOT USED] 13 1.11 FIELD CONDITIONS 14 A. Weather Conditions: See Section 32 13 13. 15 1.12 WARRANTY [NOT USED] 16 PART 2- PRODUCTS 17 2.1 OWNER FURNISHED PRODUCTS [NOT USED] 18 2.2 EQUIPMENT AND MATERIALS 19 A. Forms: See Section 32 13 13. 20 B. Concrete: See Section 32 13 13. 21 C. Reinforcement: See Section 32 13 13. 22 D. Joint Filler 23 1. Wood Filler: see Section 32 13 13. 24 2. Pre-Molded Asphalt Board Filler 25 a. Use only in areas where not practical for wood boards 26 b. Pre-molded asphalt board filler: ASTM D545 27 c. Install the required size and uniform thickness and as specified in the Drawings. 28 d. Include two liners of 0.016 asphalt impregnated kraft paper filled with a mastic 29 mixture of asphalt and vegetable fiber and/or mineral filler. 30 E. Expansion Joint Sealant: See Section 32 13 73. CITY OF FORT WORTH Park Improvements at Terry,Northside.High Crest and Smmnerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20.2012 321613-3 CONCRETE CURB AND GUTTERS AND VALLEY GUTTERS Page 3 of 5 1 2.3 ACCESSORIES [NOT USED] 2 2.4 SOURCE QUALITY CONTROL [NOT USED] 3 PART 3- EXECUTION 4 3.1 INSTALLERS [NOT USED] 5 3.2 EXAMINATION [NOT USED] 6 3.3 PREPARATION 7 A. Demolition/Removal: See Section 02 41 13. 8 3.4 INSTALLATION 9 A. Forms 10 1. Extend forms the full depth of concrete. 11 2. Wood forms: minimum of 1-1/2 inches in thickness 12 3. Metal Forms: a gauge that shall provide equivalent rigidity and strength 13 4. Use acceptable wood or metal forms for curves with a radius of less than 250 feet. 14 5. All forms showing a deviation of 1/8 inch in 10 feet from a straight line shall be 15 rejected. 16 B. Reinforcing Steel 17 1. Place all necessary reinforcement for City approval prior to depositing concrete. 18 2. All steel must be free from paint and oil and all loose scale, rust, dirt and other 19 foreign substances. 20 3. Remove foreign substances from steel before placing. 21 4. Wire all bars at their intersections and at all laps or splices. 22 5. Lap all bar splices a minimum of 20 diameters of the bar or 12 inches,whichever is 23 greater. 24 C. Concrete Placement 25 1. Deposit concrete to maintain a horizontal surface. 26 2. Work concrete into all spaces and around any reinforcement to form a dense mass 27 free from voids. 28 3. Work coarse aggregate away from contact with the forms 29 4. Hand-Laid Concrete—Curb and gutter 30 a. Shape and compact subgrade to the lines,grades and cross section shown on the 31 Drawings. 32 b. Lightly sprinkle subgrade material immediately before concrete placement. 33 c. Deposit concrete into forms. 34 d. Strike off with a template 1/4 to 3/8 inch less than the dimensions of the 35 finished curb, unless otherwise approved. 36 5. Machine-Laid Concrete—Curb and Gutter 37 a. Hand-tamp and sprinkle subgrade material before concrete placement. 38 b. Provide clean surfaces for concrete placement. 39 c. Place the concrete with approved self-propelled equipment. CITY OF FORT WORTH Park Improvements at Teny,Northside,High Crest and Smnmerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 32 16 13-4 CONCRETE CURB AND GUTTERS AND VALLEY GUTTERS Page 4 of 5 1 1) The forming tube of the extrusion machine or the form of the slipform 2 machine must easily be adjustable vertically during the forward motion of 3 the machine to provide variable heights necessary to conform to the 4 established gradeline. 5 d. Attach a pointer or gauge to the machine so that a continual comparison can be 6 made between the extruded or slipform work and the grade guideline. 7 e. Brush finish surfaces immediately after extrusion or slipforming. 8 6. Hand-Laid Concrete—Concrete Valley Gutter: See Section 32 13 13. 9 7. Expansion joints 10 a. Place expansion joints in the curb and gutter at 200-foot intervals and at 11 intersection returns and other rigid structures. 12 b. Place tooled joints at 15-foot intervals or matching abutting sidewalk joints and 13 pavement joints to a depth of 1-1/2 inches. 14 c. Place expansion joints at all intersections with concrete driveways,curbs, 15 buildings and other curb and gutters. 16 d. Make expansion joints no less than 1/2 inch in thickness,extending the full 17 depth of the concrete. 18 e. Make expansion joints perpendicular and at right angles to the face of the curb. 19 f. Neatly trim any expansion material extending above the finished to the surface 20 of the finished work. 21 g. Make expansion joints in the curb and gutter coincide with the concrete 22 expansion joints. 23 h. Longitudinal dowels across the expansion joints in the curb and gutter are 24 required. 25 i. Install 3 No. 4 round,smooth bars,24 inches in length,for dowels at each 26 expansion joint. 27 j. Coat 1/2 of the dowel with a bond breaker and terminate with a dowel cap that 28 provides a minimum of 1 inch free expansion. 29 k. Support dowels by an approved method. 30 D. Curing: see Section 32 13 13. 31 3.5 REPAIR/RESTORATION [NOT USED] 32 3.6 RE-INSTALLATION [NOT USED] 33 3.7 FIELD QUALITY CONTROL [NOT USED] 34 3.8 SYSTEM STARTUP [NOT USED] 35 3.9 ADJUSTING [NOT USED] 36 3.10 CLEANING [NOT USED] 37 3.11 CLOSEOUT ACTIVITIES [NOT USED] 38 3.12 PROTECTION [NOT USED] 39 3.13 MAINTENANCE [NOT USED] 40 3.14 ATTACHMENTS [NOT USED] 41 END OF SECTION CITY OF FORT WORTH Park Improvements at Terry,Northside.I-ligh Crest and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20 2012 32 16 13-5 CONCRETE CURB AND GUTTERS AND VALLEY GUTTERS Page 5 of 5 I Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D.Johnson 1.2.A.2.Modified payment item to vary by street type 2 CITY OF FORT WORTH Park Improvements at Terry,Northside.High Crest and Smnmerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265.02266 Revised December 20.2012 This page is intentionally blank. 32 31 13-1 CHAIN LINK FENCE AND GATES Page 1 of 7 1 SECTION 32 31 13 2 CHAIN LINK FENCE AND GATES 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Galvanized coated chain link(non-security)fencing and accessories in accordance 7 with the City's Zoning Ordinance. 8 2. Wrought iron fencing and accessories 9 3. Steel tube fencing and accessories 10 4. On utility projects: 11 a. When existing fence is within the project Site(i.e.parallel to the utility trench 12 and/or within utility easement)and is directly disturbed by construction 13 activities,fencing will be paid for as listed in Article 1.2 below. 14 b. When existing fence is crossing the proposed utility trench,the work performed 15 and materials furnished in accordance with fence replacement will be 16 considered subsidiary to the trench and no other compensation will be allowed. 17 c. When existing fence is outside of the limits of the project Site or is identified as 18 protected on the Drawings and is disturbed and/or by construction activities, 19 replacement will be at the expense of the Contractor and no other compensation 20 will be allowed. 21 B. Deviations from this City of Fort Worth Standard Specification 22 1. None. 23 C. Related Specification Sections include, but are not necessarily limited to: 24 1. Division 0-Bidding Requirements, Contract Forms, and Conditions of the Contract 25 2. Division I -General Requirements 26 1.2 PRICE AND PAYMENT PROCEDURES 27 A. Measurement and Payment 28 1. Chain Link Fence 29 a. Measurement 30 1) Measurement for this Item shall be by the linear foot of Chain Link Fence 31 installed. 32 b. Payment 33 1) The work performed and materials furnished in accordance with this Item 34 and measured as provided under"Measurement"will be paid for at the unit 35 price bid per linear foot of Chain Link Fence installed for various: 36 a) Heights 37 b) Fabric materials 38 c. The price bid shall include: 39 1) Furnishing and installing all fence and gate materials 40 2) Mow strip, if shown in Drawings 41 3) Cleanup 42 4) Hauling 43 2. Wrought Iron Fence CITY OF FORT WORTH Park Improvements at Terry,Northside,I3igh Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 3231 13-2 CHAIN LINK FENCE AND GATES Page 2 of 7 1 a. Measurement 2 1) Measurement for this Item shall be by the linear foot of Wrought Iron 3 Fence installed. 4 b. Payment 5 1) The work performed and materials furnished in accordance with this Item 6 and measured as provided under"Measurement"will be paid for at the unit 7 price bid per linear foot of Wrought Iron Fence installed for various 8 heights. 9 c. The price bid shall include: 10 1) Furnishing and installing all fence and gate materials 11 2) Mow strip, if shown in Drawings 12 3) Cleanup 13 4) Hauling 14 3. Steel Tube Fence 15 a. Measurement 16 1) Measurement for this Item shall be by the linear foot of Steel Tube Fence 17 installed. 18 b. Payment 19 1) The work performed and materials furnished in accordance with this Item 20 and measured as provided under"Measurement"will be paid for at the unit 21 price bid per linear foot of Steel Tube Fence installed for various heights. 22 c. The price bid shall include: 23 1) Furnishing and installing all fence and gate materials 24 2) Mow strip, if shown in Drawings 25 3) Cleanup 26 4) Hauling 27 1.3 REFERENCES 28 A. Reference Standards 29 1. Reference standards cited in this specification refer to the current reference standard 30 published at the time of the latest revision date logged at the end of this 31 specification,unless a date is specifically cited. 32 2. American Society for Testing and Materials(ASTM): 33 a. A 36, Standard Specification for Carbon Structural Steel 34 b. A 123, Standard Specification for Zinc(Hot-Dip Galvanized) Coatings on Iron 35 and Steel Products 36 c. A 392, Standard Specification for Zinc-Coated Steel Chain-Link Fence Fabric 37 d. A 500, Standard Specification for Cold-Formed Welded and Seamless Carbon 38 Steel Structural Tubing in Rounds and Shapes 39 e. F 626, Standard Specification for Fence Fittings 40 f. F 1043, Standard Specification for Strength and Protective Coatings on Steel 41 Industrial Chain Link Fence Framework 42 g. F 1083, Standard Specification for Pipe, Steel,Hot-Dipped Zinc-Coated 43 (Galvanized) Welded, for Fence Structures 44 h. F 1 l 83, Specification for Aluminum Alloy Chain Link Fence Fabric 45 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 46 1.5 ACTION SUBMITTALS 47 A. Shop drawings CITY OF FORT WORTFI Park Improvements at Terry Norlbside,High Crest,and Smnmerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20 2012 3231 13-3 CHAIN LINK FENCE AND GATES Page 3 of 7 1 1. Layout of fences and gates with dimensions, details, and finishes of components, 2 accessories and post foundations if requested by the City. 3 B. Product data 4 1. Manufacturer's catalog cuts indicating material compliance and specified options. 5 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 6 1.7 CLOSEOUT SUBMITTALS [NOT USED] 7 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 8 1.9 QUALITY ASSURANCE [NOT USED] 9 1.10 DELIVERY,STORAGE,AND HANDLING [NOT USED] 10 1.11 FIELD [SITE] CONDITIONS [NOT USED] 11 1.12 WARRANTY [NOT USED] 12 PART 2- PRODUCTS 13 2.1 OWNER-FURNISHED [NOT USED] 14 2.2 MANUFACTURED UNITS/MATERIALS 15 A. Manufacturer 16 1. Minimum of 5 years of experience manufacturing galvanized coated chain link 17 fencing. 18 2. Approved Manufacturer or equal: 19 a. Allied Fence,Inc. 20 b. American Fence Corp. 21 c. Anchor Fence, Inc. 22 d. Master Halco, Inc. 23 B. Materials 24 1. Chain Link Fence 25 a. General 26 1) Posts,gate frames, braces, rails, stretcher bars,truss rods and tension wire 27 shall be of steel. 28 2) Gate hinges, post caps,barbed wire supporting arms, stretcher bar bands 29 and other parts shall be of steel,malleable iron, ductile iron or equal 30 3) Post tops, rail end, ties and clips may be of aluminum. 31 4) Use only new material, or salvaged/existing material if approved by City or 32 noted on Drawings. 33 b. Steel Fabric 34 1) Fabric 35 a) No. 9 gauge 36 b) 2-inch mesh 37 (1) Commercial: both top and bottom selvages twisted and barged 38 Residential: match existing or both top and bottom selvages knuckled 39 (2) Furnish 1-piece fabric widths. 40 2) Fabric Finish: Galvanized,ASTM A 392, Class I, with not less than 1.2 oz. 41 zinc per square foot of surface. 42 c. Aluminum Fabric CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Sumtnerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20.2012 3231 13-4 CHAIN LINK FENCE AND GATES Page 4 of 7 1 1) Fabric 2 a) ASTM F 1183 3 b) No. 9 gauge 4 c) 2-inch mesh,with both top and bottom selvages twisted and barged. 5 d) Furnish 1-piece fabric widths. 6 d. Steel Framing 7 1) Steel pipe -Type I 8 a) ASTM F 1083 9 b) Standard weight schedule 40 10 c) Minimum yield strength: 30,000 psi 11 d) Sizes as indicated 12 e) Hot-dipped galvanized with minimum average 1.8 OZ/ft2 of coated 13 surface area 14 2) Steel pipe-Type 11 15 a) ASTM F 1043, Group IC 16 b) Minimum yield strength: 50,000 psi 17 c) Sizes as indicated on Drawings 18 d) Protective coating per ASTM F 1043 19 (1) External coating Type B 20 (a) Zinc with organic overcoat 21 (b) 0.9 OZ/ft2 minimum zinc coating with chromate conversion 22 coating and verifiable polymer film 23 (2) Internal coating Type B 24 (a) Minimum 0.9 OZ/ft2 zinc or Type D,zinc pigmented, 81 percent 25 nominal coating,minimum 3 mils 26 3) Formed steel ("C")sections: 27 a) Roll formed steel shapes complying with ASTM F 1043, Group 11 28 b) Minimum yield strength: 45,000 psi (3 10 MPa) 29 c) Sizes as indicated on Drawings 30 d) External coating per ASTM F 1043,Type A 31 (1) Minimum average 2.0 oz/ft2 of zinc per ASTM A 123 32 4) Steel square sections 33 a) ASTM A 500, Grade B 34 b) Minimum yield strength: 40,000 psi 35 c) Sizes as indicated on Drawings 36 d) Hot-dipped galvanized with minimum 1.8 OZ/ft2 of coated surface area 37 e. Accessories 38 1) Chain link fence accessories 39 a) ASTM F 626 40 b) Provide items required to complete fence system. 41 c) Galvanize each ferrous metal item and finish to match framing. 42 2) Post caps 43 a) Formed steel or cast malleable iron weather tight closure cap for 44 tubular posts. 45 b) Provide 1 cap for each post. 46 c) Cap to have provision for barbed wire when necessary. 47 d) "C" shaped line post without top rail or barbed wire supporting arms do 48 not require post caps. 49 e) Where top rail is used, provide tops to permit passage of top rail. 50 3) Top rail and rail ends CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Su nmerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20.2012 3231 13-5 CHAIN LINK FENCE AND GATES Page 5 of 7 1 a) 1 5/8 inch diameter galvanized round pipe for horizontal railing 2 b) Pressed steel per ASTM F626 3 c) For connection of rail and brace to terminal posts 4 4) Top rail sleeves 5 a) 7-inch expansion sleeve with a minimum 0.137 inch wire diameter and 6 1.80 inch length spring, allowing for expansion and contraction of top 7 rai 1 8 5) Wire ties 9 a) 9 gauge galvanized steel wire for attachment of fabric to line posts 10 b) Double wrap 13 gauge for rails and braces. 11 c) Hog ring ties of 12-1/2 gauge for attachment 12 6) Brace and tension(stretcher bar)bands 13 a) Pressed steel 14 b) Minimum 300 degree profile curvature for secure fence post attachment 15 c) At square post provide tension bar clips. 16 7) Tension(stretcher)bars: 17 a) 1 piece lengths equal to 2 inches less than full height of fabric 18 b) Minimum cross-section of 3/16 inch x 3/4 inch 19 c) Provide tension(stretcher)bars where chain link fabric meets terminal 20 posts. 21 8) Tension wire 22 a) Galvanized coated steel wire,6 gauge, [0.192 inch] diameter wire 23 b) Tensile strength: 75,000 psi 24 9) Truss rods&tightener 25 a) Steel rods with minimum diameter of 5/16 inch 26 b) Capable of withstanding a tension of minimum 2,000 pounds 27 10)Nuts and bolts are galvanized. 28 2. Wrought Iron Fence: specified per Drawings. 29 3. Steel Tube Fence: specified per Drawings. 30 4. Setting Materials 31 a. Concrete 32 1) Minimum 28 day compressive strength of 3,000 psi 33 2) Bagged concrete allowed. 34 b. Drive Anchors 35 1) Galvanized angles 36 2) ASTM A 36 steel 37 3) 1 inch x 1 inch x 30 inch galvanized shoe clamps to secure angles to posts. 38 2.3 ACCESSORIES [NOT USED] 39 2.4 SOURCE QUALITY CONTROL [NOT USED] 40 PART 3 - EXECUTION 41 3.1 INSTALLERS [NOT USED] 42 3.2 EXAMINATION 43 A. Verification of Conditions 44 1. Verify areas to receive fencing are completed to final grades and elevations. 45 2. Ensure property lines and legal boundaries of work are clearly established CITY OF FORT WORTH Park Improvements at Terry,Northside.High Crest,and Su nmerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20.2012 3231 13-6 CHAIN LINK FENCE AND GATES Page 6 of 7 1 3.3 PREPARATION [NOT USED] 2 3.4 INSTALLATION 3 A. Chain Link Fence Framing 4 1. Locate terminal post at each fence termination and change in horizontal or vertical 5 direction of 30 degrees or more. 6 2. Space line posts uniformly at 10 feet on center. 7 3. Set all posts in concrete 8 a. Drill holes in firm, undisturbed or compacted soil. 9 b. Drill hole diameter 4 times greater than outside dimension of post. 10 c. Set post bottom 24 inches below surface when in firm,undisturbed soil. 11 d. Excavate deeper as required for adequate support in soft and loose soils, and for 12 posts with heavy lateral loads. 13 e. Place concrete around posts in a continuous pour. Trowel finish around post. 14 Slope to direct water away from posts. 15 4. Check each post for vertical and top alignment,and maintain in position during 16 placement and finishing operations. 17 5. Bracing 18 a. Install horizontal pipe brace at mid-height for fences 6 feet and taller,on each 19 side of terminal posts. 20 b. Firmly attach with fittings. 21 c. Install diagonal truss rods at these points. 22 d. Adjust truss rod,ensuring posts remain plumb. 23 6. Tension wire 24 a. Provide tension wire at bottom of fabric and at top, if top rail is not specified. 25 b. Install tension wire before stretching fabric and attach to each post with ties. 26 c. Secure tension wire to fabric with 12-1/2 gauge hog rings 24 inches on center. 27 7. Top rail 28 a. Install lengths, 21 feet 29 b. Connect joints with sleeves for rigid connections for expansion/contraction. 30 8. Center Rails for fabric height 12 feet and taller. 31 a. Install mid rails between posts with fittings and accessories. 32 9. Bottom Rails: Install bottom rails between posts with fittings and accessories. 33 B. Chain Link Fabric Installation 34 1. Fabric 35 a. Install fabric on security side and attach so that fabric remains in tension after 36 pulling force is released. 37 b. Leave approximately 2 inches between finish grade and bottom selvage. 38 c. Attach fabric with wire ties to line posts at 15 inches on center and to rails, 39 braces, and tension wire at 24 inches on center. 40 2. Tension (stretcher)bars 41 a. Pull fabric taut. 42 b. Thread tension bar through fabric and attach to terminal posts with bands or 43 clips spaced maximum of 15 inches on center. 44 3. Accessories 45 a. Tie wires: Bend ends of wire to minimize hazard to persons and clothing. 46 b. Fasteners: Install nuts on side of fence opposite fabric side for added security. CITY OF FORT WORTH Park Improvements at'reny,Northside,High Crest,and Summer5elds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20 2012 3231 13-7 CHAIN LINK FENCE AND GATES Page 7 of 7 1 c. Slats: Install slats in accordance with manufacturer's instructions. 2 C. Wrought Iron Installation: install per Drawings 3 D. Steel Tube Fence: install per Drawings 4 3.5 REPAIR/RESTORATION [NOT USED] 5 3.6 RE-INSTALLATION [NOT USED] 6 3.7 FIELD QUALITY CONTROL [NOT USED] 7 3.8 SYSTEM STARTUP [NOT USED] 8 3.9 ADJUSTING [NOT USED] 9 3.10 CLEANING [NOT USED] 10 3.11 CLOSEOUT ACTIVITIES [NOT USED] 11 3.12 PROTECTION [NOT USED] 12 3.13 MAINTENANCE [NOT USED] 13 3.14 ATTACHMENTS [NOT USED] 14 END OF SECTION 15 Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D.Johnson 1.1.A.modified to describe when City would pay for fence replacement on utility projects 16 CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Smnmer6elds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20.2012 This page is intentionally blank. 3231 29- 1 WOOD FENCE AND GATES Page 1 of 5 1 SECTION 32 3129 2 WOOD FENCE AND GATES 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes 6 1. Construction of wood fences and gates along boundaries,property lines in 7 accordance with the City's Zoning Ordinance. 8 2. On utility projects: 9 a. When existing fence is within the project Site(i.e.parallel to the utility trench 10 and/or within utility easement)and is directly disturbed by construction I 1 activities,fencing will be paid for as listed in Article 1.2 below. 12 b. When existing fence is crossing the proposed utility trench,the work performed 13 and materials furnished in accordance with fence replacement will be 14 considered subsidiary to the trench and no other compensation will be allowed. 15 c. When existing fence is outside of the limits of the project Site or is identified as 16 protected on the Drawings and is disturbed and/or by construction activities, 17 replacement will be at the expense of the Contractor and no other compensation 18 will be allowed. 19 B. Deviations from this City of Fort Worth Standard Specification 20 1. None. 21 C. Related Specification Sections include,but are not necessarily limited to: 22 1. Division 0-Bidding Requirements, Contract Forms, and Conditions of the Contract 23 2. Division 1 -General Requirements 24 1.2 PRICE AND PAYMENT PROCEDURES 25 A. Measurement and Payment 26 1. Measurement 27 a. Measurement for this Item shall be by the linear foot of Wood Fence installed, 28 including gates. 29 2. Payment 30 a. The work performed and materials furnished in accordance with this Item and 31 measured as provided under"Measurement"will be paid for at the unit price 32 bid per linear foot of Wood Fence installed for by height. 33 3. The price bid shall include: 34 a. Furnishing all materials for fence and gates 35 b. All preparation, erection and installation of materials 36 1.3 REFERENCES 37 A. Reference Standards 38 1. Reference standards cited in this specification refer to the current reference standard 39 published at the time of the latest revision date logged at the end of this 40 specification, unless a date is specifically cited. 41 2. American Society for Testing and Materials(ASTM): CITY OF FORT WORTH Park Improvements at Terry,Northside.High Crest.and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20.2012 3231 29-2 WOOD FENCE AND GATES Page 2 of 5 1 a. A 123, Standard Specification for Zinc(Hot-Dip Galvanized) Coatings on Iron 2 and Steel Products 3 b. A 500, Standard Specification for Cold-Formed Welded and Seamless Carbon 4 Steel Structural Tubing in Rounds and Shapes 5 c. F 1043, Standard Specification for Strength and Protective Coatings on Steel 6 Industrial Chain Link Fence Framework 7 d. F 1083, Standard Specification for Pipe, Steel,Hot-Dipped Zinc-Coated 8 (Galvanized)Welded,for Fence Structures 9 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 10 1.5 SUBMITTALS 11 A. Shop drawings: Layout offences and gates with dimensions, details,and finishes of 12 components,accessories and post foundations 13 B. Product data: Manufacturer's catalog cuts indicating material compliance and specified 14 options 15 C. Building Permit:All fences over 6 feet 16 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 17 1.7 CLOSEOUT SUBMITTALS [NOT USED] 18 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 19 1.9 QUALITY ASSURANCE [NOT USED] 20 1.10 DELIVERY,STORAGE,AND HANDLING [NOT USED] 21 1.11 FIELD [SITE] CONDITIONS [NOT USED] 22 1.12 WARRANTY [NOT USED] 23 PART 2- PRODUCTS 24 2.1 OWNER-FURNISHED PRODUCTS [NOT USED] 25 2.2 MATERIALS 26 A. General 27 1. Gate hinges and post caps shall be of steel,malleable iron,ductile iron or equal. 28 2. Post tops may be of aluminum. 29 B. Slats: Redwood or cedar free from all major decay or defects which would weaken or 30 otherwise cause them to be unsuitable for fence slats. 31 C. Bottom and Top Rail: Minimum 2-inch x 4-inch x 8-foot cedar stud or match existing. 32 D. Corner, Gate,End, or Line Posts 33 1. Wood Posts 34 a. Minimum size: 4-inch x 4-inch cedar wood post or match existing 35 b. Free from all decay, splits,multiple cracks, or any other defect which would 36 weaken the posts or otherwise cause them to be structurally unsuitable for the 37 purpose intended 38 2. Steel Posts 39 a. Steel pipe-Type I CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Su nmerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 32 31 29-3 WOOD FENCE AND GATES Page 3 of 5 1 1) ASTM F 1083 2 2) Standard weight schedule 40 3 3) Minimum yield strength: 30,000 psi 4 4) Sizes as indicated on Drawings 5 5) Hot-dipped galvanized with minimum average 1.8 oz/ft2 of coated surface 6 area. 7 b. Steel pipe-Type II 8 1) ASTM F 1043,Group IC 9 2) Minimum yield strength: 50,000 psi 10 3) Sizes as indicated on Drawings 11 4) Protective coating per ASTM F 1043 12 5) External coating Type B 13 a) Zinc with organic overcoat 14 b) 0.9 oz/ft2 minimum zinc coating with chromate conversion coating and 15 verifiable polymer film 16 6) Internal coating Type B 17 a) Minimum 0.9 oz/ft'zinc or Type D,zinc pigmented, 81 percent 18 nominal coating, minimum 3 mils 19 c. Formed steel ("C")sections 20 1) Roll formed steel shapes complying with ASTM F 1043, Group 1I 21 2) Minimum yield strength:45,000 psi (310 MPa) 22 3) Sizes as indicated on Drawings 23 4) External coating per ASTM F 1043,Type A 24 a) Minimum average 2.0 0z/ft2 of zinc per ASTM A 123 25 d. Steel square sections 26 1) ASTM A 500, Grade B 27 2) Minimum yield strength: 40,000 psi 28 3) Sizes as indicated 29 4) Hot-dipped galvanized with minimum 1.8 oz/ft2 of coated surface area 30 3. Accessories 31 a. Post caps 32 1) Formed steel or cast malleable iron weather tight closure cap for tubular 33 posts. 34 2) Provide one cap for each post. 35 3) Cap to have provision for barbed wire when necessary. 36 4) "C"shaped line post without top rail or barbed wire supporting arms do not 37 require post caps. 38 5) Where top rail is used,provide tops to permit passage of top rail. 39 4. Setting Materials 40 a. Concrete 41 1) Minimum 28 day compressive strength of 3,000 psi 42 2) Bagged concrete allowed. 43 2.3 ACCESSORIES [NOT USED] 44 2.4 SOURCE QUALITY CONTROL [NOT USED] 45 PART 3 - EXECUTION 46 3.1 INSTALLERS [NOT USED] CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest.and Swnmerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265_02266 Revised December 20.2012 323129-4 WOOD FENCE AND GATES Page 4 of 5 1 3.2 EXAMINATION 2 A. Verification of Conditions 3 1. Verify areas to receive fencing are completed to final grades and elevations. 4 2. Ensure property lines and legal boundaries of work are clearly established. 5 3.3 PREPARATION [NOT USED] 6 3.4 INSTALLATION 7 A. Wood Fence Framing 8 1. Steel Posts are required for all required screening fences. 9 2. Locate terminal post at each fence termination and change in horizontal or vertical 10 direction of 30 degrees or more. 11 3. Space line posts uniformly at 10 feet on center. 12 4. Set all posts in concrete. 13 a. Drill holes in firm,undisturbed or compacted soil. 14 b. Drill hole diameter 4 times greater than outside dimension of post(minimum 15 12 inches). 16 c. Set post bottom 24 inches below surface when in firm,undisturbed soil. 17 d. Excavate deeper as required for adequate support in soft and loose soils,and 18 for posts with heavy lateral loads. 19 e. Place concrete around posts in a continuous pour. 20 f. Trowel finish around post. Slope to direct water away from posts. 21 5. Check each post for vertical and top alignment,and maintain in position during 22 placement and finishing operations. 23 B. Slats 24 1. Place slats approximately 1 inch above the ground, and on a straight grade between 25 posts by excavating high points of the ground. 26 2. Fasten slats to top and bottom railings with 2 galvanized screws designed for wood 27 fence construction at both the top and bottom rail. 28 3.5 REPAIR/RESTORATION [NOT USED] 29 3.6 RE-INSTALLATION [NOT USED] 30 3.7 FIELD QUALITY CONTROL [NOT USED] 31 3.8 SYSTEM STARTUP [NOT USED] 32 3.9 ADJUSTING [NOT USED] 33 3.10 CLEANING [NOT USED] 34 3.11 CLOSEOUT ACTIVITIES [NOT USED] 35 3.12 PROTECTION [NOT USED] 36 3.13 MAINTENANCE [NOT USED] 37 3.14 ATTACHMENTS [NOT USED] 38 END OF SECTION 39 CITY OF FORT WORTH Park Improvements at Teary,Nordiside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265_02266 Revised December 20.2012 323129-5 WOOD FENCE AND GATES Page 5 of 5 Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D.Johnson I.LA.modified to describe when City would pay for fence replacement on utility projects 1 CITY OF FORT WORTH Park Improvements at TeM,,Nortbside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENT'S 02263,02264,02265,02266 Revised December 20,2012 This page is intentionally blank. 3292 13- 1 HYDROMULCHING,SEEDING AND SODDING Pagel of 8 I SECTION 32 92 13 2 HYDROMULCHING, SEEDING AND SODDING 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Furnishing and installing grass sod and permanent seeding as shown on Drawings, 7 or as directed. 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include,but are not necessarily limited to: 11 1. Division 0-Bidding Requirements, Contract Forms, and Conditions of the Contract 12 2. Division 1 -General Requirements 13 3. Section 32 91 19—Topsoil Placement and Finishing of Parkways 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Block Sod Placement 17 a. Measurement 18 1) Measurement for this Item shall be by the square yard of Block Sod placed. 19 b. Payment 20 1) The work performed and materials furnished in accordance with this Item 21 and measured as provided under"Measurement"will be paid for at the unit 22 price bid per square yard of Block Sod placed. 23 c. The price bid shall include: 24 1) Furnishing and placing all sod 25 2) Rolling and tamping 26 3) Watering(until established) 27 4) Disposal of surplus materials 28 2. Seeding 29 a. Measurement 30 1) Measurement for this Item shall be by the square yard of Seed spread. 31 b. Payment 32 1) The work performed and materials furnished in accordance with this Item 33 and measured as provided under"Measurement"will be paid for at the unit 34 price bid per square yard of Seed placed for various installation methods. 35 c. The price bid shall include: 36 1) Furnishing and placing all Seed 37 2) Furnishing and applying water for seed fertilizer 38 3) Slurry and hydraulic mulching 39 4) Fertilizer 40 5) Watering and mowing(until established) 41 6) Disposal of surplus materials 42 3. Mowing 43 a. Measurement CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Smnmerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20.2012 329213-2 HYDROMULCHING,SEEDING AND SODDING Page 2 of 8 1 1) Measurement for this Item shall per'each. 2 b. Payment 3 1) The work performed and materials furnished in accordance with this Item 4 and measured as provided under"Measurement"will be paid for at the unit 5 price bid per each. 6 1.3 REFERENCES [NOT USED] 7 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 8 1.5 ACTION SUBMITTALS [NOT USED] 9 1.6 INFORMATIONAL SUBMITTALS 10 A. Seed 11 1. Vendors' certification that seeds meet Texas State seed law including: 12 a. Testing and labeling for pure live seed(PLS) 13 b. Name and type of seed 14 2. All seed shall be tested in a laboratory with certified results presented to the City in 15 writing,prior to planting. 16 3. All seed to be of the previous season's crop and the date on the container shall be 17 within 12 months of the seeding date. 18 1.7 CLOSEOUT SUBMITTALS [NOT USED] 19 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 20 1.9 QUALITY ASSURANCE [NOT USED] 21 1.10 DELIVERY,STORAGE,AND HANDLING 22 A. Block Sod 23 1. Protect from exposure to wind, sun and freezing. 24 2. Keep stacked sod moist. 25 B. Seed 26 1. If using native grass or wildflower seed, seed must have been harvested within 100 27 miles of the construction site. 28 2. Each species of seed shall be supplied in a separate, labeled container for 29 acceptance by the City. 30 C. Fertilizer 31 1. Provide fertilizer labeled with the analysis. 32 2. Conform to Texas fertilizer law. 33 1.11 FIELD [SITE] CONDITIONS [NOT USED] 34 1.12 WARRANTY [NOT USED] 35 PART 2- PRODUCTS [NOT USED] 36 2.1 OWNER-FURNISHED PRODUCTS [NOT USED] 37 2.2 MATERIALS AND EQUIPMENT 38 A. Materials CITY OF FORT WORTI I Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 3292 13-3 HYDROMULCHING,SEEDING AND SODDING Page 3 of 8 1 1. Block Sod 2 a. Sod Varieties(match existing if applicable) 3 1) "Stenotaphriun secundatum" (St. Augustine grass) 4 2) "Cynodon dactylon" (Common Bermudagrass) 5 3) "Buchloe dactyloides" (Buffalograss) 6 4) an approved hybrid of Common Bermudagrass 7 5) or an approved Zoysiagrass 8 b. Sod must contain stolons, leaf blades,rhizomes and roots. 9 c. Sod shall be alive, healthy and free of insects, disease,stones, undesirable 10 foreign materials and weeds and grasses deleterious to its growth or which 11 might affect its subsistence or hardiness when transplanted. 12 d. Minimum sod thickness: 3/4 inch 13 e. Maximum grass height: 2 inches 14 f. Acceptable growing beds 15 1) St. Augustine grass sod: clay or clay loam topsoil 16 2) Bermuda grasses and zoysia grasses: sand or sandy loam soils 17 g. Dimensions 18 1) Machine cut to uniform soil thickness. 19 2) Sod shall be of equal width and of a size that permits the sod to be lifted, 20 handled and rolled without breaking. 21 h. Broken or torn sod or sod with uneven ends shall be rejected. 22 2. Seed 23 a. General 24 1) Plant all seed at rates based on pure live seed(PLS) 25 a) Pure Live Seed(PLS)determined using the formula: 26 (1) Percent Pure Live Seed=Percent Purity x [(Percent Germination+ 27 Percent Firm or Hard Seed)+ 100] 28 2) Availability of Seed 29 a) Substitution of individual seed types due to lack of availability may be 30 permitted by the City at the time of planting. 31 b) Notify the City prior to bidding of difficulties locating certain species. 32 3) Weed seed 33 a) Not exceed ten percent by weight of the total of pure live seed(PLS) 34 and other material in the mixture 35 b) Seed not allowed: 36 (1) Johnsongrass 37 (2) Nutgrass seed 38 4) Harvest seed within 1-year prior to planting 39 b. Non-native Grass Seed 40 1) Plant between April 15 and September 10 41 Lbs. Common Name Botanical Name Purity Germination PLS/Acre (percent) (percent) 25 Bermuda(unhulled) cynodon dactylon 85 90 75 Bermuda(hulled) c}modon dactylon 95 90 42 43 2) Plant between September 10 and April 15 44 Lbs. Common Name Botanical Name Purity Germination PLS/Acre (percent) (percent) CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Smnmerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 329213-4 HYDROMULCHING,SEEDING AND SODDING Page 4 of 8 220 Rye Grass lolitnn tnultiflorton 85 90 75 Bermuda(unhulled) cynodon duetylon 95 90 1 2 c. Native Grass Seed 3 1) Plant between February 1 and October 1. 4 Lbs. PLS/Acre Common Name Botanical Name 1.6 Green Sprangletop Leplochloa dubia 5.5 Sideoats Grama* Bouteloua em7ipendula 3.7 Little Bluestem* Schizachyt•ittm scopa»um 17.0 Buffalograss Buchloe dactyloides 1.8 Indian Grass* Sorghastrum nutans 0.5 Sand Lovegrass* Eragrostis trichodes 6.0 Big Bluestem Andropogon gerardii 8.0 Eastern Grama Tripscacum dactyloides 1.2 Blue Grama Bouteloua gracilis 1.8 Switchgrass Panicum virgalum 10.0 Prairie Wildrye* Elytnus canadensis 5 6 d. Wildflower Seed 7 1) Plant between the following: 8 a) March 5 and May 31 9 b) September I and December 1 10 Lbs.PLS/Acre Common Name Botanical Name 3.0 Bush Sunflower Sinsia calva 5.0 Butterfly Weed Asclepias tuberosa 2.0 Clasping Coneflower* Rudbeckia amplexicaulis 3.0 Golden Wave Coreopsis basalis 13.4 Illinois Bundleflower Desmanthus illinoensis 13.6 Partridge Pea Cassia fascictdata 2.0 Prairie Verbena Verbena bipinnatifida 8.0 Texas Yellow Star Lindheimeri texana 8.0 Winecup Callirhoe involcrata 2.0 Black-eyed Susan Rudbeckia hirta 18.0 Cutleaf Daisy Engeltnannia pinnatifida 2.0 Obedient Plant Physostegia intermedia 3.0 Pitcher Sage Salvia azurea 2.0 Plains Coreopsis Coreopsis tinctoria 8.0 Scarlet Sage Salvia coccinea 11 *not to be planted within ten feet of a road or parking lot or within three feet of a 12 walkway 13 14 e. Temporary Erosion Control Seed 15 1) Consist of the sowing of cool season plant seeds. 16 3. Mulch 17 a. For use with conventional mechanical or hydraulic planting of seed. 18 b. Wood cellulose fiber produced from virgin wood or recycled paper-by-products 19 (waste products from paper mills or recycled newspaper). 20 c. No growth or germination inhibiting factors. 21 d. No more than ten percent moisture, air dry weight basis. 22 e. Additives: binder in powder form. CITY OF FORT WORTH Park Improvements at Teny,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 32 92 13-5 HYDROMULCHING,SEEDING AND SODDING Page 5 of 8 1 f. Form a strong moisture retaining mat. 2 4. Fertilizer 3 a. Acceptable condition for distribution 4 b. Applied uniformly over the planted area 5 c. Analysis 6 1) 16-20-0 7 2) 16-8-8 8 d. Fertilizer rate: 9 1) Not required for wildflower seeding 10 2) Newly established seeding areas- 100 pounds of nitrogen per acre 11 3) Established seeding areas- 150 pounds of nitrogen per acre 12 5. Topsoil: See Section 32 91 19. 13 6. Water: clean and free of industrial wastes or other substances harmful to the 14 germination of the seed or to the growth of the vegetation. 15 7. Soil Retention Blanket 16 a. "Curlex I° from American Excelsior, 900 Ave. H East,Post Office Box 5624, 17 Arlington,Texas 76001, 1-800-777-SOIL or approved equal. 18 19 2.3 ACCESSORIES [NOT USED] 20 2.4 SOURCE QUALITY CONTROL [NOT USED] 21 PART 3- EXECUTION [NOT USED] 22 3.1 INSTALLERS [NOT USED] 23 3.2 EXAMINATION [NOT USED] 24 3.3 PREPARATION 25 A. Surface Preparation: clear surface of all material including: 26 1. Stumps, stones, and other objects larger than one inch. 27 2. Roots,brush, wire, stakes, etc. 28 3. Any objects that may interfere with seeding or maintenance. 29 B. Tilling 30 1. Compacted areas:till 1 inch deep 31 '2. Areas sloped greater than 3:1:run a tractor parallel to slope to provide less 32 seed/water run-off 33 3. Areas near trees: Do not till deeper than 1/2 inch inside "drip line" of trees. 34 3.4 INSTALLATION 35 A. Block Sodding 36 1. General 37 a. Place sod between curb and walk and on terraces that is the same type grass as 38 adjacent grass or existing lawn. 39 b. Plant between the average last freeze date in the spring and 6 weeks prior to the 40 average first freeze in the fall. 41 2. Installation CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Smnmerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 329213-6 HYDROMULCHING,SEEDING AND SODDING Page 6 of 8 1 a. Plant sod specified after the area has been completed to the lines and grades 2 shown on the Drawings with 6 inches of topsoil. 3 b. Use care to retain native soil on the roots of the sod during the process of 4 excavating, hauling and planting. 5 c. Keep sod material moist from the time it is dug until planted. 6 d. Place sod so that the entire area designated for sodding is covered. 7 e. Fill voids left in the solid sodding with additional sod and tamp. 8 f. Roll and tamp sod so that sod is in complete contact with topsoil at a uniform 9 slope. 10 g. Peg sod with wooden pegs(or wire staple) driven through the sod block to the 11 firm earth in areas that may slide due to the height or slope of the surface or 12 nature of the soil. 13 3. Watering and Finishing 14 a. Furnish water as an ancillary cost to Contractor by means of temporary 15 metering/irrigation, water truck or by any other method necessary to achieve 16 an acceptable stand of turf as defined in 3.13.13. 17 b. Thoroughly water sod immediately after planted. 18 c. Water until established. 19 d. Generally, an amount of water that is equal to the average amount of rainfall 20 plus 1/2 inch per week should be applied until accepted. If applicable, plant 21 large areas by irrigation zones to ensure areas are watered as soon as they are 22 planted. 23 B. Seeding 24 1. General 25 a. Seed only those areas indicated on the Drawings and areas disturbed by 26 construction. 27 b. Mark each area to be seeded in the field prior to seeding for City approval. 28 2. Broadcast Seeding 29 a. Broadcast seed in 2 directions at right angles to each other. 30 b. Harrow or rake lightly to cover seed. 31 c. Never cover seed with more soil than twice its diameter. 32 d. For wildflower plantings: 33 1) Scalp existing grasses to 1 inch 34 2) Remove grass clippings, so seed can make contact with the soil. 35 3. Mechanically Seeding(Drilling): 36 a. Uniformly distribute seed over the areas shown on the Drawings or as directed. 37 b. All varieties of seed and fertilizer may be distributed at the same time provided 38 that each component is uniformly applied at the specified rate. 39 c. Drill seed at a depth of 1/4 inch to 3/8 inch utilizing a pasture or rangeland type 40 drill. 41 d. Drill on the contour of slopes 42 e. After planting roll with a roller integral to the seed drill,or a corrugated roller 43 of the "Cultipacker"type. 44 f. Roll slope areas on the contour. 45 4. Hydromulching 46 a. Mixing: Seed, mulch,fertilizer and water may be mixed provided that: 47 1) Mixture is uniformly suspended to form a homogenous slurry. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 329213-7 HYDROMULCHING,SEEDING AND SODDING Page 7 of 8 1 2) Mixture forms a blotter-like ground cover impregnated uniformly with 2 grass seed. 3 3) Mixture is applied within 30 minutes after placed in the equipment. 4 b. Placing 5 1) Uniformly distribute in the quantity specified over the areas shown on the 6 Drawings or as directed. 7 5. Fertilizing: uniformly apply fertilizer over seeded area. 8 6. Watering 9 a. Furnish water by means of temporary metering/irrigation, water truck or by 10 any other method necessary to achieve an acceptable stand of turf as defined in 11 3.13.B. 12 b. Water soil to a minimum depth of 4 inches within 48 hours of seeding. 13 c. Water as direct by the City at least twice daily for 14 days after seeding in such 14 a manner as to prevent washing of the slopes or dislodgement of the seed. 15 d. Water until final acceptance. 16 e. Generally, an amount of water that is equal to the average amount of rainfall 17 plus 1/2 inch per week should be applied until accepted. 18 3.5 REPAIR/RESTORATION [NOT USED] 19 3.6 RE-INSTALLATION [NOT USED] 20 3.7 FIELD QUALITY CONTROL [NOT USED] 21 3.8 SYSTEM STARTUP [NOT USED] 22 3.9 ADJUSTING [NOT USED] 23 3.10 CLEANING [NOT USED] 24 3.11 CLOSEOUT ACTIVITIES 25 3.12 PROTECTION [NOT USED] 26 3.13 MAINTENANCE 27 A. Block Sodding 28 1. Water and mow sod until completion and final acceptance of the Project or as 29 directed by the City. 30 2. Sod shall not be considered finally accepted until the sod has started to peg down 31 (roots growing into the soil)and is free from dead blocks of sod. 32 B. Seeding 33 1. Water and mow sod until completion and final acceptance of the Project or as 34 directed by the City. 35 2. Maintain the seeded area until each of the following is achieved: 36 a. Vegetation is evenly distributed 37 b. Vegetation is free from bare areas 38 3. Turf will be accepted once fully established. 39 a. Bermudagrass and Blue grama seeded area must have 100 percent growth to a 40 height of 3 inches with 1 mow cycle performed by the Contractor prior to 41 consideration of acceptance by the City. Wildflowers should show emergence 42 at 60%coverage. 43 C. Rejection CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Su nmerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 329213-8 HYDROMULCHING,SEEDING AND SODDING Page 8 of 8 1 1. City may reject block sod or seeded area on the basis of weed populations. 2 3.14 ATTACHMENTS [NOT USED] 3 END OF SECTION 4 Revision Log DATE NAME SUMMARY OF CHANGE 5 CITY OF FORT WORTH Park Improvements at Terty,Northside,High Crest,and Smmner5elds Parks STANDARD CONSTRUCTION SPECIFICA'T'ION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 3305 10- 1 UTILITY TRENCH EXCAVATION,EMBEDMENT,AND BACKFILL Page 1 of 19 1 SECTION 33 05 10 2 UTILITY TRENCH EXCAVATION, EMBEDMENT AND BACKFILL 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Excavation,Embedment and Backfill for: 7 a. Pressure Applications 8 1) Water Distribution or Transmission Main 9 2) Wastewater Force Main 10 3) Reclaimed Water Main 11 b. Gravity Applications 12 1) Wastewater Gravity Mains 13 2) Storm Sewer Pipe and Culverts 14 3) Storm Sewer Precast Box and Culverts 15 2. Including: 16 a. Excavation of all material encountered, including rock and unsuitable materials 17 b. Disposal of excess unsuitable material 18 c. Site specific trench safety 19 d. Pumping and dewatering 20 e. Embedment 21 f. Concrete encasement for utility lines 22 g. Backfill 23 h. Compaction 24 B. Deviations from this City of Fort Worth Standard Specification 25 1. None. 26 C. Related Specification Sections include, but are not necessarily limited to: 27 1. Division 0—Bidding Requirements, Contract Forms, and Conditions of the 28 Contract 29 2. Division 1 —General Requirements 30 3. Section 02 41 13—Selective Site Demolition 31 4. Section 02 41 15—Paving Removal 32 5. Section 02 41 14—Utility Removal/Abandonment 33 6. Section 03 30 00—Cast-in-place Concrete 34 7. Section 03 34 13—Controlled Low Strength Material (CLSM) 35 8. Section 31 10 00—Site Clearing 36 9. Section 31 25 00—Erosion and Sediment Control 37 10. Section 33 05 26—Utility Markers/Locators 38 11. Section 34 71 13—Traffic Control 39 1.2 PRICE AND PAYMENT PROCEDURES 40 A. Measurement and Payment CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Smntnerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,022657 02266 Revised June 19,2013 3305 I0-2 UTILITY TRENCH EXCAVATION,EMBEDMENT,AND BACKFILL Page 2 of 19 1 1. Trench Excavation,Embedment and Backfill associated with the installation of an 2 underground utility or excavation 3 a. Measurement 4 1) This Item is considered subsidiary to the installation of the utility pipe line 5 as designated in the Drawings. 6 b. Payment 7 1) The work performed and the materials furnished in accordance with this 8 Item are considered subsidiary to the installation of the utility pipe for the 9 type of embedment and backfill as indicated on the plans.No other 10 compensation will be allowed. 11 2. Imported Embedment or Backfill 12 a. Measurement 13 1) Measured by the cubic yard as delivered to the site and recorded by truck 14 ticket provided to the City 15 b. Payment 16 1) Imported fill shall only be paid when using materials for embedment and 17 backfill other than those identified in the Drawings. The work performed 18 and materials furnished in accordance with pre-bid item and measured as 19 provided under"Measurement"will be paid for at the unit price bid per 20 cubic yard of"Imported Embedment/Backfill" delivered to the Site for: 21 a) Various embedment/backfill materials 22 c. The price bid shall include: 23 1) Furnishing backfill or embedment as specified by this Specification 24 2) Hauling to the site 25 3) Placement and compaction of backfill or embedment 26 3. Concrete Encasement for Utility Lines 27 a. Measurement 28 1) Measured by the cubic yard per plan quantity. 29 b. Payment 30 1) The work performed and materials furnished in accordance with this Item 31 and measured as provided under"Measurement"will be paid for at the unit 32 price bid per cubic yard of"Concrete Encasement for Utility Lines"per 33 plan quantity. 34 c. The price bid shall include: 35 1) Furnishing, hauling, placing and finishing concrete in accordance with 36 Section 03 30 00 37 2) Clean-up 38 4. Ground Water Control 39 a. Measurement 40 1) Measurement shall be lump sum when a ground water control plan is 41 specifically required by the Contract Documents. 42 b. Payment 43 1) Payment shall be per the lump sum price bid for"Ground Water Control" 44 including: 45 a) Submittals 46 b) Additional Testing 47 c) Ground water control system installation 48 d) Ground water control system operations and maintenance 49 e) Disposal of water CITY OF FORT WORTH Park Improvements at Terry.Northside,High Crest,and Sarnwnerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised June 19,2013 330510-3 UTILITY TRENCH EXCAVATION,EMBEDMENT,AND BACKFILL Page 3 of 19 l f) Removal of ground water control system 2 5. Trench Safety 3 a. Measurement 4 1) Measured per linear foot of excavation for all trenches that require trench 5 safety in accordance with OSHA excavation safety standards(29 CFR Part 6 1926 Subpart P Safety and Health regulations for Construction) 7 b. Payment 8 1) The work performed and materials furnished in accordance with this Item 9 and measured as provided under"Measurement"will be paid for at the unit 10 price bid per linear foot of excavation to comply with OSHA excavation 1 I safety standards(29 CFR Part 1926.650 Subpart P), including,but not 12 limited to, all submittals,labor and equipment. 13 1.3 REFERENCES 14 A. Definitions 15 1. General—Definitions used in this section are in accordance with Terminologies 16 ASTM F412 and ASTM D8 and Terminology ASTM D653, unless otherwise 17 noted. 18 2. Definitions for trench width, backfill,embedment, initial backfill,pipe zone, 19 haunching bedding, springline,pipe zone and foundation are defined as shown in 20 the following schematic: rpA�J. K AS UNIPA EC ASE AS Q \1-3 E.:\\:: M Q j \\ 3Ar.KF LL \ L LLJ LIj 3t __.._. SPI\p,i i`VUL tYE ------f L u . ;, j1 Q �: t �3EDv;t,lc: CUNOATIOv \ V Q CCL;_A ANCE EXCA JA F[� KE IC W —I 21 CITY OF FORT WORTH Park Improvements at Terry.Northside,High Crest.and Summer5elds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265.02266 Revised June 19,2013 330510-4 UTILITY TRENCH EXCAVATION,EMBEDMENT,AND BACKFILL Page 4 of 19 1 3. Deleterious materials—Harmful materials Such as clay lumps, silts and organic 2 material 3 4. Excavated Trench Depth—Distance from the surface to the bottom of the bedding 4 or the trench foundation 5 5. Final Backfill Depth 6 a. Unpaved Areas—The depth of the final backfill measured from the top of the 7 initial backfill to the surface 8 b. Paved Areas—The depth of the final backfil l measured from the top of the 9 initial backfill to bottom of permanent or temporary pavement repair 10 B. Reference Standards 11 1. Reference standards cited in this Specification refer to the current reference 12 standard published at the time of the latest revision date logged at the end of this 13 Specification,unless a date is specifically cited. 14 2. ASTM Standards: 15 a. ASTM C33-08 Standard Specifications for Concrete Aggregates 16 b. ASTM C88-05 Soundness of Aggregate by Use of Sodium Sulfate or 17 Magnesium Sulfate 18 c. ASTM C136-01 Test Method for Sieve Analysis of Fine and Coarse Aggregate 19 d. ASTM D448-08 Standard Classification for Sizes of Aggregate for Road and 20 Bridge Construction. 21 e. ASTM C535-09 Standard Test Method for Resistance to Degradation of Large- 22 Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine 23 f. ASTM D588—Standard Test method for Moisture-Density Relations of Soil- 24 Cement Mixture 25 g. ASTM D698-07 Test Method for Laboratory Compaction Characteristics of 26 Soil Using Stand Efforts(12,400 ft-lb/ft3 600 Kn-m/M3)). 27 h. ASTM 1556 Standard Test Methods for Density and Unit Weight of Soils in 28 Place by Sand Cone Method. 29 i. ASTM 2487— 10 Standard Classification of Soils for Engineering Purposes 30 (Unified Soil Classification System) 31 j. ASTM 2321-09 Underground Installation of Thermoplastic Pipe for Sewers 32 and Other Gravity-Flow Applications 33 k. ASTM D2922—Standard Test Methods for Density of Soils and Soil 34 Aggregate in Place by Nuclear Methods(Shallow Depth) 35 1. ASTM 3017 - Standard Test Method for Water Content of Soil and Rock in 36 place by Nuclear Methods(Shallow Depth) 37 m. ASTM D4254- Standard Test Method for Minimum Index Density and Unit 38 Weight of Soils and Calculations of Relative Density 39 3. OSHA 40 a. Occupational Safety and Health Administration CFR 29, Part 1926-Safety 41 Regulations for Construction, Subpart P-Excavations 42 1.4 ADMINISTRATIVE REQUIREMENTS 43 A. Coordination 44 1. Utility Company Notification 45 a. Notify area utility companies at least 48 hours in advance, excluding weekends 46 and holidays, before starting excavation. CITY OF FORT WORTH Park Improvements at Tern'.Nordtside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised.tune 19,2013 3305 10-5 UTILITY TRENCH EXCAVATION,EMBEDMENT,AND BACKFILL Page 5 of 19 1 b. Request the location of buried lines and cables in the vicinity of the proposed 2 work. 3 B. Sequencing 4 1. Sequence work for each section of the pipe installed to complete the embedment 5 and backfill placement on the day the pipe foundation is complete. 6 2. Sequence work such that proctors are complete in accordance with ASTM D698 7 prior to commencement of construction activities. 8 1.5 SUBMITTALS 9 A. Submittals shall be in accordance with Section 01 33 00. 10 B. All submittals shall be approved by the City prior to construction. 11 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS 12 A. Shop Drawings 13 1. Provide detailed drawings and explanation for ground water and surface water 14 control,if required. 15 2. Trench Safety Plan in accordance with Occupational Safety and Health 16 Administration CFR 29,Part 1926-Safety Regulations for Construction, Subpart P- 17 Excavations 18 3. Stockpiled excavation and/or backfill material 19 a. Provide a description of the storage of the excavated material only if the 20 Contract Documents do not allow storage of materials in the right-of-way of the 21 easement. 22 1.7 CLOSEOUT SUBMITTALS [NOT USED] 23 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 24 1.9 QUALITY ASSURANCE [NOT USED] 25 1.10 DELIVERY, STORAGE,AND HANDLING 26 A. Storage 27 1. Within Existing Rights-of-Way(ROW) 28 a. Spoil, imported embedment and backfill materials may be stored within 29 existing ROW, easements or temporary construction easements, unless 30 specifically disallowed in the Contract Documents. 31 b. Do not block drainage ways, inlets or driveways. 32 c. Provide erosion control in accordance with Section 31 25 00. 33 d. Store materials only in areas barricaded as provided in the traffic control plans. 34 e. In non-paved areas, do not store material on the root zone of any trees or in 35 landscaped areas. 36 2. Designated Storage Areas 37 a. If the Contract Documents do not allow the storage of spoils, embedment or 38 backfill materials within the ROW,easement or temporary construction 39 easement,then secure and maintain an adequate storage location. 40 b. Provide an affidavit that rights have been secured to store the materials on 41 private property. 42 c. Provide erosion control in accordance with Section 31 25 00. CITY OF FORT WORTH Park Improvements at Tem.Northside.High Crest,and Smmnerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264;02265,02266 Revised June 19,2013 330510-6 UTILITY TRENCH EXCAVATION_EMBEDMENT-AND BACKFILL Page 6 of 19 1 d. Do not block drainage ways. 2 e. Only materials used for l working day will be allowed to be stored in the work 3 zone. 4 B. Deliveries and haul-off-Coordinate all deliveries and haul-off. 5 1.11 FIELD [SITE] CONDITIONS 6 A. Existing Conditions 7 1. Any data which has been or may be provided on subsurface conditions is not 8 intended as a representation or warranty of accuracy or continuity between soils.It 9 is expressly understood that neither the City nor the Engineer will be responsible 10 for interpretations or conclusions drawn there from by the Contractor. 11 2. Data is made available for the convenience of the Contractor. 12 1.12 WARRANTY [NOT USED] 13 PART 2- PRODUCTS 14 2.1 OWNER-FURNISHED [OR] OWNER-SUPPLIED PRODUCTS 15 2.2 MATERIALS 16 A. Materials 17 1. Utility Sand 18 a. Granular and free flowing 19 b. Generally meets or exceeds the limits on deleterious substances per Table 1 for 20 fine aggregate according to ASTM C 33 21 c. Reasonably free of organic material 22 d. Gradation: Sieve Size Percent Retained 1 inch 0 3/8 inch 0-10 #40 20-60 #100 95 23 2. Crushed Rock 24 a. Durable crushed rock or recycled concrete 25 b. Meets the gradation of ASTM D448 size numbers 56, 57 or 67 26 c. May be unwashed 27 d. Free from significant silt clay or unsuitable materials 28 e. Percentage of wear not more than 40 percent per ASTM C131 or C535 29 f. Not more than a 12 percent maximum loss when subjective to 5 cycles of 30 sodium sulfate soundness per ASTM C88 31 3. Fine Crushed Rock 32 a. Durable crushed rock 33 b. Meets the gradation of ASTM D448 size numbers 8 or 89 34 c. May be unwashed 35 d. Free from significant silt clay or unsuitable materials. 36 e. Have a percentage of wear not more than 40 percent per ASTM C131 or C535 CITY OF FORT WORTH Park Improvements at Terr),Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised.Tune 19,2013 3305 10-7 UTILITY TRENCH EXCAVATION,EMBEDMENT,AND BACKFILL. Page 7 of 19 1 f. Not more than a 12 percent maximum loss when subjective to 5 cycles of 2 sodium sulfate soundness per ASTM C88 3 4. Ballast Stone 4 a. Stone ranging from 3 inches to 6 inches in greatest dimension. 5 b. May be unwashed 6 c. Free from significant silt clay or unsuitable materials 7 d. Percentage of wear not more than 40 percent per ASTM C131 or C535 8 e. Not more than a 12 percent maximum loss when subjected to 5 cycles of 9 sodium sulfate soundness per ASTM C88 10 5. Acceptable Backfill Material 11 a. In-situ or imported soils classified as CL, CH, SC or GC in accordance with 12 ASTM D2487 13 b. Free from deleterious materials, boulders over 6 inches in size and organics 14 c. Can be placed free from voids 15 d. Must have 20 percent passing the number 200 sieve 16 6. Blended Backfill Material 17 a. In-situ soils classified as SP, SM, GP or GM in accordance with ASTM D2487 18 b. Blended with in-situ or imported acceptable backfill material to meet the 19 requirements of an Acceptable Backfill Material 20 c. Free from deleterious materials,boulders over 6 inches in size and organics 21 d. Must have 20 percent passing the number 200 sieve 22 7. Unacceptable Backfill Material 23 a. In-situ soils classified as ML,MH,PT,OL or OH in accordance with ASTM 24 D2487 25 8. Select Fill 26 a. Classified as SC or CL in accordance with ASTM D2487 27 b. Liquid limit less than 35 28 c. Plasticity index between 8 and 20 29 9. Cement Stabilized Sand (CSS) 30 a. Sand 31 1) Shall be clean, durable sand meeting grading requirements for fine 32 aggregates of ASTM C33 and the following requirements: 33 a) Classified as SW, SP, or SM by the United Soil Classification System 34 of ASTM D2487 35 b) Deleterious materials 36 (1) Clay lumps,ASTM C142, less than 0.5 percent 37 (2) Lightweight pieces,ASTM C123, less than 5.0 percent 38 (3) Organic impurities,ASTM C40, color no darker than standard 39 color 40 (4) Plasticity index of 4 or less when tested in accordance with ASTM 41 D4318. 42 b. Minimum of 4 percent cement content of Type I/II portland cement 43 c. Water 44 1) Potable water, free of soils, acids, alkalis, organic matter or other 45 deleterious substances, meeting requirements of ASTM C94 46 d. Mix in a stationary pug mill, weigh-batch or continuous mixing plant. 47 e. Strength CITY OF FORT WORTH Park Improvements at Teny,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265-,02266 Revised June 19,2013 330510-8 UTILITY TRENCH EXCAVATION,EMBEDMENT.AND BACKFILL Page 8 of 19 1 1) 50 to 150 psi compressive strength at 2 days in accordance with ASTM 2 D1633, Method A 3 2) 200 to 250 psi compressive strength at 28 days in accordance with ASTM 4 D1633, Method A 5 3) The maximum compressive strength in 7 days shall be 400 psi. Backfill 6 that exceeds the maximum compressive strength shall be removed by the 7 Contractor for no additional compensation. 8 f. Random samples of delivered product will be taken in the field at point of 9 delivery for each day of placement in the work area. Specimens will be 10 prepared in accordance with ASTM D1632. i l 10. Controlled Low Strength Material(CLSM) 12 a. Conform to Section 03 34 13 13 11. Trench Geotextile Fabric 14 a. Soils other than ML or OH in accordance with ASTM D2487 15 1) Needle punch, nonwoven geotextile composed of polypropylene fibers 16 2) Fibers shall retain their relative position 17 3) Inert to biological degradation 18 4) Resist naturally occurring chemicals 19 5) UV Resistant 20 6) Mirafi 140N by Tencate,or approved equal 21 b. Soils Classified as ML or OH in accordance with ASTM D2487 22 1) High-tenacity monofilament polypropylene woven yarn 23 2) Percent open area of 8 percent to 10 percent 24 3) Fibers shall retain their relative position 25 4) Inert to biological degradation 26 5) Resist naturally occurring chemicals 27 6) UV Resistant 28 7) Mirafi FW402 by Tencate, or approved equal 29 12. Concrete Encasement 30 a. Conform to Section 03 30 00. 31 2.3 ACCESSORIES [NOT USED] 32 2.4 SOURCE QUALITY CONTROL [NOT USED] 33 PART 3- EXECUTION 34 3.1 INSTALLERS [NOT USED] 35 3.2 EXAMINATION 36 A. Verification of Conditions 37 1. Review all known, identified or marked utilities,whether public or private, prior to 38 excavation. 39 2. Locate and protect all known, identified and marked utilities or underground 40 facilities as excavation progresses. 41 3. Notify all utility owners within the project limits 48 hours prior to beginning 42 excavation. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Sutmnerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised.tune 19.2013 330510-9 UTILITY TRENCH EXCAVATION.EMBEDMENT.AND BACKFILL Page 9 of 19 1 4. The information and data shown in the Drawings with respect to utilities is 2 approximate and based on record information or on physical appurtenances 3 observed within the project limits. 4 5. Coordinate with the Owner(s)of underground facilities. 5 6. Immediately notify any utility owner of damages to underground facilities resulting 6 from construction activities. 7 7. Repair any damages resulting from the construction activities. 8 B. Notify the City immediately of any changed condition that impacts excavation and 9 installation of the proposed utility. 10 3.3 PREPARATION i l A. Protection of In-Place Conditions 12 1. Pavement 13 a. Conduct activities in such a way that does not damage existing pavement that is 14 designated to remain. 15 1) Where desired to move equipment not licensed for operation on public 16 roads or across pavement, provide means to protect the pavement from all 17 damage. 18 b. Repair or replace any pavement damaged due to the negligence of the 19 contractor outside the limits designated for pavement removal at no additional 20 cost to the City. 21 2. Drainage 22 a. Maintain positive drainage during construction and re-establish drainage for all 23 swales and culverts affected by construction. 24 3. Trees 25 a. When operating outside of existing ROW, stake permanent and temporary 26 construction easements. 27 b. Restrict all construction activities to the designated easements and ROW. 28 c. Flag and protect all trees designated to remain in accordance with Section 31 10 29 00. 30 d. Conduct excavation,embedment and backfill in a manner such that there is no 31 damage to the tree canopy. 32 e. Prune or trim tree limbs as specifically allowed by the Drawings or as 33 specifically allowed by the City. 34 1) Pruning or trimming may only be accomplished with equipments 35 specifically designed for tree pruning or trimming. 36 f. Remove trees specifically designated to be removed in the Drawings in 37 accordance with Section 31 10 00. 38 4. Above ground Structures 39 a. Protect all above ground structures adjacent to the construction. 40 b. Remove above ground structures designated for removal in the Drawings in 41 accordance with Section 02 41 13 42 5. Traffic 43 a. Maintain existing traffic, except as modified by the traffic control plan, and in 44 accordance with Section 34 71 13. 45 b. Do not block access to driveways or alleys for extended periods of time unless: 46 1) Alternative access has been provided CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Smnmer6elds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised,tune 19.2013 3305 10- 10 UTILITY TRENCH EXCAVATION,EMBEDMENT,AND BACKFILL Page 10 of I9 1 2) Proper notification has been provided to the property owner or resident 2 3) It is specifically allowed in the traffic control plan 3 c. Use traffic rated plates to maintain access until access is restored. 4 6. Traffic Signal—Poles,Mast Arms,Pull boxes, Detector loops 5 a. Notify the City's Traffic Services Division a minimum of 48 hours prior to any 6 excavation that could impact the operations of an existing traffic signal. 7 b. Protect all traffic signal poles, mast arms,pull boxes,traffic cabinets,conduit 8 and detector loops. 9 c. Immediately notify the City's Traffic Services Division if any damage occurs to 10 any component of the traffic signal due to the contractors activities. I I d. Repair any damage to the traffic signal poles,mast arms,pull boxes,traffic 12 cabinets,conduit and detector loops as a result of the construction activities. 13 7. Fences 14 a. Protect all fences designated to remain. 15 b. Leave fence in the equal or better condition as prior to construction. 16 3.4 INSTALLATION 17 A. Excavation 18 1. Excavate to a depth indicated on the Drawings. 19 2. Trench excavations are defined as unclassified. No additional payment shall be 20 granted for rock or other in-situ materials encountered in the trench. 21 3. Excavate to a width sufficient for laying the pipe in accordance with the Drawings 22 and bracing in accordance with the Excavation Safety Plan. 23 4. The bottom of the excavation shall be firm and free from standing water. 24 a. Notify the City immediately if the water and/or the in-situ soils do not provide 25 for a firm trench bottom. 26 b. The City will determine if any changes are required in the pipe foundation or 27 bedding. 28 5. Unless otherwise permitted by the Drawings or by the City,the limits of the 29 excavation shall not advance beyond the pipe placement so that the trench may be 30 backfilled in the same day. 31 6. Over Excavation 32 a. Fill over excavated areas with the specified bedding material as specified for 33 the specific pipe to be installed. 34 b. No additional payment will be made for over excavation or additional bedding 35 material. 36 7. Unacceptable Backfill Materials 37 a. In-situ soils classified as unacceptable backfill material shall be separated from 38 acceptable backfill materials. 39 b. If the unacceptable backfill material is to be blended in accordance with this 40 Specification,then store material in a suitable location until the material is 41 blended. 42 c. Remove all unacceptable material from the project site that is not intended to be 43 blended or modified. 44 8. Rock—No additional compensation will be paid for rock excavation or other 45 changed field conditions. 46 B. Shoring, Sheeting and Bracing CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Sununer8elds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised.lone 19.2013 330510- I1 UTILITY TRENCH EXCAVATION,EMBEDMENT,AND BACKFILL Page 1 1 of 19 1 1. Engage a Licensed Professional Engineer-in the State of Texas to design a site 2 specific excavation safety system in accordance with Federal and State 3 requirements. 4 2. Excavation protection systems shall be designed according to the space limitations 5 as indicated in the Drawings. 6 3. Furnish,put in place and maintain a trench safety system in accordance with the 7 Excavation Safety Plan and required by Federal, State or local safety requirements. 8 4. If soil or water conditions are encountered that are not addressed by the current 9 Excavation Safety Plan, engage a Licensed Professional Engineer in the State of 10 Texas to modify the Excavation Safety Plan and provide a revised submittal to the I 1 City. 12 5. Do not allow soil,or water containing soil,to migrate through the Excavation 13 Safety System in sufficient quantities to adversely affect the suitability of the 14 Excavation Protection System. Movable bracing, shoring plates or trench boxes 15 used to support the sides of the trench excavation shall not: 16 a. Disturb the embedment located in the pipe zone or lower 17 b. Alter the pipe's line and grade after the Excavation Protection System is 18 removed 19 c. Compromise the compaction of the embedment located below the spring line of 20 the pipe and in the haunching 21 C. Water Control 22 1. Surface Water 23 a. Furnish all materials and equipment and perform all incidental work required to 24 direct surface water away from the excavation. 25 2. Ground Water 26 a. Furnish all materials and equipment to dewater ground water by a method 27 which preserves the undisturbed state of the subgrade soils. 28 b. Do not allow the pipe to be submerged within 24 hours after placement. 29 c. Do not allow water to flow over concrete until it has sufficiently cured. 30 d. Engage a Licensed Engineer in the State of Texas to prepare a Ground Water 31 Control Plan if any of the following conditions are encountered: 32 1) A Ground Water Control Plan is specifically required by the Contract 33 Documents 34 2) If in the sole judgment of the City,ground water is so severe that an 35 Engineered Ground Water Control Plan is required to protect the trench or 36 the installation of the pipe which may include: 37 a) Ground water levels in the trench are unable to be maintained below 38 the top of the bedding 39 b) A firm trench bottom cannot be maintained due to ground water 40 c) Ground water entering the excavation undermines the stability of the 41 excavation. 42 d) Ground water entering the excavation is transporting unacceptable 43 quantities of soils through the Excavation Safety System. 44 e. In the event that there is no bid item for a Ground Water Control and the City 45 requires an Engineered Ground Water Control Plan due to conditions 46 discovered at the site,the contractor will be eligible to submit a change order. 47 f. Control of ground water shall be considered subsidiary to the excavation when: CITY OF FORT WORTH Park Improvements at Teary.Northside.I-ligh Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265.02266 Revised June 19,2013 3305 10-12 UTILITY TRENCH EXCAVATION,EMBEDMENT,AND BACKFILI. Page 12 of 19 1 1) No Ground Water Control Plan is specifically identified and required in the 2 Contract Documents 3 g. Ground Water Control Plan installation, operation and maintenance 4 1) Furnish all materials and equipment necessary to implement, operate and 5 maintain the Ground Water Control Plan. 6 2) Once the excavation is complete, remove all ground water control 7 equipment not called to be incorporated into the work. 8 h. Water Disposal 9 1) Dispose of ground water in accordance with City policy or Ordinance. 10 2) Do not discharge ground water onto or across private property without I 1 written permission. 12 3) Permission from the City is required prior to disposal into the Sanitary 13 Sewer. 14 4) Disposal shall not violate any Federal, State or local regulations. 15 D. Embedment and Pipe Placement 16 1. Water Lines less than,or equal to, 12 inches in diameter: 17 a. The entire embedment zone shall be of uniform material. 18 b. Utility sand shall be generally used for embedment. 19 c. If ground water is in sufficient quantity to cause sand to pump,then use 20 crushed rock as embedment. 21 1) If crushed rock is not specifically identified in the Contract Documents, 22 then crushed rock shall be paid by the pre-bid unit price. 23 d. Place evenly spread bedding material on a film trench bottom. 24 e. Provide firm, uniform bedding. 25 f. Place pipe on the bedding in accordance with the alignment of the Drawings. 26 g. In no case shall the top of the pipe be less than 42 inches from the surface of the 27 proposed grade, unless specifically called for in the Drawings. 28 h. Place embedment, including initial backfill,to a minimum of 6 inches, but not 29 more than 12 inches, above the pipe. 30 i. Where gate valves are present,the initial backfill shall extend to 6 inches above 31 the elevation of the valve nut. 32 j. Form all blocking against undisturbed trench wall to the dimensions in the 33 Drawings. 34 k. Compact embedment and initial backfill. 35 1. Place marker tape on top of the initial trench backfill in accordance with 36 Section 33 05 26. 37 2. Water Lines 16-inches through 24-inches in diameter: 38 a. The entire embedment zone shall be of uniform material. 39 b. Utility sand may be used for embedment when the excavated trench depth is 40 less than 15 feet deep. 41 c. Crushed rock or fine crushed rock shall be used for embedment for excavated 42 trench depths 15 feet, or greater. 43 d. Crushed rock shall be used for embedment for steel pipe. 44 e. Provide trench geotextile fabric at any location where crushed rock or fine 45 crushed rock come into contact with utility sand 46 f. Place evenly spread bedding material on a firm trench bottom. 47 g. Provide firm, uniform bedding. 48 1) Additional bedding may be required if ground water is present in the 49 trench. CITY OF FORT WORTH Park Improvements at Teny,Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised June 19.2013 3305 10-13 UTILITY TRENCH EXCAVATION.EMBEDMENT,AND BACKFILL Page 13 of 19 1 2) If additional crushed rock is required not specifically identified in the 2 Contract Documents,then crushed rock shall be paid by the pre-bid unit 3 price. 4 h. Place pipe on the bedding according to the alignment shown on the Drawings. 5 i. The pipe line shall be within: 6 1) f3 inches of the elevation on the Drawings for 16-inch and 24-inch water 7 lines 8 j. Place and compact embedment material to adequately support haunches in 9 accordance with the pipe manufacturer's recommendations. 10 k. Place remaining embedment including initial backfill to a minimum of 6 inches, I 1 but not more than 12 inches,above the pipe. 12 1. Where gate valves are present,the initial backfill shall extend to up to the valve 13 nut. 14 m. Compact the embedment and initial backfill to 95 percent Standard Proctor 15 ASTM D 698. 16 n. Density test may be performed by City to verify that the compaction of 17 embedment meets requirements. 18 o. Place trench geotextile fabric on top of the initial backfill. 19 p. Place marker tape on top of the trench geotextile fabric in accordance with 20 Section 33 05 26. 21 3. Water Lines 30-inches and greater in diameter 22 a. The entire embedment zone shall be of uniform material. 23 b. Crushed rock shall be used for embedment. 24 c. Provide trench geotextile fabric at any location where crushed rock or fine 25 crushed rock come into contact with utility sand. 26 d. Place evenly spread bedding material on a firm trench bottom. 27 e. Provide firm, uniform bedding. 28 1) Additional bedding may be required if ground water is present in the 29 trench. 30 2) If additional crushed rock is required which is not specifically identified in 31 the Contract Documents,then crushed rock shall be paid by the pre-bid unit 32 price. 33 f. Place pipe on the bedding according to the alignment shown on the Drawings. 34 g. The pipe line shall be within: 35 1) fl inch of the elevation on the Drawings for 30-inch and larger water lines 36 h. Place and compact embedment material to adequately support haunches in 37 accordance with the pipe manufacturer's recommendations. 38 i. For steel pipe greater than 30 inches in diameter,the initial embedment lift shall 39 not exceed the spring line prior to compaction. 40 j. Place remaining embedment, including initial backfill,to a minimum of 6 41 inches,but not more than 12 inches,above the pipe. 42 k. Where gate valves are present,the initial backfill shall extend to up to the valve 43 nut. 44 1. Compact the embedment and initial backfill to 95 percent Standard Proctor 45 ASTM D 698. 46 m. Density test may be performed by City to verify that the compaction of 47 embedment meets requirements. 48 n. Place trench geotextile fabric on top of the initial backfill. 49 o. Place marker tape on top of the trench geotextile fabric in accordance with 50 Section 33 05 26. CITY OF FORT WORTH Park Improvements at"merry,Northside.High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised.Tune 19.2013 3305 10-14 UTILITY TRENCH EXCAVATION.EMBEDMENT.AND BACKFILL Page 14 of 19 1 4. Sanitary Sewer Lines and Storm Sewer Lines(HDPE) 2 a. The entire embedment zone shall be of uniform material. 3 b. Crushed rock shall be used for embedment. 4 c. Place evenly spread bedding material on a firm trench bottom. 5 d. Spread bedding so that lines and grades are maintained and that there are no 6 sags in the sanitary sewer pipe line. 7 e. Provide firm, uniform bedding. 8 1) Additional bedding may be required if ground water is present in the 9 trench. 10 2) If additional crushed rock is required which is not specifically identified in 11 the Contract Documents,then crushed rock shall be paid by the pre-bid unit 12 price. 13 f. Place pipe on the bedding according to the alignment shown in the Drawings. 14 g. The pipe line shall be within 10.1 inches of the elevation, and be consistent 15 with the grade shown on the Drawings. 16 h. Place and compact embedment material to adequately support haunches in 17 accordance with the pipe manufacturer's recommendations. 18 i. For sewer lines greater than 30 inches in diameter,the embedment lift shall not 19 exceed the spring line prior to compaction. 20 j. Place remaining embedment including initial backfill to a minimum of 6 inches, 21 but not more than 12 inches, above the pipe. 22 k. Compact the embedment and initial backfill to 95 percent Standard Proctor 23 ASTM D 698. 24 1. Density test may be performed by City to verify that the compaction of 25 embedment meets requirements. 26 m. Place trench geotextile fabric on top of the initial backfill. 27 n. Place marker tape on top of the trench geotextile fabric in accordance with 28 Section 33 05 26. 29 5. Storm Sewer(RCP) 30 a. The bedding and the pipe zone up to the spring line shall be of uniform 31 material. 32 b. Crushed rock shall be used for embedment up to the spring line. 33 c. The specified backfill material may be used above the spring line. 34 d. Place evenly spread bedding material on a firm trench bottom. 35 e. Spread bedding so that lines and grades are maintained and that there are no 36 sags in the storm sewer pipe line. 37 f. Provide firm,uniform bedding. 38 1) Additional bedding may be required if ground water is present in the 39 trench. 40 2) If additional crushed rock is required which is not specifically identified in 41 the Contract Documents,then crushed rock shall be paid by the pre-bid unit 42 price. 43 g. Place pipe on the bedding according to the alignment of the Drawings. 44 h. The pipe line shall be within 10.1 inches of the elevation, and be consistent 45 with the grade, shown on the Drawings. 46 i. Place embedment material up to the spring line. 47 1) Place embedment to ensure that adequate support is obtained in the haunch. 48 j. Compact the embedment and initial backfill to 95 percent Standard Proctor 49 ASTM D 698. CITY OF FORT WORTH Park Improvements at Teny.Northside,High Crest.and Sutmnerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.02264,02265,02266 Revised.Tune 19.2013 3305 10-15 UTILITY TRENCH EXCAVATION,EMBEDMENT.AND BACKFILL Page 15 of 19 1 k. Density test may be performed by City to verify that the compaction of 2 embedment meets requirements. 3 1. Place trench geotextile fabric on top of pipe and crushed rock. 4 6. Storm Sewer Reinforced Concrete Box 5 a. Crushed rock shall be used for bedding. 6 b. The pipe zone and the initial backfill shall be: 7 1) Crushed rock,or 8 2) Acceptable backfill material compacted to 95 percent Standard Proctor 9 density 10 c. Place evenly spread compacted bedding material on a firm trench bottom. 11 d. Spread bedding so that lines and grades are maintained and that there are no 12 sags in the storm sewer pipe line. 13 e. Provide firm, uniform bedding. 14 1) Additional bedding may be required if ground water is present in the 15 trench. 16 2) If additional crushed rock is required which is not specifically identified in 17 the Contract Documents,then crushed rock shall be paid by the pre-bid unit 18 price. 19 f. Fill the annular space between multiple boxes with crushed rock, CLSM 20 according to 03 34 13. 21 g. Place pipe on the bedding according to the alignment of the Drawings. 22 h. The pipe shall be within f0.1 inches of the elevation, and be consistent with the 23 grade, shown on the Drawings. 24 i. Compact the embedment initial backfill to 95 percent Standard Proctor ASTM 25 D698. 26 7. Water Services(Less than 2 Inches in Diameter) 27 a. The entire embedment zone shall be of uniform material. 28 b. Utility sand shall be generally used for embedment. 29 c. Place evenly spread bedding material on a firm trench bottom. 30 d. Provide film,uniform bedding. 31 e. Place pipe on the bedding according to the alignment of the Plans. 32 f. Compact the initial backfill to 95 percent Standard Proctor ASTM D698. 33 8. Sanitary Sewer Services 34 a. The entire embedment zone shall be of uniform material. 35 b. Crushed rock shall be used for embedment. 36 c. Place evenly spread bedding material on a firm trench bottom. 37 d. Spread bedding so that lines and grades are maintained and that there are no 38 sags in the sanitary sewer pipe line. 39 e. Provide firm,uniform bedding. 40 1) Additional bedding may be required if ground water is present in the 41 trench. 42 2) If additional crushed rock is required which is not specifically identified in 43 the Contract Documents,then crushed rock shall be paid by the pre-bid unit 44 price. 45 f. Place pipe on the bedding according to the alignment of the Drawings. 46 g. Place remaining embedment, including initial backfill,to a minimum of 6 47 inches,but not more than 12 inches, above the pipe. 48 h. Compact the initial backfill to 95 percent Standard Proctor ASTM D698. CITY OF FORT WORTH Park Improvements at Terry,Norihside.High Crest.and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised.tune 19.2013 3305 10- 16 UTILITY TRENCH EXCAVATION,EMBEDMENT,AND BACKFILL Page 16 of 19 1 i. Density test may be required to verify that the compaction meets the density 2 requirements. 3 E. Trench Backfill 4 1. At a minimum, place backfill in such a manner that the required in-place density 5 and moisture content is obtained, and so that there will be no damage to the surface, 6 pavement or structures due to any trench settlement or trench movement. 7 a. Meeting the requirement herein does not relieve the responsibility to damages 8 associated with the Work. 9 2. Backfill Material 10 a. Final backfill depth less than 15 feet 11 1) Backfill with: 12 a) Acceptable backfill material 13 b) Blended backfill material,or 14 c) Select backfill material,CSS, or CLSM when specifically required 15 b. Final backfill depth 15 feet or greater: (under pavement or future pavement) 16 1) Backfill depth from 0 tol5 feet deep 17 a) Backfill with: 18 (1) Acceptable backfill material 19 (2) Blended backfill material,or 20 (3) Select backfill material, CSS, or CLSM when specifically required 21 2) Backfill depth from 15 feet and greater 22 a) Backfill with: 23 (1) Select Fill 24 (2) CSS, or 25 (3) CLSM when specifically required 26 c. Final backfill depth 15 feet or greater: (not under pavement or future pavement) 27 1) Backfill with: 28 a) Acceptable backfill material, or 29 b) Blended backfill material 30 d. Backfill for service lines: 31 1) Backfill for water or sewer service lines shall be the same as the 32 requirement of the main that the service is connected to. 33 3. Required Compaction and Density 34 a. Final backfill (depths less than 15 feet) 35 1) Compact acceptable backfill material,blended backfill material or select 36 backfill to a minimum of 95 percent Standard Proctor per ASTM D698 at 37 moisture content within-2 to+5 percent of the optimum moisture. 38 2) CSS or CLSM requires no compaction. 39 b. Final backfill (depths 15 feet and greater/under existing or future pavement) 40 1) Compact select backfill to a minimum of 98 percent Standard Proctor per 41 ASTM D 698 at moisture content within-2 to+5 percent of the optimum 42 moisture. 43 2) CSS or CLSM requires no compaction. 44 c. Final backfill (depths 15 feet and greater/not under existing or future pavement) 45 1) Compact acceptable backfill material blended backfill material, or select 46 backfill to a minimum of 95 percent Standard Proctor per ASTM D 698 at 47 moisture content within -2 to+5 percent of the optimum moisture. 48 4. Saturated Soils CITY OF FORT WORTH Park Improvements at Terry,Northside.High Crest.and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised.lure 19,2013 3305 10- 17 UTILITY TRENCH EXCAVATION.EMBEDMENT,AND BACKFILL Page 17 of 19 1 a. If in-situ soils consistently demonstrate that they are greater than 5 percent over 2 optimum moisture content,the soils are considered saturated. 3 b. Flooding the trench or water jetting is strictly prohibited. 4 c. If saturated soils are identified in the Drawings or Geotechnical Report in the 5 Appendix, Contractor shall proceed with Work following all backfill 6 procedures outlined in the Drawings for areas of soil saturation greater than 5 7 percent. 8 d. If saturated soils are encountered during Work but not identified in Drawings or 9 Geotechnical Report in the Appendix: 10 1) The Contractor shall: 11 a) Immediately notify the City. 12 b) Submit a Contract Claim for Extra Work associated with direction from 13 City. 14 2) The City shall: 15 a) Investigate soils and determine if Work can proceed in the identified 16 location. 17 b) Direct the Contractor of changed backfill procedures associated with 18 the saturated soils that may include: 19 (1) Imported backfill 20 (2) A site specific backfill design 21 5. Placement of Backfill 22 a. Use only compaction equipment specifically designed for compaction of a 23 particular soil type and within the space and depth limitation experienced in the 24 trench. 25 b. Flooding the trench or water setting is strictly prohibited. 26 c. Place in loose lifts not to exceed 12 inches. 27 d. Compact to specified densities. 28 e. Compact only on top of initial backfill,undisturbed trench or previously 29 compacted backfill. 30 f. Remove any loose materials due to the movement of any trench box or shoring 31 or due to sloughing of the trench wall. 32 g. Install appropriate tracking balls for water and sanitary sewer trenches in 33 accordance with Section 33 05 26. 34 6. Backfill Means and Methods Demonstration 35 a. Notify the City in writing with sufficient time for the City to obtain samples 36 and perform standard proctor test in accordance with ASTM D698. 37 b. The results of the standard proctor test must be received prior to beginning 38 excavation. 39 c. Upon commencing of backfill placement for the project the Contractor shall 40 demonstrate means and methods to obtain the required densities. 41 d. Demonstrate Means and Methods for compaction including: 42 1) Depth of lifts for backfill which shall not exceed 12 inches 43 2) Method of moisture control for excessively dry or wet backfill 44 3) Placement and moving trench box, if used 45 4) Compaction techniques in an open trench 46 5) Compaction techniques around structure 47 e. Provide a testing trench box to provide access to the recently backfilled 48 material. CITY OF FORT WORTH Park Improvements at Terry,Northside.High Crest.and Smmnerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised.Tune 19.2013 3305 10-18 UTILITY TRENCH EXCAVATION,EMBEDMENT,AND BACKFILL Page 18 of 19 1 f. The City will provide a qualified testing lab full time during this period to 2 randomly test density and moisture continent. 3 1) The testing lab will provide results as available on the job site. 4 7. Varying Ground Conditions 5 a. Notify the City of varying ground conditions and the need for additional 6 proctors. 7 b. Request additional proctors when soil conditions change. 8 c. The City may acquire additional proctors at its discretion. 9 d. Significant changes in soil conditions will require an additional Means and 10 Methods demonstration. 11 3.5 REPAIR [NOT USED] 12 3.6 RE-INSTALLATION [NOT USED] 13 3.7 FIELD QUALITY CONTROL 14 A. Field Tests and Inspections 15 1. Proctors 16 a. The City will perform Proctors in accordance with ASTM D698. 17 b. Test results will generally be available to within 4 calendar days and distributed 18 to: 19 1) Contractor 20 2) City Project Manager 21 3) City Inspector 22 4) Engineer 23 c. Notify the City if the characteristic of the soil changes. 24 d. City will perform new proctors for varying soils: 25 1) When indicated in the geotechnical investigation in the Appendix 26 2) If notified by the Contractor 27 3) At the convenience of the City 28 e. Trenches where different soil types are present at different depths,the proctors 29 shall be based on the mixture of those soils. 30 2. Density Testing of Backfill 31 a. Density Tests shall be in conformance with ASTM D2922. 32 b. Provide a testing trench protection for trench depths in excess of 5 feet. 33 c. Place,move and remove testing trench protection as necessary to facilitate all 34 test conducted by the City. 35 d. For final backfill depths less than 15 feet and trenches of any depth not under 36 existing or future pavement: 37 1) The City will perform density testing twice per working day when 38 backfilling operations are being conducted. 39 2) The testing lab shall take a minimum of 3 density tests of the current lift in 40 the available trench. 41 e. For final backfill depths 15 feet and greater-deep and under existing or future 42 pavement: 43 1) The City will perform density testing twice per working day when 44 backfilling operations are being conducted. 45 2) The testing lab shall take a minimum of 3 density tests of the Curent lift in 46 the available trench. 47 3) The testing lab will remain onsite sufficient time to test 2 additional lifts. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest.and Smnmerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,0226,L02265_02266 Revised,lune 19.2013 3305 10-19 UTILITY TRENCH EXCAVATION,EMBEDMENT,AND BACKFILL Page 19 of 19 1 f. Make the excavation available for testing. 2 g. The City will determine the location of the test. 3 h. The City testing lab will provide results to Contractor and the City's Inspector 4 upon completion of the testing. 5 i. A formal report will be posted to the City's Buzzsaw site within 48 hours. 6 j. Test reports shall include: 7 1) Location of test by station number 8 2) Time and date of test 9 3) Depth of testing 10 4) Field moisture 11 5) Dry density 12 6) Proctor identifier 13 7) Percent Proctor Density 14 3. Density of Embedment 15 a. Storm sewer boxes that are embedded with acceptable backfill material, 16 blended backfill material, cement modified backfill material or select material 17 will follow the same testing procedure as backfill. 18 b. The City may test fine crushed rock or crushed rock embedment in accordance 19 with ASTM D2922 or ASTM 1556. 20 B. Non-Conforming Work 21 1. All non-conforming work shall be removed and replaced. 22 3.8 SYSTEM STARTUP [NOT USED] 23 3.9 ADJUSTING [NOT USED] 24 3.10 CLEANING [NOT USED] 25 3.11 CLOSEOUT ACTIVITIES [NOT USED] 26 3.12 PROTECTION [NOT USED] 27 3.13 MAINTENANCE [NOT USED] 28 3.14 ATTACHMENTS [NOT USED] 29 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 1.2—Added Item for Concrete Encasement for Utility Lines Various Sections—Revised Depths to Include 15'and greater 12/20/2012 D.Johnson 3.3.A—Additional notes for pavement protection and positive drainage. 3A.E.2—Added requirements for backfill of service lines. 3A.E.5—Added language prohibiting flooding of trench 1.2.A.3—Clarified measurement and payment for concrete encasement as per plan 6/18/2013 D.Johnson quantity 2.2.A—Added language for concrete encasement 30 CITY OF FORT WORTH Park Improvements at Terry,Northside.High Crest.and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.02264,02265,02266 Revised June 19.2013 This page is intentionally blank. 330526- 1 UTILITY MARKERS/LOCATORS Page I of 4 1 SECTION 33 05 26 2 UTILITY MARKERS/LOCATORS 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Buried and surface utility markers for utility construction 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include,but are not necessarily limited to: 10 1. Division 0—Bidding Requirements,Contract Forms, and Conditions of the 1 I Contract 12 2. Division I —General Requirements 13 1.2 PRICE AND PAYMENT PROCEDURES 14 A. Measurement and Payment 15 1. Measurement 16 a. Measurement for this Item will be by lump sum. 17 2. Payment 18 a. The work performed and materials furnished in accordance with this Item will 19 be paid for at the lump sum price bid for"Utility Markers". 20 3. The price bid shall include: 21 a. Furnishing and installing Utility Markers as specified by the Drawings 22 b. Mobilization 23 c. Pavement removal 24 d. Excavation 25 e. Hauling 26 f. Disposal of excess material 27 g. Furnishing,placement and compaction of backfill 28 h. Clean-up 29 1.3 REFERENCES 30 A. Reference Standards 31 1. Reference standards cited in this Specification refer to the current reference 32 standard published at the time of the latest revision date logged at the end of this 33 Specification,unless a date is specifically cited. 34 2. American Public Works Association(AWPA): 35 a. Uniform Color Code. 36 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 37 1.5 SUBMITTALS 38 A. Submittals shall be in accordance with Section 01 33 00. CITY OF FORT WORTH Park Improvements at Terry,Northside.High Crest,and Samnterfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised Deceinber 20.2012 330526-2 UTILITY MARKERS/LOCATORS Page 2 of 4 1 B. All submittals shall be approved by the City prior to delivery. 2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS 3 A. Product Data 4 1. Buried Marker 5 2. Surface Marker 6 1.7 CLOSEOUT SUBMITTALS [NOT USED] 7 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 8 1.9 QUALITY ASSURANCE [NOT USED] 9 1.10 DELIVERY, STORAGE,AND HANDLING [NOT USED] 10 1.11 FIELD [SITE] CONDITIONS [NOT USED] 11 1.12 WARRANTY [NOT USED] 12 PART 2 - PRODUCTS 13 2.1 OWNER-FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 14 2.2 MATERIALS 15 A. Manufacturers 16 1. Only the manufacturers as listed on the City's Standard Products List will be 17 considered as shown in Section 01 60 00. 18 a. The manufacturer must comply with this Specification and related Sections. 19 2. Any product that is not listed on the Standard Products List is considered a 20 substitution and shall be submitted in accordance with Section 01 25 00. 21 3. Provide new Utility Markers/Locators from a manufacturer regularly engaged in the 22 manufacturing of Utility Markers/Locators. 23 B. Materials 24 1. Buried Markers(Detectable Warning Tape) 25 a. Provide detectable warning tape as follows: 26 1) 5.0 mil overall thickness 27 2) Width—3 inch minimum 28 3) Weight—27.5 pounds per inch per 1,000 square feet 29 4) Triple Layer with: 30 a) Minimum thickness 0.35 mils solid aluminum foil encased in a 31 protective inert plastic jacket 32 (1) 100 percent virgin low density polyethylene 33 (2) Impervious to all known alkalis,acids,chemical reagents and 34 solvents within soil 35 (3) Aluminum foil visible to both sides 36 5) Locatable by conductive and inductive methods 37 6) Printing encased to avoid ink rub-off 38 7) Color and Legends 39 a) Potable water lines CITY OF FORT WORTH Park Improvements at Terry,Northside.High Crest,and Smmner6elds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.02264.02265,02266 Revised December 20.2012 330526-3 UTILITY MARKERS/LOCATORS Page 3 of 4 1 (1) Color—Blue(in accordance with APWA Uniform Color Code) 2 (2) Legend—Caution Potable Water Line Below(repeated every 24 3 inches) 4 b) Reclaimed water lines 5 (1) Color—Purple(in accordance with APWA Uniform Color Code) 6 (2) Legend—Caution Reclaimed Water Line Below(repeated every 24 7 inches) 8 c) Sewer Line 9 (1) Color—Green(in accordance with APWA Uniform Color Code) 10 (2) Legend—Caution Sewer Line Below(repeated every 24 inches) 11 2. Surface Markers 12 a. Provide as follows: 13 1) 4-inch diameter, 6-feet minimum length,polyethylene posts, or equal 14 2) White posts with colored, ultraviolet resistant domes as follows: 15 a) Water Lines 16 (1) Color—Blue(in accordance with APWA Uniform Color Code) 17 (2) Legend—Caution Potable Water Line Below 18 b) Reclaimed water lines 19 (1) Color—Purple(in accordance with APWA Uniform Color Code) 20 (2) Legend—Caution Reclaimed Water Line Below 21 c) Sewer lines 22 (1) Color—Green(in accordance with APWA Uniform Color Code) 23 (2) Legend—Caution Sewer Line Below 24 2.3 ACCESSORIES [NOT USED] 25 2.4 SOURCE QUALITY CONTROL [NOT USED] 26 PART 3 - EXECUTION 27 3.1 INSTALLERS [NOT USED] 28 3.2 EXAMINATION [NOT USED] 29 3.3 PREPARATION [NOT USED] 30 3.4 INSTALLATION 31 A. Buried Markers(Detectable Warning Tape) 32 1. Install in accordance with manufacturer's recommendations below natural ground 33 surface and directly above the utility for which it is marking. 34 a. Allow 18 inches minimum between utility and marker. 35 b. Bury to a depth of 3 feet or as close to the grade as is practical for optimum 36 protection and detectability. 37 B. Surface Markers 38 1. Bury a minimum of 2 feet deep, with a minimum of 4 feet above ground 39 2. The warning sign for all surface markers shall be 21 inches(not including post cap). 40 3. Where possible,place surface markers near fixed objects. 41 4. Place Surface Markers at the following locations: CITY OF FORT WORTH Park Improvements at Teny,Northside.High Crest.and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263_02264,02265,02266 Revised December 20.2012 330526-4 UTILITY MARKERS/LOCATORS Page 4 of 4 I a. Buried Features 2 1) Place directly above a buried feature. 3 b. Above-Ground Features 4 1) Place a maximum of 2 feet away from an above-ground feature. 5 c. Water lines 16-inches and larger 6 1) Each right-of-way line(or end of casing pipe)for: 7 a) Highway crossings 8 b) Railroad crossings 9 2) Utility crossings such as: 10 a) High pressure or large diameter gas lines 11 b) Fiber optic lines 12 c) Underground electric transmission lines 13 d) Or other locations shown on the Drawings, or directed by the City 14 d. Surface markers not required for 12-inch and smaller water lines 15 e. For sanitary sewer lines: 16 1) In undeveloped areas,place marker maximum of 2 feet away from an 17 above-ground feature such as a manhole or combination air valve vault. 18 2) Place at 500-foot intervals along the pipeline. 19 3.5 REPAIR/RESTORATION [NOT USED] 20 3.6 RE-INSTALLATION [NOT USED] 21 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 22 3.8 SYSTEM STARTUP [NOT USED] 23 3.9 ADJUSTING [NOT USED] 24 3.10 CLEANING [NOT USED] 25 3.11 CLOSEOUT ACTIVITIES [NOT USED] 26 3.12 PROTECTION [NOT USED] 27 3.13 MAINTENANCE [NOT USED] 28 3.14 ATTACHMENTS [NOT USED] 29 30 END OF SECTION 31 Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D.Johnson Removed references to Utility Marker Balls throughout. 32 CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest.and Summer6elds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.02264.02265.02266 Revised December 20,2012 33 05 30- 1 LOCATION OF EXISTING UTILITIES Page I of 4 1 SECTION 33 05 30 2 LOCATION OF EXISTING UTILITIES 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Locating and verifying the location and elevation of the existing underground 7 utilities that may conflict with a facility proposed for construction by use of: 8 a. Exploratory Excavation 9 b. Vacuum Excavation 10 B. Deviations from this City of Fort Worth Standard Specification 11 1. None. 12 C. Related Specification Sections include,but are not necessarily limited to: 13 1. Division 0—Bidding Requirements,Contract Forms, and Conditions of the 14 Contract 15 2. Division 1 —General Requirements 16 3. Section 33 05 10—Utility Trench Excavation, Embedment and Backfill 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Exploratory Excavation of Existing Utilities 20 a. Measurement 21 1) Measurement for this Item shall be per each excavation performed as 22 identified in the Drawings, or as directed. 23 b. Payment 24 1) The work performed and materials furnished in accordance with this Item 25 and measured as provided under"Measurement"will be paid for at the unit 26 price bid per each "Exploratory Excavation for Existing Utilities"specified. 27 c. The price bid shall include: 28 1) Grade survey 29 2) Pavement removal 30 3) Excavation 31 4) Utility Location 32 5) Hauling 33 6) Disposal of excess material 34 7) Furnishing, placing and compaction of embedment 35 8) Furnishing, placing and compaction of backfill 36 9) Clean-up 37 10) Surface restoration 38 2. Vacuum Excavation of Existing Utilities 39 a. Measurement 40 1) Measurement for this Item shall be per each excavation performed as 41 identified in the Drawings, or as directed. 42 b. Payment CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest.and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.02264,02265.02266 Revised December 20,2012 330530-2 LOCATION OF EXISTING UTILITIES Page 2 of 4 1 1) The work performed and materials furnished in accordance with this Item 2 and measured as provided under"Measurement"will be paid for at the unit 3 price bid per each"Vacuum Excavation'specified. 4 c. The price bid shall include: 5 1) Grade survey 6 2) Pavement removal 7 3) Vacuum Excavation 8 4) Utility Location 9 5) Hauling 10 6) Disposal of excess material 11 7) Furnishing,placing and compaction of embedment 12 8) Furnishing,placing and compaction of backfill 13 9) Clean-up 14 10) Surface restoration 15 1.3 REFERENCES 16 A. Definitions 17 1. Exploratory Excavation: Previously called "D-Hole"within the City, a method 18 used to locate existing underground utility as shown on the plans through the use of 19 standard excavation equipment. 20 2. Vacuum Excavation: Method used to locate existing underground utility as shown 21 on the plans through the use of geophysical prospecting equipment such as vacuum 22 excavation. 23 B. Reference Standards 24 1. Reference standards cited in this Specification refer to the current reference 25 standard published at the time of the latest revision date logged at the end of this 26 Specification,unless a date is specifically cited. 27 2. American Society of Civil Engineers(ASCE) 28 a. ASCE Publication CI/ASCE 38 (Standard Guideline for the Collection and 29 Depiction of Existing Subsurface Utility Data) 30 1.4 ADMINISTRATIVE REQUIREMENTS 31 A. Coordination 32 1. Coordinate with City Inspector at least 48 hours prior to commencing on site for 33 Exploratory Excavation of Existing Utilities. 34 2. Coordinate location of all other existing utilities within vicinity of excavation prior 35 to commencing Exploratory Excavation. 36 3. Coordinate staking of Exploratory Excavations with City at least 1 week prior to 37 commencement. 38 B. Sequencing 39 1. Exploratory Excavations shall be conducted prior to the construction of the entire 40 project. 41 C. Scheduling 42 1. For critical utility locations,the City may choose to be present during excavation. 43 2. Alter schedule for Exploratory Excavation of Existing Utilities to accommodate 44 City personnel. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest.and Sunmmerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.02264,02265.02266 Revised December 20.2012 330530-3 LOCATION OF EXISTING UTILITIES Page 3 of 4 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS 4 A. Report of Utility Location 5 1. Horizontal location of utility as surveyed 6 2. Vertical elevation of utility as surveyed 7 a. Top of utility 8 b. Spring line of utility 9 c. Existing ground 10 3. Material type, diameter and description of the condition of existing utility 11 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 12 1.9 QUALITY ASSURANCE [NOT USED] 13 1.10 DELIVERY,STORAGE,AND HANDLING [NOT USED] 14 1.11 FIELD [SITE] CONDITIONS [NOT USED] 15 1.12 WARRANTY [NOT USED] 16 PART 2 - PRODUCTS [NOT USED] 17 PART 3- EXECUTION 18 3.1 INSTALLERS [NOT USED] 19 3.2 EXAMINATION 20 A. Verification of Conditions 21 1. Verify location of existing utilities in accordance with the General Requirements, 22 the General Notes and the Drawings. 23 3.3 PREPARATION 24 A. Coordinate with City Survey, if applicable. 25 3.4 INSTALLATION 26 A. Exploratory Excavation 27 1. Verify location of existing utility at location denoted on the Drawings, or as 28 directed by the City. 29 a. Expose utility to spring line, as necessary. 30 b. Excavate and Backfill Trench for the Exploratory Excavation in accordance 31 with Section 33 05 10. 32 B. Vacuum Excavation 33 1. Verify location of existing utility at location denoted on the Drawings, or as 34 directed by the City. CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Smnmerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265,02266 Revised December 20,2012 330530-4 LOCATION OF EXISTING UTILITIES Page 4 of 4 1 2. Designate the horizontal position of the existing underground utilities that are to be 2 located using geophysical prospecting equipment. 3 a. Acquire record documentation from and coordinate with utility companies, as 4 necessary to locate utility. 5 3. Perform excavation in general accordance with the recommended practices and 6 procedures described in ASCE Publication CI/ASCE 38. 7 C. Upon completion of the utility locating,submit a report of the findings. 8 D. If location of utility is in conflict with the Drawings,notify the City Project Manager 9 for appropriate design modifications. 10 E. Place embedment and backfill in accordance with Section 33 05 10. 11 F. Once necessary data is obtained, immediately restore surface to existing conditions to: 12 1. Obtain a safe and proper driving surface, if applicable 13 2. Ensure the safety of the general public 14 3. The satisfaction of the City 15 3.5 REPAIR/RESTORATION [NOT USED] 16 3.6 RE-INSTALLATION [NOT USED] 17 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 18 3.8 SYSTEM STARTUP [NOT USED] 19 3.9 ADJUSTING [NOT USED] 20 3.10 CLEANING [NOT USED] 21 3.11 CLOSEOUT ACTIVITIES [NOT USED] 22 3.12 PROTECTION [NOT USED] 23 3.13 MAINTENANCE [NOT USED] 24 3.14 ATTACHMENTS [NOT USED] 25 END OF SECTION 26 Revision Log DATE NAME SUMMARY OF CHANGE Title-Exploratory Excavation of Utilities changed to Location of Existing Utilities 12/20/2012 D.Johnson 1.2—Added Measurement of Payment for Vacuum Excavation 1.3—Added Definitions 3.4—Added requirements for Vacuum Excavation 27 CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Summertields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.02264.02265,02266 Revised December 20.2012 334600-1 SUBDRAINAGE Page 1 of 6 1 SECTION 33 46 00 2 SUBDRAINAGE 3 PART1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Installation of pipe subdrains at the locations, lines and grades shown on the 7 Drawings. 8 a. If details are not shown on the Drawings,construct the subdrain in accordance 9 with this Section and standard storm drain details. 10 B. Deviations from this City of Fort Worth Standard Specification 11 1. None. 12 C. Related Specification Sections include,but are not necessarily limited to: 13 1. Division 0—Bidding Requirements, Contract Forms and Conditions of the Contract 14 2. Division I —General Requirements 15 3. Section 32 92 13—Hydro-Mulching, Seeding and Sodding 16 1.2 PRICE AND PAYMENT PROCEDURES 17 A. Measurement and Payment 18 1. Measurement 19 a. Measured by the linear foot along the top of the pipe and includes the length of 20 elbows, wyes,tees, and cleanouts 21 2. Payment 22 a. The work performed and material furnished in accordance with this Item and 23 measured as provided under"Measurement"will be paid for at the unit price 24 bid per linear foot of"Pipe Underdrain"installed for: 25 1) Various types 26 2) Various sizes 27 b. The price bid shall include: 28 1) Furnishing and installing the specified Underdrain 29 2) Pipe 30 3) Couplers 31 4) Plugs 32 5) Screens 33 6) Filter material 34 7) Filter fabric 35 8) Excavation 36 9) Hauling 37 10) Disposal of excess materials 38 1 1) Connection to existing structures 39 12) Riprap 40 13) Furnishing, placing and compaction of embedment 41 14) Furnishing,placing and compaction of backfill 42 15) Clean-up CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest.and Sununer6elds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.02264.02265.02266 Revised December 20,2012 334600-2 SUBDRAINAGE Page 2 of 6 1 1.3 REFERENCES 2 A. Reference Standards 3 1. Reference standards cited in this Specification refer to the current reference 4 standard published at the time of the latest revision date logged at the end of this 5 Specification, unless a date is specifically cited. 6 2. American Association of State Highway and Transportation Officials(AASHTO): 7 a. M36, Corrugated Steel Pipe,Metallic-Coated,for Sewers and Drains. 8 b. M190, Standard Specification for Bituminous-Coated Corrugated Metal Culvert 9 Pipe and Pipe Arches 10 c. M196, Corrugated Aluminum Pipe for Sewers and Drains. 11 d. M252, Standard Specification for Corrugated Polyethylene Drainage Pipe. 12 e. M278, Standard Specification for Class PS46 Polyvinyl Chloride(PVC)Pipe. 13 3. ASTM International(ASTM): 14 a. C33, Standard Specification for Concrete Aggregates. 15 b. D448, Standard Classification for Sizes of Aggregate for Road and Bridge 16 Construction. 17 c. D2751, Standard Specification for Acrylonitrile-Butadiene-Styrene(ABS) 18 Sewer Pipe and Fittings. 19 d. F949, Standard Specification for Poly(Vinyl Chloride)(PVC)Corrugated 20 Sewer Pipe With a Smooth Interior and Fittings. 21 4. Texas Department of Transportation(TxDOT): 22 a. Departmental Materials Specification(DMS): 23 1) DMS 6200,Filter Fabric. 24 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 25 1.5 SUBMITTALS [NOT USED] 26 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS 27 A. Product Data—Submit the following information in accordance with Section 01 33 00. 28 1. Subdrain pipe material to be used. 29 2. Filter fabric material to be used. 30 3. Sieve Analysis for filter material to be used. 31 1.7 CLOSEOUT SUBMITTALS [NOT USED] 32 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 33 1.9 QUALITY ASSURANCE [NOT USED] 34 1.10 DELIVERY, STORAGE,AND HANDLING [NOT USED] 35 1.11 FIELD [SITE] CONDITIONS [NOT USED] 36 1.12 WARRANTY [NOT USED] CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Sununerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264.02265.02266 Revised December 20.2012 334600-3 SUBDRAINAGF. Page 3 of 6 1 PART 2 - PRODUCTS 2 2.1 OWNER-FURNISHED [OR] OWNER-SUPPLIED PRODUCTS [NOT USED] 3 2.2 MATERIALS 4 A. Pipe 5 1. Use only I type of pipe for any subdrain system on the project. 6 a. Use perforated pipe in areas to be drained and non-perforated pipe between the 7 perforated pipe and the outfall. 8 2. Type 1 9 a. Corrugated steel pipe conforming to any type specified in AASHTO M36, 10 fabricated from corrugated galvanized sheet. 11 3. Type 2 12 a. Corrugated aluminum pipe conforming to AASHTO M196,Type I or IA, 13 fabricated from corrugated sheet. 14 4. Type 3 15 a. Bituminous-coated corrugated steel pipe conforming to the requirements of 16 Type 1 and uniformly coated inside and out with a minimum thickness of 0.05 17 inches with a bituminous material meeting the requirements of AASHTO 18 M190. 19 5. Type 4 20 a. Bituminous-coated corrugated aluminum pipe conforming to the requirement of 21 Type 2 and uniformly coated inside and out with a minimum thickness of 0.05 22 inches with a bituminous material meeting the requirements of AASHTO 23 M190. 24 6. Type 5 25 a. Acrylonitrile-butadiene-styrene pipe conforming to ASTM D2751, SDR-35 26 b. Perforations must meet the requirements of AASHTO M278. 27 7. Type 6 28 a. Corrugated polyethylene plastic tubing conforming to ASTM M252. 29 8. Type 7 30 a. Corrugated polyvinyl chloride(PVC)pipe conforming to ASTM F949. 31 9. Type 8 32 a. Smooth-wall PVC pipe conforming to AASHTO M278,Class PS 46. 33 B. Filter Material 34 1. Furnish Crushed Rock in accordance with Section 33 05 10. 35 2. Use only 1 type of filter material for any subdrain system on a project. 36 C. Filter Fabric 37 1. Use filter fabric that meets the requirements of DMS-6200, "Filter Fabric,"Type 1. 38 D. Riprap 39 1. When required, provide concrete riprap in accordance with Section 31 37 00. 40 2.3 ACCESSORIES [NOT USED] 41 2.4 SOURCE QUALITY CONTROL [NOT USED] CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Sununertields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263.02264.0226;5.02266 Revised December 20,2012 334600-4 SUBDRAINAGE Page 4 of 6 1 PART 3 - EXECUTION 2 3.1 INSTALLERS [NOT USED] 3 3.2 EXAMINATION [NOT USED] 4 3.3 PREPARATION [NOT USED] 5 3.4 INSTALLATION 6 A. Excavation 7 1. Begin excavation of the trench at the outfall and proceed toward its upper end, 8 following the lines and grades shown on the Drawings or as directed by the 9 Engineer. 10 2. Hold the minimum horizontal limits of excavation for filter material to the 11 dimensions shown in Table 3 or as shown on the Drawings. 12 13 Table 3 14 Minimum Horizontal Limits of Excavation for Filter Material Depth of Trench Trench Width (feet) (inches) 0to6 19 Over 6 to 10 25 Over 10 to 15 31 Over 15 37 15 16 B. Filter Fabric 17 1. In areas to be drained, place filter fabric in the bottom and sides of the trench before 18 placing pipe or filter material. 19 2. Provide enough width of fabric to overlap on top of the filter material. 20 C. Subdrain Pipe 21 1. Center perforated pipe in the excavated ditch with the perforations below the 22 horizontal axis. 23 2. Lay pipe according to Drawing Details with the perforations on the underside of the 24 pipe,unless otherwise directed by the Engineer. 25 3. Join the pipe with appropriate couplers in accordance with the manufacturer's 26 recommendations. 27 4. Install non-perforated pipe sections between the perforated pipe and the outfall. 28 a. The sections of non-perforated pipe do not require filter fabric or filter material. 29 5. Place a2-inch layer of filter material as a bottom course. 30 6. Firmly embed the subdrain pipe in the filter material. 31 7. Install cleanouts at the upstream end of the line, at approximately 200-foot spacing, 32 at bends and other locations shown on the Drawings, and in accordance with City 33 Standard Details. 34 8. Place plugs recommended by the pipe manufacturer in the upper ends of all pipe. 35 D. Filter Material CITY OF FORT WORTH Park Improvements at Terry,Northside,High Crest,and Smtnnerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263,02264,02265.02266 Revised December 20,2012 334600-5 SUBDRAINAGE Page 5 of 6 1 1. Place filter material at least 10 inches above the top of the pipe or as shown on the 2 Drawings. 3 2. Do not allow filter material to displace the pipe. 4 3. After placing pipe and filter material, lap filter fabric over the top of the filter 5 material according to the manufacturer's recommendation or as shown on the 6 Drawings. 7 E. Connection to Existing Structures 8 1. Storm Drain Structures 9 a. Core hole in drainage structures such as inlets, manholes and junction boxes 10 and connect downstream end of subdrain pipe. 11 b. Sea] connection with non-shrink grout. 12 2. Drainage Channels 13 a. Where the subdrain discharges into a drainage channel, center the pipe outlet in 14 a 2-foot by 2-foot concrete riprap pad. 15 b. Place the riprap to match the contour and grade of the embankment slope. 16 c. Cut the pipe to the slope of the riprap. 17 3. Retaining Walls 18 a. Where the subdrain discharges through the face of a retaining wall, cut pipe to 19 be flush with the face of wall. 20 F. Backfill 21 1. Place backfill over the pipe in accordance with City Standard Details and Section 22 33 05 10 or as shown on the Drawings 23 3.5 RESTORATION 24 A. Surface Restoration 25 1. In unpaved areas,restore surface in accordance with Section 32 91 19 and Section 26 32 92 13,as appropriate. 27 3.6 RE-INSTALLATION [NOT USED] 28 3.7 FIELD [OR] SITE QUALITY CONTROL[NOT USED] 29 3.8 SYSTEM STARTUP [NOT USED] 30 3.9 ADJUSTING [NOT USED] 31 3.10 CLEANING [NOT USED] 32 3.11 CLOSEOUT ACTIVITIES [NOT USED] 33 3.12 PROTECTION [NOT USED] 34 3.13 MAINTENANCE [NOT USED] 35 3.14 ATTACHMENTS [NOT USED] 36 END OF SECTION 37 CITY OF FORA WORTH Park Improvements at Terry,Northside,High Crest.and Summerfietds Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263_,02264,02265.02266 Revised December 20,2012 334600-6 SUBDRAINAGE Page 6 of 6 Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D.Johnson 1.2.B—Bid Item name updated to match Bid List 2.2.13—Updated reference for Filter Material 1 CITY OF FORT WORTH Park Improvements at Terry.Northside,High Crest,and Summerfields Parks STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 02263-02264,02265,02266 Revised December 20,2012 ATTACHMENT 1A Page 1 of 4 oRT ORTH City of Fort Worth Minority Business Enterprise MBE Subcontractors/Suppliers Utilization Form OFFEROR COMPANY NAME: Check applicable block to describe Northstar Construction, LLC Offeror PROJECT NAME: MM!/DBE / NON-NI/W/DBE Park Improvements at Terry, Northside, High Crest, and Summerfield Park BID DATE 05/28/2015 City's MBE Project Goal: Offeror's MBE Project Commitment: PROJECT NUMBER 14 % 1 14 % 02263, 02264, 02265, 02266 Identify all subcontractors/suppliers you will use on this project Failure to complete this form, in its entirety with requested documentation, and received by the Purchasing Division no later than 2:00 p.m. on the second City business day after bid opening, exclusive of bid opening date, will result in the bid being considered non-responsive to bid specifications. The undersigned Offeror agrees to enter into a formal agreement with the MBE firm(s) listed in this utilization schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered non-responsive to bid specifications. MBEs listed toward meeting the project goal must be located in the six(6)county marketplace at the time of bid or the business has a Significant Business Presence in the Marketplace. Marketplace is the geographic area of Tarrant. Dallas, Denton, Johnson. Parker, and Wise counties Prime contractors must identify by tier level of all subcontractors/suppliers. Tier: means the level--of- subcontracting below the prime contractor/consultant i.e. a direct payment from the prime contractor to a subcontractor is considered 1 sc tler, a payment by a subcontractor to its supplier is considered 2nd tier. The prime contractor is responsible to provide proof of payment of all tiered subcontractors identified as a MBE and counting those dollars towards meeting the contract committed goal. ALL MBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD. Certification means those firms, located within the Marketplace, that have been determined to be a bondafide minority business enterprise by the North Central Texas Regional Certification Agency(NCTRCA)or other certifying agencies that the City may deem appropriate and accepted by the City of Fort Worth. Eoperates services are utilized, the Offeror will be given credit as long as the MBE listed owns and t least one fully licensed and operational truck to be used on the contract. The MBE may lease m another MBE firm, including MBE owner-operated, and receive full MBE credit. The MBE may ks from non-MBEs, including owner-opera ted, but will only receive credit for the fees and ns earned by the MBE as outlined in the lease agreement. . C Rev.2110/15 Pace 2 of 4 Offerors are required to identify ALL subcontractors/suppliers, regardless of status; i.e;., Minority and non-MBEs, MBE firms are to be Jsted first,use additional sheets of necessary. Please:note that only certified MBEs will be counted to meet an MBE,goal. hdGTFtCA�� SUBCONTRACTOR/SUPPLIER Company dame T _ rr Detail Detail r Address i M W Subcontracting Supplies Dollar Amount T"elephanelf ax e B B M Work Purchased Email r B Contact Person Cowtowrl RediMix 1 (heady Mix 23,000,00 P.0, Pox 102027 Concrete Ft, Worth, TX 76161 r 817-759-1919 L ...... 817-759-1716 Max Ulrich Garcia Land Data 1 Surveying $ 6,000"00 6210 Campbell Rd, Suite 110 Dallas, TX 75248 214-987-0149 214.087-4026 Ernie Garcia _.._. __, ............. Martinez Construction 1 Site Amenities $ 71,590.00 Services and Shelters 836 Big Sky Lane Ft, Worth, TX 76131 817-975-8641 817-847..8641 Ruben Martinez Agustin Samano Trucking 1 Trucking $ 16,500.00 4804 hell Street Ft. Worth, TX 76119 7 817-688-2667 El 0 1 817-531-0305 Agustin Samano Barnsco Inc. 1 Concrete $ 6,000.00 5000 Blue Mound Rd. Accessories Ft. Werth, TX 76106 817-740-2400 817-740-2418 d✓ ' Greg Forbess Child's Flay 1 Playground $ 208,688.00 10661 Shady 'Trail Dallas, TX 75220 972-484-0600 El 972-484-0333 Rev.2110/15 �&� ATTACHMENT HwsmT1A peoe4o«4 $ 100,590.00 Total Dollar Amount of IVIBE Subcontractors/Suppliers Total Dollar Amount of Non-MBE Subcontractors/SUppliers s 231,18&00 TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS $331,778.00 The Offeror will not make additions, deletions, or substitutions to this certified list without the prior approval of the Minority and Women Business Enterprise Office through the submittal of a Request for Approval of ChangelAddition form. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the ordinance. The Offeror shall submit a detailed explanation of how the requested change/addition or deletion will affect the committed MBE goal. If the detail explanation is not submitted, it will affect the final compliance determination. ^ By affixing a signature to this fnnn. the Offeror further agrees to provide, directly to the City upon request, 1 complete and accurate information regarding actual work performed bv all subcontractors, including K4BE/s\ and any special arrangements with MBEs. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company. The Offeror agrees to allow the transmission of interviews with � wvvnare, princ|pa|e, ofOcera, employees and applicable subcontractors/suppliers participating on the contract that ' will substantiate the actual work performed by the K4BE(s) on this nontront, by an authorized officer oremployee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, � State or Local laws concerning false statements. Any failure to unnnp|y with this ordinance creates n material breach of the contract and may result in w determination of on irresponsible Offeror and debarment from participating in City work for a period of time not less than one /1> year. Michael A. HeiDlliCh �� `,� u [ ����ent Contact Name[Title(if different) N ort s+ar Construction, C 817-244-8885 817-244-8886 Company Name Telephone and/or Fax � 21 12 S oU ona Street milme@northstar93.com �ddress E-mail Address � ^ o f Worth, Texas 76117 06/24/2015 r'nwmoue/Z/p Date Rev. 2/10115 2013 PREVAILING WAGE RATES (Commercial Construction Projects) CLASSIFICATION DESCRIPTION Wage Rate AC Mechanic $ 25.24 AC Mechanic Helper $ 13.67 Acoustical Ceiling Installer $ 16.83 Acoustical Ceiling Installer Helper $ 12.70 Bricklayer/Stone Mason $ 19.45 Bricklayer/Stone Mason Trainee $ 13.31 Bricklayer/Stone Mason Helper $ 10.91 Carpenter $ 17.75 Carpenter Helper $ 14.32 Concrete Cutter/Sawer $ 17.00 Concrete Cutter/Sawer Helper $ 11.00 Concrete Finisher $ 15.77 Concrete Finisher Helper $ 11.00 Concrete Form Builder $ 15.27 Concrete Form Builder Helper $ 11.00 Drywall Mechanic $ 15.36 Drywall Helper $ 12.54 Drywall Taper $ 15.00 Drywall Taper Helper $ 11.50 Electrician(Journeyman) $ 19.63 Electrician Apprentice(Helper) $ 75.64 Electronic Technician $ 20.00 Floor Layer $ 18.00 Floor Layer Helper $ 10.00 Glazier $ 21.03 Glazier Helper $ 12.81 Insulator $ 16.59 Insulator Helper $ 11.21 Laborer Common $ 10.89 Laborer Skilled $ 14.15 Lather $ 12.99 Metal Building Assembler $ 16.00 Metal Building Assembler Helper $ 12.00 Metal Installer(Miscellaneous) $ 13.00 Metal Installer Helper(Miscellaneous) $ 11.00 Metal Stud Framer $ 16.12 Metal Stud Framer Helper $ 12.54 Painter $ 16.44 Painter Helper $ 9.98 Pipefitter $ 21.22 Pipefitter Helper $ 15.39 Plasterer $ 16.17 Plasterer Helper $ 12.85 Plumber $ 21.98 Plumber Helper $ 15.85 Reinforcing Steel Setter $ 12.87 Page 1 of 2 Reinforcing Steel Setter Helper $ 11.08 Roofer $ 16.90 Roofer Helper $ 11.15 Sheet Metal Worker $ 16.35 Sheet Metal Worker Helper $ 13.11 Sprinkler System Installer $ 19.17 Sprinkler System Installer Helper $ 14.15 Steel Worker Structural $ 17.00 Steel Worker Structural Helper $ 1174 Waterproofer $ 15.00 Equipment Operators Concrete Pump $ 18.50 Crane,Clamsheel, Backhoe, Derrick,D'Line Shovel $ 19.31 Forklift $ 16.45 Foundation Drill Operator $ 22.50 Front End Loader $ 16.97 Truck Driver $ 16.77 Welder $ 19.96 Welder Helper $ 13.00 The prevailing wage rates shown for Commercial construction projects were based on a salary survey conducted and published by the North Texas Construction Industry(Fall 2012)Independently compiled by the Lane Gorman Trubitt,PLLC Construction Group. The descriptions for the classifications listed are provided on the TEXO's(The Construction Association)website. www.texoassociation.org/Chapter/wagerates.asp Page 2 of 2