Loading...
HomeMy WebLinkAboutContract 46271-FP2Depart nt of TP sW Const. Services DOE gate Project Manage its Risk Management J. Page sr 11 WORTH D.O.E. Brotherton CFA Westerman/Scanne The Proceeding people have been • nt.acted concerning the request for final payment & have released this project for such payment. Clearance Conducted By Sharneka Kennedy r, SEC CONTRACT alION AND PUBLIC WORKS PROJECT COMPLETION Fsaw eel Regarding contract 217281 for \VEST FORK RANCH PH 8B-PAVING as required by the TRANSPORTATION & PUBLIC WORKS as approved by City Council on N/A through M&C N/A the director of the TRANSPORTATION & PUBLIC WORKS upon the recommendation of the Assistant Director of the Transportation & Public Works Department has accepted the project as complete. rfq Original Contract Prices: Amount of Approved Change Orders: Revised Contract Amount: Total Cost Work Completed: Less Deductions: Liquidated Damages: Pavement Deficiencies: Total Deduction Amount: Total Cost Work Completed: Less Previous Payments: Final Payment Due < ts Recommended for Acceptance Asst. Director, TPW - Infrastructure Design and Construction Accepted all Director, TRANSPORTATION & Asst. City Manager Comments: C205-541200-202760233883 EMS ILED NOV 2015 inttlel:,qo � C�Sv UBLIC WORKS la7//�r $456,891.55 $456,891.55 Ns D.O.E. Ns: 7281 a 5 FF46,2:1 i Days @ $210.00/ Day $456,891.55 $0.00 $456,891.55 ///a's Date Date //-- ')T Date OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name WEST FORK RANCH PH 8B Contract Limits Project Type PAVING City Project Numbers 02338 DOE Number 7281 Estimate Number I Payment Number 1 For Period Ending 9/24/2015 CD City Secretary Contract Number 217281 Contract Time 7ED Contract Date Days Charged to Date 139 Project Manager Buckley Contract is 100.00 Complete Contractor GILCO CONTRACTING,INC. 6331 SOUTHWEST BLVD. BENBROOK, TX 76132-1063 Inspectors LAYER / DOVERS i I i Ii I Thursday,September 24,2015 Pagel of4 f City Project Numbers 02338 DOE Number 7281 Contract Name WEST FORK RANCH PH 8B Estimate Number 1 Contract Limits Payment Number 1 Project Type PAVING For Period Ending 9/24/2015 Project Funding PAVING Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total ------------------ --------------------- 1 6"CONC PVMT 12107 SY $30.45 068,658.15 12107 $368,658.15 2 6"LIME TREATMENT 12941 SY $2.40 $31,058.40 12941 $31,058.40 3 HYDRATED LINE 194.5 TN $150.00 $29,175.00 194.5 $29,175.00 4 BARRIER FREE RAMP 14 EA $1,500.00 $21,000.00 14 $21,000.00 5 TRAFFIC CONTROL 1 EA $500.00 $500.00 1 $500.00 6 CONST STD STREET HEADER&INSTALL 1 EA $1,500.00 $1,500.00 1 $1,500.00 BARRICADE 7 CONNECT TO EXISTING PAVEMENT 4 EA $1,250.00 $5,000.00 4 $5,000.00 I Sub-Total of Previous Unit $456,891.55 $456,891.55 f F i F pq( f f E Thursday,September 24,2015 Page 2 of E f di W I s i i F City Project Numbers 02338 DOE Number 7281 Contract Name WEST FORK RANCH PH 813 Estimate Number I Contract Limits Payment Number I Project Type PAVING For Period Ending 9/24/2015 Project Funding Contract Information Summary Original ContractAmount $456,891.55 Chance Orders Total Contract Price $456,891.55 Date ✓D Total Cost of Work Completed $456,891.55 C r o % Less %Retained $0.00 / 2' Date Net Earned $456,891.55 4 � �� e io e i Earned This Period $456,891.55 s dd�� Retainage This Period $0.00 7Date lI Less Liquidated Damages Project fa a Days @ /Day $0.00 r Date —13 LessPavement Deficiency $0.00 As . irector/TPW-Infrastructure Design and Construction Less Penalty $0.00 Gtr.. G J Date �� Z- Less Previous Payment $0.00 Direc /Contracting Departure Plus Material on Hand Less 15% $0.00 14"., 10 Gr Balance Due This Payment $456,891.55 I Thursday,September 24,2015 Page 3 of 4 City Project Numbers 02338 DOE Number 7281 Contract Name WEST FORK RANCH PH 8B Estimate Number 1 Contract Limits Payment Number 1 Project Type PAVING For Period Ending 9/24/2015 Project Funding Project Manager Buckley City Secretary Contract Number 217281 Inspectors LAYER / DOVERS Contract Date Contractor GILCO CONTRACTING,INC. Contract Time 75 CD 6331 SOUTHWEST BLVD. Days Charged to Date 139 CD BENBROOK, TX 76132-1063 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded I i Total Cost of Work Completed $456,891.55 Less %Retained $0.00 Net Earned $456,891.55 Earned This Period $456,891.55 Retainage This Period $0.00 y Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 i LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 1 Balance Due This Payment $456,891.55 f Thursday,September 24,2015 Page 4 of 4 f S I rev 03/0i/07 FN,OiRTa !RofiuRT,H TRANSPORTATION&PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.:I NAM EOFPROJECT: West Fork Ranch Phase 813 PROJECT NO.: 2338 CONTRACTOR: Gilco Contracting DOE NO.: 7281 1'E R10 D FROM 05/18/15 TO: 09/14/15 FINAL INSPECTION DATE: 30-Sep-15 NVORK ORDER EFFECTIVE:5/18/2015 CONTRACT TIME: 80 0 Wf)* CD DAYS DAYS DAY OF REASON FOR DAYS DAY OF H REASON FOR DAYS CHARGEDI CHARGED MONTH CREDITED MONTH U I CREDITED DURING LDURIN!Gj 1. 16. 1 17. 3, 18. 4, 19. 5, 20. ii. 21. 7. 22. 8. 23. 9, 24. (). 25. It. 26. 12. 27. 13. 28. 14. 29. 1 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL & HOLIDAYS &TOO COLD RELOCATIONS OTHERS CHARGED DAYS TI-IIS PERIOD 139 PREVIOUS PERIOD TOTALS 139 TO DATE "REMARKS: `5 D DATE 16eECTOR 7 DATE 1,NGINEEIUNG DEPARTMENT The("'ity of Fort Worth• 1000Throckinorton Street•Fort\Vorth,TX 76012-6311 (817)392-7941 -Fax:(817)392-7845 FORTWORTHREV:02/20/07 Ilil TRANSPORTATION AND PUBLIC WORDS PERFORMANCE EVALUATION OF CONTRACTOR I) CONTRACTOR&PROJECT DATA Name of Contractor Project Name Gilco Contracting West Fork Ranch Phase 8B DOE hlspector DOE Number Jim Diestel 7281 DOEInspector Project Manager ❑ Water ❑ Waste Water❑ Storm Drainage 171 Pavement Pat Buckley Initial Contract Amount Project Difficulty $456,981.55 O Simple O Routine O Complex Final Contract Amonmt Date $456,891.55 19/30/2015 Ili)PERFORMANCE EVALUATION 0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE 1 Submission of Documents 2 Y 4 8 8 2 Public Notifications 5 N 3 Plans on Site 5 Y 4 20 20 4 Field Supervision 15 Y 4 60 60 5 Work Performed 15 Y 4 60 60 6 Finished Product 15 Y 4 60 60 7 Job Site Safety 15 Y 3 60 45 8 Traffic Control Maintenance 15 Y 4 60 60 9 Daily Clean Up 5 Y 3 20 15 10 Citizen's Complaint Resolution 5 N I i Property Restoration 5 Y 4 20 20 12 After Hours Response 5 N 13 Project Completion 5 Y 4 20 20 TOTAL ELEMENT SCORE(A) 368 BONUS POINTS(25 Maximum)(B) TOTAL SCORE(TS) 368 III)CONTRACTOR'S RATING Maximum Score(MS)=448 or sum of applicable element score maximums which= 388 Rating(ITS/MSI *100%) 368 / 388 = 95% Performance Category Excellent <20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good ?80%=Excellent Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Signature DOE Inspector IeZ4�-, !j Signature Contractor Signature DOE Inspector's Supervisor CONTRACTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax:(817)392-7845 AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me,the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Leia Hubbard, Operations Director Of Gilco Contracting, Inc.,known to me to be a credible person, who being by me duly sworn,upon her oath deposed and said; That all persons,firms; associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; Paving and Street Light Improvements to serve: West Fork Ranch Ph. 8B f U BY Leia Hubbard Subscribed and sworn before me on this 17 of September—,2015. Notary lic MARY PANNELL Tarrant County,TX NotorY Public,state of Texas my commission Expires i i %y�•�:�= October 19, 2018 CONSENT OF OWNER ❑ SURETY COMPANY ARCHITECT ❑ CONTRACTOR ❑ TO FINAL PAYMENT SURETY ❑ Conforms with the American Institute of OTHER Architects,AIA Document G707 Bond No 022050616 PROJECT: (name, address)West Fork Ranch Phase 8B-Paving Improvements Fort Worth TX TO (Owner) PULTE HOMES OF TEXAS,L.P.AND CITY OF FORT—] ARCHITECT'S PROJECT NO: WORTH CONTRACT FOR: 4800 Regent Blvd. Suite 100 West Fork Ranch Phase 8B-Paving Improvments Irving TX 75063 —J CONTRACT DATE: CONTRACTOR:GILCO CONTRACTING,INC. In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the (here Insert name and address of Surety Company) LIBERTY MUTUAL INSURANCE COMPANY- 175 Berkeley Street Boston MA 02116 , SURETY COMPANY on bond of (here insert name and address of Contractor) GILCO CONTRACTING, INC. 6331 Southwest Boulevard Benbrook TX 76132 , CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety Company of any of its obligations to (hare insert name and address of Owner) PULTE HOMES OF TEXAS,L.P.AND CITY OF FORT WORTH 4800 Regent Blvd. Suite 100 Irving TX 75063 , OWNER, as set forth in the said Surety Company's bond, IN WITNESS,WHEREOF, the Surety Company has hereunto set its hand this 21 st day of September,2015 i LIBERTY MUTUAL INSURANCE COMPANY Surety Company. Attest:Robbi Morales ��'/ZLl2L t7lL1� C� (Sea!_),; Signature of Authorized Representative Sonhinie Hunter Attorney-In-Fact j Title NOTE: This form Is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR's AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS, 0 Current Edition ONE PAGE i f I i THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND. This Power of Attorney limits the acts of those named herein,and they have no authority to bind the Company except in the manner and to the extent herein stated. Certificate No.7111246 American Fire and Casualty Company Liberty Mutual Insurance Company The Ohio Casualty Insurance Company West American Insurance Company POWER OF ATTORNEY KNOWN ALL PERSONS BY THESE PRESENTS: That American Fire&Casualty Company and The Ohio Casualty Insurance Company are corporations duly organized under the laws of the State of New Hampshire,that Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts,and WestAmerican Insurance Company is a corporation duly organized under the laws of the State of Indiana(herein collectively called the"Companies'),pursuant to and by authority herein set forth,does hereby name,constitute and appoint, Don E.Cornell;Kelly A.Westbrook;Ricardo J.Reyna;Robbi Morales;Sophinie:Hunt er;:V.DdL.6ne Marshall i all of the city of Dallas slate of-TX eact0r dividually if there be more than_one named,its true and lawful attorney it fectao make,execute,seal,acknowledge and deliver,for and on its behalf as surety arid as its act,and deed,'any and all undertakings,bonds,:recognizandes and other surely obligations In pursuance of these presents and shall be as binding upon the Companies as If they Piave been.dutysigned:by the president and attested-bythe secretary of the.Companies in their own.,proper persons. IN WITNESS WHEREOF,this Power ofAftortfey has been subscribed by an authorized officer or official of the Companies and(he corporate seals of the Companies have been affixed thereto this 111h day of September 2015 PNO CASG . �f INs p � NS NtNSW American Fire and Casualty Company 'a Q4'`ORF�oq(� yJ�e4P�R+:e9"9y CJ yo 'FOR i�q"Vr s:Aoep� > c The Ohio Casualty Insurance Company N G J v d F W b F (n z 1906 0 0 1919 > ¢ ° - - Liberty Mutual Insurance Company at 5 o x 1912 y 1991 West merican Insurance Company G H e a ° to fN `'LGy K4ntc� �=a 'y,`y`"H.tetes Pala �7°sstonts� � yJ d * * * r By: fl -STATE OF PENNSYLVANIA ss David M.Care ,Assistant Secretary C N COUNTY OF MONTGOMERY p1 On this 11th day of September 2015 before me personally appeared David M. Carey,who acknowledged himself to be the Assistant Secretary of American Fire and to 3 -Casualty Company,Liberty Mutual Insurance Company,The Ohio Casually Insurance Company,and WestAmerican Insurance Company,and that he,as such,being authorized so to do, >,W p i execute the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. d c as > IN WITNESS WHEREOF,I have hereunto subscribed my name and affixed my notarial seal at Plymouth Meeting,Pennsylvania,on the day and year first above written. O CL 3 SN PAST COMMONWEALTH OF PENNSYLVANIA Q M p Q�iM°t1wF F!� Notarial Seal a �, 4— .N !�c° l 9 Teresa Pastella,Notary Public gY; �iG'^-C�(�C�J O O i OF Plymouth Twp.,Montgomery County Teresa Pastella,Not Public y L9, My Commission Expires March 28,2017 3 YO �f.�r•51'L�y�G Member,Pennsylvania Association of Notaries O E C ` This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of American Fire and Casualty Company,The Ohio Casualty Insurance 0 e 6 N Company,Liberty Mutual Insurance Company,and West American Insurance Company which resolutions are now in full force and effect reading as follows: _rn cis i ARTICLE IV—OFFICERS—Section 12.Power of Attorney.Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President,and subject O e +; to such limitation as the Chairman or the President may prescribe,shall appoint such allomeys-in-fact,as may be necessary to act in behalf of the Corporation to make,execute,seal, �+ 10 acknowledge and deliver as surety any and all undertakings,bonds,recognizances and other surety obligations. Such attorneys-in-fact,subject to the limitations set forth in their respective j E y^ powers of attorney,shall have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so d p executed,such instruments shall be as binding as if signed by the President and attested to by the Secretary.Any power or authority granted to any representative or attorney-in-fact under > n athe provisions of this article may be revoked at any time by the Board,the Chairman,the President or by the officer or officers granting such power or authority. et° co C ARTICLE XIII—Execution of Contracts—SECTION 5.Surety Bonds and Undertakings.Any officer of the Company authorized for that purpose in writing by the chairman or the president, E > 4) and subject to such limitations as the chairman or the president may prescribe,shall appoint such atoorneys-in-fact,as may be necessary to act in behalf of the Company to make,execute, L M o : seal,acknowledge and deliver as surety any and all undertakings,bonds,recognizances and other surety obligations. Such attorneys-in-fact subject to the limitations set forth in their C o0 jZ v- respective powers of attorney,shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seat of the Company. When so v c executed such instruments shall be as binding as if signed by the president and attested by the-secretary. ct> I Certificate of Designation—The Presldentof the Company,aclmg pursuant to the Bylaws of:the:Company authorizes Dawd M.Carey,"Assistant:Secretary to appoint such attorneys-in= ~`- fact as may be necessary to act on behalf of the Companyto make execute,seal,acknowledge acid deliveras"surety any'and all undertakings bonds,recognizances and other surety obligations. Authorization—By unanimous consent of the Company s Board of Directors the Company cc:nsents that facsimile or mechanically reproduced signature of any assistant secretary of the Company,wherever appearing upon a cerhfied copy ofi�any power of attorneylssued by the Company m connection with surety bonds,shall be aalid and binding upon the Company with the same force and effect as though manually affixed I,Gregory W.Davenport,the undersigned Asststant.Secretary,ofAmerican Fire and Casualty-Company;Ttie 0}tio Casualty;Insurance Company„'Liberty Mutual Insurance Company,and WestAmerican Insurance Company do hereby certdyaiiat the original powerof attorneyof wh'ieh the foregoing is a full True and correct cdpybf the Power ofAttomey executed by said Companies,is in full force and effect and has not been"revoked. /`, IN TESTIMONY WHEREOF,I have hereunto set my hand and affixed the seals of said Companies this,. t day of )Y /YI Ur 20 j 0 CA INS 1906 p o _ 1919 on 1912 3 F 1991 3 BYE` Gregory W.Davenport,Assistant Secretary Or �'iLy�'4.ttiiv�'��, "',y�'NnMem aJa e�J°rTnc�us�Z? �r anr�ttF• <2 ' 18 of 500 i LMS_12873_122013 LibertX SURETY Important Notice TO OBTAIN INFORMATION OR TO MAKE A COMPLAINT: You may write to Liberty Mutual Surety at: Liberty Mutual Surety Interchange Corporate Center 450 Plymouth Road, Suite 400 Plymouth Meeting, PA 19462-8284 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance: P. O. Box 149104 Austin, TX 78714-9104 Fax: (512) 475-1771 Web: http://www.tdi.state.tx.us E-mail: ConsumerProtection(E�tdi.state.tx.us i k Premium or Claim Disputes z Should you have a dispute concerning a premium, you should contact the agent first. If you have a dispute concerning a claim, you should contact the company first. If the dispute is not resolved, you may contact the Texas Department of Insurance. 3 Attach This Notice To Your Policy: s This notice is for information only and does not become a part or condition of the attached document. S {(t I LMIC-3500 i i tpult . e - '. , ., September 8,2015 Mr. Dale Gilreath Gilco Contracting, Inc. 6331 Southwest Blvd. Benbrook,Texas 76132 Re: Contract for West Fork Ranch Phase 8B CoFW Project No.02338 CoFW CFA No.2014-065 CoFW DOE No.7281 Dear Dale Gilreath: This letter will document that Pulte Homes of Texas, L.P.confirms that Gilco Contracting, Inc. has completed the Work associated with the above-referenced contract in an appropriate time frame, subject to completion of any warranty or maintenance work as identified and required by the City of Fort Worth,and that no liquidated damages will be assessed by Pulte Homes in connection with the Work. Pulte Homes of TX, L.P. By: Curt M. Millward Land Development Project Manager i i I Cc: City of Fort Worth I s i Y !E! f f I{ FORTWORTHREV:02/22/07 TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY 1)PROJECT INFORMATION Date: 9—/30/2015 Name ofContraclor Project Name Gilco Contracting West Fork Ranch Phase 813 DOE Inspector Project Manager Jim Diestel Pat Buckley DOE Number — Project Difji-ido, Type of Contract 7281 10 Simple 0 Routine @ Complex ❑ Water ❑ Waste Water❑ Storm Drainage Rl Pavement 7i—fifial Cb",acl mount $456,891.55 $456,891.55 11)PERFORMANCE EVALUATION 0-Inadequate I -Deficient 2-Standard 3 -Good 4-Excellent ELEMENT RATING ELEMENT RATING INSPECTION (0-4) 6N—EVALUATION (0-4) PLANS&SPECIFICATIONS .1 Availability of Inspector I Accuracy of Plans to Existing Conditions 2 Knowledge of Inspector 2 Clarity&Sufficiency of Details 3 Accuracy of Measured Quantities-- 3 Applicability of Specifications 4 Display Of Professionalism 4 Accuracy of Plan Quantities 5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION Z Performance-Setting up Valve Crews,Labs I Knowledge And/Or Problem Resolution ADMINISTRATION 2 Availability of Project Manager Change Order Processing Time Lf--3 Communication 2 Timliness of Contractor Payments f4f Resolution of Utility Conflicts 3 Bid Opening to Pre-Con Meeting Tirriefram=ea:d IM COMMENTS&SIGNATURES COMMENTS Signature Contractor Signature DOE Inspector Signature DOE Inspector's Supervisor INSPECTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth•1000 Throckrnorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax:(817)392-7845