Loading...
HomeMy WebLinkAboutOrdinance 7139 ORDINANCE N..--71-3q AN O.--71✓LAN ORDINANCE APPROVING AND ADOPTING ESTIMATES OF THE COST OF IMPROVE- MENTS AND OF AMOUNTS TO BE ASSESSED FOR IMPROVEMENTS ON A PORTION OF ALLEN AVENUE AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS; FIXING TIME AND PLACE FOR HEARING TO THE OWNERS OF ABUTTING PROPERTY AND TO ALL OTHERS INTERESTED; DIRECTING THE CITY SECRETARY TO GIVE NOTICE OF SUCH HEARING; AND DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL AND BY FILLING THE COMPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THE CITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City Council of the City of Fort Worth, Texas, has heretofore ordered that each of the hereinafter described portions of streets, avenues and public places in the City of Fort Worth, Texas, be im- proved by raising, grading and filling same and by constructing thereon the following, to-wit: UNIT 1: ALLEN AVENUE From St. Louis Avenue to the east property line of Lot 3, Block 3, St. Helena Addition, and from the west property line of Lot 1., Block 19, Lawn Terrace Addition, to Louis- iana Avenue, known and designated as Project No. 104- 22000-143, Unit 1, a seven-inch thick reinforced concrete pavement on a six-inch thick lime stabilized subgrade wit seven-inch high superimposed concrete curb on a forty-fou to sixty foot roadway. Six-inch thick concrete driveways and four-foot wide concrete sidewalk will be constructed where specified. UNIT 2: ALLEN AVENUE OVERPASS From the east property line of Lot 3, Block 3, St. Helena Addition to the west property line of Lot 1, Block 19, Lawn Terrace Addition, known and designated as Project No 104-22000-143, Unit 2, a forty-eight foot wide prestresse concrete beam structure over the combined tracks of the A.T. & S.F., M.K. & T., and S.P. Railroad tracks. Five- foot wide concrete sidewalk will be constructed on either side, UNIT 3A: ARIZONA AVENUE From Maddox Avenue to approximately 250' south known and designated as Project No. 104-22000-143, Unit 3A, a six- inch thick hot-mix asphaltic concrete pavement on a six- inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a thirty foot roadway ending in an eighty foot cul-de-sac. Six-inch thick concrete driveways and four-foot wide con- crete sidewalk will be constructed where specified. IV. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council and by filing the complete ordinance in the appropriate Ordinance Records of this City. V. This ordinance shall take effect and be in full force and effect from and after the date of its passage. Passed and approved this day of APPROVED AS TO FORM AND LEGALITY: City Attorney UNIT 2: ALLEN AVENUE OVERPASS From the east property line of Lot 3, Block 3, St. Helena Addition to the west property line of Lot 1, Block 19, Lawn Terrace Addition, known and designated as Unit 2, Project No. 104-22000-143. The estimated cost of improvements is $ 1,127.237.04 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for _ wide concrete sidewalk is $ ; the estimated amount per square foot to be assessed against abutting preperty and the owners thereof for 6-inch thick concrete driveway is $_ per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ plus the cost incurred for concrete driveway con- struction where specified. UNIT 3A: ARIZONA AVENUE From Maddox Avenue to approximately 250' south, known and designated as Project No. 104-22000- 143, Unit 3A. The estimated cost of improvements is $ 14.500.37_ the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 3.43 the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 10.52 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $_ 4.66; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ 1,38 _ per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 18.61 plus the cost incurred for concrete driveway con- struction where specified. UNIT 3B: ARIZONA AVENUE From Elmwood Avenue to approximately 210' north, known and designated as Project No. 104-22000- 143, Unit 3B. The estimated cost of improvements is $ 10,523.70 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 3.43 _; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 10.52 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 footwide concrete sidewalk is $ 4.66 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ 1.38_ per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $—1,6j_i, plus the cost incurred for concrete driveway con- struction where specified. UNIT 4: SOUTH 14ATN STREET From Jefferson Avenue to 150' north of E. Allen Avenue, known and designated as Project No. 104-22000-143, Unit 4. The estimated cost of improvements is $ 29,991.71 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 3,43 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is S 6.92 the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot- wide concrete sidewalk is $ 4.66 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $_1.38 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 15.01 plus the cost incurred for concrete driveway con- struction where specified. UNIT 5 & 5A: JEFFERSON-BRYAN AVENUE From South Main Street east and north approx- imately 450' , known and designated as Project No. 104-22000-143, Unit 5 & 5A. The estimated cost of improvements is $ 16,781._0_5 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 3.43 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 10.52 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for Z, f,,t_ wide concrete sidewalk is $i 4.66 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is S 1.38 _ per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 18.61 plus the cost incurred for concrete driveway con- struction where specified. UNIT 6• ELMWOOD AVENUE From Epps to Louisiana Avenue, known and designated as Project No. 104-22000-143, Unit 6. The estimated cost of improvements is $ 20,499.27 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 3.43 _; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 12.83 • the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ 4.6� the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ 1.38 _ per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $_ ?nimplus the cost incurred for concrete driveway con- struction where specified. UNIT 7: MADDOX AVENUE From Epps Street to Louisiana Avenue, known and designated as Project No. 104-22000-143, Unit 7. The estimated cost of improvements is $ 20,01.9.56 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 3.43 the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is S 12.83; the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot_ wide concrete sidewalk is $ 4.66 ; the estimated amount per square foot to be assessed against abutting prcperty and the owners thereof for 6-inch thick concrete driveway is $_1,38 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $_20._92plus the cost incurred for concrete driveway con- struction where specified. UNIT 8: EAST ALLEN AVENUE From Bryan Street to 150' east, known and designated as Project No. 104-22000-143, Unit 8. The estimated cost of improvements is $ 7,822._9_3 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 3.43 the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 10.52 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for _0_ _ wide concrete sidewalk is $ -0- ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is S L per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 13.95 plus the cost incurred for concrete driveway con- struction where specified. UNIT 9: EPPS STREET From Elmwood Avenue to Maddox Avenue, known and designated as Project No. 104-22000-143, Unit 9. The estimated cost of improvements is $ 45,353.93 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 3.43 _; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 10.52 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for _0_ _ wide concrete sidewalk is $ -0- the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ 1.38 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $_Ia __, plus the cost incurred for concrete driveway con- struction where specified. UNIT 3B: ARIZONA AVENUE From Elmwood Avenue to approximately 210' north, known and designated as Project No. 104-22000-143, Unit 3B, a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a thirty foot roadway ending in an eighty foot cul-de- sac. Six-inch thick concrete driveways will be construct ed where specified. UNIT 4: SOUTH MAIN STREET From Jefferson Avenue to 150' north of E. Allen Avenue, known and designated as Project No. 104-22000-143, Unit 4, a two-inch thick hot-mix asphaltic surface course on existing concrete base and increasing the width of the street four feet on each side with six-inch thick rein- forced concrete base on a four-inch thick lime stabilized subgrade, with seven-inch high concrete curb and eighteen inch wide concrete gutter so that the finished street will be forty to forty-eight feet wide. UNIT 5 & 5A: JEFFERSON-BRYAN From South Main Street east and north approximately 450', known and designated as Project No. 104-22000-143, Unit 5 & 5A, a six-inch thick hot-mix asphaltic concrete pave- ment on a six-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide con- crete gutter on a thirty foot roadway. Bryan Avenue will end in an eighty foot cul-de-sac. Six-inch thick concret driveways will be constructed where specified. UNIT 6: ELMWOOD AVENUE From Epps Street to Louisiana Avenue, know and design- ated as Project No. 104-22000-143, Unit 6, a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch high con- crete curb and eighteen-inch wide concrete gutter on a thirty-six foot roadway. Six-inch thick concrete drive- ways will be constructed where specified. UNIT 7: MADDOX AVENUE From Epps Street to Louisiana Avenue, known and design- ated as Project No. 104-22000-143, Unit 7, a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch high con- crete curb and eighteen-inch wide concrete gutter on a thirty-six foot roadway. UNIT 8: EAST ALLEN AVENUE From Bryan Street to 150' east, known and designated as Project No. 104-22000-143, Unit 8, a six-inch thick hot- mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a thirty foot roadway. UNIT 9: EPPS STREET From Elmwood Avenue to Maddox Avenue, known and designat- ed as Project No. 104-22000-143, Unit 9, a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a thirty foot roadway. Six-inch thick concrete driveways will be constructed where specified. City of Fort Worth, Texas Mayor and Council Communication DATE REER FENCE SUBJECT: Award of Contract - Allen Avenu PAGE _ NUMBER --x/24/75 C-3022 Overpass and Related Street 4 Improvements 1 of ---City Council action is requested on Project No. 104-22000-143, as described -below. Project Description Roadway R.O.W. Unit Street Limits Width-Ft. Width-Ft. 1 Allen Avenue St. Louis Avenue to Louisiana Avenue (IH-35W) 44-60 65-170 2 Allen Avenue Overpass Over A.T.&S.F. , M.K. & T. , and S.P. Railroads 48 N/A 3A Arizona Avenue Maddox South to Cul-de-sac 30 50 3B Arizona Avenue Elmwood North to Cul-de-sac 30 50 4 South Main Street Jefferson to 310' N. of West Allen 40-48 60 5A Jefferson Avenue S. Main to Bryan 30 50 5B Bryan Avenue Jefferson - North to Cul-de-sac 30 50 6 Elmwood Avenue Epps to Louisiana 36 60 7 Maddox Avenue Epps to Louisiana 36 60 8 Old Allen Avenue Bryan to 135' East 30 60 9 Epps Street Elmwood to Maddox 30 50 Initiation of Project The 1973-75 Capital Improvement Program provides for the improvements to Allen Avenue from South Main to IH-35 (page A-23 and 24) as approved in the 1970 bond election. Arizona Avenue was initiated by a paving petition from the abutting property owners, whereas the remaining streets are City initiated in order to provide traffic circulation for the existing businesses and residences. Improvements The improvements consist of the realignment and widening of Allen Avenue to a 44 to 60-foot width by construction of industrial/major thoroughfare grade con- crete pavement with superimposed concrete curb, concrete driveway approaches Fandconcrete REFERENCE SUBJECT: Award of Contract - Allen Avenue PAGE NUMBER 1° C-3022 Overpass and Related Street 2 or 4 Improvements sidewalks. Included is the removal of the existing Allen Avenue Overpass and construction of a new 48-foot wide, prestressed concrete beam structure over the coulbined tracks of the A.T. & S.F. , M.K. & T. , and S.P. Railroad tracks. South Main Street will be widened and improved on each side of Allen Avenue to a 48-foot width to include left-turn lanes by construction of the added width of reinforced concrete base and an overlay of hot-mix asphaltic concrete surface course over the entire width. The remaining streets will be improved by construction of six-inch hot-mix asphaltic concrete pave- ment with concrete curb, gutter and driveway approaches. Included on all units are required drainage facilities and appurtenances. Railroad Agreements It will be necessary for the City to enter into an agreement with the Atchison, Topeka and Santa Fe; the Missouri-Kansas and Texas; and the Southern Pacific Railroad Companies, in order to remove the old overpass and construct the new structure over the railroad right-of-way. It is proposed that the railroad companies will reserve the right to construct, operate, rearrange and maintain their tracks and other facilities under the new structure, and that the rail- road companies communication, signal and electrical transmission lines may be constructed either over or underneath the new structure, provided, however, that the making of such additions or alterations shall not in any wise affect the use or safety of the new overpass. We have received the agreement and estimates from the Atchison, Topeka & Santa Fe Railway Company. It is necessary for the railroad to adjust their communica- tion line and signal facilities at an estimated cost of $27,100, with the actual cost to be paid by the City. The other two railroad agreements will be submitted for Council approval when such agreements have been prepared and cost estimates received from the rail- roads. Texas Pipe Line Company Agreement It will also be necessary for the City to enter into an agreement with the Texas Pipe Line Company (TEXACO) in order for the company to adjust its communication pole line. The adjustment consists of replacing the pole line with underground conduit. The Pipe Line Company will furnish all labor and material to make the adjustment at an estimated cost of $1,226.00, with the actual cost to be reimbursed to the Pipe Line Company by the City upon completion. Submission of Bids The following bids have been received: Bidder Amount Navarro Contracting Co. $1,389,751.09 Charles Cohen, Inc. 1,475,985.45 Austin Bridge Co. 1,494,449.35 Brown & Blakney, Inc. 1,513,455.33 Texas Bitulithic Co. 1,555,885.34 Bailey Bridge Co. 1,710,178.30 DATE REFERENCE SUBJECT: Award of Contract - Allen Avenue NUMBER PAGE 2/24/75 C-R Overpass and Related Street 3 4 Improvements of The following contractors took plans and specifications but did not submit bids: Glade, Inc. Kidwell Construction Co. , Inc. L. Grimes Construction Co. Dahlstrom Corp. J. L. Bertram Construction Metro Industries Halloway Construction Co. Zack Burkett Construction Co. L. B. Foster Construction Co. H. D. Riddle Construction Co. G. A. Cox Construction Co. R. & B. Construction Co. Bids Received: January 23, 1975 Working Days Allotted: 300 Proposed Assessments and Enhancements Adjacent to this project are several unusual conditions as related to assess- ment cost to adjacent benefitted property; the zoning and use of property is mixed, plus the traffic channelization lanes and grade differential of the proposed Allen Avenue relative to the adjacent property. Consequently, an independent land appraiser has been retained to appraise the adjacent proper- ties as to enhancement resulting from the proposed street improvements. Results of the appraisal will be presented at the Benefit Hearing. Project Cost and Financing Based on the low bid and standard policy, approximately $34,125.55 is proposed to be assessed against abutting property owners, which will be provided for by a bond fund transfer from the Revolving Fund Unspecified. The cost to the City for construction, engineering, administration and miscellaneous expenses is estimated to be approximately $1,520,625 plus approximately $200,000 for right-of-way and $1,229 for the Pipe Line Company agreement, for a total estimated project cost not including railroad agreements is $1,721,854 for whic sufficient funds are available in Project Account No. 104-22000-143, Allen Avenue. Recommendations It is recommended that: 1) The City Manager be authorized to execute the proposed agree- ment with the Atchison, Topeka and Santa Fe Railroad Co. , and the proposed agreement with the Texas Pipe Line Co. (TEXACO); DATE REFERENCE SUBJECT: Award of Contract - Allen Avenue PAGE NUMBER Overpass and Related Street 2/24/75 C-3022 Improvements 4 of 4 2) The following bond fund transfer be approved: Amount From To Reason $34,125.55 Unspecified Allen Avenue and To provide funds for the Revolving Fund Related Streets property owners' share of 042-09724-901 042-10422-143 construction cost of Allen Avenue and Related Streets. 3) An ordinance be adopted: a. Declaring the necessity for the ordering of the improve- ments; b. Making provisions for levying assessments; c. Directing the Public Works Department to prepare estimates of costs and amounts to be assessed; d. Awarding the contract to Navarro Contracting Company, in the amount of $1,389,751.09; and e. Making appropriations to cover the indebtedness thereby incurred for improvements of the project named above. 4) An ordinance be adopted: a. Approving the estimates of costs and amounts proposed to be assessed; and b. Setting March 24, 1975, as the date for the Benefit Hearing. RNL:ms Attachment SUBMITTED BY: DISPOS TIOY COUNCIL: PROC ED BY OVED p OTH (D SCRIBE) CITY SECRETARY ` DATE CITY MANAGER N H z W W W v >h o N1n0$-wltl"h '3w vp+vl (I 1 1 I W M W LU r I W Y 1 Zr,,�•' Q 1 , � A i II I 1, f W I'M M IN � I CSL Q .N W � Mlr• LU _ NDI l" W 1 1 1 )AV int I, I � l ( W J II � Q CITY OF FORT WORTH PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION ALLEN AVENUE OVERPASS AND REIATED STREET IMPROVEMENTS - PROJECT NO. 104-22000-143 On Monday, February 3, 1975, a Neighborhood Meeting was scheduled by the Engineering Division of the Public Works Department in the Council Chamber, for the Assessment Paving on Allen Avenue and Related Streets, Project No. 104-22000-143. Odell Schmidt explained procedures concerning the proposed improvements, owner participation in costs, and methods of payment, to the nine pro- perty owners present. After this explanation the meeting was opened for discussion. Mr. L. C. Naham, owner of Fort Worth Drug & Notion Company, said that he was being hemmed in as a result of the street widening on South Main. Mr. Schmidt explained to him that with the proposed realignment of Allen Avenue and the widening of South Main Street, both with left-turn lanes will actually make access to his property easier than it is now with all the uncontrolled and congested traffic conditions. By looking at the display of the project, Mr. Naham agreed. After a short general discussion, the meeting was adjourned. FORT WORTH, TEXAS Februarz24 , 1475 1-0 I'14E HONORABLE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS . Gentlemen and Mrs. Rimmer: In accordance with the proceeding of your Honorable Body, I have prepared estima'�as of the cost of street improvements as shown below: Estimates of the total cost of improvements on a portion of Allen Avenve and po-t lIclr_s cf sundry other streets, avenues and public places in the City of Fort Wcrth, 7..JeAs" and estimated amounts per front foot to be assessed against abutting prop.srty a-_d _ cwneres thereof, on each portion of street, avenue and public place are as follcw•8; to-wit, PROJECT NO, 104-22000-143, UNIT 1: ALLEN AVENUE FROM ST. LOUIS AVENUE TO I EAy1. PROPERTY LINE OF LOT 3, BLOCK 3, ST. HELENA ADDITION., AND FROM THE WEST PROPERTY' LYNE OF LOT 1, BLOCK 19, LAWN TERRACE ADDITION TO LOUISIANA AVENUE, to be imprce,�3 by constructing a seven-inch thick reinforced concrete pavement on a six-inch t!-_.Ick lune stabilized subgrade with seven-inch high superimposed concrete curb on a forWy- four to sixty foot roadway. Six-inch thick concrete driveways and four-foot ride: concrete sidewalk will be constructed where specified, The following assessment rates have been established: Seven-inch reinforced concrete pavement (Industrial zoning) , , , , , 0$33,KjL.: , Seven-inch superimposed concrete curb. . . ... . . . . . . .- e .* .. . . . — fo . , 1.27/L.f� Four-foot concrete sidewalk. . . . . . . . . .. .. . .. . . J . . . . . . I . .. . . . . . . . . . , 4,f6/L ,F, Six-inch thick concrete driveways, . . . . .e .. . . . .. . . . — 1,3$/sj, the assessments result in the following division of cost: Total cost to property owners. . . .. . .. . . . . . . . . .. r . .. . . . , 0 - Total cost to City of Fort Worth, . . . . . .. . . . . . . 0 . . . . . . . .. . . . .$235,996,64 TOTAL ESTIMATED CONSTRUCTION COST. . .. ... . .. . . . ... . .. . . .. . . . a$235,99b,E4 PROJECT N0, 104-22000-143, UNIT 2: ALLEN AVENUE OVERPASS FROM THE EAST PROPERTY LDNI OF LOT 3, BLOCK 3, ST, HELENA ADDITIONS TO THE 14EST PROPERTY LINE OF LOT 1, BLOCY 1_`9, IA14N TERRACE ADDITION. A forty-eight foot wide prestressed concrete beam structu:1-e- over the combined tracks of the A.T. & S.F, , M.K. & T. , and S.P. Railroad tracks, foot wide concrete sidewalk will be constructed on either side. No assessments on this unit, Total estimated construction cost. .. . . . ... . . .... . . . . .$1,127,23 7 04 PROJECT NO. 104-22000-143, UNIT 3A: ARIZONA AVENUE FROM MADDOX AVENUE TO APPROXIMATELY SOUTH, to be improved by constructing a six-inch hot-mix asphaltic concrete pavement, cn six-inch thick lime stabilized subgrade with seven-inch high concrete curb and wide concrete gutter on a thirty foot roadway ending in an eighty-foot cul-& -sac, Six-i '_'_' thick concrete driveways and four-foot wide concrete side walk will be constrvct�3 specified, The following assessment rates have been established: Six-inch hot-mix asphaltic concrete pavement (Industrial zoning). , .$10,52/!_ (Industrial zoning less owner occupied credit). .. . . . . .. . . . 9/L Seven-inch curb and eighteen-inch gutter. . . . . . . . . .. . . . . . .. . . . . . . . . 3,43/L_Io Four-foot concrete sidewalk. . . . .. . . . ... . . .. . . . ... . .. . .. . . . . . . . . .. . . Six-inch thick concrete driveways. . . . . . . . . . .. . . ... . . . . . . .. . . . . > > The assessments result in the following division of cost: Total cost to property owners. . . . .. . . . . . . . . .. . . . . .$ 3,589,20 Total cost to City of Fort Worth. . . . . . .. . .. . . . .. . .$10,911,17 Total estimated construction cost. . .. . ... .... . .. . .$14,500.37 PROJECT NO 104-22000-143 UNIT 3B: ARIZONA AVENUE FROM EIMWOOD AVENUE TO APPROXINA=1i' 210 NORTH, to be improved by constructing a six-inch thick hot-mix asphaltic concr - ps > ment on a six-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a thirty-foot roadway, ending in an eighty-focL""- CL1 de-sac. Six-inch thick concrete driveways and four-foot wide concrete sidewalk will b� structed where specified. The following assessment rates have been established: Six-inch hot-mix asphaltic concrete pavement (Industrial zoning) . ,.$1U.52./1.-. (Industrial zoning less owner occupied credit). . , .. . . . . . 6 J9/L,I. Seven-inch curb and eighteen-inch gutter. . . . .. . . . . . ... .. .. . .. . . . . .. 3,43/L,r, Four-foot concrete sidewalk. . .. . . . . . . .. . . ... . .. . .. . .. . . .. . . .... . .. . 4,66/L,Y'. Six-inch thick concrete driveways. . .. . .. . ... .. . .. . . .. . . .. . . . . .. . . o , 1.38/5 The assessments result in the following division of cost: Total cost to property owners. . . . .. . . . . .. . . .. . . . .$ 4,371,27 Total cost to City of Fort Worth. . .. .... ... . . .. ...$ 61,152.43 Total estimated construction cost. . . . .. . . . .. . . ....$10,523.70 PROJECT NO. 104-22000-143 UNIT 4: SOUTH MAIN STREET FROM JEFFERSON AVENUE TO 150' NORTH OF ALLEN AVENUE, to be improved by constructing a two-inch thick hot-mix asphaltic surface course on existing concrete base and increasing the width of the street four feet on each side with six-inch thick reinforced concrete base on a four-inch thick lime stabilized sub- grade, with seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished street will be forty to forty-eight feet wide. Six-inch thick concrete drive- ways and five-foot wide concrete sidewalk will be constructed where specified. The following assessment rates have been established: Four-foot widening each side. . . . .... ... .... .... .. .. . . ..$6.92/L.F. Seven-inch curb and eighteen-inch gutter. . . ... .. .. .. . #.$3.43/L.F. Five-foot concrete sidewalk,, , , , , , ,,, ,, ,,,,,, , ,, ,, ,,, , ,$4.66/L.F. Six-inch thick concrete driveways, , , ,, ,, , ,,, , , , ,, , , ,, ,,$1.38/S.F. The assessments result in the following division of cost: Total cost to property owners.. .. . . ... . .. .. . . . 0 - Total cost to City of Fort Worth. . . .. . .. . . .... .. ... .$29,991.71 Total estimated construction cost.. . . . .. .. . . . .. . . . . .$29,991.71 PROJECT NO, 104-22000-143, UNIT 5 & 5A: JEFFERSON-BRYAN AVENUE FROM SOUM MAIN STREET EAS 1 AND NORTH APPROXIMATELY 4501 , Jefferson Avenue will be improved by constructing a sic-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a thirty foot road- way. Bryan Avenue will be improved by constructing a six-inch thick hot-mix asphaltic con- crete pavement on a six-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a thirty foot roadway ending in an eighty- foot cul-de-sac. Six-inch thick concrete driveways will be constructed where specified. The following assessment rates have been established: Six-inch hot-mix asphaltic concrete pavement (Industrial zoning). . .$10.52/L.F. (Industrial zoning less owner occupied credit). . .. . . . . .. . 6.79/L.7E'. Seven-inch curb and eighteen-inch gutter. . . ...... . . . . . . . . . ... . . .. . . 3.43/L.F� Six-inch thick concrete driveways. . . . .. . .. . ... . .. . . .. . . . . . .. ... .. . . 1.38/S j . The assessments result in the following division of cost: Total cost to property owners. . . .. .. ... . .. .. .. .. .. . .$ 6,638.33 Total cost to City of Fort Worth. .. .. .. . .. . . . . . ... . .$10,142.72 Total estimated construction cost. .. , . ,,. .. .. ... .. . .$16,781.05 PROJECT NO. 104-22000-143, UNIT 6:` ELMWOOD AVENUE FROM EPPS STREET TO LOUISIANA AVENUE, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six- inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a thirty-six foot roadway. Six-inch thick concrete driveways will be constructed where specified. The following assessment rates have been established: Six-inch hot-mix asphaltic concrete pavement (Industrial zoning) .. .$12,83/L.F. (Industrial zoning less owner occupied credit)... ... ... .. 7.95/L.F. Seven-inch curb and eighteen-inch gutter. . ..0 ..... . .. ... >.... .. ... . 3.43/L.F. Six-inch thick concrete driveways, . . 0 . 0. . . . . .... . . .. .. . . . .. . ..... .. 1.38/S,F. The assessments result in the following division of cost: Total cost to property owners. . . .. . . . . . . ... . . . . ... . . .$12,278.56 Total cost to City of Fort Worth. . . . . .. . . . . . . . .. .. . ..$ 8,220.71 Total estimated construction cost. . . . .. . .. . . . . . .. . .. .$20,499.27 PROJECT NO. 104-22000-143, UNIT 7: MADDOX AVENUE FROM EPPS STREET TO LOUISIANA AVENUE, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six- inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a thirty-six foot roadway. The following assessment rates have been established: Six-inch hot-mix asphaltic concrete pavement (Industrial zoning).. .$12.83/L.F. (Industrial zoning less owner occupied credit). . .. .. . ... . 7.95/L.F. Seven-inch curb and eighteen-inch gutter. . . . .. . . .. .. ... . ... . .... . .. 3.43/L.F. Eighteen-inch gutter only. . .. . . .. ... ... .. . . .. . .. . ..... . .. . ... .. . . .. 1.72/L,F. The assessments result in the following division of cost: Total cost to property owners. . . ... . ... . . . .. . . . .. .. . .$ 7,248.19 Total cost to City of Fort Worth. ... . .. . .. . . .. .... . . .$12,771.37 Total estimated construction cost... . . .. . .. . . . . . ... . .$20,019.56 PROJECT NO. 104-22000-143, UNIT 8: EAST ALLEN AVENUE FROM BRYAN STREET TO 150' EAST, to be improved by constructing a six-inch thick hot-mix asphaltic concre��:e pavement on a six-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a thirty foot roadway. The following assessment rates have been established: Six-inch hot-mix asphaltic concrete pavement (Industrial zoning) , . ,$10,52/L.F. Seven-inch curb and eighteen-inch gutter. . . . . . . . . . . . . . . . . . . . . . . . .. 3.43/L.F. The assessments result in the following divis2.on of cost: Total cost to property owners , , , , , , , , , , , ,, , , , , , , , , , , , , , ,, , - 0 - Total cost to City of Fort Worth. . . . . .. . .. . . . . . . . . .. .. . . . .$7,822.93 Total estimated construction cost, , . , . . . . . , . . . . . . . . . . . . .$7,8''2,93 PROJECT NO, 104-22000-143, UNIT 9: EPPS STREET FROM EIK4oOD AVENUE_ 10 MAULOX AVENUE, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a thirty foot roadway, Six-inch thick concrete driveways will be con- structed where specified, The following assessment rates have been established- Six-inch hot-mix asphaltic concrete pavement (Industrial zoning) .. .$10.52/L,F, Seven-inch curb and eighteen-inch gutter. . . . 0 . . . . . . . . . . . . . . . . . . . .. . 3,43/L.F. Six-inch thick concrete driveways. . , . . ,,.. . . . . .. . . . . . . . . . . . . . . . .. 1.38/S.F. The assessments result in the following division of cost: Total cost to property owners. . .. . . . . . . . .. . . . . . . . . . . . . . . . - 0 - Total cost to City of Fort Worth. . . . . . . .. . . . . . . . . . .. . .. . .$45,353,93 Total estimated construction cost. .. . . . . .. . . . . . .. . . .. . . . .$45,353,93 ALL UNITS: TOTAL COST TO PROPERTY OWNERS : . ,. . . . . . . . .. ? _ . . . . . . . .$ 34,125,55 TOTAL COST TO CITY OF FORT WORTH. . . . . . . . .. . . . . . . . . . .. .$1,494,600.65 TOTAL ESTIMATED CONSTRUCTION COST. . . . . . . .. . . . . .. . .. . .$1,528,726,20 JACK M. GRAHAM, P. E. CITY ENGINEER .PROJECT NO, 104-22000-143: ALLEN AVENUE OVERPASS, UNIT 1, FROM ST, LOUIS AVENUE TO THE WEST END OF OVERPASS AND FROM THE EAST END OF OVERPASS TO LOUISIANA AVENUE, to be improved by constructing a seven-inch reinforced concrete pavement on a six-inch thick lime stabil- ized subgrade with seven-inch high superimposed concrete curb on a forty-four to sixty foot roadway. Six-inch thick concrete driveways and four-foot wide concrete sidewalk will be constructed where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE PATILLO'S ADDITION Beginning at the northeast corner of St. Louis Avenue and Allen Avenue. Tarrant County Hospital 1 & 5 200' Existing facilities No assessment District 17 , 1500 S. Main 76104 Tarrant County Hospital 18 & 31 5 193' Existing facilities No assessment District 1500 S. Main 76104 South Main Street intersects ST. HELENA ADDITION Fort Worth Drug & Notion 3 1 85.14' Grade differential No assessment Company — 1601 S. Main Street 76104 Fort Worth Drug & 6 1 100' Grade differential No assessment Notion Company 1601 S. Main St, 76104 Bryan Street intersects 1. PROJECT NO, 104-22000-143: ALLEN AVENUE OVERPASS, UNIT 1, Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NOR`rH SIDE ST. HELENA ADDITION Manuel Coronado 2 3 100' Grade differential No Assessment 1605 Bryan Ind. 76110 Overpass begins LAWN TERRACE ADDITION City of Fort Worth 5 14 110' No Assessment Ind. Arizona Avenue intersects H. D, Edmondson 6 15 100' Existing facilities No Assessment 5400 Ramey Ind. Widening for traffic channelization 76105 Delaware Western Proper- 5 15 100' Existing facilities No Assessm8nt ties, Inc. Ind. Widening for traffic channelization 'lax Department 11971 1702 Continental Life Bldg, 76102 SOUTH SIDE Phillips Petro Company 1 18 100' Existing facilities No Assessment Lesee of Reproco, Inc, Comm. Widening for traffic channelization P.O. Box 1967 Houston, Texas Y. PFOJECT NO. 104-22000-143: ALLEN AVENUE OVERPASS, UNIT 1, Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE LAWN TERRACE ADDITION City of Fort Worth 10 18_ 100' No Assessment Arizona Avenue intersects City of Fort Worth 8 19 No Assessment Overpass begins ST. HELENA ADDITION City of Fort Worth 1 4 No Assessment Ind. T. W. Wiese 10 2 100' Grade differential No Assessment 1701 Bryan Ind. 76110 Floyd J. Morris, Jr. 1 2 100' Grade differential No Assessment 1801 Ems Road East Ind. 76116 South Main Street intersects PATILLO ADDITION City of Fort Worth 64 10 100' No Assessment Comm. 3• PROJECT N0, 104-22000-143: ALLEN AVENUE OVERPASS, UNIT 1, Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE PATILLO ADDITION City of Fort Worth 33 10 100' No Assessment Galveston intersects EMORY COLLEGE SUBDIVISION S. L. Daly 32 10 100' Existing facilities No Assessments 2729 Colonial Pkwy. Res. Widening for traffic channalization 76104 St. Louis Gardens, Inc. 1 10 100' Existing facilities No Assessment 1020 Currie Apt. Widening for traffic channelization 76107 UNIT l: TOTAL COST TO PROPERTY OWNERS..............o.s..0000000- 0 - TOTAL COST TO CITY OF FORT WORTH .....................0$235,996.64 TOTAL ESTIMATED CONSTRUCTION COST......................$235,996.64 4. PROJECT NO, 104-22000-143 UNIT 3Ao ARIZONA AVENUE FROM MADDOX AVENUE TO APPROXIMATELY 250' SOUTH, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch high concrete curb and eight- een-inch wide concrete gutter on a thirty foot roadway ending in an eighty foot cul-de-sac. Six-inch thick concrete driveways and four-foot wide concrete sidewalk will be constructed where specified. BLOCK OWNER LOT ZONING FRON`1'ACE RATE AMOUNT ASSESSMENT �4 WEST SIDE LAWN TERRACE ADDITION Beginning at the southwest corner of Arizona Avenue and Maddox, Owner occupied Waymond Price 1 14 65' Pavement $ 6.79 $441.35 1600 Arizona Ind. $441.35 76104 Waymond Price 2 14 50' Pavement $10.52 $526.00 1600 Arizona Ind, $526.00 76104 Helen Peterson 3 & M of 4 14 75' Pavement $10,52 $789,00 3601 Monticello Ind. 76107 $789.00 City of Fort Worth 5 & S'k of 4 14 75' No Assessment Ind. EAST SIDE H. D. Edmondson 6 & 7 15 50' Pavement $10.52 $526.00 5400 Ramey Ind. $526.00 76105 5. PROJECT NO, 104-22000-143, UNIT 3A° ARIZONA AVENUE FROM MADDOX AVENUE, Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE LAWN TERRACE ADDITION Nathan Clark 8 15 50' Pavement $10.52 $526.00 1013 E. Davis Ind.. $526.00 76104 Omer occupied Earl Hicks 9 15 50° Pavement $ 6.79 $339.50 1605 Arizona Ind, $339.50 76104 Owner occupied Gilbert Cook 10 15 65' Pavement $ 6.79 $441.35 1601 Arizona Ind, $441.35 76104 UNIT 3Ao TOTAL COST TO PROPERTY OWNERS. ... ..... . ..... .. ......... .$ 39589.20 TOTAL COST TO CITY OF FORT WORTH.. .. ... .. ... ... . . . .... ..$10,911.17 TOTAL ESTIMATED CONS'TRUCT'ION COST. . . .. . ...... ... ..... ...$14,500.37 6. PROJECT NO. 104-22000-143, UNIT 3Ba ARIZONA AVENUE FROM ELMWOOD AVENUE TO APPROXIMATELY 210' NORTH, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen- inch wide concrete gutter on a thirty foot roadway ending in an eighty foot cul-de-sac. Six- inch thick concrete driveways and four-foot wide concrete sidewalk will be constructed where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE LAWN TERRACE ADDITION HARRIS REVISION Beginning at the northwest corner of Arizona Avenue and Elmwood. W. J. Johnson 1 19 95' Pavement $10.52 $999.40 1118 E. Allen Ind. 95' Curb & Gutter 3.43 325.85 76104 $1.,325.25 LAWN TERRACE ADDITION Good Hope Missionary 3 19 50' Pavement $10.52 $526.00 Baptist Church Ind. 50' Curb & Gutter 3.43 171.50 1118 E. Allen $ 697.50 76104 City of Fort Worth 2 19 50' No Assessment Ind. City of Fort Worth 1 19 No Assessment Ind. EAS. T SIDE Owner occupied C. L. Anderson 9 18 50' Pavement $ 6.79 $339.50 170.5 Arizona Ind. 50' Curb & Gutter 3.43 171.50 76104 74 Sq. Ft. Driveway 1.38 102.12 $ 613.12 7. PROJECT NO. 104-22000-143, UNIT 3B: ARIZONA AVENUE, Continued: BLOCK 01dNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE LAWN TERRACE ADDITION Hamilton Hughes 8 18 50' Pavement $10.52 $526.00 112 E. Rosedale Ind. 50' Curb & Gutter 3.43 171.50 76104 $ 697.50 Mrs. Douglas Smith 7 18 50' Pavement $10.52 $526.00 2212 Magnolia Ind. 50' Curb & Gutter 3.43 171.50 76110 $ 697.50 Owner occupied Louise A. Rodgers 6 18 40' Pavement $ 6.79 $271.60 1717 Arizona Ind. 40' Gutter only 1.72 68.80 76104 $ 340.40 UNIT 3B: TOTAL COST TO PROPERTY OWNERS. . . . . . . . . . .. . . .. . ... . . . . .$ 4,371.27 TOTAL COST TO CITY OF FORT WORTH. .. . . .. . .... .. . . . .. . . .$ 6,152.43 TOTAL ESTIMATED CONSTRUCTION COST. .. . ... .. .. . ... . . . .. .$10,523.70 8. PROJECT NO. 104-22000-143, UNIT 4: SOUTH MAIN STREET FROM JEFFERSON AVENUE TO 150' NORTH OF EAST ALLEN AVENUE, to be improved by constructing a two-inch thick hot-mix asphaltic surface course on existing concrete base and increasing the width of the street four feet on each side with six-inch thick reinforced concrete base on a four-inch thick lime stabilized sub- grade, with seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished street will be forty to forty-eight feet wide. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE PATILLO ADDITION EMORY COLLEGE SUBDIVISION Beginning at the intersection of South Main and Jefferson. T. & G. Properties 58 10 35' Existing facilities No Assessment 1020 Currie Comm. 76107 E. V. Srygley 59 10 50' Existing facilities No Assessment 2931 Glenco Terrace comm. 76110 E. V. Srygley 60 10 50' Existing facilities No Assessment 2931 Glenco Terrace Comm, 76107 E. V. Srygley 61 10 50' Existing facilities No Assessment 2931 Glenco Terrace Comm. 76110 E. V. Srygley 62 10 50' Existing facilities No Assessment 2931 Glenco Terrace Comm. 76110 E. R. McComb 63 10 50' Existing facilities No Assessment 1704 S. Main St. Comm. 76110 9. PROJECT N0, 104-22000-143,, UNIT 4: SOUTH MAIN STREET, Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE PATILLO ADDITION EMORY COLLEGE SUBDIVISION City of Fort Worth 64 10 34' No Assessment Comm. Allen Avenue intersects PATILLO ADDITION GOLDSMITH SUBDIVISION Tarrant County Hospital 5 310' Existing facilities No Assessment District 1500 S. Main Street 76104 EAST SIDE F. RICHARDS SURVEY St. Joseph Hospital 15 Acre Tract 150' Existing facilities No Assessment 1401 South Main Street 76104 ST. IMLENA ADDITION Fort Worth Drug & 19 2 & 3 1 135' Existing facilities No Assessment Notion Company Ind, 1601 South Main Street 76104 Laurel Street intersects 14. PROJECT N0, 104-22000-143, UNIT 4: SOUTH MAIN STREET, Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE ST, HELENA ADDITION Floyd J. Morris, Jr, N.37.5 of 1 2 37,5' Existing facilities No Assessment 1801 Ems, Road E. Comm, 76116 Mrs, Ruth Mathews 5.12,5 of 1 & 2 37,5' Existing facilities No Assessment 1703 S. Main St. N'k of 2 Comm. 76110 Wilma Blewett Little S'k of 2 & 2 65' Existing facilities No Assessment 608 Fort Worth Club Bldg, lot 3 Comm., 306 West 7th Street 76102 Floyd J. Morris, Jr, 4 2 505 Existing facilities No Assessment 1801 Ems Road East Comm: 76116 R. E. Snyder 5 2 50' Existing facilities No Assessment 1716 Bryan Avenue 76110 UNIT 4: TOTAL COST TO PROPERTY OWNERS. . . . . . . - 0 TOTAL COST TO CITY OF FORT WORTH. . . . . .$29,991.71 TOTAL ESTIMATED CONSTRUCTION COST. , . . . . . , $29,991.71 11. PROJECT NO. 104-22000-143 UNITS 5 & 5A: JEFFERSON-BRYAN AVENUE FROM SOUTH MAIN STREET EAST & NORTH APPROXIMATELY 450 . Jefferson Avenue will be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a thirty foot road- way. Bryan Avenue will be improved by constructing a six-inch thick hot-mix asphaltic con- crete pavement on a six-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a thirty foot roadway ending in an eighty foot cul-de-sac. Six-inch thick concrete driveways will be constructed where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSIXNTT NORTH SIDE ST. HELENA ADDITION Beginning at the NE corner of South Main and Jefferson. R. E. Snyder 5 2 103' Existing facilities No assessment 1716 Bryan Avenue Ind. 76110 R. E. Snyder 6 2 100' Existing facilities No assessm nz 1716 Bryan Ind. 76110 Bryan Avenue intersects SOUTH SIDE J. BURSEY SURVEY Fort Worth Drug & Tract 1, 179.58' Pavement $10.52 $1,889.18 Notion Co. .936 Acres Ind. 179.58' Curb & Gutter 3.43 615.96 1601 S. Main St. $2,535.14 76104 12. UNIT 5A: BRYAN AVENUE BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE ST. HELENA ADDITION R. E. Snyder 6 2 35' Pavement $10.52 $368.20 1717 Bryan Ind. 35' Curb & Gutter 3.43 120.05 76110 85 Sq. Ft. Driveway 1.38 117.30 $605.55 Owner occupied Sam Ramirez 7 2 50' Pavement $ 6.79 $339.50 1712 Bryan Ind. 50' Curb & Gutter 3.43 171.50 76110 85 Sq. Ft. Driveway 1.38 117.30 $628.30 Joe Ellis 8 2 40' Pavement $10.52 $420.80 996 Lingville Road Ind. 40' Curb & Gutter 3.43 137.20 Stephenville, Texas 85 Sq. Ft. Driveway 1.38 117.30 $675.30 Owner occupied R. J. Moss 9 2 50' Pavement $ 6.79 $339.50 1704 Bryan Ind. 50' Curb & Gutter 3.43 171.50 76110 85 Sq. Ft. Driveway 1.38 117.30 $628.30 T. W. Wiese 10 2 30' Pavement $10.52 $315.60 1701 Bryan Ind. 30' Curb & Gutter 3.43 102.90 76110 $418.50 EAST SIDE City of Fort Worth 1 4 30' No Assessment Ind. 13. UNIT 5A: BRYAN AVENUE, Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST T SIDE ST. HELENA ADDITION T. W. Wiese 2 4 50' Pavement $10.52 $ 526.00 1701 Bryan Ind. 50' Curb & Gutter 3.43 171.50 76110 $697.50 Fort Worth Drug & 3 4 107.47' Shallow lot (32%) Notion Company Ind. 107.47' Pavement $10.52 $1,130.58 1601 S. Main Street 107.47' Curb & Gutter 3.43 368.62 76104 $1,499.20 Less 687. - $1,019.46 $479.74 UNIT 5 & 5A: TOTAL COST TO PROPERTY OWNERS. . . . . . . . . . $ 69638.33 TOTAL COST TO CITY OF FORT WORTH. . . . . . . . $10,142.72 TOTAL ESTIMATED CONSTRUCTION COST. . . . . . . $16,781.05 ;4. PROJECT NO. 104-22000-143, UNIT 6: ELMWOOD AVENUE FROM EPPS STREET TO LOUISIANA AVENUE, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six- inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a thirty-six foot roadway. Six-inch thick concrete driveways will be constructed where specified, BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSIEKT NORTH SIDE LAWN TERRACE ADDITION (HARRIS REVISION) Beginning at the NE corner of Elmwood Avenue & Epps Street Jimmie L. Hibbler 4 20 33' Pavement $12.83 $ 423.39 2309 Lena Ind. 33' Curb & Gutter 3,43 113.19 76105 107 Sq,Ft.Driveway 1.38 147.66 $ 684.24 J. I. Black 3 20 42' Pavement $12,83 $ 538.86 5063 Gaines Court Ind. 42' Curb & Gutter 3.43 144.06 76117 107 Sq. Ft.Driveway 1.38 147.66 $ 830.58 W. J. Johnson 2 20 42' Pavement $12.83 $ 538.86 1118 E. Allen Ind, 42' Curb & Gutter 3.43 144.06 76104 234 Sq. Ft.Driveway 1.38 322.92 $1,005.84- W. 1,005.84W. J. Johnson 1 20 42' Pavement $12.83 $ 538,86 1118 E. Allen Ind. 42' Curb & Gutter 3,43 1.44.06 76104 $ 682.92 Arizona Avenue intersects ls. PROJECT NO. 104-22..000-143, UNIT 6: _ ETZ9100D AVENUE, Continued; BLOCK OUNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE IAWN TERRACE ADDITION HARRIS REVISION Owner occupied Louise A. Rodgers 6 18 100' Pavement $ 7.95 $ 795.00 1717 Arizona Ind, 100' Gutter only 1.72 172.00 76104 $ 967.00 Reproco Corp, 5 18 100' Pavement $12.83 $1,283.00 c/o Phillips Petroleum Co. Ind. 100' Gutter only 1.72 172.00 P.O. Box 1967 $1,455.00 Houston, Texas 77001 Louisiana Avenue intersects SOUTH SIDE Joe Day, Jr. & 1477.4 of 2 & 20 127' Pavement $12.83 $1,629.41 Peter J. Pealer E50 of 3 127' Curb & Gutter 3.43 435.61 1.135 Pebble Creek Rd, $2,065.02 76107 Catarino Alvarado 2h of 3 20 50' Pavement $12.83 $ 641.50 2223 Prospect Ave. Ind. 50' Curb & Gutter 3.43 171.50 76106 $ 813.00 14. E, Robinson E50 of 20 50' Pavement $1.2,83 $ 641.50 1335 E, Myrtle 3 Ind. 50' Curb & Gutter 3.43 171.50 $ 813.00 16. PROJECT NO. 104-22000-143, UNIT 6: ELMWOOD AVENUE, Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE LAWN TERRACE ADDITION Confederated Life W24 of 4 & 20 64' Pavement $12.83 $821.12 Ins. Company E40 of 5 Ind. 64' Curb & Gutter 3.43 219.52 P.O. Box 2090 $1,040.64 Dallas, Texas Exell Darden W60 of 5 20 60' Pavement $12.83 $769.80 1334 E. Myrtle Ind. 60' Curb & Gutter 3.43 205.80 76104 107 Sq. Ft. Driveway 1.38 147.66 $1,123.26 Lindbergh McMillian E50 of 6 20 40' Pavement $12.83 $513.20 5244 Mansel Lane Ind. 40' Curb & Gutter 3.43 137.20 76134 107 Sq.Ft.Driveway 1.38 147.66 $ 798.06 UNIT 6: TOTAL COST TO PROPERTY OWNERS. . . ... . .. ...... . . . ....$12,278.56 TOTAL COST TO CITY OF FORT WORTH.. .... . ... . .. ......$ 8,220.71 TOTAL ESTIMATED CONSTRUCTION COST... .. ... . .. .. . ....$20,499.27 17. PROJECT N0, 104-22000-143, UNIT 7: MADDOX AVENUE FROM EPPS STREET TO LOUISIANA AVENUE, to be I mproved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a thirty-six foot roadway, BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE LAWN TERRACE ADDITION Beginning at the NE corner of Maddox Avenue and Epps Street. Capt. James E. Williams E'k,W'k of 13 32' Pavement $12.83 $410.56 2413 Annglenn 14 Ind. 32' Gutter only 1,72 55.04 76119 $ 465.60 Curtis Pruitt W'k,E'k of 14 13 32' pavement $12,83 $410,56 4020 Forbes Indo 32'Gutter only 1.72 55.04 76105 $ 465.60 Louis Houston Ek of 14 13 32' Pavement $12,83 $410,56 5216 Bonnell Ind, 32' Gutter only 1.72 55.04 76107 $ 465.60 Arizona Avenue intersects James E. Williams 15 12 100' Pavement $12,83 $1,283,00 2413 Annglenn Ind, 100' Gutter only 1072 172,00 76119 $1,455.00 Gilbert Cook W38-14 12 38' Pavement $12.83 $487,54 1601 Arizona Ind. 38' Gutter only 1.72 65.36 76104 $ 552,90 Owner occupied James Harvey E62 of 12 62' Pavement $ 7,95 $492.90 1514 Louisiana 14 Ind, 62' Gutter only 1,72 106,64 76104 $ 599.54 18. PROJECT N0, 104-22000-143, UNIT 7: MADDOX AVENUE FROM EPPS STREET, Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORM SIDE LAWN TERRACE ADDITION Louisiana Avenue intersects SOUTH SIDE J. C. Henderson 1 15 100' Pavement $12.83 $1,283.00 1020 East Cannon Ind. 100' Gutter only 1.72 172.00 76104 $1,455.00 Owner occupied Gilbert Cook 10 15 100' Pavement $ 7.95 $ 795.00 1601 Arizona Ind. 100' Gutter only 1.72 172.00 76104 $ 967.00 Arizona Avenue intersects Owner occupied Waymond Price 1 14 85' Pavement $ 7.95 $ 675.75 1600 Arizona Ind. 85' Gutter only 1.72 146.20 76104 $ 821.95 UNIT 7: TOTAL COST TO PROPERTY OWNERS. . . .. . .. .. . .. .. . . .. ... .$ 7,248.19 TOTAL COST TO CITY OF FORT WORTH. .. . .. ... . . ... .. .. . .$12,771.37 TOTAL ESTIMATED CONSTRUCTION COST. . . ... . . . . . .. . . .. . .$20,019.56 19. PROJECT NO. 104-22000-143: UNIT 8, EAST ALLEN AVENUE FROM BRYAN STREET TO 150' EAST, to be improved constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick: lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a thirty foot roadway. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE F, RICHARDS SURVEY Beginning at the NE corner of Bryan Avenue and Allen Avenue. St. Joseph's Hospital 155' Existing facilities No Assessment 1401 South Main Street 76104 SOUTH SIDE ST, HELENA ADDITION Fort Worth Drug & 6 3 15' Existing facilities No Assessment Notion Company Ind. 1601 S. Main Street 76104 William Roh.leder 1 3 100' Existing facilities No Assessment 1601 Bryan Ind. 76110 ALLEY PAVING WEST SIDE Fort Worth Drug & 6 3 75' No Assessment Notion Co. Ind. 1601 South Main St. 76104 20. PROJECT NO. 104-22000-143; UNIT 8, EAST ALLEN AVENUE, Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT ALLEY PAVING ST. HELENA ADDITION WEST SIDE Manuel Coronado 2 3 25' No Assessment 1605 Bryan Ind. 76110 William G. Rholeder 1 3 50° No Assessment 1601 Bryan Ind. 76110 UNIT 8e TOTAL COST TO PROPERTY OWNERS. . . . . . . . - 0 - TOTAL COST TO CITY OF FORT WORTH. . . . . . . .$7,822.93 TOTAL ESTIMATED CONSTRUCTION COST. . . . . . .$7,822.93 21. pRa.TECT NO, 104-22000-143, UNIT 9: EPPS STREET FROM ELMWOOD AVENUE TO MADDOX AVENUE, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a thirty foot roadway. Six-inch thick concrete driveways will be con- structed where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE M.K.T. RAILROAD R.O.W. M.K.T. Railway Company 700' Traffic channelization No Assessment 2101 Epps Street 76104 EAST SIDE LAWN TERRACE ADDITION Waymond Price 1 14 65' Traffic channelization No Assessment 1600 Arizona Ind. 76104 Waymond Price 2 14 50' Traffic channelization No Assessment 1600 Arizona Ind. 76104 Helen Peterson 3 & A of 4 & 14 75' Traffic channelization No Assessment 3601 Monticello N45 of 6 Ind. 76107 Lonnie F. Redmond S45 of 6 14 45' Traffic channelization No Assessment 1614 Arizona 76104 22. PROJECT NO. 104-22000-143, UNIT 9: EPPS STREET, Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE LAWN TERRACE ADDITION C. L, Hunter, Jr. S65 of 8 19 40' Traffic channelization No Assessment 1704 Arizona Ind. 76104 Henry Gentry 5 19 135' Traffic channeli.zation No Assessment 1805 W. Rosedale Ind. 76104 UNIT 9: TOTAL COST TO PROPERTY OWNERS . . . . . .. .. . . .. . .. 0 - TOTAL COST TO CITY OF FORT WORTH.. .. . .. . . . . . .$45,353.93 TOTAL ESTIMATED CONSTRUCTION COST. . . . .. . . . . . .$45,353.93 ALL UNITS: TOTAL COST TO PROPERTY OWNERS.. . . . . . .. . . . . .. . . . . . . .$ 34,125.55 TOTAL COST TO CITY OF FORT WORTH. . . . . . . . . . . . . .. . . . .$1,494,600.65 TOTAL ESTIMATED CONSTRUCTION COST. . . . . . . . . ... . . . . . .$1,528,726.20 23.