To the Mayor and Members of the City Council November 17, 2015
0dy
�Lrn
SUBJECT: INTEGRATED STORMWATER MANAGEMENT (iSWM)
1875 PROCESS AND STANDARD REVISIONS
This Informal Report is to provide City Council with an update on the recent revisions to the
Integrated Stormwater Management (iSWM) review process and standards.
The Recommendations and Next Steps reported to City Council in a June 16, 2015 Pre-Council
briefing have been accomplished and processes and standards revised accordingly. They include
the following:
• Raised review threshold from 0.5 to 1 acre of land disturbance
• Eliminated downstream analysis for some small (< 5 acres) sites
• Reduced level of detail associated with preliminary reviews, primarily eliminating the need to
assess downstream impacts and requiring detailed information on proposed detention in
many cases.
• Provided simple tools for estimating detention volume at preliminary stage
• Provided training for developers and engineers on the revised process and revisions
• Published a revised, streamlined manual
• Focused City review efforts on verifying compliance with standards and leaving design
quality assurance with the owner's design engineers
• Established a Liaison Committee with representatives from the Development Advisory
Committee, Real Estate Council, and Builders Association to meet with staff at least
quarterly to review progress and develop additional improvement opportunities. Two
meetings have been held to date.
• Implemented a customer satisfaction survey
- The overall average satisfaction rating on the 17 surveys received back to date, on a
scale of 1-5 (1 = least satisfied, 5 = most satisfied) is: 4.3.
- The actual overall satisfaction score for each of the 17 responses is reflected in the chart
below. The score of 2 was a case where the applicant believed that their project would not
be subject to iSWM review and the requirement for an iSWM review resulted in the project
being delayed by 30 days.
ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS
INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 9820
�pflT�iy�
To the Mayor and Members of the City Council November 17, 2015
0dy
�Lrn
SUBJECT: INTEGRATED STORMWATER MANAGEMENT (iSWM)
1875 PROCESS AND STANDARD REVISIONS
12
10
8
Number of Responses 6
4
2
0
1 2 3 4 5
Overall Satisfaction Rating
Comments received via the Customer Satisfaction Survey have included that the process and staff
were "collaborative", "smooth and timely", "responsive", "proactive", "considerably streamlined",
and found "custom solutions".
The average review time for an iSWM submission in the past 6 months is: 7 business days (goal is
10 business days).
Staff is working to develop a means of tracking and reporting on the average number of review
cycles to achieve iSWM acceptance. For a variety of reasons it is challenging to track and report
meaningful data for this metric.
If you have any questions on the iSWM review process please contact Assistant TPW Director
Greg Simmons at 817-392-7862.
David Cooke
City Manager