Loading...
HomeMy WebLinkAboutContract 26035 AMENDMENT NO. 2 CITY SECRETARY CONTRACT NO. D� STATE OF TEXAS 8 CITY SECRETARY CONTRACT NO. (No. M&C Needed) COUNTY OF TARRANT 8 WHEREAS, the City of Fort Worth (City) and Wade and Associates, Inc. (Engineer) made and entered into City Secretary Contract No. 24148, (the Contract) which was authorized by the City Council by M&C C-16901 on the 28th day of July 1998 and whereas, the contract was revised by one previous amendment WHEREAS, the Contract involves engineering services for the following project: Engineering contract for the design of Mains 207 and 207A Drainage Area Sanitary Sewer System Rehabilitation and Improvements (Group 3, Contract 4) , Part 3 WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include specialized design work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1 . Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated the 30th day of May 2000, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $13, 146 . 16 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be: paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $95,233 . 50. SAL V'E�0QD �D ^V J��'JUU Uly(ND 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. f r l '00 EXECUTED on this the r` day of , 4.9-9, in Fort Worth, Tarrant County, Texas . ATTEST: Contract Authorization Gloria PeaPONMENDED: ity Secretary Date APPROVAL APPROVED: A. Douglas Rademaker, P.E. Mike Groomer Director, Department of Assistant City Manager Engineering Wade & Associates , Inc. ENGINEER B : �,���1 Y Name: Mark Wade, P.E. President 213 South Jennincrs Ave Fort Worth, TX 76104 APPROVED AS TO FORM AND LEGALITY: Gary te 'nberger Assistant City Attorney ENGI.FRM(NO M&C) -2- AA�L G'E00P,D WHUE 30 May, 2000 Mr. Rakesh Chaubey, P.E., City of Fort Worth Department of Engineering -Integrated Wet Weather Program 811 Lamar Street, Suite 310 Fort Worth, Texas 76102 RE: REVISED Contract Amendment No. 2, Main 207/207A Drainage Area, Sanitary Sewer System Rehabilitation and Improvements, (Group 3, Contract 5), Part 3 Project No. PS46-070460410120, DOE No. 2090 WADE File No. 9810 Dear Mr. Chaubey: Please review and approve the revised second contract amendment to the aforementioned project contract. I have addressed your comments and the table reflects final amendment adjustments. This amendment accounts for additional work beyond the original scope of work including the integration of new Standard Specifications and addressing various design changes associated with them, the re- bid of the project and the recovery of prior printing costs above the budgeted amount in the contract. The costs associated with the re-printing of the bid documents, development of mylar originals and the production of State Revolving Fund documents are itemized below. Specifically, we are seeking approval of the following additional work items in this amendment request as described below: Contract Reference: Attachment A-1 to the Contract, Design Services: Final Pipeline and Manhole Rehabilitation (Group A) • The Incorporation of numerous City directed revisions into the Plans and Contract Documents and Addressing Miscellaneous Items Associated the Project Re-bid. Since this project had to be re-bid due to the rejection of the bids by the City, Under the above referenced contract element, WADE had to incorporate numerous specification changes that the City is requiring on new projects. This situation required us to edit the project plan/profile sheets (CAD edits) and the selected revision of the contract documents/specifications and to re- plot of those plan sheets. Also included is the recovery of costs associated with the re-negotiation of the existing right of entry agreement with the Shady Oaks Country Club, as well as addressing various property owner issues associated with L-2852A that arose recently. Finally, the table also recovers costs associated with the bid process, including the construction administration phase. The table below reflects the staff hours and miscellaneous costs associated with this work item. Consulting Engineers 213 South Jennings Avenue Fort Worth, Texas 76104 .... .. 817 . 335 . 2879 r� FAX 81 7 - 335 - 1 729J,I�rCJJ�DG Page 2 of 2 Mr. Rakesh Chaubey, P.E. 5/30/2000 Staff/Item Hoaers Labor Direct Total Expenses Expenses Ex enses Senior Engineer 45 $ 4,535.55 $ 4,535.55 ($100.79/hr) Staff Engineer 2 $ 129.64 $ 129.64 ($64.82/hr) Senior Office 48 $ 2,925.12 $ 2,925.12 Technician ($60.94/hr) Administrative ($39.63/hr) 4 $ 158.52 $ 158.52 Printing/Plotting/Fax/ $ 482.00 $ 482.00 Coping Costs (In-house) Subcontractor Reproduction $ 4,915.33 $ 4,915.33 Costs (includes 10% Admin Fee and recovers prior overage amounts) Labor Subtotal: $ 7,748.83 Direct Expenses Subtotal: $ 5,397.33 TOTAL AMENDMENT REQUEST: $13,146.16 Please note that we have revised the senior technician hours down by 25 hours; however, we did not adjust the sub-contractor printing costs as requested. The amount being requested reflects the most recent printing costs associated with the re-bid of the project ($2,274.03 to Hugo Trevino & Associates) as well as the recovery of$1,769.45 in reproduction costs previously incurred from Jim's Reproduction and Hugo Trevino. The amount above also includes monies to generate final project mylars and State Revolving Fund plan sets. Upon request, we will provide copies of subcontractor payments made or the M/WBE office can be contacted for verification of subcontractor payments. Therefore, we are requesting Revised Contract Amendment No. 2 in the amount of$ 13,146.16 to the M-207/207A Agreement. This amendment increases the total contract amount from $ 82,087.34 to $ 95,233.50, representing an increase of approximately sixteen percent (16.01%). Please do not hesitate to contact me should you have any questions or need any background information concerning this matter. Thank you for your time and consideration. WAD & SSOC ES, INC. ris Br Project :Manager ATTACHMENT CC: Peter Fu, P.E., FWWD, City of Fort Worth Tony Sholola, P.E., DOE, City of Fort Worth Mark Wade, P.E., President, WADE r, Wade & Associates, Inc. WMA Consulting Engineers