Loading...
HomeMy WebLinkAboutContract 26043 CITY CONTRACT NO Y O AMENDMENT NO. 2 STATE OF TEXAS § CITY SECRETARY CONTRACT NO. (No M&C Needed) COUNTY OF TARRANT § WBEREAS, the City of Fort Worth (City) and A.N.A. Consultants, L.L.C., (Engineer) made and entered into City Secretary Contract No. 24287 (the Contract) which was authorized by the City Council by M&C C-17000 on the 22nd day of September, 1998; and then by Amendment No. 1 for $5,400.00 by Administrative order; and WHEREAS, the Contract involves engineering services for the following project: Engineering Contract for the Pavement Reconstruction and Water and Sanitary Sewer Replacements on the Following Streets: Grace St. (Springdale to NE 28th) Eagle St. (Yucca to Belknap) Bird St. (Sylvania to W. Dead End) Colonial Ave. (Grapewood to Race) Blandin Ave. (E. Belknap to Race) Race St. (Riverside to Fairview) N.Chandler Dr. (McLemore to Yucca) Maurice St. (Belknap to Seaman) Chenault St. (Brandies to Covello) Dalford St. (Fairview to Belknap) WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated June 21, 2000, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $3,700.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of$354,058.00. CRY RU 'G�, a 3. All other provisions of the contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED on this the h3 day of 0, in Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: APPROVED: -1 AA .�•� (�i c' '``am$- � ;;�- = '�'j�—� A.Douglas Rademaker, P.E. l� Mike Groomer Director, Department of Assistant City Manager Engineering A.N.A. Consultants, L.L.C. ENGINEER ATTEST: Gloria Pear on, City Secretary �-i3 ob By: Name: Assaad N. Assaad, P.E. President contract Author zation A.N.A. Consultants, L.L.C. 7-- Date APPROVED AS TO FORM AND LEGALITY: Gary Ste' erger Assistant City Attorney 1VFICC:RL kiC(0G�D Cff�S CEDE pl CSnQy U Ua woo CYR. NCONSLTTANTS,A L.L.C. ENGMERS,SURVriOW%PLANNERS& RCHITECTS 1701 River Run,Suite 610 Fort Worth,Texas 76107 (817)335-9900 Fax(817)335-9955 June 21, 2000 Mr. Gopal Sahu, P.E. Project Manager Transportation& Public Works Dept. City of Fort Worth 1000 Throckmorton St. Fort Worth, TX 76102 RE: Contract Amendment#2 1998 Capital Improvement Blandin Street, D.O.E. No. 2141 Preparation of Construction Plans for Sanitary Sewer L-1820 Dear Mr. Sahu: As per our discussion regarding the preparation of construction plans for the sanitary sewer system L-1820, this work was not part of our engineering contract. We respectfully request the following additional fees: Design Survey $ 500.00 Plan& Profile Sheets (2) $2,000.00 Construction Staking $1,200.00 $3,700.00 A summary of the total project fees are as follows: Original Contract $344,958.00 Amendment No. 1 $ 5,400.00 Amendment No. 2 $ 3.700.00 Sub-total $354,058.00 If you have any questions or desire more information, please let us know. Sincerely, A.N.A. Consultants, L.L.C. OFMCKI Assaad N. Assaad, P.E. CITY RUIWRI President WOOCTHo YM G:UOB\981200\TEXT\SAHU2.WPD Excellence in Engineering