WBEREAS, the City of Fort Worth (City) and A.N.A. Consultants, L.L.C.,
(Engineer) made and entered into City Secretary Contract No. 24287 (the Contract)
which was authorized by the City Council by M&C C-17000 on the 22nd day of
September, 1998; and then by Amendment No. 1 for $5,400.00 by Administrative order;
and
WHEREAS, the Contract involves engineering services for the following project:
Engineering Contract for the Pavement Reconstruction and Water and
Sanitary Sewer Replacements on the Following Streets:
Grace St. (Springdale to NE 28th) Eagle St. (Yucca to Belknap)
Bird St. (Sylvania to W. Dead End) Colonial Ave. (Grapewood to Race)
Blandin Ave. (E. Belknap to Race) Race St. (Riverside to Fairview)
N.Chandler Dr. (McLemore to Yucca) Maurice St. (Belknap to Seaman)
Chenault St. (Brandies to Covello) Dalford St. (Fairview to Belknap)
WHEREAS, it has become necessary to execute Amendment No. 1 to said
Contract to include an increased scope of work and revised maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through their duly
authorized representatives, enter into the following agreement which amends the
Contract:
1.
Article I of the Contract is amended to include the additional engineering services
specified in a proposal letter dated June 21, 2000, a copy of which is attached hereto and
incorporated herein. The cost to City for the additional services to be performed by
Engineer total $3,700.00.
2.
Article II of the Contract is amended to provide for an increase in the maximum
fee to be paid to Engineer for all work and services performed under the Contract, as
amended, so that the total fee paid by the City for all work and services shall not exceed
the sum of$354,058.00.
CRY RU 'G�,
a
3.
All other provisions of the contract, which are not expressly amended herein, shall
remain in full force and effect.
EXECUTED on this the h3 day of 0, in
Fort Worth, Tarrant County, Texas.
APPROVAL RECOMMENDED: APPROVED:
-1 AA
.�•� (�i c' '``am$- � ;;�- = '�'j�—�
A.Douglas Rademaker, P.E. l� Mike Groomer
Director, Department of Assistant City Manager
Engineering
A.N.A. Consultants, L.L.C.
ENGINEER
ATTEST:
Gloria Pear on, City Secretary
�-i3 ob
By:
Name: Assaad N. Assaad, P.E.
President contract Author zation
A.N.A. Consultants, L.L.C. 7--
Date
APPROVED AS TO FORM AND LEGALITY:
Gary Ste' erger
Assistant City Attorney 1VFICC:RL kiC(0G�D
Cff�S CEDE pl
CSnQy
U Ua woo CYR.
NCONSLTTANTS,A L.L.C.
ENGMERS,SURVriOW%PLANNERS& RCHITECTS
1701 River Run,Suite 610 Fort Worth,Texas 76107 (817)335-9900 Fax(817)335-9955
June 21, 2000
Mr. Gopal Sahu, P.E.
Project Manager
Transportation& Public Works Dept.
City of Fort Worth
1000 Throckmorton St.
Fort Worth, TX 76102
RE: Contract Amendment#2
1998 Capital Improvement
Blandin Street, D.O.E. No. 2141
Preparation of Construction Plans for Sanitary Sewer L-1820
Dear Mr. Sahu:
As per our discussion regarding the preparation of construction plans for the sanitary sewer system
L-1820, this work was not part of our engineering contract. We respectfully request the following
additional fees:
Design Survey $ 500.00
Plan& Profile Sheets (2) $2,000.00
Construction Staking $1,200.00
$3,700.00
A summary of the total project fees are as follows:
Original Contract $344,958.00
Amendment No. 1 $ 5,400.00
Amendment No. 2 $ 3.700.00
Sub-total $354,058.00
If you have any questions or desire more information, please let us know.
Sincerely,
A.N.A. Consultants, L.L.C.
OFMCKI
Assaad N. Assaad, P.E. CITY RUIWRI
President WOOCTHo YM
G:UOB\981200\TEXT\SAHU2.WPD Excellence in Engineering