HomeMy WebLinkAboutContract 26065 r f
SPECIFICATIONS AND CON'ii.��T DOCUMENTS
i�
FOR
RECONSTRUCTION OF SCHWARTZ AVENUE AND MAYDELL STREET
Crrf SECRffA6W AND SANITARY SEWER MAIN REHABILITATION
AND IMPROVEMENT
D.O.E. FILE CITY SECRETARY
CONTRACT 2 CONTRACT NO. CP �3
CONTRACTOR'S BONDING CO.
CONSTRUCTION'S tWOOS: 2133 Schwartz Ave (Long Ave to Eva St)
2134 Maydell St (Weber St to LeBow St)
CLIENT DEPARTMENT
UNIT I: Water and Sanitary Sewer Improvements
Water Project: PW77-060770154060
Sewer Project: PS46-070460133900
L
UNIT II: Paving and Drainage Improvements
LPaving and Drainage Project: C115-020115040558
FOR
THE CITY OF FORT WORTH, TEXAS
1999
KENNETH BARR BOB TERRELL
MAYOR CITY MANAGER
HUGO MALANGA,P.E.
DIRECTOR OF TRANSPORTATION
AND PUBLIC WORKS DEPARTMENT
LEE C.BRADLEY,JR.,P.E.
JW DIRECTOR OF WATER DEPARTMENT
A.DOUGLAS RADEMAKER,P.E.
DIRECTOR OF ENGINEERING DEPARTMENT
i
Prepared by:
Wendy Lopez&Associates,Inc.
3800 Sandshell Drive Suite 175
Fort Worth,TX 76137
(817)232-0244 O�MCI AL RICO
WLA Project No.99065 lupQ�,¢ �' Ge
City of Fort Worth, Texas
4Vayor And Council Communtcati
DATE REFERENCE NUMBER LOG NAME PAGE
7/11/00 **C-18107 1 30JL 1 of 2
SUBJECT AWARD OF CONTRACT TO J. L. BERTRAM CONSTRUCTION AND ENGINEERING,
INC. FOR RECONSTRUCTION OF SCHWARTZ AVENUE AND MAYDELL STREET
AND WATER AND SANITARY SEWER MAIN REHABILITATION, CONTRACT 2
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to execute a contract with J. L.
Bertram Construction and Engineering, Inc. in the amount of $339,636.34 for reconstruction of Schwartz
Avenue (Long Avenue to Eva Street) and Maydell Street (Weber Street to Lebow Street) including paving,
storm drain, water and sanitary sewer main replacement, Contract 2.
DISCUSSION:
The 1998 Capital Improvement Program included funds for the reconstruction of Schwartz Avenue (Long
Avenue to Eva Street) and Maydell Street (Weber Street to Lebow Street). The Water Department has
determined that the existing water line in Schwartz Avenue and sanitary sewer lines in Maydell Street are
in need of replacement prior to street reconstruction.
The street improvements include 8-inch pulverization with 3-inch HMAC (hot mix asphalt concrete)
surface course for both streets, driveway approaches and sidewalks where shown on the plans, and the
replacement of storm drain inlets and laterals.
This project was advertised for bid on March 30 and April 6, 2000. On April 27, 2000, the following bids
were received:
BIDDER AMOUNT TIME OF COMPLETION
h
J. L. Bertram Construction and Engineering, Inc. $339.636.34 120 working days
McClendon Construction Company, Inc. $387,695.00
p Stabile &Winn, Inc. $399,060.75
Richard Carr Construction Company $415,257.06
Jackson Construction, Inc. $417,221.00
Funding in the amount of$10,400.00 is included for water and sanitary sewer line construction inspection
and survey. Also included are contingency funds to cover change orders for water and sanitary sewer
line improvements ($12,000.00) and pavement improvements ($11,804.00).
J. L. Bertram Construction and Engineering, Inc. is in compliance with the City's M/WBE Ordinance by
committing to 29% M/WBE participation. The City's goal on this project is 28%.
This project is located in COUNCIL DISTRICT 2, Mapsco 48Z and 49W.
City of Fort Worth, Texas
4vagor And Council communicaflon
DATE REFERENCE NUMBER LOG NAME T'�
7/11/00 **C-18107 30JL 2 of 2
SUBJECT 'AWARD OF CONTRACT TO J. L. BERTRAM CONSTRUCTION AND ENGINEERING,
INC. FOR RECONSTRUCTION OF SCHWARTZ AVENUE AND MAYDELL STREET
AND WATER AND SANITARY SEWER MAIN REHABILITATION, CONTRACT 2
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that funds are available in the current capital budgets, as appropriated, of
the Commercial Paper-Water and Sewer Funds and the Street Improvements Fund.
MG:k
Submitted for City Manager's FUND ACCOUNT CENTER AMOUNT CITY SECRETARY
Office by: (to) APPROVED
Mike Groomer 6140 CITY COUNCIL
Originating Department Head:
JUL 11 7000
A.Douglas Rademaker 6157 (from)
PS46 541200 070460133900 $ 14,050.39 �C f
Additional Information Contact: PW77 541200 060770154060 $ 89,501.50 � Secretaty of tho
C115 541200 020115040558 $236,084.45 City of tort Worth,Texa:.
A.Douglas Rademaker 6157
FROM wEMY LOPEZ 8 Assoc. PHONE NO. : 8172324638 Apr. 21 2000 10:49AM P2
ADDENDUM NO. 1
FOR
RECONSTRUCTION OF SCHWARTZ AVENUE AND MAYDELL STREET
WATER AND SANITARY SEWER MAIN REHABILITATION AND
IMPROVEMENTS
PAGE 1 OF 2
April 20, 2000
UNjI j.• Water and Sanitary Seweer 1wrovenents
Water Pmjeet: PW77-060770154060
Sewer Project: PS46-070460133900
UNIT I..- Paving and Drainage Arvvewents
Paving and Drain ap Project: C115-020115040558
DOE MOS.- 2133 Schwartz Ave(Lon{gA►ee to Eva St)
2134 Meydell St(Weber Sr to LeBow S0
Bids to be Received: April 27, 2000
This addendum forms part of the contract documents referenced above and modifies the
original Contract Documents. Acknowledge receipt of this addendum by signing and
attaching it to the Contract Documents (inside). Note receipt of the Addendum in the Bid
` Proposal and on the outer envelope of your bid.
PLEASE MAKE NOTE OF THE FOLLOWING REVISIONS:
SPECIFICATION AND CONTRACT DOCUMENTS:
1. Bid Proposal Section A
Revisions have been made to the Proposal Section A, page 7(5). The bid
unit for pay item 27 has been replaced from 50 cubic yards (CY) to 50
square yards(SY)-
vi. Special Provisions (Transportation and Public Works Department)
Special Provisions page 13(l) section (2) Submission of Bids should be
deleted in its entirety, and replaced with the following paragraph.
Submission of Bids: The Proposal Sections of the Special Contract
Documents are arranged in two parts to identify pity items for Unit I: Water
and Sanitary Sewer Line Improvements and Unit II: Street and Storm
Drainage IImprevcments. Only one(1)contract for construction of all two (2)
units will be awarded to the bidder with the lowest total amount for all two
(2) units."
1 ADDENDUM NO. 1
FROM WENDY LOPEZ & ASSOC. PHOr4E NO. : 8172324638 Apr. 21 2000 10:5" P3
ADDENDUM NO. 1
FOR
RECONSTRUCTION OF SCHWARTZ AVENUE AND MAYDELL STREET
WATER AND SANITARY SEWER MAIN REHABILITATION AND
IMPROVEMENTS
PAGE 2OF2
April 20, 2000
All other provisions of the plans, specifications and contract document for the
project which are not expressly amended herein shall remain in full force.
Failure to return a signed copy of the addendum with the Proposal shall be
N grounds for rendering the bid non-responsive. A signed copy of this addendum
shall be placed into the Proposal at the time of bid submittal.
RECEIPT ACKNOWLEDGED A. Douglas Rademaker, P.E., Director
J.L.BERTRAM
�. Company: CONSTRUCTION&ENGINEERING,INC.
(Type or pant company name)
(Type or print name)
Date: z�
i
Approved:
Rick Trice, P.E.
Manager, Consultant Services
2 ADDENDUM NO. 9
SPECIFICATIONS AND CONTRACT DOCUMENTS
FOR
RECONSTRUCTION OF SCHWARTZ AVENUE AND MAYDELL STREET
WATER AND SANITARY SEWER MAIN REHABILITATION
AND IMPROVEMENT
CONTRACT2
DOE NOS: 2133 Schwartz Ave (Long Ave to Eva St)
2134 Maydell St (Weber St to LeBow St)
UNIT I: Water and Sanitary Sewer Improvements
Water Project: PW77- 060770154060
Sewer Project: PS46-070460133900
UNIT II: Paving and Drainage Improvements
Paving and Drainage Project: C115-020115040558
FOR
THE CITY OF FORT WORTH,TEXAS
1999
KENNETH BARR BOB TERRELL
MAYOR CITY MANAGER
HUGO MALANGA,P.E.
DIRECTOR OF TRANSPORTATION
AND PUBLIC WORKS DEPARTMENT
LEE C.BRADLEY,JR.,P.E.
DIRECTOR OF WATER DEPARTMENT
A.DOUGLAS RADEMAKER,P.E.
DIRECTOR OF ENGINEERING DEPARTMENT
Prepared by:
`fVK
Wendy Lopez&Associates,Inc.
3800 Sandshell Drive Suite 175
Fort Worth,TX 76137
(817)232-0244
WLA Project No.99065
TABLE OF CONTENTS
1 - Notice to Bidders
2 - Comprehensive Notice to Bidders
3 - Prevailing Wage Rates
4 - Special Instructions to Bidders (Water Department)
5 - Special Instructions to Bidders (T/PW Department)
6 - City of Fort Worth Minority/Women Business Enterprise Policy
7 - Proposal
0 Water Department
0 T/PW Department
8 - General Conditions (Water Department)
9 - Special Conditions (Water Department)
10 - Additional Special Conditions(Water Department)
11 - Specifications and Details(Water Department)
12 - Project Sign (Water Department)
13 - Special Provisions (T/PW Department)
14 - Silicone Joint Sealing Specifications
15 - Project Sign (T/PW Department)
16 - Vendor Compliance to State Law
17 - Contractor Compliance with Workers'Compensation Law
18 - Certificate of Insurance
19 - Bonds (City of Fort Worth)
0 Performance Bond
0 Payment Bond
0 Maintenance Bond
20 - Contract (City of Fort Worth)
21 - Soil Tests
WLA98065.00 -i-
III
NOTICE TO BIDDERS
WLA98065.00
NOTICE TO BIDDERS
Sealed proposals for the following:
FOR: 1998 Capital Improvement Project-CONTRACT 2
Reconstruction Of Schwartz Avenue and Maydell Street Water and Sanitary Sewer
Main Rehabilitation and Improvements
Unit I: Water Main and Sanitary Sewer Improvements
Water Project No.: PW77-060770154060
Sanitary Sewer Project No.: PS46-070460133900
Unit Ii: Paving and Drainage Improvements
T/PW Project No.: C115-020115040558
D.O.E.Nos.: 2133 Schwartz Avenue (East Long Avenue to Eva Street)
2134 Maydell Street (Weber Street to LeBow Street)
Addressed to Mr. Bob Terrell,City Manager of the City of Fort Worth,Texas,will be received at the Purchasing
Office until 1:30 p.m.,Thursday,April 27,2000, and then publicly opened and read aloud at 2:00 p.m.in the
Council Chambers.
Plans,Specifications and Contract Documents for this project may be obtained in the office of the Department
of Engineering, Municipal Office Building, 1000 Throckmorton Street, Fort Worth, Texas 76102. One set of
plans and documents will be provided for a deposit of fifty dollars($50.00).
The major work on the above-referenced project shall consist of the following:
Unit I- Water Main and Sanitary Sewer Improvements
1,135 LF 6 to 8 inch water pipe replacement
36 LF 6 inch water pipe replacement
23 Ea Water service lateral taps
750 LF %inch copper water service
215 LF 6 inch sanitary sewer improvements
1 Ea Standard 4'diameter shallow sanitary sewer manhole
Unit II- Paving and Storm Drain Improvements
8,300 SY 3 inch HMAC surface course
4,230 LF 7 inch reinforced concrete curb
4,600 SF 6 inch reinforced concrete driveway
The Affidavit statement(s)for(Unit I and/or Unit 11,as applicable)of the City of Fort Worth Minority and Women
Business Enterprises Specifications must be submitted with the bid at the time of bid opening. Failure to submit
the Affidavit statement(s) (for Unit I and/or Unit II,as applicable)with the bid shall result in the rejection of the
bid as non-responsive.
For additional information, please contact Mr. Paul Holmes, P.E. at(817)232-0244, or Mr.Fred Ehia, P.E. at
(817)871-8424.
Advertising Dates:
March 30,2000
April 6.2000
WLA98065.00 ��
- 2 -
COMPREHENSIVE NOTICE TO BIDDERS
WLA98065.00
COMPREHENSIVE NOTICE TO BIDDERS
Sealed proposals for the following:
FOR: 1998 CAPITAL IMPROVEMENT PROJECT, CONTRACT 2
RECONSTRUCTION OF SCHWARTZ AVENUE AND MAYDELL STREET
D.O.E. NOS.: 2133 -Schwartz Avenue (East Long Avenue to Eva Street)
2134 - Maydell Street(Weber Street to LeBow Street)
UNIT I: WATER MAIN AND SANITARY SEWER IMPROVEMENTS
WATER PROJECT NO.: PW77-060770154060
SEWER PROJECT NO.: PS46-070460133900
UNIT II:PAVING AND DRAINAGE IMPROVEMENTS
T/PW PROJECT NO.: C115-020115040558
Addressed to Mr. Bob Terrell, City Manager of the City of Fort Worth, Texas, will be received at the
Purchasing Office until 1:30 p.m.,Thursday, April 27, 2000 and then publicly opened and read aloud at
2:00 p.m. in the Council Chambers.
Plans, Specifications and Contract Documents for this project may be obtained in the office of the
Department of Engineering, Municipal Office Building, 1000 Throckmorton Street, Fort Worth, Texas
76102. A fifty dollar($50.00) deposit is required for the first set of documents and additional sets may
be purchased on a non-refundable basis for fifty dollars ($50.00) per set. These documents contain
additional information for prospective bidders.
All bidders will be required to comply with Provision 5159a of"Version's Annotated Civil Statutes"of the
State of Texas with respect to the payment of prevailing wage rates and City Ordinance No. 7278, as
amended by City Ordinance No. 7400 (Fort Worth City Code Sections 13-A-21 through 13-A-29),
prohibiting discrimination in employment practices.
Bid security is required in accordance with Paragraph 1 of the Special Instructions to Bidders.
The major work on the above-referenced project shall consist of the following:
Unit I Water Main and Sanitary Sewer Improvements
1,135 LF 6-to-8 inch water pipe replacement
36 LF 6-inch water pipe replacement
23 Ea Water service lateral taps
750 LF 1- inch copper water service
215 LF 6-inch sanitary sewer improvements
1 Ea Standard 4'diameter shallow sanitary sewer manhole
Unit II Paving and Storm Drain Improvements
8,300 SY 3-inch HMAC surface course
4,230 LF 7-inch reinforced concrete curb
4,650 SF 6- inch reinforced concrete driveway
This project is a combined contract as defined in the Ordinance No. 13781. The offeror shall list all
first and second tier subcontracting and/or supplier opportunities. All other portions of Attachment 1 of
Ordinance 13471 as amended by Ordinance 13781 apply to this contract.
WLA98065.00 Comprehensive Notice to Bidders- 1
Included in the above will be all other items of construction as outlined in the Plans and
Specifications.
The City reserves the right to reject any and/or all bids and waive any and/or all irregularities. No bid
may be withdrawn until the expiration of sixty (60)days from the date the M/WBE UTILIZATION FORM,
PRIM CONTRACTOR WAIVER FORM and/or the GOOD FAITH EFFORT FORM ("Documentation")
as appropriate is received by the City.The award of contract, if made, will be within sixty (60)days after
this documentation is received, but in no case will the award be made until all the responsibility of the
bidder to whom it is proposed to award the contract has been verified.
SUBMISSION OF BIDS: The Proposal sections of the special contract document are arranged in two
Part to identify pay items for unit I: Water and Sanitary Sewer Line Improvements and Unit II Street and
Storm Drains Improvements. Only one (1) contract for construction of all two (2) units will be
awarded to the bidder with the lowest total amount for all two units.
Bidders are responsible for obtaining all addenda to the contract documents prior to the bid receipt time
and acknowledging them at the time of bid receipt. Information regarding the status of addenda may
be obtained by contacting the Department of Engineering at (817)871-7910. Bids that do not
acknowledge all applicable addenda may be rejected as non-responsive.
In accord with the City of Fort Worth Ordinance No. 13471, as amended by Ordinance No. 13781, the
City of Fort Worth has goals for the participation of minority business enterprises and women business
enterprises in City contracts. A copy of the Ordinance can be obtained from the Office of the City
Secretary. In addition, the M/WBE UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM,
and/or the GOOD FAITH EFFORT FORM ("Documentation`)as appropriate. The documentation must
be received no later than 5:00 p.m.,within five(5) City business days after bid opening date. The bidder
shall obtain a receipt from the appropriate employee of the managing department to whom delivery was
made. Such receipt shall be evidence that the Documentation was received by the City. Failure to
comply shall render the bid non-responsive.
The Managing Department for this project is the Department of Engineering.
For additional information, please contact Mr. Paul R. Holmes, P.E., at(817)232-0244, or Mr. Fred Ehia,
P.E., at(817)871-8424.
BOB TERRELL
CITY MANAGER
ALICE CHURCH
CITY SECRETARY
ADVERTISING DATES:
March 30. 2000 _ DEPARTMENT OF ENGINEERING
April 6, 2000 A. DO ! S DEM ER, P.
By: l ,
Rick Trice, P.E.
Manager, Consulting Services
WLA98065.00 Comprehensive Notice to Bidders-2
- 3 -
PREVAILING WAGE RATES
WLA98065.00
i
City of Fort Worth
HIGHWAY(Heavy) CONSTRUCTION
Prevailing Wage Rates For 2000
•2000 HOURLY
CLASSIFICATIONS
RATES
Asphalt Raker $ 10.32
Asphalt Shoveler $ 9.75
Batching Plant Weigher $ 9.65
Carpenter(Rough) $ 13.64
Concrete Finisher-Paving $ 10.16
Concrete Finisher Helper(Paving) $ 9.70
Concrete Finisher-Structures $ 13.44
Flagger $ 7.00
Form Builder-Structures $ 13.44
Form Setter-Paving &Curbs $ 10.25
Form Setter-Structures $ 9.75
Laborer-Common $ 7.64
Laborer-Utility $ 8.64
Mechanic $ 13.25
Servicer $ 10.13
Pipe Layer $ 7.35
Pipe Layer Helper $ 6.75
Asphalt Distributor Operator $ 11.45
Asphalt Paving Machine Operator $ 11.09
Concrete Paving Saw $ 10.53
Crane, Clamshell, Backhoe, Derrick, Dragline, Shovel (< 1 1/2 CY) $ 10.00
Crane, Clamshell, Backhoe, Derrick, Dragline, Shovel (> 1 1/2 CY) $ 11.52
Front End Loader(21/2 CY&less) $ 9.94
Front End Loader(over 2 1/2 CY) $ 9.32
Milling Machine Operator $ 8.00
Mixer $ 11.00
Motor Grader Operator(Fine Grade) $ 12.31
Motor Grader Operator $ 13.75
Pavement Marking Machine $ 11.00
Roller, Steel Wheel Plant-Mix Pavements $ 9.88
Roller, Steel Wheel Other Flatwheel or Tamping $ 12.12
Roller, Pneumatic, Self-Propelled Scraper $ 8.02
Traveling Mixer $ 10.00
Reinforcing Steel Setter(Paving) $ 9.75
Truck Driver-Single Axle (Light) $ 8.00
Truck Driver-Tandem Axle Semi-Trailer $ 10.22
Truck Driver-Lowboy/Float $ 10.54
Truck Driver-Transit Mix $ 10.63
Truck Driver-Winch $ 9.80
W LA98065.00 2(1)
, 4 ,
SPECIAL INSTRUCTIONS TO BIDDERS
(WATER DEPARTMENT)
WLA98065.00
SPECIAL INSTRUCTIONS TO BIDDERS
(WATER DEPARTMENT)
1. PRE-QUALIFICATION REQUIREMENTS: All contractors submitting bids are required to be pre-
qualified by the Fort Worth Water Department prior to submitting bids. This pre-qualification process
will establish a bid limit based on a technical evaluation and financial analysis of the contractor. It is
the bidders' responsibility to submit the following documentation: a current financial statement, an
acceptable experience record, an acceptable equipment schedule and any other documents the
Department may deem necessary,to the Director of the Water Department at least seven(7)calendar
days prior to the date of the opening of bids.
(1) The financial statement required shall have been prepared by an independent certified public
accountant or an independent public accountant holding a valid permit issued by an appropriate
state licensing agency,and shall have been so prepared as to reflect the current financial status
of the submitting company. This statement must be current and not more than one (1)year old.
In the case that a bidding date falls within the time a new statement is being prepared, the
previous statement shall be updated by proper verification.
(2) For an experience record to be considered to be acceptable for a given project,it must reflect the
experience of the firm seeking qualification in work of both the same nature and technical level as
that of the project for which bids are to be received.
(3) The Director of the Water Department shall be the sole judge as to the acceptability for financial
qualification to bid on any Fort Worth Water Department project.
(4) Bids received in excess of the bid limit shall be considered non-responsive and will be rejected as
such.
(5) The City, in its sole discretion, may reject any bid for failure to demonstrate experience and/or
expertise.
(6) Any proposals submitted by a non-pre-qualified bidder shall be returned unopened, and if
inadvertently opened,shall not be considered.
(7) The City will attempt to notify prospective bidders whose qualifications(financial or experience)are
not deemed to be appropriate to the nature and/or magnitude of the project on which bids are to
be received. Failure to notify shall not be a waiver of any necessary pre-qualification.
2. BID SECURITY: A cashier's check,or an acceptable bidder's bond,payable to the City of Fort Worth
in an amount of not less than five percent(5%)of the largest possible total of the bid submitted must
accompany the bid,and is subject to forfeiture in the event the successful bidder fails to execute the
Contract Documents within ten (10)days after the contract has been awarded. To be an acceptable
surety on the bond, (1)the name of the surety shall be included on the current U.S.Treasury, or(2)
the surety must have capital and surplus equal to ten times the limit of the bond. The surety must be
licensed to do business in the State of Texas. The amount of the bond shall not exceed the amount
shown on the Treasury list or one-tenth (1/10)the total capital and surplus.
3. BONDS: A Performance bond, a payment bond, and a maintenance bond each for one hundred
percent(100%)of the contract price will be required, Reference C3-3.7.
4. WAGE RATES: Not less than the prevailing wage rates established by the City of Fort Worth,Texas,
and as set forth in the Contract Documents must be paid on this project.
W LA98065.00 4(1)
SPECIAL INSTRUCTIONS TO BIDDERS
(WATER DEPARTMENT)
5. AMBIGUITY: In the case of ambiguity or lack of clearness in stating prices in the Proposal,the City
reserves the right to adopt the most advantageous construction thereof to the City or to reject the
Proposal.
6. BIDDER LICENSE: Bidder must be a licensed Contractor in the State of Texas.
7. NONRESIDENT BIDDERS: Pursuant to Article 6018,Texas Revised Civil Statutes,the City of Fort
Worth will not award this contract to a nonresident bidder unless the nonresident's bid is lower than the
lowest bid submitted by a responsible Texas resident bidder by the same amount that a Texas resident
bidder would be required to underbid a nonresident bidder to obtain a comparable contract in the state
in which the nonresident's principal place of business is located.
"Nonresident bidder" means a bidder whose principal place of business is not in the State of
Texas, but excludes a contractor whose ultimate parent company or majority owner has its
principal place of business in the State of Texas.
This provision does not apply if this contract involves federal funds.
The appropriate blanks of the Proposal must be filled out by all nonresident bidders in order
for the bid to meet specifications. The failure of a nonresident contractor to do so will
automatically disqualify that bidder.
8. PAYMENT: If the contract amount is$25,000 or less,the contract amount shall be paid within forty-five
(45) calendar days after completion and acceptance by the OWNER.
9. AGE: In accordance with the policy("Policy")of the Executive Branch of the Federal Government,
Contractor covenants that neither it nor any of its officers, members, agents, employees, program
participants or subcontractors,while engaged in performing this contract,shall,in connection with the
employment,advancement or discharge of employees or in connection with the terms, conditions or
privileges of their employment,discriminate against persons because of their age except on the basis
of a bona fide occupational qualification, retirement plan or statutory requirement.
Contractor further covenants that neither it nor its officers, members, agents, employees,
subcontractors, program participants,or persons acting on their behalf, shall specify, in solicitations
or advertisements for employees to work on this contract,a maximum age limit for such employment
unless the specified maximum age limit is based upon a bona fide occupational qualification,
retirement plan or statutory requirement.
Contractor warrants it will fully comply with the Policy and will defend,indemnify and hold City harmless
against any claims or allegations asserted by third party or subcontractor and/or its subcontractors'
alleged failure to comply with the above referenced Policy concerning age discrimination in the
performance of this agreement.
10. DISABILITY: In accordance with the provisions of the Americans With Disabilities Act of 1990
(RADA c@),Contractor warrants that it,any and all of its subcontractors will not unlawfully discriminate
on the basis of disability in the provision of services to the general public, nor in the availability,terms
and/or conditions of employment for applicants for employment with, or employees of,Contractor or
any of its subcontractors. Contractor warrants it will fully comply with ADA's provisions and any other
applicable federal,state and local laws concerning disability and will defend,indemnify and hold City
WLA98065.00 4(2)
SPECIAL INSTRUCTIONS TO BIDDERS
(WATER DEPARTMENT)
harmless against any claims or allegations asserted by third parties or subcontractors against City
arising out of Contractor's and/or its subcontractor's alleged failure to comply with the above
referenced Policy concerning disability discrimination in the performance of this agreement.
11. MINORITY AND WOMEN BUSINESS ENTERPRISES: In accordance with the City of Fort Worth
Ordinance No. 11923, the City of Fort Worth has goals for the participation of minority business
enterprises and women business enterprises in City contracts. A copy of the Ordinance can be
obtained from the Office of the City Secretary. The bidder shall submit the M/WBE UTILIZATION
FORM, PRIME CONTRACTOR WAIVER FORM, and/or the GOOD FAITH EFFORT FORM
("Documentation', as appropriate. The Documentation must be received no later than 5:00 p.m.,five
(5) City business days after the bid opening date. The bidder shall obtain a receipt from the
appropriate employee of the managing department to whom delivery was made. Such receipt shall
be evidence that the documentation was received by the City. Failure to comply shall render the bid
non-responsive.
Upon request,Contractor agrees to provide the Owner complete and accurate information regarding
actual work performed by a Minority Business Enterprise (MBE)and/or a Women Business Enterprise
(WBE) on the contract and payment therefore. Contractor further agrees to permit an audit and/or
examination of any books, records or files in its possession that will substantiate the actual work
performed by an MBE and/or WBE. The misrepresentation of facts (other than a negligent
misrepresentation)and/or the commission of fraud by the Contractor will be grounds for termination
of the contract and/or initiating action under appropriate federal, state or local laws or ordinances
relating to false statements. Further, any such misrepresentation (other than a negligent
misrepresentation) and/or commission of fraud will result in the Contractor being determined to be
irresponsible and barred from participating in City work for a period of time of not less than three (3)
years.
9/ /9
Revised s 4 7
WLA98065.00 4(3)
w
r
4
w 5
w
SPECIAL INSTRUCTIONS TO BIDDERS
(TRANSPORTATION AND PUBLIC WORKS)
r
r
r
e
■
WLA98065.00
SPECIAL INSTRUCTIONS TO BIDDERS
(T/PW DEPARTMENT)
• 1. PRE-QUALIFICATION REQUIREMENTS: All contractors submitting bids are required to be pre-
qualified by the Fort Worth Water Department prior to submitting bids. This pre-qualification process
will establish a bid limit based on a technical evaluation and financial analysis of the contractor. It is
the bidders' responsibility to submit the following documentation: a current financial statement, an
acceptable experience record, an acceptable equipment schedule and any other documents the
Department may deem necessary,to the Director of the Water Department at least seven(7)calendar
days prior to the date of the opening of bids.
(1) The financial statement required shall have been prepared by an independent certified public
accountant or an independent public accountant holding a valid permit issued by an appropriate
state licensing agency, and shall have been so prepared as to reflect the current financial status
of the submitting company. This statement must be current and not more than one (1)year old.
In the case that a bidding date falls within the time a new statement is being prepared, the
previous statement shall be updated by proper verification.
(2) For an experience record to be considered to be acceptable for a given project,it must reflect the
experience of the firm seeking qualification in work of both the same nature and technical level as
that of the project for which bids are to be received.
(3) The Director of the Water Department shall be the sole judge as to the acceptability for financial
qualification to bid on any Fort Worth Water Department project.
(4) Bids received in excess of the bid limit shall be considered non-responsive and will be rejected as
such.
(5) The City, in its sole discretion, may reject any bid for failure to demonstrate experience and/or
expertise.
(6) Any proposals submitted by a non-pre-qualified bidder shall be returned unopened, and if
inadvertently opened,shall not be considered.
(7) The City will attempt to notify prospective bidders whose qualifications(financial or experience)are
not deemed to be appropriate to the nature and/or magnitude of the project on which bids are to
be received. Failure to notify shall not be a waiver of any necessary pre-qualification.
2. BID SECURITY: A cashier's check,or an acceptable bidder's bond,payable to the City of Fort Worth
in an amount of not less than five percent(5%)of the largest possible total of the bid submitted must
accompany the bid, and is subject to forfeiture in the event the successful bidder fails to execute the
Contract Documents within ten (10)days after the contract has been awarded. To be an acceptable
surety on the bond, (1)the name of the surety shall be included on the current U.S.Treasury, or(2)
the surety must have capital and surplus equal to ten times the limit of the bond. The surety must be
licensed to do business in the State of Texas. The amount of the bond shall not exceed the amount
shown on the Treasury list or one-tenth (1/10)the total capital and surplus.
3. BONDS: A Performance bond, a payment bond, and a maintenance bond each for one hundred
percent(100%) of the contract price will be required, Reference C3-3.7.
4. WAGE RATES: Not less than the prevailing wage rates established by the City of Fort Worth,Texas,
and as set forth in the Contract Documents must be paid on this project.
WLA98065.00 5(1)
SPECIAL INSTRUCTIONS TO BIDDERS
(T/PW DEPARTMENT)
5. AMBIGUITY: In the case of ambiguity or lack of clearness in stating prices in the Proposal,the City
reserves the right to adopt the most advantageous construction thereof to the City or to reject the
Proposal.
6. BIDDER LICENSE: Bidder must be a licensed Contractor in the State of Texas.
{ T. NONRESIDENT BIDDERS: Pursuant to Article 6018,Texas Revised Civil Statutes,the City of Fort
Worth will not award this contract to a nonresident bidder unless the nonresident's bid is lower than the
lowest bid submitted by a responsible Texas resident bidder by the same amount that a Texas resident
bidder would be required to underbid a nonresident bidder to obtain a comparable contract in the state
in which the nonresident's principal place of business is located.
"Nonresident bidder" means a bidder whose principal place of business is not in the State of
Texas, but excludes a contractor whose ultimate parent company or majority owner has its
principal place of business in the State of Texas.
This provision does not apply if this contract involves federal funds.
The appropriate blanks of the Proposal must be filled out by all nonresident bidders in order
for the bid to meet specifications. The failure of a nonresident contractor to do so will
automatically disqualify that bidder.
8. PAYMENT: If the contract amount is$25,000 or less,the contract amount shall be paid within forty-five
(45)calendar days after completion and acceptance by the OWNER.
9. AGE: In accordance with the policy("Policy's of the Executive Branch of the Federal Government,
Contractor covenants that neither it nor any of its officers, members, agents, employees, program
participants or subcontractors,while engaged in performing this contract,shall,in connection with the
employment,advancement or discharge of employees or in connection with the terms, conditions or
privileges of their employment,discriminate against persons because of their age except on the basis
.� of a bona fide occupational qualification, retirement plan or statutory requirement.
Contractor further covenants that neither it nor its officers, members, agents, employees,
subcontractors, program participants,or persons acting on their behalf, shall specify, in solicitations
or advertisements for employees to work on this contract,a maximum age limit for such employment
unless the specified maximum age limit is based upon a bona fide occupational qualification,
retirement plan or statutory requirement.
Contractor warrants it will fully comply with the Policy and will defend,indemnify and hold City harmless
against any claims or allegations asserted by third party or subcontractor and/or its subcontractors'
alleged failure to comply with the above referenced Policy concerning age discrimination in the
performance of this agreement.
10. DISABILITY: In accordance with the provisions of the Americans With Disabilities Act of 1990
(AADA@),Contractor warrants that it, any and all of its subcontractors will not unlawfully discriminate
on the basis of disability in the provision of services to the general public, nor in the availability,terms
and/or conditions of employment for applicants for employment with, or employees of,Contractor or
any of its subcontractors. Contractor warrants it will fully comply with ADA's provisions and any other
applicable federal,state and local laws concerning disability and will defend,indemnify and hold City
harmless against any claims or allegations asserted by third parties or subcontractors against City
arising out of Contractor's and/or its subcontractor's alleged failure to comply with the above
referenced Policy concerning disability discrimination in the performance of this agreement.
WL A98065.00 5(2)
SPECIAL INSTRUCTIONS TO BIDDERS
(T/PW DEPARTMENT)
11. MINORITY AND WOMEN BUSINESS ENTERPRISES: In accordance with the City of Fort Worth
Ordinance No. 11923, the City of Fort Worth has goals for the participation of minority business
} enterprises and women business enterprises in City contracts. A copy of the Ordinance can be
obtained from the Office of the City Secretary. The bidder shall submit the MIWBE UTILIZATION
FORM, PRIME CONTRACTOR WAIVER FORM, and/or the GOOD FAITH EFFORT FORM
("Documentation"), as appropriate. The Documentation must be received no later than 5:00 p.m.,five
(5) City business days after the bid opening date. The bidder shall obtain a receipt from the
appropriate employee of the managing department to whom delivery was made. Such receipt shall
be evidence that the documentation was received by the City. Failure to comply shall render the bid
• non-responsive.
Upon request,Contractor agrees to provide the Owner complete and accurate information regarding
actual work performed by a Minority Business Enterprise(MBE)and/or a Women Business Enterprise
(WBE) on the contract and payment therefore. Contractor further agrees to permit an audit and/or
examination of any books, records or files in its possession that will substantiate the actual work
performed by an MBE and/or WBE. The misrepresentation of facts (other than a negligent
• misrepresentation) and/or the commission of fraud by the Contractor will be grounds for termination
of the contract and/or initiating action under appropriate federal, state or local laws or ordinances
relating to false statements. Further, any such misrepresentation (other than a negligent
misrepresentation) and/or commission of fraud will result in the Contractor being determined to be
irresponsible and barred from participating in City work for a period of time of not less than three (3)
years.
Revised 9/4/97
WLA98065.00 5(3)
R
r
■
R
r
6 -
MINORITY AND WOMEN BUSINESS ENTERPRISE SPECIFICATIONS
s
r
w
w
4
a
w
w
WLA98065.00
c` ^s
D F?' 1 F HMENT 1A''
DEFT OF Pagel of 2
Fw
t�N� cilyofFortWortn
lafh*10nd Women usiness Enterprise Specifications
'00 �flY y P�112 36 MBE/WBE UTILIZATION '0G (7ffY ' 2* ' PM 9 55
PRIME COMPANY NA�+E 810 DATE _
4>�waptrzRv * Mwo�.I� Sr C:%V-1s 550�
PROJECT NAME PROJECT NUMBER
01 CITY's wwBE PROJECT GOAL: <11kiM/WBE PERCENTAGE ACHIEVED:
Failure to complete this form, in its entirety with supporting documentation, and received by the Managing Department
ion or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date,will result in the bid
being considered non-responsive to bid specifications.
The undersigned bidder agrees to enter into a formal agreement with the MBE and/or WBE firms for work rk listed in this
schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional=and/or knowing
Imisrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered
non-responsive to specifications.
Company Name,Contact Name, Certified Specify All Contracting Specify All Items to be Dollar Amount
Address,and Telephone No. Scope of Work{•) Supplied(') Z.;.
v O C m
4- r x
2
14L
rc w
MA1VBEs must be located in the 9(nine)county marketplace or currently doing business in the marketplace at the time of bid.
M Specify all areas in which MWBE's are to be utilized and/or items to be supplied:
(') A complete listing of items to be supplied is required in order to receive credit toward the MAYBE goal
(")Identify each Tier level. Tier:Means the level of subcontncting below the prime contractor/eonsultant,i.e.,a direct paymen�
from the prime contractor to a subcontractor is considered 1"tier,a payment by a subcontractor to
its supplier is considered 2"'tier.
THIS FORM MUST BE RECEIVED BY THE MANAGING DEPARTMENT BY 5:00 p.m., FIVE(5) CITY BUSINESS DAYS AFTER 810
^Mn LJl\V^ avr-1 I PIG-rUC Orn nccvi►!r_nA
f
ATTACHMENT 1A
Page 2 of 2
Ci of Fort Worth
Minority and Women Business Enterprise Specifications
MBE/WBE UTILIZATION
Company Name,Contact Name, Certified Specify All Contracting Specify All Items to be Dollar Amount
Address,and Telephone No. Scope of Work(')
< Supplied(')
��
v pp or
U � HF-
Z
I
I
rhe bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding
actual work performed by all subcontractors, including MBE(s) and/or WBE(s) arrangements submitted with this bid.
The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that
Irwill substantiate the actual work performed by the MBE(s) and/or WBE(s) on this contract, by an authorized officer or
/employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the
contract or debarment from City work for a period of not less than three(3) years and for initiating action under Federal,
tate or Local laws concerning false statements. Any failure to comply with this ordinance and creates a material
breach of contract may result in a determination of an irresponsible offeror and barred from participating in City work
for a period of time not less than one(1)year.
ALL MBE and WBEs MUST BE CERTIFIED BY THE CITY BEFORE CONTRACT AWARD
Authdrized Signature Printed Signature 1
'Title Contact Name and Title (if different)
A
�-�-
J
Fompany Name Telephone Number(s)
— 166-7 -4AREDWILA LZE eS1-7=2k1-45Q44 i
"Address Fax Number
Lf\ Mkv 1. ;)w!�C\
yCitylState/Zip Code Date
j,
THIS FORM MUST BE RECEIVED BY THE MANAGING DEPARTMENT BY 5:00 p.m., FIVE(5)CITY BUSINESS DAYS AFTER BID
OPENING, EXCLUSIVE OF THE BID OPENING DATE
Rev.512/98
Qarc� 1 •�ni1 9 of �M.f.. ........• �A e....e.• 1.... .�_-.---� .-__ .�_ u___�z._- ..
- 7 -
PROPOSAL
WLA98065.00
w
UNIT 1: WATER AND SANITARY SEWER IMPROVEMENTS
Pay Approx. Description of Items with Bid Prices
Item Qty. Unit Written in Words Unit Price Amount Bid
SECTION A-WATER IMPROVEMENTS
Furnish and install,including all appurtenant work,complete in place,the following items:
1 36 LF 6-Inch Water Main
Dollars
w
and Z 5! Cents per LF $ 1• %Q $ SCO
2 1,135 LF 8-Inch Water Main
Dollars
and F-Oe—�, Cents per LF $ Q9.50 . $
M 3 1 EA 6-Inch Gate Valve and Box
:SyEmys lry
Dollars
and K� Cents per EA $ -75.W $ AISCNO
4 3 EA 8-Inch Gate Valve and Box
In1
■ 1k nk � Lwzz n k--i C
rlVo—:7 Dollars ,�v�
and � Cents per EA $ �00 $ (
5 2 TN Cast/Ductile Iron Fitting
JAU JLbQ G) S 1 O-V rr'' Dollars
and l CentsperTN $ $ 1W
6 20 EA 1-Inch Water Service Taps to Main (Single
Tap)
h(— 1 Dollars
and Cents per EA $ 5 .60 $ LWO.00
WLA98065.00 7(1)
Pay Approx. Description of Items with Bid Prices
Item Qty. Unit Written in Words Unit Price Amount Bid
7 1 EA 1-Inch Bullhead Water Service Tap to Main
b
`LC�TT--CIS f Dollars
and 46 Cents per EA $ 3 VS 15
8 1 EA Class"C" Meter Box
Dollars
and KJ�N Cents per EA $ Q l b• $ Q10-06
9 750 LF 1-Inch Copper Water Service Replacement
Dollars
and Cents per LF $ $ �75•60
10 20 EA Class"A" Meter Box Replacement(For Single
Service)
l f Dollars
and qCs Cents per EA $
11 1 EA Water Meter Box Relocation
T� Map I tE4
Dollars �1
and 6, Cents per EA $ ( $ d��®•�
12 1 EA 2-Inch Service Replacement Tap to Main
�t GNT�ri0'RC.D
-Fq EF— Dollars
and Cents per EA $ 4 $ $�=�
s
r
WLA98065.00 7(2)
"
Pay Approx. Description of Items with Bid Prices
Item Qty. Unit Written in Words Unit Price Amount Bid
13 50 LF 2-Inch Type K Copper Service
Tl_, (21Kc-
Dollars
and hk� Cents per LF $ of 1.6d $ IMO •�
14 2 EA Class"B" Meter Box Replacement(For Single
Meter)
I r o�6KD'���Ol c-rE
� 'A Dollars
and N3J Cents per EA $ $
15 1 EA 1 1/2-Inch Domestic Type K Copper Service
R
Tap
Dollars
and Cents per EA $ $ L30,06
16 50 LF 1 1/2-Inch Domestic Type K Copper Service
Dollars
`
and Gents per LF $ al . $ Inso.
17 75 LF 3/4-Inch Domestic Type K Copper Service in
private property, by Licensed Plumber
Dollars
and � Cents per LF $ •C(�) $ ,S7'S -NO
18 1 EA Fire Hydrant(Over 3' 6" Bury)
�►� Au 1 Fiyr--
F
UµQRI��I / Dollars R�
and Kr'_3 Cents per EA $ b-�$ 1 4z-
WLA98065.00 7(3)
Pay Approx. Description of Items with Bid Prices
Item Qty. Unit Written in Words Unit Price Amount Bid
19 1 VF Fire HydrantBarrelExtension
Dollars
and Cents per VF $ b- $ AQ/)
20 1 EA Remove and Salvage Existing Fire Hydrant
Dollars
and 1 Cents per EA $
21 10 CY Class"B" (2,500 psi) Concrete for
Miscellaneous Placement and encasement,
Furnish and Install Complete in Place
Dollars
and Cents per CY $ $
22 10 CY Class"E" (1,500 psi) Concrete for
Miscellaneous Placement and Encasement,
Furnish and Install Complete in Place
Dollars
and Cents per CY $ L.5-CC) $ 40.50•GO
23 10 CY Ballast Stone for Miscellaneous Placement as
Directed by Engineer
Dollars
ry and Cents per CY $ $ Q16.00
"
WLA98065.00 7(4)
Pay Approx. Description of Items with Bid Prices
Item Qty. Unit Written in Words Unit Price Amount Bid
24 20 CY Crushed Limestone for Miscellaneous
Placement
Dollars
and uk. _Cents per CY $ t. d $ 4ao -
25 100 LF HMAC Permanent Pavement Repair Per
Figure 4
__ Dollars
and kcl Cents per LF $ M-CO . X700.00
26 1,900 LF Temporary HMAC Pavement Repair Per
Figure"A"
11:
Dollars
and w1 Vj-q Cents per LF $ L-30 $ 119-7o.
27 50 CY Permanent Pavement Repair Per Figure 1; as
Directed by Engineer
�FF Dollars l
and [`t L> Cents per CY $ tx), $ G t
28 1 LS Finish and Lay 2-Inch Pipe and Fittings for
Temporary Water Service Connections
Dollars
and Cents per LS $ $
SUBTOTAL- UNIT 1, SECTION A $ • �J
.................................................................................................
WLA98065.00 7(5)
4
Pay Approx. Description of Items with Bid Prices
Item Qty. Unit Written in Words Unit Price Amount Bid
SECTION B-SEWER IMPROVEMENTS
Furnish and install,including all appurtenant work,complete in place,the following items:
1 215 LF 6-Inch Sanitary Sewer Pipe (All Depths)
1'bfttuC� l9r�G
Dollars
and ft KY Obsk< Cents per LF $ 3k-
2 50 LF 4-Inch PVC Sanitary Sewer Pipe
Dollars
and Cents per LF $
3 3 EA 4-Inch Sanitary Sewer Tap
a�lM1�t
Dollars
and FtCc-� Cents per EA $FA
4 1 EA Standard 4'Diameter Shallow Manhole
e�•c� 'Z�.s�wOP,rC� F"S
Dollars
and czCents per EA $ `SAO oo $ ',5
5 1 EA Standard 4' Diameter Manhole
Dollars
and r;-� Cents per EA $
6 1 EA Watertight Gasketed Manhole Insert
Dollars
and Cents per EA $
WLA98065.00 7(6)
s
Pay Approx. Description of Items with Bid Prices
Item Qty. Unit Written in Words Unit Price Amount Bid
7 1 EA Concrete Manhole Collar
Dollars
and rye per Ea $ $ akIft;�'
8 1 EA Remove Existing Sanitary Sewer Manhole
e�t� Dollars
and Cents per EA $ s'�" $ 5 •m
9 215 LF Post Television Inspection of SS Pipe
Dollars
and Cents perms $ �'ag $ �p Z)-5
10 1 EA Vacuum Testing of SS Manhole
Dollars
and . Cents per EA $
11 5 CY Ba!last Stone for Miscellaneous Placement as
Directed by Engineer
Dollars
and r►zz:b Cents per CY $ 'm $
12 5 CY Crushed Limestone for Miscellaneous
Placement as Directed by Engineer
Dollars
and Cents per CY $
WLA98065.00 7(7)
Pay Approx. Description of Items with Bid Prices
Item Qty. Unit Written in Words Unit Price Amount Bid
13 100 LF Temporary Pavement Repair per Figure"B"
Dollars
and Cents per LF $ $' $
14 215 LF Trench Safety(Depths>5), as Directed by
Engineer
Dollars
and Cents per LF $ S $ a a S
�S
SUBTOTAL- UNIT 1, SECTION B
WLA98065.00 7(8)
UNIT II: PAVING AND STORM DRAINAGE IMPROVEMENTS
Pay Approx. Description of Items with Bid Prices
Item Qty. Unit Written in Words Unit Price Amount Bid
SECTION A-Paving and Drainage Rehabilitation Improvements
Furnish and install, including all appurtenant work, complete in place,the following items:
1 3,230 CY Unclassified Street Excavation
Dollars
and Cents per CY $ ° 3y $
2 920 LF Demolish and Remove Reinforced Concrete
Curb and Gutter
Dollars
and Cents per LF $ a"3 $ a 1�• z�
3 1,575 SF Demolish and Remove 7-inch Reinforced
Concrete Valley Gutter
%--<ca
Dollars
and s=gaLi&� Cents per SF $ ' $
4 3,370 SF Demolish and Remove Reinforced Concrete
Driveway, Sidewalk, Leadwalk, Steps, and
Wheelchair Ramp
NQ
Dollars
S-1
and F.rfi2 s--v:� Cents per SE $ - $
5 100 LF Remove Existing 6-foot Chainlink Fence,see
Sheet 12 of 14
V�- tt�
Dollars
and Cents per LF $ �',s $
WLA98065.00 7(9)
Pay Approx. Description of Items with Bid Prices
., Item Qty. Unit Written in Words Unit Price Amount Bid
6 2 EA Re-move Existing Standard 10-Foot Storm
Inlet
Dollars
and � Cents per EA $ $ Vz o
7 8,300 SY 3-inch HMAC Surface Course(Type"D"Mix)
Dollars
and tJ-,rC Cents per SY $ $'�� $
8 8,300 SY 8-inch Pulverization Base-Cement Stabilized
(5%Total Weight)
Dollars
and �gi��Cents per SY $
9 170 TN Cement
Dollars
and Cents per TN $
10 4,230 LF Construct 7-inch Concrete Curti and Gutter
Dollars
and 5 f—_ Cents per LF $ $
11 4,600 SF Construct 6-inch Reinforced Concrete
Driveways
Tt-'n'�9EF
Dollars
and '�3 L�Qg!�—__ Cents per SF $ $ q a'
WLA98065.00 7(10)
Pay Approx. Description of Items with Bid Prices
Item Qty. Unit Written in Words Unit Price Amount Bid
12 2,900 SF Construct 4-Inch Reinforced Concrete
Sidewalks, Leadwalks, and Wheelchair
Ramps
Dollars
and Cents per SF
13 2,250 SF Construct 7-inch Concrete Valley Gutter
Ty%,(Zc c
Dollars
and c �,�Cents per SF $ 3•�� $ %-13�g
14 100 LF Replacement of 6-foot Chainlink Fence to
Property Line as Directed by Engineer(See
Sheet 12 of 14)
Dollars
and a Cents per LF
15 24 CY Concrete Fence Header for 6-foot Chainlink
Fence, as Directed by Engineer
Dollars
and to Cents per CY $
16 2 EA Water Valve Boxes Adjustment
Three Hundred Dollars,
and Zero Cents per EA $ 300.00 $ 600.00
WLA98065.00 7(11)
Pay Approx. Description of Items with Bid Prices
Ite��� ^ty. Ll��it VVrtten in Words Unit Price Amount Bid
17 21 EA Water Meter Boxes Adjustment
thirtv-five Dollars
and Zero Cents per EA $ 35.00 $ 735.00
18 2 EA Adjust Manhole Rim to New Pavement Grade
Three Hundred Fifty Dollars
and Zero Cents per EA
$ 350.00 $ 700.00
19 150 CY 6-inches Compacted Parkway Top Soil
Eleven Dollars
and Zero Cents per CY $ 11.00 $ 1.650.00
20 2 EA Mail Box Removal and Replacement(See
Sheet 8 of 14)
Dollars
and nt a Cents per EA $
21 4 EA Project Destination Sign
Dollars
and a Cents per EA $
22 1 LS Utility Adjustments
Eight Thousand Dollars
and Zero Cents per LS $ 8.000.00 $ 8.000.00
WLA98065.00 7(12)
Pay Approx. Description of Items with Bid Prices
Item Qty. Unit Written in Words Unit Price Amount Bid
23 102 LF Install 24-inch Reinforced Concrete Pipe
Dollars
� 'w.Cd
and .-3 a Cents per LF $ 3�• $ '�
24 25 CY Trench Excavation and Backfill as Per Item
402 Public Works Dept. Specification
Rv�
Dollars
and Cents per CY $ S •�S $ �3�
25 2 EA Construct Standard 10-foot Storm Inlet
Dollars
and ^j 4 Cents per EA $ -Ts
26 125 LF Silicone Joint Sealant
-� Dollars
and -i�� s _Cents per LF $ �- 'a-� $ Sam• 5
Syy
27 50 .Qrf 6-inch Flex Base for the driveways Transition
as Directed by Engineer
Dollars
and rs o Cents per CY $
28 100 LF 6-Inch Subdrain Pipe, as Directed by
Engineer
Tielf
Dollars
and Ac-j1aNN Fj yZ Cents per LF $ �c $
WLA98065.00 7(13)
Pay Approx. Description of Items with Bid Prices
Item Qty. Unit Wrtftte�� in:"JoMs Unit Price Amount Bid
29 50 LF Trench Safety (Depths>5), as Directed by
Engineer
Dollars
and Cents per LF $
30 160 TN 7-Inch HMAC Pavement Transition
Dollars
and No Cents per TN $ 3 R'm $
r SUBTOTAL- UNIT II, SECTION A
.................................................................................................
A
I�
I"
A
1
WLA98065.00 7(14)
ESTIMATE SUMMARY
SUBTOTAL- UNIT I: SECTION 'A'-WATER $ $q 60 • So
SECTION 'B'- SANITARY SEWER $ kA
TOTAL UNIT 1 110
SUBTOTAL- UNIT II: PAVING AND DRAINING
TOTAL UNIT II
n V"L
3
GRAND TOTAL UNIT I+UNIT II: $ 7 '
W LA98065.00 7(15)
PART 7- PROPOSAL(Continued)
Within ten (10) days of notification from the City, the undersigned will execute the formal contract and will
deliver an approved surety bond and such other bonds as required by the Contract Documents, for the
faithful performance of the Contract. The attached bid surety, in the amount of 5% of the total amount
bid, is to become the property of the City of Fort Worth, Texas, in the event the contract and bond, or
bonds, are not executed and delivered within the time above set forth, as liquidated damages for the
w delay and additional work caused,thereby.
The undersigned bidder, certified that he has been furnished at least one set of the General Contract
Documents and General Specifications for Water Department Projects dated January 1, 1978, and that
he has read and thoroughly understands all the requirements and conditions of those General Documents
and the specific Contract Documents and appurtenant plans.
The undersigned assures that its employees and applicants for employment and those of any labor
organization, subcontractors, or employment agency, in either furnishing or referring employee applicants
to the undersigned, are not discriminated against as prohibited by terms of City Ordinance No. 7278 as
amended by City Ordinance No.7400.
i
The Bidder agrees to begin construction 10 working days after issue of the work order, and to complete
construction within 120 working days as set forth in the written work order to be furnished by the Owner.
b
(Complete A or B below, as applicable)
[ ] A. The principal place of business of our company is in the State of
w
[ ] Non-resident bidders in the State of , our principal place of business,
are required to be percent lower than resident bidders by state law. A copy of the
statute is attached.
[ ] Non-resident bidders in the State of , our principal place of business,
are not required to underbid resident bidders.
[v� B. The principal place of business of our company, our parent company, or majority owner,
is in the State of Texas.
A
Receipt is acknowledged of the following Addenda:
Addendum No. 1
Addendum No. 2
Addendum No. 3
(SEAL) If Bidder Corporation
Respectfully Submitted, J. L BERTRAM
CO STRUCTION &ENGINEERING,INC.
B .
■ Title: �!'�a'�•� � _
Address: 1luw .A ` . ;N AYE
-
' TEXAS 176011
W LA98065.00 7(16)
4
_ g _
GENERAL CONDITIONS
(WATER DEPARTMENT)
WLA98065.00
s
GENERAL CONDITIONS
(WATER DEPARTMENT)
R
t
•
■
7 Unit I
PART C - GENERAL CONDITIONS
TABLE OF CONTENTS
NOVEMBER, 1, 1987
TABLE OF CONTENTS
C1-1 DEFINITIONS
C1-1.1 Definition of Terms C1-1 (1)
C1-1.2 Contract Documents C1-1 (1)
C1-1.3 Notice to Bidders C1-1 (2)
C1-1.4 Proposal C1-1 (2)
C1-1.5 Bidder C1-1 (2)
C1-1. 6 General Conditions C1-1 (2)
C1-1.7 Special Conditions C1-1 (2)
C1-1.8 Specifications C1-1 (2)
C1-1.9 Bond C1-1 (2)
C1-1.10 Contract C1-1 (3)
C1-1.11 Plans C1-1 (3 )
C1-1.12 City C1-1 (3)
C1-1.13 City Council Cl-1 (3 )
C1-1.14 Mayor C1-1 (3)
C1-1.15 City Manager C1-1 (3)
C1-1.16 City Attorney C1-1 (3)
C1-1.17 Director of Public Works C1-1 (4 )
C1-1.18 Director, City Water Department C1-1 (4 )
C1-1.19 Engineer C1-1 (4)
C1-1.20 Contractor C1-1 (4)
C1-1.21 Sureties C1-1 (4 )
C1-1. 22 The Work or Project C1-1 (4)
C1-1.23 Working Day C1-1 (4)
C1-1.24 Calendar Day C1-1 (4)
C1-1. 25 Legal Holiday C1-1 (4)
C1-1.26 Abbreviations C1-1 (5)
C1-1. 27 Change Order C1-1 (6 )
C1-1.28 Paved Streets and Alleys C1-1 (6 )
C1-1.29 Unpaved Streets. and Alleys Cl-1 (6 )
C1-1. 30 City Streets C1-1 (6 )
C1-1.31 Roadway C1-1 (6 )
C1-1.32 Gravel Street C1-1 (6 )
C2-2 INTERPRETATION AND PREPARATION
OF PROPOSAL
C2-2.1 Proposal Form C2-2 (1)
C2-2. 2 Interpretation of Quantities C2-2 (1)
C2-2.3 Examination of Contract Documents
and Site C2-2 (2)
C2-2. 4 Submitting of Proposal' C2-2 (3)
C2-2.5 Rejection of Proposals C2-2 (3 )
C2-2.6 Bid Security C2-2 (3 )
(1)
C2-2.7 Delivery of Proposal C2-2 (4 )
C2-2.8 Withdrawing Proposals C2-2 (4 )
C2-2. 9 Telegraphic Modification of Proposals C2-2 (4)
C2-2.10 Public Opening of Proposal C2-2 (4 )
C2-2.11 Irregular Proposals C2-2 (4)
C2-2.12 Disqualification of Bidders C2-2 (5)
C3-3 AWARD AND EXECUTION OF DOCUMENTS
C3-3.1 Consideration of Proposals C3-3 (1)
C3-3.2 Minority Business Enterpise
Women-Owned Business Enterprise
compliance C3-3 (1)
C3-3.3 Equal Employment Provisions C3-3 (1)
C3-3.4 Withdrawal of Proposals C3-3 (2)
C3-3.5 Award of Contract C3-3 (2)
C3-3.6 Return of Proposal Securities C3-3 (2)
C3-3.7 Bonds C3-3 (2)
C3-3.8 Execution of Contract C3-3 (4)
C3-3.9 Failure to Execute Contract C3-3 (4)
C3-3.10 Beginning Work C3-3 (4)
C3-3.11 Insurance C3-3 (4)
C3-3.12 Contractor's Obligations C3-3 (7)
C3-3.13 Weekly Payroll C3-3 (7)
C3-3.14 Contractor's Contract Administration C3-3 (7)
C3-3.15 Venue C3-3 (8)
C4-4 SCOPE OF WORK
C4-4.1 Intent of Contract Documents C4-4 (1)
C4-4.2 Special Provisions C4-4 (1)
C4-4. 3 Increased or Decreased Quantities C4-4 (1)
C4-4.4 Alteration of Contract Documents C4-4 (2)
C4-4.5 Extra Work C4-4 (2)
C4-4. 6 Schedule of Operations C4-4 (3)
C4-4.7 Progress Schedules for Water and
Sewer Plant Facilities C4-4 (4)
C5-5 CONTROL OF WORK AND MATERIALS
C5-5.1 Authority of Engineer CS-5 (1)
C5-5.2 Conformity with Plans C5-5 (1)
C5-5.3 Coordination of Contract Documents C5-5 (2)
C5-5.4 Cooperation of Contractor C5-5 (2)
CS-5.5 Emergency and/or Rectification Work C5-5 (3 )
C5-5. 6 Fidld Office CS-5 (3 )
C5-5.7 Construction Stakes C5-5 (3)
C5-5.8 Authority and Duties of Inspectors C5-5 (4 )
C5-5.9 Inspection C5-5 (5)
CS-5.10 Removal of Defective and Unauthorized Work C5-5 (5 )
C5-5.11 Substitute Materials or Equipment C5-5 (5)
C5-5.12 Samples and Tests of Materials C5-5 (6)
C5-5.13 Storage of Materials C5-5 (6 )
C5-5.14 Existing Structures and Utilities CS-5 (7)
C5-5.15 Interruption of Service C5-5 (7)
C5-5.16 Mutual Responsibility of Contractors C5-5 (8 )
C5-5.17 Cleanup CS-5 (8)
CS-5.18 Final Inspection C5-5 (9 )
(2)
C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY
C6-6.1 Laws to be Observed C6-6 (1)
C6-6.2 Permits and Licenses C6-6 (1)
C6-6. 3 Patented Devices, Materials and Processes C6-6 (1)
C6-6.4 Sanitary Provisions C6-6 (2)
C6-6.5 Public Safety and Convenience C6-6 (2)
C6-6.6 Privileges of Contractor in Streets,
Alleys, and Right-of-Way C6-6 (3 )
C6-6.7 Railway Crossings • C6-6 (4 )
C6-6. 8 Barricades, Warnings and Watchmen C6-6 ( 4)
C6-6.9 Use of Explosives, Drop Weight, etc. C6-6 (5 )
C6-6.10 Work Within Easements C6-6 (6 )
C6-6.11 Independent Contractor C6-6 (8 )
C6-6.12 Contractor ' s Responsibility for
Damage Claims C6-6 (8 )
C6-6.13 Contractor' s Claim for Damages C6-6 (10)
C6-6.14 Adjustment of Relocation of Public
Utilities, etc. C6-6 (10 )
C6-6.15 Temporary Sewer Drain Connections C6-6 (10 )
C6-6.16 Arrangement and Charges of Water
Furnished by City C6-6 (11)
C6-6.17 Use of a Section of Portion of the Work C6-6 (11)
C6-6.18 Contractor ' s Responsibility' for Work C6-6 (11)
C6-6.19 No Waiver of Legal Rights C6-6 (12)
C6-6.20 Personal Liability of Public Officials C6-6 (12)
C6-6.21 State Sales Tax C6-6 (12)
C7-7 PROSECUTION AND PROGRESS
C7-7.1 Subletting C7-7 (1)
C7-7.2 Assignment of Contract C7-7 (1)
C7-7.3 Prosecution of the Work C7-7 (1)
C7-7. 4 Limitations of Qperations C7-7 (2)
C7-7.5 Character of Workman and Equipment C7-7 (2 )
C7-7.6 Work Schedule C7-7 (3 )
C7-7. 7 Time of Commencement and Completion C7-7 (4 )
C7-7. 8 Extension of time of Completion C7-7 (4 )
C7-7.9 Delays C7-7 (4 )
C7-7.10 Time of Completion C7-7 (5)
C7-7.11 Suspension by Court Order C7-7 (6 )
C7-7.12 Temporary Suspension C7-7 (6 )
C7-7.13 Termination of Contract due to
National Emergency C7-7 (7 )
C7-7.14 Suspension of Abandonment of the
Work and Annulment of Contract C7-7 (7)
C7-7.15 Fulfillment of Contract C7-7 (9)
C7-7.16 Termination for Convenience of the Onwer C7-7 (10 )
C7-7.17 Safety Methods and Practices C7-7 (13 )
CS-8 MEASUREMENT AND PAYMENT
C8-8.1 Measurement of Quantities C8-8 (1)
C8-8.2 Unit Prices C8-8 (1)
(3 )
Roo
C8-8.3 Lump Sum C8-8 (1)
C8-8.4 Scope of Payment CS-8 (1 )
C8-8.5 Partial Estimates and Retainage C8-8 (2)
C8-8.6 Withholding Payment C8-8 (3 )
CS-8.7 Final Acceptance C8-8 (3 )
C8-8. 8 Final Payment C8-8 (3)
CS-8. 9 Adquacy of Design C8-8 (4 )
C8-8.10 General Guaranty C8-8 (4)
CS-8.11 Subsidiary Work C8-8 (5 )
C8-8.12 Miscellaneous Placement of Material C8-8 (5)
CS-8.13 Record Documents C8-8 (5 )
(4)
r PART C - GENERAL CONDITIONS
C1-1 DEFINITIONS
SECTION C1-1 DEFINITIONS
,. C1-1 . 1 DEFINITIONS OF TERMS : Whenever in these Contract
Documents the following terms or pronouns in place of them are
used , the intent and meaning shall be understood and
interpreted as follows:
CI-1. 2 CONTRACT DOCUMENTS: The Contract Documents are all of
the written and drawn documents , such as specifications ,
bonds , addenda , plans , etc . , which govern the terms and
performance of the contract . These are contained in the
General Contract Documents and the Special Contract Documents.
a. GENERAL CONTRACT DOCUMENTS: The General Contract
Documents govern all Water Department Projects and
include the following items:
PART A - NOTICE TO BIDDERS (Sample) White
PART B - PROPOSAL (Sample) White
PART C - GENERAL CONDITIONS (CITY) Canary Yellow
(Developer) Brown
PART D - SPECIAL CONDITIONS Green
PART E - SPECIFICATIONS E1-White
E2-Golden Rod
E2A-White
PERMITS/EASEMENTS Blue
PART F - BONDS (Sample) White
PART G - CONTRACT (Sample) White
b. SPECIAL CONTRACT DOCUMENTS : The Special Contract
Documents are prepared for each specific project as
a supplement to the General Contract Documents and
include the following items:
PART A - NOTICE TO BIDDERS (Advertisement) Same as
above
PART B - PROPOSAL (Bid)
PART C - GENERAL CONDITIONS
PART D - SPECIAL CONDITIONS
PART E - SPECIFICATIONS
PERMITS/EASEMENTS
PART F - BONDS
PART G - CONTRACT
PART H - PLANS (Usually bound separately)
C1-1 (1 )
C1-1 . 3 NOTICE TO BIDDERS : All of the legal publications
either actually published in public advertising mediums or
furnished direct to interested parties pertaining to the work
contemplated under the Contract Documents constitutes the
notice to bidders.
C1-1 . 4 PROPOSAL: The completed written and signed offer or
tender of a bidder to perform the work which the Owner desires
to have done, together with the bid security, constitutes the
Proposal , which becomes binding upon the Bidder when it is
officially received by the Owner, has been publicly opened and
read and not rejected by the Owner.
C1-1 . 5 BIDDER: Any person , persons , firm, partnership,
company, association, corporation, acting directly or through
a duly authorized representative, submitting a proposal for
performing the work contemplated under the Contract Documents ,
constitutes a bidder.
C1-1 . 6 GENERAL CONDITIONS: The General Conditions are the
usual construction and contract requirements which govern the
performance of the work so that it will be carried on in
accordance with the customary procedure, the local statutes ,
and requirements of the City of Port Worth ' s charter and
promulgated ordinances.
Wherever there may be a conflict between the General
Conditions and Special Conditions , the latter shall take
precedence and shall govern.
C1-1 . 7 SPECIAL CONDITIONS : Special conditions are the
specific requirements which are necessary for the particular
project covered by the Contract Documents and not specifically
covered in the General Conditions. When considered with the
General Conditions and other elements of the Contract
Documents they provide the information which the Contractor
and Owner should have in order to gain a thorough knowledge of
the project.
C1-1 . 8 SPECIFICATIONS: The Specifications is that section or
part of the Contract Documents which sets forth in detail the
requirements which must be met by all materials, construction,
workmanship , equipment and services in order to render a
completed and useful project. Whenever reference is made to
standard specifications, regulations, requirements , statutes ,
etc. , such referred to documents shall become a part of the
Contract Documents just as though they were embodied therein.
C1-1 . 9 BOND: The bond or bonds are the written guarantee or
security furnished by the Contractor for the prompt and
C1-1 (2)
}
faithful performance of the contract and include the
following:
a. Performance Bond (see paragraph C3-3 .7 )
b. Payment Bond (see paragraph C3-3.7)
C. Maintenance Bond (see paragraph C3-3.7)
d. Proposal or Bid Security (see Special Instructions
to Bidders, Part A and C2-2.6 )
C1-1 . 10 CONTRACT: The Contract is the formal signed agreement
between the Owner and the Contractor covering the mutual
understanding of the two contracting parties about the project
to be completed under the Contract Documents.
C1-1. 11 PLANS: The plans are the drawings or reproductions
therefrom made by the Owner' s representative showing in detail
the location, dimension and position of the various elements
of the project , including such profiles , typical
cross-sections, layout diagrams, working drawings, preliminary
drawings and such supplemental drawings as the Owner may issue
to clarify other drawings or for the purpose of showing
changes in the work hereinafter authorized by the Owner . The
plans are usually bound separately from other parts of the
Contract Documents , but they are a part of the Contract
Documents just as though they were bound therein.
C1-1 . 12 CITY: The City of Fort Worth , Texas , a municipal
corporation, authorized and chartered under the Texas State
Statutes , acting by and through its governing body or its City
Manger , each of which is required by charter to perform
specific duties . Responsibility for final enforcement of
Contracts involving the City of Fort Worth is by Charter
vested in the City Manager. The terms City and Owner are
synonymous.
C1-1 . 13 CITY COUNCIL : The duly elected and qualified
governing body of the City of Fort Worth, Texas.
C1-1 . 14 MAYOR: The officially elected Mayor , or in his
absence, the Mayor Pro tem of the City of Fort Worth, Texas.
C1-1. 15 CITY MANAGER: The officially appointed and authorized
City Manager of the City of Fort Worth, Texas , or his duly
authorized representative.
C1-1. 16 CITY ATTORNEY: The officially appointed City Attorney
of the City of Fort Worth , Texas , or his duly authorized
representative.
M
C1-1 (3 )
C1-1 . 17 DIRECTOR OF PUBLIC WORKS: The duly appointed official
of the City of Fort Worth, referred to in the Charter as the
City Engineer, or his duly authorized representative.
C1-1 . 18 DIRECTOR, CITY WATER DEPARTMENT: The duly appointed
Director of the City Water Department of the City of Fort
Worth , Texas , or his duly authorized representative ,
assistant, or agents.
C1-1 . 19 ENGINEER: The Director of Public Works, the Director
of the Fort Worth City Water Department , or their duly
authorized assistants , agents , engineers , inspectors , or
superintendents, acting within the scope of the particular
duties entrusted to them.
C1-1 . 20 CONTRACTOR: The person , persons , partnership ,
company, firm, association, or corporation , entering into a
contract with the Owner for the execution of the work, acting
directly or through a duly authorized representative. A
sub-contractor is a person, firm, corporation, or others under
contract with the principal contractor , supplying labor and
materials or only labor, for work at the site of the project.
C1-1. 21 SURETIES: The Corporate bodies which are bound by
such bonds are required with and for the Contractor . The
sureties engaged are to be fully responsible for the entire
and satisfactory fulfillment of the Contract and for any and
all requirements as set forth in the Contract Documents and
approved changes therein.
C1-1. 22 THE WORK OR PROJECT: The completed work contemplated
in and covered by the Contract Documents , including but not
limited to the furnishing of all labor , materials , tools ,
equipment, and incidentals necessary to produce a completed
and serviceable project.
C1-1. 23 WORKING DAY: A working day is defined as a calendar
ay, not incl- ing Saturdays, Sundays, and legal holidays , in
which the weather or other conditions not under the control of
the Contractor permit the performance of the principal unit of
work for a period of not less than seven (7 ) hours between
7 : 00 a.m. and 6 : 00 p.m. , with exceptions as permitted in
paragraph C7-7.6.
C1-1. 24 CALENDAR DAYS: A calendar day is any day of the week
or month, no days being excepted.
C1-1. 25 LEGAL HOLIDAYS: Legal holidays shall be observed as
prescribed by the City Council of the City of Fort Worth for
observance by City employees as follows:
Cl-1 (4 )
1. New Year ' s Day January 1
2. M. L. Ring, Jr. Birthday. Third Monday in January
3. Memorial Day Last Monday in May
4. Independence Day July 4
5. Labor Day First Monday in September
6. Thanksgiving Day Fourth Thursday in November
7. Thanksgiving Friday Fourth Friday in November
8. Christmas Day December 25
9. Such other days in lieu of
holidays as the City Council
may determine
When one of the above named holidays or a special holiday is
declared by the City Council, falls on Saturday, the holiday
shall be observed on the preceding Friday or if it falls on
Sunday, it shall be observed on the following Monday, by those
employees working on working day operations . Employees
working calendar day operations will consider the calendar
holiday as the holiday.
C1-1. 26 ABBREVIATIONS : Wherever the abbreviations defined
herein appear in Contract Documents , the intent and meaning
shall be as follows:
AASHTO - American Association of MGD - Million Gallons Per
State Highway Transportation Day
Officials
ASCE - American Society of Civil CFS - Cubic Foot per
Engineers Second
LAW - In Accordance With
ASTM - American Society of Min. - Minimum
Testing Materials Mono.- Monolithic
AWWA - American Water Works % - Percentum
Association R - Radius
ASA - American Standards Association I.D. - Inside Diameter
HI - Hydraulic Institute O. D . - Outside
Diameter
Asph. - Asphalt Elev.- Elevation
Ave. - Avenue F - Fahrenheit
Blvd. - Boulevard C - Centigrade
CI - Cast Iron In. - Inch
CL - Center Line Ft. - Foot
GI - Galvanized Iron St. - Street
Lin. - Linear or Lineal CY - Cubic Yard
lb. - Pound Yd. - Yard
MH - Manhole SY - Square Yard
Max. - Maximum L.F. - Linear Foot
D.I. - Ductile Iron
C1-1 (5 )
forms or other parts of the Contract Documents will be
considered as approximate only and will be used for the
purpose of comparing bids on a uniform basis. Payment will be
made to the Contractor for only' the actual quantities of work
performed or materials furnished in strict accordance with the
Contract Documents and Plans . The quantities of work to be
performed and materials to be furnished may be increased or
decreased as hereinafter provided , without in any way
invalidating the unit prices bid or any other requirements of
the Contract Documents.
C2-2 . 3 EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF PROJECT:
Bidders are advised that the Contract Documents on file with
the Owner shall constitute all of the information which the
Owner will furnish. All additional information and data which
the owner will supply after promulgation of the formal
contract documents shall be issued in the form of written
addenda and shall become part of the Contract Documents just
as though such addenda were actually written into the original
Contract Documents.
Bidders are required, prior to the filing of proposal, to read
and become familiar with the Contract Documents , to visit the
site of the project and examine carefully all local
conditions , to inform themselves by their own independent
research and investigations, tests, boring, and by such other
means as may be necessary to gain a complete knowledge of the
conditions which will be encountered during the construction
of the project . They must judge for themselves the
difficulties of the work and all attending circumstances
affecting the cost of doing the work or the time requi;ed for
its completion, and obtain all information required to make an
intelligent proposal. No information given by the Owner or
any representative of the Owner other than that contained in
the Contract Documents and officially, promulgated addenda
thereto, shall be binding upon the Owner. Bidders shall rely
exclusively and solely upon their own estimates ,
investigation, research, tests , explorations, and other data
which are necessary for full and complete information upon
which the proposal is to be based. It is mutually agreed that
the submission of a proposal is prima-facie evidence that the
bidder has made the investigations , examinations and tests
herein required. Claims for additional compensation due to
variations between conditions actually encountered in
construction and as indicated in the Contract Documents will
not be allowed.
The logs of Soil Borings, if any, showing on the plans are for
general information only and may not be correct. Neither the
C2-2(2)
Owner nor the Engineer guarantee that the data shown is
representative of conditions which actually exist.
C2-2. 4 SUBMITTING OF PROPOSAL: The Bidder shall submit his
Proposal on the form furnished by the Owner. All blank spaces
applicable to the project contained in the form shall be
correctly filled in and the Bidder shall state the prices ,
written in ink in both words and numerals , for which he
proposes to do the work contemplated or furnishe the materials
required. All such prices shall be written legibly. In case
of discrepancy between the price written in words and the
price written in numerals, the price most advantageous to the
City shall govern.
If a proposal is submitted by an individual, his or her name
must be signed by him (her) or his (her) duly authorized agent.
If a proposal is submitted by a firm, association , or
partnership, the name and address of each member must be
given , and the proposal must be signed by a member of the
firm, association , or partnership , or by a person duly
authorized. If a proposal is submitted by a company or
corporation, the company or corporate name and business
address must be given, and the proposal signed by an official
or duly authorized agent. The corporate seal must be affixed.
Power of Attorney authorizing agents or others to sign
proposal must be properly certified and must be in writing and
4 submitted with the proposal.
C2-2. 5 REJECTION OF PROPOSA:.S: Proposals may be rejected if
they show any alteration of vords or figures, additions not
called for , conditional o: uncalled for alternate bids ,
incomplete bids, erasures , or irregularities of any kind, or
contain unbalance value of any items . Proposal tendered or
g delivered after the official time designated for receipt of
proposal shall be returned to the Bidder unopened.
C2-2 . 5 BID SECURITY: No proposal will be considered unless it
is accompanied by a "Proposal Security" of the character and
in the amount indicated in the "Notice to Bidders " and the
"Proposal . " The Bid Security is required by the Owner as
evidence of good faith on the part of the Bidder, and by way
of a guaranty that if awarded the contract, the Bidder will
within the required time execute a formal contract and furnish
the required performance and other bonds. The bid security of
the three lowest bidders will be retained until the contract
is awarded or other disposition is made thereof . The bid
security of all other bidders may be returned promptly after
the canvass of bids.
C2-2(3 )
C2-2 . 7 DELIVERY OF PROPOSAL: No proposal will be considered
unless it is delivered, accompanied by its proper Bid
Security, to the City Manager or his representative in the
official place of business as set forth in the "Notice to
Bidders . " It is the Bidder ' s sole responsibility to deliver
the proposal at the proper time to the proper place. The mere
fact that a --proposal was dispatched will not be considered.
The Bidder must_ have the proposal actually delivered. Each
proposal shall be in a sealed envelope plainly marked with the
word "PROPOSAL," and the name -or description of the project as
designated in the "Notice to Bidders. " The envelope shall be
addressed to the City Manager, City Hall, Fort Worth, Texas.
C2-2 . 8 WITHDRAWING PROPOSALS: Proposals actually filed with
the City Manager cannot be withdrawn prior to the time set for
opening proposals . A request for non-consideration of a
proposal must be made in writing , addressed to the City
Manager , and filed with him prior to the time set for the
opening of proposals. After all proposals not requested for
non-consideration -are opened and publicly read aloud, the
proposals for which non-consideration requests have been
properly filed may, at the option of the Owner , be returned
unopened.
C2-2. 9 TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may
modify his proposal by telegraphic communication at any time
prior to the time set for opening proposals , provided such
telegraphic communication is received by the City Manager
prior to the said proposal opening time, and provided further,
that the City Manager. is satisfied that a written and duly
authenticated confirmation of such telegraphic communication
over the signature of the bidder was mailed prior to the
proposal opening time. If such confirmation is not received
within forty-eight (48) hours after the proposal opening time,
no further consideration will be given to the proposal.
C2-2 . 10 PUBLIC OPENING OF PROPOSAL: Proposals which have been
properly filed and for which no "Non-consideration Request"
has been received will be publicly opened and read aloud by
the City Manager or his authorized representative at the time
and place indicated in the "Notice to Bidders. " All proposals
which have been opened and read will remain on file with the
Owner until the contract has been awarded_ Bidders or their
authorized representatives are invited to be present for the
opening of bids.
C2-2. 11 IRREGULAR PROPOSALS: Proposals shall be considered as
being "Irregular" if they show any omissions , alterations of
form, additions , or conditions not called for , unauthorized
alternate bids, or irregularities of any kind. However, the
C2-2(4)
Owner reserves the right to waive any and all irregularities
and to make the award of the contract to the best interest of
the City. Tendering a proposal after the closing hour is an
irregularity which cannot be waived.
C2-2 . 12 DISQUALIFICATION OF BIDDERS : Bidders may be
disqualified and their proposals not considered for any of ,
but not limited to, the following reason:
a. Reasons for believing that collusion exists among
,. bidders.
b. Reasonable grounds for believing that any bidder is
interested in more than one proposal for work
contemplated.
C. The bidder being interested in any litigation
against the Owner or where the Owner may have a
claim against or be engaged in litigation against
the bidder.
d. The bidder being in arrears on any existing contract
or having defaulted on a previous contract.
e. The bidder having perforined a prior contract in an
unsatisfactory manner.
f. Lack of competency as revealed by the financial
statement, experience record, equipment schedule ,
and such inquiries as the Owner may see fit to make.
g. Uncompleted work which , in the judgment of the
Owner, will prevent or hinder the prompt completion
~ of additional work if awarded.
h. The bidder not filing with the Owner, one week in
advance of the. hour of the opening of proposals the
following:
1. Financial Statement showing the financial
condition of the bidder as specified in Part
"A" - Special Instructions.
2 . A current experience record showing especially
the projects of a nature similar to the one
under consideration , which have been
successfully completed by the Bidder.
3 . An equipment schedule showing the equipment
the bidder has available for use on the
project.
The Bid Proposal of a bidder who, in the judgment of the
Engineer , is disqualified under the requirements stated
herein, shall be set aside and not opened.
C2-2(5 )
PART C - GENERAL CONDITIONS
C3-3 AWARD AND EXECUTION OF
DOCUMENTS
SECTION C3-3 AWARD AND EXECUTION OF DOCUMENTS:
C3-3 . 1 CONSIDERATION OF PROPOSALS: After proposals have been
opened and read aloud, the proposals will be tabulated on the
basis of the quoted prices , the quantities shown in the
proposal , and the application of such formulas or other
methods of bringing items to a common basis as may be
established in the Contract Documents.
The total obtained by taking the sum of the products of unit
prices quoted and the estimated quantities plus any lump sum
items and such other quoted amounts as may enter into the cost
of the completed project will be considered as the amount of
the bid.
Until the award of the contract is made by the Owner , the
right will be reserved to reject any or all proposals and
waive technicalities, to re-advertise for new proposals, or to
proceed with the work in any manner as maybe considered for
the best interest of the Owner.
C3-3 . 2 MINORITY BUSINESS ENTERPRISE/WOMEN-OWNED BUSINESS
ENTERPRISE COMPLIANCE: Contractor agrees to provide to Owner,
upon request , complete and accurate information regarding
actual work performed by a Minority Business Enterprise (MBE)
and or a a Woman-owned Business Enterprise (WBE) on the
contract and the payment therefor. Contractor further agrees ,
upon request by Owner , to allow and audit and/or an
examination of any books, records, or files in the possession
of Contractor that will substantiate the actual work performed
by the MBE or WBE. Any material misrepresentation of any
nature will be grounds for termination of the contract and for
initiating any action under appropriate federal , state or
local laws and ordinances relating to false statements ;
further , any such misrepresentation may be grounds for
disqualification of Contractor at Owner ' s discretion for
bidding on future Contracts with the Owner for a period of
time of not less than six (6) months.
C3-3 . 3 EQUAL EMPLOYMENT PROVISIONS: The Contractor shall
comply with Current City Ordinance prohibiting discrimination
in employment practices.
C3-3 (1 )
ly
The Contractor shall post the required notice to that effect
on the project site, and, at his request , will be provided
assistance by the City of Fort north ' s Equal Employment
Officer who will refer any qualified applicant he may have on
file in his office to the Contractor. Appropriate notices may
be acquired from the Equal Employment Officer.
C3-3 . 4 WITHDRAWAL OF PROPOSALS: After a proposal has been
read by the Owner it cannot a withdrawn by the Bidder within
forty-five ( 45 ) days after the date on which the proposals
were opened.
C3-3 . 5 AWARD OF CONTRACT: The Owner reserves the right to _
withholdfinal action on the proposals for a reasonable time,
not to exceed forty-five ( 45 ) days after the date of opening
proposals, and in no event will an award be made until after
investigations have been .made as to the responsibility of the
proposed awardee. . .
The award of the contract, if an award is made, will be to the
lowest and best responsible bidder.
The award of the contract shall not become effective until the
Owner has notified the Contractor in writing of such award.
0-3 . 6 RETURN OF - PROPOSAL SECURITIES: As soon as proposed
price totals have been determined or comparison of bids , the
Owner may, at its discretion, return the proposal security
which accompanied the proposals which, in its judgment , would
not be considered for the award. All other proposal
securities, usually those of the three lowest bidders , will be
retained by the Owner until the required contract has been
executed and bond furnished or the Owner has otherwise
disposed of the bids, after which they will be returned by the
City Secretary.
C3-3 . 7 BONDS: With the execution and delivery of the Contract
Documents, the Contractor shall furnish to, and file with the
Owner in the amounts herein required, the following bonds:
a. PERFORMANCE BOND : A good and sufficient
performance bond in an amount not less than 100
percent of the amount of the contract, as evidenced
by the proposal tabulation or otherwise ,
guaranteeing the full and faithful execution of the
work and performance of the contract, and for the
protection of the Owner and all other persons
against damage by reason of negligence of the
Contractor , or improper execution of the work or
the use of inferior materials . This performance
C3-3 (2 )
bond shall guarantee the payment for all labor ,
materials, equipment, supplies , and services used
in the construction of the work, and shall remain
in full force and effect until provisions as above
stipulated are accomplished and final payment is
made on the project by the City.
b. MAINTENANCE BOND : A good and sufficient
maintenance bond, in the amount of not less than
100 percent of the amount of the contract, as
evidenced by the proposal tabulation or otherwise,
guaranteeing the prompt , full and faithful
performance of the general guaranty which is set
forth in paragraph C8-8.10.
w
C. PAYMENT BOND: A good and sufficient payment bond,
in an amount not less than 100 percent of the
amount of the contract , as evidenced by the
proposal tabulation or otherw_se, guaranteeing the
prompt, full and faithful payment of all claimants
as defined in Article 5160 , , Revised Civil Statutes
of Texas , 1925 , as amended by House Bill 344 Acts
56th Legislature, Regular Session, 1959 , effective
April 27 , 1959 , and/or the latest version thereof,
supplying labor and materials in the prosecution of
the work provided for in the contract being
constructed under these specifications . Payment
Bond shall remain in force until all payments as
above stipulated are made.
d. OTHER BONDS: Such other bonds as may be required
by these Contract Documents shall be furnished by
the Contractor.
No sureties will be accepted by the Owner which are at the
time in default or delinquent on any bonds or which are
interested in any litigation against the owner. All bonds
shall be made on the forms furnished by the Owner and shall be
executed by an approved surety company doing business in the
City of Fort Worth, Texas , and which is acceptable to the
owner . In order to be acceptable, the name of the surety
shall be included on the current D . S . Treasury list of
acceptable sureties, and the amount of bond written by any one
acceptable company shall not exceed the amount -shown on the
Treasury list for that company. Each bond shall be properly
executed by both the Contractor and Surety Company.
Should any surety on the contract be determined unsatisfactory
at any time by the Owner, notice will be given the Contractor
to that effect and the Contractor shall immediately provide a
C3-3 (3 )
new surety satisfactory to the Owner. No payment will be made
under the contract until the new surety or sureties , as
required, have qualified and have been accepted by the Owner.
The contract shall not be operative nor will any payments be
due or paid until approval of the bonds by the Owner.
C3-3 . 8 EXECUTION OF CONTRACT: Within ten (10) days after the
Owner has by appropriate resolution, or otherwise, awarded the
contract, the Contractor shall execute and file with the Owner
the Contract and such bonds as may be required in the Contract
Documents.
No contract shall be binding upon the owner until it has been
attested by the City Secretary, approved as to form and
legality by the City Attorney, and executed for the Owner by
either the Mayor or City Manager.
C3-3 . 9 FAILURL TO EXECUTE CONTRACT: The failure of the
Awardee to execute the required bond or bonds or to sign the
required contract within ten (10 ) days after the contract is
awarded shall be considered by the Owner as an abandonment of
his proposal, and the Owner may annul the Award. By reason of
the uncertainty of the market prices of material and labor,
and it being impracticable and difficult to accurately
determine the amount of damages occuring to the Owner by
reason of said awardee ' s failure to execute said bonds and
contract within ten ( 10 ) days , the proposal security
accompanying the proposal shall be the agreed amount of
damages which Owner will suffer by reason of such failure on
the part of the Awardee and shall thereupon immediately be
forfeited to the Owner.
The filing of a proposal will be considered as an acceptance
of this provision by the Bidder.
C3-3 . 10 BEGINNING WORK: The Contractor . shall not commence
work until authorize in writing to do so by the Owner .
Should the Contractor fail to commence work at the site of the
project within the time stipulated in the written
authorization usually termed the "Work Order" or "Proceed
Order", it is agreed that the Surety Company will , within ten
( 10 ) days after the commencement date set forth in such
written authorization, commence the physical execution of the
contract.
C3-3 . 11 INSURANCE: The Contractor shall not commence work
under this contract until he has obtained all the insurance
required under the Contract Documents, and such insurance has
been approved by the Owner . The prime Contractor shall be
responsible for delivering to the Owner the sub-contractors '
C3-3 (4 )
certificate of insurance for approval. The prime contractor
shall indicate on the certificate of insurance included in the
documents for execution whether or not his insurance covers
sub-contractors . It is the intention of the Owner that the
insurance coverage required herein shall include the coverage
of all sub-contractors.
a. COMPENSATION INSURANCE : The Contractor shall
maintain , during the life of this contract ,
Workers ' Compensation Insurance on all of his
employees to be engaged in work on the project
under this contract, and for all sub-contractors.
In case any class of employees engaged in hazardous
work on the project under this contract is not
protected under the Workers ' Compensation Statute,
the Contractor shall provide adequate employer ' s
general liability insurance for the protection of
such of his employees not so protected.
b. COMPREHENSIVE GENERAL LIABILITY INSURANCE: The
Contractor shall procure and shall maintain during
the life of this contract Contractor ' s
Comprehensive General Liability Insurance (Public
Liability and Property Damage Insurance ) in an
amount not less than $ 500 , 000 covering each
occurrence on account of bodily injury, including
death, and in an amount not less than $500 , 000
covering each occurrence on account of property
w damage with $2,000,000 umbrella policy coverage.
C. ADDITIONAL LIABILITY : The Contractor shall
, furnish insurance as separate policies or by
additional endorsement to one of the
above-mentioned policies, and in the amount as set
forth for public liability and property damage, the
following insurance:
1. Contingent Liability ( covers General
Contractor ' s Liability for acts of
sub-contractors) .
2. Blasting, prior to any blasting being done.
3. Collapse of buildings or structures adjacent
to excavation ( if excavations are to be
performed adjacent to same) .
4. Damage to underground utilities for $500, 000.
C3-3 (5)
5. Builder 's risk (where above-ground structures
are involved) .
6. Contractual Liability ( covers all
indemnification requirements of Contract) .
d. AUTOMOBILE INSURANCE - BODILY INJURY AND PROPERTY a
DAMAGE: The Contractor shall procure and maintain,
during the life of this Contract, Comprehensive
Automobile Liability insurance in an amount not
less than $ 250 , 0*00 for injuries including
accidental death to any one person and subject to
the same limit for each person an amount not less
than $500 , 000 on account of one accident , and
automobile property damage insurance in an amount
not less than $100,000.
e. SCOPE OF INSURANCE AND SPECIAL HAZARD : The
insurance required under the above paragraphs shall
provide adequate protection for the Contractor and
his sub-contractors, respectively, against damage
claims which may arise from operations under this
contract, whether such operations be by the insured
or by anyone directly or indirectly employed by
him, and also against any of the following special
hazards which may be encountered in the performance
of the Contract.
f. PROOF OF CARRIAGE OF INSURANCE: The Contractor
shall furnish the Owner with satisfactory proof of
coverage by insurance required in these Contract
Documents in amounts and by carriers satisfactory
to the Owner . ( Sample attached. ) All insurance
requirements made upon the Contractor shall apply
to the sub- contractor , should the Prime
Contractor ' s insurance not cover the
sub-contractor's work operations.
g. LOCAL AGENT FOR INSURANCE AND BONDING : The
insurance and bond ng companies with whom the
Contractor ' s insurance and performance, payment,
maintenance and all such other bonds are written
shall be represented by an agent or agents having
an office located within the city limits of the
C3-3 (6)
Y
City of Fort Worth, Tarrant County, Texas . Each
such agent shall be a duly qualified, one upon whom
service of process may be had , and must have
authority and power to act on behalf of the
insurance and/or bonding company to negotiate and
settle with the City of Fort Worth , or any other
claimant, any claims that the City of Fort Worth or
other claimant or any property owner who has been
damaged , may have against the Contractor ,
insurance, and/or bonding company. If the local
insurance representative is not so empowered by the
insurance or bonding companies, then such authority
must be vested in a local agent or claims officer
residing in the Metroplex, the Fort Worth-Dallas
area. The name of the agent or agents shall be set
forth on all of such bonds and certificates of
insurance.
C3-3 . 12 CONTRACTOR ' S OBLIGATIONS: Under the Contract, the
Contractor shall pay for all materials , labor and services
when due.
C3-3 . 13 WEEKLY PAYROLL: A certified copy of each payroll
covering payment of wages to all person engaged in work on the
project at the site of the project shall be furnished to the
Owner ' s representative within seven ( 7 ) days after the close
of each payroll period. A copy or copies of the applicable
minimum wage rates as set forth in the Contract Documents
shall be kept posted in a conspicuous place at the site of the
project at all times during the course of the Contract .
Copies of the wage rates will be furnished the Contractor, by
the Owner; however, posting and protection of the wage rates
shall be the responsibility of the Contractor.
C3-3 . 14 CONTRACTOR'S CONTRACT ADMINISTRATION: Any Contractor,
whether a person , persons , partnership , company , firm ,
association , corporation or other who is approved to do
business with and enters into a contract with the City for
construction of water and/or sanitary sewer facilities, will
have or shall establish a fully operational business office
within the Fort Worth-Dallas metropolitan area . The
Contractor shall charge, delegate, or assign this office ( or
he may delegate his project Superintendent ) with full
authority to transact all business actions required in the
performance of the Contract. This local authority shall be
made responsible to act for the Contractor in all matters
pertaining to the work governed by the Contract whether it be
administrative or otherwise and as such shall be empowered,
thus delegated and directed, to settle all material, labor or
other expenditures, all claims against the work or any other
C3-3 (7 )
�Y
matter associated such as maintaining adequate and appropriate
insurance or security coverage for the project. Such local
authority for administration of the work under the Contract
shall be maintained until all business transactions executed
as part of the Contract - are complete.
Should the Contractor ' s principal base of operations be other
than in the Fort Worth-Dallas metropolitan area, notification
of the Contractor ' s assignment of local authority shall be
made in writing to the Engineer in advance of any work on the
project, all appropriately signed and sealed, as applicable,
by the Contractor ' s responsible officers with the
understanding that this written assignment of authority to a
local representative shall become part of the project Contract
as though bound directly into the project documents . The
intent of these requirements is that all matters associated
with the Contractor ' s administration, whether it be oriented
in furthering the work, or other, be governed direct by local
authority. This same requirement is imposed on insurance and
surety coverage. Should the Contractor' s local representative
fail to perform to the satisfaction of Engineer, the Engineer,
at his sole discretion , may demand that such local
representative be replaced and the Engineer may, at his sole
discretion , stop all work until a new local authority
satisfactory to the Engineer is assigned . No credit of
working time will be for periods in which work stoppages are
in effect for this reason.
C3-3 . 15 VENUE: Venue of any action hereinunder shall be
exclusively in Tarrant County, Texas.
C3-3 (8 )
PART C - GENERAL CONDITIONS
C4-4 SCOPE OF WORK
SECTION C4-4 SCOPE OF WORK
C4-4 . 1 INTENT OF CONTRACT DOCUMENTS : It is the definite
intention of these Contract Documents to provide for a
complete, useful project which the Contractor undertakes to
construct or furnish , all in full compliance with the
requirements and intent of the Contract Documents . It is
definitely understood that the Contractor shall do all work as
provided for in the Contract Documents, shall do all extra or
special work as may be considered by the Owner as necessary to
complete the project in a satisfactory and acceptable manner.
The Contractor shall, unless otherwise specifically stated in
these Contract Documents, furnish all labor, tools, materials,
machinery , equipment , special services , and incidentals
necessary to the prosecution and completion of the project.
C4-4 . 2 SPECIAL PROVISIONS : Should any work or conditions
which are not thoroughly and satisfactorily stipulated or
covered by General or Special Conditions of these Contract
Documents be anticipated, or should there be any additional
proposed work which is not covered by these Contract
Documents, then "Special Provisions" covering all such work
will be prepared by the Owner previous to the time of
receiving bids or proposals for such work and furnished to the
Bidder in the form of Addenda. All such "Special Provisions"
shall be considered to be a part of the Contract Documents
just as though they were originally written therein.
C4-4 . 3 INCREASED OR DECREASED QUANTITIES: The Owner reserves
the right to alter the quantities of the work to be performed
or to extend or shorten the improvements at any time when and
as found to be necessary, and the Contractor shall perform the
work as altered, increased or decreased at the unit prices.
Such increased or decreased quantity shall not be more than 25
percent of the contemplated quantity of such item or items.
When such changes increase or decrease the original quantity
of any item or items of work to be done or materials to be
furnished by the 25 percent or more, then either party to the
contract shall upon written request to the other party be
entitled to a revised consideration upon that portion of the
work above or below the 25 percent of the original quantity
stated in the proposal; such revised consideration to be
determined by special agreement or as hereinafter provided for
"Extra Work. " No allowance will be made for any changes in
anticipated profits nor shall such changes be considered as
C4-4 (1)
waiving or invalidating any conditions or provisions of the
Contract Documents.
Variations in quantities of sanitary sewer pipes in depth
categories , shall be interpreted herein as applying to the
overall quantities or sanitary sewer pipe in each pipe size,
but not to the various depth categories.
C4-4 . 4 ALTERATION OF CONTRACT DOCUMENTS: By Change Order, the
Owner reserves the right to make such changes in the Contract
Documents and in the character or quantities of the work as
may be necessary or desirable to insure completion in the most
satisfactory manner, provided such changes do not materially
alter the original Contract Documents or change the general
nature of the project as a whole. Such changes shall not be
considered as waiving or invalidating any condition or
provision of the Contract Documents.
C4-4 . 5 EXTRA WORK: Additional work made necessary by changes
and alteratio-n--s—oT the Contract Documents or of quantities or
for other reasons for which no prices are provided in the
Contract Documents, shall be defined as "Extra Work" and shall
be performed by the Contractor in accordance with these
Contract Documents or approved additions thereto; provided,
however , that before any extra work is begun a "Change Order"
shall be executed or written order issued by the Owner to do
the work for payments or credits as shall be determined by one
or more combination of the following methods:
a. Unit bid price previously approved.
b. An agreed lump sum.
C. The actual reasonable cost of (1) labor, (2) rental
of equipment used on the extra work for the time s o
used at Associated General Contractors of kmerica
current equipment rental rates ; ( 3 ) materials
entering permanently into the project, and (4 )
actual cost of insurance , bonds , and social
security as determined by the Owner , plus a fixed
fee to be agreed upon but not to exceed 10% of the
actual cost of such extra work. The Fixed fee is
not to include any additional profit to the
Contractor for rental of equipment- owned by him and
used for the extra work. The fee shall be full and
complete compensation to cover the cost of
superintendence, overhead, other profit, general
and all other expense not included in ( 1 ) , ( 2 ) ,
( 3 ) , and '( 4 ) above. The Contractor shall keep
accurate cost records on the form and in the method
C4-4 (2 )