Loading...
HomeMy WebLinkAboutContract 46559-FP5 ncp cat.s w I CONTRACT W. Project Manager Risk Management S.C AT'Ho D.O.E. Brotherton ; CFA Westerma Scainned The Procee#rnr peapte have been nmtacted cosuceemint the request '� � AND PUBLIC WO for for such paymeaL Pit COMPLETION Clearance Conducted ley Wa llacy D.O E.Nw. 7 R. g aritract''7 for BERKELEY AA0 IJ"" XT`ER der;;SE, ,era r6quired ley the 'WATER TA ARR NT as approved by Cit 'Council pan NIA thriau M& 1�1�`A the director of tf e W TET DEP�R" "lli ]! T'upon the recommendation of the Assistant bireet.or'gf the Transportation�3c Public Works Deptatth lent has:coated the prOject as c;r Pie. Original:Contract Prices: 58,677.00 Amount ofApproved Change Orders: W"W" 10, ;9 1p Ns l Revised Contract Amount: $458,677.00 � ur Total Cost Work Completed: $458,677.00 Less Deductions• Liquidated Damages: Days`@$210.00/Day f Pavement Deficiencies: Total Deduction Amount: $0.00 Total Cost'Wark Completed: $458,677.00 Less Previous Payments: Final Payment Tine $458,677.00 I 1'ecornmended for/acceptance Date Asst. Director,`f PW-Infrastructure'Design and Construction 1 � Accepted �,m���� C7ate t � Asst. Director, WATER DEPARTMENT ��►����r5" Asst. City ana'.,._. ty_. _.,_. ger Date Comments: FUND ACCT.WATER P'265-6091502295/SEWER:P275-7091302295 OF 11,11AICLRECO]RIDI 7TETARY " u RE it i t � ?Qqs, NOV 13 2 01 City Project Numbers 02295 P DOE Number 7245 Contract Name BERKELEY PHASE 11 Estimate Number I Contract Limits Payment Number I Project Type WATER&SEWER For Period Ending 8/31/2015 i Project Funding Project Manager Long City Secretary Contract Number 117245 Inspectors LAYER / NIETO Contract Date Contractor BANDERA UTILITY CONTRACTORS,INC Contract Time 120 CD 416INfERCHANGE ST. Days Charged to Date 420 CD MCKINNEY, TX 75071 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $458,677.00 Less %Retained $0.00 Net Earned $458,677.00 Earned This Period $458,677.00 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0,00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $458,677.00 Wednesday,September 09,2015 Page 5 of 5 I FORTWORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name BERKELEY PHASE II Contract Limits Project Type WATER&SEWER City Project Numbers 02295 DOE Number 7245 i Estimate Number 1 Payment Number 1 For Period Ending 8/31/2015 CD City Secretary Contract Number 117245 Contract Time 12(ED Contract Date Days Charged to Date 420 Project Manager Long Contract is 100.00 Complete Contractor BANDERA UTILITY CONTRACTORS,INC 416 INTERCHANGE ST. MCKINNEY, TX 75071 Inspectors LAYER / NIETO Wednesday,September 09,2015 Page 1 of 5 I I I City Project Numbers 02295 DOE Number 7245 Contract Name BERKELEY PHASE.II Estimate Number I Contract Limits Payment Number I Project Type WATER&SEWER For Period Ending 8/31/2015 Project Funding WATER Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total - -------------------------------------- I REMOVE 6"WATER VALVE 1 EA $250.00 $250.00 1 $250.00 i 2 SALVAGE FIRE HYDRANT I EA $500.00 $500.00 1 $500.00 3 DUCTILE IRON WATER FITTINGS 0.5 TN $2,000.00 $1,000.00 0.5 $1,000.00 W/RESTRAINT 4 2"WATER SERVICE 3 EA $1,000.00 $3,000.00 3 $3,000.00 5 6"WATER METER&VAULT 2 EA $17,000.00 $34,000.00 2 $34,000.00 6 6"GATE VALVE 2 EA $750.00 $1,500.00 2 $1;500.00 7 10"X 8"TAPPING SLEEVE&VALVE 1 EA $3,750.00 $3,750.00 1 $3,750.00 8 8"X 6"TAPPING SLEEVE&VALVE I EA $3,475.00 $3,475.00 1 $3,475.00 9 FIRE HYDRANT I EA $3,100.00 $3,100.00 1 $3,100.00 10 REMOVE ASPHALT PVMT 25 SY $18.00 $450,00 25 $450.00 11 4'WIDE ASPHALT PVMT REPAIR 55 LF $5.00 $275.00 55 $275.00 ----------------------------------------- Sub-Total of Previous Unit $51,300.00 $51,300.00 SEWER Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 SANITARY LINE GROUTING 3 CY $150.00 $450.00 3 $450.00 2 8"SEWER ABANDONMENT PLUG 3 EA $250.00 $750.00 3 $750.00 3 REMOVE 8"SEWER LINE 262 LF $18.00 $4,716.00 262 $4,716.00 4 REMOVE 4'SEWER MANHOLE 1 EA $3,500.00 $3,500.00 1 $3,500.00 5 10'WIDE ASPHALT PVMT REPAIR, 870 LF $225.00 $195,750.00 870 $195,750.00 RESIDENTIAL, 6 8"SEWER PIPE 844 LF $165.00 3139,260.00 844 $139,260.00 7 8"SEWER PIPE,CSS BACKFILL 20 LF $165.00 $3,300.00 20 $3,300.00 8 EPDXY MANHOLE LINER 28 VF $15.00 $420.00 28 $420.00 9 TRENCH WATER STOPS 4 EA $250.00 $1,000.00 4 $1,000.00 10 TMANHOLE 4 EA $11,200.00 $44,800.00 4 $44,800.00 I 1 4'DROP MANHOLE I EA $850.00 $850.00 1 $850.00 12 CONCRETE COLLAR 5 EA $75.00 $375.00 5 $375.00 13 TRENCH SAFETY 864 LF $2.90 $2,505.60 864 $2,505.60 14 POST CCTV INSPECTION 864 LF $4.00 $3,456.00 864 $3,456.00 Wednesday,September 09,2015 Page 2 of 5 City Project Numbers 02295 DOE Number 7245 Contract Name BERKELEY PHASE 11 Estimate Number I Contract Limits Payment Number I Project Type WATER&SEWER For Period Ending 8131/2015 Project Funding 15 MANHOLE VACUUM TESTING 5 EA $250.00 $1,250.00 5 $1,250.00 16 TRAFFIC CONTROL I LS $4,994.40 $4,994.40 1 $4,994.40 ---------------------------------------- Sub-Total of Previous Unit $407,377.00 $407,377.00 —————————————-- Wednesday,September 09,2015 Page 3 of 5 City Project Numbers 02295 DOE Number 7245 Contract Name BERKELEY PHASE 11 Estimate Number I Contract Limits Payment Number I Project Type WATER&SEWER For Period Ending 8/31/2015 Project Funding Contract Information Summary Original Contract Amount $458,677.00 Change Orders i Total Contract Price $458,677.00 i Date b ?12 r Total Cost of Work Completed $458,677.00 W/1.1"�rl Coi Tact ct J Less %Retained $0.00 ���• � Inspection Supe i Net Earned $458,677.00 Date Earned This Period $458,677.00 Retainage This Period $0.00 Date ^� � Less Liquidated Damages Project M Days @ /Day $0.00 Date - J� LessPavement Deficiency $0.00 Asst.Dir tor W-Infrastructure Design and Cons coon Less Penalty $0.00 X6I c n )cup (J Date 00, Less Previous Payment $0.00 c( Directo /Contracting Department Plus Material on Hand Less 15% $0.00 Balance Due This Payment $458,677.00 i I Wednesday,September 09,2015 Page 4 of 5 I j I 416 inferGhange 5t. I Mckinnay, TX 1 75071-1829 (972) 548=8406 i AFFIDAVIT i STATE OF TEXAS COUNTY OF COLLIN Before me,the undersigned authority,a notary public in the state and county aforesaid, on this day personally appeared M Jeffrey Flicks, President of Bander.- Utility Contractors, Inc., known to me to be a credible person,who being by me duly sworn, upon his oath deposed and said: i That all persons,firms,associations,corporations,or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid I full; That there are no claims pending for personal injury and/or property damages; On Contract Described as; Underground Utilities-Water,Sanitary Sewer,&Storm Sewer BY M (�ffrey Flicks, President Subscribed and sworn before me and this date 5tr of October,2025. € 4z r� X64 .l:3sttn d°J LBYny Notary Public / v _' U.yC.omrsssu, Collin County,Texas CONSENT OF OWNER SURETY COMPANY ARCHITECT CONTRACTOR TO FINAL PAYMENT SURETY Conforms with the American Institute of OTHER Architects,AIA Document G70'I Apartrnentt'� `'';a; r,samilany, '(Qrm GC LPC.C--,)u-=ors nf inc PROIJECT: (name, address) 2 57-IF a ir� uv� f-OFt ,VWU� T" -C-11-0 TO (Owner) ARCHITECT'S PROJECT NO: OF FCF-F'IN C ) A jR H CONTRACT FOR: Rsru It Slorni --i: U;C. 4ntc3cior5,cl Ti�,xasi kic.0,�,ncr 8!k�&h:'Y'R X C T DA T CONTRACTOR:DANDCRA ',�TILJTY CON TRAt,-TCR,3 INC. In accordance-,with the provisions of the Contract between the Outer and the Contractor as indicated above,the (h&6 ln54a name and address of Surety Cornimny) SURETEC INSURANGF COMPANY 1230 Post Oak Blvd. Houslim TX 77056 SURETY COMPANY on bond of there;nsort name and 94crraza of coptrsutvo BANDERAUTILUY(,ONTRACTORS, INC. 416 Interchange Street McKmriey TX 75071 CONTRACTOR. hereby approves of the final paymtmt to the,Coittractor, and agrees that final payment to the Contractor shall not relieve die Surety Cornpadiv of any of its obligationis to CITY OF FOR IWOH11-1 1000 Throckmorton Street Fort worth TX 76102 QVMER, as set tbrth in the said Surety Company's bond- N WITNESS, WHEREOF, the- Company ha,-,hcrciintoset its hand thil., '2'nd dab x S Ul"t,E T E 0 1 N S U R A N C E C 0 tvl PA NY &m tv Compart-v Attest,Robt),t•jar 7 SiaPatt rc of Authorized Representative Attorney it-t Fact T NOTE: This fa— to Ell, used as 8 "rDt4itl eW:. Ort to AIA rjOCUM-R.ff 6746, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEUTS AND C-L--AAS• CvFrUf;1 ONE PACE pox� 4221097._ SureTec Insurance Company | &.DIM][ED8,OWER OF ATTORNEY � | Kn"pv 411 Axen4y These Presents, %liat $UK,FTECINSURANCE COMPANY (the "Company-), n corporation duly organized and ! oxistoH uoU*/che laws u[the x,ateofTexas, -wid having its principal office in Houston, H«oh County, Texas, does 6y th*sepceserlin mdkn.cvu,dmcc and oppoiol Lisa oo^not.Don 2Corrv|/.R'ca,do,l Royvo,VocL"nuMa'ooa8.Sooxini^)|u:tc,.xouui '�Jo,u|ox.Ke\|y*.vvcsmmok its true and lawful Attorricy-bi-fact, with full power and autboriLy hereby conferred in its name, place and strad,to execute,acknowledge | � and J:S,ur any and all hoodx'rcvngnizoncus` uudeoo&irtgs or vd/erinsnnnncnu or cuuoactnof suretyship minclude waivers to the ounJdioa, "foxuLraoo and c"ns°"uvf*moh//�),; Five Million and 00/10nDnoo',' (Ss'ono.ou0.00) w/Jm�ind the ["n.p^"y thonobyas fully af/dsdioxjr : , itTsuch bond xc,,­,ignedh« me-Yz^idcM scaled with the corporate ,x^ cumpajjy mid duly vmcstcdhy/r�, 5coz/zy. 1/,ob, "micoo!jr,JuL o/| that Gj* ,uk| eNnwmq+in-Fact may do in the prvmi`o� Su� z�po�m.eot shall uoobov" i.` ��covti| ��*'�'� u'd � ��dcunJrroodh�uu�n�� o[�� ���w�� omk^wr;^f the 8nu�of Db*c��uf�e S�*1� mann�ccv�vu �� Bx«/*^ �� ��mep��a���ynu,r,wmcm �pAo��xv`�/'p�uu,o��nuo,"r��",uor��`�:m/Sp���r^x�| b^�d� »c�br.*-eu with full n"`=,and authority m,wnvinc any one n'more xo/uu"/*uo^`asanornc'($'|o'euctmrP, vror and act for and"n licuu|rmr the Cw"pa-ly subject m the following provisions; rid iri the name mf and w[behalf uy the Company,tooa" vto ul:kum~|*daxuod »«"rnw+i°fw/may be�moo full power and authority for v uex,^,'any and all^°xus-,/^oowo/-7,ancrs,contracts,uurcomw,nGr indemnity cmdntherwombvna|,'vm|0x^ryund..~~`u»w`«^oy^oda]| notices and |! documents r"o,"|mu m �oomohnx mv Company's |um8��acz�mc� mm �n ,u�» m`o�z��u v" ��m�� ^v mn ,.uh i hu ,xco,n,p'ieym/rsixn'aor/*"rc,uoc and scaled and efTcutcu»rumCvrp^*teoc,,*tarr. � that Ile:/ix"a:m*^f^orcvm`/rioa"m*~,Ind,=n|"/m:o^,..pox heretofore o,uprcofter affixed m any po°or(if zoo".^xo' � | u^/C:um,xte,mativu,x",*oo/�u/mu��v�,"/p.,�r"�"no.,^v",z*`n,a�»r�inu��imae^�*om�oruaxn�|,Npu|ohm/oemxx | h�/v»zu~«/^�'� ,nu u//u�gvv"n the rou'vzo °`mn9*um�v bond o/"n4,^,ynrmwu�hit�u��xm W«�^"d�"m"�^m \ l999V | j;j k),irne.q Tfirereof,SURETEC INSURANCE COMPANY has caused these presents to be signed by its President,and its corporate sea) wbo hereto affixed this »w day of we."/, .A.p� 2015 ^ 8NRETEC INSURANCE COMPANY By, John Knox jr.- 'resident State off exas m^ / co"mv"rHarris ' Op.this 9th u^yufwa.m x.o m'� h°�=mnpoum^w �me John Knox J�,mmo known,who,h�"abymud"h sworn,umdepose and m»m/uhr | ' � � �vn,W,n ^raunrEC �8iRAncsC0wP*w� momow�xd�cuhou � uo8 °mxhcxm:umd �mxh"°^ n*id�� i" n"m�" �/�a^� � = , � ��om*v*that lit; %cut'v said-CpMn"m';that the`~"|onnz"amxuid in,uvnntntu such norpv*mlqeal;that k was sooffixcdhv order of the board o(Directors vI said cump��-1 and that x^signed his nar.c thereto h/like order, My Commission expims Mky 18,2017 | >8 Bent ueuy 8u5/s tmt Scnc*y*,xUxRu|sC INSURANCE C0NP«xY'unuueh/,txiy hat the ok".c and mrouvinalauocmmmnr*cvpr '[u'vweoyxx'm*'.ovocn*4hyoomcvmnmx which b:m|in full force and,Mu;arid nniltuonore,u`^resolutions v(m0 BvAM^ynirc*vrs,v"/ out in file Power"f'xuvm* m=/nmufo,el;^"xeff-, 6I) Given finder hand s�UCompany ntHouston, |exxo �iu_���_ day of _� . . | i Any instrument issued*excess of the penalty stated above is totally void and witntail any validity. �am�uew�� m,�nnc��v/mv��n �w�pm�,�"m��o(n�v,'��m=�mu"��°��=�" SureTec Insurance Company THIS BOND RIDER CONTAINS IMPORTANT COVERAGE INFORMATION Statutory Coniplaint Notice[Filing of Claims SUIP'lec ills,�rp-rce QoMoan"', 97' 7 G•1'.,i"I ill I ice. Tr t,.[, S'Li-1to 32,0j Ausn, fy, T-8t�59 ln, Piz F '09 v.o Nnfori-1 " �"" --, _! 11 Q, You niav dh"-Te—as L.)qnctwent of h1 Suranc e at ,f, i s o 1-1 %tjst pn,J'X &-.' 4,-9)f 0 4 PK,E N411 iN4 K C LA 1 1v D P I Shoe,)d o:i h-xvc &,ow- vour pi-el-'Juir, or abo-ii-, 'i dlip-4 you shoi� V.orliad �hc I .- -- - I - � - - - !t 1 - 4 -SIIP'!V fijS;, ffjjl,�� js 'mot resol�pd' OU P'1;11; 0 1 L—panmn-':Ilr nd unv�Q� ------–-----–----–------------------ �Ridr--�01'042014 FoRT WO. R'rH TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR. PROJECT NAME: Berkeley Phase 11 PROJECT NUMBER: 02295 DOE NUMBER: 7245 WATER PIPE LAID SIZE TYPE OF PIPE LF Water 6" PVC 50 FIRE HYDRANTS: I VALVES(1611 OR LARGER) PIPE ABANDONED SIZE TYPE OF PIPE LF NA DENSITIES: Yes NEW SERVICES: 6" PVC 2 EA. 2" Copper 3 EA. SEWER PIPE LAID SIZE TYPE OF PIPE LF SDR-26 8" PVC 844 PIPE ABANDONED SIZE TYPE OF PIPE LF Sewer 8" vCP 262 DENSITIES: Yes NEW SERVICES: 6" PVC 2 EA. 4" PVC I EA. 81, PVC I EA. TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth- 1000 Throckmotton Street•Fort Worth,TX 76012-6311 (817)392-7941 -Fax:(817)392-7845 LINCOLN PROPERTY COMPANY Jeff Courtwright Lincoln Property Company 2000 McKinney Ave.,Suite 1000 Dallas,TX 75201 Office:214-740-3300 Email:jeffc@lpsi.com VIA EMAIL AND USPS October 23, 2015 Emanuel Nieto Senior Construction Inspector—Transportation and Public Works 8851 Camp Bowie West. Fort Worth, TX 76116 Re: The Berkeley Phase ll, DOE# 7245 Dear Mr. Nieto: Please accept this letter as record that LPC Southwest Acquisition, Inc. as developer for the The Berkeley Phase 11 / DOE# 7245, will not charge any contractor liquidated damages for any delays in the project. If you should have any further questions, please don't hesitate to contact me at the number above. Regards, T REV:02/20/07 FOR WORTH TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR 1) CONTRACTOR&PROJECT DATA Name of Contractor Project Name Bandera Utility Contractors,Inc. B2±2LeyPhase H DOE Inspector DOE Number Emanuel Nieto 7245 DOEInspector Project Manager El water 0 waste water❑ Storm Drainage[] Pavement Aaron Long -Initial Contract Amount Project Difficit4 $458,677.00 0 Simple QQ Routine Complex Final Contract Amount Date ,$458,677.00 19/21/2015 111)PERFORMANCE EVALUATION 0-Inadequate I-Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE I Submission of Documents 2 Y 3 8 6 Public Notifications 5 Y 4 20 20 3 Plans on Site 5 Y 4 20 20 4 Field Supervision 15 Y 4 60 60 5 Work Performed 15 Y 3 60 45 6 Finished Product 15 Y 3 60 45 7 Job Site Safety 15 Y 4 60 60 8 Traffic Control Maintenance 15 Y 3 60 45 9 Daily Clean Up 5 Y 4 20 20 10 Citizen's Complaint Resolution 5 Y 4 20 1 20 11 Property Restoration 5 Y 4 20 20 12 After Hours Response 5 Y 4 20 20 13 Project Completion 5 Y 4 20 20 TOTAL ELEMENT SCORE(A) 401 BONUS POINTS(25 Maximum)(B) TOTAL SCORE(TS) 401 111)CONTRACTOR'S RATING Maximum Score(MS)=448 or sum of applicable element score maximums which= 448 Rating([TS/MS] *100%) 401 448 = 90% Performance Category Excellent <20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good �:80%=Excellent Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS ANVARDED) Signature DOE Inspector Signature Contractor , reisor —,�- Signature DOE Inspector's Sup CONTRACTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth-1000 Throckmorton Street-Fort Worth,TX 76012-6311 (817)392-7941 -Fax:(817)392-7845 I ORTWORTH REV:02/22/07 ��uvwr+�umvouuNiiq�l ,�@m�NU�wiummm�mmu~ tmsttt�ii �n4t" TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY I)PROJECT INFORMATION Date 9121/2015 Name of Contractor Project Name Bandera Utility Contractors,Inc. Berkeley Phase II DOE Inspector Project Manager Emanuel.Nieto Aaron Long , .._........._ _.�..._..�.. DOENumbe� ProlectDr�culty TtpeofContract 7245 Simple Routine 0 Complex 0 Water O Waste Water[l Storm Drainageo Pavement _. Ini tial CantYQctAmount Final Contract Amomit _w.., .. ..., _ _ ..,_, ...w ._..... ...... $458,677.00 ... _... __._. $458,677.00 II)PERFORMANCE EVALUATION 0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent ELEMENT' .._. ..... ... ..._,_......._ _, _...._.� RATING G ELEMENT m . ._._.. .. .,.._.._... _. ....... .. _,. _.,..,,. OTING..� INSPECTION EVALUATION PLANS&SPECIFICATIONS m......_._ 2 Knowledge ab lit of Inspector or 1 of Plans to Existin Conditions �' _._.._ is 3 Accuracy of Measured Quantities ........ .,.._...Y�_.� Q,_...._....._.. _. Ala li ab huaf Snecifications.... .... ................ . � �..._ ., 4 4 Accurac y of Plan Q Display Of Professionalism m Quantities d PROJECT MANAGER EVALUATION 5 Citizen Com lamt Resoluttan _ � P. ... . P Performance Setting up Valve Crews,Labs ( 1 Knowledge And/Or Problem Resolution ADMINISTRATION 2 Availability of Pro ect Manager . .. J Manager ,. ..., 1 Change Order Processing Time 3 Communication I 2 Tunlmess of Contractor Payments 4 Resolution of Utility Conflicts 3 Bid Opening to Pre Con Meeting Time frame III)COMMENTS&SIGNATURES COMMENTS Signature Contractor Signature DOE Inspector r---�` Signature DOE Inspector's Supervisor INSPECTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth m 1000 Throckmorton Street>Fort Worth,TX 76012-6311 (817)392-7941 •Fax: (817)392-7845 FORTWORTH rev 03/05/07 Ii mlfldMll7� TRANSPORTATION&PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.:I NAME OF PROJECT: The Berkeley Phase 11 PROJECT NO.: 02295 CONTRACTOR: Bandera Utility LContractors,I DOE NO.: 7245 PERIOD FROM:07/02/14 TO: 08/25/15 FINAL INSPECTION DATE: 10-Sep-15 WORK ORDER EFFE CTIVE:7/2/—)014 CONTRACT TIME: 120 0 Wl* CD DAYS DAYS DAY OF REASON FOR DAYS DAY OF REASON FOR DAYS CHARGED CHARGED MONTH DURING CREDITED MONTH DURING CREDITED 1. 16. 2. 17. 3. 18. 4. 19. 5. 20. 6. 21. 7. 22. S. 23. 9. 24. 10. 25. IL 26. 12. 27. 13. 28. 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES OTHERS* DAYS TOTAL &HOLIDAYS &TOO COLD RELOCATIONS CHARGED DAYS THIS 420 420 PERIOD PREVIOUS PERIOD TOTALS 420 420 TO DATE *REMARKS: CON RACTOR DATE '-�SPEC tOIC'- DATE ENGINEERING DEPARTMENT The City of Fort Wordi•1000 Throckmorton Street•Fort Worth,'l X 76012-6311 (817)392-7941 •Fax-(817)392-7845 0"MAIL RECORI) C I T'y 3 1 E C R ETA R Y 7,X