Loading...
HomeMy WebLinkAboutContract 26077 AMENDMENT NO. 1 STATE OF TEXAS § COUNTY OF TEXAS § CITY SECRETARY CONTRACT NO. 71f WHEREAS, the City of Fort Worth ("City") and Goodwin & Marshall, Inc. ("Engineer") made and entered into City of Fort Worth City Secretary Contract No. 24814, ("Contract") which was authorized by the City Council by M&C C- 17324 on the 16'h day of March 1999. WHEREAS, the Contract involves professional services for the following project: Northside III Water Transmission Main ; and WHEREAS, it has become necessary to amend the Contract to include an increased scope of work and revised maximum fee. NOW, THEREFORE, City and Consultant, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the contract: 1. Section II of the Contract is amended to include the additional engineering services as specified in a proposal letter from the Engineer dated June 11, 1999, a copy of which is attached hereto and incorporated herein. 2. Section IV of the Contract is amended to provide for an increase in the maximum fee to be paid to Consultant for all work and services under the Contract, as amended, so that the total fee to be paid by City for all work and services shall not exceed the sum of$93,350.00. The total fee by this amendment is $5,045.00. 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. Executed on this the day of 2000 in Fort Worth, Tarrant County, Texas. ATTEST: CITY OF FOR ORTH/ l I By: City Secret Assistant City Manager APPROVED AS TO FORM ENGINEER: Goodwin& Marshall, Inc. Assistan ity Attorney Robert Marshall, P.E., P - cipal A) kEQu 69122 6001 Bridge Street, Suite 100 Contract Authorization Fort Worth, Texas 76112 Date 12/10/1999 14:11 4463116 GOODWIN MARSHALL PAGE e2 G WDM1N- CML1�s a w ARSH L Y Nomas SURVEYORS June 11, 1999 Mr.Rick Trice,P.E. Manager,Consulting Services City of Ft. Worth 1000 Throckmorton Ft. Worth, Texas 76102 Ref:24 inch Northside III Water Transmission Main From Harmtou Rd. Elev. Storage Tank to IH 35W City Contract#24814 Tear Mr. Trice: We would like to request an increase in our contract fee for the aforementioned project in the amount of$5,045.00. At the City's request,we designed a portion of a future 48"Northside II water line that will be in the Park Glen Blvd. right-of-way. If this request meets with your approval,please prepare the proper paper work to revise our contract amount. If you have any questions regarding this request,please feel fee to call me. Sincerely, Bruce F. Dmane, P.E. Goodwin and Marshall, ine. 9911/1,01 eoat emooe erpmer,Suns 1 t)O 1 FORT woprrK TExAs 76112/817-429-4373(METRO)