Contract 26086
5D •-- �awwm9e.�erw;omsria. r � D.O.E. FILE P IFICATION AND CONTRACTOR'S BON�iI . ACT DOCUMENTS r CONSTRUCTION'S COPY FOR CITY SECRETARY -�` r CLIENT DEPARTMENT CONTRACT NO. ZO MOP M-4 DRAINAGE AREA. SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS (GROUP 7, CONTRACT 2), PART 3, UNITS 'I AND 2 SEWER PROJECT NO. PS58-070580410070 CREPT. OF ENGINEERING PROJECT NOS. 2567 AND 2757 pm THE CITY OF FORT WORTH TARRANT COUNTY. TEXAS KENNETH L. BAER ROBERT TERRELL MAYOR CITY MANAGER LEE C. BRADLEY, JR., P.E. A. DOUGLAS RAEDEPAAKER, P.E. DIRECTOR, FORT WORTH DIRECTOR, DEPARTMENT WATER DEPARTMENT OF ENGINEERING 2000 OFFIC6Ai f Ned K. Burleson and Associates, Inc. ConsultingEngineers 2822 West Lancaster Avenue, Fort Forth, Texas 761 U7 City of Fort Worth, Texas "01yor and Council Communication DATE REFERENCE NUMBER LOG NAME PAGE 7/11/00 **C-18111 30TERRY 1 of 2 SUBJECT AWARD OF CONTRACT TO STOCKER ENTERPRISES, INC. FOR MAIN 4 DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS GROUP 7, CONTRACT 2 PART 3, UNIT 1 RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute a contract with Stocker Enterprises, Inc. in the amount of $250,380.00 for Main 4 Drainage Area Sanitary Sewer System Rehabilitation and Improvements (Group 7, Contract 2) Part 3, Unit 1. DISCUSSION: On August 12, 1997 (M&C C-16211), the City Council authorized the City Manager to execute an engineering agreement with Ned K. Burleson & Associates, Inc. to prepare plans and specifications for the reduction of inflow/infiltration in the sanitary sewer Main 4 drainage area. This project is part of the City's Integrated Wet Weather Wastewater Management Program to comply with an administrative order from the U.S. Environmental Protection Agency to eliminate sewer overflows from the City's wastewater collection system. The proposed improvements consist of the replacement of approximately 1,500 linear feet of 8, 10 and 12-inch sewer pipe for the following sanitary sewer main and lateral: • M-11 R Beginning from a point located 90 feet north of the Terry Street/3rd Street intersection, southerly 90 feet along Terry Street, easterly 270 feet along 3rd Street, then southerly 160 feet along Elm Street; and • L-7R Beginning from a point located 110 feet north of the Terry Street/3rd Street intersection, then southerly 400 feet along Terry Street. The project is located in COUNCIL DISTRICT 9, Mapsco 63W. The project was advertised for bid on March 2 and 9, 2000. On April 13, 2000, the following bids were received: City of Fort Worth, Texas 4bayor and Council Communication DATE REFERENCE NUMBERLOG NAME PAGE 7/11/00 **C-18111 30TERRY 1 2 of 2 SUBJECT AWARD OF CONTRACT TO STOCKER ENTERPRISES, INC. FOR MAIN 4 DRAINAGE AREA SANITARY SEWER 'SYSTEM REHABILITATION AND IMPROVEMENTS GROUP 7, CONTRACT 2 PART 3, UNIT 1 BIDDER AMOUNT TIME OF COMPLETION Stocker Enterprises. Inc. $250,380.00 70 Calendar Days Conatser Construction, Inc. 255,421.50 Southern Paradise Construction, Inc. 288,942.00 William J. Schultz, Inc. d/b/a Circle "C" Construction, Inc. 307,905.00 Davila Construction, Inc. 337,347.75 Cleburne Utility Construction, Inc. 355,522.00 Burleson Utilities, Inc. 359,973.20 Kebo Services, Inc. 365,466.00 Mid-State Utilities, Inc. 485,705.00 In addition to the contract cost, $18,000.00 is required for inspection and survey and $13,000.00 is provided for project contingencies. Stocker Enterprises, Inc. is in compliance with the City's M/WBE Ordinance by committing to 18% M/WBE participation. The City's goal on this project is 18%. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the State Revolving Fund - Sewer. MG:k Submitted for City Manager's FUND ACCOUNT CENTER AMOUNT CITY SECRETARY Office by: (to) APPROVED Mike Groomer 6140 CITY COUNCIL Originating Department Head: JUL 11 1000 A.Douglas Rademaker 6157 (from) PE42 541200 070420417990 $250,380.00v--- Additional Information Contact: City y Ss ecretary o!t2is City of Port Werth,ts:►! A.Douglas Rademaker 6157 92/24%2396 e4:01 3325478 FW WW PRGM YCH PAGE 01 i f I ADDENDUM N 1 TO THE CONSTRUCTION PLANS. SPECIFICATIONS AND CONTRACT DOCUMENTS FOR f' I � M-4 DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS R (GROUP 7.CONTRACT 2). PART 3 SEWER PROJECT NO. P$5"70680410070 D.O.E. PROJECT NO. 2567 IN THE CITY OF FORT WORTH.TEXAS (Bids to be received on March 30. 2000) Addendum issued March 28,2000 Prospective bidders arc hereby informed of the following: A. The following entities should be added as additional insured parties on all City i : required insurance: 1 Sundance Square Texas General Partnership 2 Bass Enterprises Production Co. 3 Sundance Square Management,L.L.0 4 f ► ; All costs associated with listing the above entities as additional insured shall be i ' considered subsidiary to the contract price. H. the contractor shall comply with seams 1 through 4 of "Constz'oction 1 Requirements for L4R from Sta 7+37 to Sta 9+99"on sheet 8 of 16 of the plans, and items 1 through 6 of"Construction requirements for L-22R from Ste. 5+53 to Sta. 8. 34"on Sheet 10 of 16 of the plans. g Receipt Acknowledged: A. Douglas Rademaker,P.E.Director, J Department of Engirte u To 4v By: By: Rick Trice,P.E.,Manapr ' 1 Consultat Services I t 1900-03-28 12.4' PAGE = O1 �n� inn 1300-03-28 nn&, inr& e+ 7r .-n @ r25;1396 C6:17 3125479 N WW PV.614 vum ADDENDUM NO. 2 TO THE PtANa,6PECIFICATIONS AND CONTRACT DOCUMENTS FOR M-+DRAINAGE AREA SANITARY SEWER$Y8TEM REHABILITATION AND IMPROVEMENTS (GROUP 7.CONTRACT 2), PART 3, UNITS 1&2 SEWED PROJECT NO.PEN-07038"10070 0,04, PROJECT NOS. 2W7,6 2757 IN THE CRY Of FORT WORTH,TEXAS (Previous Bid Rscelpt data March 30, 2000) Aside ndum issued Morch 29, 2008 Pro gpectPe bidders are twieby informed of the fc+fowrnp; The bld recslpt date has been changed to April 8,2000. This sddendurtt form a part of the Cootrad Doassrr4nto and modifies the anginal Notre to 8idderrs. A s;gVwd copy of this addendum shag be attached to the proposes at the time of bid subr mal. 8ldders shalt oleo otitnowledge r ool$of the Addendwn In the spaoo provided in the Bid Form. Failure to acknowledgo revolpt of!ho,Addendum msy subloat Wddar to dlsqutlltficAtiprt. SCWEDULED 6I0 DATE:April e,2000 DATE ADDENDIA ISSUED:March 29, 20M t RECEIPT ACKNOWLEDGED- DEPARTWNT OF HNQINEEWNO I By: tVAI 540101.1 1 4 i tit' Rick Tyke, P.E. Manager,Conaultant Services Post-IN Fut tiiord Td71 ° •b i }p1p 01. Ce, lrwv a'° Pap E 03r29roo ZCd l Pili = �. TQ G E(� LY1 A tJL1LJ MM M J Sr :S y L oAwc�cc rc•�� occT.�� ...., w 99/82:`2996 00:27 3325478 FW WW PRGM YCH PAGE 01 t � ADDENDUM M . 3 TO THE { CONSTRUCTION PLANS, SPECIFICATIONS D CONTRACT DOCUMENTS FOR a M-4 DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS (GROUP 7.CONTRACT 2), PART 3 SEWER PROJECT NO. P85"70680410070 D.O.E. PROJECT NO. 2847 IN THE CITY OF FORT WORTH, TEXAS (Bids to be received on April 6. 2000) Addendum issued April 4,2000 This Addendum forms a pert of the Contract Documents re&reneed above and modifies the original Contract Documents and Plans. Please acknowledge receipt of this Addendum on the space provided below,on Me 82-9 of your proposal and note on the outer envelope of your bid. Failure to acknowledge receipt of this Addendum could subject the bidder to be disqualified. Prospective bidders are hereby informed of the following:(SEE ATTACHED SHEETS): Public Notification Prior to Beginning of Con*Wtion 1. Two week Prc-Construction Notification Flyer 2.. Three Day Pre-Construction Flyer. Receipt Aciasowledged: A. Douglas Rademaker,P.E.Director, Department of En&m*nlz By: y.B l o n19 ��►�_+� �4 r � r 1°r ,Rick Trice,P.E.,Manages Consultant Services 1 i • I .1900,-04-04 09 s 1 ] w_ w_ PAW - 01 t D- Public Notification Prior to Reginning Construction Prior to beginning construction on any block in the project, the contractor shall, I on a block by block basis, prepare and deliver two notices or flyers of the pending construction to the front door of each residence or business that will be impacted fby construction. The two noliccs shall be prepared as follows: 1. Two Weck Pre-Construction Notification Flyer. fThe first notification shall be posted two (2) weeks prior to beginning any construction activity on each block in the project area. The flyer shall be prepared on the Contractors letterhead and shall include the following information: Name of Project. DOE No., Scope of Project (i.e. type of construction activity), atnieipated construction time within the block, the name of the contractor's foreman and his phone number, the name of the City's inspector and his phone number and the City's after-hours phone number. A sample of the `two week pre-construction notification' flyer is attached. 2. Three Day Pre-Construction Notification Flyer. The second notification shall be posted three (3) days prier to beginning actual construction on each block in the project area. This flyer will also be printed on the Contractor's letterhead and shall ba.9ically serve as a follow-up letter to the two week notification flyer and shall inform residents of the actual construction duration for the neighborhood. A sample of the three day prc-construction notification flyer is attached. The contractor shall submit a schedule showing the construction start and finish time for each block of the project to the inspector. In addition. Copies of both flyers shall be delivered to the City Inspector for his review prior being distributed. The contractor will not be allowed to begin construction on any block until both flyers are delivered to all residents of the block. Electronic versions of the sample flyers can be obtained from the Wet Weather office at 332-5474. All work involved with the pre-construction notification flyers shall be considered subsidiary to the contract price and no additional compensation shall be made. . I PAJ 07A n-1wi i nc& n�t cA n r . OT &A_&e1—^^Pi � .I (To be printed on Contractor's Letterhead) Darr: DOE No:xxxxx PROJECT NAME: MAPSCO LOCATION: <XXF,> LIMITS OF CONST.: <Alpha St. between Beta Street and Gamma La.) Estimated Duration of Coustruction on your Street:<XX>days R; THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT WORTH, OUR COMPANY WILL CONSTRUCT OR REPLACE SEWER LINES ON OR AROUND YOUR PROPERTY. YOU WILL RECEIVE A SECOND NOTICE IN ABOUT TEN DAYS SHORTLY BEFORE CONSTRUCTION ACTUALLY BEGINS. IF YOU HAVE ANY QUESTIONS, PLEASE CALL Mr. <CONTRACTOR'S SUPERINTENDENT> AT-TELEPHONE INO.> OR Mr. <crry wsrEcToR>AT<TuEPHom No.> AFTER 4.30 PM OR ON W H'EKENDS,PLEASE CALL 871-7970 !� � EASE LKEEP THIS FLYER HANDY W Y -- SEN U o CALL. �I a Crt� Oan inc+nwncn�u .nr� n' r nn 1 f I (To be printed on Contractor's Letterhead) Due: _ DOE Nw. xaxxa PROJECT NAME: MAPSCO LOCATION: <XXE> LIMITS OF CONST.: <Alpha SL between Beta Street and Gamma Lu.) Estimated Duration of Construction on your Street:<XX>days a DEAR RESIDENT, 1 AS A FOLLOW UP TO OUR PREVIOUS FLYER DATED , THIS IS TO INFORM YOU THAT CONSTRUCTION ON THE ABOVEMENTIONED PROJECT IN YOUR NEIGHBORHOOD WILL BEGIN IN THREE DAYS FROM THE DATE OF THIS NOTICE. k IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER ISSUE, PLEASE CALL IMMEDIATELY: Mr. <CONTRACTOR'S SUPERINTF,NDENI> AT<I'ELFPTIONE NO.> OR, Mr. <CITY INSPECTORS AT<TFLYPNONE NO> h PLEASE KEEP THIS FL YER HANDY WHEN YOU CALL. . i S. II d bna a�n tinc���nA n�ti T4�� PPT Pn PT .-rT bn—*n—nnaT 1 i3/03/1996 =2:16 3325478 FW WW PRGM VCH PAGE C11 ! I I ADDENDUM NO.4 TO THE SPECIFICATIONS AND CONTRACT DOCUMZN'I;S for MAIN 4 DRAINAGE AREA SANITARY SEWER ST13TEM REHABILITATION AND I VR0VXbV7 'g PART 3,VMTS 1&T (GROUP 7,CON'T'RACT 2) SEWER PROJECT NO.PS_M-0700WI8970 in the CITY OF FORT WORTH DEPARTMENT OF ENGUIRER NG PROJECT NO.2567&2757 (Rids to be received by April 13°2000) i Addendum issued April 96,2000 This Addendum forum a part of the Contract Docwnents referenced above and modifies The Original Conuact Documents and Plans. Aclmowledge receipt of this Ad&wlm n on the space provided below,on page H2.9 of your propc+sal And note on the outer envelope of your bid. Failure to acknowledge receipt of this ,Addendum could subject bidder to disgwli icatiou. 6 f Ptospeetive bidders an beteby informed of the foltowiog: i I. The Bid Opeafag'is hereby postponed to April 13,2000 Quantity Chu (C'orrts W paw*oldie Bid Proposal are artacW 2. Mata 4 Part 3,Unit 1 Pay Item 33. 192 SY iFl xible Ease Course Pay Item 34 750 SX Cobjerete Pavemeet Repeir per ft I par Item 35 192 SY Concrete Pavemenl0rivertay Repair .I ' 3 Main 4)Part 3,Unit 2 Pay Item 34 1111 SY Flexible Ross Come Pay Item IS 114 SY Concrete PevemeoNDrlveway Repair CITY OF FORT WORTH,TEXAS DEPARTMENT OF ENGINC Y' B �� W.Rick Trice,P-E.,Manager Codlultettt Sttvices Receipt Aftowledged: company: By: Pn,a acts mnc-3-iyna n-3ti toCh car cn Q+, cn OA-4A—AACi Szoc � Contractor S Street Address )I T>c City & State 3O o Telephone ma cwi n/ Contact Person SPECIFICATIONS AND CONTRACT DOCUMENTS FOR M-4 DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS (GROUP 7, CONTRACT 2), PART 3, UNITS 1 AND 2 IN THE CITY OF FORT WORTH, TEXAS SEWER PROJECT NO. PS58-070580410070 DEPARTMENT OF ENGINEERING PROJECT NO. 2567 (UNIT 1) AND 2757 (UNIT 2) CITY OF FORT WORTH TARRANT COUNTY, TEXAS 4_` E ' ���� f�i NED K. BURLESON AND ASSOCIATES, INC. . rvco• K. 4 .....LL-sotd 4, CONSULTING ENGINEERS 37429 2822 WEST LANCASTER AVENUE FORT WORTH TEXAS 76107 . MARCH 2000 f 1980 _ �` �Loo) TABLE OF CONTENTS PART A Notice to Bidders Comprehensive Notice to Bidders Special Instructions to Bidders (Water) Prevailing Wage Rates PART B Unit 1 M/WBE Specifications Unit 1 Proposal Unit 2 M/WBE Specifications Unit 2 Proposal Contractor Compliance with Worker's Compensation Law PART C General Conditions Supplemental Conditions PART D Special Conditions Additional Special Conditions PART E Certificate of Insurance Performance Bond Payment Bond Maintenance Bond PART F Contract APPENDIX 1 Material Specifications Technical Specification for Manhole Joint Sealing APPENDIX 2 Construction Details APPENDIX 3 State Revolving Fund (SRF) Information APPENDIX 4 BNSF Permit APPENDIX 5 TxDOT Permit APPENDIX 6 Sequence of Construction and Abandonment Geotechnical Report APPENDIX 7 Easements and Right-of-Entry Agreements PART A Notice to Bidders Comprehensive Notice to Bidders �pecial Instructionsko Bidders (Water z � �-reva l n� Waw _ NOTICE TO BIDDERS Sealed proposals for the following project: FOR: M-4 DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS (GROUP 7, CONTRACT 2), PART 3, UNITS 1 AND 2 SEWER PROJECT NO. PS58-070580410070 DEPARTMENT OF ENGINEERING PROJECT NO. 2567 (UNIT 1) AND 2757 (UNIT 2) The major work on UNIT 1 will consist of the following: 12 EA manholes; 425 LF of 12" DIP sanitary sewer by open cut; 94 LF of 10" or 12" PVC sanitary sewer by open cut; 89 LF of 8" DIP sanitary sewer by open cut; 66 LF of 8" PVC/DIP sanitary sewer by other than open cut; 775 LF of 8" PVC sanitary sewer by open cut; 105 LF of 6" PVC/DIP sanitary sewer by open cut; 817 LF of asphalt pavement repair. 250 SY of concrete pavement repair The major work on UNIT 2 will consist of the following: 16 EA manholes; 843 LF of 8" DIP sanitary sewer by open cut; 299 LF of 8" PVC/DIP sanitary sewer by other than open cut; 760 LF of 8" PVC sanitary sewer by open cut; 307 LF of 6" to 8" HDPE sanitary sewer replacement by pipe enlargement method; 1,219 LF of asphalt pavement repair. Addressed to Mr. Bob Terrell, City Manager of the City of Fort Worth, Texas, will be received at the Purchasing Office until 1:30 p.m., Thursday, March 30th. 2000, and then publicly opened and read aloud at 2:00 p.m. in the City Council Chambers. Plans, Specifications and Contract Documents for this project may be obtained at the office of the Department of Engineering, City of Fort Worth, 1000 Throckmorton Street, Fort Worth, Texas 76102. One set of plans and contract documents will be provided for a deposit of 50.00. These documents contain additional information for prospective bidders. Bidders shall not separate, detach or remove any portion, segment or sheets from the contract document at any time. Bidders must submit the complete specification book or risk rejection of bid. For additional information concerning this project, please contact Mr. Rakesh Chaubey, P.E., Department of Engineering, at (817) 332-5474, ext. 40, or Mr. Ned K. Burleson, Ph.D., P.E., Ned K. Burleson and Associates, Inc., at (817) 335-6203. ADVERTISING DATES: March 2nd, 2000 March 9th, 2000 Fort Worth, Texas COMPREHENSIVE NOTICE TO BIDDERS Sealed proposals for the following project: FOR: M-4 Drainage Area Sanitary Sewer System Rehabilitation and Improvements (Group 7, Contract 2), Part 3, Units 1 &2; D.O.E. Nos. 2567 (Unit 1) &2757 (Unit 2) Sewer Project No. PS58-070580410070 Addressed to Mr. Bob Terrell, City Manager of the City of Fort Worth, Texas, will be received at the Purchasing Office until 1:30 p.m., Thursday, March 30th. 2000, and then publicly opened and read aloud at 2:00 p.m. in the City Council Chambers. Plans, Specifications and Contract Documents for this project may be obtained at the office of the Department of Engineering, City of Fort Worth, 1000 Throckmorton Street, Fort Worth, Texas 76102. One set of plans and contract documents will be provided for a deposit of $50.00. These documents contain additional information for prospective bidders. All bidders will be required to comply with provision 5159a of "Vernon's Annotated Civil Statutes" of the State of Texas with respect to the payment of prevailing wage rates. All bidders must comply with City Ordinance 7278, as amended by City Ordinance 7400 (Fort Worth City Code Sections 13-A-21 through 13-A-29), prohibiting discrimination in employment practices. Bid security is required in accordance with Paragraph 1 of the Special Instructions to Bidders. The major work on UNIT 1 will consist of the following: 12 EA manholes; 425 LF of 12" DIP sanitary sewer by open cut; 94 LF of 10"or 12" PVC sanitary sewer by open cut; 89 LF of 8" DIP sanitary sewer by open cut; 66 LF of 8" PVC/DIP sanitary sewer by other than open cut; 775 LF of 8" PVC sanitary sewer by open cut; 105 LF of 6" PVC/DIP sanitary sewer by open cut; 817 LF of asphalt and/or concrete pavement repair. 250 SY of concrete pavement repair The major work on UNIT 2 will consist of the following: 16 EA manholes; 843 LF of 8" DIP sanitary sewer by open cut; 299 LF of 8" PVC/DIP sanitary sewer by other than open cut; 760 LF of 8" PVC sanitary sewer by open cut; 307 LF of 6" to 8" HDPE sanitary sewer replacement by pipe enlargement method; 1,219 LF of asphalt pavement repair. Included in the above will be all other items of construction as outlined in the Plans and Specifications. The City reserves the right to reject any and/or all bids and to waive any and/or all formalities. Bidders shall not separate, detach or remove any portion, segment or sheets from the contract document at any time. Bidders must complete the proposal section submit the complete specifications book or risk rejection of the bid as non-responsive. AWARD OF CONTRACT: No bid may be withdrawn until the expiration of ninety (90) days from the date bids are opened. The award of contract, if made, will be within ninety(90) days after the opening of bids, but in no case will the award be made until all the necessary investigations are made as to the responsibility of the bidder to whom it is proposed to award the contract. Contractor shall not be allowed to begin construction until all utilities are clear. Bidders are responsible for obtaining all addenda to the contract documents and acknowledging the receipt of the addenda by initialing the appropriate spaces on the PROPOSAL form. Bids that do not acknowledge receipt of all applicable addenda may be rejected as being non-responsive. Information regarding the status of addenda may be obtained by contacting the Department of Engineering at (817) 871-7910. This document is designed as two separate contract documents and proposals. The Proposal is arranged to allow the Contractor to bid on either or both Unit 1 or Unit 2. A contract will be awarded to the responsive low bidder for Unit 1 and to the responsive low bidder for Unit 2. Time on both Units awarded will run concurrently. If the Contractor is low bidder on both Units, his time to complete both Units will be the longest time allowed to complete any one Unit. Bidders shall not separate, detach, or remove any portion, segment or sheets from the contract documents at any time. Bidders must complete the proposal sections and submit the complete specifications book or face rejection of bid as non-responsive. Any contract or contracts awarded under this Notice to Bidders are expected to be funded in part by a loan from the Texas Water Development Board. Neither the State of Texas nor any of its departments, agencies, or employees are or will be a party to this Notice to Bidders or any resulting contract. The contract(s) is subject to regulations contained in 31 TAC §363 in effect on the date this contract is executed. In accordance with City of Fort Worth Ordinance No. 13471, as amended by Ordinance No. 13781, the City of Fort Worth has goals for the participation of minority and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the Office of the City Secretary. The bidder shall submit the M/WBE UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM, and/or the GOOD FAITH EFFORT FORM ("Documentation"), as applicable. The Documentation must be received by the contracting department no later than 5:00 p.m., five (5) City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the contracting department to whom delivery was made. Such receipt shall be evidence that the Documentation was received by the City. For additional information concerning this project, please contact Mr. Rakesh Chaubey, P.E., Department of Engineering, at (817) 332-5474, ext. 40, or Mr. Ned K. Burleson, Ph.D., P.E., Ned K. Burleson and Associates, Inc., at(817) 335-6203. Robert Terrell City Manager Gloria Pearson City Secretary A. Douglas Rademaker, P.E., Director Department of Engineering ADVERTISING DATES: March 2nd, 2000 BY: March 9th, 2000 Rick Trice, P.E. Fort Worth, Texas Manager, Consultant Service SPECIAL INSTRUCTIONS TO BIDDERS Prequalification Requirements: All contractors submitting bids are required to be prequalified by the Fort Worth Water Department prior to submitting bids. This prequalification process will establish a bid limit based on a technical evaluation and financial analysis of the contractor. It is the bidder's responsibility to submit the following documentation: a current financial statement, an acceptable experience record, an acceptable equipment schedule and any other documents the Department may deem necessary, to the Director of the Water Department at least seven (7) calendar days prior to the date of the opening of bids. (a) The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by an appropriate State Licensing agency and shall have been so prepared as to reflect the financial status of the submitting company. This statement must be current and not more than one (1) year old. In the case that a bidding date falls within the time a new statement is being, prepared, the previous statement shall be updated by proper verification. (b) For an experience record to be considered to be acceptable for a given project, it must reflect the experience of the firm seeking qualification in work of both the same nature and technical level as that of the project for which bids are to be received. (c) The Director of the Water Department shall be the sole judge as the acceptability for financial qualification to bid on any Fort Worth Water Department Project. (d) Bids received in excess of the bid limit shall be considered non-responsive and will be rejected as such. (e) The City, in it's sole discretion, may reject any bid for failure to demonstrate experience and/or expertise. (f) Any proposals submitted by a non-prequalified bidder shall be returned unopened, and if inadvertently opened, shall not be considered. (g) The City will attempt to notify prospective bidders whose qualifications (financial or experience) are not deemed to be appropriate to the nature and/or magnitude of the project on which bids are to be received. Failure to notify shall not be a waiver of any prequalification. 1. Bid Security: A cashier's check, or an acceptable bidder's bond, payable to the City of Fort Worth, in an amount of not less that five percent (5%) of the largest possible total of the bid submitted, must accompany the bid, and is subject to forfeiture in the event the successful bidder fails to execute the Contract documents within then (10) days after the contract has been awarded. To be an acceptable surety on the bond, (1) the name of the SIB-1 surety shall be included on the current US Treasury, or (2) the surety must have capital and surplus equal to ten times the limit of the bond. The surety must be licensed to do, business in the state of Texas. The amount of the bond shall not exceed the amount shown on the treasury list of one-tenth (1/10)the total capital surplus. 2. Bonds: A performance bond, a payment bond, and a maintenance bond, each for one hundred percent(100%) of the contract price will be required,reference C 3-7.7. 3. Wage Rates: Not less than the prevailing wage rates established by the city of Fort Worth, Texas, and as set forth in the Contract Documents must be paid on this project. 4. Ambiguity: In the case of ambiguity or lack of clearness in stating prices in the Proposal, the City reserves the right to adopt the most advantageous construction thereof to the City or to reject the Proposal. 5. Bidder License: Bidder must be a licensed Contractor in the State of Texas. 1P 6. Nonresident Bidders: Pursuant to Article 601g, Tex. Rev. Civ. State., the City of Fort Worth will not award this contract to a nonresident bidder unless the nonresident's bid is lower than the lowest bid submitted by a responsible Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder to obtain a comparable contract in the state which the nonresident's principal place of business is located. "Nonresident bidder" means a bidder whose principal place of business is not in this state, but excludes a contract whose ultimate parent company or majority owner has its principal place of business in this state. "Texas resident bidder" means a bidder, whose principal place of business in the state, and includes a contractor whose ultimate parent company or majority owner has its principal place of business in this state. ThisP rovision does not aPP Y 1 if this contract involves federal funds. The appropriate blanks of the Proposal must be filled out by all nonresident bidders in order for your bid to meet specifications. The failure of a nonresident contractor to do will automatically disqualify that bidder.. 7. Payment: If the contract amount is $25,000 or less, the contract amount shall be paid within fort-five (45) calendar days after completion and acceptance by the City. 8. Age: In accordance with the policy ("Policy") of the Executive Branch of the Federal rt' Government, Contractor covenants that neither it nor any of its officers, members, agents, employees, program participants or subcontractors, while engages in performing this contract, shall, in connection with the employment, advancement or discharge of employees or in connection with the terms, conditions or privileges of their employment, SIB-2 discriminate against persons because of their age except on the basis of a bona fide occupational qualification, retirement plan or statutory requirement. Contractor further covenants that neither it nor its officers, members, agents, employees, subcontractors, program participants, or persons acting on their behalf, shall specify, in solicitations or advertisements for employees to work on this contract, a maximum age limit for such employment unless the specified maximum age limit is based upon a bona fide occupational qualification, retirement plan or statutory requirement. Contractor warrants it will fully comply with the policy and will defend, indemnify and hold City harmless against any claims or allegations asserted by third party or subcontractor against City arising out of Contractor's and / or its subcontractor's alleged failure to comply with the above referenced Policy concerning age discrimination in the performance of this agreement. 9. Disability: In accordance with the provisions of the Americans with Disabilities Act of 1990 ("AD"), Contractor warrants that it and any and all of it subcontractors will not unlawfully discriminate on the basis of disability in the provision of services to the general public, nor in the availability, terms and/ or conditions of employment for applicants for employment with, or employees of Contractor or any of its subcontractors. Contractor warrants it will fully comply with ADA's provisions and any other applicable federal, state and local laws concerning disability and will defend, indemnify and hold City harmless against any claims or allegations asserted by third partied or subcontractors against City arising out of Contractor's and / or its subconsultants' alleged failure to comply with the above referenced laws concerning disability discrimination in the performance of this agreement. 10. Minority and Women Business Enterprises: In accordance with City of Fort Worth Ordinance No. 13471, as amended by Ordinance No. 13784, the City of Forth Worth has goals for the participation of minority business enterprises and women business enterprises in the City contracts. A copy of the Ordinance can be obtained form the Office of the City Secretary. In order for a bid to be considered responsible the AFFIDAVIT STATEMENT included within these bid documents must be completed and submitted with the bid. Failure to submit the completed AFFIDAVIT STATEMENT shall render he bid non-responsive. In addition, the bidder shall submit the M/WBE Utilization Form, Prime Contractor Waiver Form, and/or the Good Faith Effort Form ("Documentation"), as applicable. The Documentation must be received after no later that 5:00 p.m., five (5) City business days after the opening bid date. The bidder shall obtain a receipt form the appropriate employee of the managing department to whom delivery was made. Such a receipt shall be evidence that the Documentation was received by the City. Failure to comply shall render the bid non-responsive. Upon request, Contractor agrees to provide the Owner complete and accurate information regarding actual work performed by a Minority Business Enterprise (MBE) and / or a Women Business Enterprise (WBE) on the contract and payment. Contractor further agrees to permit an audit and/or examination of any books, records or files in its possession that will substantiate that actual work performed by an MBE and/or WBE. SIB-3 The misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate federal, state or locals laws or ordinances relating to false statements; further, any such misrepresentation (other than negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participation in City work for a period of time of not less that three (3) years. Revised 9/24/97 SIB-4 City of Fort Worth HIGHWAY (Heavy) CONSTRUCTION __ PrevailingWage Rates For 2000 *2000 CLASSIFICATIONS HOURLY RATES Asphalt Raker $ 10.32 Asphalt Shoveler $ 9.75 Batching Plant Weigher _ $ 9.65 Carpenter (Rough) $ 13.64 _ Concrete Finisher-Paving $ 10.16 Concrete Finisher Helper (Paving) $ 9.70 Concrete Finisher-Structures $ 13.44 Flagger $ 7.00 Form Builder-Structures $ 13.44 Form Setter-Paving & Curbs $ 10.25 Form Setter-Structures $ 9.75 Laborer-Common $ 7.64 Laborer-Utility $ 8.64 Mechanic $ 13.25 Servicer $ 10.13 Pipe Layer $ 7.35 Pipe Layer Helper $ 6.75 Asphalt Distributor Operator $ 11.45 Asphalt Paving Machine Operator $ 11.09 Concrete Paving Saw $ 10.53 Crane, Clamshell, Backhoe, Derrick, Dragline, $ 10.00 Shovel (< 1 1/2 CY) " Crane, Clamshell, Backhoe, Derrick, Dragline, Shovel (> 1 1/2 CY) $ 11.52 Front End Loader (2 1/2 CY & less) $ 9.94 Front End Loader (over 2 1/2 CY) $ 9.32 Milling Machine Operator $ 8.00 Mixer $ 11.00 Motor Grader Operator (Fine Grade) $ 12.31 Motor Grader Operator $ 13.75 Pavement Marking Machine $ 11.00 Source is AGC of Texas (Hwy,Hvy,Utilities Industrial Branch) 2/22/00 Roller, Steel Wheel Plant-Mix Pavements $ 9.88 Roller, Steel Wheel Other Flatwheel or Tamping , $ 12.12 Roller, Pneumatic, Self-Propelled Scraper _ $ 8.02 Traveling Mixer $ 10.00 Reinforcing Steel Setter (Paving) $ 9.75 Truck Driver-Single Axle (Light) $ 8.00 Truck Driver-Tandem Axle Semi-Trailer $ 10.22 Truck Driver-Lowboy/Float $ 10.54 Truck Driver-Transit Mix $ 10.63 Truck Driver-Winch $ 9.80 Source is AGC of Texas _ (Hwy,Hvy,Utilities Industrial Branch) 2/22/00 2 ATTAC300ahrr 1A Pogo 1 of 2 Rammed uA+MS6 CITY OF FORT WORTHr T 11�iNt3Rf1`Y'A(N6�iI�i3til�"R'IBI[P,�>`lYT' �� F W IIABElMIFBE UTILIZATION APR 19 PM 1 y'{ rOC fe" (�eL PW I �� ti G-o Company Name Rd Dste P.7.CONT.21, PMT 1 UNIT 1-D.O,E N0,2567 PS511-=5904100M Nerve Frdpect NuMW S UM►BE PROJECT GOAL: If1WBE PERCENTAGE AC HIEVEIM. ure to cornollete this form,In Its erotIlrety with supporting documentation. and received by the Managing Department on Wore 5:0 pin,five(5)City business days after bid opening,exclusive of bid opening da*,wld resutt In Ow bid being non- ftp0n0M to b4d app 4 unl "gnsd bidder agree to ~ into a forrnal agrearnent with ilia MBE andlor WeE firms for work listed In this le,conditioned upon execution of a corvb ct with the City of Fort Worth. The willful misrepreser4alJon of facts Is unds for consideration of disqualification and will result in the bid being considered non-responsive to specifications. mpany Name,Contact Name, Certified Specify All Contracting Specify All Items to Dollar Amount ddress,and Telephone No. Scope of Work(`) be Supplied(') oo rn ARROW CONSTRUCTION JANICE SNOW St°�iv A RR 3,4661 FM 1176 BROWNWOOD,TX 76801 915-646-9647 Phone 915-646-7355 Fax BANDA TRUCKING ll JUAN BANDA 4812 MAICIE ST f FORT WORTH TX 76114 �ILIt n l 817-909-1862 Phone 817-626-3358 Fax COWTOWN TRAFFIC CONTROL ROOSEVELT BURRELL lwf Ic Nor ` 5D 00 2724 BRYAN STREET I�FORT WORTH TX 76104 817-924-4524 Phone 817-926-2725 Fax M/WBEs must be located in the 9(nine)county marketplace or currently doing business in the marketplace at time of bid. cify all areas In which M/WBEs are to be utilized and/or items to be supplied: mplete listing of items to be supplied is required in order to receive credit toward the M/WBE goal. ntify Each Tier Level. Tier. Means the level of subcontracting below the prime contractor/consultant,i.e.,a direct payment from the prime contractor to a subcontractor is considered 1st tier,a payment by a subcontractor to its supplier is considered 2nd tier. ORM MUST BE RECEIVED BY THE MANAGING DEPARTMENT BY 5:00 p.m.,FIVE(5)CITY BUSINESS DAYS AFTER BID OPENING,EXCLUSIVE OF THE BID OPENING DATE r w ATTACHMENT IA Page 2 of 2 M CITY OF FORT WORTH D E PT IF Revised 06/02/98 MINORITY AND WOMEN BUSINESS ENTERPRISES "MAMC1 ►TRA F W MBE and WBE UTILIZATION FORM 00 AFR 19 Pel 1 44 Company Name,Contact Name, Certified Specify A11 Contracting Specify All Items to Dollar Amount Address,and Telephone No. Scope of Work(`) be Supplied(') m 0 c. X X =y . c.. Co C.R.I.S.&Associates GILBERT YABARRA � 900 Mt.Vernon �19eb Richardson,TX 750817(c?/If 972-680-8089 Phone 972-680-8089 Fax KAIROS CONSTRUCTION CO. p DAVID DRISKELL 2401 PLEASANT CIR.N. ARLINGTON,TX 76015 11 J 817-465-9479 Phone 817-419-6998 Fax TOPS MH CONSTRUCTION. OD DESI GUTTENECT �/f�^ ./J I 5632 FM 428 t� AUBRY TX 76227 940.565-0837 Phone 940-382-0341 Fax i The bidder, further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including MBE(s) and/or WBE(s) arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records, and files held by their company that will substantiate the actual work performed by the MBEs) and/or WBE(s) on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years nd for initiating action under Federal, State, or Local laws concerning false statements. Any failure to comply with this ordinance and creates a material breach of contract may result in a determination of an irresponsible offeror and barred from participating in City work for a period of time not less than one (1) year. ALL Ml E(s)and WBE(s) MUST BE CERTIFIED BY THE CITY BEFORE CONTRACT AWARD 576 A/ Authorized Signature Printing Signature itle Contact Name and Title (if different) -7-c 7 304- D'4( z a Company Name Telephone Number(s) /0 1�/ /I e 1 4V .30 &> g Z Z ddress �` Fax Number ��T OIL/) 5,13 fty/State/Zip Code Date THIS FORM MUST BE RECEIVED BY THE MANAGING DEPARTMENT BY 5:00 p.m.,FIVE(5)CITY BUSINESS DAYS AFTER BID OPENING, EXCLUSIVE OF THE BID OPENING DATE Pages 1 and 2 of Attachment 1A must be received by the Managing Department BID PROPOSAL TO: Mr. Robert Terrell City Manager Fort Worth, Texas FOR: M-4 DRAINAGE AREA SANITARY SEWER SYSTEM REHABILITATION AND IMPROVEMENTS (GROUP 7, CONTRACT 2), PART 3, UNIT 1 SEWER PROJECT NO. PS58-070580410070 DEPARTMENT OF ENGINEERING PROJECT NO. 2567 Pursuant to the foregoing "Notice to Bidders," the undersigned Bidder, having thoroughly examined the Contract Documents, including Plans, Special Contract Documents, and the General Contract Documents and General Specifications for Water Department projects, and the site of the Project, and understanding the amount of work to be done and the prevailing conditions, hereby proposes to do all the work, furnish all labor, equipment and materials necessary to fully complete all the work as provided in the Plans, Specifications and Contract Documents, and subject to the inspection and approval of the Director of the Department of Engineering, City of Fort Worth, Texas; and binds himself upon acceptance of this Proposal to execute a contract and furnish an approved Performance Bond, Payment Bond, Maintenance Bond and such other bonds, if any, as may be required by the Contract Documents for the performance and completion of the said work. The Contractor must be pre-qualified in accordance with the Fort Worth Water Department requirements. Contractor proposes to do the work within the time stated and for the following sums, to wit: The following are bid items required for the above referenced project, to be furnished and installed, including all appurtenant work, complete and in place. PAY APPROX. DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT ITEM QTY. ITEM PRICES WRITTEN IN WORDS PRICE BID 1 5 LF 6"PVA CSS Pipe(open cut) dPd (r� Dollars and Z O— Cents per Linear Foot $ $ 2 100 LF 6"D.I.SS Pipe(open cut) p.L r y, To dw @ Dollars andr__ r-p� Cents per Linear Foot $ $ 3 775 LF 8"PVC SS Pipe(open c`t) �Z s 6A--i`f [-010 Dollars and Cents per Linear Foot $ $ B-1 PAY APPROX. DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT ITEM QTY. ITEM PRICES WRITTEN IN WORDS PRICE BID 4 89 LF 8" D.I. SS Pipe(open cut) @ r--—I%f Dollars and s� e� O7�— Cents per Linear Foot $ C7 $ e1y-SCS 5 66 LF 8"D.I.SS Pi a(by Method Other Than Open Cut) @ AR « Dollars and 00 Q7 Cents per Linear Foot $ a $ gS 80' 6 6 LF 10" PVC SS Pipe(open cut) @ �" l i'Y Dol ars and Zj 7J ---O — Cents per Linear Foot $ $ 7 88 LF 12"PVC SS Pipe(open cut @ Dollars and r- Cr Cents per Linear Foot $ $ 8 425 LF d2"D. .SS P �(open cut) , „ C�- Dollars and (�-J � Dr Cents per Linear Foot $ $ S 9 3 EA Abandon Exist.SS anhole @ t �i�Dollars and Cents per Each $ k7Wv s $ 10 3 EA Cut,Plug,and Abandon Exist.Sanitary Sewer @ - F"C'r Dollars and CPO O Cents per Each $ Su $ 11 4 EA Remove Exist.S n.Sew. Manhole @ V l v-e 4350 Dollars and gO r Cents per Each $ ©� $ ? B-2 PAY APPROX. DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT ITEM QTY. ITEM PRICES WRITTEN IN WORDS PRICE BID 12 4 EA Std. 4' Dia. Shallow Cone San.Sew. Manhole r w o T+�-"►j AND @ r�"..�•Q. 4�.... ,.3 04:ZrO Dollars and C� Cents per Each $ $ l DOCS 13 8 EA Std.4ia. San-Sew.Manhole �ngp-�Dollars and �0 t� Cents per Each $ Z S 16 $ Z O pm 6 14 15 VF Additi al Manho Depth @ Ga4A)0&CO Dollars and 00 Cents per Vertical Foot $ O C)T $ 15 1 EA D.I.P.SS Drop Connection COLo @ "C `� Dollars and ...-0• Cents per Each $ C�D $ 16 15 EA 4"Service Reconnect @pTgJ ollars and O— Cents per Each $ ZSd $ 17 350 LF Re-Plumb(Re-Route)4"Private '' e Sanitary Sewer Se ices Z� l`�`1 o Z -2 C5 Z @S Dollars and OP d Cents per Linear Foot $ $ 18 12 EA Install " VC San.Sew.Service Cleanout Dollars and C � y Cents per Each $ J $ 19 230 LF "Sewer Lateral(within ROW) Dollars and p Cents per Linear Foot $ $ B-3 PAY APPROX. DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT ITEM QTY. ITEM PRICES WRITTEN IN WORDS PRICE BID 20 1 EA Point Repair-Service Connection Repair @ G &1,& ,fA-J/!Dollars and MD �-► C7 - Cents per Each $ ( 0 0 6 $ 21 2 Tons C.I./D.I. Fittings �A'Ate A -9 ` ollars and Cents per Ton $ j $ Z O OC' 22 1,600 LF TrenchSafetyProgram(depth greater than 5 ft.) @ (l Iy% Dollars and Cents per Linear Foot $ $ 16015 23 8 EA Concrete Collar at Sanitary Sewer-Manholes A�mp W-47J kolIrsndY el 0.4 Cents per Each $ �� $ ©C-r- 24 13 EA Watertight Gasketed Manhole nserts se� @ l" kIlars and m —c�-!Cents per Each $ Zs $ ✓W 25 155 LF Concrete Encasement per Fig. 113 @ (:;: (F= Dollars and CPO ®0 --d Cents per Linear Foot $ I `� $ Z 3,� o 26 10 VF Interior Manh e Coating w O Dollars and *_ p— Cents per Vertical Foot $ 2©0 $ 27 13 EA Vacuum Testi g of Sanitary Sewer Manholes @D co I &s-LI G O Cents per Each $ 150 $ 1 28 1,366 LF Pre-Construction TV Inspection and Cleaning @ Dollars and y Cents per Linear Foot $ $ B-4 PAY APPROX. DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT ITEM Q"1Y. ITEM PKICES WRITTEN IN WORDS PRICE BID 19 1,554 LF P(mt-Construction TV Inspection oA1/c Dollars and Cents per Linear Foot S,��" S ` r 30 1-961 LF Asphalt Pavement Repair per Fig.2 �a OR -V---�7777' ,_—I7crllnr-1 and O Cems per Linear Foot S S 31 256 LF Asphalt Pavement Repair per Fig.4 ' (� 2 7" Dollars and Q7C7 00 d Cents per Linear Foot S oG. " 32 40 LF 2"HMA(; @ - Vollars and �� -Cents per Linear root S... S _ IC 33 192 SY Flexible Base Course l - Dollms and ¢� Cu goo Cents per Square Yard S s _S 34 750 SY Concrete Pavement Repair per Ig. 1 �—ISte' `6Cl— IILrY kl(IlI I If � _ cegts per Squarc Yard S — - 35 192 SY Concrete 7777i I wa..y Repair Q — Cents per Square Yard S S 36 40 11F Concrete e�willk Rep�a,,irn a, kl e I ` Dollars and Cents per Linear rook S _[_ S _..� _ 37 295 LF 7"Monolithic Curb Replacement til>d Uotlan and ®0 cap i ` ___Cents per Linear Foot S B-5 mn4zi7Ana n73m ,oca cat cn cti •en on_un_nncr PAY APPROX. DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT ITEM QTY. ITEM PRICES WRITTEN IN WORDS PRICE BID 38 45 LF Concrete Curb a d GutrI eplacement @ `�MDollars and O B Cents per Linear Foot $ 5 $ and 39 800 LF Silicone Joint Se lant L7 @ " lays and Cents per Linear Foot $_ 4e= $ ` 40 24 EA 4" Round White Lane Markers @ A*jy Dollars and 0 r Cents per Each $ 4130— $ 7-4 41 50 LF 21"RCP Replacement @ Dollars and -- v— Cents per Linear Foot $ $ 6� 42 20 LF 6"D.I.P.Water Line Replacement @ � � Dollars and mD ►� �` Cents per Linear Foot $ C) 43 1 EA Relocate Exist.PrAvate Water Meter Service/Box �a tAjh!F0 Dollars and 60 c %P-1b 0— Cents per Each $ J $ S B 44 24 LF 6"PVC Drain Pipe @ C/Nl r Dollars and Cents per Linear Foot $ l $ �P 45 10 Cy Topsoil (t� Dollars an ( O ��-- Gents per Cubic Yard $ Q $ 46 360 LF Bermuda Grass Sog Q L®r v 0 O @ J'` l �G Dollars and a Cents per Linear Foot $ v B-6 47 5 LF Hydro Mulch <�� f/"v 6'� @ Dollars and l ,O ---d-- Cents per Linear Foot $ 48 1 EA Pre-Construction Drill Hole @ , 1="r Y Dollars and Cents per Each $ $ SUB-TOTAL MAIN-4 PART 3,UNIT 1 $ 501 3`6 D B-7 Contractor shall select type of pipe to be used: STANDARD SPEC. NO. SIZE E1-31 4" thru 30" E1-25 4" thru 15" E1-27 4" thru 15" E1-28 18" thru 27" E100-2 18"thru 48" Consult the "City of Fort Worth, Texas Standard Product List" to obtain the Generic/Trade and the Manufacturer for the pipes listed above. Contractor shall indicate interior manhole coating product to be used: Product Name of Subcontractor, if applicable Microsilicate Quadex Spray Wall Raven 405 Permacast Strong-Seal Failure to provide the information required above may result in rejection of bid as non-responsive. Only products or methods listed above will be allowed for use in this project. Any substitution shall result in rejection of bid as non-responsive. Within ten (10) days of notification by the City, the undersigned will execute the formal contract and will deliver an approved Surety Bond and other such bonds as required by the Contract Documents, for the faithful performance of the Contract. The attached bid security in the amount of 5% of the amount bid is to become the property of the City of Fort Worth, Texas, in the event that the contract and bond or bonds are not executed and delivered within the time above set forth, as liquidated damages for the delay and additional work caused thereby. The undersigned bidder certifies that he has obtained at least one set of the General Contract Documents and General Specifications for Water Department Projects, dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and the Specific Contract Documents and appurtenant plans. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors, or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278, as amended by City Ordinance No. 7400 (Fort Worth City Code Sections 13-A-21 through 13-A-29). (Complete A or B below, as applicable:) B-8 A. The principal place of business of our company is in the State of 0 Nonresident bidders in the State of , our principal place of business, are R required to be percent lower than resident bidders by state law. A copy of the statute is attached. ❑ Nonresident bidders in the State of , our principal place of business, are not required to underbid resident bidders. B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. This contract is issued by an organization which qualifies for exemption pursuant to the provisions of Article 20.04 (F) of the Texas Limited Sales, Excise and Use Tax Act. All equipment and materials not consumed by or incorporated into the project construction are subject to State sales tax under House Bill 11, enacted August 15, 1991. The undersigned agrees to begin construction within ten (10) calendar days after issue of the work order, and to complete all work covered by these contract documents within seventy (70) Calendar Days after the date for commencing work as set forth in the Written Work Order to be issued by the Owner. This project is included in the Administrative Order issued by the U.S. Environmental Protection Agency, and contract completion within the above stipulated contract time will be strictly enforced. I (We) acknowledge receipt of the following addenda to the plans and specifications, all of the provisions and requirements of which we have taken into consideration in preparation of the foregoing bid: Addendum No. 1 (initials) Addendum No. 2 (initials) Addendum No. 3 (initials) Res ectfully submitted, 7r , I e,GLL IVA Company Name jj��Q' By: 7 Title: C Address: (S E A L) �� Telephone: 1 Date: O Fax: B-9 on pop PART C General Conditions Supplemental Conditions p - PART C - GENERAL CONDITIONS TABLE OF CONTENTS NOVEMBER, 1, 1987 TABLE OF CONTENTS Cl-1 DEFINITIONS C1-1. 1 Definition of Terms C1-1 (1) C1-1. 2 Contract Documents C1-1 (1) C1-1. 3 Notice to Bidders C1-1 (2) C1-1. 4 Proposal C1-1 (2 ) C1-1.5 Bidder ' C1-1 (2) C1-1. 6 General Conditions C1-1 (2) C1-1. 7 Special Conditions C1-1 (2) C1-1.8 Specifications C1-1 (2) C1-1. 9 Bond C1-1 (2) ° C1-1.10 Contract C1-1 (3) C1-1.11 Plans C1-1 (3 ) C1-1.12 City C1-1 (3) C1-1.13 City Council C1-1 (3 ) C1-1.14 Mayor C1-1 (3) C1-1.15 City Manager C1-1 (3 ) C1-1.16 City Attorney C1-1 (3) C1-1.17 Director of Public Works C1-1 (4 ) C1-1.18 Director, City Water Department C1-1 (4 ) C1-1.19 Engineer Cl-1 (4 ) C1-1.20 Contractor C1-1 (4 ) C1-1.21 Sureties C1-1 ( 4 ) C1-1.22 The Work or Project C1-1 ( 4) C1-1.23 Working Day C1-1 ( 4) C1-1.24 Calendar Day C1-1 (4 ) - C1-1.25 Legal Holiday C1-1 ( 4 ) C1-1.26 Abbreviations C1-1 (5) 1p C1-1. 27 Change Order Cl-1 (6 ) C1-1. 28 Paved Streets -and Alleys C1-1 (6) C1-1.29 Unpaved Streets and Alleys Cl-.1 (6 ) C1-1.30 City Streets C1-1 (6) " C1-1.31 Roadway Cl-1 (6) C1-1.32 Gravel Street C1-1 (6 ) d C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL C2-2.1 Proposal Form C2-2 (1) C2-2. 2 Interpretation of Quantities C2-2 (1) C2-2.3 Examination of Contract Documents and Site C2-2 (2) C2-2. 4 Submitting of Proposal C2-2 (3 ) C2-2.5 Rejection of Proposals C2-2 (3 ) C2-2.6 Bid Security C2-2 _(3 ) (1) 0 C2-2.7 Delivery of Proposal C2-2 (4 ) C2-2.8 Withdrawing Proposals C2-2 (4 ) C2-2. 9 Telegraphic Modification of Proposals C2-2 (4 ) C2-2.10 Public Opening of Proposal C2-2 (4 ) C2-2.11 Irregular Proposals C2-2 (4 ) C2-2.12 Disqualification of Bidders C2-2 (5 ) C3-3 AWARD AND EXECUTION OF DOCUMENTS C3-3.1 Consideration of Proposals C3-3 (1) C3-3. 2 Minority Business Enterpise Women-Owned Business Enterprise compliance C3-3 (1 ) C3-3.3 Equal Employment Provisions C3-3 (1) C3-3.4 Withdrawal of Proposals C3-3 (2) C3-3.5 Award of Contract C3-3 (2) C3-3.6 Return of Proposal Securities C3-3 (2 ) C3-3.7 Bonds C3-3 (2 ) C3-3.8 Execution of Contract C3-3 (4 ) C3-3.9 Failure to Execute Contract C3-3 (4 ) C3-3.10 Beginning Work C3-3 (4 ) C3-3.11 Insurance C3-3 (4 ) C3-3.12 Contractor ' s Obligations C3-3 (7 ) C3-3.13 Weekly Payroll C3-3 (7) C3-3.14 Contractor ' s Contract Administration C3-3 (7 ) C3-3.15 , Venue C3-3 (8 ) C4-4 SCOPE OF WORK C4-4.1 Intent of Contract Documents C4-4 (1 ) C4-4. 2 Special Provisions C4-4 (1 ) C4-4. 3 Increased or Decreased Quantities C4-4 (1) C4-4. 4 Alteration of Contract Documents C4-4 (2 ) C4-4.5 Extra Work C4-4 (2) C4-4.6 Schedule of Operations C4-4 (3) C4-4.7 Progress Schedules for Water and Sewer Plant Facilities C4-4 (4 ) C5-5 CONTROL OF WORK AND MATERIALS C5-5.1 Authority of Engineer C5-5 (1) C5-5.2 Conformity with Plans C5-5 (1) C5-5. 3 Coordination of Contract Documents C5-5 (2) C5-5. 4 Cooperation of Contractor C5-5 (2) C5-5.5 Emergency and/or Rectification Work C5-5 (3 ) C5-5. 6 Field Office C5-5 (3 ) C5-5. 7 Construction Stakes C5-5 (3 ) C5-5.8 Authority and Duties of Inspectors C5-5 (4 ) C5-5.9 Inspection C5-5 (5 ) C5-5.10 Removal of Defective and Unauthorized Work C5-5 (5 ) C5-5.11 Substitute Materials or Equipment C5-5 (5) C5-5.12 Samples and Tests of Materials C5-5 (6 ) C5-5.13 Storage of Materials C5-5 (6 ) C5-5.14 Existing Structures and Utilities C5-5 (7) C5-5.15 interruption of Service C5-5 (7) C5-5.16 Mutual Responsibility of Contractors C5-5 (8 ) C5-5.17 Cleanup C5-5 (8 ) C5-5.18 Final Inspection C5-5 (9) (2 ) C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY C6-6.1 Laws to be Observed C6-6 (1 ) C6-6. 2 Permits and Licenses C6-6 (1) C6-6. 3 Patented Devices, Materials and Processes C6-6 (1) C6-6. 4 Sanitary Provisions C6-6 (2) C6-6. 5 Public Safety and Convenience C6-6 (2) C6-6. 6 Privileges of Contractor in Streets, Alleys, and Right-of=Way C6-6 (3 ) C6-6. 7 Railway Crossings C6-6 (4) C6-6. 8 Barricades, Warnings and Watchmen C6-6 (4) C6-6.9 Use of Explosives, Drop Weight, etc. C6-6 (5) C6-6.10 Work Within Easements C6-6 (6 ) C6-6.11 Independent Contractor C6-6 (8 ) C6-6.12 Contractor ' s Responsibility for Damage Claims C6-6 (8 ) C6-6.13 Contractor 's Claim for Damages C6-6 (10) C6-6.14 Adjustment of Relocation of Public Utilities, etc. C6-6 (10) C6-6.15 Temporary Sewer Drain Connections C6-6 (10) C6-6.16 Arrangement and Charges of Water Furnished by City C6-6 (11) C6-6.17 Use of a Section of Portion of the Work C6-6 (11) C6-6.18 Contractor 's Responsibility for Work C6-6 (11) C6-6 .19 No Waiver of Legal Rights C6-6 (12) C6-6. 20 Personal Liability of Public Officials C6-6 (12) C6-6.21 State Sales Tax C6-6 (12) C7-7 PROSECUTION AND PROGRESS C7-7.1 Subletting C7-7 (1) C7-7. 2 Assignment of Contract C7-7 (1 ) C7-7.3 Prosecution of the Work C7-7 (1) C7-7. 4 Limitations of Operations C7-7 (2 ) C7-7.5 Character of workman and Equipment C7-7 (2 ) C7-7.6 Work Schedule C7-7 (3 ) C7-7. 7 Time of Commencement and Completion C7-7 (4 ) C7-7. 8 Extension of time of Completion. C7-7 (4 ) C7-7.9 Delays C7-7 (4) C7-7. 10 Time of Completion C7-7 (5) C7-7.11 Suspension by Court Order C7-7 (6) C7-7.12 Temporary Suspension C7-7 (6 ) j C7-7.13 Termination of, Contract due to National Emergency C7-7 (7) C7-7.14 Suspension of Abandonment of the Work and Annulment of Contract C7-7 (7 ) C7-7.15 Fulfillment of Contract C7-7 (9) C7-7.16 Termination for Convenience of the Onwer C7-7 (10 ) C7-7.17 Safety Methods and Practices C7-7 (13 ) C8-8 MEASUREMENT AND PAYMENT C8-8 .1 Measurement of Quantities C8-8 (1) C8-8. 2 Unit Prices C8-8 (1) C8-8. 3 Lump Sum C8-8 (1) C8-8 . 4 Scope of Payment C8-8 (1) C8-.8 .5 Partial Estimates and Retainage C8-8 (2) C8-8. 6 Withholding Payment C8-8 (3 ) C8=8.7 Final Acceptance C8-8 (3 ) C8-8.8 Final Payment C8-8 (3 ) C8-8.9 Adquacy of Design C8-8 (4) C8-8.10 General Guaranty C8-8 (4) C8-8.11 Subsidiary Work C8-8 (5) C8-8.12 Miscellaneous Placement of Material C8-8 (5 ) C8-8.13 Record Documents C8-8 (5) (4) PART C - GENERAL CONDITIONS C1-1 DEFINITIONS SECTION C1-1 DEFINITIONS C1-1 . 1 DEFINITIONS OF TERMS : Whenever in these Contract Documents the following terms or pronouns in place of them are used , the intent and meaning shall be understood and' interpreted as follows: C1-1. 2 CONTRACT DOCUMENTS: The Contract Documents are all of the written and drawn documents , such as specifications , bonds , addenda , plans , etc . , which govern the terms and performance of the contract . These are contained in the General Contract Documents and the Special Contract Documents. a. GENERAL CONTRACT DOCUMENTS : The General Contract .Documents govern all Water Department Projects and include the following items: PART A - NOTICE TO BIDDERS (Sample) White PART B - PROPOSAL (Sample) White PART C - GENERAL CONDITIONS (CITY) Canary Yellow (Developer) Brown PART D - SPECIAL CONDITIONS Green PART E - SPECIFICATIONS E1-White E2-Golden Rod E2A-White - PERMITS/EASEMENTS Blue PART F - BONDS (Sample) White PART G - CONTRACT ` (Sample) White b. SPECIAL CONTRACT DOCUMENTS: The Special Contract Documents are prepared for each specific project as a supplement to the General Contract Documents and include the following items: PART A - NOTICE TO BIDDERS (Advertisement) Same as above PART B - PROPOSAL (Bid) PART C - GENERAL CONDITIONS PART D - SPECIAL CONDITIONS PART E - SPECIFICATIONS PERMITS/EASEMENTS ,,. PART F - BONDS PART G - CONTRACT PART H - PLANS (Usually bound separately) C1-1 (1) C1-1 . 3 NOTICE TO BIDDERS : All of the legal publications either actually published in public advertising mediums or furnished direct to interested parties pertaining to the work contemplated under the Contract Documents constitutes the notice to bidders. C1-1 . 4 PROPOSAL: The completed written and signed offer or tender of a bidder to perform the work which the Owner desires to have done, together with the bid security, constitutes the Proposal , which becomes binding upon the Bidder when it is officially received by the Owner, has been publicly opened and read and not rejected by the Owner. - C1-1 . 5 BIDDER: Anyperson , persons , firm, partnership, company, association, corporation, acting directly or through a duly authorized representative, submitting a proposal for performing the work contemplated under the Contract Documents , constitutes a bidder. C1-1 . 5 GENERAL CONDITIONS : The General Conditions are the usual construction and contract requirements which govern the performance of the work so that it will be carried on in accordance with the customary procedure, the local statutes , and requirements of the City of Fort Worth ' s charter and promulgated ordinances. Wherever there may be a conflict between the General Conditions and Special Conditions , the latter shall take precedence and shall govern. C1-1 . 7 SPECIAL CONDITIONS : Special conditions are the specific requirements which are necessary for the particular project covered by the Contract Documents and not specifically covered in the General Conditions . When considered with the General Conditions and other elements of the Contract Documents they provide the information which the Contractor and Owner should have in order .to gain a thorough knowledge of the project. C1-1. 8 SPECIFICATIONS: The Specifications is that section or part of the Contract Documents which sets forth in detail the requirements which must be met by all materials, construction, workmanship, equipment and services in order to render a completed and useful project . Whenever reference is made to standard specifications, regulations, requirements , statutes , etc. , such referred to documents shall become a part of the Contract Documents just as though they were embodied therein. C1-1. 9 BOND: The bond or bonds are the written guarantee or security furnished by the Contractor for the prompt and C1-1 (2) faithful performance of the contract and include the following: a. Performance Bond (see paragraph C3-3 . 7) b. Payment Bond (see paragraph C3-3 . 7) C. Maintenance Bond (see paragraph C3-3.7 ) d. Proposal or Bid Security (see Special Instructions to Bidders, Part A and C2-2. 6) C1-1. 10 CONTRACT: The Contract is the formal signed agreement between the Owner and the Contractor covering the mutual understanding of the two contracting parties about the project to be completed under the Contract Documents . - C1-1. 11 PLANS: The plans are the drawings or reproductions therefrom made by the Owner' s representative showing in detail the location , dimension and position of the various elements of the project , including -- such profiles , typical cross-sections, layout diagrams, working drawings, preliminary drawings and such supplemental drawings as the Owner may issue to clarify other drawings or for the purpose of showing changes in the work hereinafter authorized by the Owner . The plans are usually - bound separately from other parts of the Contract Documents , but they are a part of the Contract Documents just as though they were bound therein. C1-1 . 12 CITY: The City of Fort Worth, Texas , a municipal corporation, authorized and chartered under the Texas State Statutes , acting by and through its governing body or its City Manger , each of which is required by charter.- to perform specific duties . Responsibility for final enforcement of Contracts involving the City. of Fort Worth is by Charter vested in the- City Manager . The terms City and Owner are synonymous. C1.-1 . 13 CITY COUNCIL: The duly elected and qualified governing body of the City of Fort Worth, Texas. C1-1 . 14 - MAYOR: The officially elected Mayor, or in his absence; the Mayor Pro tem of the City of Fort Worth, Texas. IL C1-1. 15 CITY MANAGER: The officially appointed and authorized City Manager of the City of Fort Worth, Texas , or his duly authorized representative. C1-1. 16 CITY ATTORNEY: The officially appointed City Attorney of the City of Fort Worth, Texas , or his duly authorized representative. rC1-1 (3 ) 1 C1-1 . 17 DIRECTOR OF PUBLIC WORKS: The duly appointed officialI o -the City of Fort Worth, referred to in the Charter as the City Engineer, or his duly authorized representative. C1-1 . 18 DIRECTOR, CITY WATER- DEPARTMENT: The duly appointed Director of the City Water Department of the City of Fort Worth , Texas , or his duly authorized representative., assistant, or agents. C1-1 . 19 ENGINEER: The Director of Public Works, the Director of the Fort Worth City Water Department , or their duly authorized assistants , agents , engineers , inspectors , or superintendents , acting within the scope of the particular duties entrusted to them. C1-1 . 20 CONTRACTOR: The person , persons , partnership , company, firm, association , or corporation, entering into a contract with the Owner for the execution of the work, acting directly. or through a duly authorized representative . A sub-contractor is a person, firm, corporation, or others under contract with the principal contractor , supplying labor and materials or only labor, for work at the site of the project. C1-1 . 21 SURETIES: The Corporate bodies which are bound by such bonds are required with and for the Contractor . The sureties engaged are to be fully responsible for the entire and satisfactory fulfillment of the Contract and for- any and " all requirements as set forth in the Contract Documents and approved changes therein. C1-1. 22 THE WORK OR PROJECT: The completed work contemplated in and covered by the Contract Documents, including but not limited to the furnishing of all labor , materials , tools , equipment, and incidentals necessary to produce a completed and serviceable project. C1-1 . 23 WORKING DAY: A working day is defined as a calendar day, not incluTing Saturdays, Sundays , and legal holidays , in which the weather or other conditions not under the control of the Contractor permit the performance of the principal unit of work for a period of not less than seven ( 7 ) hours between 7 : 00 a.m. and 6 : 00 p.m. , with exceptions as permitted in paragraph C7-7. 6. C1-1 . 24 CALENDAR DAYS : A calendar day is any day of the week or month, no days being excepted. C1-1. 25 LEGAL HOLIDAYS : Legal holidays shall be observed as prescribed by the City Council of the City of Fort Worth for observance by City employees as follows: C1-1 (4 ) 1. New Year 's Day January 1 2. M. L. King, Jr. Birthday. Third Monday in January 3 . Memorial Day Last Monday in May 4 . Independence Day July 4 5. Labor Day First Monday in September 6 . Thanksgiving Day Fourth Thursday in November 7. Thanksgiving Friday Fourth Friday in November 8. Christmas Day December 25 9. Such other: days in lieu of holidays as the City Council may determine When one of the above named holidays or a special holiday is declared by the City Council , falls on Saturday, the holiday shall be observed on the preceding Friday or if it falls on ~� Sunday, it shall be observed on the following Monday, by those employees working on working day operations . Employees working calendar day operations will consider the calendar holiday as the holiday. C1-1. 26 ABBREVIATIONS: Wherever the abbreviations defined - herein appear in Contract Documents , the intent and meaning shall be as follows: AASHTO - American Association of MGD - Million Gallons Per, State Highway Transportation Day Officials ASCE - American- Society of Civil CFS - Cubic Foot per Engineers Second LAW - In Accordance With ASTM - American Society of Min. - Minimum Testing Materials. Mono.- Monolithic AWWA - American Water Works % - Percentum Association ° R - Radius ASA , - American Standards Association I.D. - Inside Diameter HI - Hydraulic Institute O . D . - .Outside Diameter Asph. - Asphalt Elev.- Elevation Ave. - Avenue F - Fahrenheit Blvd. - Boulevard C - Centigrade CI - Cast Iron In. - Inch CL - Center Line Ft. - Foot GI - Galvanized Iron St. - Street Lin. - Linear or Lineal CY - Cubic Yard lb. - Pound Yd. - Yard MH - Manhole SY - Square Yard Max. - Maximum L.F. - Linear Foot D.I . - Ductile Iron C1-1 (5 ) C1-1 . 27 CHANGE ORDER : A " Change Order " is a written supplemental agreement between the Owner and the Contractor covering some added or deducted item or feature which may be found necessary and which was not specifically included in the scope of the project on which bids were submitted. Increase in unit quantities stated in the proposal are not the subject matter of a Change Order unless the increase or decrease is more than 25% of the amount of the particular item or items in the original proposal. All "Change Orders " shall be prepared by the City from information as necessary furnished by the Contractor.- Cl-1. 28 PAVED STREETS AND ALLEYS: A paved street or alley shall be defined as a street or alley having one of the following types of wearing surfaces applied over the natural unimproved surface: 1. Any type of asphaltic concrete with or without separate base material. 2. Any type of asphalt surface treatment , not including an oiled surface , with or without separate base material. 3. Brick, with or without separate base material. 4. Concrete, with or without separate base material. 5. Any combination of the above. C1-1. 29 UNPAVED STREETS OR ALLEYS: An unpaved street, alley, roadway or other surface is any area except those defined above for "Paved Streets and Alleys. " C1-1. 30 CITY STREETS : A city street is defined as that area between the right-of-way lines as the street is dedicated. C1-1. 31 ROADWAY: The roadway is defined as the area between parallel lines two ( 21 ) feet back of the curb lines or Pour ( 41 ) feet back of the average edge of pavement where no curb exists. C1-1. 32 GRAVEL STREET: A gravel street is any unpaved street to which has been--a—M-e-a one or more applications of gravel or similar material other than the natural material found on the street surface before any improvement was made. C1-1 (6 ) SECTION C - GENERAL CONDITIONS C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL SECTION C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL C2--2. 1 PROPOSAL FORM: The Owner will furnish bidders with proposal form, which will contain an itemized list of the items of work to be done or materials to be furnished and upon which bid prices ,'are requested. The Proposal form will state the Bidder ' s general understanding of the project to be completed, provide a space for furnishing the amount of bid security ,' and state the basis- for entering into a formal contract. The Owner will furnish forms for the Bidder ' s "Experience Record, " "Equipment Schedule , " and "Financial Statement, " all of which must be properly executed and filed with the Director of the City Water Department one week prior to the hour for opening of bids. The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by an appropriate state licensing agency, and shall have been so prepared as to reflect the current financial status . This statement must be current and not more than one ( 1 ) year old. In the case that a bidding date falls within the time a new statement is being prepared, the previous statement shall be updated by proper verification. Liquid assets in the amount of ten ( 10% Y percent of the estimated project cost will be required. For an experience record to be considered to be acceptable for a given project, it must reflect the experience of the firm seeking qualification in work of both the same nature and magnitude as that of the project for which bids are to be received , and such experience must have been on projects completed not more than five ( 5 ) years prior to the date on which are to be received . The Director of the Water department shall be sole judge as to the acceptability of experience for qualification to bid on any Fort Worth Water Department project. The prospective bidder shall schedule the equipment he has available for the project and state that he will rent such additional equipment as may be required to complete the project on which he submits a bid. C2-2 . 2 INTERPRETATION OF QUANTITIES: The quantities of- work and materials to be furnished as may be listed in the proposal C2-2(1) forms or other parts of the Contract Documents will be considered as approximate only and will be used for the purpose of comparing bids on a uniform basis. Payment will be made to the Contractor for only the actual quantities of work performed or materials furnished in strict accordance with the Contract Documents and Plans . The quantities of work to be performed and materials to be furnished may be increased or decreased as hereinafter provided , without in any way invalidating the unit prices bid or any other requirements of the Contract Documents. C2-2. 3 EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF PROJECT: Bidders are advised that the Contract Documents on file with the Owner shall constitute all of the information which the T Owner will furnish. All additional information and data which the owner will supply after promulgation of the formal contract documents * shall be issued in the form of written addenda and shall become part of the Contract Documents just as though such addenda were actually written into the original Contract Documents. Bidders are required, prior to the filing of proposal, to read and become familiar with the Contract Documents , to visit the , site of the project and examine carefully all local conditions , to inform themselves by their own independent research and investigations, tests, boring, and by such other means as may be necessary to gain a complete knowledge of the conditions which will be encountered during the construction of the project . They must judge for themselves the difficulties of the work and all attending circumstances _ affecting the cost of doing the work or the time requited for its completion, and obtain all information required to make an intelligent proposal . No information given by the Owner or any representative of the Owner other than that contained in the Contract Documents and officially promulgated addenda thereto, shall be binding upon the Owner. Bidders shall rely exclusively and solely upon their own estimates , investigation, research, tests , explorations, and other data which are necessary for full and complete information upon which the proposal is to be based. It is mutually agreed that the submission of a proposal is prima-facie evidence that the bidder has made the investigations, examinations and tests herein required . Claims for additional compensation due to variations between conditions actually encountered in construction and as indicated in the Contract Documents will not be allowed. The logs of Soil Borings, if any, showing on the plans are for general information only and may not be correct. Neither the C2-2( 2) Owner nor the Engineer guarantee that the data shown is representative of conditions which actually exist. C2-2. 4 SUBMITTING OF PROPOSAL: The Bidder shall submit his Proposal on the form furnished by the Owner. All blank spaces applicable to the project contained in the form shall be correctly filled in and the Bidder shall state the prices , written in ink in both words and numerals , for which he proposes to do the work contemplated or furnishe the materials required . All such prices shall be written legibly. In case of discrepancy between the price written in words and the price written in numerals , the price most advantageous to the s. City shall govern. If a proposal is submitted by an individual, his or her name must be signed by him (her) or his (her) duly authorized agent. If a proposal is submitted by a firm, association , or partnership, the name and address of each member must be given , and the proposal must be signed by a member of the firm, association , or partnership, or by a person duly authorized . If a proposal is submitted by a company or corporation , the company or corporate name and business address must be given, and the proposal signed by an official or duly authorized agent. The corporate seal must be affixed. Power of Attorney authorizing agents or others to sign proposal must be properly certified and must be in writing and submitted with the proposal. C2-2. 5 REJECTION OF PROPOSALS: Proposals may be rejected if they show any alteration of words or figures , additions not called for , conditional or uncalled for alternate bids, ? incomplete bids, erasures , or irregularities of any kind, or contain unbalance value of any items . Proposal tendered or delivered after the official time designated for receipt of proposal shall be returned to the Bidder unopened. C2-2. 6 BID SECURITY: No proposal will be considered unless it is accompanied by a "Proposal Security" of the character and in the amount indicated in the "Notice to Bidders" and the "Proposal . " The Bid Security is required by the Owner as evidence of good faith on the part of the Bidder, and by way of a guaranty that if awarded the contract, the Bidder will s. within the required time execute a formal contract and furnish the required performance and other bonds. The bid security of the three lowest bidders will be retained until the contract is awarded or other .disposition is made thereof . The bid security of all other bidders may be returned promptly after the canvass of bids. C2-2 (3 ) C2-:-2'. 7 DELIVERY OF PROPOSAL: No proposal will be considered unless it is delivered , accompanied by its proper Bid Security, to the City Manager or his representative in the official place of business as set forth in the "Notice to Bidders . " It is the Bidder ' s sole responsibility to deliver the proposal at the proper time to the proper place. The mere fact that a proposal was dispatched will not be considered. The Bidder must have the proposal actually delivered. Each proposal shall be in a sealed envelope plainly marked with the word "PROPOSAL, " and the name or description of the project as designated in the "Notice to Bidders. " The envelope shall be addressed to the City Manager, City Hall, Fort Worth, Texas. C2-2 . 8 WITHDRAWING PROPOSALS: • Proposals actually filed with the City Manager cannot be withdrawn prior to the time set for opening proposals . A request for non-consideration of a proposal must be made in writing , addressed to the City Manager , and filed with him prior to the time set for the opening of proposals. After all proposals not requested for -non-consideration are opened and publicly read aloud, the proposals for which non-consideration 'requests have been properly filed may, at the option of the Owner , be returned unopened. C2-2. 9 TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may modify h1s proposal by telegraphic communication at any time prior to the time set for opening proposals , provided such telegraphic communication is received by the City Manager prior to the said proposal opening time, and provided further, that the City Manager is satisfied that a written and duly authenticated confirmation of such telegraphic communication over the signature of the bidder was mailed prior to the proposal opening time. If such confirmation is not received within forty-eight (48) hours after the proposal opening time, no further consideration will be given to the proposal. C2-2. 10 PUBLIC OPENING OF PROPOSAL: Proposals which have been properly filed and For which no "Non-consideration Request" has been received will be publicly opened and read aloud by the City Manager or his authorized representative at the time and place indicated in the "Notice to Bidders." All proposals which have been opened and read will remain on file with the Owner until the contract has been awarded. Bidders or their authorized representatives are invited to be present for the opening of bids. C2-2 . 11 IRREGULAR PROPOSALS: Proposals shall be considered as eing -"Irregular" it they show any omissions , alterations of form, additions , or conditions not called for, unauthorized alternate bids, or irregularities of any kind. However, the C2-2(4) Owner reserves the right to waive any and all irregularities and to make the award of the contract to the best interest of the City. Tendering a proposal after the closing hour is an irregularity which cannot be waived. f ti C2 - 2 . 12 DISQUALIFICATION OF BIDDERS : Bidders may be disqualified and their proposals not considered for any of , but not limited to, the following reason: A a. Reasons for believing that collusion exists among bidders. b. Reasonable grounds for believing that any bidder is interested in more than one proposal for work contemplated. C. The bidder being interested in any litigation against the Owner or where the Owner may have a claim against or be engaged in litigation against the bidder. r d. The bidder being in arrears on any existing contract or having defaulted on a previous contract. e. The bidder having performed a prior contract in an unsatisfactory manner. f. Lack of competency as revealed by the financial statement, experience record, equipment schedule , and such inquiries as the Owner may see fit to snake. g. Uncompleted work which , in the judgment of the Owner, will prevent or hinder the prompt completion of additional work if awarded. h. The bidder not filing with the Owner, one week in advance of the hour of the opening of proposals the following: G1. Financial Statement showing the financial condition of the bidder as specified in Part "A" - Special Instructions. 2 . A current experience record showing especially the projects of a nature similar to the one under consideration , which have been successfully completed by the Bidder. 3 . An equipment schedule showing the equipment the bidder has available for use on the project. The Bid Proposal of a bidder who, in the judgment of the Engineer , is disqualified under the requirements stated herein, shall be set aside and not opened. C2-2(5) PART C - GENERAL CONDITIONS C3-3 AWARD AND EXECUTION OF DOCUMENTS a SECTION C3-3 AWARD AND EXECUTION OF DOCUMENTS: 3 C3-3 . 1 CONSIDERATION OF PROPOSALS: After proposals have been opened and read aloud, the proposals will be tabulated on the basis of the quoted prices , the quantities shown in the proposal , and the application of such formulas or other methods of bringing items to a common basis as may be established in the Contract Documents. A The total obtained by taking the sum of the products of unit prices quoted and the estimated quantities plus any lump sum items and such other quoted amounts as may enter into the cost of the completed project will be considered as the amount of the bid. Until the award of the contract is made by the Owner, the right will be reserved to- reject any or all proposals and waive technicalities, to re-advertise for new proposals, or to proceed with the work in any manner as maybe considered for ' the best interest of the Owner. C3-3 . 2 MINORITY BUSINESS ENTERPRISE/WOMEN-OWNED BUSINESS ENTERPRISE COMPLIANCE: Contractor agrees to provide to Owner, upon request ; complete and accurate information regarding actual work performed bya Minority Business Enterprise (MBE) and or a' a Woman-owned Business Enterprise (WBE ) on the contract and the payment therefor. Contractor further agrees , upon request by Owner`, to allow and audit and/or an examination of any books, records, or files in the possession of Contractor that will substantiate the actual work performed by. the MBE or WBE. Any material misrepresentation of any nature will be grounds for termination 'of the contract and for initiating any action under appropriate federal , state or local laws and ordinances relating to false statements ; further , any such misrepresentation may be grounds for disqualification of Contractor at Owner ' s discretion for bidding on future Contracts with the Owner for a period of time of not less than six (6 ) months. C3--3 . 3 EQUAL EMPLOYMENT PROVISIONS: The Contractor shall comply with Current City Ordinance prohibiting discrimination in employment practices. D C3-3 (1) The Contractor shall post the required notice to that effect on the project site, and, at his request , will be provided assistance by the City of Fort Worth Is Equal Employment �. Officer who will refer any qualified applicant he may have on file in his office to the Contractor. Appropriate notices may be acquired from the Equal Employment Officer. C3-3 . 4 WITHDRAWAL OF PROPOSALS: After a proposal has been read by the Owner it cannot be .withdrawn by the Bidder within forty-five ( 45 ) days after the date on which the proposals were opened. C3-3 . 5 AWARD OF CONTRACT: The Owner reserves the right to withholdfinal action on the proposals for a reasonable time, not to exceed forty-five ( 45 ) days after the date of opening proposals, and in no event will an award be made until after investigations have been made as to the responsibility of the proposed awardee. . . The award of the contract, if an award is made, will be to the lowest and best responsible bidder. The award of the contract shall not become effective until the Owner has notified the Contractor in writing of such award. C3-3 . 6 RETURN OF PROPOSAL SECURITIES : As soon as proposed prise totals have been determined for comparison of .bids , the Owner may, at its discretion, return the proposal security which accompanied the proposals which, in its judgment, would not be considered for the award . All other proposal securities, usually those of the three lowest bidders , will be retained by the Owner until the required contract has been executed and bond furnished or the Owner has otherwise disposed of, the bids, after which they will be returned by the City Secretary. C3-3 . 7 BONDS : With the execution and delivery of the Contract Documents, the Contractor shall furnish to, and file with the Owner in the amounts herein required, the following bonds: a. PERFORMANCE BOND : A good and sufficient performance bond in an amount not less than 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise , guaranteeing the full and faithful execution of the work and performance of the contract , and for the protection of the Owner and all other persons against damage by reason of negligence of the 4 Contractor, or improper execution of the work or the use of inferior materials . This performance C3-3 (2) bond shall guarantee the payment for all labor , materials, equipment, supplies , and services used in the construction of the work , and shall remain in full force and effect until provisions as above stipulated are accomplished and final payment is made on the project by the City. b. • MAINTENANCE BOND : A good and sufficient maintenance bond, in the amount of not less than 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise, guaranteeing the prompt , full and faithful performance of the general guaranty which is set forth in paragraph C8-8.10. f C. PAYMENT BOND: A good and sufficient payment bond, in an amount not less than 100 percent of the amounnt of the contract , as evidenced by the proposal tabulation or otherwise, guaranteeing the prompt, full and faithful payment of all claimants as- defined in Article 5160 , Revised Civil Statutes of Texas , 1925 , as amended by House Bill ° 344 Acts 56th Legislature, Regular Session , 1959 , effective April 27 , 1959 ,� and/or the latest version° thereof, supplying labor and materials in the prosecution of the work provided for in the contract •being constructed under these specifications . Payment . _ Bond shall remain in force until all payments as above stipulated are made. d. OTHER BONDS : Such other bonds as may be required by these Contract Documents shall be furnished by the Contractor. No sureties will be accepted° by the Owner which are at the time in default or delinquent on any bonds or which are interested- in any litigation agai-nst the owner. All bonds- shall' be- made• on+ the forms furnished by the Owner and shall be executed by an° approved- surety- company doing business in the City of Fort Worth, Texas , and which' is acceptable to the owner : In order to be acceptable, the name of the surety shall be included on the current U . S . Treasury list of acceptable sureties, and the amount of bond written by any one acceptable company shall not exceed the amount shown on the Treasury list for that company. Each bond shall be properly executed by both the Contractor and Surety Company. Should any surety on the contract be determined unsatisfactory at any time by' the Owner, notice will be given the Contractor to that effect and the Contractor shall immediately provide a C3-3 (3 ) i e new surety satisfactory to the Owner. No payment will be made under -the contract until the new surety or sureties , as required, have qualified and shave been accepted by the Owner. The contract shall not be operative nor will any payments be due or paid until approval of the bonds by the Owner. C3-3 . 8 EXECUTION OF CONTRACT: Within ten (10) days after the Owner has by appropriate resolution, or otherwise, awarded the contract, the Contractor shall execute and file with the Owner the Contract and such bonds as may be required in the Contract Documents. No contract shall be binding upon the owner until it has been attested by the City . Secretary, approved as to form and z legality by the City Attorney, and executed for the Owner by either the Mayor or City Manager. C3-3 . 9 FAILURE TO EXECUTE CONTRACT : The failure of the Awardee to execute the required bond or bonds or to sign the required contract within ten (10 ) days after the contract is awarded shall be considered by the Owner as an abandonment of his proposal , and the Owner may annul the Award. By reason of the uncertainty of the market prices of material and labor, and it being impracticable and difficult to accurately determine the amount of damages occuring to the Owner by reason of said awardee ' s failure to execute said bonds and contract within ten ( 10 ) days , the proposal security accompanying the proposal shall be the agreed amount of damages which Owner will suffer by reason of such failure on the part of the Awardee and shall thereupon immediately be forfeited to the Owner. The filing of a proposal will be considered as an acceptance of this provision by the Bidder. C3-3 . 10 BEGINNING WORK: The Contractor shall not commence work until authorized in writing to do so by the Owner . Should the Contractor fail to commence work at the site of the project within the time stipulated in the written authorization usually termed the "Work Order" or "Proceed Order" , it is agreed that the Surety Company will , within ten ( 10 ) days after the commencement date set forth in such written authorization, commence the physical execution of the contract. C3-3 . 11 INSURANCE: The Contractor shall not commence work under this contract until he has obtained all the insurance required under the Contract Documents, and such insurance has been approved by the Owner. The prime Contractor shall be responsible for delivering to the Owner the sub-contractors ' C3-3 (4 ) certificate of insurance for approval . The prime contractor shall indicate on the certificate of insurance included in the documents for execution whether or not his insurance covers sub-contractors . It is the intention of the Owner that the .� insurance coverage required herein shall include the coverage of all sub-contractors. a. COMPENSATION INSURANCE : The Contractor shall ma ntain , during the life of this* c•o"ntract , Workers ! Compensation Insurance on all of his employees to be engaged in work on the project under this . contract, and for all sub-contractors. In case any class of employees engaged in .hazardous work on the project under this contract is not protected under the Workers ' Compensation Statute, the Contractor shall provideadequate employer ' s 1 general liability insurance for the protection of such of his employees not so protected.,_ _ b. COMPREHENSIVE GENERAL LIABILITY INSURANCE: The Contractor shall procure and shall maintain during the • life of this contract Cont'ractor ' s Comprehensive General Liability Insurance (Public Liability and Property Damage Insurance) in an amount not less than $ 500 , 000 covering each occurrence on account of bodily, injury.,,, -including death, and in an amount not less than $ 500 , 000 covering each occurrence on account of property damage with $2,000,000 umbrella policy coverage. C. ADDITIONAL LIABILITY: The Contractor shall furnish insurance as separate policies or by additional endorsement to one " of the above-mentioned policies, and in the amount as set forth for public liability and property damage, the following insurance: 1. Contingent Liability ( covers General Contractor ' s Liability for acts of sub-contractors) . 2. Blasting, prior to any blasting being- done. 3. Collapse of buildings or structures adjacent to excavation ( if excavations are to be performed adjacent to same) . 4. Damage to undergra-ind utilities. for $500,000. C3-3 (5) '0 5. Builder ' s risk (where above-ground structures ' are involved) . 6. Contractual Liability ( covers all indemnification requirements of Contract) . d. AUTOMOBILE INSURANCE - BODILY INJURY AND PROPERTY - DAMAGE: The Contractor shall procure and maintain, during the life of this Contract, Comprehensive Automobile Liability insurance in an amount not less than $ 250 , 000 for injuries including accidental death to any one person and subject to the same limit for each person an amount not less than $500 , 000 on account' of one accident , and automobile property damage insurance in an amount not less than $100,000. e. SCOPE OF INSURANCE AND SPECIAL HAZARD : The insurance required under the above paragraphs shall provide adequate protection for the Contractor and his sub-contractors , respectively, against damage claims which may arise from operations under this contract, whether such operations be by the insured or by anyone directly or indirectly employed by him, and also against any of the following special hazards which may be encountered in the performance of the Contract. f. PROOF OF CARRIAGE OF INSURANCE: The Contractor shall furnish the Owner with satisfactory proof of coverage by insurance required• in these Contract Documents in amounts and by carriers satisfactory to the Owner . ( Sample attached. ) All insurance requirements made upon the Contractor shall apply to the sub- contractor , should the Prime Contractor ' s insurance not cover the sub-contractor's work operations. g. LOCAL AGENT FOR INSURANCE AND BONDING : The insurance and bonding companies with whom the Contractor ' s insurance and performance, payment, maintenance and all such other bonds are written shall be represented by an agent or agents having an office located within the city limits of the C3-3 (6 ) City of Fort Worth, Tarrant County, Texas . Each such agent shall be a duly qualified, one upon whom service of process may be had , and must have authority and power to act on behalf of the insurance and/or bonding company to negotiate and settle with the City of Fort Worth, or any other claimant, any claims that the City of Fort Worth or other claimant or any property owner who has been ' damaged ; may have against the Contractor , insurance, and/or bonding company. , If the local insurance representative is not so empowered by the insurance or bonding companies, then such authority must be vested in a local agent or claims officer residing in the Metroplex, the Fort Worth-Dallas area . The name of the agent or agents shall be set forth on all of such bonds and certificates of insurance. C3-3 . 12 CONTRACTOR ' S OBLIGATIONS: Under the Contract, the Contractor shall pax for all materials , labor and services when due. 1 C3-3 . 13 WEEKLY PAYROLL: A certified copy of each payroll covering payment of wages to all person engaged in work on the project at . the site of the project shall be furnished to the Owner's representative within seven ( 7 ) days after the close .. of each payroll period. A copy or copies of the applicable minimum wage rates as set forth in the Contract Documents shall be kept posted in a conspicuous place at the site of the project at all times during the course of the Contract . Copies of the wage rates will be furnished the Contractor, by the Owner; however, posting and protection of the wage rates shall .be the responsibility of the Contractor. C3-3. 14 CONTRACTOR'S CONTRACT ADMINISTRATION: Any Contractor, whether a person , parsons , partnership , company , firm , association ,, corporation or other who is approved to do business with and enters into a contract with the City for construction of water and/or sanitary sewer facilities, will have or shall establish a fully operational business office within the Fort Worth- Dallas metropolitan area . The Contractor shall charge, delegate, or assign this office (or he may delegate his Project Superintendent ) with full authority to transact all business actions required in the performance of the Contract. This local authority shall be made responsible to act for the Contractor in all matters pertaining to the work governed by the Contract whether it be administrative or otherwise and as such shall be empowered, thus delegated and directed, to settle all material, labor or other expenditures, all claims against the work or any other C3-3 (7) matter associated such as maintaining adequate and appropriate insurance or security coverage for the project . Such local authority for administration of the work under the Contract shall be maintained until all business transactions executed as part of the Contract are complete. Should the Contractor ' s principal base of operations be other than in the Fort Worth-Dallas metropolitan area, notification of the Contractor ' s assignment of local authority shall be made in writing to the Engineer in advance of any work on the project, all appropriately signed and sealed, as applicable, by the Contractor ' s responsible officers with the understanding that this written assignment of authority to a local representative shall become part of the project Contract as though bound directly into the project documents . The intent of these requirements is that all matters associated with the' Contractor ' s administration, whether it be oriented in furthering the work, or other, be governed direct by local authority. This same requirement is imposed on insurance and surety coverage. Should the Contractor 's local representative fail to perform to the satisfaction of Engineer, the Engineer, at his sole discretion , may demand that such local representative be replaced and the Engineer may, at his sole discretion , stop all work until a new local authority satisfactory to the Engineer is assigned . No credit of working time will be for periods in which work stoppages are in effect for this reason. C3-3 . 15 VENUE : Venue of any action hereinunder. shall be exclusively in Tarrant County, Texas. C3-3 (8 ) F ? PART C - GENERAL CONDITIONS C4-4 SCOPE OF WORK SECTION C4-4 SCOPE OF WORK C4-4 . 1 INTENT OF CONTRACT DOCUMENTS: It is the definite intention of these. Contract Documents to provide for a complete , useful project which the Contractor undertakes to construct or furnish , all in full compliance with the requirements and intent of the Contract Documents . It is definitely understood that the Contractor shall do all work as provided for in the Contract Documents, shall do all extra or special work as may be considered by the Owner as necessary to complete the project in a satisfactory and acceptable manner. 3 The Contractor shall, unless otherwise specifically stated in these Contract Documents, furnish all labor, tools, materials, machinery, equipment , special services , and incidentals necessary to the prosecution and completion of the project. s C4-4 . 2 SPECIAL PROVISIONS : Should any work or conditions which are not thoroughly and satisfactorily stipulated or covered by General or Special Conditions of these Contract Documents be anticipated, or should there be any additional proposed work which is not covered by these Contract Documents, then "Special Provisions" covering all such work will be prepared by the Owner previous to the time of receiving bids or proposals for such work and furnished to the Bidder in the form of Addenda. All such "Special Provisions" shall- be considered to be a part of the Contract Documents just as though they were originally written therein. C4-4 . 3 INCREASED OR DECREASED QUANTITIES: The Owner reserves the right to alter the quantities of the work to be performed or to extend- or shorten the improvements at any time when and as found to be necessary, and the Contractor shall perform the work as altered, increased or decreased at the, unit prices. Such increased or decreased quantity shall not be more than 25 percent of the contemplated quantity of such item or items. When such changes increase or decrease the original quantity of any item or items of work to be done or materials to be furnished by the 25 percent or more, then either party to the contract shall upon *written request to the other party be entitled to a revised consideration upon that portion of the work above or below the 25 percent of the original quantity stated in the proposal; such revised consideration to be determined by special agreement or as hereinafter provided for "Extra Mork. " No allowance will be made for any changes in anticipated profits nor shall such changes be considered as C4-4 (1) waiving or invalidating any conditions or provisions of the Contract Documents. Variations in quantities of sanitary sewer pipes in depth categories , shall be interpreted herein as applying to the overall quantities or sanitary sewer pipe in each pipe size, but not to the various depth categories. C4-4 . 4 ALTERATION OF CONTRACT DOCUMENTS: By Change Order, the Owner reserves the right to make such changes in the Contract Documents and in the character or quantities of the work as may be necessary or desirable to insure completion in the most satisfactory manner, provided such changes do not materially alter the original Contract Documents or change the general nature of the project as a whole . Such changes shall not be considered as waiving or invalidating any condition or provision of the Contract Documents. C4-4 . 5 EXTRA WORK: a. Additional work made necessary by changes and alterations of the Contract Documents or of quantities or for other reasons for which no prices are provided in the Contract Documents, shall be defined as "Extra Work" and shall be performed by the Contractor in accordance with these Contract Documents or approved additions thereto; provided, however , that before any extra work is begun a "Change Order" shall be executed or written order issued by the Owner to do the work for payments or credits as shall be determined by one or more combination of the following methods : a. Unit bid price previously approved. b. An agreed lump sum. C. The actual reasonable cost of (1 ) labor, ( 2 ) rental of equipment used on the extra work for the time so used at Associated General Contractors of America current equipment rental rates ; ( 3 ) materials entering permanently into the project, and ( 4 ) actual cost of insurance , bonds , and social security as determined by the Owner , plus a fixed fee to be agreed upon but not to exceed 10% of the actual cost of such extra work. The fixed 'fee 'is not to include any additional profit to the Contractor for rental of equipment owned by him and used for the extra work. The fee shall be full and complete compensation to cover the cost of superintendence, overhead, other profit, general and all other expense not included in ( 1 ) , ( 2 ) , ( 3 ) , and ( 4 ) above. The Contractor shall keep accurate cost records on the form and in the method C4-4 ( 2 ) suggested by the Owner and shall give the Owner access to all accounts , bills , vouchers , and records relating to the Extra Work. ' No "Change Order" shall become effective until it has been approved and signed by each of the Contracting parties. No claim for Extra Work of any kind will be allowed unless ordered in writing - by the Owner . In case any orders or instructions , either oral or written, appear to the Contractor to involve Extra Work for which he should receive compensation , he shall make written request to the Engineer for written orders authorizing such Extra Work , prior to beginning such work. Should a difference arise as to what does or does not _ constitute Extra Work, or as to the payment thereof , and the Engineer insists upon its performance, the Contractor shall proceed with the work after making written request for written orders and shall keep an accurate account of the actual ? reasonable cost thereof as provided under method ( Item C ) . Claims for extra work will not be paid unless the Contractor shall file his claim with the Owner within five ( 5 ) days before the time For making the first estimate after such work is done and unless the claim is supported by satisfactory vouchers and certified payrolls covering all labor and materials expended upon the said Extra Work. The Contractor shall furnish the Owner such installation records of all deviations from the- original Contract Documents as may be necessary; to enable the Owner to prepare for permanent record a corrected set of plans showing the actual installation. The compensation agreed upon for ' extra work' whether or not iniitiated by a 'change order ' shall be a full, complete and final payment for all costs Contractor incurs as a result or relating to the change or extra work, whether said costs are known, unknown, foreseen or unforeseen at that time, including without limitation, any costs for delay, extended overhead, ripple or impact cost , or any other effect on changed or unchanged work as a result or the change or extra work. C4-4 . 6 SCHEDULE OF OPERATIONS: Before commencing any work under this contract, the Contractor shall submit to the Owner and receive the Owner ' s "approval thereof, a "Schedule of Operations , " showing by a straight line method the date of commencing and finishing each of the major elements of the contract . There shall be also shown the estimated monthly cost of work for which estimates are to be expected. There C4-4 (3) shall be presented also a composite graph showing the anticipated progress of construction with the time being plotted horizontally and the percentage of completion plotted vertically. The progress charts shall be prepared on 8-1/2" x 11" sheets and at least five black or blue line prints shall be furnished to the Owner. C4-4 . 7 PROGRESS SCHEDULES FOR WATER AND SEWER PLANT FACILITIES : Within ten (10 ) days prior to submission of first monthly progress payment , the Contractor shall prepare and submit to the Owner for approval six copies of the schedule in which the Contractor proposes to carry on the work, the date of which he will start the several major activities ( including procurement of materials, plans, and equipment ) and the contemplated dates for completing the same. The schedule shall be in the form of a time schedule Critical Path Method (CPM) network diagram. As the work progresses , the Contractor shall enter on the diagram the actual progress at the end of each partial payment period or at such intervals as directed by the Engineer , The Contractor shall also revise the schedule to reflect any adjustments in contract time approved by the Engineer . Three copies of the updated schedule. shall be delivered at such intervals as directed by the Owner. As a minimum, the construction schedule shall incorporate all work elements and activities indicated in the proposal and in the technical specifications. Prior to the final drafting of the detailed construction schedule, the Contractor shall review the draft schedule r with the Engineer to ensure the Contractor ' s understanding of the contract requirements. The following guidelines shall be adhered to in preparing the construction schedule: a. Milestone dates and final project completion dates shall be developed to conform to time constraints , sequencing requirements and completion time. b. The construction proces3 shall be divided into activities with time durations of approximately fourteen ( 14 ) days and construction values not to exceed $ 50 , 000 . Fabrication , delivery and submittal activities are exceptions to this guideline. C4-4 ( 4 ) C. Durations shall be in calendar days and normal holidays and weather conditions over the duration of the contract shall be accounted for within the duration of each activity. d. One critical path shall be shown on the construction schedule. e. Float time is defined as the amount of time between the earliest start date and the latest start date of a chain' of activities of the CPM construction schedule. Float time is not for the exclusive use or benefit of either the Contractor or the Owner. f. Thirty days shall be used for submittal review unless otherwise specified. Al The construction schedule shall as a minimum be divided into general categories as indicated in the Proposal and Technical Specifications and each general category shall be broken down into activities in enough detail to achieve activities of approximately fourteen (14 ) days duration. For each general category, the construction schedule shall identify all trades or subcontracts whose work is represented by activities that follow the guidelines of this Section. For each of the trades or subcontracts , the construction schedule shall indicate the following procurements , construction and preaceeptance activities and events in their logical sequence for equipment and materials. s 1. Preparation and transmittal of submittals. 2. Submittal .review periods. 1 v 3 . Shop fabrication and delivery. 4 . Erection or installation. 5. Transmittal of manufacturer ' s operation and maintenance instructions. 6. Installed equipment and materials testing. 7. Owner ' s operator instruction (if applicable) . 8 . Final inspection. C4-4 (5 ) 9 . Operational testing. 10. Final inspection. If , in the opinion of the Owner , work accomplished falls behind that scheduled , the Contractor shall take such action as necessary to improve his progress. In addition, the Owner may require the Contractor to submit a revised schedule demonstrating his program and proposed plan to make up lag in scheduled progress and to insure completion of the work within the contract time . If the Owner finds the proposed plan not acceptable , he may require the Contractor to increase the work force, the construction plant and equipment, the number of work shifts or the overtime operations without additional cost to the Owner. Failure of the Contractor to comply with these requirements shall be considered grounds for determination by the Owner •that the Contractor is failing to prosecute the work with such diligence as will insure its completion within the time specified. C4-4 ( 6 ) F1 9 1 PART C - GENERAL CONDITIONS C5-5 CONTROL OF WORK AND MATERIALS i SECTION C5-5 CONTROL OF WORK AND MATERIALS C5-5 .1 AUTHORITY, OF ENGINEER: The work shall be performed to the satisfaction of the Engineer and in strict compliance with the Contract Documents . He shall decide all questions which arise as to the quality and acceptability of materials furnished , work performed, rate of progress of the work, overall sequence of the construction , interpretation of the Contract Documents , acceptable fulfillment of the contract, compensation, mutual rights between Contractor and Owner under these Contract Documents, supervision of the work, resumption of operations, and all other questions or disputes which may arise . Engineer will not be responsible for Contractor ' s means , methods , techniques , sequences or procedures of construction, or the safety precaution and programs incident thereto, and he will not be responsible for Contractor ' s failure to perform the work in accordance with the contract documents. B He shall determine the amount and quality of the work 3 completed and materials furnished , and his decisions and estimates shall be final . His estimates in such event shall be a °condition to the right of the Contractor to receive money due him under the Contract . The Owner shall have executive j authority to enforce and make effective such necessary decisions and orders as the Contractor fails to carry out promptly. In the event of any- dispute between the Engineer and Contractor over the decision of the Engineer on any such matters , the Engineer must, within a reasonable time, upon written request of the Contractor, render and deliver to both the Owner and Contractor, a written decision on the matter in controversy. C5-5 . 2 CONFORMITY WITH PLANS : The finished project in all cases shall conform with lir.nes , grades , cross-sections , finish , and dimensions shown on the plans or any other requirements otherwise described in the Contract Documents . Any deviation from the approved Contract Documents required by the Engineer during construction will in all cases be determined by the Engineer and authorized by the Owner by Change Order. C5-5 (1) C5-5 . 3 COORDINATION OF CONTRACT DOCUMENTS : The Contract Documents are made up -of several sections , which , taken together, are intended to describe and provide for a complete and useful project, and any requirements appearing in one of the sections is as binding as though it occurred in all sections. In case of discrepancies , figured dimension shall govern over scaled dimensions , plans shall govern over specifications, special conditions shall govern over general . conditions and standard specifications, and quantities shgwn on the plans shall govern over those shown in the proposal . The Contractor shall not take advantage of any apparent error or omission in the Contract Documents , and the Owner shall be permitted to make such corrections or interpretations as may be deemed necessary for the fulfillment of the intent of the Contract Documents . In the event the Contractor discovers an apparent error or discrepancy, he shall immediately call this condition to the attention of the Engineer. In the event of a conflict in the drawings, specifications, or other portions of the Contract Documents which were not reported prior to the award of Contract, the Contractor shall be deemed to have quoted the most expensive resolution of the conflict. C5-5 . 4 COOPERATION OF CONTRACTOR: The Contractor will be furnished with three sets of the Contract Documents and shall have available on the site of the project at all times one set of such Contract Documents. The Contract shall give to the work the constant attention necessary to facilitate the progress thereof and shall cooperate with the Engineer , his inspector , and other Contractors in every possible way. The Contractor shall at all times have competent personnel available to the project site for proper performance of the work. The Contractor shall provide and maintain at all times at the site of the project a competent , English-speaking superintendent and an assistant who are fully authorized to act as the Contractor ' s agent on the work . Such superintendgnt and his assistant shall be capable of reading and understanding the Contract Documents and shall receive and fulfill instructions from the Owner, the Engineer, or his authorized representatives . Pursuant to this responsibility of the Contractor , the Contractor shall designate in writing to the project superintendent, to act as the Contractor ' s agent on the work. Such assistant project superintendent shall be a resident of Tarrant County, Texas and shall be subject to call, as is the project Superintendent, at any time of the day or night on any day of the week on which the Engineer determines that circumstances require the presence on the project site of a representative of the Contractor to C5-5 (2 ) adequately provide for the safety or convenience of the traveling public or the owners of property across which the project extends or the safety of property contiguous to the project routing. The Contractor shall provide all facilities to enable the Engineer and his inspector to examine and inspect the workmanship and materials entering into the work. ' CS-5 . 5 EMERGENCY AND/OR RECTIFICATION WORK: When , in the opinion of the Owner or Engineer, a condition of emergency exists related to any part of the work, the Contractor, or the Contractor through his designated representative , shall respond with dispatch to a verbal request made by the Owner or Engineer to alleviate the emergency condition . Such a response shall occur day or night, whether the project is scheduled on a calendar-day or on a working-day basis. Should the Contractor fail to respond to a request from the Engineer to rectify any discrepancies , omissions , or corrections necessary to conform with the requirements of the project specifications or plans , the Engineer shall give the Contractor written notice that such work or changes are to be performed. The written notice shall direct attention to the discrepant condition and request the Contractor to take remedial action to correct the condition . In the event the Contractor does not take positive steps to fulfill this written request, or does not show just cause for not taking the proper action, within 24 hours , the City may take such iremedial action. with City forces or by contract. The City J shall then deduct an amount equal to the entire costs for such remedial action, plus 25% , from any funds due the Contractor on the project. C5-5 . 6 FIELD OFFICE: The Contractor shall provide, at no extra. compensation, an adequate field office for use of the Engineer , if specifically called for. The field office shall be not less than 10 by 14 feet in floor area, substantially constructed,, well heated , air conditioned , lighted, and weather-proof , so that documents will not be damaged by the elements: C5-5 . 7 CONSTRUCTION STAKES: The City, through its Engineer, will. furnish the Contractor with all lines , grades , and measurements necessary to the proper prosecution and control of the work contracted for under these Contract Documents , and lines , grades and measurements will be established by means of stakes or other customary method of marking as may be found consistent with good practice. C5-5 (3 )