HomeMy WebLinkAboutOrdinance 16599-09-2005ORDINANCE NO _1 GS 9' q d y- dos AN ORDINANCE FINDING THAT CONDITIONS HAVE MATERIALLY CHANGED SO THAT THE PROJECT SCOPE FOR THE RECONSTRUCTION OF NORTH TARRANT PARKWAY FROM RAINY LAKE DRIVE TO US 377 AS INCLUDED IN THE 2004 CAPITAL IMPROVEMENT PROGRAM HAS INCREASED TO INCLUDE THE RECONSTRUCTION OF THE EXISTING SOUTH LANES AUTHORIZING THE 2004 CAPITAL IMPROVMENT PROGRAM FUNDS DESIGNATED FbR NORTH TARRANT PARKWAY BE USED TO INCLUDE THE INCREASED PROJECT SCOPE PROVIDING THAT THIS ORDINANCE IS CUMULATIVE PROVIDING A SEVERABILITY CLAUSE AND PROVIDING AN EFFECTIVE DATE. WHEREAS on February 7 2004 the citizens of the City of Fort Worth approved the 2004 Capital Improvement Program, and WHEREAS the 2004 Capital Improvement Program included the project scope for the reconstruction of North Tarrant Parkway between Rainy Lake Drive to US 377 and WHEREAS Fort Worth staff has reevaluated North Tarrant Parkway and has determined that increasing the project scope to include the reconstruction of the existing south lanes within the limits of the project would be necessary and wise and WHEREAS, staff recommends the 2004 Capital Improvement Program funds designated for the reconstruction of North Tarrant Parkway be used to include the increased project scope NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH. SECTION 1 That the Crty Council finds that conditions have materially changed so that the reconstruction of North Tarrant Parkway from Ramey Lake Drive to US 377 as included 09 26 05 N"12 16 I N m the 2004 Capital Improvement Program has increased m scope to include reconstruction of the existing south lanes for length of the project. SECTION 2. The City Council hereby authorizes the use of 2004 Capital Improvement Program funds designated for North Tarrant Parkway from Rainy Lake Drive to US 377 to include the increased scope of the reconstruction of the existing south lanes. SECTION 3. This ordinance shall be cumulative of all provisions of ordinances and of the Code of the City of Fort Worth, Texas (1986), as amended, except where the provisions of this ordinance are m direct conflict with the provisions of such ordinances and such Code, m which event conflicting provisions of such ordinances and such Code are hereby repealed. SECITON 4 It is hereby declared to be the intention of the City Council that the sections, paragraphs, sentences, clauses and phrases of this ordinance are severable, and, if any phrase, clause sentence, paragraph or section of this ordinance shall be declared unconstitutional by the valid judgment or decree of any court of competent jurisdiction, such unconstitutionality shall not affect any of the remaining phrases, clauses, sentences, paragraphs and sections of this ordinance, since the same would have been enacted by the City Council without the incorporation in this ordinance of any such unconstitutional phrase, clause, sentence, paragraph or section SECTION 5. This ordinance shall be in full force and effect upon adoption. APPROVED AS TO FORM AND LEGALITY ASSISTA T IT ATTORNEY DATE ADOPTED ,SQ,p f "Pay,lyar- ~3, o~Q~" EFFECTIVE Seao~e.~,~er 13a2~S City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION Approved on 9/13/2005 Ordinance No 16599-09-2005 DATE Tuesday September 13 2005 LOG NAME. 20NORTH TARRANT REFERENCE NO C-20995 SUBJECT Authorization to Increase Funding Participation Rainy Lake Drive to US 377 and Adopt Ordinance RECOMMENDATION It is recommended that the City Council. for Construction of North Tarrant Parkway from 1) Adopt the attached ordinance finding that a material change has occurred such that the scope of work has increased on the 2004 Capital Improvement Program street reconstruction project, North Tarrant Parkway from Rainy Lake Drive to US 377 to include reconstruction of the existing south lanes for the length of the project; 2) Authorize an estimated increase of $1 522,200 in the City's funding participation for construction of North Tarrant Parkway from Rainy Lake Drive to US 377 for change orders for reconstruction of existing south lanes and other modifications associated with the project; 3) Authorize corresponding payment to the Texas Department of Transportation for the change orders. DISCUSSION Texas Department of Transportation (TxDOT) entered into a contract with Austin Bridge & Road L.P for construction of the north half of North Tarrant Parkway from Rainy Lake to US 377 The project is included in the 2004 Capital Improvement Program (CIP) with an allocation of $6 700 000 00 and on June 29 2004 City Council authorized the City's cost participation in the amount of $1 305 727 00 The original project scope did not include reconstruction of the existing south lanes. However the existing pavement for the south half of North Tarrant Parkway has deteriorated to poor condition Therefore, it is recommended that the south lanes be reconstructed with six inches of cement stabilized base and six inches of asphalt pavement, so that when the total four-lane divided arterial is completed in 2006 both the north and south pavements are of comparable quality and capable of serving the projected traffic for a reasonable design life. The Federal funding limit has already been reached and City funding would be used for the change order There is adequate funding in the 2004 CIP North Tarrant Parkway project budget to pay for this change order TxDOT and City staff consider the costs to be fair and reasonable. This reconstruction would have to be done eventually To do the work as a change order to the ongoing contract will avoid additional mobilization and traffic control costs. Disruption wil! be minimized because the additional work will be coordinated with the ongoing construction The proposed work falls within the project limits set in the 2004 CIP and the corresponding description in the CIP addresses reconstruction of the south lanes from Beach Street to Park Vista Blvd approximately Logname 20NORTH TARRANT Page 1 of 3 1 15 miles The proposed change would complete the reconstruction for the length of the project, approximately 2.25 miles. Given the poor condition of the existing pavement and that this section is within the original boundaries of the project, staff considers this to be a reasonable and needed change Therefore staff believes that approval of this change order is an appropriate exception to the recently adopted Restricted Residual Policy for Surplus Bond Funds. There are other pending changes associated with the ongoing construction project. They include the addition of median openings and left turn lanes at Western Meadows Drive and Arcadia Park Drive requested by the community additional excavation storm drain and driveways required by new development in the area, median irrigation sleeves requested by PID No 6 and revisions at Park Vista Drive If approved 2004 CIP funds designated for the construction of North Tarrant Parkway from Rainy Lake Drive to US 377 will be paid to TxDOT for the following change order items Chanae Estimated City Cost Reconstruction south pavement $1,220 000 00 Median openings at Western Meadows & Arcadia Park Drives $77 400 00 Additional storm drain, driveways, etc. to match existing development $43 800 00 Irrigation sleeves for future use by PID 6 $16 000 00 Revisions at Park Vista to provide PC Conc. pavement to match existing $114 500 00 Remove fill material in right-of-way at new development & other misc. costs $50.500.00 Total $1,522,200.00 HISTORY On October 8 1996 (M8~C C-15688) the City Counci{ authorized the execution of a Surface Transportation Program Metropolitan Mobility (STP-MM) agreement with the TxDOT for construction of North Tarrant Parkway from IH-35W to US 377 City funds in the amount of $593 750 00 were approved from the Special Assessment Paving Fund with Federal funding in the amount of $2,375 000 00 On June 29 2004 (M8~C G-14406) the City Council authorized the execution of an amendment to the Funding Agreement to split the project into two sections. (1) from IH-35W to Rainy Lake Drive and (2) from Rainy Lake Drive to US 377 Federal funding for the subject Section #2 from Rainy Lake to US 377 was set at $5 572 086 00 plus 80% of right-of-way costs. On October 26 2004 the City paid TxDOT $1 355 727 04 for the City's estimated share of construction costs for Section #2. This project is located in COUNCIL DISTRICTS 2 and 4 Mapsco 35H-36H FISCAL {NFORMATION/CERTIFICATION The Finance Director certifies that funds are available in the current capital budget, as appropriated of the Street Improvements Fund. Logname 20NORTH TARRANT Page 2 of 3 TO Fund/Account/Centers FROM Fund/Account/Centers C200 541200 204230000880 $1.522.200.00 Submitted for City Manager's Office b~ Marc Ott (8476) Originating Department Head: Robert Goode (7804) Additional Information Contact: Tom Leuschen (2442) Logname 20NORTH TARRANT Page 3 of 3