ORDINANCE NO N ~ `
AN ORDINANCE INCREASING ESTIMATED RECEIPTS AND
APPROPRIATIONS IN THE WATER CAPITAL PROJECT FUND IN
THE AMOUNT OF $132,791 16 FROM AVAILABLE FUNDS FOR
THE PURPOSE OF AN ADVANCE FUNDING AGREEMENT WITH
THE TEXAS DEPARTMENT OF TRANSPORTATION FORA 24-
INCH WATER MAIN CONNECTION AT FM157 AND PIPELINE
ROAD, PROVIDING FOR A SEVERABILITY CLAUSE, MAKING
THIS ORDINANCE CUMULATIVE OF PRIOR ORDINANCES AND
REPEALING ALL PRIOR ORDINANCES IN CONFLICT HEREWITH,
AND PROVIDING AN EFFECTIVE DATE
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT
WORTH, TEXAS
SECTION I
That m addition to those amounts allocated to the various Crty departments for Fiscal Year 2001/02 m
the Budget of the Crty Manager, there shall also be increased estimated receipts and appropriations m
the Water Capital Project Fund m the amount of $132,791 16 from available funds for the purpose of an
advance funding agreement with the Texas Department of Transportation fora 24-inch water main
connection at FM157 and Pipeline Road.
SECTION 2
Should any portion, section or part of a section of this ordinance be declared invalid, inoperative or void
for any reason by a court of competent jurisdiction, such decision, opinion or judgment shall m,no way
impair the remaining portions,- sections, or parts of sections of this ordinance, which said remaining
provisions shall be and remain m full force and effect.
SECTION 3
That this ordinance shall be cumulative of Ordinance No 14745 and all other ordinances and
appropriations amending the same except m those instances where the provisions of this ordinance are m
direct conflict with such other ordinances and appropriations, mwhich instance said conflicting
provisions of said prior ordinances and appropriations are hereby expressly repealed.
SECTION 4
This ordinance shall take effect upon adoption.
APPROVED AS TO FORM AND LEGALITY
i~
Assistant City ttorney
~,:
ADOPTED AND EFFECTIVE r " l ~ ~ ~ ~ ~ 02~~
~~
City of FoYt Worth, Texas
Mayor and Council Communication
DATE REFERENCE NUMBER LOG NAME PAGE
3/19/02 C-19009 30PIPELINE 1 of 2
SUBJECT APPROPRIATION ORDINANCE AND ADVANCE FUNDING AGREEMENT WITH THE
TEXAS DEPARTMENT OF TRANSPORTATION FORA 24-INCH WATER MAIN
CONNECTION AT FM157 AND PIPELINE ROAD
RECOMMENDATION
It is recommended that the City Council
1 Authorize the transfer of $132,791 16 from the Water and Sewer Operating Fund to the Water
Capital Project Fund, and
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Water Capital Project Fund in the amount of $132,791 16 from available funds, and
3 Authorize the City Manager to execute an Advance Funding Agreement with the Texas Department
of Transportation (TxDOT) providing for the connection of a proposed 24-inch water main to an
existing water main at FM157 and Pipeline Road for a total cost of $132,791 16
DISCUSSION
On February 20, 2001 (M&C C-18466), the City Council authorized a contract with B&H Utilities, Inc. in
the amount of $1,039,317 00 for the construction of a 24-inch water main relocation in FM157 and a 16-
inch water main extension in Trinity Boulevard This contract was required to relocate the City's
facilities ahead of the pending TxDOT reconstruction of FM157
Construction is substantially complete with the exception of the connection of a 24-inch water main to
an existing main in Pipeline Road The connection of this main is critical and difficult due to the traffic
on FM157
City staff examined options with B&H Utilities, Inc. and TxDOT to provide the most efficient means of
completing this work and minimizing potential conflicts It was decided, with concurrence from B&H
Utilities, Inc., to delete the remaining work in its contract and accomplish it through a change order to
the TxDOT's contractor for FM157, Ed Bell Construction City staff is currently preparing a deduction
change order to the original B&H Utilities, Inc. contract (City Secretary Contract No 26584) which will
also include the assessment of liquidated damages to the contractor for failing to complete the work in a
timely manner
Ed Bell Construction has overall traffic control responsibility for the project and will include this work
with other utility work it is performing in FM157 The actual construction cost is $119,524 00
The amount of $13,267 16 is included in the $132,791 16 amount for TxDOT engineering overhead and
contingencies
This project is located in COUNCIL DISTRICTS 5 and 6, Mapsco 55T and X.
.4+ '``.
City of Fort Worth, Texas
Mayor and Council Communication
DATE
3/19/02 REFERENCE NUMBER
C-19009 LOG NAME
30PIPELINE PAGE
2 of 2
SUBJECT APPROPRIATION ORDINANCE AND ADVANCE FUNDING AGREEMENT WITH THE
TEXAS DEPARTMENT OF TRANSPORTATION FORA 24-INCH WATER MAIN
CONNECTION AT FM157 AND PIPELINE ROAD
FISCAL INFORMATION/CERTIFICATION
The Finance Director certifies that upon approval and completion of recommendation No 1, and
adoption of the attached appropriation ordinance, funds will be available in the current capital budget,
as appropriated, of the Water Capital Project Fund
BG k
Submitted for City Manager's FUND ACCOUNT CENTER AMOUNT CITY SECRETARY
Office by: (to)
1&2) PW53 472045 060530175790 $132,791 16
Bridgette Garrett/Acting G140 2) PW53 541200 060530175790 $132,791 16
Originating Department Head:
Douglas Rademaker 6157 (from) APPROVED 03/19/02
1) PE45 538070 0609020 $132,791 16 ORD.# 15031
Additional Information Contact: 3) PW53 541200 060530175790 $132,791 16
Douglas Rademaker 6157