HomeMy WebLinkAboutOrdinance 14566s, A
Ordinance No. `(~~ b
AN ORDINANCE INCREASING THE ESTIMATED RECEIPTS AND APPROPRIATIONS IN THE
WATER CAPITAL PROJECT FUND IN THE AMOUNT OF $582,968 AND IN THE SEWER CAPITAL
PROJECT FUND IN THE AMOUNT OF $195,022.99 FROM AVAILABLE FUNDS FOR THE
PURPOSE OF FUNDING A CONTRACT WITH J L. BERTRAM CONSTRUCTION AND
ENGINEERING, INC., FOR HMAC SURFACE OVERLAY 2000-12 AT VARIOUS LOCATIONS,
MAKING THIS ORDINANCE CUMULATIVE OF PRIOR ORDINANCES AND REPEALING ALL
PRIOR ORDINANCES IN CONFLICT HEREWITH, AND PROVIDING AN EFFECTIVE DATE.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS.
SECTION 1
That in addition to those amounts allocated to the vanous City departments for the Fiscal Year 2000-01 and in the Budget of
the City Manager, there shall also be increased estunated receipts in the Water Capital Project Fund in the amount of $582,968
and in the Sewer Capital Protect Fund in the amount of $195 022.99 from available funds for the purpose of funding a contract
with J L. Bertram Construction and Engineenng, Inc., for HMAC Surface Overlay 2000-12 at various Locations.
SECTION 2.
That should any portion, section or part of a section of this ordinance be declared invalid, inoperative or void for any reason by
a court of competent jurisdiction, such decision, opinion or judgment shall in no way impair the remaining portions, sections,
or parts of sections of this ordinance, which said remaining provisions shall be and remain in full force and effect.
SECTION 3
That this ordinance shall be cumulative of Ordinance No. 14286 and all other ordinances and appropriations amending the
same except in those instances where the provisions of this ordinance are in direct conflict with such other ordinances and
appropriations, mwhich instance said conflicting provisions of said prior ordinances and appropnations are hereby expressly
repealed.
SECTION 4
This ordinance shall take effect and be in full force after the date of its passage, and it is so ordained.
APPROVED AS TO FORM AND LEGALITY
~~
Assistant i Attorney
3~S'~~/
Date
~a~~o ~
Adopted
~Ia`~~0(
Effective
City of Fort Worth, Texas
M,~A~oe and Council CommunieAtion
DATE REFERENCE NUMBER LOG NAME PAGE
3/27/01 **C-18511 20AWARD 1 of 3
SUBJECT APPROPRIATION ORDINANCE AND AWARD OF CONTRACT TO J L. BERTRAM
CONSTRUCTION & ENGINEERING, INC FOR HMAC SURFACE OVERLAY 2000-12.
AT VARIOUS LOCATIONS
RECOMMENDATION
It is recommended that the City Council
Authorize the City Manager to transfer $777,990 99 from the Water and Sewer Operating Fund to
the Water Capital Project Fund in the amount of $582,968 00, and the Sewer Capital Project Fund
in the amount of $195,022 99, and
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Water Capital Project Fund in the amount of $582,968 00, and the Sewer Capital Project Fund in
the amount of $195,022 99 from available funds, and
3 Authorize the City Manager to execute a contract with J L. Bertram Construction & Engineering,
Inc. in the amount of $1,394,581 98 for 240 working days for HMAC Surface Overlay 2000-12.
DISCUSSION
In the 1999-2000 Contract Major Maintenance Program, various types of street maintenance
techniques are grouped into specific contract packages HMAC (hot mix asphalt concrete) Surface
Overlay 2000-12 provides for surface and base rehabilitation, replacement of failed curb and gutter, and
driveway approaches for asphalt streets at various locations
The streets included in this contract are currently under construction for the replacement of water
and/or sewer lines or have recently had water and/or sewer lines replaced The Transportation and
Public Works Department has determined that curb-to-curb restoration of the pavement surface is the
best option for the repair of these streets The cost for repair of these streets will be shared equally
(50/50) between the Water Department and the Transportation and Public Works Department.
The following list details the limits for each of the streets included in this project:
City of Fort Worth, Texas
M,,Ayor and Council Cammun~cnrion
DATE I REFERENCE NUMBER LOG NAME PAGE
3/27/01 **C-18511 20AWARD 2 of 3
SUBJECT APPROPRIATION ORDINANCE AND AWARD OF CONTRACT TO J L. BERTRAM
CONSTRUCTION & ENGINEERING, INC FOR HMAC SURFACE OVERLAY 2000-12
AT VARIOUS LOCATIONS
STREET FROM TO
Bailey Avenue White Settlement Road Casa Blanca Avenue
Barnett Street Jenson Road Tierney (E) Road
Blalock Street Fair Park Boulevard East deadend
Bruce Avenue Braswell Drive Crabtree Street
Dovenshire Terrace Canterbury Circle Oak Hill Road
Forbes Street Edgewood Terrace South Langston Street
Gaston Avenue Fairfax Street Penrose Avenue
Half Moon Drive Cindy Drive Lakeland Street
Jenson Road Wilson Road Meadowbrook Drive
Livingston Avenue West Cantey Street McPherson Avenue
McCart Avenue Seminary Drive IH-20
Milam Street Gary Lane Ellis Road
Montague Street Shackleford Street Erath Street
Monterrey Drive Barron Lane Janice Lane
Pate Drive Killian Street Baylor Street
Repper Street Deen Road Grover Avenue
Bandage Avenue West Drew Street West Bolt Street
Sevilla Road Genoa Road Dakar Road
Shackleford Street Martin Street Knox Drive
Sheffield Place Bradford Place Franwood Terrace
Tahoe Drive Carmel Avenue Wilbarger Street
Vega Drive Wooten Drive Wedgway Drive
This project is located in COUNCIL DISTRICTS 2, 3, 4, 5, 6, 7 and 9
This project was advertised for bid on November 30 and December 7, 2000 On December 28, 2000,
the following bids were received
BIDDERS AMOUNT
J. L. Bertram Construction & Engineering, Inc. $1,394,581.98
Peachtree Construction $1,465,930 50
Branch & Sons Contractors, Inc. $1,499,065 80
APAC-Texas, Inc. $1,512,749.25
Austin Bridge & Road, Inc. $1,565,192 80
J L. Bertram Construction & Engineering, Inc. is in compliance with the City's M/WBE Ordinance by
committing to 18% M/WBE participation The City's goal on this project is 15%
City of Fort Worth, Texas
~1-~A~ar And C,crunc;l Ca~fnun;cAt~an
DATE REFERENCE NUMBER LOG NAME PAGE
3/27/01 **C-18511 20AWARD 3 of 3
SUBJECT APPROPRIATION ORDINANCE AND AWARD OF CONTRACT TO J L. BERTRAM
CONSTRUCTION & ENGINEERING, INC FOR HMAC SURFACE OVERLAY 2000-12
AT VARIOUS LOCATIONS
In addition to the contract cost, $25,000 00 and $8,700 00 are required for possible change orders for
water and sewer, respectively Contingencies for associated cons truction inspection and survey are
$35,000 00 and $12,000 00 for water and sewer, respectively
FISCAL INFORMATION/CERTIFICATION
The Finance Director certifies that upon approval and completion of recommendation No 1, and
adoption of the attached appropriation ordinance, funds will be avail able in the current capital budgets,
as appropriated, of the Water and Sewer Capital Projects Funds, the Contract Street Maintenance
Fund, and the Street Improvements Fund
MG k
Submitted for City Manager's FUND ACCOUNT CENTER AMOUNT CITY SECRETARY
Office by: (to)
1&2) PW53 472045 060530175640 $582,968.00
Mike Groomer 6140 1&2) PS58 472045 070580174810 $195,022.99
Originating Department Head: 2) PW53 541300 060530175640 $547,968.00
2) PW53 531350 030530175640 $ 35,000 00 APPROVED
2 )PS58 541300 070580174810 $183,022.99 /~ n y~I^ q
2) PS58 531350 030580174810 $ 12
000 00 GiTY C~UNCI~
,
Hugo Malanga 7801. (from)
3) GS93 541200 020930522150 $657,688 49 MAR 27 2pp~
Additional Information Contact: 3) C111 541200 020111053222 $ 39,602.50 ))
1) PE45 538070 0609020 $582,968.00 ''
., ~J~~~.~..1./
1) PE45 538070 0709020 $195,022.99 City Secretmry of t)ha
3) PW53 541300 060530175640 $522,968.00 City of Fort Worth, 9Perss
Hugo Malanga 7801 3) PS58 541300 070580174810 $174,322.99
Adapted ~rd~nance No. ~°-