HomeMy WebLinkAboutOrdinance 14250Ordinance No. ~ / L l
AN ORDINANCE INCREASING THE ESTIMATED RECEIPTS AND APPROPRIATIONS IN THE
COMMERCIAL PAPER -SEWER FUND IN THE AMOUNT OF $157,000 FROM AVAILABLE
FUNDS FOR THE PURPOSE OF FUNDING AN ENGINEERING AGREEMENT WITH KIMLEY-
HORN AND ASSOCIATES, INC., FOR DESIGN AND CONSTRUCTION MANAGEMENT OF THE
RICHARDSON SLOUGH LIFT STATION REPLACEMENT, PROVIDING FOR A SEVERABILITY
CLAUSE, MAKING THIS ORDINANCE CUMULATIVE OF PRIOR ORDINANCES AND
REPEALING ALL PRIOR ORDINANCES IN CONFLICT HEREWITH, AND PROVIDING AN
EFFECTIVE DATE.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS
SECTION 1
That in addition to those amounts allocated to the various City departments for the Fiscal Year 1999-00 and in the Budget of
the City Manager, there shall also be increased estimated receipts and appropriations in the Commercial Paper -Sewer Fund in
the amount of $157,000 from available funds for the purpose of funding an engineering agreement with Kunley-Horn and
Associates, Inc., for design and construction management of the Richardson Slough Lift Station Replacement.
SECTION 2.
That should any portion, section or part of a section of this ordinance be declared invalid, inoperative or void for any reason by
a court of competent jurisdiction, such decision, opinion or judgment shall in no way impair the remaining portions, sections,
or parts of sections of this ordinance, which said remaining provisions shall be and remain in full force and effect.
SECTION 3
That this ordinance shall be cumulafive of Ordinance No. 13886 and all other ordinances and appropriations amending the
same except in those instances where the provisions of this ordinance are in direct conflict with such other ordinances and
appropriations, in which instance said conflicting provisions of said prior ordinances and appropriations are hereby expressly
repealed.
SECTION 4
This ordinance shall take effect and be in full force after the date of its passage, and it is so ordained.
APPROVED AS TO FORM AND LEGALITY
Assistant City orney
Ali lb o
Date
-.2d-OG
Adopted
6 -2/ ~-vG
Effective
City of Fort Worth, ~'exas
~1-~Aya~ and C,aunc~l ammun;cAt~ian
DATE REFERENCE NUMBER LOG NAME PAGE
6/20/00 **C-18085 60LIFT 1 of 2
SUBJECT APPROPRIATION ORDINANCE AND AWARD OF ENGINEERING AGREEMENT TO
KIMLEY-HORN AND ASSOCIATES, INC FOR DESIGN AND CONSTRUCTION
MANAGEMENT OF THE RICHARDSON SLOUGH LLFT STATION REPLACEMENT
RECOMMENDATION
It is recommended that the City Council
1 Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Sewer Capital Projects Fund by $157,000 from available funds, and
2. Authorize the transfer of $157,000 from the Sewer Capital Project Fund to the Commercial Paper -
Sewer Fund, and
3 Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Commercial Paper -Sewer Fund in the amount of $157,000 from available funds; and
4 Authorize the City Manager to execute an engineering agreement with Kimley-Horn and Associates,
Inc. for the Design and Construction Management of the Richardson Slough Lift Station
Improvements, for a total fee not to exceed $149,500
DISCUSSION
The existing Richardson Slough Lift Station, located along Old Cranbury Road, was built as a
temporary lift station, using an existing low capacity package lift station The lift station was designed to
provide service in the area generally south of Columbus Trail and west of South Hulen Street. Due to
continuing growth in the area, a replacement of the existing lift station with a new (larger) lift station to
serve the basin near Benbrook Lake is now needed
Kimley-Horn and Associates, Inc. will prepare and submit a preliminary design report for the new
Richardson Slough Replacement Lift Station that will provide for initial capacity of 5 MGD (million
gallons per day) and expansion capabilities to 7 MGD with the addition of a pump The design will also
determine the site layout for future facilities to allow the lift station to have a total capacity of 14 MGD
Additionally, Kimley-Horn and Associates, Inc. will prepare construction plans and specifications for the
new 5 MGD lift station, and will provide construction administration support during the construction
phase for-a cost not to exceed $149,500
t,
Kimley-Horn and~•Associates, Inc. is in compliance with the City's M/WBE Ordinance by committing to
30%.M/1NBE participation The City's goal on this project is 24%
}-
In addition to the authorized amount, $7,500 is required for staff review
t,.
City of Fort Worth, Texas
~I~A~o~" And caunc~il Ci~1~11rtunlcAt'10n
DATE
6/20/00 REFERENCE NUMBER
**C-18085 LOG NAME
60LIFT PAGE
2 of 2
SUBJECT APPROPRIATION ORDINANCE AND AWARD OF ENGINEERING AGREEMENT TO
KIMLEY-HORN AND ASSOCIATES, iNC FOR DESIGN AND CONSTRUCTION
MANAGEMENT OF THE RICHARDSON SLOUGH LIFT STATION REPLACEMENT
FISCAL INFORMATION/CERTIFICATION
The Finance Director certifies that upon approval and completion of recommendation 1, and adoption of
the attached appropriation ordinances, funds will be available in the current capital budget, as
appropriated, of the Commercial Paper -Sewer Fund
MGI
Submitted for City Manager's FUND ACCOUNT CENTER AMOUNT CITY SECRETARY
Office by: (to)
1) PS58 488353 020580200050 $157,000.00
1) PS58 538070 020580200050 $157,000.00 ~QR4V~
2
6 COt3NC~
Mike Groomer 6140 3) PS46 531200 07046028 020 $149,500.00 .
ITY
Originating Department Head: 3) PS46 511070 070460280020 $ 7,500.00
2U
2000
JUN
Dale Fisseler 8207 (from) ~~ ~~ ))
2) PS58 538070 070580200050 $157,000.00 .. l~•K-~/
Additional Information Contact: 4) PS46 531200 070460280020 $149,500.00 City Sacretnry of the
City of Fort Wcrth, ttixs+
3
Dale.Fisseler 8207
^~ A6optecl Drct;nand No. I y2y9 Adapted Ordinance No. ~ yiSO