Loading...
HomeMy WebLinkAboutOrdinance 14275Ordinance No. ~ L~2 7 5 AN ORDINANCE INCREASING THE ESTIMATED RECEII'TS AND APPROPRIATIONS IN THE ENGINEERING SERVICES FUND IN THE AMOUNT OF $30,000 FROM AVAILABLE FUNDS FOR THE PURPOSE OF FUNDING A CONTRACT WITH WISS, JANNEY, ELSTNER ASSOCIATES, FOR FIltE SUPPRESSION SYSTEM AT MEACHAM INTERNATIONAL AIRPORT, PROVIDING FOR A SEVERABILITY CLAUSE, MAKING THIS ORDINANCE CUMiJLATNE OF PRIOR ORDINANCES AND REPEALING ALL PRIOR ORDINANCES IN CONFLICT HEREWITH, AND PROVIDING AN EFFECTNE DATE. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS. SECTION 1 That in addition to those amounts allocated to the various City departments for the Fiscal Year 1999-00 and in the Budget of the City Manager, there shall also be increased estimated receipts and appropriafions m the Engineering Services Fund in the amount of $30,000 from available funds for the purpose of funding a contract with Wiss, Janney, Elstner Associates, for fire suppression system at Meacham International Airport. SECTION 2. That should any portion, section or part of a section of this ordinance be declared invalid, inoperative or void for any reason by a court of competent jurisdiction, such decision, opinion or judgment shall in no way unpair the remaining portions, sections, or parts of sections of this ordinance, which said remaining provisions shall be and remain in full force and effect. SECTION 3 That this ordinance shall be cumulative of Ordinance No. 13886 and all other ordinances and appropriations amending the same except in those instances where the provisions of this ordinance are in direct conflict with such other ordinances and appropriations, in which instance said conflicting provisions of said prior ordinances and appropnations are hereby expressly repealed. SECTION 4 This ordinance shall take effect and be in full force after the date of its passage, and it is so ordained. APPROVED AS TO FORM AND LEGALITY ~ ~~ Assistant Ci Attorney ~~ ~/~ Date 7-~~-0 0 Adopted ~-! 9-o d Effective r :s City of Fort Worth, Texas ~1-~A~a~ And caunc~il eu~~»un~cA~an DATE REFERENCE NUMBER LOG NAME PAGE 7/18/00 C-18152 55WISS 1 of 2 SUBJECT SUPPLEMENTAL APPROPRIATION ORDINANCE AND AWARD OF CONTRACT TO WISS, JANNEY, ELSTNER ASSOCIATES, INC FOR A FIRE SUPPRESSION SYSTEM FAILURE INVESTIGATION AT MEACHAM INTERNATIONAL AIRPORT. HANGER 39N RECOMMENDATION It is recommended that the City Council 1 Authorize the City Manager to adopt the attached supplemental appropriation ordinance increasing appropriations in the General Fund by $30,000 and decreasing the unreserved, undesignated General Fund fund balance by the same amount; and 2 Authorize the City Manager to transfer $30,000 from the General Fund to the Engineering Services Fund, and 3 Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Engineering Services Fund by $30,000 from available funds, and 4 Authorize the City Manager to execute an engineering services contract with Wiss, Janney, Elstner Associates, Inc. (WJE) for a Fire Suppression System Failure Investigation at Meacham International Airport, Hangar 39N for an amount not to exceed $30,000 DISCUSSION Hangar 39N is located near the north end of Meacham International Airport. It was originally constructed in 1990 as the Page AvJet facility The hangar is provided fire protection by a 24-inch waterline and a 6-inch Aqueous Film Forming Foam line. The fire system was design by Carter and Burgess, Inc. (C&B), and constructed by Architectural Utilities, Inc. (AUI) During the 10-year life of the system, there have been numerous leaks in both the foam line and the waterline. On September 16, 1997 the City Council approved M&C C-16294, that authorized a contract with Turner, Collie and Braden, Inc. (TCB) to examine construction and design and determine the possible cause for the leakage TCB determined deficiencies in both design and construction City staff has negotiated with C&B and AUI to remedy the problem During the negotiations, both C&B and AUI identified several areas they wanted to examine All of the parties agreed in principle to hire an independent consultant to perform a forensic investigation WJE was selected to do that work. WJE will primarily examine the soil conditions and the thrust blocking and pipe restraint fittings They will, however, examine other areas of concern as they are raised The compensation will be based on hourly rates and will not exceed $30,000 00 This cost will be .included in any negotiations regarding the total cost of remediation of the system M/V1IBE goals for this contract have been waived due to the nature of emergency for this work. ,,, City of Fort Worth, Texas ~11~A~or Anil ~,~an~l c~mrmun~cAt~~n DATE 7/18/00 REFERENCE NUMBER C-18152 LOG NAME 55W lSS PAGE 2 of 2 SUBJECT SUPPLEMENTAL APPROPRIATION ORDINANCE AND AWARD OF CONTRACT TO WISS, JANNEY, ELSTNER ASSOCIATES, INC FOR A FIRE SUPPRESSION SYSTEM FAILURE INVESTIGATION AT MEACHAM INTERNATIONAL AIRPORT, HANGER 39N FISCAL INFORMATION/CERTIFICATION The Finance Director certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinances, funds will be available in the current operating budget, as appropriated, in the Engineering Services Fund After this action, the General Fund balance will be $26,635,491 RG I Submitted for City Manager's FUND ACCOUNT CENTER AMOUNT CITY SECRETARY Office by: (to) 1) GG01 538070 0909103 $30,000.00 AppR(~~ED Ramon Guajaxdo 6140 2&3) PI19 472001 0301000 $30,000.00 (TY CQUNGl~ Originating Department Head: 3) PI19 539120 0301000 $30,000.00 ~ ~ Z~~ )U~ Lisa A. Pyles 5400 (from). ` ' 2) GG01 538070 0909103 $30,000.00 ~ yy ~ Additional Information Contact: 4) PI19 539120 0301000 $30,000.00 a""' t `~~'""`1 City ~crptaxq of tl:o ^i ^.•..: F33.7xt3t, Tazx:9 Cit Luis Elguezabal 5401 e .. Adopted Ordnance No. ~~ `275 Adopted Ord-nanc~ ~o. ~,~ 6