HomeMy WebLinkAboutOrdinance 13455
Ordinance No , .~~7
AN ORDINANCE INCREASING THE ESTIMATED RECEII'TS AND APPROPRIATIONS IN THE
SPECIAL TRUST FUND IN THE AMOUNT OF $528,412.00 FROM AVAILABLE FUNDS FOR THE
PURPOSE OF FUNDING TRACK FAILURE REPAIR AT DOROTHY SPUR, MILE POST 629;
PROVIDING FOR A SEVERABILITY CLAUSE, MAKING THIS ORDINANCE CUMULATNE OF
PRIOR ORDINANCES AND REPEALING ALL PRIOR ORDINANCES IN CONFLICT HEREWITH,
AND PROVIDING AN EFFECTIVE DATE.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS
SECTION 1
That in addition to those amounts allocated to the various City departments for the Fiscal Year 1997-98 and in the Budget of
the City Manager, there shall also be increased estimated receipts and appropriations in the Special Trust Fund in the amount of
$528,412,00 from available funds for the purpose of funding track failure repair at Dorothy Spur, Mile Post 629
SECTION 2.
Should any portion, section or part of a section of this ordinance be declared invalid, inoperative or void for any reason by a
court of competent jurisdiction, such decision, opinion or judgment shall in no way nnpair the remaining portions, sections, or
parts of sections of this ordinance, which said remaining provisions shall be and remain in full force and effect.
SECTION 3
That this ordinance shall be cumulaflve of Ordinance No. 13111 and all other ordinances and appropriations amending the
same except in those instances where the provisions of this ordinance are in direct conflict with such other ordinances and
appropriations, inwhich instance said conflicting provisions of said prior ordinances and appropriations are hereby expressly
repealed.
SECTION 4
This ordinance shall take effect and be in full force and effect and after the date of its passage, and it is so ordained.
APPROVED AS TO FORM AND LEGALITY
Assistan Attorney
~/.~ (~ ~-
Date
Adopted
r,~-~ti--~I~
Effective
City of Fort Worth, Texas
M'Ayar and Caunc~l CommunicAt~on
DATE REFERENCE NUMBER LOG NAME PAGE
5/26/98 G-12216 02SPUR 1 of 2
SUBJECT DFW RAILTRAN SYSTEM TRACK FAILURE REPAIR AT DOROTHY SPUR, MILE
POST 629, ON THE RAILTRAN LINE
RECOMMENDATION
It is recommended that the City Council
1 Authorize the City Manager to expend $528,412 00 to repair a track failure in the Dorothy Spur
area, MP 629, on the RAILTRAN line, and
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Special Trust Fund by $528,412.00 from available funds.
Over the years, various attempts have been made to correct the problem at MP 629 on the RAILTRAN
line that is caused by poor drainage. In 1994, the 60" corrugated metal pipe, which had been installed
by the Union Pacific Railroad, pulled apart. Burlington placed corrugated bands around the pipe in an
attempt to hold it together In May, 1995, after several heavy rains, the track began to shift,
necessitating a 10 mph slow order for that section of track. French drains were installed in an effort to
drain the water inside the embankment. A culvert inspection revealed that the metal pipe was
continuing to shift and that without immediate action the entire line would fail, possibly causing a
derailment.
Burlington solicited bids for the portion of the work which would not be performed by their own forces,
primarily dirt movement.
Gilbert Construction was selected as the successful bidder Gilbert Construction provided all dirt work,
labor, and equipment while Burlington provided track work labor and all materials, totaling $400,000
Work began on September 10, 1995, at which time the line was taken out of service. When the
excavation of the embankment began, water was discovered deeper than originally estimated
necessitating additional excavation in an effort to remove all the standing water
Once the concrete box culvert was set, additional french drains were installed in an attempt to drain the
rest of the embankment. Also, additional work was needed to locate an old drainage pipe which, it was
suspected, was leaking and causing additional track failure. The pipe was located and eventually
removed These unexpected changes increased the original estimated cost from $400,000 to
$528,412.
Sufficient funds are available in the RAILTRAN account for this expenditure. The Dallas RAILTRAN
office will transfer $528,412 to the Fort Worth RAILTRAN office for the payment of all invoices related to
this project.
..~
City of Fort- Worth, Texas
~1-~Ayar And C,aunc~l L,ammun~cAt~an
DATE REFERENCE NUMBER LOG NAME PAGE
5/26/98 G-12216 02SPUR 2 of 2
SUBJECT DFW RAILTRAN SYSTEM TRACK FAILURE REPAIR AT DOROTHY SPUR, MILE
POST 629, ON THE RAILTRAN LINE
On November 16, 1995, the RAILTRAN Policy Committee recommended the repair but directed staff to
obtain information from the railroad detailing the cause of the increase Due to Burlington Northern's
merger and the complete change over of their financial system, that information was just recently
received from the railroad The RAILTRAN staff has received the information and believes the cost to
be reasonable given the unanticipated work that was needed to correct the problem
FISCAL INFORMATION/CERTIFICATION•
The Director of the Department of Finance has determined that upon adoption of the attached
appropriation ordinance and the transfer of funds from the Dallas RAILTRAN office to the Fort Worth
RAILTRAN office, sufficient funds will be available in the Special Trust Fund
MG m
Submitted for City Manager's FUND ACCOUNT CENTER AMOUNT CITY SECRETARY
Office by: (to)
FE72 488413 002514098000 $528,412.00 ~~ ~~
~
Bob Terrell 6116 FE72 539120 002514098000 $528;412.00 ~~
~~~
Originating Department Head:
~.~ AY ,2s 1998
Lisa Pyles 5403 (from)
~~
Additional Information Contact: ~
'
~
~
o
,
l~s
r
f
~it
j
Lisa Pyles 5403
®dopted p~.d~nancA ~o~l~-S.