ORDINANCE NO ~,,.3 a~~
AN ORDINANCE INCREASING THE ESTIMATED RECEIPTS AND
APPROPRIATIONS IN THE WATER CAPITAL PROJECTS FUND IN THE
AMOUNT OF $42,762.50 FROM AVAILABLE FUNDS FOR THE PURPOSE OF
FUNDING AN ENGINEERING AGREEMENT WITH A.N.A. CONSULTANTS,
L.L.C. FOR WATER LINE EXTENSION INSIDE THE FORT WORTH ZOO;
PROVIDING FOR A SEVERABILITY CLAUSE, MAKING THIS ORDINANCE
CUMULATIVE OF PRIOR ORDINANCES AND REPEALING ALL PRIOR
ORDINANCES IN CONFLICT HEREWITH, AND PROVIDING AN EFFECTIVE
DATE.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH,
TEXAS:
SECTION 1
That in addition to those amounts allocated to the various City departments for the Fiscal Year 1996/97 and in the
Budget of the City Manager, there shall also be increased estimated receipts and appropriations in the
Water Capital Projects Fund in the amount of $42,762.50 from available funds for the purpose of funding an
engineering agreement with A.N.A. Consultants, L.L.C. for water line extension inside the Fort Worth Zoo.
SECTION 2.
Should any portion, section or part of a section of this ordinance be declared invalid, inoperative or void for any
reason by a court of competent jurisdiction, such decision, opinion or judgment shall in no way impair the
remaining portions, sections, or parts of sections of this ordinance, which said remaining provisions shall be and
remain in full force and effect.
SECTION 3.
That this ordinance shall be cumulative of Ordinance No. 12629 and all other ordinances and appropriations
amending the same except in those instances where the provisions of this ordinance are in direct conflict with
such other ordinances and appropriations, in which instance said conflicting provisions of said prior ordinances
and appropriations are hereby expressly repealed.
SECTION 4.
This ordinance shall take effect and be in full force and effect from and after the date of its passage, and it is so
ordained.
APPROVED AS TO FORM AND LEGALITY
Assistant Attorney
Date
7 -~a- - ~ 7
Adopted
~~aa~-~~
Effective
City of Fort Worth, Texas
Mayor and Council Communication
07/22/97 **C-16189 30200 1 of 2
SUBJECT APPROPRIATION ORDINANCE AND AWARD OF ENGINEERING AGREEMENT TO
ANA CONSULTANTS, L L C , INC FOR WATER LINE EXTENSION INSIDE THE
FORT WORTH ZOO
RECOMMENDATION
It is recommended that the City Council
1 Authorize the transfer of $42,762 50 from the Water and Sewer Operating Fund to
the Water Capital Projects Fund, and
2 Adopt the attached appropriation ordinance increasing estimated receipts and
appropriations in the Water Capital Projects Fund in the amount of $42,762 50 from
available funds, and
3 Authorize the City Manager to execute an engineering agreement with A N A
Consultants, L L C ,Inc , for a fee not to exceed 583,525 00 to prepare plans and
specifications for the Water Main extension inside the Fort Worth Zoo
DISCUSSION
In order to eliminate the significant fluctuation in water pressure in the vicinity of the Park
Hill Addition, an extension of a 12-inch water main from Park Hill Drive into the Zoo and
looping this 12-inch water main into the existing 6" water line in Winton Terrace East,
located northwest of the Zoo is necessary
The work for this project includes the preparation of plans and specifications for the water
main extension inside the Zoo In accordance with City Secretary Contract No 18454,
Section 8 04 with the Zoological Association, the City will relocate or alter basic utilities
to accommodate any construction or modifications at the Zoo The remaining 541,762 50
of the engineering agreement is from funds that are appropriated each year from Capital
Projects Reserve to Specially Funded projects for utility improvements at the Zoo based
on scheduled construction This water project will be jointly funded by the Water
Department and the Parks and Community Services Department Construction of this
proposed water main extension will also extend the useful life of the existing water main
in Winton Terrace East
ANA Consultants, L L C ,Inc ,located at 1701 River Run, No 610, Fort Worth, TX
76107, proposes to perform the design work for this project for a fee not to exceed
583,525 00, based on established hourly rates Staff considers this fee to be fair and
reasonable for the scope of services proposed
Printed on Recyded Paper
City of Fort Worth, Texas
Mayor and Council Communication
DATE REFERENCE NfJI~ER LOG NAME PAGE
07/22/97 **C-16189 30200 2 of 2
SUBJECT APPROPRIATION ORDINANCE AND AWARD OF ENGINEERING AGREEMENT TO
ANA CONSULTANTS, L L C , INC FOR WATER LINE EXTENSION INSIDE THE
FORT WORTH ZOO
A N A Consultants, L L C ,Inc , is in compliance with the City's M/WBE Ordinance by
committing to 16% M/WBE participation The City's goal on this project is 15%
This project is located in COUNCIL DISTRICT 9, Mapsco 76P
In addition to the contract amount, S 1,000 00 is required for plan review by the
Department of Engineering
FISCAL INFORMATION/CERTIFICATION
The Director of Fiscal Services certifies that upon approval and completion of
recommendation 1 and the adoption of the attached appropriation ordinance, funds will
be available in the current capital budget, as appropriated, of the Water Capital Projects
Fund
MGf
u mine or ity anager's F T E TER AM T CITY ECRET RY
office by: (to>
APPROVED
Mike Groomer 6140 ) CI TY \jO~
r~ginating Department ea
2) PW53
531350
030530174770
1,00 .00 1 Y
V
~~~ '
A. Douglas Itademaker 6157 (om) `
22 199
1) PF,45 538070 0609020 42,762.5 ,
~~
For 'tiona ormation 3) W53 531200 060530174770 41,762.0 II
L4ee¢„~J
Contact: GC35 53 120 081018001000 42,762.50 City pf
~Wa
C
A. Douglas Rademaker 6157 ity of For
~ T
91L
..1
RaS
Q~ino~ed Ordinance No./..~~
Printed on Re~yded Paper ' `