HomeMy WebLinkAboutOrdinance 12375 Ordinance No p`~~~~ AN ORDINANCE INCREASING THE ESTIMATED RECEIPTS AND APPROPRIATIONS IN THE WATER CAPITAL PROJECTS FUND IN THE AMSUNT OF $51,459 75 FOR THE ~ PURPOSE OF FUNDING CHANGE ORDER NO 2 FOR THE CONTRACT WITH JRB CONSTRUCTION, INC , FOR REHABILITATION OF WATER MAINS ON LOWDEN STREET, BOWIE STREET, RYAN AVENUE, CHAPARRAL LANE AND STADIUM DRIVE; PROVIDING FOR A SEVERABILITY CLAUSE; MAKING THIS ORDINANCE CUMULATIVE OF PRIOR ORDINANCES AND REPEALING ALL PRIOR ORDINANCES IN CONFLICT HEREWITH; AND PROVIDING AN EFFECTIVE DATE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS SECTION 1 That in addition to those amounts allocated to the various City departments for the Fiscal Year 1995-96 and in the Budget of the City Manager, there shall also be increased estimated receipts and appropriations in the Water Capital Projects Fund in the amount of $51,459 75 for the purpose of funding Change Order No 2 for the contract with JRB Construction, Inc for rehabilitation of water mains on Lowden Street, Bowie Street, Ryan Avenue, Chaparral Lane, and Stadium Drive SECTION 2 Should any portion, section or part of a section of this ordinance be declared invalid, inoperative or void for any reason by a court of competent jurisdiction, such decision, opinion or judgement shall in no way impair the remaining portions, sections, or°parts of sections of this ordinance, which said remaining provisions shall be and remain in full force and effect SECTION 3 That this ordinance shall be cumulative of Ordinance No 12074 and all other ordinances and appropriations amending the same except in those instances where the provisions of this ordinance are in direct conflict with such other ordinances and appropriations, in which instance said conflicting provisions of said prior ordinances and appropriations are hereby expressly repealed SECTION 4 This ordinance shall take effect and be in full force and effect and .after the date of its passage, and it is so ordained APPROVED AS TO FORM AND LEGALITY / - Assist ity Attorney 1--11 q 6 Date ~- ~~ - Adopted Effective City of Fort Worth, Texas Mayor and Council Communication DATE REFERENCE NUMBER LOG NAME PAGE 1/23/96 **f'_15244 30WATER 1 of 2 SUBJECT APPROPRIATION ORDINANCE AND PROPOSED CHANGE ORDER NO 2 FOR THE CONTRACT WITH JRB CONSTRUCTION, INC ,FOR REHABILITATION OF WATER MAINS ON LOWDEN STREET, BOWIE STREET, RYAN AVENUE, CHAPARRAL LANE AND STADIUM DRIVE RECOMMENDATION It is recommended that the City Council 1 Authorize the City Manager to transfer 551,459 75 from Water and Sewer Operating Fund to the Water Capital Projects Fund, and 2 Adopt the attached appropriations ordinance increasing, estimated receipts and appropriations in the Water Capital Projects Fund in the amount of 551,459 75, and 3 Authorize Change Order No 2 in the amount of 551,459 75 to the Water Main Rehabilitation Contract Z, Part II (City Secretary Contract No 21327) with JRB Construction, Inc ,revising the total contract cost to 5548,258 85 DISCUSSION On August 15, 1995 (M&C C-12085), the City Council authorized the award of this contract to JRB Construction, Inc for the rehabilitation of the water mains on Lowden Street, Bowie Street, Ryan Avenue, Chaparral Lane and Stadium Drive During the construction of the project a number of conditions were encountered which required additional work or modification of the design The conditions are described as follows Ryan Avenue (between RR~, south and Berry St.) Concrete beneath the HMAC -Excavation revealed a concrete sub-base which had to be cut for water main replacement and then replaced for proper street repair Concrete Pavement Repair -Proper water main replacement required cutting and repairing portions of the concrete pavement on Berry Street and use of a high early strength mix to minimize the disruption to the traffic Chaparral Lane (between Bellaire Drive and Harlanwood Drive) Cement Stabilized Subgrade -The City soil laboratory determined that existing soil conditions warranted an increase in the ratio of cement to soil to properly stabilize the foundation for the street Printed on Regded Paper City of Fort Worth, Texas Mayor and Council Communication DATE REFERENCE NUMBER LOG NAME PAGE 1/23/96 **C-15244 30WATER 2 of 2 SUBJECT APPROPRIATION ORDINANCE AND PROPOSED CHANGE ORDER NO 2 FOR THE CONTRACT WITH JRB CONSTRUCTION, INC ,FOR REHABILITATION OF WATER MAINS ON LOWDEN STREET, BOWIE STREET, RYAN AVENUE, CHAPARRAL LANE AND STADIUM DRIVE Concrete Pavement Repair -Replacement of the water main required extending the trench into the concrete pavement on Bellaire Drive There was no item for concrete pavement repair under the original proposed' scope of work on Chaparral Lane The net effect of the proposed changes is summarized below • Original Contract Cost $483,809 10 • Extras to Date 5 12,990 00 • Proposed Change Order No 2 5 51,459 75 • Revised Contract Cost 5548,258 85 • Original Contract Time -Calendar (days) 120 • Additional Approved Time to Date 15 • Additional Time per Change Order No 2 20 • Revised Contract Time 155 The Department of Engineering has reviewed and recommends the above changes FISCAL INFORMATION/CERTIFICATION The Director of Fiscal Services certifies that upon approval and completion of recommendation 1 and the adoption of the attached appropriations ordinance, funds will be available in the current operating budget of the Water Capital Projects Fund MG a Submitted for City Manager's FUND ACCOUNT CENTER AMOUNT CITY SECRETARY Office by: (to) 1&2) PW53 472045 060530173070 $51 459 7S ' ~~ .z Mike Groomer 6140 PW5 2 ~'~ ~ltr`4.? r;f. ) 3 531200 060530173070 $SI 459 75 ,.,-: d~ ~ ~ r G Ori inatin De artment Head: g g ; ~ ` ~ ~~ ~ > i ~ ~ P ,... ~.J 4! A. Douglas Rademaker 6157 (from) ~ ~ 3) PW53 531200 060530173070 $51 459 75 r' For Additional Information 1) PE4S 538070 0609020 $51 459 75 ~.., • -- h ; Contact: ;;,~ r ,>: ;. ;a C;~:v ~~:,:,_•,:, City <->2 ivt? '``> A. Douglas Rademaker 6157 Printed on Regded Paper ~ ~i• 1~ ; j ~~'~r -tip