HomeMy WebLinkAboutOrdinance 12679ORDINANCE NO ~ 9
AN ORDINANCE INCREASING THE ESTIMATED RECEIPTS AND
APPROPRIATIONS IN THE WATER CAPITAL PROJECTS FUND IN THE
AMOUNT OF $48,903.00 AND THE SEWER CAPITAL PROJECTS FUND IN
THE AMOUNT OF $35,274.00 FROM AVAILABLE FUNDS FOR THE PURPOSE
OF FUNDING THE PREPARATION OF PLANS AND SPECIFICATIONS FOR
WATER AND SANITARY SEWER IMPROVEMENTS ON WABASH AVENUE
(TRAIL LAKE DRIVE TO SEMINARY DRIVE), TRAIL LAKE DRIVE (SOUTH
RIDGE TERRACE TO SOUTH DRIVE) AND GRANBURY ROAD (TRAIL LAKE
DRIVE TO SEMINARY DRIVE}; PROVIDING FOR A SEVERABILITY CLAUSE,
MAKING THIS ORDIlVANCE CUMULATIVE OF PRIOR ORDINANCES AND
REPEALING ALL PRIOR ORDINANCES IN CONFLICT HEREWITH, AND
PROVIDING AN EFFECTIVE DATE.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH,
TEXAS:
SECTION 1.
That in addition to those amounts allocated to the various City departments for the Fiscal Year 1995/96 and in the
Budget of the City Manager, there shall also be increased estimated receipts and appropriations in the
Water Capital Projects Fund in the amount of $48,903.00 and in the Sewer Capital Projects Fund in the amount of
$35,274.00 from available funds for the purpose of funding the preparation of plans and specifications for water
and sanitary sewer improvements on Wabash Avenue (Trail Lake Drive to Seminary Drive), Trail Lake Drive
(South Ridge Terrace to South Drive} and Cranbury Road (Trail Lake Drive to Seminary Drive).
SECTION 2.
Should any portion, section or part of a section of this ordinance be declared invalid, inoperative or void for any
reason by a court of competent jurisdiction, such decision, opinion or judgment shall in no way impair the
remaining portions, sections, or parts of sections of this ordinance, which said remaining provisions shall be and
remain in full force and effect.
SECTION 3.
That this ordinance shall be cumulative of Ordinance No. 12074 and all other ordinances and appropriations
amending the same except in those instances where the provisions of this ordinance are in direct conflict with
such other ordinances and appropriations, in which instance said conflicting provisions of said prior ordinances
and appropriations are hereby expressly repealed.
SECTION 4.
This ordinance shall take effect and be in full force and effect from and after the date of its passage, and it is so
ordained.
APPROVED AS TO FORM AND LEGALITY
l~
Assist Attozney
q~~-l~~
Date
Adopted
Effective
~l~
City of Fort Worth, Texas
Mceyor and G'oacncil Communication
DATE REFERENCE NUMBER LOG NAME PAGE
09/17/96 X*C-15646 30WABASH 1 of 3
SUBJECT APPROPRIATIONS ORDINANCE AND AWARD OF ENGINEERING SERVICES
CONTRACT TO A N A CONSULTANTS, L L C ,FOR WATER AND SANITARY
SEWER REPLACEMENTS ON WABASH AVENUE (TRAIL LAKE DRIVE TO SEMINARY
DRIVE), TRAIL LAKE DRIVE (SOUTH RIDGE TERRACE TO SOUTH DRIVE) AND
GRANBURY ROAD (TRAIL LAKE DRIVE TO SEMINARY DRIVE)
RECOMMENDATION
It is recommended that the City Council
1 Authorize the City Manager to transfer 584,177 00 from the Water and Sewer
Operating Fund to the Water Capital Projects Fund in the amount of 548,903 00 and
the Sewer Capital Projects Fund in the amount of 535,274 00, and
2 Adopt the attached appropriations ordinance increasing estimated receipts and
appropriations in the Water Capital Projects Fund in the amount of 548,903 00 and
the Sewer Capital Projects Fund In the amount of 535,274 00 from available funds,
and
3 Authorize the City Manager to execute an engineering agreement with A N A
Consultants, LLC , for a fee not to exceed 580,177 00 to prepare plans and
specifications for water and sanitary sewer improvements on Wabash Avenue (Trail
Lake Drive to Seminary Drive), Trail Lake Drive (South Ridge Terrace to South Drive)
and Granbury Road. (Trail Lake Drive to Seminary Drive)
DISCUSSION
The Intermodal Surface Transportation Efficiency Act of 1991, (ISTEA), established a
congestion mitigation and air quality improvement program (CMAQ) to contribute to the
attainment of a natural ambient air quality standard On November 30, 1994, the
Transportation Commission passed Minute Order 104667 which authorized the corridor
improvement project on Granbury-Wabash between Trail Lake Drive and Seminary Drive
through the State Transportation Program
On May 9, 1995 (M&C C-14802), the City Council authorized the execution of a
Congestion Mitigation and Air Quality Improvement Agreement with the TxDOT for
corridor improvements on Granbury-Wabash between Trail Lake Drive and Seminary Drive
at an estimated cost of 5280,000 ANA Consultants, was selected by the City to study
the traffic area and to prepare plans and specifications to provide more efficient and safer
traffic flow through this congested area Contract negotiations subject to TxDOT approval,
are currently underway with A N A Consultants L L C for the proposed improvements
Printed on Recycled Paper
~'ity ~-a f'~®~t ~rt~a, texas
1~~~®~ end G°®~t~il ~®r~tunic~cti®n
DATE REFERENCE NUMBER LOG NAME PAGE
09/17/96 **C-15646 30WABASH 2 of 3
SUBJECT APPROPRIATIONS ORDINANCE AND AWARD OF ENGINEERING SERVICES
CONTRACT TO A N A CONSULTANTS, L L C ,FOR WATER AND SANITARY
SEWER REPLACEMENTS ON WABASH AVENUE (TRAIL LAKE DRIVE TO SEMINARY
DRIVE), TRAIL LAKE DRIVE (SOUTH RIDGE TERRACE TO SOUTH DRIVE) AND
GRANBURY ROAD (TRAIL LAKE DRIVE TO SEMINARY DRIVE)
The Water Department has determined that the water and sanitary sewer lines within the
project area are seriously deteriorated and should be replaced In order to advertise for
bids in conjunction with the roadway improvements, the Water Department is requesting
that A N A Consultants, L L C , be authorized to prepare plans and specifications for the
water and sanitary sewer replacements
ANA Consultants, L L C ,located at 1701 River Run, Suite 610, Fort Worth, Texas
76107, proposes to perform the design work for this project for a fee not to exceed
580,177 00 based on established hourly rates Staff considers this fee to be fair and
reasonable for the scope of services proposed
ANA Consultants, L L C , by committing to 15% M/WBE participation is in compliance
with the City's M/WBE Ordinance The City's goal for this project is 1 5%
The project is located in COUNCIL DISTRICT 3, Mapsco 89 H and M
In addition to the contract amount, 54,000 00 is required for water and sanitary sewer
plan review by the Department of Engineering
Printed nn Recycled Paper
Caty of~'ort Worth, Texas
Ndayor and G'ouncil Coyeamunication
DATE
09/17/96 REFERENCE NUMBER
**C-15646 LOG NAME
30WABASH PAGE
3 of 3
SUBJECT APPROPRIATIONS ORDINANCE AND AWARD OF ENGINEERING SERVICES
CONTRACT TO A N A CONSULTANTS, L L C ,FOR WATER AND SANITARY
SEWER REPLACEMENTS ON WABASH AVENUE (TRAIL LAKE DRIVE TO SEMINARY
DRIVE), TRAIL LAKE DRIVE (SOUTH RIDGE TERRACE TO SOUTH DRIVE) AND
GRANBURY ROAD (TRAIL LAKE DRIVE TO SEMINARY DRIVE)
FISCAL INFORMATION/CERTIFICATION
The Director or Fiscal Services certifies that upon approval and completion of
Recommendation 1, and the adoption of the attached appropriations ordinance, funds will
be available in the current capital budgets, as appropriated, of the Water and Sewer
Capital Projects Funds
MG m
u mitte or ity anager s A E ER M '1 ' R
Office by: (to)
(1) PW53 472045 060530174700 48,903 0
( _
(2) PWS 472045 0605 0174700 48, 3 pp~s,~~g~~(~~
"'
(2) PS58 472045 070580174060 $35,274 0 ~~ F. s k ~, ma
!
'
n
(2) PW53 531200 060530174700 46,503 0 ~~ g'"43~'4~
3~~`k
~ P
Mike Groomer 614 ) _ _ _
riginating epartment I ea (2) P'S8 5 1350 030580174060 1 600 0 <<~,t1
v,~t~ ~:
(2) PS58 531299 070580174060 $33 674.0 ,
"' "
A Douglas Rademaker 6157 (from)
(3) PW53 531200 060530174700 46,503 0( "~' ~="=- .. -. d .r
or itional n ormation (3) PWS 531350 030530174700 2,400 0 ~ -.,.,
~C..f~ci i ~ri'r-•
~
(3) PS58
531200
070580174060
$33 674 0 u
:.!cap
Contact: (3) PS58 531350 030580174060 1600 0
A Douglas Rademaker 615 (1) PE45 538070 0609020 R4 177 0
* Printed on Recycled Paper /~~/~~') /p / ~ t ~ ~7 i` "' ~