HomeMy WebLinkAboutOrdinance 12100~-.
,a
Ordinance No `O
AN ORDINANCE INCREASING THE ESTIMATED RECEIPTS AND APPROPRIATIONS IN
THE WATER CAPITAL PROJECTS FUND IN THE AMOUNT OF $13,086 00 FOR THE
PURPOSE OF FUNDING AN ENGINEERING SERVICES AGREEMENT WITH HDR
ENGINEERING, INC , FOR STREET RECONSTRUCTION AND WATER AND .SEWER
REPLACEMENT ON ANNABELL LANE AND FAIRWAY DRIVE; PROVIDING FOR A
SEVERABILITY CLAUSE; MAKING THIS ORDINANCE CUMULATIVE OF PRIOR
ORDINANCES AND REPEALING ALL PRIOR ORDINANCES IN CONFLICT HEREWITH
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS
SECTION 1
That in addition to those amounts allocated to the various City departments for
the Fiscal Year 1994-95 and in the Budget of the City Manager, there shall also be
increased estimated receipts and appropriations in the Water Capital Projects Fund
in the amount of $13,086 00 for the purpose of funding an engineering services
agreement with HDR Engineering, Inc for street reconstruction and water and
sewer replacement on Annabell Lane and Fairway Drive
SECTION 2
Should any portion, section or part of a section of this ordinance be declared
invalid, inoperative or void for any reason by a court of competent jurisdiction,
such decision, opinion or judgement shall in no way impair the remaining portions,
sections, or parts of sections of this ordinance, which said remaining provisions
shall be and remain in full force and effect
SECTION 3
That this ordinance shall be cumulative of Ordinance No 11645 and all other
ordinances and appropriations amending the same except in those instances where
the provisions of this ordinance are in direct conflict with such other ordinances
and appropriations, in which instance said conflicting provisions of said prior
ordinances and appropriations are hereby expressly repealed
SECTION 4
This ordinance shall take effect and be in full force and effect and after the
date of its passage, and it is so ordained
APPROVED AS TO FORM AND LEGALITY
J ~-~
~i try' At(t/o n
Date
Adopted
Effective
City of Fort Worth, Texas
Mayor and Council Communication
DATE REFERENCE LOG NAME PAGE
NUMBER **C-14979
08/22/95 30ANNA 1 of 2
SUBJECT APPROVAL OF SUPPLEMENTAL APPROPRIATIONS ORDINANCE AND AWARD OF
ENGINEERING SERVICES AGREEMENT WITH HDR ENGINEERING, INC ,FOR STREET
RECONSTRUCTION AND WATER AND SEWER REPLACEMENTS ON ANNABELL
LANE (FROM HIGHPOINT TO OLD MANSFIELD) AND FAIRWAY DRIVE (HIGHPOINT
TO OLD MANSFIELD)
RECOMMENDATION
1 Authorize the City Manager to transfer 524,266 00 from Water and Sewer
Operating Fund to the Water Capital Projects Fund in the amount of 513,086 00 and
Sewer Capital Projects Fund in the amount of 511,180 00 and
2 Adopt the attached appropriations ordinance increasing estimated receipts and
appropriations in the Water Capital Projects Fund in the amount of 513,086 00 and
the Sewer Capital Projects Fund in the amount of 511,180 00 from increased
revenue, and
3 Authorize the City Manager to execute an engineering services agreement with HDR
Engineering, Inc , 6500 West Freeway, Fort Worth, Texas, for a fee not to exceed
545,554 00 to prepare plans and specifications for the design of pavement, storm
drain, water and sanitary sewer facilities for Annabell (Highpoint to Old Mansfield)
and Fairway Drive (Highpoint to Old Mansfield)
DISCUSSION
The 1993 Capital Improvement Program included funds for the reconstruction of Annabell
Lane (Highpoint to Old Mansfield) and Fairway Drive (Highpoint to Old Mansfield) The
consultant proposes to prepare plans and specifications for paving, drainage, water and
sanitary sewer improvements utilizing the City's current design standards
HDR Engineering, Inc ,proposes to perform the design work for this project for a fee not
to exceed 545,554 00 based on reimbursable expenses and hourly rates
An additional 51,044 00 is required for engineering services coordination of water and
sewer on this project
HDR Engineering, Inc , is in compliance with the City's MBE/WBE ordinance by committing
to 24% participation
This. project is located in DISTRICT 8, Mapsco 91 D
City of Fort Worth, Texas
Mayor and Council Communication
DATE
08/22/95 REFERENCE
NUMBER **C-14979 LOG NAME
30ANNA PAGE
2 of 2
SUB3ECT APPROVAL OF SUPPLEMENTAL APPROPRIATIONS ORDINANCE AND AWARD OF
ENGINEERING SERVICES AGREEMENT WITH HDR ENGINEERING, INC ,FOR STREET
RECONSTRUCTION AND WATER AND SEWER REPLACEMENTS ON ANNABELL
LANE (FROM HIGHPOINT TO OLD MANSFIELD) AND FAIRWAY DRIVE (HIGHPOINT
TO OLD MANSFIELD)
FISCAL INFORMATION/CERTIFICATION
The Director of Fiscal Services certifies that upon approval and completion of
recommendation 1, and the adoption of the attached appropriations ordinance, funds
required for the design phase of the water and sewer facilities will be available in the
current capital budget of the Water and Sewer Capital Projects Funds and that funds
required for the design phase for the street reconstruction are available in the Street
Improvements Fund
MG a
nbmitted for City Managers ACCOUNT CENTE OUNT CI SE
Office by: (to)
1
1) PS58 472072 070580173550 11 180.
2) PW53 472072 060530174120 13,086.
2) PS58 472072 070580173550 11,180.
1 ~
X APPROVED
2) PW53 531350 060530174120 564. ~~~~ COUNCif
2) PS58 531200 070580173550 10,700. L
Mike Groomer 6140 2) PS58 531350 070580173550 80.0
ngmatmg epartment ea 1 1 A(J~ ,~,~, ~~
1) PF.45 538070 0709020 11,180.
A. Douglas Rademaker 6157 (from) ~
J
(3) PW53 531200 060530174120 12,522. e
City Secretary of the
• City of Fort Worth, Texas
(3) PS58 531200 070580173550 10 700.
or Additional Information (3) PS58 531350 070580173550 480.
:.ontact: (3) CI11 531200 020111040454 11,158.
A. Douglas Rademaker 6157 ( .