Loading...
HomeMy WebLinkAboutOrdinance 12117Ordinance N~pCi/~ AN ORDINANCE INCREASING THE ESTIMATED RECEIPTS AND APPROPRIATIONS IN THE CAPITAL PROJECTS RESERVE FUND IN THE AMOUNT OF $89,866 00 FOR THE PURPOSE OF FUNDING A CONTRACT WITH SOUTHWEST INDUSTRIAL CONSTRUCTORS, INC , FOR REPLACEMENT OF FLOORSLAB IN FIRE STATION NO 22; PROVIDING FOR A SEVERABILITY CLAUSE; MAKING THIS ORDINANCE CUMULATIVE OF PRIOR ORDINANCES AND REPEALING ALL PRIOR ORDINANCES IN CONFLICT HEREWITH BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS SECTION 1 That in addition to those amounts allocated to the various City departments for the Fiscal Year 1994-95 and in the Budget of the City Manager, there shall also be increased estimated receipts and appropriations in the Capital Projects .Reserve Fund in the amount of $89,866 00 for the purpose of funding contract with Southwest Industrial Constructors, Inc for replacement of floorslab in Fire Station No 22 SECTION 2 Should any portion, section or part of a section of this ordinance be declared invalid, inoperative or void for any reason by a court of competent jurisdiction, such decision, opinion or judgement shall in noway impair the remaining portions, sections, or parts of sections of this ordinance, which said remaining provisions shall be and remain in full force and effect SECTION 3 That this ordinance shall be cumulative of Ordinance No 11645 and all other ordinances and appropriations amending the same except in those instances where the provisions of this ordinance are. in direct conflict with such other ordinances and appropriations, i.n which instance said conflicting provisions of said prior ordinances and appropriations are hereby expressly repealed SECTION 4 This ordinance shall take effect and be in full force and effect and after the date of its passage, and it is so ordained APPROVED AS TO FORM AND LEGALITY /~~ amity Atto e // ~ S'~ Date -~ ~-9.~ Adopted Effective <a1 City of Fort Worth, Texas Mayor and Council Communication 08/29/95 ~$R **C-14989 PAGE 20FLOOR I 1 of 2 SUBJ$CT APPROVAL OF APPROPRIATION ORDINANCE AND CONTRACT WITH SOUTHWEST INDUSTRIAL CONSTRUCTORS,INC ,FOR REPLACEMENT OF FLOORSLAB IN FIRE STATION NO 22 RECOMMENDATION It is recommended that the City Council 1 Adopt the attached appropriations ordinance increasing estimated receipts and appropriations in the Capital Projects Reserve Fund by 589,866 00 from increased revenues, and 2 Authorize the transfer of 589,866 00 from the Capital Projects Reserve Fund to the Specially Funded Capital Projects Fund, and 3 Adopt the attached appropriations ordinance increasing estimated receipts and appropriations in the Specially Funded Capital Projects Fund by 589,866 00 from increased revenues, and 4 Authorize the City Manager to execute a contract with Southwest Industrial Constructors, Inc , in the amount of 589,866 and 60 calendar days for the replacement of the floor slab in the equipment bays of Fire Station No 22 DISCUSSION The equipment bay floor at Fire Station No 22 is constructed of structural concrete channel beams and shows signs of excessive setting deflection as evidenced by failure of the concrete topping The Fire equipment cannot be parked in the facility in a fully loaded, ready status A structural engineer under contract to the City has evaluated the floor and advised the City that sudden collapse is possible if fully loaded trucks are parked in the bays It was determined that it would be necessary to replace the floor slab in order to allow the equipment to be safely parked inside the bays Two alternative floor replacements were evaluated (1) installation. of a concrete floor on a gravel subgrade and (2) construction of a structural concrete floor on piers The second alternative was recommended as a permanent solution in order to prevent the floor movement which would have been expected with the first solution A design and cost estimate was prepared for the second option Due to increases in the construction cost estimate it was decided to bid the project The following bids for this project were received on August 3, 1995, after being advertised on July 6 and July 13, 1995 City of Fort Worth, Texas Mayor and Council G'ommunication DATE REFERENCE LOG NAME FAGS N~ER **C-14989 08/29/95 20FLOOR 2 of 2 svBSECT APPROVAL OF APPROPRIATION ORDINANCE AND CONTRACT WITH SOUTHWEST INDUSTRIAL CONSTRUCTORS,INC ,FOR REPLACEMENT OF FLOORSLAB IN FIRE STATION NO 22 Bidder Bid Extra Mile Construction 568,577 Southwest Industrial Constructors 89,866 - The Frymire Company 92,000 Briscoe Construction Co 95,000 Iowa Bridge and Culvert, Inc 115,000 Penntex Construction Co 135,570 A construction duration of sixty (60) calendar days was specified in the contract documents All but one bidder acknowledged both addendums Briscoe Construction Co acknowledged one addendum The Engineer's estimate for the construction was 5100,000 The Bidders were requested to include the cost of casing the piers in the base bid Extra Mile Construction requested to withdraw his bid since it had assumed that the piers would be uncased The second and third apparent low bidders acknowledged that the cost of the pier casing was included in the base bid The second low bidder, Southwest Industrial Constructors, Inc , is in compliance with the City's M/WBE ordinance by committing 14 3 percent M/WBE participation The stated City goal set for this project was 12 0% FISCAL INFORMATION /CERTIFICATION The Director of Fiscal Services certifies that upon adoption of the above recommendations and adoption of the attached appropriations ordinance, funds required for these repairs will be available in the current capital budget of the Specially Funded Capital Project Fund The cash balance of the Capital Projects Reserve fund after this transfer will be 54,622,608 00 MG a u mate or ity anager s Office by: (to) (1) GC10 472040 013010001000 89,866 PPROVED : ~ A Mike Groomer 6140 CiTY COUNCIL Originating Department Head: (3) GC35 472010 020036001000 89,866. (3) GC35 541200 020036001000 89,866. ,~~~,~ UG 29 Hugo A. Malanga 7800 (from) Q 1 For Additional Information (4) GC35 541200 020036001000 89,866. ~LttiJ Contact: ~ ~t `{'@{t& 1 W TO o Hugo A. Malanga 7800 { A S City ti~apte~ ~r~i;ranoe ~~~o L/~~ Adopted t'rd;ranc~ i~o.