HomeMy WebLinkAboutOrdinance 12032i
Ordinance No ~ ~~~
AN ORDINANCE INCREASING THE ESTIMATED RECEIPTS AND APPROPRIATIONS IN
THE STREET IMPROVEMENTS FUND THE AMOUNT OF $102,386 00 FOR THE PURPOSE
OF FUNDING A CONTRACT WITH AUSTIN BRIDGE AND ROAD FOR MISCELLANEOUS
CONCRETE REPLACEMENT WORK IN CONJUNCTION WITH H M A C SURFACE
OVERLAY; PROVIDING FOR A SEVERABILITY CLAUSE; MAKING THIS ORDINANCE
CUMULATIVE OE' PRIOR ORDINANCES AND REPEALING ALL PRIOR ORDINANCES IN
CONFLICT HEREWITH
BE IT ORbAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS
SECTION 1
That in addition to those amounts allocated to the various City departments for
the Fiscal Year 1994-95 and in the Budget of the City Manager, there shall also be
increased estimated receipts and appropriations in the Street Improvements Fund in.
the amount of $102,386 00 for the purpose of funding a contract with Austin Bridge
and Road for miscellaneous concrete replacement work in conjunction with H M A C
Surface Overlay
SECTION 2
Should any portion, section or part of a section of this ordinance be declared
invalid, inoperative or void for any reason by a court of competent jurisdiction,
such decision, opinion or judgement shall in no way impair the remaining portions,
sections, or parts of sections of this ordinance, which said remaining provisions
shall be and remain in full force and effect
SECTION 3
That this ordinance shall be cumulative of Ordinance No 11645 and all other
ordinances and appropriations amending the same except in those instances where
the provisions of this ordinance are in direct conflict with such other ordinances
and appropriations, in which instance said conflicting provisions of said prior
ordinances and appropriations are hereby expressly repealed
SECTION 4
This ordinance shall take effect and be in full force and effect and after the
date of its passage, and it is so ordained
APPROVED AS TO FORM AND LEGALITY
~~
/`~~ City At y
Date
Adopted
7~ // _ c1~
Effective
r'
City of Fort Worth Texas
Mayor and Council Communication
DATE REFERENCE LOG NAME PAGE
07/11 /95 Nvrr~ER **C-14902
__ 20-955 1 of 3
SIISJSCT CONTRACT WITH AUSTIN BRIDGE AND ROAD FOR H M A C SURFACE OVERLAY I
95-5 (PROJECT NO 93-052169)
RECOMMENDATION
It is recommended that the City Council
1 Adopt the attached appropriation ordinance increasing estimated receipts and
appropriations in the Special Assessment fund by S 102,386 00, and
2. Authorize the transfer of $102,386 00 from the Special Assessment fund to the Street
Improvements Fund, and
3 Adopt the attached appropriation ordinance increasing estimated receipts and
appropriations in the Street Improvements Fund by S 102,386 00 from increased revenues
for the purpose of miscellaneous concrete replacement work in conjunction with H M A C
Surface Overlay (95-5), and
4 Authorize the City Manager to execute a contract with Austin Bridge and Road in the
amount of S965,146 for H M A C Surface Overlay 95-5
DISCUSSION
In conjunction with the 7 994-95 Contract Street Maintenance Program, various types of street
maintenance techniques are grouped into specific contract packages This contract package,
H M A C Surface Overlay (95-5), provides for surface and base rehabilitation and curb and gutter
and valley gutter replacements for various asphalt streets in Council District 4, 5 and 8, funded
from Contract Street Maintenance and Assessment Paving Revolving Fund Bond funds The
contract also includes construction of new concrete valley gutters and curb ramps where
required, funded from Street Improvement Bonds
The following listing details the limits and Council district for each of the streets included in this
project
A 2" H.M.A.C. SURFACE OVERLAY
STREET FROM l'O CD
Avenue D Thrall Wesleyan g
Avenue E Nashville Street Wesleyan g
Avenue G Etta Liberty 5
Avenue K Vaughn Avenue .Bishop Street 5
Avenue L Vaughn Avenue Bishop Street 5
City of Fort Worth, Texas
Mayor and Council Communication
DATS RSFSRSNCS LOG NAME PAGE
07/11 /95 NoMBER ~*C-14902 20-955 2 of 3
SUBJECT I CONTRACT WITH AUSTIN BRIDGE AND ROAD FOR H M A C SURFACE OVERLAY I
95-5 (PROJECT NO 93-052169)
Binkley Street
Brentwood Stair Rd
Burke Road
Carriage lane
Castillo Road
Cobblestone Ct
Conner Avenue
Erath Street
Etta Street
Forbes Street
Haynes Avenue
Langston Street
Laurie
Madeira
McLean
Mitchell Blvd
Norma Street
Panola Avenue
Patino Road
Pecos Street
Pollard .Street
Rand Street
Rockbrook Court
Rodeo
Rolling Springs Ct
Roseland Street
Routt Street
Shackleford Street
Sugar Lake Road
Tiki Trail
Timberwilde Court
Wilson Road
Rosedale Street E
Sandy Lane
Wilbarger Street
Morrison
Hitson
Carriage Lane
Rosedale St E
Vaughn Boulevard
Rosedale Street E
Rufus
Panola Avenue
Ramey
Sandy Lane
Sandy Lane
Ben
M L K Jr Frwy
Edgewood Terrace
Griggs
Castillo
Eastover
Meadowbrook Drive
Lancaster Avenue
Carriage Lane
Old Mansfield
Newport
Norma
Rose Hill Drive
Wilbarger Street
Lake Louise
Lisa Court
Wilson
Briarwood
Avenue D
Barron Lane
Wilhelm
Lanewood
Patino Road
No cul-de-sac
Avenue D
Reed
Calumet
Sydney
Hawlet
Fitzhugh
Enoch
Lanewood
E. Lancaster Ave
Beach Street So
Queen
Edgewood Terrace
Acapulco
Parker Henderson
Van Natta Lane
Panola
No cul-de-sac
Change in Pavement
Concrete cul-de-sac
Lancaster Avenue E
West dead-end
Martin
Willow Ridge
Craig Street
Concrete cul-de-sac
Brentwood Stair
8
4
5
4
5
4
8
5
5
5
8
5
4
4
4
5/8
5
8
5
5
5
8
4
8
4
5
5
5/8
4
5
4
4
B 3" H.M.A.C. SURFACE OVERLAY
STREET
Springfield
Village Creek
FROM
Hampshire So
Cottey
TO
Old Handley Road
Ramey
CD
5
5
City of Fort Worth, Texas
Mayor and Council Communication
DATE REFERENCE LOG NAME PAGE
NvMBER **C-14902
07/11 /95 20-955 3 of 3
SUBJECT CONTRACT WITH AUSTIN BRIDGE AND ROAD FOR H M A C SURFACE OVERLAY
95-5 (PROJECT NO 93-052169)
The project was advertised on May 22 and 25, 1995 The following bids were received on May
30
BIDDERS AMOUNT WORKING TIME BID
Austin Bridge and Road 5 965,146 00 60 Working Days Specified
APAC-Texas, Inc 999,428 00
J L Bertram Construction & Eng 1,023,608 50
The engineer's estimate of construction cost was 51,090,245
Austin Bridge and Road, based on a good faith effort and 13 28 percent DBE participation, is in
compliance with the City's DBE Policy
This project is located in DISTRICTS 4, 5 and 8
FISCAL INFORMATION/CERTIFICATION
The Director of Fiscal Services certifies that, upon approval of the above recommendations and
adoption of the attached appropriations ordinances, funds required for this project will be
available in the current capital budgets, as appropriated, of the Contract Street Maintenance Fund
and the Street Improvements Bond Fund
MG a
u mute or ity anager s A E T CI
Office by: (to)
(1) GS94 538070 020940531580 102,386. APPROVED
Mike Groomer 6140 ~~~/ ^f~~ }
i ~~ ~
riginating partment ead: (3) GC13 472094 020130531580 102,386. ~~Jj,J
1 ~
Hugo A. Malanga 7800 (from)
JUL I i tq 4
(2) GS94 538070 020940531580 102,386. _ ,
or ditional ormation (4) GS93 541200 020930521690 859,510. ~~
Contact: ~ ~+
~~~
Hugo A. Malanga 7800 (4) GS13 541200 020130531580 102,386. ~
~~ •'°i°'+