Loading...
HomeMy WebLinkAboutOrdinance 12282w Ordinance No /( AN ORDINANCE INCREASING THE ESTIMATED RECEIPTS AND APPROPRIATIONS IN THE SEWER CAPITAL PROJECTS FUND IN THE AMOUNT OF $332,776 00 FOR THE PURPOSE OF FUNDING AN ENGINEERING AGREEMENT WITH TURNER, COLLIE & BRADEN, INC , FOR SANITARY SEWER MAIN 207R DRAINAGE AREA INFLOW/INFILTRATION EVALUATION STUDY AND SEWER IMPROVEMENTS (GROUP 5, CONTRACT 3); PROVIDING FOR A SEVERABILITY CLAUSE; MAKING THIS ORDINANCE CUMULATIVE OF PRIOR ORDINANCES AND REPEALING ALL PRIOR ORDINANCES IN CONFLICT HEREWITH; AND PROVIDING AN EFFECTIVE DATE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS SECTION 1 That in addition to those amounts allocated to the various City departments for the Fiscal Year 1995-96 and in the Budget of the City Manager, there shall also be increased estimated receipts and appropriations in the Sewer Capital Projects Fund in the amount of $332,776 00 for the purpose of funding an engineering agreement with Turner, Collie & Braden, Inc for Sanitary Sewer Main 207R Drainage Area Inflow/Infiltration Evaluation Study and Sewer Improvements (Group 5, Contract 3) SECTION 2 Should any portion, section or part of a section of this ordinance be declared invalid, inoperative or void for any reason by a court of competent jurisdiction, such decision, opinion or judgement shall in no way impair the remaining portions, sections, or parts of sections of this ordinance, which said remaining provisions shall be and remain in full force and effect SECTION 3 That this ordinance shall be cumulative of Ordinance No 12074 and all other ordinances and appropriations amending the same except in those instances where the provisions of this ordinance are in direct conflict with such other ordinances and appropriations, in which instance said conflicting provisions of said prior ordinances and appropriations are hereby expressly repealed SECTION 4 This ordinance shall take effect and be in full force and effect and after the date of its passage, and it is so ordained APPROVED AS TO FORM AND LEGALITY Assist City Attorney ~(-I-S'3 Date ~~ ~~i % ~.../ Adopted v/ l~~/~ Effective City of Fort i~orth, Texas Mayor and Council Communication DATE REFERENCB NUMBER LOG NAME PAGE 11 /28/95 **C-15150 30TURNER 1 of 2 SUBJECT ADOPTION OF APPROPRIATION ORDINANCE AND AWARD OF ENGINEERING AGREEMENT WITH TURNER, COLLIE & BRADEN, INC FOR SANITARY SEWER MAIN 207R DRAINAGE AREA INFLOW/INFILTRATION EVALUATION STUDY AND SEWER IMPROVEMENTS (GROUP 5, CONTRACT 3) RECOMMENDATION. It is recommended that the City Council 1 Authorize the City Manager to transfer 5332, 776 00 from the Water and Sewer Operating Fund to the Sewer Capital Projects Fund, and 2 Adopt the attached appropriations ordinance increasing estimated and appropriations in the Sewer Capital Projects Fund in the amount of $332,776 00 from increased revenue, and 3 Authorize the City Manager to execute an engineering agreement with Turner, Collie & Braden, Inc in the amount of 5332,776 00 for the Sanitary Sewer Main 207R Drainage Area Inflow/Infiltration Evaluation Study and Sewer Improvements DISCUSSION. The engineering services to be performed under this agreement consist of conducting continuous wastewater flow and rainfall monitoring, to determine the existing flow, performing detailed Sewer System Evaluation Survey (SSES) to identify the nature and locations of defects in the collection system, using hydraulic modeling and engineering analysis to develop plans for removal of public and private sector inflow and infiltration sources and for constructing a relief sewer to transport the remaining flow The project scope also includes preparing the special contract documents and managing a small diameter (6" - 15") sewer cleaning concurrent with the SSES In addition this agreement includes the design of approximately 1,700 linear feet of critical sewer replacement The project is a part of the Integrated Wet Weather Wastewater Management Program to comply with an Administrative Order from the U S Environmental Protection Agency to eliminate sewer overflows in the City's wastewater collection system The M 207R Drainage Area is located in the western part of Fort Worth in the Kings Creek Drainage Basin (COUNCIL DISTRICTS 3 & 7) The area is generally bounded on the north by Interstate Highway 30 and U S Highway 183, the east by Bigham Blvd (south of IH 30) and Ridgmar Blvd (north of IH 30-, the south by U S Highway 80 and the west by Laredo Drive Turner, Collie & Braden, Inc is in compliance with the City's M/WBE Ordinance by committing to 59 2% M/N/BE participation The goal on this project was 16% In addition to the above engineering fee, $6,000 is included for project management and review Printed on recycled i•- City of Fort Worth, Texas Mayor and Council Communication DATE 11 /28/95 REFERENCE NLJMSER **C-15150 LOG NAM}3 30TURNER PAGE 2 of 2 SIIBJECT ADOPTION OF APPROPRIATION ORDINANCE AND AWARD OF ENGINEERING AGREEMENT WITH TURNER, COLLIE & BRADEN, INC FOR SANITARY SEWER MAIN 207R DRAINAGE AREA INFLOW/INFILTRATION EVALUATION STUDY AND SEWER IMPROVEMENTS (GROUP 5, CONTRACT 3) FISCAL INFORMATION/CERTIFICATION. The Director of Fiscal Services certifies that upon approval and completion of recommendation 1, and the adoption of the attached appropriations ordinance, funds required for this agreement will be available in the current operating budget of the Sewer Capital Projects Fund MG b Submitted for City Manager's FUND ACCOUNT CENTER AMOUNT CITY SECRETARY Office by: (to) 1)PS58 472045 070580410040 $332,776.00 2)PS58 472045 070580410040 $332,776.00 APPROVED 2)PS58 531200 070580410040 $326,776.00 C ITY COU~lC(L Mike Groomer 6140 2)PS58 511070 070580410040 $5,000.00 Originating Department Head: 2)PS58 531350 030580410040 $1,000.00 N®Y 26 1995 Lee C. Bradley, Jr 8207 (from) ~G~/ f the t 1)PE45 538070 0709020 $332,776.00 azy o City Secre City of Fort Worth,'~exas For Additional Information 3)PS58 531200 070580410040 $326,776.00 ContaM: 3)PS58 511070 070580410040 $5,000.00 Lee C. Bradley, Jr 8207 3)PS58 531350 030580410040 $1,000.00