Loading...
HomeMy WebLinkAboutContract 53393RECEIVED JAN 15 2020z -e C1TY0FF0RTW0nTff �b CITYSFCRETAHY F'oeTvVORrH CONTRACT FOR THE CONSTRUCTION OF CITY SECRE-TIDY oowTAcT No. 2339 3 City Secretary Construction EJ Project Manager E3 HMAC SURFACE OVERLAY (2019-6) Betsy Price Mayor City Project No. 102098 William Johnson Director, Transportation and Public Works Department Prepared for The City of Fort Worth 2019 David Cooke City Manager OFFICI N, RECORD UTY SECRETMY o wr INIO RT ff. City of Fort Worth Standard Construction Specification Documents Adopted September 2011 000000-1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page I of4 SECTION 00 00 00 TABLE OF CONTENTS Division 00 - General Conditions 0005 10 Mayor and Council Communication 0005 15 Addenda 00 1113 Invitation to Bidders 0021 13 00 32 15 0032 15.1 0032 15.2 00 32 15.3 0032 15.4 0035 13 00 41 00 00 42 43 0043 13 00 43 37 00 45 11 0045 12 0045 13 00 45 26 00 45 40 Agreement Performance Bond Payment Band Maintenance Bond Instructions to Bidders Construction Project Schedule Construction Project -Baseline Example Construction Project -Progress Example Construction Project -Schedule Narrative Construction Project -Submittal Process Conflict of Interest Affidavit Bid Form Proposal Form Unit Price Bid Bond Vendor Compliance to State Law Nonresident Bidder Bidders Prequalification Prequalification Statement Bidder Prequalification Application Contractor Compliance with Workers` Compensation Law Minority Business Enterprise Goal Small Business Enterprise Goal 00 45 41 00 52 43 Division 01 - General Requirements 01 1100 Summary of Work 01 25 00 Substitution Procedures 01 31 19 Preconstruction Meeting 01 31 20 Project Meetings v�.rs 01 32 33 Preconstruction Video 01 3300 Submittals 01 35 13 Special Project Procedures 01 4523 Testing and Inspection Services 01 5000 Temporary Facilities and Controls 01 55 26 Street Use Permit and Modifications to Traffic Control 01 5713 Storm Water Pollution Prevention PIan 01 58 13 Temporary Project Signage 01 60 00 Product Requirements 01 6600 Product Storage and Handling Requirements 01 70 00 Mobilization and Remobilization CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No, 102098 Revised February 2, 2016 CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No, 102098 Revised February 2, 2016 000000-2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 2 of 4 01 71 23 Construction ,Staking and Survey 01 71 23, 4 6,01 Attachment A_Survey Staking Standards 01 74 23 Cleaning 01 77 19 Closeout Requirements 01 78 23 Operation and Maintenance Data Of 7839 Project Record Documents Technical Specifications which have been modified by the Engineer specifically for this Project; hard copies are included in the Project's Contract Documents Division 02 - Existing Conditions 0241 15 Paving Removal Division 32 - Exterior Improvements 32 1123 Flexible Base Courses 32 13 20 Concrete Sidewalks, Driveways and Barrier Free Ramps 3291 19 Topsoil Placement and Finishing of Parkways Division 34 - Transportation 3471 13 Traffic Control Technical Specifications listed below are included for this Project by reference and can be viewed/downloaded from the City's website at: littp:Hfortworthtexas.gov/tpw/contractors/ Division 02 - Existing Conditions 0241 13 Selective Site Demolition Division 03 - Concrete 03 30 00 Cast -In -Place Concrete Division 31 - Earthwork 3123 16 Unclassified Excavation Division 32 - Exterior Improvements 32 1133 Cement Treated Base Courses 32 12 16 Asphalt Paving 32 16 13 Concrete Curb and Gutters and Valley Gutters 32 17 23 Pavement Markings 32 92 13 Hydro -Mulching, Seeding, and Sodding Division 33 - Utilities 3305 10 Utility Trench Excavation, Embedment and Backfill 33 05 13 Frame, Cover and Grade Rings -Cast Iron 33 05 13,01 Frame, Cover and Grade Rings -Composite 3305 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to Grade 3305 17 Concrete Collar 33 12 10 Water Services 1-inch to 2-inch 33 46 00 Subdrainage CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised February 2, 2016 000000-3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 3 of 4 Division 34 — Transportation 3441 30 Aluminum Signs Division 99 — Construction Allowance 99 99 00 Paving Construction Allowance Appendix GC-6.06.D Minority and Women Owned Business Enterprise Compliance GC-6.07 Wage Rates GN-1.00 General Notes SP-1.00 Special Provisions SD-1.00 Standard Construction Specifications SD-2.00 Standard Construction Details SL-1.00 1IMAC 2019-6 Street List SM-1.00 HMAC 2019-6 Street Map END OF SECTION CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102099 Revised February 2,2016 City of Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, December 17, 2019 LOG NAME. 20HMAC SURFACE OVERLAY 2019-6 REFERIENCE N0.. "" &C 19-0411 SUBJECT: Authorize Exacutlon of a- tintiract w14fi Peachtree Oonstructlon, Ltd., in the Amount of 1,079,975,00 for Flat Mix Asphaltic Concrete, HMAC (2019-6) Surface Overlay along Various Streets (COUNCIL DISTRICTS 2 and 9) RECOMMENDATION: It is recommended that the City Council auitharize the execution of a contract with Peachtree Con tructlon, Ltd., In the Amount of 1,079.97 .00 for loot Mix Asphaltic Concrete, HMAC (2019-6) Surface Overlay along varlaus street sections Ideritifled in the attached locatlon map (City Proloct No. 102098). DESCUSSIN: Ire the Fiscal Year 2019 Pay -Go Centraot Street Maintenance Program, various types of street Waintenance are grouped Into specl#ic contract packages. This contract provides Pulverization and Overlay (POL) which is a process that reuses the existing pavement and base material, along with an added treatment material, to reclaim the roadway structural inLeg rit . After eslabilshing the new basa, new asphalt pavement will be placed on the appro imatply 1.44 lane rriliss along various street sections identified below: Street Marne Avenue Laaonda Avenue 5th Avenue Page Street Elizabeth Boulevard Street Urnits IBlock Number11 CD 11 Mapsco Grand Avenue - West NorthsIde Drive 1 00 - 1299 Grand Avenue - West Northside Drive 1201 - 1299 West Magnalla Avenue - West Allen Avenue 1300 - 1699 9 Hemphill Street - Collage Avenue 700 -999 9 College Avenue - South Adems Street 1000-1096 9 6P 2T Ill: 'FAI 76 7'6V Consiructlon for this project Is expected to start approximately January 2020 and to be completed by appmxlmately October 2020. Upon completion of the project there will be no anticipated impact on the general fund operating budget. This project was advertised for laid on September 12, 2019 and September 19, . 019 In the Fort Worth Star -Telegram, On October 10. 2019, the followlncg bids were recelved: Bidders Amount Peachtree Construction, Lld. $1,079,975.00 ITe� as Bit - Texas Materials Group $1,109,9 1.15 M fW6E OFFICE - Peachtree Con structlion, Ltd. Is In compliance wlth the Dity's BDE 0rdInance by coMM1ItIng to fit% MBE participation and documenting {foot# faith effort. Peachtree Construction, Ltd. identii'led several subcontracting and suppiler opportunities. However, the firms contacted in the areas identiffied dId too! respond or did not submit the lowest bias, The C ity's MBE goal an this project In 13l . The C1ty reserves the right to increase or decrease q ua ntlities of Individual pay Items within the contract provided that th9 total contract arriouot remains within plus or minus 25 percent of the contract award. This project is located in COUNCIL DISTRICTS 2 and J. FISCAL INFORMATION I CERTIFICATION: Tire Director of Finance certfies that upon approval of the above recommendation and award of the contract, funds are available In the current capital budget, as appropriated, In the Gerteral Capital Projects Fund, Project 10 098. Prior to any expendktura beIng Incurred, the Transportation & Public Works has the responslbillty to validate the availability of funds, FUND IDENTIFIERS (FIDsj: Fund Department ccoun Project -- ID ID Budget I Deference Year (qaq leld iu Fund Department AeoProgramlActivity budget Reference Xmoun ID ID _ Year hartfleld u-b fitted for_ .Ity ftmger's Office by- Dana BurghdofF (5018) Originating Department Head, William Johnsen (7801) Additional InformatiorLP_"J t Monte Hall (8662) ATTACHi E;NTS 1. 191 0-2.-I.MBE Corn (lance I erne - Peacbtrea Coilt HMAQ 2019-6.pdf (CM WOMEII) . FAD Tabl,r HI AO. 09-G.xJs_x_ (CFW internaq 3, Form 1295.1 df {CFUU Intkrnol) 4. HI IAC Surface Overlay CoMpI& (PuLdic) 5. AMsearchResulls_pdf. (CF W lntarnW ADDENDUM NO. i MUC SURFACE 0VE LAV 2019.6 P D.W CT N 0.. 302098 Ad6wlwn No. 1. Issued: September 25r 2019 Praspgxtivo Bidden &V hweby no ified Uthe foIlowing ra9vlaiarw: PROPOSAL FORM UNTIr PFJCU: SKIMON 00 47 41 F' OPOSAI . I{OKM UNIT KUCE Shall be. replaced with the anched revised 00 42 4.3 prnpormI horn dociptnunts. EC"Y'IO,N SD-2,00 8TANDARD COWSTRUG"1 ON DETA LS: S3 =ON SD-:1O0 STANDAIM CONSTRUCTION DIi`l A-U,S Curb ramps drawkg detniIs shall he-mpla?+ed +,' iffi the a taehcd rovised Burl} mmpa drawIng detailf[. Please ac;Is. G wfedge mcelpt oflbis addendtini by �riwiliig aud-in-sorting intca yo it pnTusaI at the time of Kidding. FaiI mo to retoru a signed copy csf this addendum mny lie ga'aun& For rendering the �iql as nna respormiva. Kecsvipt Acknowledges. Fry: lay; BWLrR JUAN PIABLO DE LA CREPT., PROJECT MAMQ =R ADDENDUM NO. I IE"C SURFACE OVERLAY 2019-6 CITY PROJECT NO.: 102098 Addendum No. 1 issued: September 25, 2019 Prospective Bidders are hereby notified of the following revisions: PROPOSAL FORM UNIT PRICE: SECTION 00 42 43 PROPOSAL FORM UNIT PRICE shall be replaced with the attached revised 00 42 43 proposal from documents. SE, MON SD-2.00 STANDARD COp TRUCTION DETAILS: SECTION SD-2.00 STANDARD CONSTRUCTION DETAILS Curb ramps drawing details shall be replaced with the attached revised curb ramps drawing details. Please acknowledge receipt of this addendum by signing and inserting into your proposal at the time of bidding. Failure to return a signed copy of this addendum may be grounds for rendering the bid as nonresponsive. Receipt Acknowledges: PEACHTW' CONSMUC110N, LTD. By. - _ By: �� JUAN PABLO DR LA CRUZ, PROJWT MANAGRR U4J:43 DE3 PROPORAL NE 1 ul I 1 SECTION 00 47 43 PROPOSAL r-Old UNIT PRIDE BID action Bidder's Application rrDj;%L rscrrl Infoin1m4in 41rupusid ElidlielHUM N I7c,arriplinn Sp�:irio3rio, 'tear(ml No. author PvTanulw Bill Quurnlly +,fn�i Prrec Bi;S V�la,eNo 1 0135.0201 RE6 ONILTZATION 01 7000 EA 1 $500.00 $5Q0 Do 2 ID241 1304 REMOVE CC. NC VE.iRBL4iGU TEF 0241 15 LF 4F60 3 3216.0102 7" GQNC CoUR B AN GUTTER 32 13 70 LF - 45Q0 4 0241;4601 REMOW COI cRuEDRIVE 0241 1a SF 51QF0 .5 37110401 6" CONCRETE DRIVEWAY U 13 m: SF 5100 6 0aAi,01Q0 RF-MOVESIDEVVALK 02-411a SF 2000 7 3213,0: 1 41 CONC SIDEWALK 3.21320 SF 11P1100 a 3213.0322 1 ONC CURT3 AT SACK OF SIDEVVALX 15 to * Inch milx) 32 13 20 LF 44C1 024 T 1400 REMOVE GONQ VAI-I-EY GUTTER 02 41 t5 SY t50 10 3216.0301 7" COLIC VALLEY CRITTER 32 16 13 SY ISO 11 0241.0.N0 REMOVE ADA RAMP 0241 13 EA 20 12 321 a.a5b1 BARRIER FREE RAMP, TYPE k-1 32 13 2Q A I 13 2213.0503 MRRIER FRFF RAMP. TYPE M-1 32 13 20 PA 2 1.4 3213.05Q4 RARRJE R FREE RAMP, TYPE M-2 32 13 213 EA- 2 15 3213_13506 E3.8,RRIER FRFF DAMP, TYPE P-1 321320 EA' 5 t6 990 4000 TRLJNCADrmb DOME PLATE (5' X 2') 00 00 m F-A 4 17 0241.1700 8`1:1AVWFNTPULVr-R1ZAT1CN 0241 15 SY 11500 19 3212.0302 &' ASPHALT PAVEMENT, TYPED 32 12 143 Zy 11500 19 3211.0000 CEMENT MODIFICATION, 25 Ib8{sy 32 1133 TN 15(3 20 0241.1200 REMOVE DRIC K PAVEMENT 0241 15 SY 20 21 3214.0100 BRICK PAVEMENT 32 14 10 SY 73 .22 3110,0101 SITE CLEARING 31 1000 LS 1 UUID0,00 53,w4.00 23 0110.0102 W-12" TREE REtU1QVA 31 1000 1--A 4 C,We [iV rt%l S'I IFLIP 3'fhmminvgwRLCTjor4Srr-rlPjd'A ION0Q'1)RTPw$ [1hrU% R-WALMOVE LAY2o-la.1, i-l. LL 11A Sul 4L21k bw rpajm l Na SECTON 04 42 43 PR PQML FORA UNIT PENCE BID nQgX4] wn,ikoffi 4m, Nwr 5 or 11 Bidder's Application Prnifta Plildcr& ChupRwmn RI,01191r1t!LII L1otl [tpljun I:mIIII I ITn11Of Rid IINi�}�r1G� FI�l Yial4Ye No. I 4ann ;,I�o l4�1d!R:lu rt Chj uElty 24 3123_0101 UNCLASSIFIED EX V TION M 23 is CY 5C 2E 3292.0101} BLOCK SOD REPLACEMENT W U2 13 &Y 1100 26 3217.9305 -STOP MR6-PAVEMENT MARKINGS 32 17 23 LF 150 27 '3217.0001 4" SOLIO THERMOPLASTIC 33 17 23 LF 150 (HAS) LANE LINE 28 3217.00G2. 4" SOL1❑ THERMOPL4 TIG 32 'r7 29 LF 160 (HAS) CENTER L I N F n 3217.0601 247 SCUD WHITE THERMOPLASTIC 3217 23 LF 150 {}-IA CRQSSWA[ K LIMES 3d1 3217 5{}0 OURE ADRESS PAINTING 32 17 25 EA 21 Si 32-11 0122 FLEX BASE, TYPE A, GR-2 32 11 23 CY 6U 32 W06.01V8 MISCELLANEOUS ADJUSTMENT LS fflUT'ICS) 33 09', M 1 sti.000.00 se.000.1 0 33 =E.01(18 MI`S-CELLAN ECU STRUCTURE AD.1USTMENT 33 14 LS 1 63.000-Go $3.00D.Cm 3305.G.,11 YVATER VALVE BOX (WFrH EEL �4 -ADJUSTMENT RISER)0-5EA�3 �1A � 5 35 3305.0112 WATER VALVE SOX AWUST M�NT WITH 3305 14 5A 5 CONCRETE RISER) 36 3312_2{O3 1- INCH STAINDARD PLASTX METEN 13OX 33 12 10 EA 2. 37 5$12.20031-1NGH STAN[7ARDCONCRETEMETER BOX 33 121d EA 2: 33410.0107 MANHOLE ADJUSTMENT U WWTH ZTEEL RISER 33 05 14 EA 4 33U5.011? M�ANIIQLF-A❑JUSTR�1ENT 39 FrH CON CkETE CCLLAR) 33 bG 17 EA v 4a 3305.0108 MIS CELLANLEOU S STNCT RE ADJUST ENT 33 05 ,14 EA 1 (5'STORM DRAIN INLET TOP) 33R5 0148 WCELLANFOUS ;TRUCTiJRF Aw U TMENT Al 0U STORM DPW INLET TOP I 33 05 14 CA t 42 3346,0101 6" PERFORATED 5UJ30RAIN PIPE 33 46 U0 LF 30 43 99 :0000 REMOVE CONCT PVMT 02:41 15 f;Y 200 44 9999.00K PINING DON TRU TION ALLOWANCE EA i �2�,1�011,�0 1a2v,Of}0-OQ B 1L1 5hllhllt4111'y �Il�nr.11id TOW Bld $37, Qtl_80 care'OFlra iuwxn 57ANGARTi EM AC.R WArX D-YrRLAT w Gu n jlwDRrvlred luI2aLid VIM Uuljrel hb, IRDA 4 � y O �I C4 V— n W h I]. • € LI 1 I _ a cr j .1-3 El `O_ O Q F' ID 6 a;n to w -14 w \-4 ' eJx raw COT •. F.. LL Cl % rLL 1 LL Fn 1 +%i • 4 yp� tidy// w i Gz i Ld € # ^ } EL a Ir 30 N Ir cr 3 ; 1r� if 2 on a s xo _ h. ED tL 74ir= x a: WJ Y LU r U] 4 [ v1 a ? {j 1s P. LL 159 w U O -- tI— i 11 0 _j 1WW� 3r C :r a �1 Fa U1 OFF I " L 1 F— Ck NZ3,4 40 f 3 LLJ EL I k _ a., w � I IL I ir � t � 44 fn �I o ai ' z w g 9a r F�� � 4 [3 s I*WO ¢ Uj Uj17-r, 2 jr o CV L r ix m En Li a'NIN r LL 0 4. �� W t5 LuLg _ �E - a i } 4 yj CL La }* y :2 31'IYh53pC5 IN � z:y WIN t: #�* .fi +�{R� z LL "� uyt xVW l-1 r ti tix 3 M. 4 + , x � rra�yy S-- X Lrl a7��4 � m,3 + a�rli'7imom�ELL Rr oo1} � w� W',tw ix pE. { U. z +Z i., yr x ,n � a. n ,- , " rt � u U ED w 3 ] Q A '- 2 Wiz' a aLl ZL 0 � z La afl W Y a�c??a ADDEN-DUMN0.2 RMAC S IIRFACF OVE RLAV 20E9-6 CITY 13ItClM Cr NO.: 1.02.098 Addendum No. 2"7ssued: Onphof 1, 2018 ProspecVve Bidd6tq deg hervk y n6ti3ied of the fwIlowi. g rifvisioos. IIMA C S LWACE OVERLAY 2019-6 D I D OPE NI G: - e bid opening clijle has. bauTi extended to Ocrober 10, 20.1.9 .tt 2,00 ?M C ST. PROVOSA.I,.r FORM: 5EC'ITON 00 42 43 PRO1'C?SAL FORM in Addenduiii No, l sha]I hu ri:placed with the atiaahEd revisers 00 42 43 pnaposml R)m dncLiments, PleawacknawlWge rEcj--.ipt of this �d e�d£rm by �ignutg and instx1ino into your proposal afthe time e� bidding. Failure to ta:iurn a qipied copy of this addendum may be goiln.ds Fir rendering the laid as nantespmsivie. Recaipt Aoknowlgdges; By: a .By; JIU1W PAB LO DE LA CRUZ; I$AOJrELT [AANAGER' ADDENDUM NO.2 HMAC SURFACE OVERLAY 2019-6 CITY PROJECT NO.: 102098 Addendum No. 2 Issued: October 1, 2018 Prospective Bidders are hereby notified of the following revisions: HMAC SURFACE OVERLAY 2019-6 BID OPENING: The bid opening date has been extended to October 10, 2019 at 2:00 PM CST PROPOSAL FORM: SECTION 00 42 43 PROPOSAL FORM in Addendum No. 1 shall be replaced with the attached revised 00 42 43 proposal form documents. Please acknowledge receipt of this addendum by signing and inserting into your proposal at the time of bidding. Failure to return a signed copy of this addendum may be grounds for rendering the bid as nonresponsive. Receipt Acknowledges: PEACHTR CONSTRUC'l ION, LTD. By: C- By: BIDD JUAN PABLO DE LA CRUZ, PROJECT MANAGER 001113-1 INVITATION TO BIDDERS Page 1 of 2 I SECTION 00 1113 2 INVITATION TO BIDDERS 3 4 RECEIPT OF BIDS 5 Sealed bids for the construction of HMAC SURFACE OVERLAY 2019-6 will be received by the 6 City of Fort Worth Purchasing Office: 7 8 City of Fort Worth 9 Purchasing Division 10 200 Texas Street 11 Fort Worth, Texas 76102 12 until 1:30 P.M. CST, Thursday, October 10, 2019, and bids will be opened publicly and read 13 aloud at 2:00 PM CST in the Council Chambers. 14 15 GENERAL DESCRIPTION OF WORK 16 The major work will consist of the (approximate) following: 17 11500 SY 3 " HMAC Surface Course, Type D 18 11500 SY 8 " Pavement Pulverization 19 150 Ton Cement Modification 20 5100 SF Concrete Driveway 21 4500 LF Concrete Curb and Gutter 22 12100 SF Sidewalk 23 20 EA AD-4 Ramps 24 25 PREQUALIFICATION 26 The improvements included in this project must be performed by a contractor who is pre- 27 qualified by the City at the time of bid opening. The procedures for qualification and pre- 28 qualification are outlined in the Section 00 21 13 -- INSTRUCTIONS TO BIDDERS. 29 30 DOCUMENT EXAMINATION AND PROCUREMENTS 31 The Bidding and Contract Documents may be examined or obtained on-line by visiting the City 32 of Fort Worth's Purchasing Division website at http://www.fortworthtexas,goy/purchasing/ and 33 clicking on the Buzzsaw link to the advertised project folders on the City's Bu7ZSaw site. The 34 Contract Documents may be downloaded, viewed, and printed by interested contractors and/or 35 suppliers. The contractor is required to fill out and notarize the Certificate of Interested 36 Parties Form 1295 and the form must be submitted to the Project Manager before the 37 contract will be presented to the City Council. The form can be obtained at 38 https://www.ethics.state.tx.us/rilinginfo/1295/. 39 40 Copies of the Bidding and Contract Documents may be purchased from Nikki McLeroy, 817- 41 392-8363, City of Fort Worth, TPW, 200 Texas St., Fort Worth, TX 76102. 42 43 The cost of Bidding and Contract Documents is: $30 44 45 PREBID CONFERENCE 46 A prebid conference may be held as described in Section 00 21 13 - INSTRUCTIONS TO 47 BIDDERS at the following location, date, and time: 48 DATE: Tuesday, September 24, 2019 49 TIME: 10:00 AM CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised December 22, 2016 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 0011 13 - 2 INVITATION TO BIDDERS Page 2 of 2 PLACE: Transportation and Public Works, Pavement Management 5001 James Avenue, Suite 301 Fort Worth, TX 76115 CITY'S RIGHT TO ACCEPT OR REJECT BIDS City reserves the right to waive irregularities and to accept or reject bids. INQUIRIES All inquiries relative to this procurement should be addressed to the following: Attn: Juan Pablo De La Cruz, City of Fort Worth Email: Juan.DeLaCruz@fortworthtexas.gov Phone: 817-392-6747 ADVERTISEMENT DATES September 12, 2019. Seplember 19, 2019 17 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 22, 2016 14MAC SURFACE OVERLAY 2019-6 City Project No. 102098 0021 13 - 1 INSTRUCTIONS TO BIDDERS Page 1 of 9 1 SECTION 00 2113 2 INSTRUCTIONS TO BIDDERS 4 1. Defined Terms 5 6 1.1. Terms used in these INSTRUCTIONS TO BIDDERS, which are defined in Section 00 72 7 00 - GENERAL CONDITIONS. 8 9 1.2. Certain additional terms used in these INSTRUCTIONS TO BIDDERS have the 10 meanings indicated below which are applicable to both the singular and plural thereof. 11 12 1.2.1. Bidder: Any person, firm, partnership, company, association, or corporation acting 13 directly through a duly authorized representative, submitting a bid for performing 14 the work contemplated under the Contract Documents. 15 16 1.2.2. Nonresident Bidder: Any person, firm, partnership, company, association, or 17 corporation acting directly through a duly authorized representative, submitting a 18 bid for performing the work contemplated under the Contract Documents whose 19 principal place of business is not in the State of Texas. 20 21 1.2.3. Successful Bidder: The lowest responsible and responsive Bidder to whom City 22 (on the basis of City's evaluation as hereinafter provided) makes an award. 23 24 2. Copies of Bidding Documents 25 26 2.1. Neither City nor Engineer shall assume any responsibility for errors or misinterpretations 27 resulting from the Bidders use of incomplete sets of Bidding Documents. 28 29 2.2. City and Engineer in making copies of Bidding Documents available do so only for the 30 purpose of obtaining Bids for the Work and do not authorize or confer a license or grant 31 for any other use. 32 33 3. Prequalificatioln of Bidders (Prime Contractors and Subcontractors) 34 35 3.1, All Bidders and their subcontractors are required to be prequaliled for the work types 36 requiring prequalif cation at the time of bidding. Bids received from contractors who are 37 not prequalified (even if inadvertently opened) shall not be considered. Prequalification 38 requirement work types and documentation are as follows: 39 40 3.1.1. Paving — Requirements document located at; 41 baps.//projectpoint.buzzsaw.com/fortwortligL3v/Resources/02%20- 42 %20Construction%2ODocuments/Contractor%2OPre4ualifiication/TPW%2OPaving 43%20Coritractor%2OPrequalification%2OProgram/PREQUALIFICATION%20REQ 44 UIRE.MENTS%20FOR%20PAVING%2000NTRACTORS.PDF?public 45 3.1.2. Roadway and Pedestrian Lighting -- Requirements document located at; 46 htt sill rojeet oint.buzzsaw.com/fortworth ov/Resources/02%20- 47 %20Construction%2ODocuments/Contractor%2OPrequalification/TPW%2OPaving 48%o20Contractor%2OPrequalification%2OProgam/PREQUALIFICATION%20REO 49 UIREMENTS%20FOR%20PAVING%2000NTRACTORS.PDF?public CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised August 21, 2015 0021 13-2 INSTRUCTIONS TO BIDDERS Page 2 of 9 2 3.1.3. Water and Sanitary Sewer — Requirements document located at; 3 https://proi ectpoint.buzzsaw. com/fortworthgov/Resources/02%20- 4 %20Construction%2OD ocuments/Contractor%2O Preg ual i ficaf ion/Water%20and%2 5 OSanitary%2OSewer%2OContractor%2OPregualification%2OProgram/WSS%20pre 6qua] %2Orequirements.doc`lpublic 7 9 3.2. Each Bidder unless currently prequalified, must be prepared to submit to City within t0 seven (7) calendar days prior to Bid opening, the documentation identified in Section 00 11 45 11, BIDDERS PREQUALIFICATIONS. 12 I3 3.2.1. Submission of and/or questions related to prequalification should be addressed to 14 the City contact as provided in Paragraph 6.1. I5 16 17 3.3. The City reserves the right to require any pre -qualified contractor who is the apparent low 18 bidder(s) for a project to submit such additional information as the City, in its sole 19 discretion may require, including but not limited to manpower and equipment records, 20 information about key personnel to be assigned to the project, and construction schedule, 21 to assist the City in evaluating and assessing the ability of the apparent low bidder(s) to 22 deliver a quality product and successfully complete projects for the amount bid within 23 the stipulated time frame. Based upon the City's assessment of the submitted 24 information, a recommendation regarding the award of a contract will be made to the 25 City Council. Failure to submit the additional information, if requested, may be grounds 26 for rejecting the apparent low bidder as non -responsive. Affected contractors will be 27 notified in writing of a recommendation to the City Council. 28 29 3.4. In addition to prequalification, additional requirements for qualification may be required 30 within various sections of the Contract Documents. 31 32 4. Examination of Bidding and Contract Documents, Other Related Data, and Site 33 34 4.1. Before submitting a Bid, each Bidder shall: 35 36 4.1.1. Examine and carefully study the Contract Documents and other related data 37 identified in the Bidding Documents (including "technical data" referred to in 38 Paragraph 4.2. below). No information given by City or any representative of the 39 City other than that contained in the Contract Documents and officially 40 promulgated addenda thereto, shall be binding upon the City. 41 42 4.1.2, Visit the site to become familiar with and satisfy Bidder as to the general, local and 43 site conditions that may affect cost, progress, performance or furnishing of the 44 Work. 45 46 4.1.3. Consider federal, state and local Laws and Regulations that may affect cost, 47 progress, performance or furnishing of the Work. 48 49 4.1.4. 50 CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised August 21, 2015 0021 13 - 3 INSTRUCTIONS TO BIDDERS Page 3 of 9 1 4.1.5. Study all: (i) reports of explorations and tests of subsurface conditions at or 2 contiguous to the Site and all drawings of physical conditions relating to existing 3 surface or subsurface structures at the Site (except Underground Facilities) that 4 have been identified in the Contract Documents as containing reliable "technical 5 data" and (ii) reports and drawings of Hazardous Environmental Conditions, if any, 6 at the Site that have been identified in the Contract Documents as containing 7 reliable "technical data." 9 4.1.6. Be advised that the Contract Documents on mile with the City shall constitute all of 10 the information which the City will furnish. All additional information and data 1 I which the City will supply after promulgation of the formal Contract Documents 12 shall be issued in the form of written addenda and shall become part of the Contract 13 Documents just as though such addenda were actually written into the original 14 Contract Documents. No information given by the City other than that contained in 15 the Contract Documents and officially promulgated addenda thereto, shall be 16 binding upon the City. 17 18 4.1.7. Perform independent research, investigations, tests, borings, and such other means 19 as may be necessary to gain a complete knowledge of the conditions which will be 20 encountered during the construction of the project. On request, City may provide 2I each Bidder access to the site to conduct such examinations, investigations, 22 explorations, tests and studies as each Bidder deems necessary for submission of a 23 Bid. Bidder must fill all holes and clean up and restore the site to its former 24 conditions upon completion of such explorations, investigations, tests and studies. 25 26 4.1.8. Determine the difficulties of the Work and all attending circumstances affecting the 27 cost of doing the Work, time required for its completion, and obtain all information 28 required to make a proposal. Bidders shall rely exclusively and solely upon their 29 own estimates, investigation, research, tests, explorations, and other data which are 30 necessary for full and complete information upon which the proposal is to be based. 31 It is understood that the submission of a proposal is prima -facie evidence that the 32 Bidder has made the investigation, examinations and tests herein required. Claims 33 for additional compensation due to variations between conditions actually 34 encountered in construction and as indicated in the Contract Documents will not be 35 allowed. 36 37 4.1.9. Promptly notify City of all conflicts, errors, ambiguities or discrepancies in or 38 between the Contract Documents and such other related documents. The Contractor 39 shall not take advantage of any gross error or omission in the Contract Documents, 40 and the City shall be permitted to make such corrections or interpretations as may 41 be deemed necessary for fulfillment of the intent of the Contract Documents. 42 43 4.2. Reference is made to Section 00 73 00 -- Supplementary Conditions for identification of 44 45 4.2.1. those reports of explorations and tests of subsurface conditions at or contiguous to 46 the site which have been utilized by City in preparation of the Contract Documents. 47 The logs of Soil Borings, if any, on the plans are for general information only. 48 Neither the City nor the Engineer guarantee that the data shown is representative of 49 conditions which actually exist. 50 CI I'Y OF FORT WORTH RMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised August 21, 2015 0021 13 - 4 INSTRUCTIONS TO BIDDERS Page 4 of 9 1 4.2.2. those drawings of physical conditions in or relating to existing surface and 2 subsurface structures (except Underground Facilities) which are at or contiguous to 3 the site that have been utilized by City in preparation of the Contract Documents. 4 5 4.2.3. copies of such reports and drawings will be made available by City to any Bidder 6 on request. Those reports and drawings may not be part of the Contract 7 Documents, but the "technical data" contained therein upon which Bidder is entitled 8 to rely as provided in Paragraph 4.02. of the General Conditions has been identified 9 and established in Paragraph SC 4.02 of the Supplementary Conditions. Bidder is 10 responsible for any interpretation or conclusion drawn from any "technical data" or 11 any other data, interpretations, opinions or information. 12 13 4.3. The submission of a Bid will constitute an incontrovertible representation by Bidder (i) 14 that Bidder has complied with every requirement of this Paragraph 4, (ii) that without 15 exception the Bid is premised upon performing and furnishing the Work required by the 16 Contract Documents and applying the specific means, methods, techniques, sequences or 17 procedures of construction (if any) that may be shown or indicated or expressly required 18 by the Contract Documents, (iii) that Bidder has given City written notice of all 19 conflicts, errors, ambiguities and discrepancies in the Contract Documents and the 20 written resolutions thereof by City are acceptable to Bidder, and when said conflicts, 21 etc., have not been resolved through the interpretations by City as described in 22 Paragraph 6., and (iv) that the Contract Documents are generally sufficient to indicate 23 and convey understanding of all terms and conditions for performing and furnishing the 24 Work. 25 26 4.4. The provisions of this Paragraph 4, inclusive, do not apply to Asbestos, Polychlorinated 27 biphenyls (PCBs), Petroleum, Hazardous Waste or Radioactive Material covered by 28 Paragraph 4.06. of the General Conditions, unless specifically identified in the Contract 29 Documents. 30 31 5. Availability of Lands for Work, Etc. 32 33 5,1. The lands upon which the Work is to be performed, rights -of -way and easements for 34 access thereto and other lands designated for use by Contractor in performing the Work 35 are identified in the Contract Documents. All additional lands and access thereto 36 required for temporary construction facilities, construction equipment or storage of 37 materials and equipment to be incorporated in the Work are to be obtained and paid for 38 by Contractor. Easements for permanent structures or permanent changes in existing 39 facilities are to be obtained and paid for by City unless otherwise provided in the 40 Contract Documents. 41 42 5.2.Outstanding right-of-way, easements, and/or permits to be acquired by the City are listed 43 in Paragraph SC 4.01 of the Supplementary Conditions. In the event the necessary right- 44 of -way, easements, and/or permits are not obtained, the City reserves the right to cancel 45 the award of contract at any time before the Bidder begins any construction work on the 46 project. 47 CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised August 21, 2015 002113-5 INSTRUCTIONS TO BIDDERS Page 5 of 9 1 5.3. The Bidder shall be prepared to commence construction without all executed right-of- 2 way, easements, and/or permits, and shall submit a schedule to the City of how 3 construction will proceed in the other areas of the project that do not require permits 4 and/or easements. 5 6 6. Interpretations and Addenda 7 8 6.1. All questions about the meaning or intent of the Bidding Documents are to be directed to 9 City in writing on or before 2 p.m., the Monday prior to the Bid opening. Questions 10 received after this day may not be responded to. Interpretations or clarifications 11 considered necessary by City in response to such questions will be issued by Addenda 12 delivered to all parties recorded by City as having received the Bidding Documents. 13 Only questions answered by formal written Addenda will be binding. Oral and other 14 interpretations or clarifications will be without legal effect. 15 16 Address questions to: 17 18 City of Fort Worth 19 200 Texas Street 20 Fort Worth, TX 76102 21 22 Attn: Juan Pablo De La Cruz, Transportation and Public Works 23 Email: Juan.DeLaCruz@fortworthtexas.gov 24 Phone: 817-392-6747 25 26 27 6.2. Addenda may also be issued to modify the Bidding Documents as deemed advisable by 28 City. 29 30 6.3. Addenda or clarifications may be posted via Buzzsaw at 31 https://,orojectpoint.huzzscm.coinI ortworth ov/A_dvertrsecl/102098%20-- 32%20HMAC%206urface9lo20Overlay%202019-6?public 33 34 6.4.A pre bid conference may be held at the time and place indicated in the Advertisement or 35 INVITATION TO BIDDERS. Representatives of City will be present to discuss the 36 Project. Bidders are encouraged to attend and participate in the conference. City will 37 transmit to all prospective Bidders of record such Addenda as City considers necessary 38 in response to questions arising at the conference. Oral statements may not be relied 39 upon and will not be binding or legally effective. 40 41 7. Bid Security 42 43 7.1. Each Bid must be accompanied by Bid Bond made payable to City in an amount of five 44 (5) percent of Bidder's maximum Bid price on form attached, issued by a surety meeting 45 the requirements of Paragraphs 5.01 of the General Conditions. 46 CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised August21, 2015 0021 13 - 6 INSTRUCTIONS TO BIDDERS Page 6 of 9 1 7.2. The Bid Bond of all Bidders will be retained until the conditions of the Notice of Award 2 have been satisfied. if the Successful Bidder fails to execute and deliver the complete 3 Agreement within 10 days after the Notice of Award, City may consider Bidder to be in 4 default, rescind the Notice of Award, and the Bid Bond of that Bidder will be forfeited. 5 Such forfeiture shall be City's exclusive remedy if Bidder defaults. The Bid Bond of all 6 other Bidders whom City believes to have a reasonable chance of receiving the award 7 will be retained by City until final contract execution. 8 9 S. Contract Times 10 The number of days within which, or the dates by which, Milestones are to be achieved in 11 accordance with the General Requirements and the Work is to be completed and ready for 12 Final Acceptance is set forth in the Agreement or incorporated therein by reference to the 13 attached Bid Form. 14 15 9. Liquidated Damages 16 Provisions for Iiquidated damages are set forth in the Agreement. 17 18 10. Substitute and "Or -Equal" Items 19 The Contract, if awarded, will be on the basis of materials and equipment described in the 20 Bidding Documents without consideration of possible substitute or "or -equal" items. 21 Whenever it is indicated or specified in the Bidding Documents that a "substitute" or "or- 22 equal" item of material or equipment may be furnished or used by Contractor if acceptable to 23 City, application for such acceptance will not be considered by City until after the Effective 24 Date of the Agreement. The procedure for submission of any such application by Contractor 25 and consideration by City is set forth in Paragraphs 6.05A., 6.05B. and 6.05C. of the General 26 Conditions and is supplemented in Section 01 25 00 of the General Requirements. 27 28 11. Subcontractors, Suppliers and Others 29 30 11.1. In accordance with the City's Business Diversity Enterprise Ordinance No. 20020- 31 12-2011 (as amended), the City has goals for the participation of minority business 32 and/or small business enterprises in City contracts. A copy of the Ordinance can be 33 obtained from the Office of the City Secretary. The Bidder shall submit the MBE and 34 SBE Utilization Form, Subcontractor/Supplier Utilization Form, Prime Contractor 35 Waiver Form and/or Good Faith Effort Form with documentation and/or Joint 36 Venture Form as appropriate. The Forms including documentation must be received 37 by the City no later than 2:00 P.M. CST, on the second business days after the bid 38 opening date. The Bidder shall obtain a receipt from the City as evidence the 39 documentation was received. Failure to comply shall render the bid as non- 40 responsive. 41 42 11.2. No Contractor shall be required to employ any Subcontractor, Supplier, other person 43 or organization against whom Contractor has reasonable objection. 44 45 12. Bid Form 46 47 12.1. The Bid Form is included with the Bidding Documents; additional copies maybe 48 obtained from the City. 49 CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Projcct No. 102098 Revised August 21, 2015 0021 13-7 INSTRUCTIONS TO BIDDERS Page 7 of 9 1 12.2. All blanks on the Bid Form must be completed by printing in ink and the Bid Form 2 signed in ink. Erasures or alterations shall be initialed in ink by the person signing 3 the Bid Form. A Bid price shall be indicated for each Bid item, alternative, and unit 4 price item listed therein. In the case of optional alternatives, the words "No Bid," 5 "No Change," or "Not Applicable" may be entered. Bidder shall state the prices, 6 written in ink in both words and numerals, for which the Bidder proposes to do the 7 work contemplated or furnish materials required. All prices shall be written legibly. 8 In case of discrepancy between price in written words and the price in written 9 numerals, the price in written words shall govern. 10 11 12.3. Bids by corporations shall be executed in the corporate name by the president or a 12 vice-president or other corporate officer accompanied by evidence of authority to 13 sign. The corporate seal shall be affixed. The corporate address and state of 14 incorporation shall be shown below the signature. 15 16 12.4. Bids by partnerships shall be executed in the partnership name and signed by a 17 partner, whose title must appear under the signature accompanied by evidence of 18 authority to sign. The official address of the partnership shall be shown below the 19 signature. 20 21 12.5. Bids by limited liability companies shall be executed in the name of the firm by a 22 member and accompanied by evidence of authority to sign. The state of formation of 23 the firm and the official address of the firm shall be shown. 24 25 12.6. Bids by individuals shall show the Bidder's name and official address. 26 27 12.7. Bids by joint ventures shall be executed by each joint venturer in the manner 28 indicated on the Bid Form. The official address of the joint venture shall be shown. 29 30 12.8. All names shall be typed or printed in ink below the signature. 31 32 12.9. The Bid shall contain an acknowledgement of receipt of all Addenda, the numbers of 33 which shall be filled in on the Bid Form. 34 35 12.10. Postal and e-mail addresses and telephone number for communications regarding the 36 Bid shall be shown. 37 38 12.11. Evidence of authority to conduct business as a Nonresident Bidder in the state of 39 Texas shall be provided in accordance with Section 00 43 37 — Vendor Compliance 40 to State Law Non Resident Bidder. 41 42 13. Submission of Bids 43 Bids shall be submitted on the prescribed Bid Form, provided with the Bidding Documents, 44 at the time and place indicated in the Advertisement or INVITATION TO BIDDERS, 45 addressed to Purchasing Manager of the City, and shall be enclosed in an opaque sealed 46 envelope, marked with the City Project Number, Project title, the name and address of 47 Bidder, and accompanied by the Bid security and other required documents. If the Bid is sent 48 through the mail or other delivery system, the sealed envelope shall be enclosed in a separate 49 envelope with the notation "BID ENCLOSED" on the face of it. 50 CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised August 21, 2015 0021 13 - 8 INSTRUCTIONS TO BIDDERS Page 8 of 9 1 14. Modification and Withdrawal of Bids 2 3 14.1. Bids addressed to the Purchasing Manager and filed with the Purchasing Office 4 cannot be withdrawn prior to the time set for bid opening. A request for withdrawal 5 must be made in writing by an appropriate document duly executed in the manner 6 that a Bid must be executed and delivered to the place where Bids are to be submitted 7 at any time prior to the opening of Bids. After all Bids not requested for withdrawal 8 are opened and publicly read aloud, the Bids for which a withdrawal request has been 9 properly filed may, at the option of the City, be returned unopened. 10 11 14.2. Bidders may modify their Bid by electronic communication at any time prior to the 12 time set for the closing of Bid receipt. 13 14 15. Opening of Bids 15 Bids will be opened and read aloud publicly at the place where Bids are to be submitted. An 16 abstract of the amounts of the base Bids and major alternates (if any) will be made available 17 to Bidders after the opening of Bids. 18 19 16. Bids to Remain Subject to Acceptance 20 All Bids will remain subject to acceptance for the time period specified for Notice of Award 21 and execution and delivery of a complete Agreement by Successful Bidder. City may, at 22 City's sole discretion, release any Bid and nullify the Bid security prior to that date. 23 24 17. Evaluation of Bids and Award of Contract 25 26 17.1. City reserves the right to reject any or all Bids, including without limitation the rights 27 to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids 28 and to reject the Bid of any Bidder if City believes that it would not be in the best 29 interest of the Project to mare an award to that Bidder, whether because the Bid is 30 not responsive or the Bidder is unqualified or of doubtful financial ability or fails to 31 meet any other pertinent standard or criteria established by City. City also reserves 32 the right to waive informalities not involving price, contract time or changes in the 33 Work with the Successful Bidder. Discrepancies between the multiplication of units 34 of Work and unit prices will be resolved in favor of the unit prices. Discrepancies 35 between the indicated sum of any column of figures and the correct sum thereof will 36 be resolved in favor of the correct suln. Discrepancies between words and figures 37 will be resolved in favor of the words. 38 39 17.1.1. Any or all bids will be rejected if City has reason to believe that collusion exists 40 among the Bidders, Bidder is an interested party to any litigation against City, 41 City or Bidder may have a claim against the other or be engaged in litigation, 42 Bidder is in arrears on any existing contract or has defaulted on a previous 43 contract, Bidder has performed a prior contract in an unsatisfactory manner, or 44 Bidder has uncompleted work which in the judgment of the City will prevent or 45 hinder the prompt completion of additional work if awarded. 46 CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No, 102098 Revised August 21, 2015 0021 13 - 9 INSTRUCTIONS TO BIDDERS Page 9 of 9 1 17.2. City may consider the qualifications and experience of Subcontractors, Suppliers, and 2 other persons and organizations proposed for those portions of the Work as to which 3 the identity of Subcontractors, Suppliers, and other persons and organizations must 4 be submitted as provided in the Contract Documents or upon the request of the City. 5 City also may consider the operating costs, maintenance requirements, performance 6 data and guarantees of major items of materials and equipment proposed for 7 incorporation in the Work when such data is required to be submitted prior to the 8 Notice of Award. 10 17.3. 11 12 13 14 15 16 17 18 I9 20 21 22 23 24 25 26 27 28 29 City may conduct such investigations as City deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors, Suppliers and other persons and organizations to perform and furnish the Work in accordance with the Contract Documents to City's satisfaction within the prescribed time. 17.4. Contractor shall perform with his own organization, work of a value not less than 35% of the value embraced on the Contract, unless otherwise approved by the City. 17.5. if the Contract is to be awarded, it will be awarded to lowest responsible and responsive Bidder whose evaluation by City indicates that the award will be in the best interests of the City. 17.6. Pursuant to Texas Government Code Chapter 2252.001, the City will not award contract to a Nonresident Bidder unless the Nonresident Bidder's bid is lower than the lowest bid submitted by a responsible Texas Bidder by the same amount that a Texas resident bidder would be required to underbid a Nonresident Bidder to obtain a comparable contract in the state in which the nonresident's principal place of business is located. 30 17.7. A contract is not awarded until formal City Council authorization. If the Contract is 31 to be awarded, City will award the Contract within 90 days after the day of the Bid 32 opening unless extended in writing. No other act of City or others will constitute 33 acceptance of a Bid. Upon the contractor award a Notice of Award will be issued by 34 the City. 35 36 17.8. Failure or refusal to comply with the requirements may result in rejection of Bid. 37 38 18. Signing of Agreement 39 When City issues a Notice of Award to the Successful Bidder, it will be accompanied by the 40 required number of unsigned counterparts of the Agreement. Within 14 days thereafter 41 Contractor shall sign and deliver the required number of counterparts of the Agreement to 42 City with the required Bonds, Certificates of Insurance, and all other required documentation. 43 City shall thereafter deliver one fully signed counterpart to Contractor. 44 45 46 47 END OF SECTION CITY OF FORT WORTH I IMAC SURFACE OVERLAY 20I9-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised August21, 2015 003215-0 CONSTRUCTION PROGRESS SCHEDULE Page I of 10 1 SECTION 00 32 15 2 CONSTRUCTION PROJECT SCHEDULE 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. General requirements for the preparation, submittal, updating, status reporting and 7 management of the Construction Project Schedule 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include, but are not necessarily limited to: 11 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 12 2. Division 1 — General Requirements 13 D. Purpose 14 The City of Fort Worth (City) is committed to delivering quality, cost-effective 15 infrastructure to its citizens in a timely manner. A key tool to achieve this purpose is a 16 properly structured schedule with accurate updates. This supports effective monitoring 17 of progress and is input to critical decision making by the project manager throughout 18 the life of the project. Data from the updated project schedule is utilized in status 19 reporting to various levels of the City organization and the citizenry. 20 21 This Document complements the City's Standard Agreement to guide the construction 22 contractor (Contractor) in preparing and submitting acceptable schedules for use by the 23 City in project delivery. The expectation is the performance of the work follows the 24 accepted schedule and adhere to the contractual timeline. 25 26 The Contractor will designate a qualified representative (Project Scheduler) responsible 27 for developing and updating the schedule and preparing status reporting as required by 28 the City. 29 30 1.2 PRICE AND PAYMENT PROCEDURES 31 A. Measurement and Payment 32 1. Work associated with this Item is considered subsidiary to the various items bid. 33 No separate payment will be allowed for this Item. 34 2. Non-compliance with this specification is grounds for City to withhold payment of 35 the Contractor's invoices until Contractor achieves said compliance. 36 1.3 REFERENCES 37 A. Project Schedules 38 Each project is represented by City's master project schedule that encompasses the 39 entire scope of activities envisioned by the City to properly deliver the work. When the 40 City contracts with a Contractor to perform construction of the Work, the Contractor CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD SPECIFICATION City Project No. 102098 Revised JULY 20, 2018 003215-0 CONSTRUCTION PROGRESS SCHEDULE Page 2 of 10 1 will develop and maintain a schedule for their scope of work in alignment with the 2 City's standard schedule requirements as defined herein. The data and information of 3 each such schedule will be leveraged and become integral in the master project 4 schedule as deemed appropriate by the City's Project Control Specialist and approved 5 by the City's Project Manager. 6 7 1. Master Project Schedule 8 The master project schedule is a holistic representation of the scheduled activities 9 and milestones for the total project and be Critical Path Method (CPM) based. The 10 City's Project Manager is accountable for oversight of the development and I 1 maintaining a master project schedule for each project. When the City contracts for 12 the design and/or construction of the project, the master project schedule will 13 incorporate elements of the Design and Construction schedules as deemed 14 appropriate by the City's Project Control Specialist. The assigned City Project 15 Control Specialist creates and maintains the master project schedule in P6 (City's 16 scheduling software). 17 18 2. Construction Schedule 19 The Contractor is responsible for developing and maintaining a schedule for the 20 scope of the Contractor's contractual requirements. The Contractor will issue an 21 initial schedule for review and acceptance by the City's Project Control Specialist 22 and the City's Project Manager as a baseline schedule for Contractor's scope of 23 work. Contractor will issue current, accurate updates of their schedule (Progress 24 Schedule) to the City at the end of each month throughout the life of their work. 25 26 B. Schedule Tiers 27 The City has a portfolio of projects that vary widely in size, complexity and content 28 requiring different scheduling to effectively deliver each project. The City uses a 29 "tiered" approach to align the proper schedule with the criteria for each project. The 30 City's Project Manager determines the appropriate schedule tier for each project, and 31 includes that designation and the associated requirements in the Contractor's scope of 32 work. The following is a summary of the "tiers". 33 34 1. Tier 1: Small Size and Short Duration Project (design not required) 35 The City develops and maintains a Master Project Schedule for the proj ect. No 36 schedule submittal is required from Contractor. City's Project Control Specialist 37 acquires any necessary schedule status data or information through discussions with 38 the respective party on an as -needed basis. 39 40 2. Tier 2: Small Size and Short to Medium Duration Project 41 The City develops and maintains a Master Project Schedule for the project. The 42 Contractor identifies "start" and "finish" milestone dates on key elements of their 43 work as agreed with the City's Project Manager at the kickoff of their work effort. 44 The Contractor issues to the City, updates to the "start" and "finish" dates for such 45 milestones at the end of each month throughout the life of their work on the project. 46 47 3. Tier 3: Medium and Large Size and/or Complex Projects Regardless of Duration 48 The City develops and maintains a Master Project Schedule for the project. The 49 Contractor develops a Baseline Schedule and maintains the schedule of their 50 respective scope of work on the project at a level of detail (generally Level 3) and in CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD ,SPECIFICATION City Project No. 102098 Revised JULY 20, 2018 0032 15 - 0 CONSTRUCTION PROGRESS SCHEDULE Page 3 of 10 1 alignment with the WBS structure in Section 1.4.H as agreed by the Project Manager. 2 The Contractor issues to the City, updates of their respective schedule (Progress 3 Schedule) at the end of each month throughout the life of their work on the project. 4 C. Schedule Types 5 Project delivery for the City utilizes two types of schedules as noted below. The City 6 develops and maintains a Master Project Schedule as a "baseline" schedule and issue 7 monthly updates to the City Project Manager (end of each month) as a "progress" 8 schedule. The Contractor prepares and submits each schedule type to fulfill their 9 contractual requirements. 10 11 1. Baseline Schedule 12 The Contractor develops and submits to the City, an initial schedule for their scope 13 of work in alignment with this specification. Once reviewed and accepted by the 14 City, it becomes the "Baseline" schedule and is the basis against which all progress 15 is measured. The baseline schedule will be updated when there is a change or 16 addition to the scope of work impacting the duration of the work, and only after 17 receipt of a duly authorized change order issued by the City. In the event progress is 18 significantly behind schedule, the City's Project Manager may authorize an update 19 to the baseline schedule to facilitate a more practical evaluation of progress. An 20 example of a Baseline Schedule is provided in Specification 00 32 15.1 21 Construction Project Schedule Baseline Example. 22 23 2. Progress Schedule 24 The Contractor updates their schedule at the end of each month to represent the 25 progress achieved in the work which includes any impact from authorized changes 26 in the work. The updated schedule must accurately reflect the current status of the 27 work at that point in time and is referred to as the "Progress Schedule". The City's 28 Project Manager and Project Control Specialist reviews and accepts each progress 29 schedule. In the event a progress schedule is deemed not acceptable, the 30 unacceptable issues are identified by the City within 5 working days and the 31 Contractor must provide an acceptable progress schedule within 5 working days 32 after receipt of non -acceptance notification. An example of a Progress Schedule is 33 provided in Specification 00 32 15.2 Construction Project Schedule Progress 34 Example. 35 36 1.4 CITY STANDARD SCHEDULE REQUIREMENTS 37 The following is an overview of the methodology for developing and maintaining a 38 schedule for delivery of a project. 39 40 A. Schedule Framework 41 The schedule will be based on the defined scope of work and follow the (Critical Path 42 Methodology) CPM method. The Contractor's schedule will align with the requirements 43 of this specification and will be cost loaded to reflect their plan for execution. Overall 44 schedule duration will align with the contractual requirements for the respective scope of 45 work and be reflected in City's Master Project Schedule. The Project Number and Name 46 of the Project is required on each schedule and must match the City's project data. 47 48 B. Schedule File Name CITY OF PORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD SPECIFICATION City Project No. 102098 Revised JULY 20, 2018 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 003215-0 CONSTRUCTION PROGRESS SCHEDULE Page 4 of 10 All schedules submitted to the City for a project will have a file name that begins with the City's project number followed by the name of the project followed by baseline (if a baseline schedule) or the year and month (if a progress schedule), as shown below. • Baseline Schedule File Name Format: City Project Number Project Name —Baseline Example: 101376North Montgomery Street UMAC_Baseline • Progress Schedule File Name Format: City Project Number _Project Name_YYYY-MM Example: 101376 North Montgomery Street HMAC 2018_01 • Project Schedule Progress Narrative File Name Format: City Project Number _Project Name_PN_YYYY-MM Example: 101376 North Montgomery Street HMAC PN 2018 01 C. Schedule Templates The Contractor will utilize the relevant sections from the City's templates provided in the City's document management system as the basis for creating their respective project schedule. Specifically, the Contractor's schedule will align with the layout of the Construction section. The templates are identified by type of project as noted below. • Arterials • Aviation • Neighborhood Streets • Sidewalks (later) • Quiet Zones (later) r Street Lights (later) • Intersection Improvements (later) • Parks • Storm water • Street Maintenance • Traffic • Water D. Schedule Calendar The City's standard calendar for schedule development purposes is based on a 5-day workweek and accounts for the City's eight standard holidays (New Years, Martin Luther King, Memorial, Independence, Labor, Thanksgiving, day after Thanksgiving, Christmas). The Contractor will establish a schedule calendar as part of the schedule development process and provide to the Project Control Specialist as part of the basis for their schedule. Variations between the City's calendar and the Contractor's calendar must be resolved prior to the City's acceptance of their Baseline project schedule. E. WBS & Milestone Standards for Schedule Development The scope of work to be accomplished by the Contractor is represented in the schedule in the form of a Work Breakdown Structure (WBS). The WBS is the basis for the development of the schedule activities and shall be imbedded and depicted in the schedule. CITY OF FORT WORTH STANDARD SPECIFICATION Revised SULY 20, 2018 HMAC SURFACE OVERLAY 2019-6 City Project No. 102098 0032 f5-0 CONSTRUCTION PROGRESS SCHEDULE Page 5 of 10 I The following is a summary of the standards to be followed in preparing and maintaining 2 a schedule for project delivery. 3 4 1. Contractor is required to utilize the City's WBS structure and respective project type 5 template for "Construction" as shown in Section 1.4.H below. Additional activities 6 may be added to Levels 1 - 4 to accommodate the needs of the organization executing 7 the work. Specifically the Contractor will add activities under WBS XXXXXX.80.83 8 "Construction Execution" that delineates the activities associated with the various 9 components of the work. 10 11 2. Contractor is required to adhere to the City's Standard Milestones as shown in 12 Section 1.4.I below. Contractor will include additional milestones representing 13 intermediate deliverables as required to accurately reflect their scope of work. 14 15 F. Schedule Activities 16 Activities are the discrete elements of work that make up the schedule. They will be 17 organized under the umbrella of the WBS. Activity descriptions should adequately 18 describe the activity, and in some cases the extent of the activity. All activities are 19 logically tied with a predecessor and a successor. The only exception to this rule is for 20 "project start" and "project finish" milestones. 21 22 The activity duration is based on the physical amount of work to be performed for the 23 stated activity, with a maximum duration of 20 working days. If the work for any one 24 activity exceeds 20 days, break that activity down incrementally to achieve this duration 25 constraint. Any exception to this requires review and acceptance by the City's Project 26 Control Specialist. 27 28 G. Change Orders 29 When a Change Order is issued by the City, the impact is incorporated into the previously 30 accepted baseline schedule as an update, to clearly show impact to the project timeline. 31 The Contractor submits this updated baseline schedule to the City for review and 32 acceptance as described in Section 1.5 below. Updated baseline schedules adhere to the 33 following: 34 35 1. Time extensions associated with approved contract modifications are limited to the 36 actual amount of time the project activities are anticipated to be delayed, unless 37 otherwise approved by the Program Manager. 38 39 2. The re-baselined schedule is submitted by the Contractor within ten workdays after 40 the date of receipt of the approved Change Order. 41 42 3. The changes in logic or durations approved by the City are used to analyze the impact 43 of the change and is included in the Change Order. The coding for a new activity(s) 44 added to the schedule for the Change Order includes the Change Order number in the 45 Activity ID. Use as many activities as needed to accurately show the work of the 46 Change Order. Revisions to the baseline schedule are not effective until accepted by 47 the City. 48 49 50 H. City's Work Breakdown Structure CfTY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD SPECIFICATION City Project No. 102098 Revised JULY 20, 2018 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 0032 15 - 0 CONSTRUCTION PROGRESS SCHEDULE Page 6 of 10 WBS Code WBS Name )O XXXX Project Name XXXXXX.30 Design XXXXXX.30.10 Design Contractor Agreement XXXXXX.30.20 Conceptual Design (30%) XXXXXX.30.30 Preliminary Design (60%) XXXXXX.30.40 Final Design XXXXXX.30.50 Enviromnental XXXXXX.30.60 Permits XXXXXX.30.60.10 Permits - Identification XXXXXX.30.60.20 Permits - Review/Approve XXXXXX.40 ROW & Easements XXXXXX.40.10 ROW Negotiations XXXXXX.40.20 Condemnation XXXXXX.70 Utility Relocation XXXXXX.70.10 Utility Relocation Co-ordination XXXXXX,80 Construction XXXXXX.80.81 Bid and Award XXXXXX.80.83 Construction Execution XXXXXX.80.85 inspection XXXXXX.80.86 Landscaping XXXXXX.90 Closeout XXXXXX90.10 Construction Contract Close-out XXXXXX.90.40 Design Contract Closure 1. City's Standard Milestones The following milestone activities (i.e., important events on a project that mark critical points in time) are of particular interest to the City and must be reflected in the project schedule for all phases of work. Activity ID Activity Name Design 3020 Award Design Agreement 3040 Issue Notice To Proceed - Design Engineer 3100 Design Kick-off Meeting 3120 Submit Conceptual Plans to Utilities, ROW, Traffic, Parks, Storm Water, Water &,Sewer 3150 Peer Review Meeting/Design Review meeting (technical) 3160 Conduct Design Public Meeting # 1 (required) 3170 Conceptual Design Complete 3220 Submit Preliminary Plans and Specifications to Utilities, ROW, Traffic, Parks, Storm Water, Water & Sewer 3250 Conduct Design Public Meeting 92 (required) 3260 Preliminary Design Complete CITY OF FORT WORM HMAC SURFACE OVERLAY 2019-6 STANDARD SPECIFICATION City Project No. 102098 Revised JULY 20, 2018 003215-0 CONSTRUCTION PROGRESS SCHEDULE Page 7 of 10 1 3310 Submit Final Design to Utilities, ROW, Traffic, Parks, Storm Water, 2 Water & Sewer 3 3330 Conduct Design Public Meeting #3 (if required) 4 3360 Final Design Complete 5 ROW & Easements 6 4000 Right of Way Start 7 4230 Right of Way Complete 8 Utility Relocation 9 7000 Utilities Start 10 7120 Utilities Cleared/Complete 11 Construction 12 Bid and Award 13 8110 Start Advertisement 14 8150 Conduct Bid Opening 15 8240 Award Construction Contract 16 Construction Execution 17 8330 Conduct Construction Public Meeting #4 Pre -Construction 18 8350 Construction Start 19 8370 Substantial Completion 20 8540 Construction Completion 2I 9130 Notice of Completion/Green Sheet 22 9150 Construction Contract Closed 23 9420 Design Contract Closed 24 1.5 SUBMITTALS 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 A. Schedule Submittal & Review The City's Project Manager is responsible for reviews and acceptance of the Contractor's schedule. The City's Project Control Specialist is responsible for ensuring alignment of the Contractor's baseline and progress schedules with the Master Project Schedule as support to the City's Project Manager. The City reviews and accepts or rejects the schedule within ten workdays of Contractor's submittal. 1. Schedule Format The Contractor will submit each schedule in two electronic forms, one in native file format (.xer, .xml, .mpx) and the second in a pdf format, in the City's document management system in the location dedicated for this purpose and identified by the Project Manager. In the event the Contractor does not use Primavera P6 or MS Project for scheduling purposes, the schedule information must be submitted in .xls or .xlsx format in compliance with the sample layout (See Specification 00 32 115.1 Construction Project Schedule Baseline Example), including activity predecessors, successors and total float. 2. Initial & Baseline Schedule The Contractor will develop their schedule for their scope of work and submit their initial schedule in electronic form (in the file formats noted above), in the City's document management system in the location dedicated for this purpose within ten workdays of the Notice ofAward. CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD SPECIFICATION City Project No. 102098 Revised JULY 20, 2018 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 003215-0 CONSTRUCTION PROGRESS SCHEDULE Page 8 of 10 The City's Project Manager and Project Control Specialist review this initial schedule to determine alignment with the City's Master Project Schedule, including format & WBS structure. Following the City's review, feedback is provided to the Contractor for their use in finalizing their initial schedule and issuing (within five workdays) their Baseline Schedule for final review and acceptance by the City. 3. Progress Schedule The Contractor will update and issue their project schedule (Progress Schedule) by the last day of each month throughout the life of their work on the project. The Progress Schedule is submitted in electronic form as noted above, in the City's document management system in the location dedicated for this purpose. The City's Project Control team reviews each Progress Schedule for data and information that support the assessment of the update to the schedule. In the event data or information is missing or incomplete, the Project Controls Specialist communicates directly with the Contractor's scheduler for providing same. The Contractor re -submits the corrected Progress Schedule within S workdays, following the submittal process noted above. The City's Project Manager and Project Control Specialist review the Contractor's progress schedule for acceptance and to monitor performance and progress. The fallowing list of items are required to ensure proper status information is contained in the Progress Schedule. O Baseline Start date b Baseline Finish Date O % Complete o Float O Activity Logic (dependencies) Critical Path Activities added or deleted 0 Expected Baseline Finish date 4 Variance to the Baseline Finish Date B. Monthly Construction Status Report The Contractor submits a written status report (referred to as a progress narrative) at the end of each month to accompany the Progress Schedule submittal, using the standard format provided in Specification 00 32 15.3 Construction Project Schedule Progress Narrative. The content of the Construction Project Schedule Progress Narrative should be concise and complete to: + Reflect the current status of the work for the reporting period (including actual activities started and/or completed during the reporting period) Explain variances from the baseline on critical path activities 9 Explain any potential schedule conflicts or delays * Describe recovery plans where appropriate * Provide a summary forecast of the work to be achieved in the next reporting period. C. Submittal Process CrrY OF FORT WORTH STANDARD SPECIFICATION Revised IULY 20, 2018 HMAC SURFACE OVERLAY 2019-6 City Project No. 102098 003215-0 CONSTRUCTION PROGRESS SCHEDULE Page 9 of 10 1 o Schedules and Monthly Construction Status Reports are submitted in Buzzsaw 2 following the steps outlined in Specification 00 32 15.4 Construction Project 3 Schedule Submittal Process. 4 • Once the project has been completed and Final Acceptance has been issued by the 5 City, no further progress schedules or construction status reports are required from 6 the Contractor. 7 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 8 1.7 CLOSEOUT SUBMITTALS [NOT USED] 9 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 10 1.9 QUALITY ASSURANCE 11 A. The person preparing and revising the Contractor's Project Schedule shall be 12 experienced in the preparation of schedules of similar complexity. 13 B. Schedule and supporting documents addressed in this Specification shall be prepared, 14 updated and revised to accurately reflect the performance of the Contractor's scope of 15 work. 16 C. The Contractor is responsible for the quality of all submittals in this section meeting the 17 standard of care for the construction industry for similar projects. 18 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 19 1.11 FIELD [SITE] CONDITIONS [NOT USED] 20 1.12 WARRANTY [NOT USED] 21 1.13 ATTACHMENTS 22 Spec 00 32 15.1 Construction Project Schedule Baseline Example 23 Spec 00 32 15.2 Construction Project Schedule Progress Example 24 Spec 00 32 15.3 Construction Project Schedule Progress Narrative 25 Spec 00 32 15.4 Construction Project Schedule Submittal Process 26 27 28 PART 2 - PRODUCTS [NOT USED] 29 30 31 32 33 34 PART 3 - EXECUTION [NOT USED] END OF SECTION CITY OF FORT WORTH I- MAC SURFACE OVERLAY 2019-6 STANDARD SPECIFICATION City Project No. 402098 Revised DULY 20, 2018 003215-0 CONSTRUCTION PROGRESS SCHEDULE Page 10 of 10 Revision Log DATE NAME SUMMARY OF CHANGE July 20, 2018 M. Jarrell Initial Issue CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD SPECIFICATION City Project No. 102098 Revised JULY 20, 2018 0032 15.1 - 0 CONSTRUCTION PROGRESS SCHEDULE — BASELINE EXAMPLE Page 1 of 5 I SECTION 00 32 15.1 2 CONSTRUCTION PROJECT SCHEDULE — BASELINE EXAMPLE 3 PART1- GENERAL 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 3I 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 The fallowing is an example of a Contractor's project schedule that illustrates the data and expectation for schedule content depicting the baseline for the project. This version of the schedule is referred to as a "baseline" schedule. This example is intended to provide guidance for the Contractor when developing and submitting a baseline schedule. See CFW Specification 00 32 15 Construction Project Schedule for details and requirements regarding the Contractor's project schedule. CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised .NLY 20, 2018 0032 15.1 - 0 CONSTRUCTION PROGRESS SCHEDULE — BASELINE EXAMPLE Page 2 of 5 ------------ F--------- t--------- {------------ F---------- ;---------- {________._{----------- {------ ---- I- ----------- {-----.-_-.F._--_---_{--__--_-_{--_ W i i i i i i i i # { i _ __ ___' --_' ___ ---------------------- ------ ---- - T— F E ---------- ----------r----- --- I�B �d �,L,`1 � C'.4,G Fi; ••1� Iz �'N p�C]:FJ l,r �l•q;r',+ � +a R'�_ �u're3 tl Cl'i+r:� !+'uY n �'� F- F-'� w r;� �l i` r+5' d+-35 rl r5 xl YF 7G iJ II_ Irr/.1�-11 ,YyTjl p q 8 � � � •I p qI •F fi i3 C r� p p p p 4 4 �'�.1 .6 I- r8 � �d r'w I I r�i y q� I� �6 �4 i� � �� L'� � � r a3 O I rr ' rY .,� r� 17 P � ro r¢ R F] • { � � �"-1 i� C7 a1 _LS r c5 C u 41. L'J rl #: Coil �40 -.. r1 c W � �.li (D "� p G 41 yy { Msl 0 _ .• . n Ez ii u 4ra ' .��. • :ri n �' ' Q `3 v,I vi 41 Ilk in is : •' S I OL u Fd ea tU c If 33 3 .y� � G Lp �p cp 12 i }❑? u $ I i V u r � y��u,� I 7-5-92 4s of z+ ;:1 PJ w rIC�Io7 19 v � ~ f QS �L �yILR iqJ V A # ,yy} LV I !! 33 � aJ ♦ OI r! �' I �''r • � L. CITY OF PORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised JULY 20, 2018 1 2 003215.1-0 CONSTRUCTION PROGRESS SCHEDULE — BASELINE EXAMPLE Page 3 of 5 QQ =3 CN ------------------ --------- ................ r ---------------------- --------- ----------- ------------ I-.--- ----------- ------- ---------------- -------------------------------- - -------- -- 1 ----------- L --------- J ---------- ----------------- - ----------- ----------- 4 4 --------- 4 ----------- --------- ---- ----------- --------- --------- - --------- --- - --- L-45W ------ ---- — --------- ------------- ----------- ----------- ---------- -------- --- ---------- A L-1 m, 1I o n 1! 11 r4 7i �•i 'I T'�' !2 2 2�7 11 7. r n pWp 11 w 11 w I I L t 7 7 7 7 2 rl 49 49 2 a u ip Cy is 6 > E CL p lu E 6 LL; Lp 'm G 0 0 n! N I'! is 14 0 Ml UN a rk 16 m v V w L, CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised JULY 20,2018 HMAC SURFACE OVERLAY 2019-6 City Project No. 102098 I 0032 15.1 -0 CONSTRUCTION PROGRESS SCHEDULE —BASELINE EXAMPLE Page 4 of 5 a----------}--' - -------- - ---------- - -------- -- E q0 di plo, .12 14 0 AA u a u Q Ld > 0 F=: (.3 in w ra pup u r= 7n a < O CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Reviscd JULY 20, 2018 00 32 15.1 - 0 CONSTRUCTION PROGRESS SCHEDULE— BASELINE EXAMPLE Page 5 of 5 1 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE July 20, 2018 M. Jarrell Initial Issue CITY OF FORT WORTH IIMAC SURFACE OVERLAY 20I9-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised JULY 20, 2018 1 2 c 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 0032 15.2 - 0 CONSTRUCTION PROGRESS SCHEDULE-- PROGRESS EXAMPLE Page 1 of 4 SECTION 00 32 15.2 CONSTRUCTION PROJECT SCHEDULE — PROGRESS EXAMPLE PART1- GENERAL The following is an example of a Contractor's project schedule that illustrates the data and expectation for schedule content depicting the progress for the project. This version of the schedule is referred to as a "progress" schedule. This example is intended to provide guidance for the Contractor when developing and submitting a progress schedule. See CFW Specification 00 32 15 Construction Project Schedule for details and requirements regarding the Contractor's project schedule. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised JULY 20, 20 i 8 HMAC SURFACE OVERLAY 2019-6 City Project No. 102098 I 003215.2-0 CONSTRUCTION PROGRESS SCHEDULE — PROGRESS EXAMPLE Page 2 of 4 a a c t� C ry � v tUCS .may D m kV LL'1 C! tljC] IC9 ";.tiY CJ 1 �� N N.N N N-i0ilei i"J",N.N N f1 ivii`� tviC{-N N I I � f E E i I ra n •, o r; `o (p }v6��w•ca.� tll �� ai a, a, {J M-wl5o i.r u W M v rJ A A ,n .s iri � m w r R+ Y 1 w •� 4 Od r.7 r m +n m 1r as nu an uo w. m 'n. W a 04 N!fJ N r N f+l 'i rp - -- LLit E:xa,�•. 'J�y'Iu�"rS t?_Y3'L rl a+ �i } {, �_ ' � ml `L :49u i i. i N N YLp+ I�11,J #r p J�a '� chi nE�a.ri ori.J t 6-c:�_�#; !`--rur #u'�a'Si g©r' o n.o a o i 44 04 v SAJ 1 C ZI T ` fA i I il! nL bE. ]it `t tic pia ly 7 F,gi � F, ...I 4 - __ _ CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised .IULY 20, 2018 1 2 0032 15.2 - 0 CONSTRUCTION PROGRESS SCHEDULE — PROGRESS EXAMPLE Page 3 of 4 Lrq .. _{._.__.—.j--------- {---------- ---------- 1---------- --------- j___—_____}--___—___.{_.________F------------ F---------- .j---------- ---------4___ G Q i i i i i i 3 F— i# - ----- - _ - ------------ '-- - ------ -------- - ----- - - ,� �I 3 N1 N rf,N W rl lfF li,r FI N`W N N J�rY n 7d :: r• W rl rA'N N I.. t ;N,N E ' _.__. ` L_.INI �__... �. 4 ri � rss w rs � rir � n n - rx r:, r] n n r. i- ----..-_--.1.--:�i�'' ie! ti n k r{Ni �r �• 'Ji �pp� f�].-�-� �i +. FI 14 M YL !1"I [�`i Y1i� �f N i�il ,F�rpy�[r �Qi S+y�J Q ��or{yr •TSi ��,eL�^ O ibr � � i ' �I !A it �rj� � y � � � I � : " �J r-..,. , 14 s yKyWNu3 nh t4 YI N N x a XI r _ .x .r. rn m m q'Idl a 'a y rh M.CL = ri o _. 1.5 I w C? r {y YI fV r rn 5*i rNk'1 Yr #i �a m �. c5 u L' r 4 r 0 to r f{ -r rr ,n'.rr. fl:;Ll x Wdr.:+q; 4 4 o_ fr. 4 fl 4 r't 4 4 +a 4 a x J,4 }yy !rA r H V ! f al ul u �'1 •/y' ;, { R, »..' L L* ,t iP iy n •I i w ur IriY » n I .� MI T " aii^i '� • r JI 9 o i. iZ P. p I• 0 �+{ I 1 `{(e�) W • id � L�+,J IJ „ 's (D �i W a � }� qq� �I -3 k d , a ; eg e o a ten' g ' f ' n 4 ,I �j ,Y■qJ�� � r II F III i\ A IL IJ L'I L iJ h_ r� p al f fl •-r-p• ul CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised .iULY 20, 2018 003215.2--0 CONSTRUCTION PROGRESS SCHEDULE — PROGRESS EXAMPLE Page 4 of 4 1 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE July 20, 2018 M. Jarrell Initial Issue CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised JULY 20, 2018 00 32 15.3 - 0 — PROGRESS NARRATIVE Page 1 of 1 SECTION 00 32 15.3 CONSTRUCTION PROJECT SCHEDULE PROGRESS NARRATIVE Reporting Period: Date Issued: Project Name: Company Name: City Project No: Engineer's Project No: City Project Manager: Engineer's Project Manager: A. List of activities accompiisnea in the reporting perioa. 1. (insert text here) 2. (insert text here) 3. (insert text here) 4. (insert text here) 5. (insert text here) 6. (insert text here) K List of activities to ne accompiisnea in the next reporting perioa 1. (insert text here) 2. (insert text here) 3. (insert text here) 4. (insert text here) S. (insert text here) 6. (insert text here) List any potential delays and provide mitigation actions 1. (insert text here) 2. (insert text here) 3. (insert text here) D. List any actual delays and provide recovery actions 1. (insert text here) Z. (insert text here) 3. (insert text here) City of Fort Worth, Texas Construction Project Schedule Narrative Report for CFW Projects TPW Official Release Date: 7.20.2018 Page 1 of 1 0032 15.4 - 0 CONSTRUCTION PROGRESS SCHEDULE — SUBMITTAL PROCESS Page I of7 1 SECTION 00 32 15.4 2 CONSTRUCTION PROJECT SCHEDULE SUBMITTAL PROCESS 3 PART1- GENERAL 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 The following information provides the process steps for the Contractor to follow for submitting a project baseline or progress schedule for a capital project to the City of Fort Worth. See CFW Specification 00 32 15 Construction Project Schedule for details and requirements regarding the Contractor's project schedule. If you are not a registered CFW Buzzsaw user, please email or contact: Fred Griffin, Buzzsaw Administrator City of Fort Worth Fred. Griffin@fortworthgov.org 817-392-8868 Using your registered username and password log into the City's Buzzsaw Site Navigate to your Project Folder. Verify that your Project ID and Project Name are consistent with Project Folder Name. Navigate to the Schedule Directory under your Project Folder. The 0070 1 -Flaxseed Drainage Improvements project is used for illustration. CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised JULY 20, 2018 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 003215.4--0 CONSTRUCTION PROGRESS SCHEDULE. — SUBMITTAL PROCESS Page 2 of 7 0e EW rl: ." kNt.. � � fdd- • .I Rapt# k�lv:�atl,nnv -� " J)I 00701-tn.—d l?rainage lnjrtorei v rJ Did Forms ±. M Bid Resp— Construcfoon L [� ConsuEianls Contractor corresprde— i General Contract Dome hands t PrejeCt Draw,ngS i [ PubGe Meebngs k deal Property r �11�L1 l�s �. 03705-LArbar k1llages Central Cluster 00705-LFbar L'LUo :n .' ., 00705- Lkbar Wlages 5E CL..L_ Er 00705-tbl,. V.lages SE Cole lkw El 00730-Satuiary Sewer R tub {reams 00755 - Mesgute Rd 2009 CIP Year I P 100763 -Dirks Road -Dryant lrum to 4r. {�I ni7-A- Leh— CM-4 00786- Summer Creek &Syr more SA, -Ir{�o0737-Cranbury Road -AIM�fsA " im. ne— k10liL+M1SkikPmrWImF-:1wrs+kd+tt3wL ri C n *A5-w Im - I Two files will be uploaded for each submittal. A native schedule file format either Primavera .xer or MS Project .mpp and a PDF version of the schedule will be uploaded Verify that the file name contains the 5-digit Project ID, Project Name, and Submittal Date and follows the standard naming convention. Initial schedule submittal will be labeled as `Baseline' for example: 00701-FlaxseedDrainagelmprovements-Baseline Schedule submittal updates will be labeled with Schedule Submittal Date `YYYY_MM' for example: 00701-FiaxseedDrainagelmprovements-2009_0I Expand or select the Schedules folder and add both the native file and PDF file to the directory. From the Toolbar Select I IAddDoeument CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised DULY 20, 2018 HMAC SURFACE OVERLAY 2019-6 City Project No. 102098 1 2 3 4 5 6 7 8 9 10 00 32 15.4 - 0 CONSTRUCTION PROGRESS SCHEDULE — SUBMITTAL PROCESS Page 3 of 7 File Cdit ftiv T::'_ NLr ,fell I� -{` I pAd = ^.) 1 it = I x - X. I I}i I'':J I t-I 0,W ,p� La I';.I I ii Rd I.m. - I �rDrawing F1oIl dw i`_-e] 113L2 -- _ .JQfWhWiM,I 0L Fbldora Link -- 00701-Flaxseed Drainage lmprovemer i�� j Folder LJ. eidForms U Ikd Respomes U Construction A LJ Consultants Contractor Correspondence General Contract Documents and Sped r 0] Projpd DraWings r, C] Public Meetings f+_ .n RReeaall mpperty Ell r Schedules Index.xls Utlities r sl G0705 -Urban Villages Central Cluster S"ixf i ( OWD5 - Man Villages Central Cluster Saul 00106 -Urban Wages SE ct-m er Berry -Rio 00706 -Urban Villages SE CkusterNear Eas [ 00730 -Sanitary sewer Rehab Contract LX T00755-Me9ghste Rd 2004 CIP Year I(De, [. 00766 - Dirks Ruad - Ikyant Irvin to Granbi 00TA -Lebow Channel _s: %` 00706 - Susinmer Creek & Svcamore School r Index.As Fred Griffin €6,304 Mirromfl I Select Browse and go to the location of the files on your desktop. Select Open DSdrt hbaudnto♦naddbd'cW*d nor dho-. yw ran idrq add to 4h 00oul&4RVV3% ). 05dect Volta__ Dor Leans A Lgeri torni i hrP Fl r Fk•L _ I iW 1A6LIIb., Wn i.urtth ['r �' �Lh�ldop — tt1 I-1 FiY Documents �tiH,.Jiet MlndMaaager Ara 7 S AY computer Musimotes Player lh4'Ay Network Places :�)Aciive Projects a Lj� Odoheptrohat3Prnh, lino l 'T'E3nf0ngP.1,pdf !'� In i'J`hhm CDs&DVDs I .puasaw 2008 QearType Turfing cool Record Edit Pro CH2M HILL YPPJ Cray hind PW Exam Sim 7.1 Fdaffa Client g$Crystal Reports 2003 I+t;ooale Earth ty�.D-dl Quidc Reference Gthide.pdf I IP Photosmart Express I�r;�h+'photasmart W.Dsk Dekagmenter Premrer Ef, Free Saund Recorder I•h W solution Center 1IF,—SnundRemr&r.eae �r N Pas Connect ( I Tunes dDLaptopSecurity lRIogin.3PG I Microsoft Visio Version 2002 Inside Out eBook W4P1etMeeting 1 FW" rya d �yLw 9JI rya; f' h The file will appear in the Buzzsaw Add to Project — SeIect Documents window Select Next. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised IULY 20, 2018 EIMAC SURFACE OVERLAP 2019-6 City Project No. 102098 1 Do not select Finish at this time. 2 3 4 5 6 7 8 9 to 11 12 13 14 15 16 0032 15.4 - 0 CONSTRUCTION PROGRESS SCHEDULE-- SUBMITTAL PROCESS Page 4 of 7 SE6d &s hL 61 BW lu >}.e 703ed Wb e� rdUi &--M iu a 6---- k-k- (tq�ondj it s��sr F- t)aruwien}x kFthih f�rmrrnt f9e rrr�W *"+ . 5 �It1101�waaPbt_]tlm_in,ape Ctljpsvaendar�„- Ifx�t., 1X�.' 5rmi Enug !luhlkal� I-' ---- —I L[ W > &W. C..ru Jl lr}i You will be placed into the Attach Comment window to enter a record into the Project Schedule Submittal Log. Enter the Project ID -Project Name -Submittal in the Subject Line. Type Submittal and Company Name into the Comment window along with Contact Name and Contact Phone Number. Select Next- a r-m a,mrrmsr[ W heco tFe.. moon cL-r pbm and fret dxn mluc for Nm bwq added. CFr. s rl} is spftwlal Sdetf Dua3menYs f ,4lu rmrtiott to tY�rErSalSiGh ■J 11[tach Cunrwent I J I&--.7tt u �.a [:-:J I I oL-I Wdt]nxi SU�j=L 100701 F1%3xseedDrainageImpru'rYiMrGSti�iRel�e Contact Name Contact Phone Dr 2pdate Sdiedula Submittal h om'Campany Name' fur work performed up to January 31, 2009 Contact Name Contact Phone •'N-k I rtcxl r J F[Fth valm ►Hp I Crl'Y OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised JULY 20, 2018 0032 15.4-0 CONSTRUCTION PROGRESS SCHEDULE — SUBMITTAL PROCESS Page 5 of 2 You will be placed into the Send Email Notification window. 3 4 Select To and the Select Recipients window will appear with a list of Project Contacts. 5 6 Select the Project Manager as the To Recipient and the Project Controls Group as the Copy 7 Recipient. 8 9 10 11 12 13 14 15 -aJ 4L -M I L-11 0.- P -JtrY-- 71-6-7 T 5::. C.., N 7-3.- T 3... 3-.:. V..... W- 6- Select the Paste Comment button to copy the Comment into the body of the email Select Finish. CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised JULY 20,2018 1 2 3 4 5 6 7 8 9 10 I 12 13 14 ;elect Documents Atini moment = hand t-m#q "IAM 1o14 0032 15.4 - 0 CONSTRUCTION PROGRESS SCHEDULE -- SUBMITTAL PROCESS Page 6 of 7 :I R-I3rrJima=4r atl-apn0fiXt SbWib's mblying dqm 0 Ire heW at 4CLUhhl Nko. Tha SIB M erplirMdl Ilk.. I I Fred Griffin - - {i' � �'roiect Con#n17� Team { I 19Si?ill-Fla�tseedDrainaoeimorovements-Baseline iw4k,a ;duedule Submittal from'Company Name' Contact Name Contact Rhone ror I update sd-ledule Submittal from'Company Name for work performed up to 3artuary 31, 2Ao9 Contact Name %,� 'Crantaet Phone <I�P& I J. n-& C.Wd t� The schedule file is uploaded to the directory. An email is sent to the City's Project Manager and Project Control Specialist. r1> H IWo. tier sl tire. -9 0J1 w 4 ti ' x P .'tx#1-4Yh9 .4 I Br®o■ CI 1MI.il ...... 1 11 ...ii -I.I- .. ..k..sk rrgl Griffin In,384 6♦temmri F-1Nf.,. 1Ij2LrA08 Rothe NaR... 74,7W N$y Fte 1,1' . 1.1 p� tl6T71 n e.d . n Rd Reeporeses - � CMsfrJetlofl . � CAr1A�taRi£ _ � f C[mtractnr �'� Corresgnrrderrce - � General Lon6act 4ow.nh ar {aa •.,j Rmjed OraLvngs Nbk Meetings 4 . _ Rul Property 1Sd dede _ - ;y' OJi I ne.StliLr MlleelrE'4•Sli 5dh ddAe Index. & - 'j ulrtltles i �j 907g5-Vahan YB�ages Central Cluster tilr r 00705-Vr6an:Te tm-r rlgrlr S6+ I' 03MG .ryyrl ,p ff Ckm fi r AB r - 1 90706-SkYw~6E n7 rlaw si I 9�1i39-SarrLerY 511r neisb Crrrtr?01 4- 99755-1.ie,O� Rd 2064CW W 1 QY �ri { 09768-Oal¢Rnad-8ry.irrkm m,&&& ? I G0773-i 6.. Channel 1 W 21 Upload the PDF file using the same guideline. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised JULY 20, 2018 M HMAC SURFACE OVERLAY 2019-6 City Project No. 102098 00 32 15.4 - 0 CONSTRUCTION PROGRESS SCHEDULE — SUBM [TTAI, PROCESS Page 7 of 7 Revision Log DATE NAME SUMMARY OF CHANGE July 20, 2018 A Jarrell Initial Issue CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. I02098 Revised JULY 20, 2018 00 35 13 BID FORM Page 1 of 11 SECTION 00 35 13 CONFLICT OF INTEREST STATEMENT Each bidder, offeror or respondent (hereinafter referred to as "You") to a City of Fort Worth procurement may be required to complete a Conflict of Interest Questionnaire (the attached CIQ Form) and/or a Local Government Officer Conflicts Disclosure Statement (the attached CIS Form) pursuant to state law. You are urged to consult with counsel regarding the applicability of these forms to your company. The referenced forms may be downloaded from the links provided below. http://www.ethics.state.tx.us/forms/CIQ.pdf h tt://www.ethics.state,tx.us/forms/CIS. pdf ❑ CIQ Form does not apply Ll CIQ Form is on file with City Secretary ❑ CIQ Form is being provided to the City Secretary ❑ CIS Form does not apply 0 CIS Form is on File with City Secretary ❑ CIS Form is being provided to the City Secretary BIDDER: Peachtree Construction, Ltd. 5801 Park Vista Circle Keller, TX 76244 END OF SECTION By: J. Barry l�:=� rk Signature: L Title: President CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20171109 HMAC SURFACE OVERLAY 2019-6 City Project No. 102098 0041 00 BID FORM Page 2 of 11 SECTION 00 41 00 BID FORM TO: The Purchasing Manager c/o: The Purchasing Division 200 Texas Street City of Fort Worth, Texas 76102 FOR: HMAC Surface Overlay 2019-6 City Project No.: 102098 Units/Sections: 1. Enter Into Agreement The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with City in the form included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. 2. BIDDER Acknowledgements and Certification 2.1. In submitting this Bid, Bidder accepts all of the terms and conditions of the INVITATION TO BIDDERS and INSTRUCTIONS TO BIDDERS, including without limitation those dealing with the disposition of Bid Bond. 2.2. Bidder is aware of all costs to provide the required insurance, will do so pending contract award, and will provide a valid insurance certificate meeting all requirements within 14 days of notification of award. 2.3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation. 2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid. 2.6. Bidder has not solicited or induced any individual of entity to refrain from bidding. 2.6. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph: a. "corrupt practice" means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process. b. "fraudulent practice" means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of City (b) to establish Bid prices at artificial non-competitive levels, or (c) to deprive City of the benefits of free and open competition. c. "collusive practice" means a scheme or arrangement between two or more Bidders, with or without the knowledge of City, a purpose of which is to establish Bid prices at artificial, non-competitive levels. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS HMAC SURFACE OVERLAY 2019-6 Form Revised 20150821 City Project No. 102098 0041 00 BID FORM Page 3 of 11 d. "coercive practice" means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract. 3. Prequalification The Bidder acknowledges that the following work types must be performed only by prequalified contractors and subcontractors: a, Asphalt Paving Heavy Maintenance (UNDER $1,000,000) I] C. .M 4. Time of Completion 4.1. The Work will be complete for Final Acceptance within 175 calendar days after the date when the Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. 4.2. Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work {andlor achievement of Milestones) within the times specified in the Agreement. 5. Attached to this Bid The following documents are attached to and made a part of this Bid: a. This Bid Form, Section 00 41 00 b. Required Bid Bond, Section 00 43 13 issued by a surety meeting the requirements of Paragraph 5.01 of the General Conditions. c. Proposal Form, Section 00 42 43 d. Vendor Compliance to State Law Non Resident Bidder, Section 00 43 37 e. MWBE Forms (optional at time of bid) f. Prequalification Statement, Section 00 45 12 g. Conflict of Interest Affidavit, Section 00 35 13 *If necessary, CIQ or CIS forms are to be provided directly to City Secretary h. Any additional documents that may be required by Section 12 of the Instructions to Bidders 6. Total Bid Amount 6.1. Bidder will complete the Work in accordance with the Contract Documents for the following bid amount. In the space provided below, please enter the total bid amount for this project. Only this figure will be read publicly by the City at the bid opening. 6.2, It is understood and agreed by the Bidder in signing this proposal that the total bid amount entered below is CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS HMAC SURFACE OVERLAY 2019-6 Form Revised 20150821 City Project No. 102098 0041 00 BID FORM Page 4 of 11 subject to verification and/or modification by multiplying the unit bid prices for each pay item by the respective estimated quantities shown in this proposal and then totaling all of the extended amounts. 6.3. Total Bid 7. Bid Submittal This Bid is submitted on October 10, 2019 Respectfully submi d, By:_ e I C—_ (Signature) J. Sarfy Clarlc (Printed Name) Title: Presddent Company: Peatah#ree onitrk.Ian, Lid Address: 5801 Par'A Vista Circle Keller, TX 76244 State of Incorporation e I:1i11exel9.9x019C47►I $1,079,975.00 by the entity named below. Receipt is acknowledged of the following Addenda: Initial Addendum No. 1: JBC 0%. Addendum No. 2: JBC. Addendum No. 3: Addendum No. 4: Corporate Seal: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS HMAC SURFACF OVERLAY 2019-8 Form Revised 20150821 City Project No. 102098 SECTION 00 42 43 PROPOSAL FORM UNIT PRICE BID 00 42 43 BID PROPOSAL Page 5 of I i Bidder's Application Project Item Information Bidder's Proposal BidIist Item No. Description Specification Section No. Unit of Measure Bic[ Quantity Unit Price Bid Value 1 0135.0201 REMOBILIZATION 01 7000 EA 1 $500.00 $500.00 2 0241.1300 REMOVE CONC CURB&GUTTER 0241 15 LF 8000 $5.50 $44,000.00 3 3216.0102 7" CONC CURB AND GUTTER 32 13 20 LF 8000 $35.00 $280,000.00 4 0241.0401 REMOVE CONCRETE DRIVE 0241 13 SF 7200 $1.10 $7,920.00 5 3213.0401 6" CONCRETE DRIVEWAY 32 13 20 SF 7200 $7.25 $52,200.00 6 0241.0100 REMOVE SIDEWALK 0241 13 SF 8000 $1.10 $8,800.00 7 3213.0301 4" CONC SIDEWALK 32 13 20 SF 18100 $7.75 $140,275.00 8 3213.0322 CONC CURB AT BACK OF SIDEWALK (6 to 12 Inch max) 32 13 20 LF 400 $24.50 $9,800.00 9 0241.1400 REMOVE CONC VALLEY GUTTER 0241 15 SY 150 $50.00 $7,500.00 10 3216.0301 7" CONC VALLEY GUTTER 32 16 13 SY 150 $90.00 $13,500.00 11 0241.0300 REMOVE ADA RAMP 0241 13 EA 40 $165.00 $6,600.00 12 3213.0501 BARRIER FREE RAMP, TYPE R-1 32 13 20 EA 20 $3,500.00 $70,000.00 13 3213.0503 BARRIER FREE RAMP, TYPE M-1 32 13 20 EA 6 $2,750.00 $16,500.00 14 3213.0504 BARRIER FREE RAMP, TYPE M-2 32 13 20 EA 6 $2,750.00 $16,500.00 15 3213.0506 BARRIER FREE RAMP, TYPE P-1 32 13 20 EA 8 $2,750.00 $22,000.00 16 9999.0000 TRUNCADED DOME PLATE (5' X 2-) 00 00 00 EA 2 $330.00 $660.00 17 0241.1700 8"PAVEMENT PULVERIZATION 02 41 15 SY 11500 $7.00 $80,500.00 18 3212.0302 3" ASPHALT PAVEMENT, TYPE D 32 12 16 SY 11500 $15.40 $177,100.00 19 3211.0600 CEMENT MODIFICATION, 26 Ib$/ry 321133 TN 150 $205.00 $30,750.00 20 0241.1200 REMOVE BRICK PAVEMENT 0241 15 SY 20 $47.00 $940.00 21 3214.0100 BRICK PAVEMENT 32 14 16 SY 20 $110.00 $2,200.00 22 9999,0000 SITE CLEARING 31 1000 SY 1000 $5.25 $5,250.00 23 3110.0102 6"-12" TREE REMOVAL 31 1000 EA 4 $1,100.00 $4,400.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120120 HMAC SURFACE OVERLAY 2019-6 City Project No. 102099 SECTION 00 42 43 PROPOSALFORM UNIT PRICE BID 00 42 43 BID PROPOSAL Page 6 of I Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Description Specification Unit of Bid Unit Price Bid Value No. Section No. Measure Quantity 24 3123.0101 UNCLASSIFIED EXCAVATION 31 2316 Cy 50 $27.50 $1,375.00 25 3292.0100 BLOCK SOD REPLACEMENT 32 92 13 SY 1100 $13.25 $14,575.00 26 3217.0305 STOP BARS PAVEMENT MARKINGS 32 17 23 LF 150 $6.60 $990.00 27 3217.0001 4" SOLID THERMOPLASTIC 33 17 23 LF 150 $1.10 $165.00 (HAS) LANE LINE 28 3217.0002 4" SOLID THERMOPLASTIC 321723 LF 150 $1.10 $165.00 (HAS) CENTER LINE 29 3217.0501 24" SOLID WHITE THERMOPLASTIC 32 17 23 LF 150 $8.80 $1,320.00 (HAE) CROSSWALK LINES 30 3217.5001 CURB ADRESS PAINTING 32 17 25 EA 60 $50.00 $3,000.00 31 3211.0122 FLEX BASE, TYPE A, GR-2 3211 23 CY 50 $88.00 $4,400.00 32 3305.0108 MISCELLANEOUS ADJUSTMENT 33 05 14 LS 1 $6,000.00 $6,000.00 (UTILITIES) 33 3305.0108 MISCELLANEOUS STRUCTURE ADJUSTMENT 33 05 14 Sy 50 $72.00 $3,600.00 34 3305.0111 WATER VALVE BOX ADJUSTMENT (WITH STEEL 33 05 14 EA 5 $250.00 $1,250.00 RISER) 35 3305.0112 WATER VALVE BOX ADJUSTMENT (WITH 33 05 14 EA 5 $280.00 $1,400.00 CONCRETE RISER) 36 3312.2003 1- INCH STANDARD PLASTIC METER BOX 33 12 10 EA 2 $160.00 $320.00 37 3312.2003 1- INCH STANDARD CONCRETE METER BOX 33 12 10 EA 2 $280.00 $560.00 38 3349.0107 MANHOLE ADJUSTMENT 33 05 14 EA 4 $500.00 $2,000.00 (WITH STEEL RISER) 39 3305.0112 MANHOLE ADJUSTMENT 33 05 17 EA 6 $850.00 $5,100.00 (WITH CONCRETE COLLAR) 40 3305,0108 MISCELLANEOUS STRUCTURE ADJUSTMENT 33 05 14 EA 1 $2,800.00 $2,800.00 (5' STORM DRAIN INLET TOP) 41 3305.0108 MISCELLANEOUS STRUCTURE ADJUSTMENT 33 05 14 EA 1 $4,200.00 $4,200.00 (10' STORM DRAIN INLET TOP) 42 3346.0101 6" PERFORATED SUBDRAIN PIPE 33 46 00 LF 30 $22.00 $660.00 43 9999.0000 REMOVE CONCT PVMT 02 41 15 Sy 200 $16.00 $3,200.00 44 9999.0096 PAVING CONSTRUCTION ALLOWANCE EA 1 $25,000.00 $25,000.00 Bid Summary Base Bid Total Bid 1 $1,079,975.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Fonn Revised 20120120 HMAC SURFACE OVERLAY 2019-6 City Project No. 102098 00 42 43 BID PROPOSAL Page 7 of 11 SECTION 00 42 43 PROPOSALFORM UNIT PRICE BID "idderr='s Application Project Item Information Bidder's Proposal Bidlist Item Description Specification Unit of Bid Unit Price Bid Value No. Section No. Measure Quantity END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS HMAC SURFACE OVERLAY 2019-6 Form Revised 20120120 City Project No. 102099 BID BOND Travelers Casualty and Surety Company of America Hartford, CT 06183 KNOWN ALL BY THESE PRESENTS, That we, Peachtree Construction, Ltd. as Principal, and Travelers Casualty and Surety Company of America , as Surety, are held and firmly bound unto Cily of Fort Worth , as Obligee, in the sum of Five Percent 5% of the Bidder's Maximum Bid Price Dollars ( 5% ) for the payment of which we bind ourselves, and our successors and assigns, jointly and severally, as provided herein. WHEREAS, Principal has submitted or is about to submit a bid to the Obligee on a contract for HMAC SURFACE OVERLAY 2019-6 ("Project"). NOW, THEREFORE, the condition of this bond is that if Obligee accepts Principal's bid, and Principal enters into a contract with Obligee in conformance with the terms of the bid and provides such bond or bonds as may be specified in the bidding or contract documents, then this obligation shall be void; otherwise Principal and Surety will pay to Obligee the difference between the amount of Principal's bid and the amount for which Obligee shall in good faith contract with another person or entity to perform the work covered by Principal's bid, but in no event shall Surety's and Principal's liability exceed the penal sum of this bond. Signed this 3rd day of October 2019 Peachtree Construction, Ltd. (Principal) By: Travelers Casualty and Surety Co p ny of America B Linda K. Edwards orney-,in-F=-act 47-1 TRAVELERSJ Travelers Casualty and Surety Company of America Travelers Casualty and Surety Company St. Paul Fire and Marine Insurance Company POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company are corporations duly organized under the laws of the State of Connecticut (herein collectively called the "Companies"). and that the Companies do hereby make, constitute and appoint Linda K Edwards of FT WORTH Texas , their true and lawful Attorney -in -Fact to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. IN WITNESS WHEREOF, the Companies have caused this instrument to be signed, and their corporate seals to be hereto affixed, this 17th day of January, 2019. RE�exxp . G9m i �r t COefL £` w w r�CONN. o w ° State of Connecticut City of Hartford ss. i By: Robert L. Rane , enior Vice President On this the 17th day of January, 2019, before me personally appeared Robert L. Raney, who acknowledged himself to be the Senior Vice President of Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company, and that he, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing on behalf of said Companies by himself as a duly authorized officer. IN WITNESS WHEREOF, I hereunto set my hand and official seal. My Commission expires the 30th day of June, 2021 x9m — t runic Anna P. Nowik, Notary Public This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company, which resolutions are now in full force and effect, reading as follows: RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate„Secretary or any Assistant Secretary may appoint Attorneys -in -Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her; and it is FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary; and it is FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary; or (b) duly executed (under seal, if required) by one or more Attorneys -in -Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys -in -Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. I, Kevin E. Hughes, the undersigned, Assistant Secretary of Travelers Casualty and Surely Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company, do hereby certify that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which remains in full force and effect. Dated this 3rd day of October 2019 R :E & �y UpQOSY RpQ q.GR W 1tw•,YS� N NF MR a CON.s : ' Kevin E. Hughes, Assistant Secretary To verify the authenticity of this Power ofAttorney, Please call us at 1-800-4213880, Plsrse refer to the above named Attorney -in -Fact and the details of the bond to which this Power of Attorney is attached 004397 VENDOR COMPLIANCE TO STATE LAW Page 10 of 11 SECTION 00 43 37 VENDOR COMPLIANCE TO STATE LAW NON RESIDENT BIDDER Texas Government Code Chapter 2252 was adopted for the award of contracts to nonresident bidders. This law provides that, in order to be awarded a contract as low bidder, nonresident bidders (out-of-state contractors whose corporate offices or principal place of business are outside the State of Texas) bid projects for construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder in order to obtain a comparable contract in the State which the nonresident's principal place of business is located. The appropriate blanks in Section A must be filled out by all nonresident bidders in order for your bid to meet specifications. The failure of nonresident bidders to do so will automatically disqualify that bidder. Resident bidders must check the box in Section B_ A. Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by State Law. A copy of the statute is attached. Nonresident bidders in the State of , our principal place of business, are not required to underbid resident bidders. B. The principal place of business of our company or our parent company or majority owner is in the State of Texas.0 BIDDER: Peachtree Construction, Ltd. 5801 Park Vista Circle Keller, TX 76244 END OF SECTION By: J. Barry Clark I (Signature) Title: President Date: 1 b . t0— 14% CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20110627 H41AC SURFACE OVERLAY 2019-6 City Project No. 102098 00 45 12 BID FORM Page 11 of 11 SECTION 00 4512 PREQUALIFICATION STATEMENT Each Bidder for a City procurement is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. Major Work Type Contractor/Subcontractor Company Name Prequalification Expiration Date Asphalt Paving Heavy Maintenance (UNDER Peachtree Construction, Ltd. 6/1/2021 $1, 000, 000) 0 0 0 The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. Peachtree Construction, Ltd. 5801 Park Vista Circle Keller, TX 76244 END OF SECTION By: J. Barry Clark Title: President Date: { ignature) CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS HMAC SURFACE OVERLAY 2019-6 Form Revised 20120120 City Project No. 102098 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 N19 00 45 26 - 1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page 1 of 1 SECTION 00 45 26 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it provides worker's compensation insurance coverage for all of its employees employed on City Project No.I02098. Contractor further certifies that, pursuant to Texas Labor Code, Section 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with worker's compensation coverage. CONTRACTOR: PEACHTREE CCNSTRUCAON, LTD. By- Company 5801 PARK VISTA GIR. Signature: i Address ` KELLER, TX 76244 City/State/Zip THE STATE OF TEXAS § COUNTY OF TARRANT § J. HARRY Cl.ARK (Please Print) Title: PRESIDENT (Please Print) BEFORE ME, the undersigned authority, on this day personally appeared J. RARRY CLARK known to me to be the person whose name is subscribed to the foregoinginstrument and ac�o ]edged to me that he/she executed the same as the act and deed of IACN 1 REE CONSTRUCTI N L� for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this 70 day of CHERYL JEROME NotublieN or the State of Texas �' SPRY pVe ifa s: ry,Notary Public, State of texas Comm. Expires fl8�42-2D20 '�TFof:� Notary ID 616044-1 "���++'' - - D OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 HMAC SURFACE OVERLAY 2019-6 City Project No. 102098 6 3 4 5 6 7 8 9 I0 11 12 13 14 I5 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 004540-1 Minority Business Enterprise Specifications Page 1 of 2 SECTION 00 45 40 Minority Business Unterprise Specifications APPLICATION OF POLICY If the total dollar value of the contract is greater than $50,000, then a MBE subcontracting goal is applicable. POLICY STATEMENT ft is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority Business Enterprises (MBE) in the procurement of all goods and services. All requirements and regulations stated in the City's current Business Diversity Enterprise Ordinance apply to this bid. MBE PROJECT GOALS The City's MBE goal on this project is 13% of the total bid value of the contract (Base bid applies to Parks and Community Services). Note: If both MBE and SBE subcontracting goals are established for this project, then an Offeror must submit both a MBE Utilization Form and a SBE Utilization Form to be deemed responsive. COMPLIANCE TO BID SPECIFICATIONS On City contracts $50,000 or more where a MBE subcontracting goal is applied, Offerors are required to comply with the intent of the City's Business Diversity Enterprise Ordinance by one of the following: 1. Meet or exceed the above stated MBE goal through MBE subcontracting participation, or 2. Meet or exceed the above stated MBE goal through MBE Joint Venture participation, or 3. Good Faith Effort documentation, or; 4. Prime Waiver documentation. SUBMITTAL OF REQUIRED DOCUMENTATION The applicable documents must be received by the Purchasing Division, within the following times allocated, in order for the entire bid to be considered responsive to the specifications. The Offeror shall deliver the. KBE documentatlon in person to the appropriate .employee of the pklrchasing division and obtain a date/time receipt. Such reaeipi shnil be evidence that the City received the docilmentativn in the hire allocated..A.faxed And/or eirni led copy will not be accepted. 1. Subcontractor Utilization Form, if received no Iater than 2:00 p.m., on the second City business goal is met or exceeded: day after the bid opening date, exclusive of the bid opening date. 2. Good Faith Effort and received no later than 2:00 p.m., on the second City business Subcontractor Utilization Form, if day after the bid opening date, exclusive of the bid opening participation is less than stated goal: date. 3. Good Faith Effort and received no later than 2:00 p.m., on the second City business Subcontractor Utilization Form, if no day after the bid opening date, exclusive of the bid opening MBE partici ation: date. 4. Prime Contractor Waiver Form, received no later than 2:00 p.m., on the second City business if you will perform all day after the bid opening date, exclusive of the bid opening contracting/supplier work: date. CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised June 9, 2015 004540-2 Minority Business Enterprise Specifications Page 2 of 2 5. Joint Venture Form, if goal is met received no later than 2:00 p.m., on the second City business or exceeded. day after the bid opening date, exclusive of the bid opening date. FAILURE TO COMPLY WITH THE CITY'S BUSINESS DIVERSITY ENTERPRISE ORDINANCE WILL RESULT IN THE BID BEING CONSIDERED NON-RESONSIVE TO SPECIFICATIONS. FAILURE TO SUBMIT THE REQUIRED MBE DOCUMENTATION WILL RESULT IN THE BID BEING CONSIDERED NON -RESPONSIVE. A SECOND FAILURE WILL RESULT IN THE OFFEROR BEING DISQUALIFIED FOR A PERIOD OF ONE YEAR. THREE FAILURES IN A FIVE YEAR PERIOD WILL RESULT IN A DISQUALIFICAITON PERIOD OF THREE YEARS. 7 Any Questions, Please Contact The NMBE Office at (817) 212-2674. 8 END OF SECTION 10 11 CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised June 9, 2015 2 SECTION 00 52 43 AGREEMENT 00 52 43 - 1 Agreement Page 1 of 5 3 THIS AGREEMENT, authorized on December 17, 2019 is made by and between the City of 4 Forth Worth, a Texas home rule municipality, acting by and through its duly authorized City 5 Manager,("City"), and Peachtree Construction, Ltd., authorized to do business in Texas, acting by 6 and through its duly authorized representative, ("Contractor"). 7 City and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as 8 follows: 9 Article 1. WORK 10 Contractor shall complete all Work as specified or indicated in the Contract Documents for the 11 Project identified herein. 12 Article 2. PROJECT 13 The project for which the Work under the Contract, Documents may be the whole or only a part is 14 generally described as follows: 15 HMAC SURFACE OVERLAY 2019-6 16 City Proiect No. 102098 17 Article 3. CONTRACT PRICE 18 City agrees to pay Contractor for performance of the Work in accordance with the Contract 19 Documents an amount, in current funds, of ONE MILLION, SEVENTY-NINE THOUSAND, 20 NINE HUNDRED SEVENTY FIVE AND 00/100 Dollars ($1,079,975.00). 21 Article 4. CONTRACT TIME 22 4.1 Final Acceptance. 23 The Work will be complete for Final Acceptance within 175 Calendar days after the date 24 when the Contract Time commences to run, as provided in Paragraph 2.03 of the General 25 Conditions, plus any extension thereof allowed in accordance with Article 12 of the 26 General Conditions. 27 4.2 Liquidated Damages 28 Contractor recognizes that time is of the essence for completion of Milestones, if any, and 29 to achieve Final Acceptance of the Work and City will suffer financial loss if the Work is 30 not completed within the time(s) specified in Paragraph 4.1 above. The Contractor also 31 recognizes the delays, expense and difficulties involved in proving in a legal proceeding, 32 the actual loss suffered by the City if the Work is not completed on time. Accordingly, 33 instead of requiring any such proof, Contractor agrees that as liquidated damages for 34 delay (but not as a penalty), Contractor shall pay City SIX HUNDRED AND FIFTY 35 DOLLARS ($650.00) for each day that expires after the time specified in Paragraph 4.1 36 for Final Acceptance until the City issues the Final Letter of Acceptance. 37 Article 5. CONTRACT DOCUMENTS 38 5.1 CONTENTS: 39 A. The Contract Documents which comprise the entire agreement between City and 40 Contractor concerning the Work consist of the following: CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised 11.15.17 00 52 43 - 2 Agreement Page 2 of 5 41 1. This Agreement. 42 2. Attachments to this Agreement: 43 a. Bid Form 44 1) Proposal Form 45 2) Vendor Compliance to State Law Non -Resident Bidder 46 3) Prequalification Statement 47 4) State and Federal documents (project specific) 48 b. Current Prevailing Wage Rate Table 49 c. Insurance ACORD Form(s) 50 d. Payment Bond 51 e. Performance Band 52 f. Maintenance Bond 53 g. Power of Attorney for the Bonds 54 h. Worker's Compensation Affidavit 55 i. MBE and/or SBE Utilization Form 56 3. General Conditions. 57 4. Supplementary Conditions. 58 5. Specifications specifically made a part of the Contract Documents by attachment 59 or, if not attached, as incorporated by reference and described in the Table of 60 Contents of the Project's Contract Documents. 61 6. Drawings. 62 7. Addenda. 63 8. Documentation submitted by Contractor prior to Notice of Award. 64 9. The following which may be delivered or issued after the Effective Date of the 65 Agreement and, if issued, become an incorporated part of the Contract Documents: 66 a. Notice to Proceed. 67 b. Field Orders. 68 c. Change Orders. 69 d. Letter of Final Acceptance. 70 71 Article 6. INDEMNIFICATION 72 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 73 expense, the city, its officers, servants and employees, from and against any and all 74 claims arising out of, or alleged to arise out of, the work and services to he performed 75 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees 76 under this contract. This indemnification provision is specifically intended to operate 77 and be effective even if it is alleged or proven that all or some of the damages being 78 sought were caused, in whole or in part, by any act, omission or negligence of the city. 79 This indemnity provision is intended to include, without limitation, indemnity for 80 costs, expenses and legal fees incurred by the city in defending against such claims and 81 causes of actions. 82 CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUN FNTS City Project No. 102098 Revised 11,15.17 005243-3 Agreement Page 3 of 5 83 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 84 the city, its officers, servants and employees, from and against any and all loss, damage 85 or destruction of property of the city, arising out of, or alleged to arise out of, the work 86 and services to be performed by the contractor, its officers, agents, employees, 87 subcontractors, licensees or invitees under this contract. This indem"ification 88 provision is specifically intended to operate and be effective even if it is alleged or 89 proven that all or some of the damages being sought were caused, in whole or in part, 90 by any act, omission or negligence of the city_. 91 92 Article 7. AUSCELLANEDUS 93 7.1 Terms. 94 Terms used in this Agreement which are defined in Article I of the General Conditions will 95 have the meanings indicated in the General Conditions. 96 7.2 Assignment of Contract. 97 This Agreement, including all of the Contract Documents may not be assigned by the 98 Contractor without the advanced express written consent of the City. 99 7.3 Successors and Assigns. 100 City and Contractor each binds itself, its partners, successors, assigns and legal 101 representatives to the other party hereto, in respect to all covenants, agreements and 102 obligations contained in the Contract Documents. 103 7.4 Severability. 104 Any provision or part of the Contract Documents held to be unconstitutional, void or 105 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 106 remaining provisions shall continue to be valid and binding upon CITY and 107 CONTRACTOR. 108 7.5 Governing Law and Venue. 109 This Agreement, including all of the Contract Documents is performable in the State of 110 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 111 Northern District of Texas, Fort Worth Division. 112 7.6 Authority to Sign. 113 Contractor shall attach evidence of authority to sign Agreement if signed by someone other 114 than the duly authorized signatory of the Contractor. 115 116 7.7 Prohibition On Contracts With Companies Boycotting Israel. 117 Contractor acknowledges that in accordance with Chapter 2270 of the Texas Government 118 Code, the City is prohibited from entering into a contract with a company for goods or 119 services unless the contract contains a written verification from the company that it: (1) 120 does not boycott Israel; and (2) will not boycott Israel during the term of the contract. CITY Or FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised 11.15.17 00 52 43 - 4 Agreement Page 4 of 5 121 The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms 122 in Section 808.001 of the Texas Government Code. By signing this contract, Contractor 123 certifies that Contractor's signature provides written verification to the City that 124 Contractor. (1) does not boycott Israel; and (2) will not boycott Israel during the term of 125 the contract. 126 127 7.8 128 129 130 131 132 133 134 135 136 137 138 139 140 Immigration Nationality Act. Contractor shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, Contractor shall provide City with copies of all I-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Contractor shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Contractor employee who is not legally eligible to perform such services. CONTRACTOR SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY CONTRACTOR, CONTRACTOR'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Contractor, shall have the right to immediately terminate this Agreement for violations of this provision by Contractor. 141 142 7.9 No Third -Party Beneficiaries. 143 This Agreement gives no rights or benefits to anyone other than the City and the Contractor 144 and there are no third -party beneficiaries. 145 146 7.10 No Cause of Action Against Engineer. 147 Contractor, its subcontractors and equipment and materials suppliers on the PROJECT or their 148 sureties, shall maintain no direct action against the Engineer, its officers, employees, and 149 subcontractors, for any claim arising out of, in connection with, or resulting from the 150 engineering services performed. Only the City will be the beneficiary of any undertaking by 151 the Engineer. The presence or duties of the Engineer's personnel at a construction site, 152 whether as on -site representatives or otherwise, do not make the Engineer or its personnel 153 in any way responsible for those duties that belong to the City and/or the City's construction 154 contractors or other entities, and do not relieve the construction contractors or any other 155 entity of their obligations, duties, and responsibilities, including, but not limited to, all 156 construction methods, means, techniques, sequences, and procedures necessary for 157 coordinating and completing all portions of the construction work in accordance with the 159 Contract Documents and any health or safety precautions required by such construction 159 work. The Engineer and its personnel have no authority to exercise any control over any 160 construction contractor or other entity or their employees in connection with their work or 161 any health or safety precautions. 162 163 SIGNATURE PAGE TO FOLLOW 164 CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No, 102098 Revised 11.15.17 00 52 43 - 5 Agreement Page 5 of 5 165 166 IN WITNESS WHEREOF, City and Contractor have each executed this Agreement to be 167 effective as of the date subscribed by the City's designated Assistant City Manager ("Effective 168 Date"). 169 Contractor: Peachtree Construction, Ltd. City of Fort Worth By: ana B doff By: { �� _ Assistant i doffJer� (Signature) 77 Date _��� J. Barry Clark Attest: ..%,0 (Printed Name) City Secre ary Title: President (Seal) Address: " 5801 Park Vista Circle M&C 190411 170 171 172 173 174 175 176 177 City/State/Zip: Keller, TX 76244 I2.10- 19 Date Date: 12/17/2019 Form 1295 No. 2019-556292 Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Juan Pablo De La Cruz Project Manager Approved as to Form and Legality: QKQ� Douglas W. Black Assistant City Attorney APPROVAL RECOMMNDSE William Johnson DIRECTOR, Transportation an Public Works Department CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 11.15.17 FFMAL RECORD UM"TALL X 2019-6 P ct I lo.102098 FT WoRfa, 0061 13 - 1 PERFORMANCE BOND Page 1 of2 I SECTION 00 6113 2 Bond 0106971478 PERFORMANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNT F' OF TARRANT § 7 That we, Peachtree Construction, L td., known as "Principal" herein and $ Travelers Casualty and Surety Company of America , a corporate suivty(sureties, if more than 9 one) duty authorized to do business in the State of Texas, known as "Surety" herein (whether one 10 or more), are held and firmly bound unto the City of Fort Worth, a municipal corporation created I I pursuant to the laws of Texas, known as "City" herein, in the penal sum of, ONE MILLION, I2 SEVENTY NINE THOUSAND-„INE HUNDRED KVENTY FIVE AND 00/100 Dollars 13 ($1.079,975.01Q), lawful money of the United States, to be paid in Fort Worth, Tarrant County, 14 Texas for the payment of which sum well and truly to be made, we bind ourselves, our heirs, 15 executors, administrators, successors and assigns, jointly and severally, firmly by these presents. 16 WHEREAS, the Principal has entered into a certain written contract with the City 17 awarded the 17" day of December, 2019, which Contract is hereby referred to and made a part 18 hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor and 19 other accessories defined by law, in the prosecution of the Work, including any Change Orders, 20 as provided for in said Contract designated as HMA.0 Surface Overlay 2019-6, City Project No. 21 102098. 22 NOW, THEREFORE, the condition of this obligation is such that if the said Principal 23 shall faithfully perform it obligations under the Contract and shall in all respects duly and 24 faithfully perform the Work, including Change Orders, under the Contract according to the plans, 25 specifications, and contract documents therein referred to, and as we] I during any period of 26 extension of the Contract that may he gran ed on the part of the City, them this obligation shall be 27 and become null and void, otherwise to remain in fiill force and effect. 28 PROVIDED FURTHER, that if any legal action be tiled on this Bond, venue shall lie in 29 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 30 Worth Division. CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July 1.2011 0061 U - 2 PERFORMANCE BOND Page 2 of 2 1 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 2 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 3 accordance with the provisions of said statue. 4 IN NVITiriESS WMREOF, the Principal and the Surety have SIGNED and SEALED 5 this instrument by duly a►s(horize.d agents and officers on this the 18th _—day of 6 December , 2019 7 8 9 10 11 12 13 1A 15 16 17 l8 19 20 21 22 23 24 25 26 27 21 29 30 31 32 33 34 35 36 37 39 39 4© 41 42 43 44 45 ATT1;S`i_; (Principal) Secretary &etup_� Witne as to Pr1icif}iti / I - Witness as to Surety-Lorrie Scott PRINCIPAL: Peachtree Construction, Ltd. BY: Ygnature J. Bares Clark, President Name and Title Address: 5801 Park Vista Cirele Keller, TIC 76244 SURETY: Travelere.Casualty and Surety_ Compatly of Apperica 13<:An_ r'�' - Uwa P-L Signature Linda K. Edwards, Attorney -in -Fact Name and Title Address: 2900 Marguita Dr _ Fort Worth, TX 76116 Telephone Number: 817-737-4943 *Note: if signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. if Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019•6 STANDARD CON5TRUcrm SP6'C1F1CAT1ON DOC1i.MENTS City Projeet No.10209? Revised Juty 1, 2011 Travelers Casualty and Surety Company of America Travelers Casualty and Surety Company TRAVELERS1 St. Paul Dire and Marine Insurance Company POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company are corporations duly organized under the laws of the State of Connecticut (herein collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint Linda K Edwards of FT WORTH , Texas , their true and lawful Attorney -in -Fact to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. IN WITNESS WHEREOF, the Companies have caused this instrument to be signed, and their corporate seals to be hereto affixed, this 17th day of January, 2019. •p_y�,�j-un a iiniurozo. ,t Ix+ i.�.L #yg State of Connecticut City of Hartford ss. By: Robert L. Rane , enior Vice President On this the 17th day of January, 2019, before me personally appeared Robert L. Raney, who acknowledged himself to be the Senior Vice President of Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company, and that he, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing on behalf of said Companies by himself as a duly authorized officer. s"y'PN IN WITNESS WHEREOF, I hereunto set my hand and official seal. A� Y[GFAEfY My Commission expires the 30th day of June, 2021 F0119 Anna P. Nowik, Notary Public This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Travelers Casualty and Surety Company of America, Travelers Casually and Surety Company, and St. Paul Fire and Marine Insurance Company, which resolutions are now in full force and effect, reading as follows: RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys -in -Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her; and it is FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary; and it is FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary; or (b) duly executed (under seal, if required) by one or more Attomeys-in-Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys -in -Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. I, Kevin E. Hughes, the undersigned, Assistant Secretary of Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company, do hereby certify that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which remains in full force and effect. Dated this 18th day of December , 2019 �... ��Y.4 SRJ(Th Y ,1Npgt ® t� ���'� Kevin E. Hughes, Assistant Secretary -ro verify the autfientlelty of this Power of Attorney, please call us at 1-ffiOO-421-3880. Please refer to the above -named Attorney-ln-Fact and the detalls of the bond to which this power ofAttVMey is attached 0061 14 - 1 PAYMENT BOND Page 1 of2 1 SECTION 00 6114 2 Bond #106971478 PAYMENT BOND 3 4 TEE STAVE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY Or' TAR.RANT § 7 That we, Peachtree Construction. Ltd known as "Principal' herein, and 8 Travelers Casualty and Surety Company of America a corporate surety 9 (sureties), duly authorized to do business in the State of Texas, known as "Surety" herein 10 (whether one or more), are held and firmly bound unto the City of Fort Worth, a municipal 11 corporation created pursuant to the taws of the State of Texas, known as "City" herein, in the 12 penal Burn of ONE MILLION SEVENTY NINE THOUSAND NINE IIUNDRED SEVENTY 13 FIVE AND 00/100 Dollars W,079,975.001, awful money of the United States, to be paid in Fort 14 Worth, Tarrant County, Texas, for the payment of which sum well and truly be made, we bind 15 ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, 16 firmly by these presents: 17 WHEREAS, Principal has entered into a certain written Contract with City, awarded the 18 .171 day of December. 20119, which Contract is hereby referred to and made a part hereof for all iu purposes as if filly set forth herein, to fiimish all materials, equipment, labor and other 20 accessonces as defined by law, in the prosecution of the Work as provided for in said Contract and 21 designated as HMAC Surface Overlay 2019-6, City Project No. 102098. 22 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if 23 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in 24 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under 25 the C:unlrllcl, l;:en this obligation shall be and become null and void; otherwise to remain in full 26 force and effect. 7 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 28 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 29 accordance with the provisions of said statute. 30 CITY OF FART WORTH 11MAC SURFACF OVERLAY 200-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102099 Revised duly 1. 2011 00 61 14 - 2 PAYMENTBOND Page 2 of 2 IN WITNESS WDEREOF. trje prl isnc:pal and Surety have each SIGNED and SEALED 2 this instrument by duly authorized agents and officers on this the 18th day of 3 4 5 6 7 8 9 10 ly December , 2019 ATTEST; (Prin" al) Secretary W1tne to Principal mmm ATTEST: (Surety) Secre - Tina Payne Witness as to Surety - Lorrie Scott PRINCIPAL: Peachtree Construction, Ltd. BY: . Signature J. Barry Clark, President Name and Title Address: 5801 Park 'Vista Circle Keller, TX 76244 SURETY: Travelers Casualty and Surety Company of America BY' ALXl Utz Q(% =) Signature Linda K. Edwards,Attorney-In-Fact Name slid Title Address: 29n0 Marmi to nr_ Fort Worth, TX 76116 Telephone Number: 817-737-4943 Note: If signed by an officer of the Surety, there must be on file a certified extract from the bylaws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall -riot be prior to the date the Contract is awarded. END OF SECTION CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July 1, 20l t Travelers Casualty and Surety Company of America Travelers Casualty and Surety Company TRAVELERS,,! St. Paul Fire and Marine Insurance Company POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That Travelers Casualty and Surety Company of America, Travelers Casually and Surety Company, and St. Paul Fire and Marine Insurance Company are corporations duly organized under the laws of the State of Connecticut (herein collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint Linda K Edwards of FT WORTH , Texas , their true and lawful Attorney -in -Fact to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. IN WITNESS WHEREOF, the Companies have caused this instrument to be signed, and their corporate seals to be hereto affixed, this 17th day of January, 2019. Gar State of Connecticut City of Hartford ss. By: Robert L. Rane enior Vice President On this the 17th day of January, 2019, before me personally appeared Robert L. Raney, who acknowledged himself to be the Senior Vice President of Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company, and that he, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing on behalf of said Companies by himself as a duly authorized officer. rl �y�' IN WITNESS WHEREOF, I hereunto set my hand and official seal. ^SaTY. u�lYy My Commission expires the 30th day of June, 20211 ¢'e r°mie Anna P. Nowik, Notary Public This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Travelers Casually and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company, which resolutions are now in full force and effect, reading as follows: RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys -in -Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizanoes, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her; and it is FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary; and it is FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary; or (b) duly executed (under seal, if required) by one or more Attorneys -in -Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys -in -Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. I, Kevin E. Hughes, the undersigned, Assistant Secretary of Travelers Casually and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company, do hereby certify that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which remains in full force and effect. Dated this 18th day of December 2019 # .Yy �Y.45."ij7M¢, JA`tY qya �.S'31- �U, Kevin E. Hughes, Assistant Secretary Fo verify the aafhendeify of this power ofAttorney, please call us at 1-800-421 3880. Please refer to the above -named Attorney -in fact and the details of the bond fo whlah this power ofAttomey Is aCtached. 0061 19 - 1 MAINTENANCE BOND Page 1 or 3 SECTION 00 6119 2 Bond #106971478 MAINTENANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COTj'Nri'�r' OF T ARRANT § 7 Thai we l ea: hlMe Construction. Ltd., known its "Principal" herein and 8 i 10 11 12 13 14 I5 16 1'7 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 Travelers Casualty and Surety Company of America , a corporate surety (sureties, if more than one) Aida nuthorized to do business in the State of Texas, known as "Surety" herein (whether one or more), are icid ✓irld rinfly .b.0- ,:1 unto the City of Fort Worth, a municipal corporation created pursuant to the laws of the State of Texas, known as "City" herein, in the sum of ONE MILLION, SEVENTY-NINE THOUSANl3. NINE. LJLII ';Q SEVENTY FIVE AND 00/1. A.0 Ooll-aff's ($1.079.975.00), lawful money of the United -States. tw be fa„d ra R 0- Worth, Tarrant County, Texas, for paymcot of which sum well and truly be made unto the City and its successors, we bind ourselves, our heirs; exetmtors, administraiors, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has entered into a certain written contract with the City awarded the 171, day of December, 2019, which Contract is hereby referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all maleria,Is, equipment lsbor and other accessories as defined by law, in the prosecution of the ''Work, including any Work resulting; from a duly aulhoriz-,d Chai age Order (coliectively llerein, the `,Wnrk") as provided Ear ir1 said contmet and designated as HMAC Surtke Overlay 2019-655, C my I'rujjec No. 102098; and WHEREAS, Principal binds itself to use such materials and to so construct the Work in accordance with the plans, specifications and Contract Documents that the Work is and will remain free from defects in materials or workmanslii1) for a11ti dtkniing the period of two (2) years after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and WHEREAS, Principal binds itself to repair or reconstruct the Work in whole -or in part upon receiving notice from the City of the need therefor at any time within the Maintenance Period. CITY OF FORT W01CM 1IArIAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July 1, 2011 0061 19 - 2 MAINTENANCE BOND Page 2 of 3 1 NOW THEREFORE, the condition of this obligation is such that if Principal shall 2 remedy any defective Work, for which timely notice was provided by City, to a completion 3 satisfactory to the City, then this obligation shall become null and void; otherwise to remain in 4 full force and effect. 5 6 PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely 7 noticed defective Work, it is agreed that the City may cause any and all such defective Work to S be repaired and/or reconstructed with all associated costs thereof being borne by the Principal and 9 the Surety under this Maintenance bond; and 10 11 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 12 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 13 Worth Division; and 14 15 PROVIDED FURTHER, that this obligation shall be continuous in nature and 16 successive recoveries may be had hereon for successive breaches. 17 18 19 CITY OF FORT WORTH HMAC ,SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July 1, 2011 5 6 7 8 9 1D 1] 12 13 14 15 i6 17 Is 19 20 21 22 23 24 25 26 27 nfi 29 30 31 32 33 34 35 36 37 38 39 40 41 0061 19-3 MAINTrNANCF BONI) Page 3 of IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this instrument by duly authorized agents and officers on this the lath day of December 2019 ATTEST: (Principal) Secretary 4P, �li4'1�7a1 ATVs i': (Surety) SSeecreW-Tinaa Payne /rnr•�y [_- gig wiblp-35 as to surety . Lorrie Scott PRINCIPAL: Peactrinx ConsUmcdon. Lip , S ature J. Barry Clark, President Name and Title Address: 5801 Paris Vista Circle Keller TX 76244 SURETY: Travelers Casualty and Sure Company of America Linda K. Edwards, Attorney -in -Fact Name and Title Address: 2900 Marguita D - Fort Worth, TX 76116 Telephone Number: 817-737-4943 *Note- If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Sur Vp"s t1hYgiryai nddr?Gs is different from its mailing address, both must be provided. The date of the band shall not be prior to the date the Co,^.tract is awarded. CITY OF FORT WORTH STANDARD C(3-%8TRk IC'TION SPFCIFIC'ATION WCUMENTS Rmised !u13' I, -' U 3 1 HMAC SURFACE OVF.RI.AY 2019-6 City Projeet No. I M98 Travelers Casualty and Surety Company of America Travelers Casualty and Surety Company T/1,®/�81R/��%� ELERS.4 St. Paul Fire and Marine Insurance Company POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That Travelers Casualty and Surety Company of America, Travelers Casualty and Surely Company, and St. Paul Fire and Marine Insurance Company are corporations duly organized under the laws of the State of Connecticut (herein collectively called the "Companies"). and that the Companies do hereby make, constitute and appoint Linda K Edwards of FT WORTH , Texas , their true and lawful Attorney -in -Fact to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. IN WITNESS WHEREOF, the Companies have caused this instrument to be signed, and their corporate seals to be hereto affixed, this 17th day of January, 2019. ,,IV AV, spy rl p�.p rfLGttlLY�fS p .k { f State of Connecticut City of Hartford ss. By: Robert L. RaneyCtonior Vice President On this the 17th day of January, 2019, before me personally appeared Robert L. Raney, who acknowledged himself to be the Senior Vice President of Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company, and that he, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing on behalf of said Companies by himself as a duly authorized officer. "p P hrci IN WITNESS WHEREOF, I hereunto set my hand and official *1 seal.4� 1{gTJYRY �i 0 My Commission expires the 30th day of June, 2021 tr 14 41- Anna P. Nowik, Notary Public This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company, which resolutions are now in full force and effect, reading as follows: RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys -in -Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her; and it is FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vioe President, any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary; and it is FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking shall be valid and binding upon the Company when (a) signed by the President. any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary; or (b) duly executed (under seal, if required) by one or more Attorneys -in -Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys -in -Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. I, Kevin E. Hughes, the undersigned, Assistant Secretary of Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company, do hereby certify that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which remains in full force and effect. Dated this 16th day of December , 2019 ua o" tY apes ttl<Za�' u PAW � er Z4 �= 11 Kevin E. Hughes, Assistant Secretary r'o verity the authenticity of this Power of Attorney, please callus at 1-800-4213880. Please refer to the above -named Attorney -in -Pact and the details of the bond to which this Power ofAttomeyis attached IMPORTANT NOTICE To obtain information or make a complaint: You may call Travelers Casualty and Surety Company of America and its affiliates' toll - free telephone number for information or to make a complaint at: 1-800-328-2189 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance: P. O. Box 149104 Austin, TX 78714-9104 Fax: (512) 475-1771 Web: http://www.tdi.state.tx.us E-mail: ConsumerProtection(&-tdi.state.tx.us PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should contact your Agent or Travelers first. if the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR BOND: This notice is for information only and does not become a part or condition of the attached document and is given to comply with Texas legal and regulatory requirements. (PN-042-B) Ed.10.18.07 STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT CPFY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febnoy 2, 2016 STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT TABLE OF CONTENTS Page Article 1 Definitions and Terminology.......................................................................................................... I 1.01 Defined Terms...............................................................................................................................1 1.02 Terminology............................................................................................................. ...6 Article2 --- Preliminary Matters......................................................................................................................... 7 2.01 Copies of Documents.................................................................................................................... 7 2.02 Commencement of Contract Time; Notice to Proceed................................................................ 7 2.03 Starting the Work..........................................................................................................................8 2.04 Before Starting Construction........................................................................................................ 8 2.05 Preconstruction Conference..........................................................................................................8 2.06 Public Meeting.............................................................................................................................. 8 2.07 Initial Acceptance of Schedules.................................................................................................... 8 Article 3 — Contract Documents: Intent, Amending, Reuse............................................................................ 8 3.01 Intent .............................................................................................................................................. 8 3.02 Reference Standards......................................................................................................................9 3.03 Reporting and Resolving Discrepancies.......................................................................................9 3.04 Amending and Supplementing Contract Documents.................................................................10 3.05 Reuse of Documents...................................................................................................................10 3.06 Electronic Data............................................................................................................................ I 1 Article 4 — Availability of Lands; Subsurface and Physical Conditions; Hazardous Environmental Conditions; Reference Points...........................................................................................................11 4.01 Availability of Lands..................................................................................................................11 4.02 Subsurface and Physical Conditions..........................................................................................12 4.03 Differing Subsurface or Physical Conditions.............................................................................12 4.04 Underground Facilities...............................................................................................................13 4.05 Reference Points.........................................................................................................................14 4.06 Hazardous Environmental Condition at Site..............................................................................14 Article 5 — Bonds and Insurance.....................................................................................................................16 5.01 Licensed Sureties and Insurers...................................................................................................16 5.02 Performance, Payment, and Maintenance Bonds.......................................................................16 5.03 Certificates of Insurance.............................................................................................................16 5.04 Contractor's Insurance................................................................................................................18 5.05 Acceptance of Bonds and Insurance; Option to Replace...........................................................19 Article 6 — Contractor's Responsibilities........................................................................................................19 6.01 Supervision and Superintendence...............................................................................................19 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICA11ON DOCUMENTS Revision: Febuazy2,2016 6,02 Labor; Working Hours ............................................ 20 6.03 ,Services, Materials, and Equipment........................................................................................... 20 6.04 Project ScheduIe..........................................................................................................................21 6.05 Substitutes and "Or-Equals"....................................................................................................... 21 6.06 Concerning Subcontractors, Suppliers, and Others....................................................................24 6.07 Wage Rates..................................................................................................................................25 6.08 Patent Fees and Royalties...........................................................................................................26 6.09 Permits and Utilities....................................................................................................................27 6.10 Laws and Regulations................................................................................................................. 27 6.11 Taxes...........................................................................................................................................28 6.12 Use of Site and Other Areas..................................................................................... ..................28 6.13 Record Documents......................................................................................................................29 6.14 Safety and Protection.................................................................................................................. 29 6.15 Safety Representative..................................................................................................................30 6.16 Hazard Communication Programs.............................................................................................30 6,17 Emergencies and/or Rectification............................................................................................... 30 6.18 Submittals....................................................................................................................................31 6.19 Continuing the Work................................................................................................................... 32 6.20 Contractor's General Warranty and Guarantee.......................................................................... 32 6.21 Indemnification......................................................................................................................... 33 6.22 Delegation of Professional Design Services.............................................................................. 34 6.23 Right to Audit.............................................................................................................................. 34 6.24 Nondiscrimination.......................................................................................................................35 Article 7 --- Other Work at the Site...................................................................................................................35 7.01 Related Work at Site ....................................................... .......35 7.02 Coordination................................................................................................................................36 Article 8 - City's Responsibilities................................................................................................................... 36 8.01 Communications to Contractor...................................................................................................36 8.02 Furnish Data................................................................................................................................ 36 8.03 Pay When Due............................................................................................................................ 36 8.04 Lands and Easements; Reports and Tests...................................................................................36 8.05 Change Orders.............................................................................................................................36 8.06 Inspections, Tests, and Approvals..............................................................................................36 8.07 Limitations on City's Responsibilities.......................................................................................37 8.08 Undisclosed Hazardous Environmental Condition....................................................................37 8.09 Compliance with Safety Program............................................................................................... 37 Article 9 - City's Observation Status During Construction........................................................................... 37 9.01 City's Project Manager ...................................... I................ ... 37 .................................................. 9.02 Visits to Site................................................................................................................................ 37 9,03 Authorized Variations in Work..................................................................................................38 9.04 Rejecting Defective Work..........................................................................................................38 9.05 Determinations for Work Performed..........................................................................................38 9.06 Decisions on Requirements of Contract Documents and Acceptability of Work.....................38 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Fcbmery 2, 2016 Article 10 - Changes in the Work; Claims; Extra Work................................................................................38 10.01 Authorized Changes in the Work............................................................................................... 38 10.02 Unauthorized Changes in the Work...........................................................................................39 10.03 Execution of Change Orders.......................................................................................................39 10.04 Extra Work..................................................................................................................................39 10.05 Notification to Surety..................................................................................................................39 10.06 Contract Claims Process......................................................... ... 40 ................................................. Article I I - Cost of the Work; Allowances; Unlit Price Work; Plans Quantity Measurement ......................41 11.01 Cost of the Work.........................................................................................................................41 11.02 Allowances..................................................................................................................................43 11.03 Unit Price Work ............................... ............ .................... ...... ..44 11.04 Plans Quantity Measurement......................................................................................................45 Article 12 - Change of Contract Price; Change of Contract Time................................................................. 46 12.01 Change of Contract Price...................•........................................................................................46 12.02 Change of Contract Time............................................................................................................47 12.03 Delays.......................................................................................................................................... 47 Article 13 - Tests and Inspections; Correction, Removal or Acceptance of Defective Work ......................48 13.01 Notice of Defects............................................................................. ... 48 ........................................ 13.02 Access to Work...........................................................................................................................48 13.03 Tests and Inspections..................................................................................................................48 13.04 Uncovering Work........................................................................................................................49 13.05 City May Stop the Work.............................................................................................................49 13.06 Correction or Removal of Defective Work................................................................................ 50 13.07 Correction Period........................................................................................................................ 50 13.08 Acceptance of Defective Work................................................................................................... 51 13.09 City May Correct Defective Work............................................................................................. 51 Article 14 - Payments to Contractor and Completion....................................................................................52 14.01 Schedule of Values...................................................................................................................... 52 14.02 Progress Payments...................................................................................................................... 52 14.03 Contractor's Warranty of Title................................................................................................... 54 14.04 Partial Utilization.................................................................................. .. 55 .................................... 14.05 Final Inspection.............................................................•.............................•...............................55 14.06 Final Acceptance......................................................................................................................... 55 14.07 Final Payment..............................................................................................................................56 14.08 Final Completion Delayed and Partial Retainage Release........................................................56 14.09 Waiver of Claims........................................................................................................................ 57 Article 15 -- Suspension of Work and Termination........................................................................................ 57 15.01 City May ,Suspend Work............................................................................................................. 57 15.02 City May Terminate for Cause................................................................................................... 58 15.03 City May Terminate For Convenience....................................................................................... 60 Article 16 - Dispute Resolution...................................................................................................................... 61 16.01 Methods and Procedures............................................................................................................. 61 Cr1Y OF FORT WORTH STANDARDCONSTRUC110N SPECIFICATION DOCUMENTS Revision: Fcbnmty 2, 2016 Article 17 -- Miscellaneous ................... 17.01 Giving Notice ................... 17.02 Computation of Times ..... 17.03 Cumulative Remedies ...... 17.04 Survival of Obligations .... 17.05 Headings ........................... ........................................................................................................... 62 ........................................................................................................... 62 .... I ........ ". ........................................................................................... 62 ........................................................................................................... 62 ........................................................................................................... 63 ........................................................................................................... 63 CIIY OF FORT WORTII STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febawwy2,2016 007200- l GENERAL CONDITIONS Page I of 63 ARTICLE 1— DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed -defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Addenda —Written or graphic instruments issued prior to the opening of Bids which clarify, correct, or change the Bidding Requirements or the proposed Contract Documents. 2. Agreement —The written instrument which is evidence of the agreement between City and Contractor covering the Work. 3. Application for Payment The form acceptable to City which is to be used by Contractor during the course of the Work in requesting progress or final payments and which is to be accompanied by such supporting documentation as is required by the Contract Documents. 4. Asbestos —Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 5. Award— Authorization by the City Council for the City to enter into an Agreement. 6. Bid —The offer or proposal of a Bidder submitted on the prescribed form setting forth the prices for the Work to be performed. 7. Bidder —The individual or entity who submits a Bid directly to City. 8. Bidding Documents The Bidding Requirements and the proposed Contract Documents (including all Addenda). 9. Bidding Requirements —The advertisement or Invitation to Bid, Instructions to Bidders, Bid security of acceptable form, if any, and the Bid Form with any supplements. 10. Business Day A business day is defined as a day that the City conducts normal business, generally Monday through Friday, except for federal or state holidays observed by the City. 11. Buzzsaw City's on -Mine, electronic document management and collaboration system. 12. Calendar Day ---- A day consisting of 24 hours measured from midnight to the next midnight. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febnwiy2, 2016 007200-1 GENERAL CONDITIONS Page 2 of 63 13. Change Order A document, which is prepared and approved by the City, which is signed by Contractor and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 14. City— The City of Fort Worth, Texas, a home -rule municipal corporation, authorized and chartered under the Texas State Statutes, acting by its governing body through its City Manager, his designee, or agents authorized under his behalf, each of which is required by Charter to perform specific duties with responsibility for final enforcement of the contracts involving the City of Fort Worth is by Charter vested in the City Manager and is the entity with whom Contractor has entered into the Agreement and for whom the Work is to be performed. 15. City Attorney — The officially appointed City Attorney of the City of Fort Worth, Texas, or his duly authorized representative. 16. City Council - The duly elected and qualified governing body of the City of Fort Worth, Texas. 17. City Manager — The officially appointed and authorized City Manager of the City of Fort Worth, Texas, or his duly authorized representative. 18. Contract Claim —A demand or assertion by City or Contractor seeking an adjustment of Contract Price or Contract Time, or both, or other relief with respect to the terms of the Contract. A demand for money or services by a third party is not a Contract Claim. 19. Contract —The entire and integrated written document between the City and Contractor concerning the Work. The Contract contains the Agreement and all Contract Documents and supersedes prior negotiations, representations, or agreements, whether written or oral. 20. Contract Documents Those items so designated in the Agreement. All items listed in the Agreement are Contract Documents. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 21. Contract Price The moneys payable by City to Contractor for completion of the Work in accordance with the Contract Documents as stated in the Agreement (subject to the provisions of Paragraph 11.03 in the case of Unit Price Work). 22. Contract Time The number of days or the dates stated in the Agreement to: (i) achieve Milestones, if any and (ii) complete the Work so that it is ready for Final Acceptance. 23. Contractor —The individual or entity with whom City has entered into the Agreement. 24. Cast of the Work See Paragraph 11.01 of these General Conditions for definition. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: February 2, 2016 007200-1 GENERAL CONDITIONS Page 3 of 63 25. Damage Claims -- A demand for money or services arising from the Project or Site from a third party, City or Contractor exclusive of a Contract Claim. 26. Day or day — A day, unless otherwise defined, shall mean a Calendar Day. 27. Director of Aviation — The officially appointed Director of the Aviation Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 28. Director of Parks and Community Services -- The officially appointed Director of the Parks and Community Services Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 29. Director of Planning and Development The officially appointed Director of the Planning and Development Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 30. Director of Transportation Public Works The officially appointed Director of the Transportation Public Works Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 31. Director of Water Department The officially appointed Director of the Water Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 32. Drawings —That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 33. Effective Date of the Agreement The date indicated in the Agreement on which it becomes effective, but if no such date is indicated, it means the date on which the Agreement is signed and delivered by the last of the two parties to sign and deliver. 34. Engineer The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the City. 35. Extra Work — Additional work made necessary by changes or alterations of the Contract Documents or of quantities or for other reasons for which no prices are provided in the Contract Documents. Extra work shall be part of the Work. 36. Field Order — A written order issued by City which requires changes in the Work but which does not involve a change in the Contract Price, Contract Time, or the intent of the Engineer. Field Orders are paid from Field Order Allowances incorporated into the Contract by funded work type at the time of award. 37. Final Acceptance The written notice given by the City to the Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febnimy 2, 2016 007200-1 GENERAL CONDITIONS Page 4 of 63 38. Final Inspection — Inspection carried out by the City to verify that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 39. General Requirements —Sections of Division 1 of the Contract Documents. 40. Hazardous Environmental Condition —The presence at the Site of Asbestos, PCBs, Petroleum, Hazardous Waste, Radioactive Material, or other materials in such quantities or circumstances that may present a substantial danger to persons or property exposed thereto. 41. Hazardous Waste Hazardous waste is defined as any solid waste listed as hazardous or possesses one or more hazardous characteristics as defined in the federal waste regulations, as amended from time to time. 42. Laws and Regulations —Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 43. Liens --Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 44. Major Item — An Item of work included in the Contract Documents that has a total cost equal to or greater than 5% of the original Contract Price or $25,000 whichever is less. 45. Milestone —A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 46. Notice of Award The written notice by City to the Successful Bidder stating that upon timely compliance by the Successful Bidder with the conditions precedent listed therein, City will sign and deliver the Agreement. 47. Notice to Proceed A written notice given by City to Contractor fixing the date on which the Contract Time will commence to run and on which Contractor shall start to perform the Work specified in Contract Documents. 48. PCBs Polychlorinated biphenyls. 49. Petroleum Petroleum, including crude oil or any fraction thereof which is liquid at standard conditions of temperature and pressure (60 degrees Fahrenheit and 14.7 pounds per square inch absolute), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline, kerosene, and oil mixed with other non -Hazardous Waste and crude oils. 50. Plans — See definition of Drawings. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febnacy2, 2016 007200- l GENERAL CONDITIONS Page 5 of 63 51. Project Schedule —A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Time. 52. Project —The Work to be performed under the Contract Documents. 53. Project Manager The authorized representative of the City who will be assigned to the Site. 54. Public Meeting — An announced meeting conducted by the City to facilitate public participation and to assist the public in gaining an informed view of the Project. 55. Radioactive Material —Source, special nuclear, or byproduct material as defined by the Atomic Energy Act of 1954 (42 USC Section 2011 et seq.) as amended from time to time. 56. Regular Working Hours --- Hours beginning at 7:00 a.m. and ending at 6:00 p.m., Monday thru Friday (excluding legal holidays). 57. Samples —Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. 58. Schedule of Submittals —A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 59. Schedule of Values —A schedule, prepared and maintained by Contractor, allocating portions of the Contract Price to various portions of the Work and used as the basis for reviewing Contractor's Applications for Payment. 60. Sile—Lands or areas indicated in the Contract Documents as being furnished by City upon which the Work is to be performed, including rights -of -way, permits, and easements for access thereto, and such other lands furnished by City which are designated for the use of Contractor. 61. Specifications That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made a part of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 62. Subcontractor An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of a part of the Work at the Site. CTrY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febnwry 2, 20I6 007200-] GENERAL CONDITIONS Page 6 of 63 63. Submittals —All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 64. Successful Bidder —The Bidder submitting the lowest and most responsive Bid to whom City makes an Award. 65. Superintendent — The representative of the Contractor who is available at all times and able to receive instructions from the City and to act for the Contractor. 66. Supplementary Conditions —That part of the Contract Documents which amends or supplements these General Conditions. 67. Supplier A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. 68. Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 69. Unit Price Work —See Paragraph 11.03 of these General Conditions for definition. 70. Weekend Working Hours — Hours beginning at 9:00 a.m. and ending at 5:00 p.m., Saturday, Sunday or legal holiday, as approved in advance by the City. 71. Work —The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all Iabor, services, and documentation necessary to produce such construction including any Change Order or Field Order, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 72. Working Day — A working day is defined as a day, not including Saturdays, Sundays, or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p.m. 1.02 Terminology A. The words and terms discussed in Paragraph 1.02.B through E are not defined but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. .Intent of Certain Terms orAdjectives: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: F&ftmty 2, 2016 00 72 00 - ] GENERAL CONDITIONS Page 7 of 63 1. The Contract Documents include the terms "as allowed," "as approved," "as ordered," "as directed" or terms of like effect or import to authorize an exercise of judgment by City. In addition, the adjectives "reasonable," "suitable," "acceptable," "proper," "satisfactory," or adjectives of like effect or import are used to describe an action or determination of City as to the Work. It is intended that such exercise of professional judgment, action, or determination will be solely to evaluate, in general, the Work for compliance with the information in the Contract Documents and with the design concept of the Project as a functioning whole as shown or indicated in the Contract Documents (unless there is a specific statement indicating otherwise). C. Defective: 1. The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory, faulty, or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been damaged prior to City's written acceptance. D. Furnish, Install, Perform, Provide: I. The word "Furnish" or the word "install" or the word "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. E. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. ARTICLE 2 — PRELIMINARY MATTERS 2.01 Copies of Documents City shall furnish to Contractor one (1) original executed copy and one (1) electronic copy of the Contract Documents, and four (4) additional copies of the Drawings. Additional copies will be furnished upon request at the cost of reproduction. 2.02 Commencement of Contract Time; Notice to Proceed The Contract Time will commence to run on the day indicated in the Notice to Proceed. A Notice to Proceed may be given at any time within 14 days after the Effective Date of the Agreement. CT£Y Or FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febnmuy 2, 2016 0072 00 -1 GENERAL CONDITIONS Page 8 of 63 2.03 Starting the Work Contractor shall start to perform the Work on the date when the Contract Time commences to run. No Work shall be done at the Site prior to the date on which the Contract Time commences to run. 2.04 Before Starting Construction Baseline Schedules: Submit in accordance with the Contract Documents, and prior to starting the Work. 2.05 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.06 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. 2.07 Initial Acceptance of Schedules No progress payment shall be made to Contractor until acceptable schedules are submitted to City in accordance with the Schedule Specification as provided in the Contract Documents. ARTICLE 3 — CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE 3.01 Intent A. The Contract Documents are complementary; what is required by one is as binding as if required by all. B. It is the intent of the Contract Documents to describe a functionally complete project (or part thereof) to be constructed in accordance with the Contract Documents. Any labor, documentation, services, materials, or equipment that reasonably may be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the indicated result will be provided whether or not specifically called for, at no additional cost to City. C. Clarifications and interpretations of the Contract Documents shall be issued by City. D. The Specifications may vary in form, format and style. Some Specification sections may be written in varying degrees of streamlined or declarative style and some sections may be relatively narrative by comparison. Omission of such words and phrases as "the Contractor shall," "in conformity with," "as shown," or "as specified" are intentional in streamlined sections. Omitted words and phrases shall be supplied by inference. Similar types of provisions may appear in various parts of a section or articles within a part depending on the format of the CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: February 2, 2016 00'72 00 - I GENERAL CONDITIONS Page 9 o£63 section. The Contractor shall not take advantage of any variation of form, format or style in making Contract Claims. E. The cross referencing of specification sections under the subparagraph heading "Related Sections include but are not necessarily limited to:" and elsewhere within each Specification section is provided as an aid and convenience to the Contractor. The Contractor shall not rely on the cross referencing provided and shall be responsible to coordinate the entire Work under the Contract Documents and provide a complete Project whether or not the cross referencing is provided in each section or whether or not the cross referencing is complete. 3.02 Reference Standards A. Standards, Specifications, Codes, Laws, and Regulations L Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision of any such standard, specification, manual, or code, or any instruction of a Supplier, shall be effective to change the duties or responsibilities of City, Contractor, or any of their subcontractors, consultants, agents, or employees, from those set forth in the Contract Documents. No such provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.03 Reporting and Resolving Discrepancies A. Reporting Discrepancies: Contractor's Review of Contract Documents Before Starting Work: Before undertaking each part of the Work, Contractor shall carefully study and compare the Contract Documents and check and verify pertinent figures therein against all applicable field measurements and conditions. Contractor shall promptly report in writing to City any conflict, error, ambiguity, or discrepancy which Contractor discovers, or has actual knowledge of, and shall obtain a written interpretation or clarification from City before proceeding with any Work affected thereby. 2. Contractor's Review of Contract Documents During Performance of Work: If, during the performance of the Work, Contractor discovers any conflict, error, ambiguity, or discrepancy within the Contract Documents, or between the Contract Documents and (a) any applicable Law or Regulation, (b) any standard, specification, manual, or code, or (c) any instruction of any Supplier, then Contractor shall promptly report it to City in writing. Contractor shall not proceed with the Work affected thereby (except in an emergency as required by Paragraph CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision; Febnaty2,2016 007200-1 GENERAL CONDITIONS Page 10 of 63 6.17.A) until an amendment or supplement to the Contract Documents has been issued by one of the methods indicated in Paragraph 3.04. 3. Contractor shall not be liable to City for failure to report any conflict, error, ambiguity, or discrepancy in the Contract Documents unless Contractor had actual knowledge thereof. B. Resolving Discrepancies: 1. Except as may be otherwise specifically stated in the Contract Documents, the provisions of the Contract Documents shall take precedence in resolving any conflict, error, ambiguity, or discrepancy between the provisions of the Contract Documents and the provisions of any standard, specification, manual, or the instruction of any Supplier (whether or not specifically incorporated by reference in the Contract Documents). 2. In case of discrepancies, figured dimensions shall govern over scaled dimensions, Plans shall govern over Specifications, Supplementary Conditions shall govern over General Conditions and Specifications, and quantities shown on the Plans shall govern over those shown in the proposal. 3.04 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Change Order. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized, by one or more of the following ways: 1. A Field Order; 2. City's review of a Submittal (subject to the provisions of Paragraph 6.1 S.C); or 3. City's written interpretation or clarification. 3.05 Reuse of Documents A. Contractor and any Subcontractor or Supplier shall not: 1. have or acquire any title to or ownership rights in any of the Drawings, Specifications, or other documents (or copies of any thereof) prepared by or bearing the seat of Engineer, including electronic media editions; or 2. reuse any such Drawings, Specifications, other documents, or copies thereof on extensions of the Project or any other project without written consent of City and specific written verification or adaptation by Engineer. CrfY OF FORT WORTFI STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febrmy 2, 2016 007200-1 GENERAL CONDITIONS Page 11 of 63 B. The prohibitions of this Paragraph 3.05 will survive final payment, or termination of the Contract. Nothing herein shall preclude Contractor from retaining copies of the Contract Documents for record purposes. 3.06 Electronic Data A. Unless otherwise stated in the Supplementary Conditions, the data furnished by City or Engineer to Contractor, or by Contractor to City or Engineer, that may be relied upon are limited to the printed copies included in the Contract Documents (also known as hard copies) and other Specifications referenced and located on the City's Buzzsaw site. Files in electronic media format of text, data, graphics, or other types are furnished only for the convenience of the receiving party. Any conclusion or information obtained or derived from such electronic files will be at the user's sole risk. If there is a discrepancy between the electronic files and the hard copies, the hard copies govern. B. When transferring documents in electronic media format, the transferring party makes no representations as to long term compatibility, usability, or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by the data's creator. ARTICLE 4 — AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; HAZARDOUS ENVIRONMENTAL CONDITIONS; REFERENCE POINTS 4.01 Availability of Lands A. City shall furnish the Site. City shall notify Contractor of any encumbrances or restrictions not of general application but specifically related to use of the Site with which Contractor must comply in performing the Work. City will obtain in a timely manner and pay for easements for permanent structures or permanent changes in existing facilities. The City has obtained or anticipates acquisition of and/or access to right-of-way, and/or easements. Any outstanding right-of-way and/or easements are anticipated to be acquired in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding right-of-way, and/or easements. 2. The City has or anticipates removing and/or relocating utilities, and obstructions to the Site. Any outstanding removal or relocation of utilities or obstructions is anticipated in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding utilities or obstructions to be removed, adjusted, and/or relocated by others. B. Upon reasonable written request, City shall furnish Contractor with a current statement of record legal title and legal description of the lands upon which the Work is to be performed. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: FebniaFy2, 2016 00 72 00 - 1 GENERAL CONDITIONS Page 12 of 63 C. Contractor shall provide for all additional lands and access thereto that may be required for construction facilities or storage of materials and equipment. 4.02 Subsurface and Physical Conditions A. Reports and Drawings: The Supplementary Conditions identify: 1. those reports known to City of explorations and tests of subsurface conditions at or contiguous to the Site; and 2. those drawings known to City of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities). B. Limited Reliance by Contractor on Technical Data Authorized, Contractor may rely upon the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Contractor may not make any Contract Claim against City, or any of their officers, directors, members, partners, employees, agents, consultants, or subcontractors with respect to: 1. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions, and information contained in such reports or shown or indicated in such drawings; or 3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such other data, interpretations, opinions, or information. 4.03 Differing Subsurface or Physical Conditions A. Notice: If Contractor believes that any subsurface or physical condition that is uncovered or revealed either: 1. is of such a nature as to establish that any "technical data" on which Contractor is entitled to rely as provided in Paragraph 4.02 is materially inaccurate; or 2. is of such a nature as to require a change in the Contract Documents; or 3. differs materially from that shown or indicated in the Contract Documents; or 4. is of an unusual nature, and differs materially from conditions ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents; CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: FebrLmy 2, 2016 007200-1 GENERAL CONDITIONS Page 13 of 63 then Contractor shall, promptly after becoming aware thereof and before further disturbing the subsurface or physical conditions or performing any Work in connection therewith (except in an emergency as required by Paragraph 6.17.A), notify City in writing about such condition. B. Possible Price and Time Adjustments Contractor shall not be entitled to any adjustment in the Contract Price or Contract Time if: 1. Contractor knew of the existence of such conditions at the time Contractor made a final commitment to City with respect to Contract Price and Contract Time by the submission of a Bid or becoming bound under a negotiated contract; or 2. the existence of such condition could reasonably have been discovered or revealed as a result of the examination of the Contract Documents or the Site; or 3. Contractor failed to give the written notice as required by Paragraph 4.03.A. 4.04 Underground Facilities A. Shown or Indicated.• The information and data shown or indicated in the Contract Documents with respect to existing Underground Facilities at or contiguous to the Site is based on information and data furnished to City or Engineer by the owners of such Underground Facilities, including City, or by others. Unless it is otherwise expressly provided in the Supplementary Conditions: 1. City and Engineer shall not be responsible for the accuracy or completeness of any such information or data provided by others; and 2. the cost of all of the following will be included in the Contract Price, and Contractor shall have full responsibility for: a. reviewing and checking all such information and data; b. locating all Underground Facilities shown or indicated in the Contract Documents; c. coordination and adjustment of the Work with the owners of such Underground Facilities, including City, during construction; and d. the safety and protection of all such Underground Facilities and repairing any damage thereto resulting from the Work. B. Not Shown or Indicated: 1. If an Underground Facility which conflicts with the Work is uncovered or revealed at or contiguous to the Site which was not shown or indicated, or not shown or indicated with reasonable accuracy in the Contract Documents, Contractor shall, promptly after becoming aware thereof and before further disturbing conditions affected thereby or performing any CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Fcbnkuy2,2016 007200-1 GENERAL CONDITIONS Page 14 of63 Work in connection therewith (except in an emergency as required by Paragraph 6.17.A), identify the owner of such Underground Facility and give notice to that owner and to City. City will review the discovered Underground Facility and determine the extent, if any, to which a change may be required in the Contract Documents to reflect and document the consequences of the existence or location of the Underground Facility. Contractor shall be responsible for the safety and protection of such discovered Underground Facility. 2. If City concludes that a change in the Contract Documents is required, a Change Order may be issued to reflect and document such consequences. 3. Verification of existing utilities, structures, and service lines shall include notification of all utility companies a minimum of 48 hours in advance of construction including exploratory excavation if necessary. 4.05 Reference Points A. City shall provide engineering surveys to establish reference points for construction, which in City's judgment are necessary to enable Contractor to proceed with the Work. City will provide construction stakes or other customary method of marking to establish Iine and grades for roadway and utility construction, centerlines and benchmarks for bridgework. Contractor shall protect and preserve the established reference points and property monuments, and shall make no changes or relocations. Contractor shall report to City whenever any reference point or property monument is lost or destroyed or requires relocation because of necessary changes in grades or locations. The City shall be responsible for the replacement or relocation of reference points or property monuments not carelessly or willfully destroyed by the Contractor. The Contractor shall notify City in advance and with sufficient time to avoid delays. B. Whenever, in the opinion of the City, any reference point or monument has been carelessly or willfully destroyed, disturbed, or removed by the Contractor or any of his employees, the full cost for replacing such points plus 25% will be charged against the Contractor, and the full amount will be deducted from payment due the Contractor. 4.06 Hazardous Environmental Condition at Site A. Reports and Drawings: The Supplementary Conditions identify those reports and drawings known to City relating to Hazardous Environmental Conditions that have been identified at the Site. B. Limited Reliance by Contractor on Technical Data Authorized: Contractor may rely upon the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Contractor may not make any Contract Claim against City, or any of their officers, directors, members, partners, employees, agents, consultants, or subcontractors with respect to: 1. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences and procedures of CrrY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: February 2, 2016 007200- I GENERAL CONDITIONS Page 15 of 63 construction to be employed by Contractor and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions and information contained in such reports or shown or indicated in such drawings; or 3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such other data, interpretations, opinions or information. C. Contractor shall not be responsible for any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work. Contractor shall be responsible for a Hazardous Environmental Condition created with any materials brought to the Site by Contractor, Subcontractors, Suppliers, or anyone else for whom Contractor is responsible. D. If Contractor encounters a Hazardous Environmental Condition or if Contractor or anyone for whom Contractor is responsible creates a Hazardous Environmental Condition, Contractor shall immediately: (i) secure or otherwise isolate such condition; (ii) stop all Work in connection with such condition and in any area affected thereby (except in an emergency as required by Paragraph 6.17.A); and (iii) notify City (and promptly thereafter confirm such notice in writing). City may consider the necessity to retain a qualified expert to evaluate such condition or take corrective action, if any. E. Contractor shall not be required to resume Work in connection with such condition or in any affected area until after City has obtained any required permits related thereto and delivered written notice to Contractor: (i) specifying that such condition and any affected area is or has been rendered suitable for the resumption of Work; or (ii) specifying any special conditions under which such Work may be resumed. F. 1f after receipt of such written notice Contractor does not agree to resume such Work based on a reasonable belief it is unsafe, or does not agree to resume such Work under such special conditions, then City may order the portion of the Work that is in the area affected by such condition to be deleted from the Work. City may have such deleted portion of the Work performed by City's own forces or others. G. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to a Hazardous Environmental Condition created by Contractor or by anyone for whom Contractor is responsible. Nothing in this Paragraph 4.06.G shall obligate Contractor to indemnify any individual or entity from and against the consequences of that individual's or entity's own negligence. H. The provisions of Paragraphs 4.02, 4.03, and 4.04 do not apply to a Hazardous Environmental Condition uncovered or revealed at the Site. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febnmy2,2016 00 72 00 - 1 GENERAL CONDITIONS Page 16 of 63 ARTICLE 5 — BONDS AND INSURANCE 5.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverages so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided in the Supplementary Conditions. 5.02 Performance, Payment, and .!Maintenance Bonds A. Contractor shall furnish performance and payment bonds, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney -in -fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney -in -fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of Paragraph 5.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 5.01 and 5.02.C. 5.03 Certificates of Insurance Contractor shall deliver to City, with copies to each additional insured and loss payee identified in the Supplementary Conditions, certificates of insurance (and other evidence of insurance requested by City or any other additional insured) which Contractor is required to purchase and maintain. 1. The certificate of insurance shall document the City, and all identified entities named in the Supplementary Conditions as "Additional Insured" on all liability policies. CITY OF PORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCYN ENTS Revision: Febnory2,2016 007200- 1 GENERAL CONDITIONS Page 17 of 63 2. The Contractor's general liability insurance shall include a, "per project" or "per location", endorsement, which shall be identified in the certificate of insurance provided to the City. 3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Property & Casualty Guide 4. The insurers for all policies must be licensed anal/or approved to do business in the State of Texas. Except for workers' compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required, written approval of City is required. 5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in the Supplementary Conditions 6. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor's obligation to maintain such lines of insurance coverage. 7. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 8. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If coverage is underwritten on a claims -made basis, the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is claims -made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 9. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 10. Any self -insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In CITY OF FORT WORTH STANDARD CONSMUCTION SPECIFICATION DOCUMENTS Revision: Febnary2, 2016 007200-1 GENERAL CONDITIONS Page 18 of 63 lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups, must also be approved by City. 11. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first -dollar basis, must be acceptable to and approved by the City. 12. City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage's and their Iimits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 13. City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either party or the underwriter on any such policies. 14. City shall not be responsible for the direct payment of insurance premium costs for Contractor's insurance. 5.04 Contractor's Insurance A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such insurance coverage with Iimits consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Texas Labor Code, Ch. 406, as amended), - and minimum limits for Employers' Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers' compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. B. Commercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations, personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other CITY' OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision- Febmry 2, 2016 007200-1 GENERAL CONDITIONS Page 19 of 63 insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project (if identified in the Supplementary Conditions). C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto', defined as autos owned, hired and non -owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the requirements identified in the Supplementary Conditions. E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other Ioss of insurance coverage. Contractor shall stop work until replacement insurance has been procured. There shall be no time credit for days not worked pursuant to this section. 5.05 Acceptance of Bonds and Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required by the Contract Documents, the City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 6 — CONTRACTOR'S RESPONSIBILITIES 6.01 Supervision and Superintendence A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. CITY Or FORT WORTH STANDARD CONSTRUCTION SPECiFFICATION DOCUMENTS Revision; Febnry2,2016 00 72 00 - 1 GENERAL CONDITIONS Page 20 of 63 B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor's representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent shall be binding on Contractor. C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of construction. 6.02 Labor; Working Hours A. Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City's written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication) to perform Work: for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2. for Weekend Working Hours request must be made by noon of the preceding Thursday 3. for legal holidays request must be made by noon two Business Days prior to the legal holiday. 6.03 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, Contractor required testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febwary 2, 2016 007200-1 GENERAL CONDITIONS Page 21 of 63 C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. D. All items of standard equipment to be incorporated into the Work shall be the Iatest model at the time of bid, unless otherwise specified. 6.04 Project Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.07 and the General Requirements as it may be adjusted from time to time as provided below. 1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.07 and the General Requirements) proposed adjustments in the Project Schedule that will not result in changing the Contract Time. Such adjustments will comply with any provisions of the General Requirements applicable thereto. 2. Contractor shall submit to City a monthly Project Schedule with a monthly progress payment for the duration of the Contract in accordance with the schedule specification 0132 16. 3. Proposed adjustments in the Project Schedule that will change the Contract Time shall be submitted in accordance with the requirements of Article 12. Adjustments in Contract Time may only be made by a Change Order. 6.05 Substitutes and "Or -Equals" A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or "or -equal" item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. 1. "Or -Equal " Items: If in City's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and suff ciently similar so that no change in related Work will be required, it may be considered by City as an "or -equal" item, in which case review and approval of the proposed item may, in City's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 6.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if: a. the City determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febnwy2, 2016 007200-1 GENERAL CONDITIONS Page 22 of 63 2) it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3) it has a proven record of performance and availability of responsive service; and b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time; and 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2. Substitute Items: a. If in City's sole discretion an item of material or equipment proposed by Contractor does not qualify as an "or -equal" item under Paragraph 6.05.A.1, it may be submitted as a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow City to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c. Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section 01 25 00 and: 1) shall certify that the proposed substitute item will: a) perform adequately the functions and achieve the results called for by the general design; b) be similar in substance to that specified; c) be suited to the same use as that specified; and 2) will state: a) the extent, if any, to which the use of the proposed substitute item will prejudice Contractor's achievement of final completion on time; b) whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with City for other work on the Project) to adapt the design to the proposed substitute item; CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febnmiy 2, 2016 0072CO-1 GENERAL CONDITIONS Page 23 of63 c) whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3) will identify: a) all variations of the proposed substitute item from that specified; b) available engineering, sales, maintenance, repair, and replacement services; and 4) shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B. ,substitute Construction Methods or Procedures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph 6.05.A.2. C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 6.05.A and 6.05.13. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. No "or -equal" or substitute will be ordered, installed or utilized until City's review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an "or -equal." City will advise Contractor in writing of its determination. D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall indemnify and hold harmless City and anyone directly or indirectly employed by them from and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 6.05.A.2 and 6.05.13. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City for the charges for making changes in the Contract Documents (or in the provisions of any other direct contract with City) resulting from the acceptance of each proposed substitute. F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or "or -equal" at Contractor's expense. CITY OF FORT WORTII STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febnrary2,2016 0072 00 - 1 GENERAL CONDITIONS Page 24 of 63 G. City Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Change Order. H. Time Extensions: No additional time will be granted for substitutions. 6.06 Concerning Subcontractors, Suppliers, and Others A. Contractor shall perform with his own organization, work of a value not less than 35% of the value embraced on the Contract, unless otherwise approved by the City. B. Contractor shall not employ any Subcontractor, Supplier, or other individual or entity, whether initially or as a replacement, against whom City may have reasonable objection. Contractor shall not be required to employ any Subcontractor, Supplier, or other individual or entity to furnish or perform any of the Work against whom Contractor has reasonable objection (excluding those acceptable to City as indicated in Paragraph 6.06.C). C. The City may from time to time require the use of certain Subcontractors, Suppliers, or other individuals or entities on the project, and will provide such requirements in the Supplementary Conditions. D. Minority Business Enterprise Compliance: It is City policy to ensure the full and equitable participation by Minority Business Enterprises (MBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for a MBE goal, Contractor is required to comply with the intent of the City's MBE Ordinance (as amended) by the following: 1. Contractor shall, upon request by City, provide complete and accurate information regarding actual work performed by a MBE on the Contract and payment therefor. 2. Contractor will not make additions, deletions, or substitutions of accepted MBE without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debarment in accordance with the procedures outlined in the Ordinance. 3. Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by an MBE. Material misrepresentation of any nature will be grounds for termination of the Contract in accordance with Paragraph 15.02.A. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. E. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract Documents: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Feb wy2,2016 00 72 00 - 1 GENERAL CONDITIONS Page 25 of 63 1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2. shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. F. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. G. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. H. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of the Contract Documents for the benefit of City. 6.07 Wage Rates A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. C. Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall make an initial determination, before the 31st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City's determination that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. CITY OF FOItl' WORT H STAN➢ARDCONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febmazy2, 2016 00 72 00 -1 GENERAL CONDITIONS Page 26 of 63 D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 11th day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F. Progress Payments. With each progress payment or payroll period, whichever is Iess, the Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code. G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. 6.08 Patent Fees and Royalties A. Contractor shall pay all license fees and royalties and assume all costs incident to the use in the performance of the Work or the incorporation in the Work of any invention, design, process, product, or device which is the subject of patent rights or copyrights held by others. If a particular invention, design, process, product, or device is specified in the Contract Documents for use in the performance of the Work and if, to the actual knowledge of City, its use is subject to patent rights or copyrights calling for the payment of any license fee or royalty to others, the existence of such rights shall be disclosed by City in the Contract Documents. Failure of the City to disclose such information does not relieve the Contractor from its obligations to pay for the use of said fees or royalties to others. B. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from CITY OF PORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision - Fa bniaiy2,2016 007200-1 GENERAL CONDITIONS Page 27 of 63 the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. 6.09 Permits and Utilities A. Contractor obtained permits and licenses. Contractor shall obtain and pay for all construction permits and licenses except those provided for in the Supplementary Conditions or Contract Documents. City shall assist Contractor, when necessary, in obtaining such permits and licenses. Contractor shall pay all governmental charges and inspection fees necessary for the prosecution of the Work which are applicable at the time of opening of Bids, or, if there are no Bids, on the Effective Date of the Agreement, except for permits provided by the City as specified in 6.09.13. City shall pay all charges of utility owners for connections for providing permanent service to the Work. B. City obtained permits and licenses. City will obtain and pay for all permits and licenses as provided for in the Supplementary Conditions or Contract Documents. It will be the Contractor's responsibility to carry out the provisions of the permit. If the Contractor initiates changes to the Contract and the City approves the changes, the Contractor is responsible for obtaining clearances and coordinating with the appropriate regulatory agency. The City will not reimburse the Contractor for any cost associated with these requirements of any City acquired permit. The following are permits the City will obtain if required: 1. Texas Department of Transportation Permits 2. U.S. Army Corps of Engineers Permits 3. Texas Commission on Environmental Quality Permits 4. Railroad Company Permits C. Outstanding permits and licenses. The City anticipates acquisition of and/or access to permits and licenses. Any outstanding permits and licenses are anticipated to be acquired in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding permits and licenses. 6.10 Latins and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's compliance with any Laws or Regulations. B. if Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all CITY OF FORT wORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: February 2, 2016 00 72 00 - 1 GENERAL CONDITIONS Page 28 of63 court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor's responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's obligations under Paragraph 3.02. C. Changes in Laws or Regulations not known at the time of opening of Bids having an effect on the cost or time of performance of the Work may be the subject of an adjustment in Contract Price or Contract Time. 6.11 Taxes A. On a contract awarded by the City, an organization which qualifies for exemption pursuant to Texas Tax Code, Subchapter H, Sections 151.301-335 (as amended), the Contractor may purchase, rent or lease all materials, supplies and equipment used or consumed in the performance of this contract by issuing to his supplier an exemption certificate in lieu of the tax, said exemption certificate to comply with State Comptroller's Ruling .007. Any such exemption certificate issued to the Contractor in lieu of the tax shall be subject to and shall comply with the provision of State Comptroller's Ruling .011, and any other applicable rulings pertaining to the Texas Tax Code, Subchapter H. B. Texas Tax permits and information may be obtained from: 1. Comptroller of Public Accounts Sales Tax Division Capitol Station Austin, TX 78711; or 2. http://www.window.state.tx.us/taxinfo/taxforms/93-forms.html 6.12 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas: 1. Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is commenced on any additional area of the Site. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febnoy2, 2016 007200-1 GENERAL CONDITIONS Page 29 of 63 3. Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim. 4. Pursuant to Paragraph 6.21, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against City. B. Removal of Debris During Performance of the Work: During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the City, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and the costs of such direct action, plus 25 % of such costs, shall be deducted from the monies due or to become due to the Contractor. D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent property owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all property disturbed by the Work. E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 6.13 Record Documents A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate Iocations for buried and imbedded items. 6.14 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febnwy2, 2016 00 72 00 - 1 GENERAL CONDITIONS Page 30 of 63 take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who may be affected by the Work; 2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City's safety programs, if any. D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any, with which City's employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 6.14.A.2 or 6.14.A.3 caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and City has accepted the Work. 6.15 Safety Representative Contractor shall inform City in writing of Contractor's designated safety representative at the Site. 6.16 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 6.17 Emergencies and/or Rectification A. In emergencies affecting the safety or protection of persons or the Work or property at the Site or adjacent thereto, Contractor is obligated to act to prevent threatened damage, injury, or loss. Contractor shall give City prompt written notice if Contractor believes that any significant MY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febnty 2, 2016 00 72 00 - 1 GENERAL CONDITIONS Page 31 of 63 changes in the Work or variations from the Contract Documents have been caused thereby or are required as a result thereof. If City determines that a change in the Contract Documents is required because of the action taken by Contractor in response to such an emergency, a Change Order may be issued. B. Should the Contractor fail to respond to a request from the City to rectify any discrepancies, omissions, or correction necessary to conform with the requirements of the Contract Documents, the City shall give the Contractor written notice that such work or changes are to be performed. The written notice shall direct attention to the discrepant condition and request the Contractor to take remedial action to correct the condition. In the event the Contractor does not take positive steps to fulfill this written request, or does not show just cause for not taking the proper action, within 24 hours, the City may take such remedial action with City forces or by contract. The City shall deduct an amount equal to the entire costs for such remedial action, plus 25%, from any funds due or become due the Contractor on the Project. 6.18 Submittals A. Contractor shall submit required Submittals to City for review and acceptance in accordance with the accepted Schedule of Submittals (as required by Paragraph 2.07). Each submittal will be identified as City may require. l . Submit number of copies specified in the General Requirements. 2. Data shown on the ,Submittals will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limited purposes required by Paragraph 6.1 S.C. 3. Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5. For -Information -Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 6.18.C. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febnkuy2,2016 00 72 00 - I GENERAL CONDITIONS Page 32 of 63 B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City's review and acceptance of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. City's Review: City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City's review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. 2. City's review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. 3. City's review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section 01 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City's review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 6.19 Continuing the Work Except as otherwise provided, Contractor shall carry on the Work and adhere to the Project Schedule during all disputes or disagreements with City. No Work shall be delayed or postponed pending resolution of any disputes or disagreements, except as City and Contractor may otherwise agree in writing. 6.20 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor's warranty and guarantee. B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by: abuse, modification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febmary2, 2016 007200-1 GENERAL CONDITIONS Page 33 of 63 2. normal wear and tear under normal usage. C. Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: 1. observations by City; 2. recommendation or payment by City of any progress or final payment; 3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acceptance of a Submittal by City; 6. any inspection, test, or approval by others; or 7. any correction of defective Work by City. D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of Article 5.02.B. The City will give notice of observed defects with reasonable promptness. 6.21 Indemnification A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED IN WHOLE OR IN PART —BY ANY ACT, OMISSION-OR-NEOR-NE ENCE OIF THE CITX. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the City in defending against such claims and causes of actions. B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febmary2, 2016 00 72 00 - 1 GENERAL CONDITIONS Page 34 of 63 SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGMT WERE CAUSED, IN WHOLE OR IN PART, BY Y ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. 6.22 Delegation of Professional Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carry out Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly Iicensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, and Submittals prepared by such professional. Submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to City. C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 6.22, City's review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City's review and acceptance of Submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 6.18.C. 6.23 Right to Audit A. The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. B. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and further, that City shall have access during Regular Working Hours to ail CrrY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Februwy 2,2016 00 72 00 - 1 GENERAL CONDITIONS Page 35 of 63 Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. C. Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 6.24 Nondiscrimination A. The City is responsible for operating Public Transportation Programs and implementing transit - related projects, which are funded in part with Federal financial assistance awarded by the U.S. Department of Transportation and the Federal Transit Administration (FTA), without discriminating against any person in the United States on the basis of race, color, or national origin. B. Title V1,, Civil Rights Act of 1964 as amended- Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. ARTICLE 7 — OTHER WORK AT THE SITE 7.01 Related Work at Site A. City may perform other work related to the Project at the Site with City's employees, or other City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to starting any such other work; and B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility owner, and City, if City is performing other work with City's employees or other City contractors, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C. If the proper execution or results of any part of Contractor's Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects in the work provided by others. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febnzary2,2016 00 72 00 - 1 GENERAL CONDITIONS Page 36 of 63 7.02 Coordination A. If City intends to contract with others for the performance of other work on the Project at the Site, the following will be set forth in Supplementary Conditions: the individual or entity who will have authority and responsibility for coordination of the activities among the various contractors will be identified; 2. the specific matters to be covered by such authority and responsibility will be itemized; and 3. the extent of such authority and responsibilities will be provided. B. Unless otherwise provided in the Supplementary Conditions, City shall have authority for such coordination. ARTICLE 8 — CITY'S RESPONSIBILITIES 8.01 Communications to Contractor Except as otherwise provided in the Supplementary Conditions, City shall issue all communications to Contractor. 8.02 Furnish Data City shall timely furnish the data required under the Contract Documents. 8.03 Pay When Due City shall make payments to Contractor in accordance with Article 14. 8.04 Lands and Easements; Reports and Tests City's duties with respect to providing lands and easements and providing engineering surveys to establish reference points are set forth in Paragraphs 4.01 and 4.05. Paragraph 4.02 refers to City's identifying and making available to Contractor copies of reports of explorations and tests of subsurface conditions and drawings of physical conditions relating to existing surface or subsurface structures at or contiguous to the Site that have been utilized by City in preparing the Contract Documents. 8.05 Change Orders City shall execute Change Orders in accordance with Paragraph 10.03. 8.06 Inspections, Tests, and Approvals City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 13.03. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febm iy2, 2016 00 72 00 - 1 GENERAL CONDITIONS Page 37 of 63 8.07 Limitations on City's Responsibilities A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 6.14. 8.08 Undisclosed Hazardous Environmental Condition City's responsibility with respect to an undisclosed Hazardous Environmental Condition is set forth in Paragraph 4.06. 8.09 Compliance with Safety Program While at the Site, City's employees and representatives shall comply with the specific applicable requirements of Contractor's safety programs of which City has been informed pursuant to Paragraph 6.14. ARTICLE 9 — CITY'S OBSERVATION STATUS DURING CONSTRUCTION 9.01 City's Project Manager City will provide one or more Project Manager(s) during the construction period. The duties and responsibilities and the limitations of authority of City's Project Manager during construction are set forth in the Contract Documents. The City's Project Manager for this Contract is Juan Pablo De La Cruz or his/her successor pursuant to written notification from the Director of Transportation and Public Works. 9.02 Visits to Site A. City's Project Manager will make visits to the Site at intervals appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the quality of the various aspects of Contractor's executed Work. Based on information obtained during such visits and observations, City's Project Manager will determine, in general, if the Work is proceeding in accordance with the Contract Documents. City's Project Manager will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City's Project Manager's efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents, B. City's Project Manager's visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents including those set forth in Paragraph 8.07. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENCS Revision: Febnmry 2, 2016 007200- 1 GENERAL CONDITIONS Page 38 of63 9.03 Authorized Variations in Work City's Project Manager may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City and also on Contractor, who shall perform the Work involved promptly. 9.04 Rejecting Defective Work City will have authority to reject Work which City's Project Manager believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. City will have authority to conduct special inspection or testing of the Work as provided in Article 13, whether or not the Work is fabricated, installed, or completed. 9.05 Determinations for Work Performed Contractor will determine the actual quantities and classifications of Work performed. City's Project Manager will review with Contractor the preliminary determinations on such matters before rendering a written recommendation. City's written decision will be final (except as modified to reflect changed factual conditions or more accurate data). 9.06 Decisions on Requirements of Contract Documents and Acceptability of Work A. City will be the initial interpreter of the requirements of the Contract Documents and judge of the acceptability of the Work thereunder. B. City will render a written decision on any issue referred. C. City's written decision on the issue referred will be final and binding on the Contractor, subject to the provisions of Paragraph 10.06. ARTICLE 10 — CHANGES IN THE WORK; CLAIMS; EXTRA WORK 10.01 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Change Order which may or may not precede an order of Extra work. B. For minor changes of Work not requiring changes to Contract Time or Contract Price, a Field Order may be issued by the City. CITY' OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febnjmy2,2016 00 72 00 - 1 GENERAL CONDITIONS Page 39 of63 10.02 Unauthorized Changes in the Work Contractor shall not be entitled to an increase in the Contract Price or an extension of the Contract Time with respect to any work performed that is not required by the Contract Documents as amended, modified, or supplemented as provided in Paragraph 3.04, except in the case of an emergency as provided in Paragraph 6.17. 10.03 Execution of Change Orders A. City and Contractor shall execute appropriate Change Orders covering: 1. changes in the Work which are: (i) ordered by City pursuant to Paragraph 10.01.A, (ii) required because of acceptance of defective Work under Paragraph 13.08 or City's correction of defective Work under Paragraph 13.09, or (iii) agreed to by the parties; 2. changes in the Contract Price or Contract Time which are agreed to by the parties, including any undisputed sum or amount of time for Work actually performed. 10.04 Extra Work A. Should a difference arise as to what does or does not constitute Extra Work, or as to the payment thereof, and the City insists upon its performance, the Contractor shall proceed with the work after making written request for written orders and shall keep accurate account of the actual reasonable cost thereof, Contract Claims regarding Extra Work shall be made pursuant to Paragraph 10.06. B. The Contractor shall furnish the City such installation records of all deviations from the original Contract Documents as may be necessary to enable the City to prepare for permanent record a corrected set of plans showing the actual installation. C. The compensation agreed upon for Extra Work whether or not initiated by a Change Order shall be a full, complete and final payment for all costs Contractor incurs as a result or relating to the change or Extra Work, whether said costs are known, unknown, foreseen or unforeseen at that time, including without limitation, any costs for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged work as a result of the change or Extra Work. 10.05 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time), the giving of any such notice will be Contractor's responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febmwy2, 2016 00 72 00 - 1 GENERAL CONDITIONS Page 40 of 63 10.06 Contract Claims Process A. City's Decision Required: All Contract Claims, except those waived pursuant to Paragraph 14.09, shall be referred to the City for decision. A decision by City shall be required as a condition precedent to any exercise by Contractor of any rights or remedies he may otherwise have under the Contract Documents or by Laws and Regulations in respect of such Contract CIaims. B. Notice: 1. Written notice stating the general nature of each Contract Claim shall be delivered by the Contractor to City no later than 15 days after the start of the event giving rise thereto. The responsibility to substantiate a Contract Claim shall rest with the party making the Contract Claim. 2. Notice of the amount or extent of the Contract CIaim, with supporting data shall be delivered to the City on or before 45 days from the start of the event giving rise thereto (unless the City allows additional time for Contractor to submit additional or more accurate data in support of such Contract Claim). 3. A Contract Claim for an adjustment in Contract Price shall be prepared in accordance with the provisions of Paragraph 12.01. 4. A Contract Claim for an adjustment in Contract Time shall be prepared in accordance with the provisions of Paragraph 12.02. 5. Each Contract Claim shall be accompanied by Contractor's written statement that the adjustment claimed is the entire adjustment to which the Contractor believes it is entitled as a result of said event. 6. The City shall submit any response to the Contractor within 30 days after receipt of the claimant's last submittal (unless Contract allows additional time). C. City's Action: City will review each Contract Claim and, within 30 days after receipt of the last submittal of the Contractor, if any, take one of the following actions in writing: 1. deny the Contract Claim in whole or in part; 2. approve the Contract Claim; or 3. notify the Contractor that the City is unable to resolve the Contract Claim if, in the City's sole discretion, it would be inappropriate for the City to do so. For purposes of further resolution of the Contract Claim, such notice shall be deemed a denial. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febwary 2, 2016 007200-1 GENERAL CONDITIONS Page 41 of 63 D. City's written action under Paragraph 10.06.0 will be final and binding, unless City or Contractor invoke the dispute resolution procedure set forth in Article 16 within 30 days of such action or denial. E. No Contract Claim for an adjustment in Contract Price or Contract Time will be valid if not submitted in accordance with this Paragraph 10.06. ARTICLE 11— COST OF THE WORK; ALLOWANCES; UNIT PRICE WORK; PLANS QUANTITY MEASUREMENT 11.01 Cost of the Work A. Costs Included: The term Cost of the Work means the sum of all costs, except those excluded in Paragraph 11.0 LB, necessarily incurred and paid by Contractor in the proper performance of the Work. When the value of any Work covered by a Change Order, the costs to be reimbursed to Contractor will be only those additional or incremental costs required because of the change in the Work. Such costs shall not include any of the costs itemized in Paragraph 11.0I.B, and shall include but not be limited to the following items: 1. Payroll costs for employees in the direct employ of Contractor in the performance of the Work under schedules of job classifications agreed upon by City and Contractor. Such employees shall include, without limitation, superintendents, foremen, and other personnel employed full time on the Work. Payroll costs for employees not employed full time on the Work shall be apportioned on the basis of their time spent on the Work. Payroll costs shall include; a. salaries with a 55% markup, or b. salaries and wages plus the cost of fringe benefits, which shall include social security contributions, unemployment, excise, and payroll taxes, workers' compensation, health and retirement benefits, bonuses, sick leave, vacation and holiday pay applicable thereto. The expenses of performing Work outside of Regular Working Hours, Weekend Working Hours, or legal holidays, shall be included in the above to the extent authorized by City. 2. Cost of all materials and equipment furnished and incorporated in the Work, including costs of transportation and storage thereof, and Suppliers' field services required in connection therewith. 3. Rentals of all construction equipment and machinery, and the parts thereof whether rented from Contractor or others in accordance with rental agreements approved by City, and the costs of transportation, loading, unloading, assembly, dismantling, and removal thereof. All such costs shall be in accordance with the terms of said rental agreements. The rental of any such equipment, machinery, or parts shall cease when the use thereof is no longer necessary for the Work. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febnaary2, 2016 007200-1 GENERAL CONDITIONS Page 42 oif 63 4. Payments made by Contractor to Subcontractors for Work performed by Subcontractors. If required by City, Contractor shall obtain competitive bids from subcontractors acceptable to City and Contractor and shall deliver such bids to City, who will then determine, which bids, if any, will be acceptable. If any subcontract provides that the Subcontractor is to be paid on the basis of Cost of the Work plus a fee, the Subcontractor's Cost of the Work and fee shall be determined in the same manner as Contractor's Cost of the Work and fee as provided in this Paragraph 11.01. 5. Costs of special consultants (including but not limited to engineers, architects, testing laboratories, surveyors, attorneys, and accountants) employed for services specifically related to the Work. 6. Supplemental costs including the following: a. The proportion of necessary transportation, travel, and subsistence expenses of Contractor's employees incurred in discharge of duties connected with the Work. b. Cost, including transportation and maintenance, of all materials, supplies, equipment, machinery, appliances, office, and temporary facilities at the Site, and hand tools not owned by the workers, which are consumed in the performance of the Work, and cost, less market value, of such items used but not consumed which remain the property of Contractor. c. Sales, consumer, use, and other similar taxes related to the Work, and for which Contractor is liable not covered under Paragraph 6.11, as imposed by Laws and Regulations. d. Deposits lost for causes other than negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, and royalty payments and fees for permits and licenses. e. Losses and damages (and related expenses) caused by damage to the Work, not compensated by insurance or otherwise, sustained by Contractor in connection with the performance of the Work, provided such losses and damages have resulted from causes other than the negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable. Such losses shall include settlements made with the written consent and approval of City. No such losses, damages, and expenses shall be included in the Cost of the Work for the purpose of determining Contractor's fee. f. The cost of utilities, fuel, and sanitary facilities at the Site. g. Minor expenses such as telegrams, Iong distance telephone calls, telephone and communication services at the Site, express and courier services, and similar petty cash items in connection with the Work. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febnuy2,2016 007200-1 GENERAL CONDITIONS Page 43 of 63 h. The costs of premiums for all bonds and insurance Contractor is required by the Contract Documents to purchase and maintain. B. Costs Excluded: The term Cost of the Work shall not include any of the following items: Payroll costs and other compensation of Contractor's officers, executives, principals (of partnerships and sole proprietorships), general managers, safety managers, engineers, architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents, expediters, timekeepers, clerks, and other personnel employed by Contractor, whether at the Site or in Contractor's principal or branch office for general administration of the Work and not specifically included in the agreed upon schedule of job classifications referred to in Paragraph 11.01.A.1 or specifically covered by Paragraph 11.01.A.4, all of which are to be considered administrative costs covered by the Contractor's fee. 2. Expenses of Contractor's principal and branch offices other than Contractor's office at the Site. 3. Any part of Contractor's capital expenses, including interest on Contractor's capital employed for the Work and charges against Contractor for delinquent payments. 4. Costs due to the negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including but not limited to, the correction of defective Work, disposal of materials or equipment wrongly supplied, and making good any damage to property. 5. Other overhead or general expense costs of any kind. C. Contractor's Fee: When all the Work is performed on the basis of cost-plus, Contractor's fee shall be determined as set forth in the Agreement. When the value of any Work covered by a Change Order for an adjustment in Contract Price is determined on the basis of Cost of the Work, Contractor's fee shall be determined as set forth in Paragraph 12.01.C. D. Documentation: Whenever the Cost of the Work for any purpose is to be determined pursuant to Paragraphs 11.01.A and 11.01.13, Contractor will establish and maintain records thereof in accordance with generally accepted accounting practices and submit in a form acceptable to City an itemized cost breakdown together with supporting data. 11.02 Allowances A. Specified Allowance: It is understood that Contractor has included in the Contract Price all allowances so named in the Contract Documents and shall cause the Work so covered to be performed for such sums and by such persons or entities as may be acceptable to City. B. Pre -bid Allowances: 1. Contractor agrees that: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febn ly2,2016 00 72 00 - 1 GENERAL CONDITIONS Page 44 of 63 a. the pre -bid allowances include the cost to Contractor of materials and equipment required by the allowances to be delivered at the Site, and all applicable taxes; and b. Contractor's costs for unloading and handling on the Site, labor, installation, overhead, profit, and other expenses contemplated for the pre -bid allowances have been included in the allowances, and no demand for additional payment on account of any of the foregoing will be valid. C. Contingency Allowance: Contractor agrees that a contingency allowance, if any, is for the sole use of City. D. Prior to final payment, an appropriate Change Order will be issued to reflect actual amounts due Contractor on account of Work covered by allowances, and the Contract Price shall be correspondingly adjusted. 11.03 Unit -Price Work A. Where the Contract Documents provide that all or part of the Work is to be Unit Price Work, initially the Contract Price will be deemed to include for all Unit Price Work an amount equal to the sum of the unit price for each separately identified item of Unit Price Work times the estimated quantity of each item as indicated in the Agreement. B. The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the purpose of comparison of Bids and determining an initial Contract Price. Determinations of the actual quantities and classifications of Unit Price Work performed by Contractor will be made by City subject to the provisions of Paragraph 9.05. C. Each unit price will be deemed to include an amount considered by Contractor to be adequate to cover Contractor's overhead and profit for each separately identified item. Work described in the Contract Documents, or reasonably inferred as required for a functionally complete installation, but not identified in the listing of unit price items shall be considered incidental to unit price work listed and the cost of incidental work included as part of the unit price. D. City may make an adjustment in the Contract Price in accordance with Paragraph 12.01 if: 1. the quantity of any item of Unit Price Work performed by Contractor differs materially and significantly from the estimated quantity of such item indicated in the Agreement; and 2. there is no corresponding adjustment with respect to any other item of Work. E. Increased or Decreased Quantities: The City reserves the right to order Extra Work in accordance with Paragraph 10.01. 1. If the changes in quantities or the alterations do not significantly change the character of work under the Contract Documents, the altered work will be paid for at the Contract unit price. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: F6nmy2,2016 00 72 00 - I GENERAL CONDITIONS Page 45 of 63 2. if the changes in quantities or alterations significantly change the character of work, the Contract will be amended by a Change Order. 3. If no unit prices exist, this will be considered Extra Work and the Contract will be amended by a Change Order in accordance with Article 12. 4. A significant change in the character of work occurs when: a. the character of work for any Item as altered differs materially in kind or nature from that in the Contract or b. a Major Item of work varies by more than 25% from the original Contract quantity. 5. When the quantity of work to be done under any Major Item of the Contract is more than 125% of the original quantity stated in the Contract, then either party to the Contract may request an adjustment to the unit price on the portion of the work that is above 125%. 6. When the quantity of work to be done under any Major Item of the Contract is less than 75% of the original quantity stated in the Contract, then either party to the Contract may request an adjustment to the unit price. 11.04 Plans Quantity Measurement A. Plans quantities may or may not represent the exact quantity of work performed or material moved, handled, or placed during the execution of the Contract. The estimated bid quantities are designated as final payment quantities, unless revised by the governing Section or this Article, B. If the quantity measured as outlined under "Price and Payment Procedures" varies by more than 25% (or as stipulated under "Price and Payment Procedures" for specific Items) from the total estimated quantity for an individual Item originally shown in the Contract Documents, an adjustment may be made to the quantity of authorized work done for payment purposes. The party to the Contract requesting the adjustment will provide field measurements and calculations showing the final quantity for which payment will be made. Payment for revised quantity will be made at the unit price bid for that Item, except as provided for in Article 10. C. When quantities are revised by a change in design approved by the City, by Change Order, or to correct an error, or to correct an error on the plans, the plans quantity will be increased or decreased by the amount involved in the change, and the 25% variance will apply to the new plans quantity. D. If the total Contract quantity multiplied by the unit price bid for an individual Item is less than $250 and the Item is not originally a plans quantity Item, then the Item may be paid as a plans quantity Item if the City and Contractor agree in writing to fix the final quantity as a plans quantity. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febnury 2, 2016 007200-1 GENERAL CONDITIONS Page 46 o£63 E. For callout work or non -site specific Contracts, the plans quantity measurement requirements are not applicable. ARTICLE 12 — CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 12.01 Change of Contract Price A. The Contract Price may only be changed by a Change Order. B. The value of any Work covered by a Change Order will be determined as follows: 1. where the Work involved is covered by unit prices contained in the Contract Documents, by application of such unit prices to the quantities of the items involved (subject to the provisions of Paragraph 11.03); or 2. where the Work involved is not covered by unit prices contained in the Contract Documents, by a mutually agreed lump sum or unit price (which may include an allowance for overhead and profit not necessarily in accordance with Paragraph 12.0l.C.2), and shall include the cost of any secondary impacts that are foreseeable at the time of pricing the cost of Extra Work; or 3. where the Work involved is not covered by unit prices contained in the Contract Documents and agreement to a lump sum or unit price is not reached under Paragraph 12.01.13.2, on the basis of the Cost of the Work (determined as provided in Paragraph 11.01) plus a Contractor's fee for overhead and profit (determined as provided in Paragraph 12.01.C). C. Contractor's Fee: The Contractor's additional fee for overhead and profit shall be determined as follows: 1. a mutually acceptable fixed fee; or 2. if a fixed fee is not agreed upon, then a fee based on the following percentages of the various portions of the Cost of the Work: a. for costs incurred under Paragraphs 11.0l.A.1, 11.01.A.2. and 11.0l.A.3, the Contractor's additional fee shall be 15 percent except for: 1) rental fees for Contractor's own equipment using standard rental rates; 2) bonds and insurance; b. for costs incurred under Paragraph 11.01.A.4 and 11.01.A.5, the Contractor's fee shall be five percent (5%); 1) where one or more tiers of subcontracts are on the basis of Cost of the Work plus a fee and no fixed fee is agreed upon, the intent of Paragraphs 12.01.C.2.a and 12.0l.C.2.b is that the Subcontractor who actually performs the Work, at whatever CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febmay2,2016 007200- 1 GENERAL CONDITIONS Page 47 of 63 tier, will be paid a fee of 15 percent of the costs incurred by such Subcontractor under Paragraphs 11.0l.A.1 and 11.01.A.2 and that any higher tier Subcontractor and Contractor will each be paid a fee of five percent (5%) of the amount paid to the next lower tier Subcontractor, however in no case shall the cumulative total of fees paid be in excess of 25%; c. no fee shall be payable on the basis of costs itemized under Paragraphs 11.0LA.6, and 11.01.B; d. the amount of credit to be allowed by Contractor to City for any change which results in a net decrease in cost will be the amount of the actual net decrease in cost plus a deduction in Contractor's fee by an amount equal to five percent (5%) of such net decrease. 12.02 Change of Contract Time A. The Contract Time may only be changed by a Change Order. B. No extension of the Contract Time will be allowed for Extra Work or for claimed delay unless the Extra Work contemplated or claimed delay is shown to be on the critical path of the Project Schedule or Contractor can show by Critical Path Method analysis how the Extra Work or claimed delay adversely affects the critical path. 12.03 Delays A. Where Contractor is reasonably delayed in the performance or completion of any part of the Work within the Contract Time due to delay beyond the control of Contractor, the Contract Time may be extended in an amount equal to the time lost due to such delay if a Contract Claim is made therefor. Delays beyond the control of Contractor shall include, but not be limited to, acts or neglect by City, acts or neglect of utility owners or other contractors performing other work as contemplated by Article 7, fires, floods, epidemics, abnormal weather conditions, or acts of God. Such an adjustment shall be Contractor's sole and exclusive remedy for the delays described in this Paragraph. B. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. C. Contractor shall not be entitled to an adjustment in Contract Price or Contract Time for delays within the control of Contractor. Delays attributable to and within the control of a Subcontractor or Supplier shall be deemed to be delays within the control of Contractor. D. The Contractor shall receive no compensation for delays or hindrances to the Work, except when direct and unavoidable extra cost to the Contractor is caused by the failure of the City to provide information or material, if any, which is to be furnished by the City. CTFY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: FebrLmry 2, 20 t6 00 72 00 - 1 GENERAL CONDITIONS Page 48 of 63 ARTICLE 13 — TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 13.01 Notice of Defects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work may be rejected, corrected, or accepted as provided in this Article 13. 13.02 Access to Work City, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor's safety procedures and programs so that they may comply therewith as applicable. 13.03 Tests and Inspections A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR) inspections, which shall be paid as described in the Supplementary Conditions. C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re -tests, or approvals required for City's acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such inspections, tests, re -tests, or approvals shall be performed by organizations acceptable to City. D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to perform any inspections or tests ("Testing") for any part of the Work, as determined solely by City. 1. City will coordinate such Testing to the extent possible, with Contractor; 2. Should any Testing under this Section 13.03 D result in a "fail", "did not pass" or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Contractor's cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT'S Revision: Febnmy 2, 2016 007200-1 GENERAL CONDITIONS Page 49 of 63 3. Any amounts owed for any retest under this Section 13.03 D shall be paid directly to the Testing Lab by Contractor. City will forward all invoices for retests to Contractor. 4. If Contractor fails to pay the Testing Lab, City will not issue Final Payment until the Testing Lab is paid. E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for observation. F. Uncovering Work as provided in Paragraph 13.03.E shall be at Contractor's expense. G. Contractor shall have the right to make a Contract CIaim regarding any retest or invoice issued under Section 13.03 D. 13.04 Uncovering Work A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City's observation and replaced at Contractor's expense. B. If City considers it necessary or advisable that covered Work be observed by City or inspected or tested by others, Contractor, at City's request, shall uncover, expose, or otherwise make available for observation, inspection, or testing as City may require, that portion of the Work in question, furnishing all necessary labor, material, and equipment. I. If it is found that the uncovered Work is defective, Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such uncovering, exposure, observation, inspection, and testing, and of satisfactory replacement or reconstruction (including but not limited to all costs of repair or replacement of work of others); or City shall be entitled to accept defective Work in accordance with Paragraph 13.08 in which case Contractor shall still be responsible for all costs associated with exposing, observing, and testing the defective Work. 2. If the uncovered Work is not found to be defective, Contractor shall be allowed an increase in the Contract Price or an extension of the Contract Time, or both, directly attributable to such uncovering, exposure, observation, inspection, testing„ replacement, and reconstruction. 13.05 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any CITY OF FORT 'WOR rH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febnuy2, 2016 007200-1 GENERAL CONDITIONS Page 50 o£63 Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 13.06 Correction or Removal of Defective Work A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B. When correcting defective Work under the terms of this Paragraph 13.06 or Paragraph 13.07, Contractor shall take no action that would void or otherwise impair City's special warranty and guarantee, if any, on said Work. 13.07 Correction Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor's use by City or permitted by Laws and Regulations as contemplated in Paragraph 6.10.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City's written instructions: 1. repair such defective land or areas; or 2. correct such defective Work; or 3. if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective, and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B. If Contractor does not promptly comply with the terms of City's written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by Contractor. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision_ Febnkuy2,2016 00 72 00 - 1 GENERAL CONDITIONS Page 51 of 63 C. In special circumstances where a particular item of equipment is placed in continuous service before Final Acceptance of all the Work, the correction period for that item may start to run from an earlier date if so provided in the Contract Documents. D. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 13.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor should such additional warranty coverage be required. Contractor may dispute this requirement by filing a Contract Claim, pursuant to Paragraph 10.06. E. Contractor's obligations under this Paragraph 13.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 13.07 shall not be construed as a substitute for, or a waiver of, the provisions of any applicable statute of limitation or repose. 13.08 Acceptance of Defective Work If, instead of requiring correction or removal and replacement of defective Work, City prefers to accept it, City may do so. Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) attributable to City's evaluation of and determination to accept such defective Work and for the diminished value of the Work to the extent not otherwise paid by Contractor. If any such acceptance occurs prior to Final Acceptance, a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work, and City shall be entitled to an appropriate decrease in the Contract Price, reflecting the diminished value of Work so accepted. 13.09 City May Correct Defective Work A. If Contractor fails within a reasonable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 13.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven (7) days written notice to Contractor, correct, or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 13.09, City shall proceed expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor's services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants, employees, and City's other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febnja y 2, 2016 007200-1 GENERAL CONDITIONS Page 52 of63 costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City's rights and remedies under this Paragraph 13.09. ARTICLE 14 — PAYMENTS TO CONTRACTOR AND COMPLETION 14.01 Schedule of Values The Schedule of Values for lump sum contracts established as provided in Paragraph 2.07 will serve as the basis for progress payments and will be incorporated into a form of Application for Payment acceptable to City. Progress payments on account of Unit Price Work will be based on the number of units completed. 14.02 Progress Payments A..Applications for Payments: 1. Contractor is responsible for providing all information as required to become a vendor of the City. 2. At least 20 days before the date established in the General Requirements for each progress payment, Contractor shall submit to City for review an Application for Payment filled out and signed by Contractor covering the Work completed as of the date of the Application and accompanied by such supporting documentation as is required by the Contract Documents. 3. If payment is requested on the basis of materials and equipment not incorporated in the Work but delivered and suitably stored at the Site or at another location agreed to in writing, the Application for Payment shall also be accompanied by a bill of sale, invoice, or other documentation warranting that City has received the materials and equipment free and clear of all Liens and evidence that the materials and equipment are covered by appropriate insurance or other arrangements to protect City's interest therein, all of which must be satisfactory to City. 4. Beginning with the second Application for Payment, each Application shall include an affidavit of Contractor stating that previous progress payments received on account of the Work have been applied on account to discharge Contractor's legitimate obligations associated with prior Applications for Payment. 5. The amount of retainage with respect to progress payments will be as stipulated in the Contract Documents. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febnmry2,2016 007200-1 GENERAL CONDITIONS Page 53 of 63 B. Review ofAppliccations: 1. City will, after receipt of each Application for Payment, either indicate in writing a recommendation of payment or return the Application to Contractor indicating reasons for refusing payment. In the latter case, Contractor may make the necessary corrections and resubmit the Application. 2. City's processing of any payment requested in an Application for Payment will be based on City's observations of the executed Work, and on City's review of the Application for Payment and the accompanying data and schedules, that to the best of City's knowledge: a. the Work has progressed to the point indicated; b. the quality of the Work is generally in accordance with the Contract Documents (subject to an evaluation of the Work as a functioning whole prior to or upon Final Acceptance, the results of any subsequent tests called for in the Contract Documents, a final determination of quantities and classifications for Work performed under Paragraph 9.05, and any other qualifications stated in the recommendation). 3. Processing any such payment will not thereby be deemed to have represented that: a. inspections made to check the quality or the quantity of the Work as it has been performed have been exhaustive, extended to every aspect of the Work in progress, or involved detailed inspections of the Work beyond the responsibilities specifically assigned to City in the Contract Documents; or b. there may not be other matters or issues between the parties that might entitle Contractor to be paid additionally by City or entitle City to withhold payment to Contractor, or c. Contractor has complied with Laws and Regulations applicable to Contractor's performance of the Work. 4. City may refuse to process the whole or any part of any payment because of subsequently discovered evidence or the results of subsequent inspections or tests, and revise or revoke any such payment previously made, to such extent as may be necessary to protect City from loss because: a. the Work is defective, or the completed Work has been damaged by the Contractor or his subcontractors, requiring correction or replacement; b. discrepancies in quantities contained in previous applications for payment; c. the Contract Price has been reduced by Change Orders; d. City has been required to correct defective Work or complete Work in accordance with Paragraph 13.09; or CITY Or FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febftwy 2, 2016 007200- 1 GENERAL CONDITIONS Page 54 of63 e. City has actual knowledge of the occurrence of any of the events enumerated in Paragraph 15.02.A. C. Retainage: 1. For contracts less than $400,000 at the time of execution, retainage shall be ten percent (10%). 2. For contracts greater than $400,000 at the time of execution, retainage shall be five percent (5 %). D. Liquidated Damages. For each calendar day that any work shall remain uncompleted after the time specified in the Contract Documents, the sum per day specified in the Agreement, will be deducted from the monies due the Contractor, not as a penalty, but as liquidated damages suffered by the City. E. Payment: Contractor will be paid pursuant to the requirements of this Article 14 and payment will become due in accordance with the Contract Documents. F. Reduction in Payment: 1. City may refuse to make payment of the amount requested because: a. Liens have been filed in connection with the Work, except where Contractor has delivered a specific bond satisfactory to City to secure the satisfaction and discharge of such Liens; b. there are other items entitling City to a set-off against the amount recommended; or c. City has actual knowledge of the occurrence of any of the events enumerated in Paragraphs 14.02.B.4.a through 14.02.B.4.e or Paragraph 15.02.A. 2. If City refuses to make payment of the amount requested, City will give Contractor written notice stating the reasons for such action and pay Contractor any amount remaining after deduction of the amount so withheld. City shall pay Contractor the amount so withheld, or any adjustment thereto agreed to by City and Contractor, when Contractor remedies the reasons for such action. 14.03 Contractor's Warranty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment, whether incorporated in the Project or not, will pass to City no later than the time of payment free and clear of all Liens. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: F&niary2,2016 007200-I GENERAL CONDITIONS Page 55 of 63 14.04 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed part of the Work which has specifically been identified in the Contract Documents, or which City, determines constitutes a separately functioning and usable part of the Work that can be used by City for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready for its intended use, subject to the following conditions: 1. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. 2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and Contractor shall make an inspection of that part of the Work to determine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3. Partial Utilization will not constitute Final Acceptance by City. 14.05 Finallnspection A. Upon written notice from Contractor that the entire Work is complete in accordance with the Contract Documents: 1. within 10 days, City will schedule a Final Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. B. No time charge will be made against the Contractor between said date of notification of the City and the date of Final Inspection. Should the City determine that the Work is not ready for Final Inspection, City will notify the Contractor in writing of the reasons and Contract Time will resume. 14.06 Final Acceptance Upon completion by Contractor to City's satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revisiow Febmuy2,2016 007200-1 GENERAL CONDITIONS Page 56 of 63 14.07 Final Payment A. Application for Payment: 1. Upon final Acceptance, and in the opinion of City, Contractor may make an application for final payment following the procedure for progress payments in accordance with the Contract Documents. 2. The final Application for Payment shall be accompanied (except as previously delivered) by: a. all documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; b. consent of the surety, if any, to final payment; c. a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and d. affidavits of payments and complete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. B. Payment Becomes Due: 1. After City's acceptance of the Application for Payment and accompanying documentation, requested by Contractor, less previous payments made and any sum City is entitled, including but not limited to liquidated damages, will become due and payable. 2. After all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Claim has been reported to Contractor's insurance provider for resolution. 3. The making of the final payment by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. 14.08 Final Completion Delayed and Partial Retainage Release A. If final completion of the Work is significantly delayed, and if City so confirms, City may, upon receipt of Contractor's final Application for Payment, and without terminating the Contract, make payment of the balance due for that portion of the Work fully completed and accepted. if the remaining balance to be held by City for Work not fully completed or corrected is less than the retainage stipulated in Paragraph 14.02.C, and if bonds have been furnished as required in Paragraph 5.02, the written consent of the surety to the payment of the balance due for that CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febnmiy2,2016 007200- l GENERAL CONDITIONS Page 57 of 63 portion of the Work fully completed and accepted shall be submitted by Contractor to City with the Application for such payment. Such payment shall be made under the terms and conditions governing final payment, except that it shall not constitute a waiver of Contract Claims. B. Partial Retainage Release. For a Contract that provides for a separate vegetative establishment and maintenance, and test and performance periods following the completion of all other construction in the Contract Documents for all Work locations, the City may release a portion of the amount retained provided that all other work is completed as determined by the City. Before the release, all submittals and final quantities must be completed and accepted for all other work. An amount sufficient to ensure Contract compliance will be retained. 14.09 Waiver of Claims The acceptance of final payment will constitute a release of the City from all claims or liabilities under the Contract for anything done or furnished or relating to the work under the Contract Documents or any act or neglect of City related to or connected with the Contract. ARTICLE 15 -- SUSPENSION OF WORK AND TERMINATION 15.01 City May Suspend Work A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will make no extra payment for stared -by time of construction equipment and/or construction crews. B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be determined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not available within a reasonable period of time, Contractor may request an extension in Contract Time, directly attributable to any such suspension. C. if it should become necessary to suspend the Work for an indefinite period, the Contractor shall store all materials in such a manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. D. Contractor may be reimbursed for the cost of moving his equipment off the job and returning the necessary equipment to the job when it is determined by the City that construction may be resumed. Such reimbursement shall be based on actual cost to the Contractor of moving the equipment and no profit will be allowed. Reimbursement may not be allowed if the equipment is moved to another construction project for the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Fehnmiy2, 2016 00 72 00 - 1 GENERAL CONDITIONS Page 5 S of 63 15.02 City May Terminate for Cause A. The occurrence of any one or more of the following events by way of example, but not of limitation, may justify termination for cause: 1. Contractor's persistent failure to perform the Work in accordance with the Contract Documents (including, but not limited to, failure to supply sufficient skilled workers or suitable materials or equipment, failure to adhere to the Project Schedule established under Paragraph 2.07 as adjusted from time to time pursuant to Paragraph 6.04, or failure to adhere to the City's Business Diversity Enterprise Ordinance #20020-12-2011established under Paragraph 6.06.D); 2. Contractor's disregard of Laws or Regulations of any public body having jurisdiction; 3. Contractor's repeated disregard of the authority of City; or 4. Contractor's violation in any substantial way of any provisions of the Contract Documents; or 5. Contractor's failure to promptly (make good any defect in materials or workmanship, or defects of any nature, the correction of which has been directed in writing by the City; or 6. Substantial indication that the Contractor has made an unauthorized assignment of the Contract or any funds due therefrom for the benefit of any creditor or for any other purpose; or 7. Substantial evidence that the Contractor has become insolvent or bankrupt, or otherwise financially unable to carry on the Work satisfactorily; or 8. Contractor commences legal action in a court of competent jurisdiction against the City. B. If one or more of the events identified in Paragraph 15.02A. occur, City will provide written notice to Contractor and Surety to arrange a conference with Contractor and Surety to address Contractor's failure to perform the Work. Conference shall be held not later than 15 days, after receipt of notice. 1. If the City, the Contractor, and the Surety do not agree to allow the Contractor to proceed to perform the construction Contract, the City may, to the extent permitted by Laws and Regulations, declare a Contractor default and formally terminate the Contractor's right to complete the Contract. Contractor default shall not be declared earlier than 20 days after the Contractor and Surety have received notice of conference to address Contractor's failure to perform the Work. 2. If Contractor's services are terminated, Surety shall be obligated to take over and perform the Work. If Surety does not commence performance thereof within 15 consecutive calendar days after date of an additional written notice demanding Surety's performance of its CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febnary2, 2016 00 72 00 - 1 GENERAL CONDITIONS Page 59 of 63 obligations, then City, without process or action at law, may take over any portion of the Work and complete it as described below. a. If City completes the Work, City may exclude Contractor and Surety from the site and take possession of the Work, and all materials and equipment incorporated into the Work stored at the Site or for which City has paid Contractor or Surety but which are stored elsewhere, and finish the Work as City may deem expedient. Whether City or Surety completes the Work, Contractor shall not be entitled to receive any further payment until the Work is finished. If the unpaid balance of the Contract Price exceeds all claims, costs, losses and damages sustained by City arising out of or resulting from completing the Work, such excess will be paid to Contractor. If such claims, costs, losses and damages exceed such unpaid balance, Contractor shall pay the difference to City. Such claims, costs, losses and damages incurred by City will be incorporated in a Change Order, provided that when exercising any rights or remedies under this Paragraph, City shall not be required to obtain the lowest price for the Work performed. 4. Neither City, nor any of its respective consultants, agents, officers, directors or employees shall be in any way liable or accountable to Contractor or Surety for the method by which the completion of the said Work, or any portion thereof, may be accomplished or for the price paid therefor. 5. City, notwithstanding the method used in completing the Contract, shall not forfeit the right to recover damages from Contractor or Surety for Contractor's failure to timely complete the entire Contract. Contractor shall not be entitled to any claim on account of the method used by City in completing the Contract. 6. Maintenance of the Work shall continue to be Contractor's and Surety's responsibilities as provided for in the bond requirements of the Contract Documents or any special guarantees provided for under the Contract Documents or any other obligations otherwise prescribed by law. C. Notwithstanding Paragraphs 15.02.13, Contractor's services will not be terminated if Contractor begins within seven days of receipt of notice of intent to terminate to correct its failure to perform and proceeds diligently to cure such failure within no more than 30 days of receipt of said notice. D. Where Contractor's services have been so terminated by City, the termination will not affect any rights or remedies of City against Contractor then existing or which may thereafter accrue. Any retention or payment of moneys due Contractor by City will not release Contractor from liability. E. If and to the extent that Contractor has provided a performance bond under the provisions of Paragraph 5.02, the termination procedures of that bond shall not supersede the provisions of this Article. CITY Or FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febrwy2, 20 l6 00 72 00 - 1 GENERAL CONDITIONS Page 60 of63 15.03 City May Terminate For Convenience A. City may, without cause and without prejudice to any other right or remedy of City, terminate the Contract. Any termination shall be effected by mailing a notice of the termination to the Contractor specifying the extent to which performance of Work under the contract is terminated, and the date upon which such termination becomes effective. Receipt of the notice shall be deemed conclusively presumed and established when the letter is placed in the United States Postal Service Mail by the City. Further, it shall be deemed conclusively presumed and established that such termination is made with just cause as therein stated; and no proof in any claim, demand or suit shall be required of the City regarding such discretionary action. B. After receipt of a notice of termination, and except as otherwise directed by the City, the Contractor shall: 1. Stop work under the Contract on the date and to the extent specified in the notice of termination; 2. place no further orders or subcontracts for materials, services or facilities except as may be necessary for completion of such portion of the Work under the Contract as is not terminated; 3. terminate all orders and subcontracts to the extent that they relate to the performance of the Work terminated by notice of termination; 4. transfer title to the City and deliver in the manner, at the times, and to the extent, if any, directed by the City: a. the fabricated or unfabricated parts, Work in progress, completed Work, supplies and other material produced as a part of, or acquired in connection with the performance of, the Work terminated by the notice of the termination; and b. the completed, or partially completed plans, drawings, information and other property which, if the Contract had been completed, would have been required to be furnished to the City. 5. complete performance of such Work as shall not have been terminated by the notice of termination; and 6. take such action as may be necessary, or as the City may direct, for the protection and preservation of the property related to its contract which is in the possession of the Contractor and in which the owner has or may acquire the rest. C. At a time not later than 30 days after the termination date specified in the notice of termination, the Contractor may submit to the City a list, certified as to quantity and quality, of any or all items of termination inventory not previously disposed of, exclusive of items the disposition of which has been directed or authorized by City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCi JMENTS Revision: Febnory2,2016 007200-1 GENERAL CONDITIONS Page 61 of63 D. Not later than 15 days thereafter, the City shall accept title to such items provided, that the Iist submitted shall be subject to verification by the City upon removal of the items or, if the items are stored, within 45 days from the date of submission of the Iist, and any necessary adjustments to correct the list as submitted, shall be made prior to final settlement. E. Not Iater than 60 days after the notice of termination, the Contractor shall submit his termination claim to the City in the form and with the certification prescribed by the City. Unless an extension is made in writing within such 60 day period by the Contractor, and granted by the City, any and all such claims shall be conclusively deemed waived. F. In such case, Contractor shall be paid for (without duplication of any items): 1. completed and acceptable Work executed in accordance with the Contract Documents prior to the effective date of termination, including fair and reasonable sums for overhead and profit on such Work; 2. expenses sustained prior to the effective date of termination in performing services and furnishing labor, materials, or equipment as required by the Contract Documents in connection with uncompleted Work, plus fair and reasonable sums for overhead and profit on such expenses; and 3. reasonable expenses directly attributable to termination. G. In the event of the failure of the Contractor and City to agree upon the whole amount to be paid to the Contractor by reason of the termination of the Work, the City shall determine, on the basis of information available to it, the amount, if any, due to the Contractor by reason of the termination and shall pay to the Contractor the amounts determined. Contractor shall not be paid on account of loss of anticipated profits or revenue or other economic loss arising out of or resulting from such termination. ARTICLE 16 — DISPUTE RESOLUTION 16.01 Methods and Procedures A. Either City or Contractor may request mediation of any Contract Claim submitted for a decision under Paragraph 10.06 before such decision becomes final and binding. The request for mediation shall be submitted to the other party to the Contract. Timely submission of the request shall stay the effect of Paragraph 10.06.E. B. City and Contractor shall participate in the mediation process in good faith. The process shall be commenced within 60 days of filing of the request. C. if the Contract Claim is not resolved by mediation, City's action under Paragraph 10.06.0 or a denial pursuant to Paragraphs 10.06.C.3 or 10.06.D shall become final and binding 30 days after termination of the mediation unless, within that time period, City or Contractor: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febnmry 2, 2016 00 72 00 - 1 GENERAL CONDITIONS Page 62 of 63 elects in writing to invoke any other dispute resolution process provided for in the Supplementary Conditions; or 2. agrees with the other party to submit the Contract Claim to another dispute resolution proccss; or 3. gives written notice to the other party of the intent to submit the Contract Claim to a court of competent jurisdiction. ARTICLE 17 — MISCELLANEOUS 17.01 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given if: 1. delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended; or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. B. Business address changes must be promptly made in writing to the other party. C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receiving party. 17.02 Computation of Times When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day of the period. 17.03 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. CrTY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febnoy2, 2016 007200-1 GENERAL CONDITIONS Page 63 of 63 17.04 Survival of Obligations All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 17.05 Headings Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Febmary2,2016 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 SECTION 00 73 00 SUPPLEMENTARY CONDITIONS TO GENERAL CONDITIONS Supplementary Conditions 007300- 1 SUPPLEMENTARY CONDITIONS Page I of 5 These Supplementary Conditions modify and supplement Section 00 72 00 - General Conditions, and other provisions of the Contract Documents as indicated below. All provisions of the General Conditions that are modified or supplemented remain in full force and effect as so modified or supplemented. All provisions of the General Conditions which are not so modified or supplemented remain in full force and effect. Defined Terms The terms used in these Supplementary Conditions which are defined in the General Conditions have the meaning assigned to them in the General Conditions, unless specifically noted herein. Modifications and Supplements The following are instructions that modify or supplement specific paragraphs in the General Conditions and other Contract Documents. SC-3.03B.2, "Resolving Discrepancies" Plans govern over Specifications. SC-4.01A Easement limits shown on the Drawing are approximate and were provided to establish a basis for bidding. Upon receiving the final easements descriptions, Contractor shall compare them to the lines shown on the Contract Drawings. SC-4.01A.1., "Availability of Lands" The following is a list of known outstanding right-of-way, and/or easements to be acquired, if any as of September 12, 2019 Outstanding Right -Of -Way, and/or Easements to Be Acquired PARCEL OWNER TARGET DATE NUMBER OF POSSESSION "None" The Contractor understands and agrees that the dates listed above are estimates only, are not guaranteed, and do not bind the City. If Contractor considers the final easements provided to differ materially from the representations on the Contract Drawings, Contractor shall within five (5) Business Days and before proceeding with the Work, notify City in writing associated with the differing easement line locations. SC-4.01A.2, "Availability of Lands" CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised January 22, 2016 HMAC SURFACE OVERLAY 2019-6 City Project No. 102098 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 007300-2 SUPPLEMENTARY CONDITIONS Page 2 of 5 Utilities or obstructions to be removed, adjusted, and/or relocated The following is list of utilities and/or obstructions that have not been removed, adjusted, and/or relocated as of September 12, 2019 EXPECTED UTILITY AND LOCATION TARGET DATE OF OWNER ADJUSTMENT "None " The Contractor understands and agrees that the dates listed above are estimates only, are not guaranteed, and do not bind the City. SC-4.02A., "Subsurface and Physical Conditions" The following are reports of explorations and tests of subsurface conditions at the site of the Work: A "None " Report No. , dated , prepared by "None " a sub -consultant of "None " a consultant of the City, providing additional information on "None" The following are drawings of physical conditions in or relating to existing surface and subsurface structures (except Underground Facilities) which are at or contiguous to the site of the Work: "None" SC-4.06A., "Hazardous Environmental Conditions at Site" The following are reports and drawings of existing hazardous environmental conditions known to the City: "None" SC-5.03A., "Certificates of Insurance" The entities listed below are "additional insureds as their interest may appear" including their respective officers, directors, agents and employees. (1) City (2) Consultant: "None" (3) Other: "None" SC-5.04A., "Contractor's Insurance" The limits of liability for the insurance required by Paragraph GC-5.04 shall provide the following coverages for not less than the following amounts or greater where required by laws and regulations: 5.04A. Workers' Compensation, under Paragraph GC-5.04A. Statutory limits Employer's liability $100,000 each accidentloccurrence $100,000 Disease - each employee $500, 000 Disease -policy limit SC-5.04B., "Contractor's Insurance" CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised January 22, 2016 HMAC SURFACE OVERLAY 2019-6 City Project No. 102098 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 007300-3 SUPPLEMENTARY CONDITIONS Page 3 of 5 5.0413. Commercial General Liability, under Paragraph GC-5.0413. Contractor's Liability Insurance under Paragraph GC-5.04B., which shall be on a per project basis covering the Contractor with minimum limits of: $1,000,000 each occurrence $2, 000, 000 aggregate limil The policy must have an endorsement (Amendment — Aggregate Limits of Insurance) making the General Aggregate Limits apply separately to each job site. The Commercial General Liability Insurance policies shall provide "X", "C", and "U" coverage's. Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. SC 5,04C., "Contractor's Insurance" 5.04C. Automobile Liability, under Paragraph GC-5.04C, Contractor's Liability Insurance under Paragraph GC-5.04C., which shall be in an amount not less than the following amounts: (1) Automobile Liability - a commercial business policy shall provide coverage on "Any Auto", defined as autos owned, hired and non -owned. $1, 000, 000 each accident on a combined single limit basis. Split limits are acceptable if limits are at least: $250, 000 Bodily Injury per person / $500, 000 Bodily Injury per accident / $100, 000 Property Damage SC-5.04D., "Contractor's Insurance" The Contractor's construction activities will require its employees, agents, subcontractors, equipment, and material deliveries to cross railroad properties and tracks `None" The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, binder, or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains or other property. Such operations on railroad properties may require that Contractor to execute a "Right of Entry Agreement' with the particular railroad company or companies involved, and to this end the Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute the right -of -entry (if any) required by a railroad company. The requirements specified herein likewise relate to the Contractor's use of private and/or construction access roads crossing said railroad company's properties. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide coverage for not less than the following amounts, issued by companies satisfactory to the City and to the Railroad Company for a term that continues for so long as the Contractor's operations and work cross, occupy, or touch railroad property: (1) General Aggregate: (2) Each Occurrence: ___m. Requiredfor this Contract N/A N/A X Not required for this Contract With respect to the above outlined insurance requirements, the following shall govern: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised January 22, 2016 HMAC SURFACE OVERLAY 2019-6 City Projcct No. 102098 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 007300-4 SUPPLEMENTARY CONDITIONS Page 4 of 5 1. Where a single railroad company is involved, the Contractor shall provide one insurance policy in the name of the railroad company. However, if more than one grade separation or at -grade crossing is affected by the Project at entirely separate locations on the line or lines of the same railroad company, separate coverage may be required, each in the amount stated above. 2. Where more than one railroad company is operating on the same right-of-way or where several railroad companies are involved and operated on their own separate rights -of -way, the Contractor may be required to provide separate insurance policies in the name of each railroad company. 3. If, in addition to a grade separation or an at -grade crossing, other work or activity is proposed on a railroad company's right-of-way at a location entirely separate from the grade separation or at - grade crossing, insurance coverage for this work must be included in the policy covering the grade separation. 4. If no grade separation is involved but other work is proposed on a railroad company's right-of- way, all such other work may be covered in a single policy for that railroad, even though the work may be at two or more separate locations. No work or activities on a railroad company's property to be performed by the Contractor shall be commenced until the Contractor has furnished the City with an original policy or policies of the insurance for each railroad company named, as required above. All such insurance must be approved by the City and each affected Railroad Company prior to the Contractor's beginning work. The insurance specified above must be carried until all Work to be performed on the railroad right-of-way has been completed and the grade crossing, if any, is no longer used by the Contractor. In addition, insurance must be carried during all maintenance and/or repair work performed in the railroad right-of-way. Such insurance must name the railroad company as the insured, together with any tenant or lessee of the railroad company operating over tracks involved in the Project. SC-6.04., "Project Schedule" Project schedule shall be tier 3 for the project. SC-6.07., "Wage Rates" The following is the prevailing wage rate table(s) applicable to this project and is provided in the Appendixes: The following is the prevailing rate table(s) applicable to this project and is provided in the Appendix: GC — 6.07, "2013 Prevailing Wage Rate (Highway & Heavy Constructions Projects)". SC-6.09., "Permits and Utilities" SC-6.09A., "Contractor obtained permits and licenses" The following are known permits and/or licenses required by the Contract to be acquired by the Contractor: Fort Worth City Street Use Permit. SC-6.09B. "City obtained permits and licenses" The following are known permits and/or licenses required by the Contract to be acquired by the City: "None " SC-6.09C. "Outstanding permits and licenses" The following is a list of known outstanding permits and/or licenses to be acquired, if any as of April 11, 2019: Outstanding Permits and/or Licenses to Be Acquired CfI'Y OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised January 22, 2016 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 I7 18 19 20 21 22 23 24 007300-5 SUPPLEMENTARY CONDITIONS Page 5 of 5 OWNER PERMIT OR LICENSE AND LOCATION TARGET DATE OF POSSESSION "None„ SC-7.02., "Coordination" The individuals or entities listed below have contracts with the City for the performance of other work at the Site: Vendor Scope of Work Coordination Authority None None None SC-8.01, "Communications to Contractor" SC-9.01., "City's Project Manager" The City's Project Manager for this Contract is Juan Pablo De La Cruz or his/her successor pursuant to written notification from the Director of Transportation and Public Works. SC-13.03C., "Tests and Inspections" "None" SC-16.01C.1, "Methods and Procedures" "None" END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 1/22/2016 F. Griffin SC-9.01., "City's Project Representative" wording changed to City's Project Manager. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised January 22, 2016 fIMAC SURFACE OVERLAY 2019-6 City Project No. 102098 SECTION 01 11 00 SUMMARY OF WORK 3 PARTI- GENERAL 4 1.1 SUMMARY 01 11 00 -1 SUMMARY OF WORK Page 1 of 3 5 A. Section Includes: 6 1. Summary of Work to be performed in accordance with the Contract Documents 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. tv OL31LIZA.TION ANr [)FMOBII,1/,A'1'1('I 1 Sl IA.LL'Bl-' 4E1BSITIIARY'I 9 T 1-I1S P6LOJECT PAY ITEMS, NO SEPARAT. '. PAY, NO PAYMCN'I- WILL 13.E 10 MADFs FOR M0131LI7ATION AND i3[;M OBILI A'110N FROM ONE 11 LOCAT70N TO-ANOTIIER IN N0RIIIAL 1r ROGRESS Cif PE RFORM rNG 'CHE 12 WORK. REMOBTLIZAT[ON PAY ITEM S1 [ALL BE PAID FOR SUSPENS ION 13 OF WORK SPECULL---LY REQUIRED [NTl-IE CONTRACT DOCUMENTS OR 14 AS R-EQUT-RED BY T}IE CITY. 15 C. Related Specification Sections include, but are not necessarily limited to: 16 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract 17 2. Division 1 - General Requirements 18 1.2 PRICE AND PAYMENT PROCEDURES 19 A. Measurement and Payment 20 1. Work associated with this Item is considered subsidiary to the various items bid. 21 No separate payment will be allowed for this Item. 22 1.3 REFERENCES [NOT USED] 23 1.4 ADMINISTRATIVE REQUIREMENTS 24 A. Work Covered by Contract Documents 25 1. Work is to include furnishing all labor, materials, and equipment, and performing 26 all Work necessary for this construction project as detailed in the Drawings and 27 Specifications. 28 B. Subsidiary Work 29 1. Any and all Work specifically governed by documentary requirements for the 30 project, such as conditions imposed by the Drawings or Contract Documents in 31 which no specific item for bid has been provided for in the Proposal and the item is 32 not atypical unit bid item included on the standard bid item list, then the item shall 33 be considered as a subsidiary item of Work, the cost of which shall be included in 34 the price bid in the Proposal for various bid items. 35 C. Use of Premises 36 1. Coordinate uses of premises under direction of the City. 37 2. Assume full responsibility for protection and safekeeping of materials and 38 equipment stored on the Site. Crl'Y OF FORT WORTH ) IMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised December 20, 2012 01 11 00 -- 2 SUMMARY OF WORK Page 2 of 3 1 3. Use and occupy only portions of the public streets and alleys, or other public places 2 or other rights -of -way as provided for in the ordinances of the City, as shown in the 3 Contract Documents, or as may be specifically authorized in writing by the City. 4 a. A reasonable amount of tools, materials, and equipment for construction 5 purposes may be stored in such space, but no more than is necessary to avoid 6 delay in the construction operations. 7 b. Excavated and waste materials shall be stored in such a way as not to interfere 8 with the use of spaces that may be designated to be left free and unobstructed 9 and so as not to inconvenience occupants of adjacent property. 10 c. If the street is occupied by railroad tracks, the Work shall be carried on in such 11 manner as not to interfere with the operation of the railroad. 12 1) All Work shall be in accordance with railroad requirements set forth in 13 Division 0 as well as the railroad permit. 14 D. Work within Easements 15 1. Do not enter upon private property for any purpose without having previously 16 obtained permission from the owner of such property. 17 2. Do not store equipment or material on private property unless and until the 18 specified approval of the property owner has been secured in writing by the 19 Contractor and a copy furnished to the City. 20 3. Unless specifically provided otherwise, clear all rights -of -way or easements of 21 obstructions which must be removed to make possible proper prosecution of the 22 Work as apart of the project construction operations. 23 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants, 24 lawns, fences, culverts, curbing, and all other types of structures or improvements, 25 to all water, sewer, and gas lines, to all conduits, overhead pole lines, or 26 appurtenances thereof, including the construction of temporary fences and to all 27 other public or private property adjacent to the Work. 28 5. Notify the proper representatives of the owners or occupants of the public or private 29 lands of interest in lands which might be affected by the Work. 30 a. Such notice shall be made at least 48 hours in advance of the beginning of the 31 Work. 32 b. Notices shall be applicable to both public and private utility companies and any 33 corporation, company, individual, or other, either as owners or occupants, 34 whose land or interest in land might be affected by the Work. 35 c. Be responsible for all damage or injury to property of any character resulting 36 from any act, omission, neglect, or misconduct in the manner or method or 37 execution of the Work, or at any time due to defective work, material, or 38 equipment. 39 6. Fence 40 a. Restore all fences encountered and removed during construction of the Project 41 to the original or a better than original condition. 42 b. Erect temporary fencing in place of the fencing removed whenever the Work is 43 not in progress and when the site is vacated overnight, and/or at all times to 44 provide site security. 45 c. The cost for all fence work within easements, including removal, temporary 46 closures and replacement, shall be subsidiary to the various items bid in the 47 project proposal, unless a bid item is specifically provided in the proposal. CITY OF FORT WORTH 1IMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised December 20, 2012 1 2 3 4 5 6 7 8 7 01 11 00 - 3 SUMMARY OF WORT{ Page 3 of 3 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] 11 12 13 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised December 20, 2012 1 2 3 PART 1 - GENERAL 4 1.1 SUMMARY SECTION 0125 00 SUBSTITUTION PROCEDURES 01 25 00 - 1 SUBSTITUTION PROCEDURES Page I of 4 5 A. Section Includes: 6 1. The procedure for requesting the approval of substitution of a product that is not 7 equivalent to a product which is specified by descriptive or performance criteria or 8 defined by reference to 1 or more of the following: 9 a. Name of manufacturer 10 b. Name of vendor 11 c. Trade name 12 d. Catalog number 13 2. Substitutions are not "or -equals". 14 B. Deviations from this City of Fort Worth Standard Specification 15 1. None. 16 C. Related Specification Sections include, but are not necessarily limited to: 17 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 18 2. Division 1 — General Requirements 19 1.2 PRICE AND PAYMENT PROCEDURES 20 A. Measurement and Payment 21 1. Work associated with this Item is considered subsidiary to the various items bid. 22 No separate payment will be allowed for this Item. 23 1.3 REFERENCES [NOT USED] 24 1.4 ADMINISTRATIVE REQUIREMENTS 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 A. Request for Substitution - General 1. Within 30 days after award of Contract (unless noted otherwise), the City will consider formal requests from Contractor for substitution of products in place of those specified. 2. Certain types of equipment and kinds of material are described in Specifications by means of references to names of manufacturers and vendors, trade names, or catalog numbers. a. When this method of specifying is used, it is not intended to exclude from consideration other products bearing other manufacturer's or vendor's names, trade names, or catalog numbers, provided said products are "or -equals," as determined by City. 3. Other types of equipment and kinds of material may be acceptable substitutions under the following conditions: a. Or -equals are unavailable due to strike, discontinued production of products meeting specified requirements, or other factors beyond control of Contractor; or, CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July 1, 2011 012500-2 SUBSTITUTION PROCEDURES Pago 2 of 4 1 b. Contractor proposes a cost and/or time reduction incentive to the City. 2 1.5 SUBMITTALS 3 A. See Request for Substitution Form (attached) 4 B. Procedure for Requesting Substitution 5 1. Substitution shall be considered only: 6 a. After award of Contract 7 b. Under the conditions stated herein 8 2. Submit 3 copies of each written request for substitution, including: 9 a. Documentation 10 1) Complete data substantiating compliance of proposed substitution with 11 Contract Documents 12 2) Data relating to changes in construction schedule, when a reduction is 13 proposed 14 3) Data relating to changes in cost 15 b. For products 16 1) Product identification 17 a) Manufacturer's name 18 b) Telephone number and representative contact name 19 c) Specification Section or Drawing reference of originally specified 20 product, including discrete name or tag number assigned to original 21 product in the Contract Documents 22 2) Manufacturer's literature clearly marked to show compliance of proposed 23 product with Contract Documents 24 3) Itemized comparison of original and proposed product addressing product 25 characteristics including, but not necessarily limited to: 26 a) Size 27 b) Composition or materials of construction 28 c) Weight 29 d) Electrical or mechanical requirements 30 4) Product experience 31 a) Vocation of past projects utilizing product 32 b) Name and telephone number of persons associated with referenced 33 projects knowledgeable concerning proposed product 34 c) Available field data and reports associated with proposed product 35 5) Samples 36 a) Provide at request of City. 37 b) Samples become the property of the City. 38 c. For construction methods: 39 1) Detailed description of proposed method 40 2) Illustration drawings 41 C. Approval or Rejection 42 1. Written approval or rejection of substitution given by the City 43 2. City reserves the right to require proposed product to comply with color and pattern 44 of specified product if necessary to secure design intent. 45 3. In the event the substitution is approved, the resulting cost and/or time reduction 46 will be documented by Change Order in accordance with the General Conditions. CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July 1, 2011 012500-3 SUBSTITUTION PROCEDURES Page 3 of4 1 4. No additional contract time will be given for substitution. 2 5. Substitution will be rejected if- 3 a. Submittal is not through the Contractor with his stamp of approval 4 b. Request is not made in accordance with this Specification Section 5 c. In the City's opinion, acceptance will require substantial revision of the original 6 design 7 d. In the City's opinion, substitution will not perform adequately the function 8 consistent with the design intent 9 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 10 1.7 CLOSEOUT SUBMITTALS [NOT USED] 11 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 12 1.9 QUALITY ASSURANCE 13 A. In making request for substitution or in using an approved product, the Contractor 14 represents that the Contractor: I5 1. Has investigated proposed product, and has determined that it is adequate or 16 superior in all respects to that specified, and that it will perform function for which 17 it is intended 18 2. Will provide same guarantee for substitute item as for product specified 19 3. Will coordinate installation of accepted substitution into Work, to include building 20 modifications if necessary, making such changes as may be required for Work to be 21 complete in all respects 22 4. Waives all claims for additional costs related to substitution which subsequently 23 arise 24 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 25 1.11 FIELD [SITE] CONDITIONS [NOT USED] 26 1.12 WARRANTY [NOT USED] 27 PART 2 - PRODUCTS [NOT USED] 28 PART 3 - EXECUTION [NOT USED] 29 30 31 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTIi HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July 1, 2011 012500-4 SUBSTITUTION PROCEDURES Page 4 of 4 1 EXHIBIT A 2 REQUEST FOR SUBSTITUTION FORM: 3 4 TO: 5 PROJECT: DATE: 6 We hereby submit for your consideration the following product instead of the specified item for 7 the above project: 8 SECTION PARAGRAPH SPECIFIED ITEM 9 10 i 1 Proposed Substitution: 12 Reason for Substitution: 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 Include complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation. Fill in Blanks Below: A. Will the undersigned contractor pay for changes to the building design, including engineering and detailing costs caused by the requested substitution? B. What effect does substitution have on other trades? C. Differences between proposed substitution and specified item? D. Differences in product cost or product delivery time? E. Manufacturer's guarantees of the proposed and specified items are: Equal Better (explain on attachment) The undersigned states that the function, appearance and quality are equivalent or superior to the specified item. Submitted By: For Use by City Signature as noted Firm Address Date Telephone For Use by City: Approved City Recommended Recommended Not recommended Received late By Date Remarks Date Rejected CITY OF FORT WORTFI HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July 1, 2011 1 2 3 PART1- GENERAL 4 1.1 SUMMARY SECTION 013119 PRECONSTRUCTION MEETING 0131 19- 1 PRECONSTRUCTION MEETING Page I of 3 5 A. Section Includes: 6 1. Provisions for the preconstruction meeting to be held prior to the start of Work to 7 clarify construction contract administration procedures 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include, but are not necessarily limited to: I 1 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 12 2. Division 1 — General Requirements 13 1.2 PRICE AND PAYMENT PROCEDURES 14 A. Measurement and Payment 15 1. Work associated with this Item is considered subsidiary to the various items bid. 16 No separate payment will be allowed for this Item. 17 1.3 REFERENCES [NOT USED] 18 1.4 ADMINISTRATIVE REQUIREMENTS 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 A. Coordination 1. Attend preconstruction meeting. 2. Representatives of Contractor, subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity each represents. 3. Meeting administered by City may be tape recorded. a. If recorded, tapes will be used to prepare minutes and retained by City for future reference. B. Preconstruction Meeting 1. A preconstruction meeting will be held within 14 days after the execution of the Agreement and before Work is started. a. The meeting will be scheduled and administered by the City. 2. The Project Representative will preside at the meeting, prepare the notes of the meeting and distribute copies of same to all participants who so request by fully completing the attendance form to be circulated at the beginning of the meeting. 3. Attendance shall include: a. Project Representative b. Contractor's project manager c. Contractor's superintendent d. Any subcontractor or supplier representatives whom the Contractor may desire to invite or the City may request CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised August 17, 2012 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 01 31 19-2 PRECONSTRUCTION MEETING Page 2 of 3 e. Other City representatives f. Others as appropriate 4. Construction Schedule a. Prepare baseline construction schedule in accordance with Section 01 32 16 and provide at Preconstruction Meeting. b. City will notify Contractor of any schedule changes upon Notice of Preconstruction Meeting. 5. Preliminary Agenda may include: a. Introduction of Project Personnel b. General Description of Project c. Status of right-of-way, utility clearances, easements or other pertinent permits d. Contractor's work plan and schedule e. Contract Time f. Notice to Proceed g. Construction Staking h. Progress Payments i. Extra Work and Change Order Procedures j. Field Orders k. Disposal Site Letter for Waste Material 1. Insurance Renewals in. Payroll Certification n. Material Certifications and Quality Control Testing o. Public Safety and Convenience p. Documentation of Pre -Construction Conditions q. Weekend Work Notification r. Legal Holidays s. Trench Safety Plans t. Confined Space Entry Standards u. Coordination with the City's representative for operations of existing water systems v. Storm Water Pollution Prevention Plan w. Coordination with other Contractors x. Early Warning System y. Contractor Evaluation z. Special Conditions applicable to the project aa. Damages Claims bb. Submittal Procedures cc. Substitution Procedures dd. Correspondence Routing ee. Record Drawings ff. Temporary construction facilities gg. M/W13E or MBE/SBE procedures hh. Final Acceptance ii. FinaI Payment jj. Questions or Comments CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised August 17, 2012 HMAC SURFACE OVERLAY 2019-6 City Project No. 102098 013119-3 PRECONSTRUCTION MEETING Page 3 of 3 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] & 1.12 WARRANTY [NOT USED] 9 PART 2 - PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] 11 12 13 END OF SECTION IRevision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised August 17, 2012 01 3120- 1 PROJECT MEETINGS Page I of 3 1 SECTION 013120 2 PROJECT MEETINGS 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Provisions for project meetings throughout the construction period to enable orderly 7 review of the progress of the Work and to provide for systematic discussion of 8 potential problems 9 B. Deviations this City of Fort Worth Standard Specification 10 1. None. 11 C. Related Specification Sections include, but are not necessarily limited to: 12 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 13 2. Division 1 — General Requirements 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Work associated with this Item is considered subsidiary to the various items bid. 17 No separate payment will be allowed for this Item. 18 1.3 REFERENCES [NOT USED1 19 1.4 ADMINISTRATIVE REQUIREMENTS 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 A. Coordination 1. Schedule, attend and administer as specified, periodic progress meetings, and specially called meetings throughout progress of the Work. 2. Representatives of Contractor, subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity each represents. 3. Meetings administered by City may be tape -recorded. a. If recorded, tapes will be used to prepare minutes and retained by City for future reference. 4. Meetings, in addition to those specified in this Section, may be held when requested by the City, Engineer or Contractor. B. Pre -Construction Neighborhood Meeting 1. After the execution of the Agreement, but before construction is allowed to begin, attend I Public Meeting with affected residents to: a. Present projected schedule, including construction start date b. Answer any construction related questions 2. Meeting Location a. Location of meeting to be determined by the City. 3. Attendees a. Contractor CITY OF FORT WORTH HMAC SURFACE. OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July I, 201_L 01 31 20 - 2 PROJECT MEETINGS Page 2 of 3 1 b. Project Representative 2 c. Other City representatives 3 4, Meeting Schedule 4 a. In general, the neighborhood meeting will occur within the 2 weeks following 5 the pre -construction conference. 6 b. In no case will construction be allowed to begin until this meeting is held. 7 C. Progress Meetings 8 1. Formal project coordination meetings will be held periodically. Meetings will be 9 scheduled and administered by Project Representative. 10 2. Additional progress meetings to discuss specific topics will be conducted on an as - II needed basis. Such additional meetings shall include, but not be limited to: 12 a. Coordinating shutdowns 13 b. Installation of piping and equipment 14 c. Coordination between other construction projects 15 d. Resolution of construction issues 16 e. Equipment approval 17 3. The Project Representative will preside at progress meetings, prepare the notes of 18 the meeting and distribute copies of the same to all participants who so request by 19 fully completing the attendance form to be circulated at the beginning of each 20 meeting. 21 4. Attendance shall include: 22 a. Contractor's project manager 23 b. Contractor's superintendent 24 c. Any subcontractor or supplier representatives whom the Contractor may desire 25 to invite or the City may request 26 d. Engineer's representatives 27 e. City's representatives 28 f. Others, as requested by the Project Representative 29 5. Preliminary Agenda may include: 30 a. Review of Work progress since previous meeting 31 b. Field observations, problems, conflicts 32 c. Items which impede construction schedule 33 d. Review of off -site fabrication, delivery schedules 34 c. Review of construction interfacing and sequencing requirements with other 35 construction contracts 36 f. Corrective measures and procedures to regain projected schedule 37 g. Revisions to construction schedule 38 h. Progress, schedule, during succeeding Work period 39 i. Coordination of schedules 40 j. Review submittal schedules 41 k. Maintenance of quality standards 42 1. Pending changes and substitutions 43 m. Review proposed changes for: 44 1) Effect on construction schedule and on completion date 45 2) Effect on other contracts of the Project 46 n. Review Record Documents 47 o. Review monthly pay request 48 p. Review status of Requests for Information CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July 1, 2011 1 2 3 4 5 6 7 8 9 10 11 12 13 14 i5 16 17 18 19 01 31 20 - 3 PROJECT MEETINGS Page 3 of 3 6. Meeting Schedule a. Progress meetings will be held periodically as determined by the Project Representative. 1) Additional meetings may be held at the request of the: a) City b) Engineer c) Contractor 7. Meeting Location a. The City will establish a meeting location. 1) To the extent practicable, meetings will be held at the Site. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] 20 PART 3 - EXECUTION [NOT USED] 21 22 23 END OF SECTION 1 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July 1, 2011 1 2 3 PARTI- GENERAL 4 1.1 SUMMARY SECTION 0132 33 PRECONSTRUCTION VIDEO 013233-1 PRECONSTRUCTION VIDEO Page 1 of 2 5 A. Section Includes: 6 1. Administrative and procedural requirements for: 7 a. Preconstructian Videos 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include, but are not necessarily limited to: 11 1. Division 0 -- Bidding Requirements, Contract Forms and Conditions of the Contract 12 2. Division 1 — General Requirements 13 1.2 PRICE AND PAYMENT PROCEDURES 14 A. Measurement and Payment 15 1. Work associated with this Item is considered subsidiary to the various items bid. 16 No separate payment will be allowed for this Item. 17 1.3 REFERENCES [NOT USED] 18 1.4 ADMINISTRATIVE REQUIREMENTS 19 A. Preconstruction Video 20 1. Produce a preconstruction video of the site/alignment, including all areas in the 21 vicinity of and to be affected by construction. 22 a. Provide digital copy of video upon request by the City. 23 2. Retain a copy of the preconstruction video until the end of the maintenance surety 24 period. 25 1.5 SUBMITTALS [NOT USED] 26 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 1.9 QUALITY ASSURANCE [NOT USED] 30 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 31 1.11 FIELD [SITE] CONDITIONS [NOT USED] 32 1.12 WARRANTY [NOT USED] 33 PART 2 - PRODUCTS [NOT USED] CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July 1, 2011 0I3233-2 PRECONSTRUCTION VIDEO Page 2 of 2 PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No, 102098 Revised July I, 2011 01 33 00 - 1 SUBMITTALS Page 1 of 8 I SECTION 0133 00 2 SUBMITTALS 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. General methods and requirements of submissions applicable to the following 7 Work -related submittals: 8 a. Shop Drawings 9 b. Product Data (including Standard Product List submittals) 10 c. Samples 11 d. Mock Ups 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include, but are not necessarily limited to: 15 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 16 2. Division I General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 A. Coordination 1. Notify the City in writing, at the time of submittal, of any deviations in the submittals from the requirements of the Contract Documents. 2. Coordination of Submittal Times a. Prepare, prioritize and transmit each submittal sufficiently in advance of performing the related Work or other applicable activities, or within the time specified in the individual Work Sections, of the Specifications. b. Contractor is responsible such that the installation will not be delayed by processing times including, but not limited to: a) Disapproval and resubmittal (if required) b) Coordination with other submittals c) Testing d) Purchasing e) Fabrication f) Delivery g) Similar sequenced activities c. No extension of time will be authorized because of the Contractor's failure to transmit submittals sufficiently in advance of the Work. CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised December 20, 2012 01 33 00 - 2 SUBMITTALS Page 2 of 8 1 d. Make submittals promptly in accordance with approved schedule, and in such 2 sequence as to cause no delay in the Work or in the work of any other 3 contractor. 4 B. Submittal Numbering 5 1. When submitting shop drawings or samples, utilize a 9-character submittal cross- 6 reference identification numbering system in the following manner: 7 a. Use the first 6 digits of the applicable Specification Section Number. 8 b. For the next 2 digits number use numbers 01-99 to sequentially number each 9 initial separate item or drawing submitted under each specific Section number. 10 c. Last use a letter, A-z, indicating the resubmission of the same drawing (i.e. l I A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical 12 submittal number would be as follows: 13 14 03 30 00-08-B 15 16 1) 03 30 00 is the Specification Section for Concrete 17 2) 08 is the eighth initial submittal under this Specification Section 18 3) B is the third submission (second resubmission) of that particular shop 19 drawing 20 C. Contractor Certification 21 1. Review shop drawings, product data and samples, including those by 22 subcontractors, prior to submission to determine and verify the following: 23 a. Field measurements 24 b. Field construction criteria 25 c. Catalog numbers and similar data 26 d. Conformance with the Contract Documents 27 2. Provide each shop drawing, sample and product data submitted by the Contractor 28 with a Certification Statement affixed including: 29 a. The Contractor's Company name 30 b. Signature of submittal reviewer 31 c. Certification Statement 32 1) `By this submittal, I hereby represent that I have determined and verified 33 field measurements, field construction criteria, materials, dimensions, 34 catalog numbers and similar data and I have checked and coordinated each 35 item with other applicable approved shop drawings." 36 D. Submittal Format 37 1. Fold shop drawings larger than 8 % inches x I I inches to 8 '/z inches x I I inches. 38 2. Bind shop drawings and product data sheets together. 39 3. Order 40 a. Cover Sheet 41 1) Description of Packet 42 2) Contractor Certification 43 b. List of items / Table of Contents 44 c. Product Data /Shop Drawings/Samples /Calculations 45 E. Submittal Content 46 1. The date of submission and the dates of any previous submissions CITY OF FORT WORTH IIMAC SURFACE: OVERLAY 2019 6 STANDARD CONS11WCTTON SPECIFICATION DOCUMENTS City Project No. 102098 Revised December 20, 2012 013300-3 SUBMITTALS Page 3 of 8 1 2. The Project title and number 2 3. Contractor identification 3 4. The names of 4 a. Contractor 5 b. Supplier 6 c. Manufacturer 7 5. Identification of the product, with the Specification Section number, page and 8 paragraph(s) 9 6. Field dimensions, clearly identified as such 10 7. Relation to adjacent or critical features of the Work or materials 11 8. Applicable standards, such as ASTM or Federal Specification numbers 12 9. Identification by highlighting of deviations from Contract Documents 13 10. Identification by highlighting of revisions on resubmittals 14 11. An 8-inch x 3-inch blank space for Contractor and City stamps 15 F. Shop Drawings 16 1. As specified in individual Work Sections includes, but is not necessarily limited to: 17 a. Custom -prepared data such as fabrication and erection/installation (working) 18 drawings 19 b. Scheduled information 20 c. Setting diagrams 21 d. Actual shopwork manufacturing instructions 22 e. Custom templates 23 f. Special wiring diagrams 24 g. Coordination drawings 25 h. Individual system or equipment inspection and test reports including: 26 1) Performance curves and certifications 27 i. As applicable to the Work 28 2. Details 29 a. Relation of the various parts to the main members and lines of the structure 30 b. Where correct fabrication of the Work depends upon field measurements 31 1) Provide such measurements and note on the drawings prior to submitting 32 for approval. 33 G. Product Data 34 1. For submittals of product data for products included on the City's Standard Product 35 List, clearly identify each item selected for use on the Project. 36 2. For submittals of product data for products not included on the City's Standard 37 Product List, submittal data may include, but is not necessarily limited to: 38 a. Standard prepared data for manufactured products (sometimes referred to as 39 catalog data) 40 1) Such as the manufacturer's product specification and installation 41 instructions 42 2) Availability of colors and patterns 43 3) Manufacturer's printed statements of compliances and applicability 44 4) Roughing -in diagrams and templates 45 5) Catalog cuts 46 6) Product photographs CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised December 20, 2012 01 33 00 - 4 SUBMITTALS Page 4 of 8 1 7) Standard wiring diagrams 2 8) Printed performance curves and operational -range diagrams 3 9) Production or quality control inspection and test reports and certifications 4 10) Mill reports 5 11) Product operating and maintenance instructions and recommended 6 spare -parts listing and printed product warranties 7 12) As applicable to the Work 8 H. Samples 9 1. As specified in individual Sections, include, but are not necessarily limited to: 10 a. Physical examples of the Work such as: I 1 I ) Sections of manufactured or fabricated Work 12 2) Small cuts or containers of materials 13 3) Complete units of repetitively used products color/texture/pattern swatches 14 and range sets 15 4) Specimens for coordination of visual effect 16 5) Graphic symbols and units of Work to be used by the City for independent 17 inspection and testing, as applicable to the Work 18 I. Do not start Work requiring a shop drawing, sample or product data nor any material to 19 be fabricated or installed prior to the approval or qualified approval of such item. 20 1. Fabrication performed, materials purchased, or on -site construction accomplished 21 whicb does not conform to approved shop drawings and data is at the Contractor's 22 risk. 23 2. The City will not be liable for any expense or delay due to corrections or remedies 24 required to accomplish conformity. 25 3. Complete project Work, materials, fabrication, and installations in conformance 26 with approved shop drawings, applicable samples, and product data. 27 J. Submittal Distribution 28 1. Electronic Distribution 29 a. Confirm development of Project directory for electronic submittals to be 30 uploaded to City's Buzzsaw site, or another external FTP site approved by the 31 City. 32 b. Shop Drawings 33 1) Upload submittal to designated project directory and notify appropriate 34 City representatives via email of submittal posting. 35 2) Hard Copies 36 a) 3 copies for all submittals 37 b) ff Contractor requires more than 1 hard copy of Shop Drawings 38 returned, Contractor shall submit more than the number of copies listed 39 above. 40 c. Product Data 41 1) Upload submittal to designated project directory and notify appropriate 42 City representatives via email of submittal posting. 43 2) Hard Copies 44 a) 3 copies for all submittals 45 d. Samples 46 1) Distributed to the Project Representative 47 2. Hard Copy Distribution (if required in lieu of electronic distribution) CITY OF FORT WORTH ` HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No, 102098 Revised December 20, 2012 013300-5 SUBMITTALS Page 5 of 8 1 a. Shop Drawings 2 1) Distributed to the City 3 2) Copies 4 a) 8 copies for mechanical submittals 5 b) 7 copies for all other submittals 6 c) If Contractor requires more than 3 copies of Shop Drawings returned, 7 Contractor shall submit more than the number of copies listed above. 8 b. Product Data 9 1) Distributed to the City 10 2) Copies 11 a) 4 copies 12 c. Samples 13 1) Distributed to the Project Representative 14 2) Copies 15 a) Submit the number stated in the respective Specification Sections. 16 3. Distribute reproductions of approved shop drawings and copies of approved 17 product data and samples, where required, to the job site file and elsewhere as 18 directed by the City. 19 a. Provide number of copies as directed by the City but not exceeding the number 20 previously specified. 21 K. Submittal Review 22 1. The review of shop drawings, data and samples will be for general conformance 23 with the design concept and Contract Documents. This is not to be construed as: 24 a. Permitting any departure from the Contract requirements 25 b. Relieving the Contractor of responsibility for any errors, including details, 26 dimensions, and materials 27 c. Approving departures from details furnished by the City, except as otherwise 28 provided herein 29 2. The review and approval of shop drawings, samples or product data by the City 30 does not relieve the Contractor from his/her responsibility with regard to the 31 fulfillment of the terms of the Contract. 32 a. All risks of error and omission are assumed by the Contractor, and the City will 33 have no responsibility therefore. 34 3. The Contractor remains responsible for details and accuracy, for coordinating the 35 Work with all other associated work and trades, for selecting fabrication processes, 36 for techniques of assembly and for performing Work in a safe manner. 37 4. If the shop drawings, data or samples as submitted describe variations and show a 38 departure from the Contract requirements which City finds to be in the interest of 39 the City and to be so minor as not to involve a change in Contract Price or time for 40 performance, the City may return the reviewed drawings without noting an 41 exception. 42 5. Submittals will be returned to the Contractor under I of the following codes: 43 a. Code] 44 1) "NO EXCEPTIONS TAKEN' is assigned when there are no notations or 45 comments on the submittal. 46 a) When returned under this code the Contractor may release the 47 equipment and/or material for manufacture. 48 b. Code 2 CITY OF FORT WORTH I-IMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised December 20, 2012 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 01 33 00 - 6 SUBMITTALS Page 6 of 8 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of the notations and comments 1S NOT required by the Contractor. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. c. Code 3 1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is assigned when notations and comments are extensive enough to require a resubmittal of the package. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. b) This resubmittal is to address all comments, omissions and non -conforming items that were noted. c) Resubmittal is to be received by the City within 15 Calendar Days of the date of the City's transmittal requiring the resubmittal. d. Code 4 1) "NOT APPROVED" is assigned when the submittal does not meet the intent of the Contract Documents. a) The Contractor must resubmit the entire package revised to bring the submittal into conformance. b) It may be necessary to resubmit using a different manufacturer/vendor to meet the Contract Documents. 6. Resubmittals a. Handled in the same manner as first submittals 1) Corrections other than requested by the City 2) Marked with revision triangle or other similar method a) At Contractor's risk if not marked b. Submittals for each item will be reviewed no more than twice at the City's expense. 1) All subsequent reviews will be performed at times convenient to the City and at the Contractor's expense, based on the City's or City Representative's then prevailing rates. 2) Provide Contractor reimbursement to the City within 30 Calendar Days for all such fees invoiced by the City. c. The need for more than 1 resubmission or any other delay in obtaining City's review of submittals, will not entitle the Contractor to an extension of Contract Time. 7. Partial Submittals a. City reserves the right to not review submittals deemed partial, at the City's discretion. b. Submittals deemed by the City to be not complete will be returned to the Contractor, and will be considered "Not Approved" until resubmitted. c. The City may at its option provide a list or mark the submittal directing the Contractor to the areas that are incomplete. 8. If the Contractor considers any correction indicated on the shop drawings to constitute a change to the Contract Documents, then written notice must be provided thereof to the City at least 7 Calendar Days prior to release for manufacture. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT'S Revised December 20, 2012 HMAC SURFACE OVERLAY 2019-6 City Project No. 102098 013300-7 SUBMITTALS Page 7 of 8 1 9. When the shop drawings have been completed to the satisfaction of the City, the 2 Contractor may carry out the construction in accordance therewith and no further 3 changes therein except upon written instructions from the City. 4 10. Each submittal, appropriately coded, will be returned within 30 Calendar Days 5 following receipt of submittal by the City. 6 L. Mock ups 7 1. Mock Up units as specified in individual Sections, include, but are not necessarily 8 limited to, complete units of the standard of acceptance for that type of Work to be 9 used on the Project. Remove at the completion of the Work or when directed. 10 M. Qualifications 11 1. If specifically required in other Sections of these Specifications, submit a P.E. 12 Certification for each item required. 13 N. Request for Information (RFI) 14 1. Contractor Request for additional information 15 a. Clarification or interpretation of the contract documents 16 b. When the Contractor believes there is a conflict between Contract Documents 17 e. When the Contractor believes there is a conflict between the Drawings and 18 Specifications 19 1) Identify the conflict and request clarification 20 2. Use the Request for Information (RFI) form provided by the City. 21 3. Numbering of RFI 22 a. Prefix with "RFI" followed by series number, "-xxx", beginning with "01" and 23 increasing sequentially with each additional transmittal. 24 4. Sufficient information shall be attached to permit a written response without further 25 information. 26 5. The City will log each request and will review the request. 27 a. If review of the project information request indicates that a change to the 28 Contract Documents is required, the City will issue a Field Order or Change 29 Order, as appropriate. 30 1.5 SUBMITTALS [NOT USED] 31 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 32 1.7 CLOSEOUT SUBMITTALS [NOT USED] 33 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 34 1.9 QUALITY ASSURANCE [NOT USED] 35 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 36 1.11 FIELD [SITE] CONDITIONS [NOT USED] 37 1.12 WARRANTY f NOT USED] CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised December 20, 2012 01 33 00 - 8 SUBMITTALS Page 8 of 8 ] PART 2 - PRODUCTS [NOT USED] 2 PART 3 - EXECUTION [NOT USED] 3 END OF SECTION Revision Log DAIS NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1.4.K.8. Working Days modified to Calendar Days CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised December 20, 2012 01 35 13- 1 SPECIAL PROJECT PROCEDURES Page 1 of 8 1 SECTION 0135 13 2 SPECIAL PROJECT PROCEDURES 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. The procedures for special project circumstances that includes, but is not limited to: 7 a. Coordination with the Texas Department of Transportation 8 b. Work near High Voltage Lines 9 c. Confined Space Entry Program 10 d. Air Pollution Watch Days 11 e. Use of Explosives, Drop Weight, Etc. 12 f. Water Department Notification 13 g. Public Notification Prior to Beginning Construction 14 h. Coordination with United States Army Corps of Engineers I5 i. Coordination within Railroad permits areas 16 j. Dust Control 17 k. Employee Parking 18 B. Deviations from this City of Fort Worth Standard Specification 19 1. None. 20 C. Related Specification Sections include, but are not necessarily limited to: 21 1. Division 0 Bidding Requirements, Contract Forms and Conditions of the Contract 22 2. Division I — General Requirements 23 3. Section 33 12 25 — Connection to Existing Water Mains 24 1.2 PRICE AND PAYMENT PROCEDURES 25 A. Measurement and Payment 26 1. Coordination within Railroad permit areas 27 a. Measurement 28 1) Measurement for this Item will be by lump sum. 29 b. Payment 30 1) The work performed and materials furnished in accordance with this Item 31 will be paid for at the lump sum price bid for Railroad Coordination. 32 c. The price bid shall include: 33 1) Mobilization 34 2) Inspection 35 3) Safety training 36 4) Additional Insurance 37 5) Insurance Certificates 38 6) Other requirements associated with general coordination with Railroad, 39 including additional employees required to protect the right-of-way and 40 property of the Railroad from damage arising out of and/or from the 41 construction of the Project. 42 2. Railroad Flagmen CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised December 20, 2012 01 35 13-2 SPECIAL PROJECT PROCEDURES Page 2 of 8 1 a. Measurement 2 1) Measurement for this Item will be per working day. 3 b. Payment 4 1) The work performed and materials furnished in accordance with this Item 5 will be paid for each working day that Railroad Flagmen are present at the 6 Site. 7 c. The price bid shall include: 8 1) Coordination for scheduling flagmen 9 2) Flagmen 10 3) Other requirements associated with Railroad 11 3. All other items 12 a. Work associated with these Items is considered subsidiary to the various Items 13 bid. No separate payment will be allowed for this Item. 14 1..3 REFERENCES 15 A. Reference Standards 16 1. Reference standards cited in this Specification refer to the current reference 17 standard published at the time of the latest revision date logged at the end of this 18 Specification, unless a date is specifically cited. 19 2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. 20 High Voltage Overhead Lines. 21 3. North Central Texas Council of Governments (NCTCOG) -W Clean Construction 22 Specification 23 1.4 ADMINISTRATIVE REQUIREMENTS 24 A. Coordination with the Texas Department of Transportation 25 1. When work in the right-of-way which is under the jurisdiction of the Texas 26 Department of Transportation (TxDOT): 27 a. Notify the Texas Department of Transportation prior to commencing any work 28 therein in accordance with the provisions of the permit 29 b. All work performed in the TxDOT right-of-way shall be performed in 30 compliance with and subject to approval from the Texas Department of 31 Transportation 32 B. Work near High Voltage Lines 33 1. Regulatory Requirements 34 a. All Work near High Voltage Lines (more than 600 volts measured between 35 conductors or between a conductor and the ground) shall be in accordance with 36 Health and Safety Code, Title 9, Subtitle A, Chapter 752. 37 2. Warning sign 38 a. Provide sign of sufficient size meeting all OSHA requirements. 39 3. Equipment operating within 10 feet of high voltage lines will require the following 40 safety features 41 a. Insulating cage -type of guard about the boom or arm 42 b. Insulator links on the lift hook connections for back hoes or dippers 43 c. Equipment must meet the safety requirements as set forth by OSHA and the 44 safety requirements of the owner of the high voltage lines 45 4. Work within 6 feet of high voltage electric lines CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised December 20, 2012 013513-3 SPECIAL PROJECT PROCEDURES Page 3 of 8 1 a. Notification shall be given to: 2 1) The power company (example: ONCOR) 3 a) Maintain an accurate log of all such calls to power company and record 4 action taken in each case. 5 b. Coordination with power company 6 1) After notification coordinate with the power company to: 7 a) Erect temporary mechanical barriers, de -energize the lines, or raise or 8 lower the lines 9 c. No personnel may work within 6 feet of a high voltage line before the above 10 requirements have been met. 11 C. Confined Space Entry Program 12 1. Provide and follow approved Confined Space Entry Program in accordance with 13 OSHA requirements. 14 2. Confined Spaces include: 15 a. Manholes 16 b. All other confined spaces in accordance with OSHA's Permit Required for 17 Confined Spaces 18 D. Air Pollution Watch Days 19 1. General 20 a. Observe the following guidelines relating to working on City construction sites 21 on days designated as "AIR POLLUTION WATCH DAYS". 22 b. Typical Ozone Season 23 1) May 1 through October 31. 24 c. Critical Emission Time 25 1) 6:00 a.m. to 10:00 a.m. 26 2. Watch Days 27 a. The Texas Commission on Environmental Quality (TCEQ), in coordination 28 with the National Weather Service, will issue the Air Pollution Watch by 3:00 29 p.m. on the afternoon prior to the WATCH day. 30 b. Requirements 31 1) Begin work after 10:00 a.m. whenever construction phasing requires the 32 use of motorized equipment for periods in excess of I hour. 33 2) However, the Contractor may begin work prior to 10:00 a.m. if 34 a) Use of motorized equipment is less than 1 hour, or 35 b) If equipment is new and certified by EPA as "Low Emitting", or 36 equipment burns Ultra Low Sulfur Diesel (ULSD), diesel emulsions, or 37 alternative fuels such as CNG. 38 E. TCEQ Air Permit 39 1. Obtain TCEQ Air Permit for construction activities per requirements of TCEQ. 40 F. Use of Explosives, Drop Weight, Etc. 41 1. When Contract Documents permit on the project the following will apply: 42 a. Public Notification 43 1) Submit notice to City and proof of adequate insurance coverage, 24 hours 44 prior to commencing. 45 2) Minimum 24 hour public notification in accordance with Section 01 31 13 46 G. Water Department Coordination CITY OF FORT WORTH IIMAC SURFACE OVERLAY 2019 6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised December 20, 2012 0135 13 - 4 SPECIAL PROJECT PROCEDURES Page 4 of 8 1 1. During the construction of this project, it will be necessary to deactivate, for a 2 period of time, existing lines. The Contractor shall be required to coordinate with 3 the Water Department to determine the best times for deactivating and activating 4 those lines. 5 2. Coordinate any event that will require connecting to or the operation of an existing 6 City water line system with the City's representative. 7 a. Coordination shall be in accordance with Section 33 12 25. 8 b. If needed, obtain a hydrant water meter from the Water Department for use 9 during the life of named project. 10 c. In the event that a water valve on an existing live system be turned off and on I I to accommodate the construction of the project is required, coordinate this 12 activity through the appropriate City representative. 13 1) Do not operate water line valves of existing water system. 14 a) Failure to comply will render the Contractor in violation of Texas Penal 15 Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor 16 will be prosecuted to the full extent of the law. 17 b) In addition, the Contractor will assume all liabilities and 18 responsibilities as a result of these actions. 19 H. Public Notification Prior to Beginning Construction 20 1. Prior to beginning construction on any block in the project, on a block by block 21 basis, prepare and deliver a notice or flyer of the pending construction to the front 22 door of each residence or business that will be impacted by construction. The notice 23 shall be prepared as follows: 24 a. Post notice or flyer 7 days prior to beginning any construction activity on each 25 block in the project area. 26 1) Prepare flyer on the Contractor's letterhead and include the following 27 information: 28 a) Name of Project 29 b) City Project No (CPN) 30 c) Scope of Project (i.e. type of construction activity) 31 d) Actual construction duration within the block 32 e) Name of the contractor's foreman and phone number 33 f) Name of the City's inspector and phone number 34 g) City's after-hours phone number 35 2) A sample of the `pre -construction notification' flyer is attached as Exhibit 36 A. 37 3) Submit schedule showing the construction start and finish time for each 38 block of the project to the inspector. 39 4) Deliver flyer to the City Inspector for review prior to distribution. 40 b. No construction will be allowed to begin on any block until the flyer is 41 delivered to all residents of the block. 42 I. Public Notification of Temporary Water Service Interruption during Construction 43 1. In the event it becomes necessary to temporarily shut down water service to 44 residents or businesses during construction, prepare and deliver a notice or flyer of 45 the pending interruption to the front door of each affected resident. 46 2. Prepared notice as follows: 47 a. The notification or flyer shall be posted 24 hours prior to the temporary 48 interruption. CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised December 20, 2012 01 35 13-5 SPECIAL PROJECT PROCEDURES Page 5 of 8 1 b. Prepare flyer on the contractor's letterhead and include the following 2 information: 3 1) Name of the project 4 2) City Project Number 5 3) Date of the interruption of service 6 4) Period the interruption will take place 7 5) Name of the contractor's foreman and phone number 8 6) Name of the City's inspector and phone number 9 c. A sample of the temporary water service interruption notification is attached as 10 Exhibit B. 11 d. Deliver a copy of the temporary interruption notification to the City inspector 12 for review prior to being distributed. 13 e. No interruption of water service can occur until the flyer has been delivered to 14 all affected residents and businesses. 15 f. Electronic versions of the sample flyers can be obtained from the Project 16 Construction Inspector. 17 J. Coordination with United States Army Corps of Engineers (USAGE) 18 1. At locations in the Project where construction activities occur in areas where 19 USACE permits are required, meet all requirements set forth in each designated 20 permit. 21 K. Coordination within Railroad Permit Areas 22 1. At locations in the project where construction activities occur in areas where 23 railroad permits are required, meet all requirements set forth in each designated 24 railroad permit. This includes, but is not limited to, provisions for: 25 a. Flagmen 26 b. Inspectors 27 c. Safety training 28 d. Additional insurance 29 e. Insurance certificates 30 f. Other employees required to protect the right-of-way and property of the 31 Railroad Company from damage arising out of and/or from the construction of 32 the project. Proper utility clearance procedures shall be used in accordance 33 with the permit guidelines. 34 2. Obtain any supplemental information needed to comply with the railroad's 35 requirements. 36 3. Railroad Flagmen 37 a. Submit receipts to City for verification of working days that railroad flagmen 38 were present on Site. 39 L. Dust Control 40 1. Use acceptable measures to control dust at the Site. 41 a. If water is used to control dust, capture and properly dispose of waste water. 42 b. If wet saw cutting is performed, capture and properly dispose of slurry. 43 M. Employee Parking 44 1. Provide parking for employees at locations approved by the City. 45 N. {Coordination with North Central Texas Council of Governments (NCTCOG) Clean 46 Construction Specification [if required for the project -- verify with City] CITY OF FORT WORTH RMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102099 Revised December 20, 2012 013513-6 SPECIAL PROJECT PROCEDURES Page 6 of 8 1 1. Comply with equipment, operational, reporting and enforcement requirements set 2 forth in NCTCOG's Clean Construction Specification.} 3 1.5 SUBMITTALS [NOT USED] 4 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 5 1.7 CLOSEOUT SUBMITTALS [NOT USED] 6 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 7 19 QUALITY ASSURANCE [NOT USED] 8 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 9 1.11 FIELD [SITE] CONDITIONS [NOT USED] 10 1.12 WARRANTY [NOT USED] 11 PART 2 - PRODUCTS [NOT USED] 12 PART 3 - EXECUTION [NOT USED] 13 14 15 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson 1.4.B — Added requirement of compliance with Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. 1.4.E -- Added Contractor responsibility for obtaining a TCEQ Air Permit CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102093 Revised December 20, 2012 01 35 13 - 7 SPECIAL PROJECT PROCEDURES Page 7 of 8 1 EXHIBIT A 2 (To be printed on Contractor's Letterhead) 3 4 5 6 Date: 7 8 CPN No.: 9 Project Name: 10 MapscO Location: 11 Limits Of Construction: 12 13 14 W M M VF ® M ® ® M w ® M ® ® ff = ® Mi 15 16 17 THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT 18 WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR 19 PROPERTY. 20 21 CONSTRUCTION WILL. BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE 22 OF THIS NOTICE. 23 24 IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER 25 ISSUE, PLEASE CALL: 26 27 28 Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> 29 30 OR 31 32 Mr. <CITY INSPECTOR> AT < TELEPHONE NO.> 33 34 AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 35 36 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL 37 CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised December 20, 2012 A 3 4 013513-8 SPECIAL PROJECT PROCEDURES Page 8 of 8 EXHIBIT B FORTWORTH BOB No. xxxx wo� 1: NOTICE OF TEMPORARY WATER SERVICE INTERRUPTION DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON BETWEEN THE HOURS OF AND IR YOU HAVE QUESTIONS ABOUT THIS SHUT -OUT, PLEASE CALF.: MR. AT (CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER) OR MR. AT (CITY INSPECTOR) (TELEPHONE NUMBER) THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE. THANK YOU, CONTRACTOR CITY OF FORT WORTH IIMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised December 20, 2012 01 45 23 - 1 TESTING AND INSPECTION SERVICES Page I of 2 1 SECTION 0145 23 2 TESTING AND INSPECTION SERVICES 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Testing and inspection services procedures and coordination 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: I0 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1 — General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various Items bid. 15 No separate payment will be allowed for this Item. 16 a. Contractor is responsible for performing, coordinating, and payment of all 17 Quality Control testing. 18 b. City is responsible for performing and payment for first set of Quality 19 Assurance testing. 20 1) If the first Quality Assurance test performed by the City fails, the 21 Contractor is responsible for payment of subsequent Quality Assurance 22 testing until a passing test occurs. 23 a) Final acceptance will not be issued by City until all required payments 24 for testing by Contractor have been paid in full. 25 1.3 REFERENCES [NOT USED] 26 1.4 ADMINISTRATIVE REQUIREMENTS 27 A. Testing 28 1. Complete testing in accordance with the Contract Documents. 29 2. Coordination 30 a. When testing is required to be performed by the City, notify City, sufficiently 31 in advance, when testing is needed. 32 b. When testing is required to be completed by the Contractor, notify City, 33 sufficiently in advance, that testing will be performed. 34 3. Distribution of Testing Reports 35 a. Electronic Distribution 36 1) Confirm development of Project directory for electronic submittals to be 37 uploaded to City's Buzzsaw site, or another external FTP site approved by 38 the City. CITY OF FORT WORTH H AC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July 1, 2011 014523-2 TESTING AND INSPECTION SERVICES Page 2 of 2 1 2) Upload test reports to designated project directory and notify appropriate 2 City representatives via email of submittal posting. 3 3) Hard Copies 4 a) 1 copy for all submittals submitted to the Project Representative 5 b. Hard Copy Distribution (if required in lieu of electronic distribution) 6 l) Tests performed by City 7 a) Distribute 1 hard copy to the Contractor 8 2) Tests performed by the Contractor 9 a) Distribute 3 hard copies to City's Project Representative 10 4. Provide City's Project Representative with trip tickets for each delivered load of 11 Concrete or Lime material including the following information: 12 a. Name of pit 13 b. Date of delivery 14 c. Material delivered 15 B. Inspection 16 1. Inspection or lack of inspection does not relieve the Contractor from obligation to 17 perform work in accordance with the Contract Documents. 18 1.5 SUBMITTALS [NOT USED] 19 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 20 1.7 CLOSEOUT SUBMITTALS [NOT USED] 21 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 22 1.9 QUALITY ASSURANCE [NOT USED] 23 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 24 1.11 FIELD [SITE] CONDITIONS [NOT USED] 25 1.12 WARRANTY [NOT USED] 26 PART 2 - PRODUCTS [NOT USED] 27 PART 3 - EXECUTION [NOT USED] 28 29 30 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July 1, 2011 01 50 00 - 1 TEMPORARY FACILITIES AND CONTROLS Page I of 4 1 SECTION 0150 00 2 TEMPORARY FACILITIES AND CONTROLS 3 PARTI- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Provide temporary facilities and controls needed for the Work including, but not 7 necessarily limited to: 8 a. Temporary utilities 9 b. Sanitary facilities 10 c. Storage Sheds and Buildings 11 d. Dust control 12 e. Temporary fencing of the construction site 13 B. Deviations from this City of Fort Worth Standard Specification 14 1. None. 15 C. Related Specification Sections include, but are not necessarily limited to: 16 1. Division 0 Bidding Requirements, Contract Forms and Conditions of the Contract 17 2. Division 1 --- General Requirements 18 1.2 PRICE AND PAYMENT PROCEDURES 19 A. Measurement and Payment 20 1. Work associated with this Item is considered subsidiary to the various Items bid. 21 No separate payment will be allowed for this Item. 22 1.3 REFERENCES [NOT USED] 23 1.4 ADMINISTRATIVE REQUIREMENTS 24 A. Temporary Utilities 25 1. Obtaining Temporary Service 26 a. Make arrangements with utility service companies for temporary services. 27 b. Abide by rules and regulations of utility service companies or authorities 28 having jurisdiction. 29 c. Be responsible for utility service costs until Work is approved for Final 30 Acceptance. 31 1) Included are fuel, power, light, heat and other utility services necessary for 32 execution, completion, testing and initial operation of Work. 33 2. Water 34 a. Contractor to provide water required for and in connection with Work to be 35 performed and for specified tests of piping, equipment, devices or other use as 36 required for the completion of the Work. 37 b. Provide and maintain adequate supply of potable water for domestic 38 consumption by Contractor personnel and City's Project Representatives. 39 c. Coordination 40 1) Contact City 1 week before water for construction is desired CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July 1, 2011 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 015000-2 TEMPORARY FACILITIES AND CONTROLS Page 2 of 4 d. Contractor Payment for Construction Water 1) Obtain construction water meter from City for payment as billed by City's established rates. 3. Electricity and Lighting a. Provide and pay for electric powered service as required for Work, including testing of Work. 1) Provide power for lighting, operation of equipment, or other use. b. Electric power service includes temporary power service or generator to maintain operations during scheduled shutdown. 4. Telephone a. Provide emergency telephone service at Site for use by Contractor personnel and others performing work or furnishing services at Site. 5. Temporary Heat and Ventilation a. Provide temporary heat as necessary for protection or completion of Work. b. Provide temporary heat and ventilation to assure safe working conditions. B. Sanitary Facilities 1. Provide and maintain sanitary facilities for persons on Site. a. Comply with regulations of State and local departments of health. 2. Enforce use of sanitary facilities by construction personnel at job site. a. Enclose and anchor sanitary facilities. b. No discharge will be allowed from these facilities. c. Collect and store sewage and waste so as not to cause nuisance or health problem. d. Haul sewage and waste off -site at no less than weekly intervals and properly dispose in accordance with applicable regulation. 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 4. Remove facilities at completion of Project C. Storage Sheds and Buildings 1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor above ground level for materials and equipment susceptible to weather damage. 2. Storage of materials not susceptible to weather damage may be on blocks off ground. 3. Store materials in a neat and orderly manner. a. Place materials and equipment to permit easy access for identification, inspection and inventory. 4. Equip building with lockable doors and lighting, and provide electrical service for equipment space heaters and heating or ventilation as necessary to provide storage environments acceptable to specified manufacturers. 5. Fill and grade site for temporary structures to provide drainage away from temporary and existing buildings. 6. Remove building from site prior to Final Acceptance. D. Temporary Fencing 1. Provide and maintain for the duration or construction when required in contract documents E. Dust Control CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 HMAC SURFACE OVERLAY 20I9-6 City Project No. 102098 01 50 00 - 3 TEMPORARY FACILITIES AND CONTROLS Page 3 of 4 1 1. Contractor is responsible for maintaining dust control through the duration of the 2 project. 3 a. Contractor remains on -call at all times 4 b. Must respond in a timely manner 5 F. Temporary Protection of Construction 6 1. Contractor or subcontractors are responsible for protecting Work from damage due 7 to weather. 8 1.5 SUBMITTALS [NOT USED] 9 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 10 1.7 CLOSEOUT SUBMITTALS [NOT USED] 11 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 12 1.9 QUALITY ASSURANCE [NOT USED] 13 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 14 111 FIELD [SITE] CONDITIONS [NOT USED] 15 1.12 WARRANTY [NOT USED] 16 PART 2 - PRODUCTS [NOT USED] 17 PART 3 - EXECUTION [NOT USED] 18 3.1 INSTALLERS [NOT USED] 19 3.2 EXAMINATION [NOT USED] 20 3.3 PREPARATION [NOT USED] 21 3.4 INSTALLATION 22 A. Temporary Facilities 23 1. Maintain all temporary facilities for duration of construction activities as needed. 24 3.5 [REPAIR] / [RESTORATION] 25 3.6 RE -INSTALLATION 26 3.7 FIELD [oR] SITE QUALITY CONTROL [NOT USED] 27 3.8 SYSTEM STARTUP [NOT USED] 28 3.9 ADJUSTING [NOT USED] 29 3.10 CLEANING [NOT USED] 30 3.11 CLOSEOUT ACTIVITIES 31 A. Temporary Facilities CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July 1, 2011 01 50 00 - 4 TEMPORARY FACILITIES AND CONTROLS Page 4 of 4 1 1. Remove all temporary facilities and restore area after completion of the Work, to a 2 condition equal to or better than prior to start of Work. 3 3.12 PROTECTION [NOT USED] 4 3.13 MAINTENANCE [NOT USED] S 3.14 ATTACHMENTS [NOT USED] 6 7 8 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102099 Revised July 1, 2011 Ol 55 26 - 1 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page I of 3 1 SECTION 0155 26 2 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Administrative procedures for: 7 a. Street Use Permit 8 b. Modification of approved traffic control 9 c. Removal of Street Signs 10 B. Deviations from this City of Fort Worth Standard Specification 11 1. None. 12 C. Related Specification Sections include, but are not necessarily limited to: 13 1. Division 0 Bidding Requirements, Contract Forms and Conditions of the Contract 14 2. Division I -- General Requirements 15 3. Section 34 71 13 Traffic Control 16 1.2 PRICE AND PAYMENT PROCEDURES I7 A. Measurement and Payment 18 1. Work associated with this Item is considered subsidiary to the various Items bid. 19 No separate payment will be allowed for this Item. 20 1.3 REFERENCES 21 A. Reference Standards 22 1. Reference standards cited in this specification refer to the current reference standard 23 published at the time of the latest revision date logged at the end of this 24 specification, unless a date is specifically cited. 25 2. Texas Manual on Uniform Traffic Control Devices (TMUTCD). 26 1.4 ADMINISTRATIVE REQUIREMENTS 27 28 29 30 31 32 33 34 35 36 37 38 A. Traffic Control 1. General a. When traffic control plans are included in the Drawings, provide Traffic Control in accordance with Drawings and Section 34 71 13. b. When traffic control plans are not included in the Drawings, prepare traffic control plans in accordance with Section 34 71 13 and submit to City for review. 1) Allow minimum 10 working days for review of proposed Traffic Control. B. Street Use Permit 1. Prior to installation of Traffic Control, a City Street Use Permit is required. a. To obtain Street Use Permit, submit Traffic Control Plans to City Transportation and Public Works Department. CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July I, 2011 015526-2 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 2 of 3 1 1) Allow a minimum of 5 working days for permit review. 2 2) Contractor's responsibility to coordinate review of Traffic Control plans for 3 Street Use Permit, such that construction is not delayed. 4 C. Modification to Approved Traffic Control 5 1. Prior to installation traffic control: 6 a. Submit revised traffic control plans to City Department Transportation and 7 Public Works Department. 8 1) Revise Traffic Control plans in accordance with Section 34 71 13. 9 2) Allow minimum 5 working days for review of revised Traffic Control. 10 3) It is the Contractor's responsibility to coordinate review of Traffic Control 11 plans for Street Use Permit, such that construction is not delayed. 12 D. Removal of Street Sign 13 1. If it is determined that a street sign must be removed for construction, then contact 14 City Transportation and Public Works Department, Signs and Markings Division to 15 remove the sign. 16 E. Temporary Signage 17 1. In the case of regulatory signs, replace permanent sign with temporary sign meeting 18 requirements of the latest edition of the Texas Manual on Uniform Traffic ControI 19 Devices (MUTCD). 20 2. Install temporary sign before the removal of permanent sign. 21 3. When construction is complete, to the extent that the permanent sign can be 22 reinstalled, contact the City Transportation and Public Works Department, Signs 23 and Markings Division, to reinstall the permanent sign. 24 F. Traffic Control Standards 25 1. Traffic Control Standards can be found on the City's Buzzsaw website. 26 1.5 SUBMITTALS [NOT USED] 27 1.6 ACTION SUBMITTALSIINFORMATIONAL SUBMITTALS [NOT USED] 28 1.7 CLOSEOUT SUBMITTALS [NOT USED] 29 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 30 1.9 QUALITY ASSURANCE [NOT USED] 31 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 32 1.11 FIELD [SITE] CONDITIONS [NOT USED] 33 1.12 WARRANTY [NOT USED] 34 PART 2 - PRODUCTS [NOT USED] 35 PART 3 - EXECUTION [NOT USED] 36 END OF SECTION CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July 1, 2011 01 55 26 - 3 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 3 of 3 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July 1, 2011 015713-1 STORM WATER POLLU"ITON PREVENTION Page 1 of 3 1 SECTION 0157 13 2 STORM WATER POLLUTION PREVENTION 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Procedures for Storm Water Pollution Prevention Plans 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 -- Bidding Requirements, Contract Forms and Conditions of the 11 Contract 12 2. Division I General Requirements 13 3. Section 3125 00 — Erosion and Sediment Control 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Construction Activities resulting in less than 1 acre of disturbance 17 a. Work associated with this Item is considered subsidiary to the various Items 18 bid. No separate payment will be allowed for this Item. 19 2. Construction Activities resulting in greater than 1 acre of disturbance 20 a. Measurement and Payment shall be in accordance with Section 3125 00, 21 1.3 REFERENCES 22 A. Abbreviations and Acronyms 23 1. Notice of Intent: NOI 24 2. Notice of Termination: NOT 25 3. Storm Water Pollution Prevention Plan: SWPPP 26 4. Texas Commission on Environmental Quality: TCEQ 27 5. Notice of Change: NOC 28 A. Reference Standards 29 1. Reference standards cited in this Specification refer to the current reference 30 standard published at the time of the latest revision date logged at the end of this 31 Specification, unless a date is specifically cited. 32 2. Integrated Storm Management (iSWM) Technical Manual for Construction 33 Controls 34 1.4 ADMINISTRATIVE REQUIREMENTS 35 A. General 36 1. Contractor is responsible for resolution and payment of any fines issued associated 37 with compliance to Stormwater Pollution Prevention Plan. CITY OF FORT WORTH FIMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July 1, 2011 015713-2 STORM WATER POLLUTION PREVENTION Page 2 of 3 1 B. Construction Activities resulting in: 2 1. Less than 1 acre of disturbance 3 a. Provide erosion and sediment control in accordance with Section 3125 00 and 4 Drawings. 5 2. 1 to Iess than 5 acres of disturbance 6 a. Texas Pollutant Discharge Elimination System (TPDES) General Construction 7 Permit is required 8 b. Complete SWPPP in accordance with TCEQ requirements 9 1) TCEQ Smali Construction Site Notice Required under general permit 10 TXR 150000 I I a) Sign and post at job site 12 b) Prior to Preconstruction Meeting, send 1 copy to City Department of 13 Transportation and Public Works, Environmental Division, (817) 392- 14 6088. 15 2) Provide erosion and sediment control in accordance with: 16 a) Section 3125 00 17 b) The Drawings 18 c) TXR150000 General Permit 19 d) SWPPP 20 e) TCEQ requirements 21 3. 5 acres or more of Disturbance 22 a. Texas Pollutant Discharge Elimination System (TPDES) General Construction 23 Permit is required 24 b. Complete SWPPP in accordance with TCEQ requirements 25 1) Prepare a TCEQ NO] form and submit to TCEQ along with required fee 26 a) Sign and post at job site 27 b) Send copy to City Department of Transportation and Public Works, 28 Environmental Division, (817) 392-6088. 29 2) TCEQ Notice of Change required if making changes or updates to NOI 30 3) Provide erosion and sediment control in accordance with: 31 a) Section 3125 00 32 b) The Drawings 33 c) TXR150000 General Permit 34 d) SWPPP 35 e) TCEQ requirements 36 4) Once the project has been completed and all the closeout requirements of 37 TCEQ have been met a TCEQ Notice of Termination can be submitted. 38 a) Send copy to City Department of Transportation and Public Works, 39 Environmental Division, (817) 392-6088. 40 1.5 SUBMITTALS 41 A. SWPPP 42 1. Submit in accordance with Section 01 33 00, except as stated herein. 43 a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City 44 as follows: 45 1) 1 copy to the City Project Manager 46 a) City Project Manager will forward to the City Department of 47 Transportation and Public Works, Environmental Division for review CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. I02098 Revised July 1, 2011 015713-3 STORM WATER POLLUTION PREVENTION Page 3 of 3 I B. Modified SWPPP 2 1. If the SWPPP is revised during construction, resubmit modified S WPPP to the City 3 in accordance with Section 01 33 00. 4 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 5 1.7 CLOSEOUT SUBMITTALS [NOT USED] 6 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 7 1.9 QUALITY ASSURANCE [NOT USED] 8 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 9 1.11 FIELD [SITE] CONDITIONS [NOT USED] 10 1.12 WARRANTY [NOT USED] 11 PART 2 - PRODUCTS [NOT USED] 12 PART 3 - EXECUTION [NOT USED] 13 14 15 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July 1, 2011 0158I3-1 TEMPORARY PROJECT SIGNAGE Page 1 of 3 1 SECTION 0158 13 2 TEMPORARY PROJECT SIGNAGE 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Temporary Project Signage Requirements 7 B. Deviations from this City of Port Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 —Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1 — General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various Items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 18 1.5 SUBMITTALS [NOT USED] 19 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 20 1.7 CLOSEOUT SUBMITTALS [NOT USED] 21 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 22 1.9 QUALITY ASSURANCE [NOT USED] 23 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 24 1.11 FIELD [SITE] CONDITIONS [NOT USED] 25 1.12 WARRANTY [NOT USED] 26 PART 2 - PRODUCTS 27 2.1 OWNER -FURNISHED [oR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 28 2.2 EQUIPMENT, PRODUCT TYPES, AND MATERIALS 29 A. Design Criteria 30 1. Provide free standing Project Designation Sign in accordance with City's Standard 31 Details for project signs. CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July 1, 2011 01 58 13 - 2 TEMPORARY PROJECT SIGNAGE Page 2 or 3 I B. Materials 2 1. Sign 3 a. Constructed of/4-inch fir plywood, grade A-C (exterior) or better 4 2.3 ACCESSORIES [NOT USED] 5 2.4 SOURCE QUALITY CONTROL [NOT USED] 6 PART 3 - EXECUTION 7 3.1 INSTALLERS [NOT USED] 8 3.2 EXAMINATION [NOT USED] 9 3.3 PREPARATION [NOT USED] 10 3.4 INSTALLATION I A. General 12 1. Provide vertical installation at extents of project. 13 2. Relocate sign as needed, upon request of the City. 14 B. Mounting options 15 a. Skids 16 b. Posts 17 c. Barricade 18 3.5 REPAIR / RESTORATION [NOT USED] 19 3.6 RE -INSTALLATION [NOT USED] 20 3.7 FIELD [oR] SITE QUALITY CONTROL [NOT USED] 21 3.8 SYSTEM STARTUP [NOT USED] 22 3.9 ADJUSTING [NOT USED] 23 3.10 CLEANING [NOT USED] 24 3.11 CLOSEOUT ACTIVITIES [NOT USED] 25 3.12 PROTECTION [NOT USED] 26 3.13 MAINTENANCE 27 A. General 28 1. Maintenance will include painting and repairs as needed or directed by the City. 29 3.14 ATTACHMENTS [NOT USED] 30 END OF SECTION 31 CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTROCTION SPECIFICATION DOCUMENTS City Project No 102098 Revised July 1, 2011 015813-3 TEMPORARY PROJECT SIGNAGE Page 3 of 3 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July I, 2011 SECTION 0160 00 PRODUCT REQUIREMENTS 3 PARTI- GENERAL 4 1.1 SUMMARY 01 60 00 - 1 PRODUCT REQUIREMENTS Page 1 of2 5 A. Section Includes: 6 1. References for Product Requirements and City Standard Products List 7 B. Deviations from this City of Fort Worth Standard Specification 8 1, None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division I — General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED] 13 1.3 REFERENCES ]NOT USED] 14 1.4 ADMINISTRATIVE REQUIREMENTS 15 A. A list of City approved products for use is located on Buzzsaw as follows: 16 1. Resources102 - Construction DocumentslStandard Products List 17 B. Only products specifically included on City's Standard Product List in these Contract 18 Documents shall be allowed for use on the Project. 19 1. Any subsequently approved products will only be allowed for use upon specific 20 approval by the City. 21 C. Any specific product requirements in the Contract Documents supersede similar 22 products included on the City's Standard Product List. 23 1. The City reserves the right to not allow products to be used for certain projects even 24 though the product is listed on the City's Standard Product List. 25 D. Although a specific product is included on City's Standard Product List, not all 26 products from that manufacturer are approved for use, including but not limited to, that 27 manufacturer's standard product. 28 E. See Section 01 33 00 for submittal requirements of Product Data included on City's 29 Standard Product List. 30 1.5 SUBMITTALS [NOT USED] 31 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 32 1.7 CLOSEOUT SUBMITTALS [NOT USED] 33 L8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 34 1.9 QUALITY ASSURANCE [NOT USED] CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised December 20, 2012 016000-2 PRODUCT .REQUIREMENTS Page 2 of 2 1 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 2 1.11 FIELD [SITE] CONDITIONS [NOT USED] 3 1.12 WARRANTY [NOT USED] 4 PART 2 - PRODUCTS [NOT USED] 5 PART 3 - EXECUTION [NOT USED] 6 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 10/12/12 D. Johnson Modified Location of City's Standard Product List CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised December 20, 2012 01 66 00 - 1 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 1 of I SECTION 0166 00 2 PRODUCT STORAGE AND HANDLING REQUIREMENTS 3 PARTI- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Scheduling of product delivery 7 2. Packaging of products for delivery 8 3. Protection of products against damage from: 9 a. Handling 10 b. Exposure to elements or harsh environments 11 B. Deviations from this City of Fort Worth Standard Specification 12 1. None. 13 C. Related Specification Sections include, but are not necessarily limited to: 14 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 15 2. Division 1 — General Requirements 16 1.2 PRICE AND PAYMENT PROCEDURES 17 A. Measurement and Payment 18 1. Work associated with this Item is considered subsidiary to the various Items bid. 19 No separate payment will be allowed for this Item. 20 1.3 REFERENCES [NOT USED] 21 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 22 1.5 SUBMITTALS [NOT USED] 23 1.6 ACTION SUBMITTALSIINFORMATIONAL SUBMITTALS [NOT USED] 24 1.7 CLOSEOUT SUBMITTALS [NOT USED] 25 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 26 1.9 QUALITY ASSURANCE [NOT USED] 27 1.10 DELIVERY AND HANDLING 28 A. Delivery Requirements 29 1. Schedule delivery of products or equipment as required to allow timely installation 30 and to avoid prolonged storage. 31 2. Provide appropriate personnel and equipment to receive deliveries. 32 3. Delivery trucks will not be permitted to wait extended periods of time on the Site 33 for personnel or equipment to receive the delivery. CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July 1, 2011 016600-2 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 2 of 4 1 4. Deliver products or equipment in manufacturer's original unbroken cartons or other 2 containers designed and constructed to protect the contents from physical or 3 environmental damage. 4 5. Clearly and fully mark and identify as to manufacturer, item and installation 5 location. 6 6. Provide manufacturer's instructions for storage and handling. 7 B. Handling Requirements 8 1. Handle products or equipment in accordance with these Contract Documents and 9 manufacturer's recommendations and instructions. 10 C. Storage Requirements 11 1. Store materials in accordance with manufacturer's recommendations and 12 requirements of these Specifications. 13 2. Make necessary provisions for safe storage of materials and equipment. 14 a. Place loose soil materials and materials to be incorporated into Work to prevent 15 damage to any part of Work or existing facilities and to maintain free access at 16 all times to all parts of Work and to utility service company installations in 17 vicinity of Work. 18 3. Keep materials and equipment neatly and compactly stored in locations that will 19 cause minimum inconvenience to other contractors, public travel, adjoining owners, 20 tenants and occupants. 21 a. Arrange storage to provide easy access for inspection. 22 4. Restrict storage to areas available on construction site for storage of material and 23 equipment as shown on Drawings, or approved by City's Project Representative. 24 5. Provide off -site storage and protection when on -site storage is not adequate. 25 a. Provide addresses of and access to off -site storage locations for inspection by 26 City's .Project Representative. 27 6. Do not use lawns, grass plots or other private property for storage purposes without 28 written permission of owner or other person in possession or control of premises. 29 7. Store in manufacturers' unopened containers. 30 8. Neatly, safely and compactly stack materials delivered and stored along line of 31 Work to avoid inconvenience and damage to property owners and general public 32 and maintain at least 3 feet from fire hydrant. 33 9. Keep public and private driveways and street crossings open. 34 10. Repair or replace damaged lawns, sidewalks, streets or other improvements to 35 satisfaction of City's Project Representative. 36 a. Total length which materials may be distributed along route of construction at 37 one time is 1,000 linear feet, unless otherwise approved in writing by City's 38 Project Representative. CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No, 102098 Revised July 1, 2011 016600-3 PRODUCT STORAGE AND HANDLING REQUIREMENTS Pagc 3 of 4 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2 - PRODUCTS [NOT USED] 4 PART 3 - EXECUTION 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 ERECTION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [oR1 SITE QUALITY CONTROL A. Tests and Inspections 1. Inspect all products or equipment delivered to the site prior to unloading. B. Non -Conforming Work 1. Reject all products or equipment that are damaged, used or in any other way unsatisfactory for use on the project. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION A. Protect all products or equipment in accordance with manufacturer's written directions. B. Store products or equipment in location to avoid physical damage to items while in storage. C. Protect equipment from exposure to elements and keep thoroughly dry if required by the manufacturer. 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July 1, 2011 01 66 00 - 4 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 4 of 4 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Pfoject No. 102098 Revised July 1, 2011 017000-1 MOBILIZATION AND REMOBiLIZATION Page l J4 1 SECTION 0170 00 2 MOBILIZATION AND REMOBILIZATION 3 PARTI- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 1. Mobilization and Demobilization a. Mobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies to the Site 2) Establishment of necessary general facilities for the Contractor's operation at the Site 3) Premiums paid for performance and payment bonds 4) Transportation of Contractor's personnel, equipment, and operating supplies to another location within the designated Site 5) Relocation of necessary general facilities for the Contractor's operation from 1 location to another location on the Site. b. Demobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies away from the Site including disassembly 2) Site Clean-up 3) Removal of all buildings and/or other facilities assembled at the Site for this Contract c. Mobilization and Demobilization do not include activities for specific items of work that are for which payment is provided elsewhere in the contract. 2. Remobilization a. Remobilization for Suspension of Work specifically required in the Contract Documents or as required by City includes: 1) Demobilization a) Transportation of Contractor's personnel, equipment, and operating supplies from the Site including disassembly or temporarily securing equipment, supplies, and other facilities as designated by the Contract Documents necessary to suspend the Work. b) Site Clean-up as designated in the Contract Documents 2) Remobilization a) Transportation of Contractor's personnel, equipment, and operating supplies to the Site necessary to resume the Work. b) Establishment of necessary general facilities for the Contractor's operation at the Site necessary to resume the Work. 3) No Payments will be made for: a) Mobilization and Demobilization from one location to another on the Site in the normal progress of performing the Work. b) Stand-by or idle time c) Lost profits 3. Mobilizations and Demobilization for Miscellaneous Projects a. Mobilization and Demobilization CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised November 22, 2016 017000-2 MOBILIZATION AND REMOBILIZATION Page 2 of 4 1 1) Mobilization shall consist of the activities and cost on a Work Order basis 2 necessary for: 3 a) Transportation of Contractor's personnel, equipment, and operating 4 supplies to the Site for the issued Work Order. 5 b) Establishment of necessary general facilities for the Contractor's 6 operation at the Site for the issued Work Order 7 2) Demobilization shall consist of the activities and cost necessary for- 8 a) Transportation of Contractor's personnel, equipment, and operating 9 supplies from the Site including disassembly for each issued Work 10 Order I b) Site Clean-up for each issued Work Order 12 c) Removal of all buildings or other facilities assembled at the Site for 13 each Work Oder 14 b. Mobilization and Demobilization do not include activities for specific items of 15 work for which payment is provided elsewhere in the contract. 16 4. Emergency Mobilizations and Demobilization for Miscellaneous Projects 17 a. A Mobilization for Miscellaneous Projects when directed by the City and the 18 mobilization occurs within 24 hours of the issuance of the Work Order. 19 B. Deviations from this City of Fort Worth Standard Specification 20 1. None. 21 C. Related Specification Sections include, but are not necessarily limited to: 22 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 23 2. Division 1 — General Requirements 24 1.2 PRICE AND PAYMENT PROCEDURES 25 A. Measurement and Payment [Consult City Department/Division for direction on if 26 Mobilization pay item to be included or the item should be subsidiary. Include the 27 appropriate Section 1.2 A. 1.] 28 1. Mobilization and Demobilization 29 a. Measure 30 1) This Item is considered subsidiary to the various Items bid. 31 b. Payment 32 1) The work performed and materials furnished in accordance with this Item 33 are subsidiary to the various Items bid and no other compensation will be 34 allowed. 35 2. Remobilization for suspension of Work as specifically required in the Contract 36 Documents 37 a. Measurement 38 1) Measurement for this Item shall be per each remobilization performed. 39 b. Payment 40 1) The work performed and materials furnished in accordance with this Item 41 and measured as provided under "Measurement" will be paid for at the unit 42 price per each "Specified Remobilization" in accordance with Contract 43 Documents. 44 c. The price shall include: 45 1) Demobilization as described in Section 1.1.A.2.a.1) 46 2) Remobilization as described in Section 1.1.A.2.a.2) CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised November 22, 2016 017000.3 MOBILIZATION AND REMOBILIZATION Page 3 of 4 1 d. No payments will be made for standby, idle time, or lost profits associated this 2 Item. 3 3. Remobilization for suspension of Work as required by City 4 a. Measurement and Payment 5 1) This shall be submitted as a Contract Claim in accordance with Article 10 6 of Section 00 72 00. 7 2) No payments will be made for standby, idle time, or lost profits associated 8 with this Item. 9 4. Mobilizations and Demobilizations for Miscellaneous Projects 10 a. Measurement 11 1) Measurement for this Item shall be for each Mobilization and 12 Demobilization required by the Contract Documents 13 b. Payment 14 1) The Work performed and materials furnished in accordance with this Item 15 and measured as provided under "Measurement" will be paid for at the unit 16 price per each "Work Order Mobilization" in accordance with Contract 1.7 Documents. Demobilization shall be considered subsidiary to mobilization 18 and shall not be paid for separately. 19 c. The price shall include: 20 1) Mobilization as described in Section I.1.A.3.a.1) 21 2) Demobilization as described in ,Section 1.I.A.3.a.2) 22 d. No payments will be made for standby, idle time, or lost profits associated this 23 Item. 24 5. Emergency Mobilizations and Demobilizations for Miscellaneous Projects 25 a. Measurement 26 1) Measurement for this Item shall be for each Mobilization and 27 Demobilization required by the Contract Documents 28 b. Payment 29 1) The Work performed and materials furnished in accordance with this Item 30 and measured as provided under "Measurement" will be paid for at the unit 31 price per each "Work Order Emergency Mobilization" in accordance with 32 Contract Documents. Demobilization shall be considered subsidiary to 33 mobilization and shall not be paid for separately. 34 c. The price shall include 35 1) Mobilization as described in Section 1.1.A.4.a) 36 2) Demobilization as described in Section I.I.A.3.a.2) 37 d. No payments will be made for standby, idle time, or lost profits associated this 38 Item, 39 1.3 REFERENCES [NOT USED] 40 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 41 1.5 SUBMITTALS [NOT USED] 42 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 43 1.7 CLOSEOUT SUBMITTALS [NOT USED] 44 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION sPECIFICATION DOCUMENTS City Project No. 102098 Revised November 22, 2016 017000-4 MOBILIZATION AND REMOBILIZATION Page 4 of 4 1 1.9 QUALITY ASSURANCE [NOT USED] 2 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 3 1.11 FIELD [SITE] CONDITIONS [NOT USED] 4 1.12 WARRANTY [NOT USED] 5 PART 2 - PRODUCTS [NOT USED] 6 PART 3 - EXECUTION [NOT USED] 7 8 9 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 11/22/16 Michael Owen 1.2 Price and Payment Procedures - Revised specification, including blue text, to make specification flexible for either subsidiary or paid bid item for Mobilization. CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised November 22, 2016 017123-1 CONSTRUCTION STAKING AND SURVEY Page 1 of 8 I SECTION 01 71 23 2 CONSTRUCTION STAKING AND SURVEY 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes- 6 1. Requirements for construction staking and construction survey 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1 — General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 A. Measurement and Payment 1. Construction Staking a. Measurement 1) Measurement for this Item shall be by lump sum. b. Payment 1) The work performed and the materials furnished in accordance with this Item shall be paid for at the lump sum price bid for "Construction Staking". 2) Payment for "Construction Staking" shall be made in partial payments prorated by work completed compared to total work included in the lump sum item. c. The price bid shall include, but not be limited to the following: 1) Verification of control data provided by City. 2) Placement, maintenance and replacement of required stakes and markings in the field. 3) Preparation and submittal of construction staking documentation in the form of "cut sheets" using the City's standard template. 2. Construction Survey a. Measurement 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 3. As -Built Survey a. Measurement 1) Measurement for this Item shall be by lump sum. b. Payment 1) The work performed and the materials furnished in accordance with this Item shall be paid for at the lump sum price bid for "As -Built Survey". CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised February 14, 2018 01 71 23 - 2 CONSTRUCTION STAKING AND SURVEY Page 2 of 8 1 2) Payment for "Construction Staking" shall be made in partial payments 2 prorated by work completed compared to total work included in the lump sum 3 item. 4 c. The price bid shall include, but not be limited to the following:: 5 1) Field measurements and survey shots to identify location of completed 6 facilities. 7 2) Documentation and submittal of as -built survey data onto contractor redline 8 plans and digital survey files. 9 10 1.3 REFERENCES 11 A. Definitions 12 1. Construction Survey - The survey measurements made prior to or while 13 construction is in progress to control elevation, horizontal position, dimensions and 14 configuration of structures/improvements included in the Project Drawings. 15 2. As -built Survey —The measurements made after the construction of the 16 improvement features are complete to provide position coordinates for the features 17 of a project. 18 3. Construction Staking — The placement of stakes and markings to provide offsets 19 and elevations to cut and fill in order to locate on the ground the designed 20 structures/improvements included in the Project Drawings. Construction staking 21 shall include staking easements and/or right of way if indicated on the plans. 22 4. Survey "Field Checks" — Measurements made after construction staking is 23 completed and before construction work begins to ensure that structures marked on 24 the ground are accurately located per Project Drawings. 25 B. Technical References 26 1. City of Fort Worth — Construction Staking Standards (available on City's Buzzsaw 27 website) — 01 71 23.16.01_ Attachment A —Survey Staking Standards 28 2. City of Fort Worth - Standard Survey Data Collector Library (fxl) files (available 29 on City's Buzzsaw website). 30 3. Texas Department of Transportation (TxDOT) Survey Manual, latest revision 31 4, Texas Society of Professional Land Surveyors (TSPS), Manual of Practice for Land 32 Surveying in the State of Texas, Category 5 33 34 1.4 ADMINISTRATIVE REQUIREMENTS 35 A. The Contractor's selection of a surveyor must comply with Texas Government 36 Code 2254 (qualifications based selection) for this project. 37 1.5 SUBMITTALS 38 A. Submittals, if required, shall be in accordance with Section 0133 00. 39 B. All submittals shall be received and reviewed by the City prior to delivery of work. 40 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS 41 A. Field Quality Control Submittals CITY OF FORT WORTH IIMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised February 14, 2018 017123-3 CONSTRUCTION STAKING AND SURVEY Page 3 of 8 1 1. Documentation verifying accuracy of field engineering work, including coordinate 2 conversions if plans do not indicate grid or ground coordinates. 3 2. Submit "Cut -Sheets" conforming to the standard template provided by the City 4 (refer to 01 71 23.16.01 — Attachment A — Survey Staking Standards). 5 1.7 CLOSEOUT SUBMITTALS 6 B. As -built Redline Drawing Submittal 7 1. Submit As -Built Survey Redline Drawings documenting the locations/elevations of 8 constructed improvements signed and sealed by Registered Professional Land 9 Surveyor (RPLS) responsible for the work (refer to 01 71 23.16.01 Attachment A 10 Survey Staking Standards) . 11 2. Contractor shall submit the proposed as -built and completed redline drawing 12 submittal one (1) week prior to scheduling the project final inspection for City 13 review and comment. Revisions, if necessary, shall be made to the as -built redline 14 drawings and resubmitted to the City prior to scheduling the construction final 15 inspection. I 16 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 17 1.9 QUALITY ASSURANCE 18 A. Construction Staking 19 1. Construction staking will be performed by the Contractor. 20 2. Coordination 21 a. Contact City's Project Representative at least one week in advance notifying 22 the City of when Construction Staking is scheduled. 23 b. It is the Contractor's responsibility to coordinate staking such that 24 construction activities are not delayed or negatively impacted. 25 3. General 26 a. Contractor is responsible for preserving and maintaining stakes. If City 27 surveyors are required to re -stake for any reason, the Contractor will be 28 responsible for costs to perform staking. If in the opinion of the City, a 29 sufficient number of stakes or markings have been lost, destroyed disturbed or 30 omitted that the contracted Work cannot take place then the Contractor will be 31 required to stake or re -stake the deficient areas. 32 B. Construction Survey 33 1. Construction Survey will be performed by the Contractor. 34 2. Coordination 35 a. Contractor to verify that borizontal and vertical control data established in the 36 design survey and required for construction survey is available and in place. 37 3. General 38 a. Construction survey will be performed in order to construct the work shown 39 on the Construction Drawings and specified in the Contract Documents. 40 b. For construction methods other than open cut, the Contractor shall perform 41 construction survey and verify control data including, but not limited to, the 42 following: 43 1) Verification that established benchmarks and control are accurate. CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised February 14, 2018 01 71 23 - 4 CONSTRUCTION STAKING AND SURVEY Page 4 of 8 1 2) Use of Benchmarks to furnish and maintain all reference lines and grades 2 for tunneling. 3 3) Use of line and grades to establish the location of the pipe. 4 4) Submit to the City copies of field notesused to establish all lines and 5 grades, if requested, and allow the City to check guidance system setup prior 6 to beginning each tunneling drive. 7 5) Provide access for the City, if requested, to verify the guidance system and 8 the line and grade of the carrier pipe. 9 6) The Contractor remains fully responsible for the accuracy of the work and 10 correction of it, as required. 11 7) Monitor line and grade continuously during construction. 12 8) Record deviation with respect to design line and grade once at each pipe 13 joint and submit daily records to the City. 14 9) If the installation does not meet the specified tolerances (as outlined in 15 Sections 33 05 23 and/or 33 05 24), immediately notify the City and correct 16 the installation in accordance with the Contract Documents. 17 C. As -Built Survey 18 1. Required As -Built Survey will be performed by the Contractor. 19 2. Coordination 20 a. Contractor is to coordinate with City to confirm which features require as- 21 built surveying. 22 b. It is the Contractor's responsibility to coordinate the as -built survey and 23 required measurements for items that are to be buried such that construction 24 activities are not delayed or negatively impacted. 25 c. For sewer mains and water mains 12" and under in diameter, it is acceptable 26 to physically measure depth and mark the location during the progress of 27 construction and take as -built survey after the facility has been buried. The 28 Contractor is responsible for the quality control needed to ensure accuracy. 29 3. General 30 a. The Contractor shall provide as -built survey including the elevation and 31 location (and provide written documentation to the City) of construction 32 features during the progress of the construction including the following: 33 1) Water Lines 34 a) Top of pipe elevations and coordinates for waterlines at the following 35 Iocations: 36 (1) Minimum every 250 linear feet, including 37 (2) Horizontal and vertical points of inflection, curvature, 38 etc. 39 (3) Fire line tee 40 (4) Plugs, stub -outs, dead-end lines 41 (5) Casing pipe (each end) and all buried fittings 42 2) Sanitary Sewer 43 a) Top of pipe elevations and coordinates for force mains and siphon 44 sanitary sewer lines (non -gravity facilities) at the following locations: 45 (1) Minimum every 250 linear feet and any buried fittings 46 (2) Horizontal and vertical points of inflection, curvature, 47 etc. 48 3) Stormwater — Not Applicable CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. I02099 Revised February 14, 2018 01 71 23 - 5 CONSTRUCTION STAKING AND SURVEY Page 5 of 8 1 b. The Contractor shall provide as -built survey including the elevation and 2 location (and provide written documentation to the City) of construction 3 features after the construction is completed including the following: 4 1) Manholes 5 a) Rim and flowline elevations and coordinates for each manhole 6 2) Water Lines 7 a) Cathodic protection test stations 8 b) Sampling stations 9 c) Meter boxes/vaults (All sizes) 10 d) Fire hydrants l I e) Valves (gate, butterfly, etc.) 12 f) Air Release valves (Manhole rim and vent pipe) 13 g) Blow off valves (Manhole rim and valve lid) 14 h) Pressure plane valves 15 i) Underground Vaults 16 (1) Rim and flowline elevations and coordinates for each 17 Underground Vault. 18 3) Sanitary Sewer 19 a) Cleanouts 20 (1) Rim and flowline elevations and coordinates for each 21 b) Manholes and Junction Structures 22 (1) Rim and flowline elevations and coordinates for each 23 manhole and junction structure. 24 4) Stormwater Not Applicable 25 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 26 1.11 FIELD [SITE] CONDITIONS [NOT USED] 27 1.12 WARRANTY 28 PART 2 - PRODUCTS 29 A. A construction survey will produce, but will not be limited to: 30 1. Recovery of relevant control points, points of curvature and points of intersection. 31 2. Establish temporary horizontal and vertical control elevations (benchmarks) 32 sufficiently permanent and located in a manner to be used throughout construction. 33 3. The location of planned facilities, easements and improvements. 34 a. Establishing final line and grade stakes for piers, floors, grade beams, parking 35 areas, utilities, streets, highways, tunnels, and other construction. 36 b. A record of revisions or corrections noted in an orderly manner for reference. 37 c. A drawing, when required by the client, indicating the horizontal and vertical 38 location of facilities, easements and improvements, as built. 39 4. Cut sheets shall be provided to the City inspector and Survey Superintendent for all 40 construction staking projects. These cut sheets shall be on the standard city template 41 which can be obtained from the Survey Superintendent (817-392-7925). 42 S. Digital survey files in the following formats shall be acceptable: 43 a. AutoCAD (.dwg) 44 b. ESRI Shapefile (.shp) CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised February 14, 2018 017123-6 CONSTRUCTION STAKING AND SURVEY Page 6 of 8 1 c. CSV file (.csv), formatted with X and Y coordinates in separate columns (use 2 standard templates, if available) 3 6. Survey files shall include vertical and horizontal data tied to original project 4 control and benchmarks, and shall include feature descriptions 5 PART 3 - EXECUTION 6 3.1 INSTALLERS 7 A. Tolerances: 8 1. The staked location of any improvement or facility should be as accurate as 9 practical and necessary. The degree of precision required is dependent on many 10 factors all of which must remain judgmental. The tolerances listed hereafter are 11 based on generalities and, under certain circumstances, shall yield to specific 12 requirements. The surveyor shall assess any situation by review of the overall plans 13 and through consultation with responsible parties as to the need for specific 14 tolerances. 15 a. Earthwork: Grades for earthwork or rough cut should not exceed 0.1 ft. vertical 16 tolerance. Horizontal alignment for earthwork and rough cut should not exceed 17 1.0 ft. tolerance. 18 b. Horizontal alignment on a structure shall be within .0.111 tolerance. 19 c. Paving or concrete for streets, curbs, gutters, parking areas, drives, alleys and 20 walkways shall be located within the confines of the site boundaries and, 21 occasionally, along a boundary or any other restrictive line. Away from any 22 restrictive Iine, these facilities should be staked with an accuracy producing no 23 more than 0.05ft. tolerance from their specified Iocations. 24 d. Underground and overhead utilities, such as sewers, gas, water, telephone and 25 electric lines, shall be located horizontally within their prescribed areas or 26 easements. Within assigned areas, these utilities should be staked with an 27 accuracy producing no more than 0.1 ft tolerance from a specified location. 28 c. The accuracy required for the vertical location of utilities varies widely. Many 29 underground utilities require only a minimum cover and a tolerance of 0.1 ft. 30 should be maintained. Underground and overhead utilities on planned profile, 3I but not depending on gravity flow for performance, should not exceed 0.1 ft. 32 tolerance. 33 B. Surveying instruments shall be kept in close adjustment according to manufacturer's 34 specifications or in compliance to standards. The City reserves the right to request a 35 calibration report at any time and recommends regular maintenance schedule be 36 performed by a certified technician every 6 months. 37 1. Field measurements of angles and distances shall be done in such fashion as to 38 satisfy the closures and tolerances expressed in Part 3.1.A. 39 2. Vertical locations shall be established from a pre -established benchmark and 40 checked by closing to a different bench mark on the same datum. 41 3. Construction survey field work shall correspond to the client's plans. Irregularities 42 or conflicts found shall be reported promptly to the City. 43 4. Revisions, corrections and other pertinent data shall be logged for future reference. 44 CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No, 102098 Revised February 14, 20IS 017123-7 CONSTRUCTION STAKING AND SURVEY Page 7 of 8 1 3.2 EXAMINATION [NOT USED] 2 3.3 PREPARATION [NOT USED] 3 3.4 APPLICATION 4 3.5 REPAIR / RESTORATION 5 A. If the Contractor's work damages or destroys one or more of the control 6 monuments/points set by the City, the monuments shall be adequately referenced for 7 expedient restoration. 8 1. Notify City if any control data needs to be restored or replaced due to damage 9 caused during construction operations. 10 a. Contractor shall perform replacements and/or restorations. 11 b. The City may require at any time a survey "Field Check" of any monument 12 or benchmarks that are set be verified by the City surveyors before further 13 associated work can move forward. 14 3.6 RE -INSTALLATION [NOT USED] 15 3.7 FIELD [oR] SITE QUALITY CONTROL 16 A. It is the Contractor's responsibility to maintain all stakes and control data placed by the 17 City in accordance with this Specification. This includes easements and right of way, if 18 noted on the plans. 19 B. Do not change or relocate stakes or control data without approval from the City. 20 3.8 SYSTEM STARTUP 21 22 23 24 25 26 27 28 29 30 31 32 33 34 A. Survey Checks 1. The City reserves the right to perform a Survey Check at any time deemed necessary. 2. Checks by City personnel or 3rd party contracted surveyor are not intended to relieve the contractor of his/her responsibility for accuracy. 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised February 14, 2018 017123-8 CONSTRUCTION STAKING AND SURVEY Page 8 of 8 DATE NAME SUMMARY OF CHANGE 8/31/2012 D.7ohnson Added instruction and modified measurement & payment under 1.2; added 8/31/2017 M, Owen definitions and references under 1.3; modified 1.6; added 1.7 closeout submittal requirements; modified 1.9 Quality Assurance; added PART 2 — PRODUCTS ; Added 3.1 Installers; added 3.5 Repair/Restoration; and added 3.8 System Startup. Removed "blue text"; revised measurement and payment sections for Construction Staking and As -Built Survey; added reference to selection compliance with TGC 2/14/2018 M Owen 2254; revised action and Closeout submittal requirements; added acceptable depth measurement criteria; revised list of items requiring as -built survey "during" and "after" construction; and revised acceptable digital survey file format CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised February 14, 2018 FORT WORTH,@ Section 017123.01 m Attachment A Survey Staking Standards February 2017 CAUse rs\del aj u\Docu men ts\Contract Books\HMAC SURFACE OVERLAY 2019-4\Div 01 General Requirements\01 71 23.16.01_Attachment A_Survey Staking Standards.docx HMAC SURFACE OVERLAY 2019-4 Page 1 of 22 City Project No. 102098 These procedures are intended to provide a standard method for construction staking services associated with the City of Fort Worth projects. These are not to be considered all inclusive, but only as a general guideline. For projects on TXDOT right-of-way or through joint TXDOT participation, adherence to the TXDOT Survey Manual shall be followed and if a discrepancy arises, the TXDOT manual shall prevail. (http://onlinemanuals.txdot.goy/txdotmanuals/ess/ess.pdf) If you have a unique circumstance, please consult with the project manager, inspector, or survey department at 817-392-7925. Fable of Contents I. City of Fort Worth Contact Information II. Construction Colors III. Standard Staking Supplies IV, Survey Equipment, Control, and Datum Standards V. Water Staking VI. Sanitary Sewer Staking VII, Storm Staking Vill. Curb and Gutter Staking IX. Cut Sheets X. As -built Survey C.\Users\delaju\Documents\Contract Books\HMAC SURFACE OVERLAY 2019-4\Div 01 General Requirements\01 7123.16.01_Attachment A_Survey Staking Standards.docx HMAC SURFACE OVERLAY 2019-4 Page 2 of 22 City Project No. 102098 I. Survey Department Contact Information Physical and mailing address: 8851 Camp Bowie West Boulevard Suite 300 Fort Worth, Texas 76116 Office: (817) 392-7925 Survey Superintendent, direct fine: (817) 392-8971 II. Construction Colors The following colors shall be used for staking or identifying features in the field. This includes flagging, paint of laths/stakes, paint of hubs, and any identification such as pin flags if necessary. Utility Color PROPOSED EXCAVATION WHITE ALL ELECTRIC AND CONDUITS e POTABLE WATER GAS OR OIL YELLOW TELEPHONE/FIBER OPTIC ORANGE SURVEY CONTROL POINTS, BENCHMARKS, PROPERTY CORNERS, RIGHT-OF-WAYS, AND ALL PAVING INCLUDING CURB, SIDEWALK, BUILDING CORNERS PINK SANITARY SEWER IRRIGATION AND RECLAIMED WATER ' III. Standard Staking Supplies Item Minimum size Lath/Stake 36" tall Wooden Hub (2"x2" min. square preferred) 6" tall Pin Flags (2.5" x 3.5" preferred) 21" long Guard Stakes Not required PK or Mag nails 1" long Iron Rods (1/2" or greater diameter) 18" long Survey Marking Paint Water -based Flagging 1" wide Marking Whiskers (feathers) 6" long Tacks (for marking hubs) 3/4" long C:\Users\delaju\Documents\Contract Books\HMAC SURFACE OVERLAY 2019-4WN 01 General Requirements\01 7123.16.01_Attachment A_Survey Staking Standards.docx HMAC SURFACE OVERLAY 2019-4 Page 3 of 22 City Project No. 102098 IV. Survey Equipment, Control, and Datum Standards A. City Benchmarks All city benchmarks can be found here: http://fortworthtexas.gov/itsolutions/GIS/ Look for 'Zoning Maps'. Under'Layers' , expand 'Basemap Layers', and check on 'Benchmarks'. B. Conventional or Robotic Total Station Equipment I. A minimum of a 10 arc -second instrument is required. I1. A copy of the latest calibration report may be requested by the City at any time. It is recommended that an instrument be calibrated by certified technician at least 1 occurrence every 6 months. C. Network/V.R.S. and static GPS Equipment I. It is critical that the surveyor verify the correct horizontal and vertical datum prior commencing work. A site calibration may be required and shall consist of at least 4 control points spaced evenly apart and in varying quadrants. Additional field checks of the horizontal and vertical accuracies shall be completed and the City may ask for a copy of the calibration report at any time. II. Network GPS such as the Western Data Systems or SmartNet systems may be used for staking of property/R.O.W, forced -main water lines, and rough -grade only. No GPS staking for concrete, sanitary sewer, storm drain, final grade, or anything that needs vertical grading with a tolerance of 0.25' or less is allowed. D. Control Points Set I. All control points set shall be accompanied by a lath with the appropriate Northing, Easting, and Elevation (if applicable) of the point set. Control points can be set rebar, 'X' in concrete, or any other appropriate item with a stable base and of a semi -permanent nature. A rebar cap is optional, but preferred if the cap is marked 'control point' or similar wording. If. Datasheets are required for all control points set. Datasheet should include: A. Horizontal and Vertical Datum used, Example: N.A.D.83, North Central Zone 4202, NAVD 88 Elevations B. Grid or ground distance. — If ground, provide scale factor used and base point coordinate, Example: C.S.F.=0.999125, Base point=North: 0, East=O C. Geoid model used, Example: GEOID12A C:\Users\delaju\Documents\Contract Books\HMAC SURFACE OVERLAY 2019-4\Div 01 General Requirements\01 7123.16.01—Attachment A —Survey Staking Standards.docx HMAC SURFACE OVERLAY 2019-4 Page 4 of 22 City Project No. 102098 E. Preferred Grid Datum Although many plan sets can be in surface coordinates, the City's preferred grid datum is listed below. Careful consideration must be taken to verify what datum each project is in prior to beginning work. It is essential the surveyor be familiar with coordinate transformations and how a grid/surface/assumed coordinate system affect a project. Proiected Coordinate System: NAD_1983_StatePlane_Texas_North_Central_FIPS_4202_Feet Projection: Lambert—Conformal_Conic Fa Ise_E ast i ng: 1968500.00000000 False —Northing: 65 61666. 66666667 Central —Meridian: -98.50000000 Standard Parallel 1: 32.13333333 Standard Parallel 2: 33.96666667 Latitude —Cif —Origin: 31.66666667 Linear Unit: Foot US Geographic Coordinate System: GCS_ North_American_1983 Datum: D North American 1983 Prime Meridian: Greenwich Angular Unit: Degree Nate: Regardless of what datum each particular project is in, deliverables to the City must be converted/translated into this preferred grid datum. 1 copy of the deliverable should be in the project datum (whatever it may be) and 1 copy should be in the NAD83, TX North Central 4202 zone. See Preferred File Naming, Convention below F. Preferred Deliverable Format txt csv dwg .job G. Preferred Data Format P,N,E,Z,D,N Point Number, Northing, Easting, Elevation, Description, Notes (if applicable) H. Preferred File Naming Convention This is the preferred format: City Project Number Description_Datum.csv Example for a project that has surface coordinates which must be translated: File 1: C1234 As -built of Water on Main Street Grid NAD83 TXSP 4202.csv C:\Users\delaju\Documents\Contract Books\HMAC SURFACE OVERLAY 2019-4\Div 01 General Requirements\01 71 23.16.01 Attachment A_Survey Staking Standards.docx HMAC SURFACE OVERLAY 2019-4 Page 5 of 22 City Project No. 102098 File 2: C1234_As-built of Water on Main Street —Project Specific Datum.csv Example Control Stakes C:\Users\delaju\Documents\Contract Books\HMAC SURFACE OVERLAY 2019-4\Div 01 General Requirements\01 7123.16.01_Attachment A Survey Staking Standards.docx HMAC SURFACE OVERLAY 2019-4 Page 6 of 22 City Project No. 102098 0 LI CL Ld m C3 m 1016 EL. = 1 ao. Da' Ld . m � 72 P n < J - J r w J F- m 0 i CH #1 N=5000.00 � w w 0 c� TLLJ = c� < J V w C7� iC Q n m � L7C CL ( ) V. Water Staking Standards C:\Users\delaju\Documents\Contract Books\HMAC SURFACE OVERLAY 2019-4\Div 01 General Requirements\01 71 23.16.01_Attachment A_Survey Staking Standards.docx H MAC SURFACE OVERLAY 2019-4 Page 7 of 22 City Project No. 102098 A. Centerline Staking —Straight Line Tangents I. Offset lath/stakes every 200' on even stations II. Painted blue lath/stake only, no hub is required III. Grade is to top of pipe (T/P) for 12" diameter pipes or smaller IV. Grade to flow line (F/L) for 16" and larger diameter pipes V. Grade should be 3.50' below the proposed top of curb line for 10" and smaller diameter pipes VI. Grade should be 4.00' below the proposed top of curb line for 12" and larger diameter pipes Vll. Cut Sheets are required on all staking and a copy can be received from the survey superintendent Optional: Actual stakes shall consist of a 60D nail or hub set with a whisker B. Centerline Staking- Curves I. If arc length is greater than 100', POC (Point of Curvature) offset stakes should be set at a 25' interval II. Same grading guidelines as above III. Staking of radius points of greater than 100' may be omitted C. Water Meter Boxes 1. 7.0' perpendicular offset is preferred to the center of the box Il. Center of the meter should be 3.0' behind the proposed face of curb III. Meter should be staked a minimum of 4.5' away from the edge of a driveway IV. Grade is to top of box and should be +0.06' higher than the proposed top of curb unless shown otherwise on the plans D. Fire Hydrants 1. Center of Hydrant should be 3.0' behind proposed face of curb II. Survey offset stake should be 7.0' from the center and perpendicular to the curb line or water main III. Grade of hydrants should be +0.30 higher than the adjacent top of curb E. Water Valves & Vaults I. Offsets should be perpendicular to the proposed water main II. RIM grades should only be provided if on plans Example Water Stakes C:\Users\delaju\Documents\Contract Books\HMAC SURFACE OVERLAY 2019-4\Div 01 General Requirements\01 71 23.16.01_Attachment A_Survey Staking Standards.docx HMAC SURFACE OVERLAY 2019-4 Page 8 of 22 City Project No. 102098 M ; % L »24§ iR\G_ 22$ §SSE oe\§ « o/ f w/ \ U2 _ E.mk Sae+,\! $( \ LLJ IL _ Ld _EL ~ j [ \ §[ \ �W § CAm ~ /j § / tj \ IL \ / z m & - )E \ »� o C w/[��A=+10)11 \ e / �*± k ' a, 0 §(k� 3w 6 a£/z % u» VE San|t r Sewer Staking CKmer d@%GDo mmmt C n «tom oal Ua SURFACE OVERLAY 719- Ev01Gene»IR gaemmt o1 712I16 $1-k@mme% A- kgpSt§m a&Aa&d«x HMA SURFACE OVERLAY S& Page 9 of 22 City Project No. 102098 A. Centerline Staking — Straight Line Tangents I. Inverts shall be field verified and compared against the plans before staking il. Painted green lath/stake WITH hub and tack or marker dot, no flagging required Ill. I offset stake between manholes if manholes are 400' or less apart IV. Offset stakes should be located at even distances and perpendicular to the centerline V. Grades will be per plan and the date of the plans used should be noted VI. If multiple lines are at one manhole, each line shall have a cut/fill and direction noted VII. Stakes at every grade break Vill. Cut sheets are required on all staking Optional. Actual stakes shall consist of a 60D Trail or hub set with a whisker B. Centerline Staking — Curves 1. If arc length is greater than 100', POC (Point of Curvature) offset stakes should be set at a 25' interval II. Staking of radius points of greater than 100' may be omitted C. Sanitary Sewer Manholes I. 2 offset stakes per manhole for the purpose of providing alignment to the contractor I!. Flowline grade should be on the lath/stake for each flowline and direction noted Ill. RIM grade should only be on the stake when provided in the plans C:\Users\delaju\Documents\Contract Books\HMAC SURFACE OVERLAY 2019-4\Div 01 General Requirements\01 7123.16.01_Attachment A_Survey Staking Standards.docx HMAC SURFACE OVERLAY 2019-4 Page 10 of 22 City Project No. 102098 Example Sanitary Sewer Stakes QS— ~ dfi Z m0� �` � lul 11LL Il w�x � afC fC C�4 - W NCD W 4 i C� 0 ( "0 I I W M C-0m � 6 Ld Ld J� to w -a. Z © a a tZ 1.2' 0/S SS STA-0+G0 C-OU l�� C-- C-aa l � J kL F- ter Vj W t J m Cwm F.. m .0; O G Q fi Y F Q F: LJ F pp 4 YOU" 7 Z~ 5 N W d EL z O i K C:\Users\delaju\Documents\Contract Books\HMAC SURFACE OVERLAY 2019-4\Div 01 General Requirements\01 7123.16.01WAttachment A_Survey Staking Standards.docx HMAC SURFACE OVERLAY 2019-4 Page 11 of 22 City Project No. 102098 VII. Storm Sewer & Inlet Staking A. Centerline Staking — Straight Line Tangents 1. 1 offset stake every 200' on even stations If. Grades are to flowline of pipe unless otherwise shown on plans Ill. Stakes at every grade break IV. Cut sheets are required on all staking Optional: Actual stakes shall consist of a 60D nail or hub set with a whisker B. Centerline Staking — Curves I. If arc length is greater than 100', POC (Point of Curvature) offset stakes should be set at a 25' interval If. Staking of radius points of greater than 100' may be omitted C. Storm Drain Inlets I. Staking distances should be measured from end of wing If. Standard 10' Inlet = 16.00' total length Ill. Recessed 10' Inlet = 20.00' total length IV. Standard double 10' inlet = 26.67' total length V. Recessed double 10' inlet = 30.67' total length D. Storm Drain Manholes 1. 2 offset stakes per manhole for the purpose of providing alignment to the contractor If. Flowline grade should be on the lath/stake for each flowline and direction noted Ill. RIM grade should only be on the stake when provided in the plans C:\Users\delaju\Documents\Contract Books\HMAC SURFACE OVERLAY 2019-4\Div 01 General Requirements\01 7123.16.01_Attachment A_Survey Staking Standards.docx HMAC SURFACE OVERLAY 2019-4 Page 12 of 22 City Project No. 102098 Example Storm Inlet Stakes FRONT (SIDE FACING ) i� n m d r -mf BACK BACK �30E FAaNC FLEM) I {5E2E FANG FF.QW_IDENTIFIES PANT # A IDENTIFIES i�i-IIC�-I END OF THE WNG PUNT 0 BEING STAKED HUFJ ELEVATIFH 11 INLET BThTICN HUB ELEVAMON „ I t (F NOTED ON PLAUS) TT IGEI-MMES CRAGS TO TOP OF CURB 6 I � ]DENT]F]ES GRADE rO FLOYA.lNE 4 rg, SIANUAND TU" - 1N- RECESSED ]D' m 20l FRET (SIDE FACING) ?O U= xh 2f ID0d1IFlES "MICH E14D OF THE 'AINC BONG STAKED tl 7 I� i €I -P i STANDARD DOUBLE 10' — 25.67' , ._.. RECESS — ED 11U BLE 10` — 21 _BY HUB @1TH TACK , --------------------------°"� I I 9AG1t OF INLET H w 's bI k1AR€141E - of HACK OF WHII — — — — — -- FL{PALINE E GE OF PAWEVIENT FACE OF INLET EDGE OF FAWENT FACE CF INLET WE OF PAVEMENT BAL;K OF CURB EWE CP PAVFv dENr— — C:\Users\delaju`,Documen ts\Contract Books\HMAC SURFACE OVERLAY 2019-4\Div 01 General Requirements\01 7123.16.01_Attachment A_Survey Staking Standards.docx HMAC SURFACE OVERLAY 2019-4 Page 13 of 22 City Project No. 102098 Hill. Curb and Gutter Staking A. Centerline Staking —Straight Line Tangents V. 1 offset stake every 50' on even stations VI. Grades are to top of curb unless otherwise shown on plans VI I. Stakes at every grade break Vill. Cut sheets are required on all staking Optional: Actual stakes shall consist of a 60D nail or hub set with a whisker B. Centerline Staking —Curves III. If arc length is greater than 100', POC (Point of Curvature) offset stakes should be set at a 25' interval IV. Staking of radius points of greater than 100' may be omitted C:\Users\delaju\Documents\Contract Books\HMAC SURFACE OVERLAY 2019-4\Div 01 General Requirements\01 7123.1G.01_Attachment A_Survey Staking Standards.docx HMAC SURFACE OVERLAY 2019-4 Page 14 of 22 City Project No. 102098 Example Curb & Gutter Stakes FRONT (SIDE FACING CL) Q FRONT 1DENnFlES ETaf] FRONT u7 (SM FAMNC tj PONT OF Tyr IGMT 7W FRONT t} 51QE FACING IOENTIFlES START PG P{7FJT OF CSfR1+ATUNE� p % SIDE PAGING �} {! !' f Ih I wT Ear i�ffj O PT 1 {-. BALK C� (SIDE FACING R.OX) 135EiJ3lFlE3 4FF6ET 13 T6 N.n",� '�F cuNe at r/n FC:FT FRG€ OF MRS T%C p q PUNT # —A F I I F III i I+ r j - IUfNnHES C4 ADE Fs TO Mf' tlP CURD III I Hula ELEvn-flON ? Q . NO GN OE n1l RADIUS PpIfJT5, c- 4 I �- TOP OF CURS BALD OF CURB I�=� �C1 FACF OF CURB 1`I-0%s LINE t EDGE OF PAVEMENT Example Curb & Gutter Stakes at Intersection C:\Users\delaju\Documents\Contract Books\HMAC SURFACE OVERLAY 2019-4\Div 01 General Requirements�01 71 23.16.01_Attachment A_Survey Staking Standards.docx HMAC SURFACE OVERLAY 2019-4 Page 15 of 22 City Project No. 102098 P WW�� LL-� w m w� nw SI G �01- - �tt� h � N p +r � �a4 n � Oi LU LI w r � ry QI 30IFlrF.LS10 'ht�Y� QS � i I Hang do HDve s N�Y h� uw0f swm — 3�m d _. O F m 0M �QN N 0 eHnD -40 move g 0 I 33NH1510 'I:VYS ,tl5 I� o w T J i w 0 � ,01 V_ w z w arm u Z3 N z �n v s fw C:\Users\delaju\Documents\Contract Books\HMAC SURFACE OVERLAY 2019-4\Div 01 General Requirements\01 71 23.16.01 Attachment A_Survey Staking Standards.docx HMAC SURFACE OVERLAY 2019-4 Page 16 of 22 City Project No. 102098 IX. Cut Sheets A. Date of field work B. Staking Method (GPS, total station) C. Project Name D. City Project Number (Example: C01234) E. Location (Address, cross streets, GPS coordinate) F. Survey company name G. Crew chief name H. A blank template can be obtained from the survey superintendent (see item I above) Standard City Cut Sheet Date: ❑ TOTAL Staking Method: ❑ GPS STATION LOCATION: CO NS U LTA NT/CO NTRACTO R SURVEY CREW INITIALS City Project Number: Project Name: ❑ OTHER ALL GRADES ARE TO FLOWLINE OR TOP OF CURB UNLESS OTHERWISE NOTED_ PT # STATION OFFSET -LT/+RT DESCRIPTION PROP. GRADE STAKED ELEV. CUT + FILL C:\Users\delaju\Documents\Contract Books\HMAC SURFACE OVERLAY 2019-4\Div 01 General Requirements\01 7123.16.01_Attachment A_Survey Staking Standards.docx HMAC SURFACE OVERLAY 2019-4 Page 17 of 22 City Project No. 102098 X. As -built Survey A. Definition and Purpose The purpose of an as -built survey is to verify the asset was installed in the proper location and grade. Furthermore, the information gathered will be used to supplement the City's GIS data and must be in the proper format when submitted. See section IV. As -built survey should include the following (additional items may be requested): Manholes Top of pipe elevations every 250 feet Horizontal and vertical points of inflection, curvature, etc. (All Fittings) Cathodic protection test stations Sampling stations Meter boxes/vaults (All sizes) Fire lines Fire hydrants Gate valves (rim and top of nut) Plugs, stub -outs, dead-end lines Air Release valves (Manhole rim and vent pipe) Blow off valves (Manhole rim and valve lid) Pressure plane valves Cleaning wyes Clean outs Casing pipe (each end) Inverts of pipes Turbo Meters C:\Users\delaju\Documents\Contract Books\HMAC SURFACE OVERLAY 2019-4\Div 01 General Requirements\01 71 23.16.01_Attachment A_Survey Staking Standards.docx HMAC SURFACE OVERLAY 2019-4 Page 18 of 22 City Project No. 102098 B. Example Deliverable A hand written red line by the field surveyor is acceptable in most cases. This should be a copy of the plans with the point number noted by each asset. If the asset is missing, then the surveyor should write "NOT FOUND" to notify the City. C:\Users\delaju\Documents\Contract Books\HMAC SURFACE OVERLAY 2019-4\Div 01 General Requirements\01 7123.16.01_Attachment A_Survey Staking Standards.docx HMAC SURFACE OVERLAY 2019-4 Page 19 of 22 City Project No. 102098 se sa OybVls 3Nl1 N�lf/W __ E���5,`� Irl .• � .I�F f A x Oii 4 C:\Users\delaju\Documents\Contract Books\HMAC SURFACE OVERLAY 2019-4\Div 01 General Requirements\01 7123.16.01_Attachment A_Survey Staking Standards.docx HMAC SURFACE OVERLAY 2019-4 Page 20 of 22 City Project No. 102098 SrAQ " IXWL fY.CJAYC[W mw SSA4rdrm -- rP IM fp=D txv VA&OX - 0ft (PLWD A'O )gEld}T 4 &AWAG' EXIST. x 0Vy pIPOP.-iPiV1LrFR EVE VWYE & HEM1,10eIN TEE ten. MLETJW !-I2'Sti11D VZEVE 3fAO -!P'WL r p®iYlth pig �xGQF YHYE � r r2 ArY �itlU Sl i d 66i9 � 8IWL M4WOS5d94O j A' Pi?'WV31L'§ INSTik11. � E.yplr92 E:.�"z337'JT94 � w � F5"?�fti7,7JTtl IL i6m-, AFL W LEAP LOT I pp,q A01CkEYan fm wxwt mHt "{ u tlUf 8 a ELEV 7BY �'r 1df 1 i If rr AFJ.Y)/E` £YrST. -xw IrWAMP 50 Tom •E13142 1 f f y + i PllWOSE'D Exxir YAEYE SEE SNE'E t 04SYERr. DWI) �_ s ep+. r3wximr�xau a$„ N6947W74994 '_ w srAW= - 0WL IRM AR) STAO'57M - rE'W SYAowm - to d rAw rrsrrw #MAU* -f-CALSOW SIFEYE Fli"ia�'YELiT.9CVL} I-&45'YEAr,4EPO Ei L. OF lOWATW7 PIPE N *mil "A S99i K4W47O52-%-'3 Ovywr TO EXIST, rrwWF.R E 328f3 k pemj*Am E`:304R73r P, J — C:\Users\delaju\Documents\Contract Books\HMAC SURFACE OVERLAY 2019-4\Div 01 General Requirements\01 7123.16.01_AttachrnentA Survey Staking Standards.docx HMAC SURFACE OVERLAY 2019-4 Page 21 of 22 City Project No. 102098 C;\ YGWc•R p3 ':c�'swµKuvsy Y n'dy y ��a� �'Y�i p � �ifa• � Sd w nN 193AJNd Ada 'J-NSgm IM ,L7iX J 11,M3Nld3N Y3.A'35 Nvil L's Mir L 7 "7 nts\01 7123.16.01_Attachment A_Survey Staking Standards.docx HMAC SURFACE OVERLAY 2019-4 Page 22 of 22 City Project No. 102098 C: ujrements\01 71 23.16.01 Attachment A Survey Staking Standards.docx HMAC SURFACE OVERLAY 2019-4 Page 23 of 23 City Project No. 102098 Obviously the .csv or .txt file cannot be signed/sealed by a surveyor in the format requested. This is just an example and all this information should be noted when delivered to the City so it is clear to what coordinate system the data is in. POINT NO, NORTHING EA5TING ELEV. DESCRIPTION 1 6946257,189 2296079,165 726.09 SSMH RIM ~� C-C✓ �`- 2 6946260.893 2296062.141 725.668 GV RIM 3 6946307.399 2296038.306 726.95 GV RIM 1)1.-+ j 4 6946220.582 2296011.025 723.358 SSMH RIM 5 6946195.23 2296015.116 722.123 GV RIM 6 6946190.529 2296022.721 722.325 FH -A 7 6946136.012 2295992.115 719.448 WM RIM 8 6946002.267 2295919.133 713.331 WM RIM 9 6946003.056 2295933,419 713.652 CO RIM 10 69459S4.677 2295880.52 711.662 SSMH RIM 11 6945986,473 2295869.892 710.046 WM RIM 12 6945895.077 2295860.962 707.72 WM RIM 13 6945896.591 2295862.188 703.205 WM RIM 14 6945934,286 2295841.925 709.467 WM RIM 15 6945936.727 2295830.441 710.084 CO RIM r t 3 } ; a s 16 6945835.678 2295799.707 707.774 SSMH RIM # 17 6945817.488 2295827.011 708.392 SSMH RIM 18 6945759.776 2295758.643 711.218 SSMH RIM 19 6945769.563 2295778.424 710.086 GV RIM 20 6945743,318 2295788.392 710.631 GV RIM 21 6945723.219 2295754.394 712.849 GV RIM r 22 6945682.21 2295744,22 116.686 WM RIM _ 23 6945621,902 2295669.471 723.76 WM RIM 24 6945643.407 2295736,03 719.737 CO RIM fk(_I 2Z +`? 25 6945571,059 2295655.195 727.514 SSMH RIM 26 5945539,498 2295667.803 729.123 WM RIM 27 6945519,834 2295619.49 732.689 WM RIM 28 6945417.879 2295580,27 740.521 WM RIM 29 6945456.557 2295643.145 736.451 CO RIM ; 30 6945387.356 2295597.101 740.756 GV RIM 31 6945370,688 2295606.793 740.976 GV RIM 32 6945393.53 2295610.559 740,408 FH 33 6945321.228 2295551,105 746,34 WM RIM 34 6945319.365 2295539,728 746.777 CO RIM 35 6945242.289 229S570.715 748.454 WM RIM 36 37 6945233.624 6945206.483 2295544,626 2295529.305 749.59 SSMFI RIM 751.058 WM RIM L 38 6945142.015 2295557.666 750,853 WM RIM 39 40 6945113.445 6945049.02 2295520.335 2295527.345 751.871 WM RIM 752.257 SSMH RIM 41 6945041=4 2295552,675 751.79 WM RIM . e 42 6945038.878 2295552.147 751.88 WM RIM 43 6945006.397 2295518.135 752,615 WM RIMSt 44 6944944.782 2295520.635 752.801 WM RIM y� 45 6944943.432 2295556.479 752.156WMRIM 46 6944860.416 2295534.397 752.986 SSMH RIM Ap C:\Users\delaju\Documents\Contract Books\HMAC SURFACE OVERLAY 2019-4\Div 01 General Requirements\01 71 23.16.01_Attachment A_Survey Staking Standards.docx HMAC SURFACE OVERLAY 2019-4 Page 24 of 24 City Project No. 102098 C. Other preferred as -built deliverable Some vendors have indicated that it is easier to deliver this information in a different format. Below is an example spreadsheet that is also acceptable and can be obtained by request from the survey superintendent. C:\Users\deiaju\Documents\Contract Books\H MAC SURFACE OVERLAY 2019-4\Div 01 General Requirements\01 7123.16.01_Attachment A_Survey Staking Standards.docx HMAC SURFACE OVERLAY 2019-4 Page 25 of 25 City Project No. 102098 — — — — -- — -- --- ------ ----- ------ --- ---------- $ iR m n i - _ Y Z ik _ I L' _ Q 5= o 3 2 � llP III ql hnh ' al t'q $ N $ y 51 ,^i g C:\Users\delaju\Documents\Contract Books\HMAC SURFACE OVERLAY 2019-4\Div 01 General Requirements\01 71 23.16.01_Attachment A Survey Staking Standards.docx HMAC SURFACE OVERLAY 2019-4 Page 26 of 26 City Project No. 102098 01 74 23 - 1 CLEANING Page 1 of 4 1 SECTION 0174 23 2 CLEANING 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Intermediate and final cleaning for Work not including special cleaning of closed 7 systems specified elsewhere 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include, but are not necessarily limited to: 11 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 12 2. Division 1 — General Requirements 13 3. ,Section 32 92 13 — Hydro Mulching, Seeding and Sodding 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Work associated with this Item is considered subsidiary to the various Items bid. 17 No separate payment will be allowed for this Item. 18 1.3 REFERENCES [NOT USED] 19 1.4 ADMINISTRATIVE REQUIREMENTS 20 A. Scheduling 21 1. Schedule cleaning operations so that dust and other contaminants disturbed by 22 cleaning process will not fall on newly painted surfaces. 23 2. Schedule final cleaning upon completion of Work and immediately prior to final 24 inspection. 25 1.5 SUBMITTALS [NOT USED] 26 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 1.9 QUALITY ASSURANCE [NOT USED1 30 1.10 STORAGE, AND HANDLING 31 A. Storage and Handling Requirements 32 1. Store cleaning products and cleaning wastes in containers specifically designed for 33 those materials. CYrY OF FORT WORTH HMAC SURFACE OVERLAY 2019-0 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July 1, 2011 017423-2 CLEANING Page 2 of 4 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2 - PRODUCTS 4 2.1 OWNER -FURNISHED [oR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 5 2.2 MATERIALS 6 A. Cleaning Agents 7 1. Compatible with surface being cleaned 8 2. New and uncontaminated 9 3. For manufactured surfaces 10 a. Material recommended by manufacturer 11 2.3 ACCESSORIES [NOT USED] 12 2.4 SOURCE QUALITY CONTROL [NOT USED] 13 PART 3 - EXECUTION 14 3.1 INSTALLERS [NOT USED] 15 3.2 EXAMINATION [NOT USED] 16 3.3 PREPARATION [NOT USED] 17 3.4 APPLICATION [NOT USED] 18 3.5 REPAIR / RESTORATION [NOT USED] 19 3.6 RE -INSTALLATION [NOT USED] 20 3.7 FIELD [oR] SITE QUALITY CONTROL [NOT USED] 21 3.8 SYSTEM STARTUP [NOT USED] 22 3.9 ADJUSTING [NOT USED] 23 3.10 CLEANING 24 A. General 25 1. Prevent accumulation of wastes that create hazardous conditions. 26 2. Conduct cleaning and disposal operations to comply with laws and safety orders of 27 governing authorities. 28 3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in 29 storm or sanitary drains or sewers. 30 4. Dispose of degradable debris at an approved solid waste disposal site. 31 5. Dispose of nondegradable debris at an approved solid waste disposal site or in an 32 alternate manner approved by City and regulatory agencies. CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July 1, 2011 017423-3 CLEANING Page 3 of 4 I 6. Handle materials in a controlled manner with as few handlings as possible. 2 7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with 3 this project. 4 8. Remove all signs of temporary construction and activities incidental to construction 5 of required permanent Work. 6 9. If project is not cleaned to the satisfaction of the City, the City reserves the right to 7 have the cleaning completed at the expense of the Contractor. 8 10, Do not burn on -site. 9 B. Intermediate Cleaning during Construction IO 1. Keep Work areas clean so as not to hinder health, safety or convenience of I 1 personnel in existing facility operations. 12 2. At maximum weekly intervals, dispose of waste materials, debris and rubbish. 13 3. Confine construction debris daily in strategically located container(s): 14 a. Cover to prevent blowing by wind 15 b. Store debris away from construction or operational activities 16 c. Haul from site at a minimum of once per week 17 4. Vacuum clean interior areas when ready to receive finish painting. 18 a. Continue vacuum cleaning on an as -needed basis, until Final Acceptance. 19 5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which 20 may become airborne or transported by flowing water during the storm. 21 C. Interior Final Cleaning 22 1. Remove grease, mastic, adhesives, dust, dirt, stains, fingerprints, labels and other 23 foreign materials from sight -exposed surfaces. 24 2. Wipe all lighting fixture reflectors, tenses, lamps and trims clean. 25 3. Wash and shine glazing and mirrors. 26 4. Polish glossy surfaces to a clear shine. 27 5. Ventilating systems 28 a. Clean permanent filters and replace disposable filters if units were operated 29 during construction. 30 b. Clean ducts, blowers and coils if units were operated without filters during 31 construction. 32 6. Replace all burned out lamps. 33 7. Broom clean process area floors. 34 8. Mop office and control room floors. 35 D. Exterior (Site or Right of Way) Final Cleaning 36 1. Remove trash and debris containers from site. 37 a. Re -seed areas disturbed by location of trash and debris containers in accordance 38 with Section 32 92 13. 39 2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object 40 that may hinder or disrupt the flow of traffic along the roadway. 41 3. Clean any interior areas including, but not limited to, vaults, manholes, structures, 42 junction boxes and inlets. CITY OF PORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July I, 2011 1 2 3 4 5 6 7 10 017423-4 CLEANING Page 4 of 4 4. If no longer required for maintenance of erosion facilities, and upon approval by City, remove erosion control from site. 5. Clean signs, lights, signals, etc. 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION f NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION IRevision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH STANDARD CONSTRUCTfON SPECIFICATION DOCUMENTS Revised July 1, 2011 HMAC SURFACE OVERLAY 2019-6 City Project No. 102098 1 2 3 PART1- GENERAL 4 1.1 SUMMARY SECTION 0177 19 CLOSEOUT REQUIREMENTS 017719-1 CLOSEOUT REQUIREMENTS Page 1 of 3 5 A. Section Includes: 6 1. The procedure for closing out a contract 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1 -- General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various Items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS 18 A. Guarantees, Bonds and Affidavits 19 1. No application for final payment will be accepted until all guarantees, bonds, 20 certificates, licenses and affidavits required for Work or equipment as specified are 21 satisfactorily filed with the City. 22 B. Release of Liens or Claims 23 1. No application for final payment will be accepted until satisfactory evidence of 24 release of liens has been submitted to the City. 25 1.5 SUBMITTALS 26 A. Submit all required documentation to City's Project Representative. CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July 1, 2011 017719-2 CLOSEOUT REQUIREMENTS Page 2 of 3 1 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 2 1.7 CLOSEOUT SUBMITTALS [NOT USED] 3 PART 2 - PRODUCTS [NOT USED] 4 PART 3 - EXECUTION 5 3.1 INSTALLERS [NOT USED] 6 3.2 EXAMINATION [NOT USED] 7 3.3 PREPARATION [NOT USED] 8 3.4 CLOSEOUT PROCEDURE 9 A. Prior to requesting Final Inspection, submit: 10 1. Project Record Documents in accordance with Section 0178 39 11 2. Operation and Maintenance Data, if required, in accordance with Section O1 78 23 12 B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section 13 01 7423, 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 C. Final Inspection 1. After final cleaning, provide notice to the City Project Representative that the Work is completed. a. The City will make an initial Final Inspection with the Contractor present. b. Upon completion of this inspection, the City will notify the Contractor, in writing within 10 business days, of any particulars in which this inspection reveals that the Work is defective or incomplete. 2. Upon receiving written notice from the City, immediately undertake the Work required to remedy deficiencies and complete the Work to the satisfaction of the City. 3. Upon completion of Work associated with the items listed in the City's written notice, inform the City, that the required Work has been completed. Upon receipt of this notice, the City, in the presence of the Contractor, will make a subsequent Final Inspection of the project. 4. Provide all special accessories required to place each item of equipment in full operation. These special accessory items include, but are not limited to: a. Specified ,spare parts b. Adequate oil and grease as required for the first lubrication of the equipment c. Initial fill up of all chemical tanks and fuel tanks d. Light bulbs e. Fuses f. Vault keys g. Handwheels h. Other expendable items as required for initial start-up and operation of all equipment D. Notice of Project Completion CITY OF FORT WORTH IIMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No, 102098 Revised July 1, 2011 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 017719-3 CLOSEOUT REQUIREMENTS Page 3 of 3 1. Once the City Project Representative finds the Work subsequent to Final Inspection to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet). E. Supporting Documentation 1. Coordinate with the City Project Representative to complete the following additional forms: a. Final Payment Request b. Statement of Contract Time c. Affidavit of Payment and Release of Liens d. Consent of Surety to Final Payment e. Pipe Report (if required) f. Contractor's Evaluation of City g. Performance Evaluation of Contractor F. Letter of Final Acceptance 1. Upon review and acceptance of Notice of Project Completion and Supporting Documentation, in accordance with General Conditions, City will issue Letter of Final Acceptance and release the Final Payment Request for payment. 33 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [oR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 HMAC SURFACE OVERLAY 2019-6 City Project No. 102098 1 2 3 PART1- GENERAL 4 1.1 SUMMARY 01 78 23 - 1 OPERATION AND MAINTENANCE DATA Page 1 of 5 SECTION 0178 23 OPERATION AND MAINTENANCE DATA 5 A. Section Includes: 6 1. Product data and related information appropriate for City's maintenance and 7 operation of products furnished under Contract 8 2. Such products may include, but are not limited to: 9 a. Traffic Controllers 10 b. Irrigation Controllers (to be operated by the City) 11 c. Butterfly Valves 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include, but are not necessarily limited to: 15 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 16 2. Division 1 — General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various Items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS 23 A. Schedule 24 1. Submit manuals in final form to the City within 30 calendar days of product 25 shipment to the project site. 26 1.5 SUBMITTALS 27 A. Submittals shall be in accordance with Section 0133 00 . All submittals shall be 28 approved by the City prior to delivery. 29 1.6 INFORMATIONAL SUBMITTALS 30 A. Submittal Form 31 1. Prepare data in form of an instructional manual for use by City personnel. 32 2. Format 33 a. Size: 8'/z inches x 11 inches 34 b. Paper 35 1) 40 pound minimum, white, for typed pages 36 2) Holes reinforced with plastic, cloth or metal 37 c. Text: Manufacturer's printed data, or neatly typewritten CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No, 102098 Revised December 20, 2012 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 017823-2 OPERATION AND MAINTENANCE DATA Pagc 2 of 5 d. Drawings 1) Provide reinforced punched binder tab, bind in with text 2) Reduce larger drawings and fold to size of text pages. e. Provide fly -leaf for each separate product, or each piece of operating equipment. 1) Provide typed description of product, and major component parts of equipment. 2) Provide indexed tabs. f. Cover 1) Identify each volume with typed or printed title "OPERATING AND MAINTENANCE INSTRUCTIONS". 2) List: a) Title of Project b) Identity of separate structure as applicable c) Identity of general subject matter covered in the manual 3. Binders a. Commercial quality 3-ring binders with durable and cleanable plastic covers b. When multiple binders are used, correlate the data into related consistent groupings. 4. If available, provide an electronic form of the O&M Manual. B. Manual Content 1. Neatly typewritten table of contents for each volume, arranged in systematic order a. Contractor, name of responsible principal, address and telephone number b. A list of each product required to be included, indexed to content of the volume c. List, with each product: 1) The name, address and telephone number of the subcontractor or installer 2) A list of each product required to be included, indexed to content of the volume 3) Identify area of responsibility of each 4) Local source of supply for parts and replacement d. Identify each product by product name and other identifying symbols as set forth in Contract Documents. 2. Product Data a. Include only those sheets which are pertinent to the specific product. b. Annotate each sheet to: 1) Clearly identify specific product or part installed 2) Clearly identify data applicable to installation 3) Delete references to inapplicable information 3. Drawings a. Supplement product data with drawings as necessary to clearly illustrate: 1) Relations of component parts of equipment and systems 2) Control and flow diagrams b. Coordinate drawings with information in Project Record Documents to assure correct illustration of completed installation. c. Do not use Project Record Drawings as maintenance drawings. 4. Written text, as required to supplement product data for the particular installation: a. Organize in consistent format under separate headings for different procedures. b. Provide logical sequence of instructions of each procedure. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 HMAC SURFACE OVERLAY 2019-6 City Project No. 102098 017823-3 OPERATION AND MAINTENANCE DATA Page 3 of 5 1 S. Copy of each warranty, bond and service contract issued 2 a. Provide information sheet for City personnel giving: 3 1) Proper procedures in event of failure 4 2) Instances which might affect validity of warranties or bonds 5 C. Manual for Materials and Finishes 6 1. Submit 5 copies of complete manual in final form. 7 2. Content, for architectural products, applied materials and finishes: 8 a. Manufacturer's data, giving full information on products 9 1) Catalog number, size, composition 10 2) Color and texture designations 11 3) Information required for reordering special manufactured products 12 b. Instructions for care and maintenance 13 1) Manufacturer's recommendation for types of cleaning agents and methods 14 2) Cautions against cleaning agents and methods which are detrimental to 15 product 16 3) Recommended schedule for cleaning and maintenance 17 3. Content, for moisture protection and weather exposure products: 18 a. Manufacturer's data, giving frill information on products 19 1) Applicable standards 20 2) Chemical composition 21 3) Details of installation 22 b. Instructions for inspection, maintenance and repair 23 D. Manual for Equipment and Systems 24 1. Submit 5 copies of complete manual in final form. 25 2. Content, for each unit of equipment and system, as appropriate: 26 a. Description of unit and component parts 27 1) Function, normal operating characteristics and limiting conditions 28 2) Performance curves, engineering data and tests 29 3) Complete nomenclature and commercial number of replaceable parts 30 b. Operating procedures 31 1) Start-up, break-in, routine and normal operating instructions 32 2) Regulation, control, stopping, shut -down and emergency instructions 33 3) Summer and winter operating instructions 34 4) Special operating instructions 35 c. Maintenance procedures 36 1) Routine operations 37 2) Guide to "trouble shooting" 38 3) Disassembly, repair and reassembly 39 4) Alignment, adjusting and checking 40 d. Servicing and lubrication schedule 41 1) List of lubricants required 42 e. Manufacturer's printed operating and maintenance instructions 43 f. Description of sequence of operation by control manufacturer 44 1) Predicted life of parts subject to wear 45 2) Items recommended to be stocked as spare parts 46 g. As installed control diagrams by controls manufacturer 47 h. Each contractor's coordination drawings 48 1) As installed color coded piping diagrams CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised December 20, 2012 01 78 23 - 4 OPERATION AND MAINTENANCE DATA Page 4 of 5 1 i. Charts of valve tag numbers, with location and function of each valve 2 j. List of original manufacturer's spare parts, manufacturer's current prices, and 3 recommended quantities to be maintained in storage 4 k. Other data as required under pertinent Sections of Specifications 5 3. Content, for each electric and electronic system, as appropriate: 6 a. Description of system and component parts 7 1) Function, normal operating characteristics, and limiting conditions 8 2) Performance curves, engineering data and tests 9 3) Complete nomenclature and commercial number of replaceable parts 10 b. Circuit directories of panelboards 1 1 1) Electrical service 12 2) Controls 13 3) Communications 14 c. As installed color coded wiring diagrams 15 d. Operating procedures 16 1) Routine and normal operating instructions 17 2) Sequences required 18 3) Special operating instructions 19 e. Maintenance procedures 20 1) Routine operations 21 2) Guide to "trouble shooting" 22 3) Disassembly, repair and reassembly 23 4) Adjustment and checking 24 f. Manufacturer's printed operating and maintenance instructions 25 g. List of original manufacturer's spare parts, manufacturer's current prices, and 26 recommended quantities to be maintained in storage 27 h. Other data as required under pertinent Sections of Specifications 28 4. Prepare and include additional data when the need for such data becomes apparent 29 during instruction of City's personnel. 30 1.7 CLOSEOUT SUBMITTALS [NOT USED] 31 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 32 1.9 QUALITY ASSURANCE 33 A. Provide operation and maintenance data by personnel with the following criteria: 34 1. Trained and experienced in maintenance and operation of described products 35 2. Skilled as technical writer to the extent required to communicate essential data 36 3. Skilled as draftsman competent to prepare required drawings CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOC13MENTS City Project No. 102098 Revised December 20, 2012 017823-5 OPERATION AND MAINTENANCE DATA Page 5 of 5 1 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 2 1.11 FIELD [SITE] CONDITIONS [NOT USED] 3 1.12 WARRANTY [NOT USED] 4 PART 2 - PRODUCTS [NOT USED] 5 PART 3 - EXECUTION [NOT USED] 6 END OF SECTION 7 Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson 1.5.A.1 — title of section removed CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised December 20, 2012 1 2 3 PARTI- GENERAL 4 1.1 SUMMARY SECTION 0178 39 PROJECT RECORD DOCUMENTS 01 78 39 - 1 PROJECT RECORD DOCUMENTS Page 1 of 4 5 A. Section Includes: 6 1. Work associated with the documenting the project and recording changes to project 7 documents, including: 8 a. Record Drawings 9 b. Water Meter Service Reports 10 c. Sanitary Sewer Service Reports 11 d. Large Water Meter Reports 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include, but are not necessarily limited to: 15 1. Division 0 -- Bidding Requirements, Contract Forms and Conditions of the Contract 16 2. Division 1 — General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various Items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 23 1.5 SUBMITTALS 24 A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to 25 City's Project Representative. 26 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 1.9 QUALITY ASSURANCE 30 A. Accuracy of Records 31 1. Thoroughly coordinate changes within the Record Documents, making adequate 32 and proper entries on each page of Specifications and each sheet of Drawings and 33 other Documents where such entry is required to show the change properly. 34 2. Accuracy of records shall be such that future search for items shown in the Contract 35 Documents may rely reasonably on information obtained from the approved Project 36 Record Documents. CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July 1, 2011 017839-2 PROJECT RECORD DOCUMENTS Page 2 of 4 1 3. To facilitate accuracy of records, make entries within 24 hours after receipt of 2 information that the change has occurred. 3 4. Provide factual information regarding all aspects of the Work, both concealed and 4 visible, to enable future modification of the Work to proceed without lengthy and 5 expensive site measurement, investigation and examination. 6 1.10 STORAGE AND HANDLING 7 A. Storage and Handling Requirements 8 I . Maintain the job set of Record Documents completely protected from deterioration 9 and from loss and damage until completion of the Work and transfer of all recorded 10 data to the final Project Record Documents. 11 2. In the event of loss of recorded data, use means necessary to again secure the data 12 to the City's approval. 13 a. In such case, provide replacements to the standards originally required by the t4 Contract Documents. 15 1.11 FIELD [SITE] CONDITIONS [NOT USED] 16 1.12 WARRANTY [NOT USED] 17 PART 2 - PRODUCTS 18 2.1 OWNER -FURNISHED [oR] OWNER -SUPPLIED PRODUCTS [NOT USED] I9 2.2 RECORD DOCUMENTS 20 A. Job set 21 1. Promptly following receipt of the Notice to Proceed, secure from the City, at no 22 charge to the Contractor, 1 complete set of all Documents comprising the Contract. 23 B. Final Record Documents 24 1. At a time nearing the completion of the Work and prior to Final Inspection, provide 25 the City 1 complete set of all Final Record Drawings in the Contract. 26 2.3 ACCESSORIES [NOT USED] 27 2.4 SOURCE QUALITY CONTROL [NOT USED] 28 PART 3 - EXECUTION 29 3.1 INSTALLERS [NOT USED] 30 3.2 EXAMINATION [NOT USED] 31 3.3 PREPARATION [NOT USED] 32 3.4 MAINTENANCE DOCUMENTS 33 A. Maintenance of Job Set 34 1. Immediately upon receipt of the job set, identify each of the Documents with the 35 title, "RECORD DOCUMENTS - JOB SET". CITY OF FORT WORTH IIMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July 1, 2011 017839-3 PROJECT RECORD DOCUMENTS Page 3 of 4 1 2. Preservation 2 a. Considering the Contract completion time, the probable number of occasions 3 upon which the job set must be taken out for new entries and for examination, 4 and the conditions under which these activities will be performed, devise a 5 suitable method for protecting the job set. 6 b. Do not use the job set for any purpose except entry of new data and for review 7 by the City, until start of transfer of data to final Project Record Documents. 8 c. Maintain the job set at the site of work. 9 3. Coordination with Construction Survey 10 a. At a minimum, in accordance with the intervals set forth in Section 01 71 23, 11 clearly mark any deviations from Contract Documents associated with 12 installation of the infrastructure. 13 4. Making entries on Drawings 14 a. Record any deviations from Contract Documents. 15 b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the 16 change by graphic line and note as required. 17 c. Date all entries. 18 d. Call attention to the entry by a "cloud" drawn around the area or areas affected. 19 e. In the event of overlapping changes, use different colors for the overlapping 20 changes. 21 5. Conversion of schematic layouts 22 a. In some cases on the Drawings, arrangements of conduits, circuits, piping, 23 ducts, and similar items, are shown schematically and are not intended to 24 portray precise physical layout. 25 1) Final physical arrangement is determined by the Contractor, subject to the 26 City's approval. 27 2) However, design of future modifications of the facility may require 28 accurate information as to the final physical layout of items which are 29 shown only schematically on the Drawings. 30 b. Show on the job set of Record Drawings, by dimension accurate to within 1 31 inch, the centerline of each run of items. 32 1) Final physical arrangement is determined by the Contractor, subject to the 33 City's approval. 34 2) Show, by symbol or note, the vertical location of the Item ("under slab", "in 35 ceiling plenum", "exposed", and the like). 36 3) Make all identification sufficiently descriptive that it may be related 37 reliably to the Specifications. 38 c. The City may waive the requirements for conversion of schematic layouts 39 where, in the City's judgment, conversion serves no useful purpose. However, 40 do not rely upon waivers being issued except as specifically issued in writing 41 by the City. 42 B. Final Project Record Documents 43 1. Transfer of data to Drawings 44 a. Carefully transfer change data shown on the job set of Record Drawings to the 45 corresponding final documents, coordinating the changes as required. 46 b. Clearly indicate at each affected detail and other Drawing a full description of 47 changes made during construction, and the actual location of items. CTPY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July 1, 2041 017939-4 PROJECT RECORD DOCUMENTS Page 4 of 4 1 c. Call attention to each entry by drawing a "cloud" around the area or areas 2 affected. 3 d. Make changes neatly, consistently and with the proper media to assure 4 longevity and clear reproduction. 5 2. Transfer of data to other Documents 6 a. If the Documents, other than Drawings, have been kept clean during progress of 7 the Work, and if entries thereon have been orderly to the approval of the City, 8 the job set of those Documents, other than Drawings, will be accepted as final 9 Record Documents. 10 b. If any such Document is not so approved by the City, secure a new copy of that 11 Document from the City at the City's usual charge for reproduction and 12 handling, and carefully transfer the change data to the new copy to the approval 13 of the City. 14 3.5 REPAIR / RESTORATION [NOT USED] 15 3.6 RE -INSTALLATION [NOT USED] 16 3.7 FIELD [oR] SITE QUALITY CONTROL [NOT USED] 17 3.8 SYSTEM STARTUP [NOT USED] IS 3.9 ADJUSTING [NOT USED] 19 3.10 CLEANING [NOT USED] 20 3.11 CLOSEOUT ACTIVITIES [NOT USED] 21 3.12 PROTECTION [NOT USED] 22 3.13 MAINTENANCE [NOT USED] 23 3.14 ATTACHMENTS [NOT USED] 24 END OF SECTION 25 26 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July 1, 2011 0241 15 - 1 PAVING REMOVAL Page I of 6 SECTION 02 4115 PAVING REMOVAL PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Removing concrete paving, asphalt paving and brick paving 2. Removing concrete curb and gutter 3. Removing concrete valley gutter 4, Milling roadway paving 5. Pulverization of existing pavement 6. Disposal of removed materials B. Deviations from this Citv of Fort Worth Standard Specification E. -P1Jm-ovAL oi. E±,7C1- 'r'N(', A.9 PT-IAL T PAVI-:, f1:,N I' OV-C- R IV.X1S'rCL)NCPETE- PA VEM FNT (BASF.) 814ALL BE COIs gIDERED S UBS1.171ARY WORK TO r EM NO. 35 "Ri;M(iW CON CkkrE PA VHM EN I',` NO S EPA RATE PAY_ C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 -Bidding Requirements, Contract Forms, and Conditions of the Contract 2. Division 1 - General Requirements 3. Section 32 1133 - Cement Treated Base Courses 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Measurement a. Remove Concrete Paving: measure by the square yard from back-to-back of curbs. b. Remove Asphalt Paving: measure by the square yard between the lips of gutters. c. Remove Brick Paving: measure by the square yard. d. Remove Concrete Curb and Gutter: measure by the linear foot. e. Remove Concrete Valley Gutter: measure by the square yard f. Wedge Milling: measure by the square yard for varying thickness. g. Surface Milling: measure by the square yard for varying thickness. h. Butt Milling: measured by the linear foot. i. Pavement Pulverization: measure by the square yard. j. Remove Speed Cushion: measure by each. 2. Payment a. Remove Concrete Paving: full compensation for saw cutting, removal, hauling, disposal, tools, equipment, Iabor and incidentals needed to execute work. For utility projects, this Item shall be considered subsidiary to the trench and no other compensation will be allowed. b. Remove Asphalt Paving: full compensation for saw cutting, removal, hauling, disposal, tools, equipment, labor and incidentals needed to execute work. For utility projects, this Item shall be considered subsidiary to the trench andno other compensation will be allowed. CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised February 2, 2016 0241 15 - 2 PAVING REMOVAL Page 2 of 6 c. Remove Brick Paving: full compensation for saw cutting, removal, salvaging, cleaning, hauling, disposal, tools, equipment, labor and incidentals neededto execute work. For utility projects, this Item shall be considered subsidiary to the trench and no other compensation will be allowed. d. Remove Concrete Curb and Gutter: full compensation for saw cutting, removal, hauling, disposal, tools, equipment, labor and incidentals needed to execute work. For utility projects, this Item shall be considered subsidiary to thetrench and no other compensation will be allowed. e. Remove Concrete Valley Gutter: full compensation for saw cutting, removal, hauling, disposal, tools, equipment, labor and incidentals needed to execute work. f. Wedge Milling: full compensation for all milling, hauling milled material to salvage stockpile or disposal, tools, labor, equipment and incidentals necessary to execute the work. g. Surface Milling: full compensation for all milling, hauling milled material to salvage stockpile or disposal, tools, labor, equipment and incidentals necessary to execute the work. h. Butt Milling: full compensation for all milling, hauling milled material to salvage stockpile or disposal, tools, labor, equipment and incidentals necessary to execute the work. i. Pavement Pulverization: full compensation for all labor, material, equipment, tools and incidentals necessary to pulverize, remove and store the pulverized material, undercut the base, mixing, compaction, haul off, sweep, and dispose of the undercut material. j. Remove speed cushion: full compensation for removal, hauling, disposal, tools, equipment, Iabor, and incidentals needed to execute the work. For utility projects, this Item shall be considered subsidiary to the trench and no other compensation will be allowed. k. No payment for saw cutting of pavement or curbs and gutters will be made under this section. Include cost of such work in unit prices for items listed in bid form requiring saw cutting. 1. No payment will be made for work outside maximum payment limits indicated on plans, or for pavements or structures removed for CONTRACTOWs convenience. 1.3 REFERENCES A. ASTM International (ASTM): a. D698, Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort (12 400 ft-lbfM3 (600 kN-m/m3)) 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 110 DELIVERY, STORAGE, AND HANDLING [NOT USED] CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised February 2, 2016 0241 I5 - 3 PAVING REMOVAL Page 3 of 6 1.11 FIELD CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART2- PRODUCTS 2.1 OWNER -FURNISHED PRODUCTS [NOT USED] 2.2 EQUIPMENT [NOT USED] 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 EXAMINATION [NOT USED] 3.2 INSTALLERS [NOT USED] 3.3 PREPARATION A. General: 1. Mark paving removal limits for City approval prior to beginning removal. 2. Identify known utilities below grade - Stake and flag locations. 3.4 PAVEMENT REMOVAL A. General. 1. Exercise caution to minimize damage to underground utilities. 2. Minimize amount of earth removed. 3. Remove paving to neatly sawed joints. 4. Use care to prevent fracturing adjacent, existing pavement. B. Sawing 1. Sawing Equipment. a. Power -driven. b. Manufactured for the purpose of sawing pavement. c. In good operating condition. d. Shall not spall or fracture the pavement structure adjacent to the removal area. 2. Sawcut perpendicular to the surface to full pavement depth, parallel and perpendicular to existing joint. 3. Sawcut parallel to the original sawcut in square or rectangular fashion. 4. If a sawcut falls within 5 feet of an en existing dummy joint, construction joint, saw joint, cold joint, expansion joint, edge of paving or gutter lip, remove paving to that joint, edge or lip. 5. If a pavement edge of a cut is damaged subsequent to saw cutting, saw to anew, neat, straight line for the purpose of removing the damaged area. C. Remove Concrete Paving and Concrete Valley Gutter 1. Sawcut: Sce 3.4.13. 2. Remove concrete to the nearest expansion joint or vertical saw cut. CfTY OF FORT WORTH HMAC SLJERFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised February 2, 2016 0241 15-4 PAVING REMOVAL Page 4 of 6 D. Remove Concrete Curb and Gutter 1. Sawcut: See 3.4.13. 2. Minimum limits of removal: 30 inches in length. E. Remove Asphalt Paving 1. Sawcut: See 3.4.13. 2. Remove pavement without disturbing the base material. 3. When shown on the plans or as directed, stockpile materials designated as salvageable at designated sites. 4. Prepare stockpile area by removing vegetation and trash and by providing for proper drainage. F. Milling 1. GeneraI a. Mill surfaces to the depth shown in the plans or as directed. b. Do not damage or disfigure adjacent work or existing surface improvements. c. If milling exposes smooth underlying pavement surfaces, mill the smooth surface to make rough. d. Provide safe temporary transition where vehicles or pedestrians must pass over the milled edges. e. Remove excess material and clean milled surfaces. f. Stockpiling of planed material will not be permitted within the right ofway unless approved by the City. g. If the existing base is brick and cannot be milled, remove a 5 foot width ofthe existing brick base. See 3.3.G. for brick paving removal. 2. Milling Equipment a. Power operated milling machine capable of removing, in one pass ortwo passes, the necessary pavement thickness in a five-foot minimum width. b. Self-propelled with sufficient power, traction and stability to maintain accurate depth of cut and slope. c. Equipped with an integral loading and reclaiming meads to immediately remove material cut from the surface of the roadway and discharge the cuttings into a truck, all in one operation. d. Equipped with means to control dust created by the cutting action. c. Equipped with a manual system providing for uniformly varying the depth of cut while the machine is in motion making it possible to cut flush to all inlets, manholes, or other obstructions within the paved area. f. Variable Speed in order to leave the specified grid pattern. g. Equipped to minimize air pollution. 3. Wedge Milling and Surface Milling a. Wedge Mill existing asphalt, concrete or brick pavement from the lip of gutter at a depth of 2 inches and transitioning to match the existing pavement (0-inch cut) at a minimum width of 5 feet. b. Surface Mill existing asphalt pavement to the depth specified, c. Provide a milled surface that provides a uniform surface free from gouges, ridges, oil film, and other imperfections of workmanship with auniform textured appearance. CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised February 2, 2016 0241 15 - 5 PAVING RCMOVAL Page 5 of 6 d. In all situations where the existing H.M.A.C. surface contacts the curb face, the wedge milling includes the removal of the existing asphalt covering the gutter up to and along the face of curb. e. Perform wedge or surface milling operation in a continuous manner along both sides of the street or as directed. 4. Butt Joint Milling a. Mill butt joints into the existing surface, in association with the wedge mil ling operation. b. Butt joint will provide a full width transition section and a constant depth at the point where the new overlay is terminated. c. Typical locations for butt joints are at all beginning and ending points of streets where paving material is removed. Prior to the milling of the butt joints, consult with the City for proper location and limits of these joints. d. Butt Milled joints are required on both sides of all railroad tracks and concrete valley gutters, bridge decks and culverts and all other items whichtransverse the street and end the continuity of the asphalt surface. e. Make each butt joint 20 feet long and milled out across the full width ofthe street section to a tapered depth of 2 inch. f. Taper the milled area within the 20-feet to a depth from 0-inch to 2-inch at a line adjacent to the beginning and ending points or intermediate transverse items. g. Provide a temporary wedge of asphalt at all butt joints to provide a smooth ride over the bump. G. Remove Brick Paving 1. Remove masonry paving units to the limits specified in the plans or as directed by the City. 2. Salvage existing bricks for re -use, clean, palletize, and deliver to the City Stockpile yard at 3300 Yuma Street or as directed. H. Pavement Pulverization 1. Pulverization a. Pulverize the existing pavement to depth of 8 inches. See Section 32 1133. b. Temporarily remove and store the 8-inch deep pulverized material, then cutthe base 2 inches. c. Start 2-inch base cut at a depth of 8 inches from the existing pulverized surface. 2. Cement Application a. Use 3.5% Portland cement. b. See Section 32 1133. 3. Mixing: see Section 32 11 33. 4. Compaction: see Section 32 11 33. 5. Finishing: see Section 32 11 33. 6. Curing: see Section 32 1133. 7. if the existing pavement has a combination of 10 inches of H.M.A.C. and crushed stone/gravel: a. Undercut not required b. Pulverize 10 inches deep. c. Remove 2-inch the total pulverized amount. CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised February 2, 2046 024115-6 PAVING REMOVAL Page 6 of 6 I. Remove speed cushion 1. Scrape or sawcut speed cushion from existing pavement without damaging existing pavement. 3.5 REPAIR [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1.2.A —modified payment requirements on utility projects 2/2/2016 F. Griffin 1.2.A.2.b. —Removed duplicate last sentence. CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised February 2,2016 SECTION 32 1123 FLEXIBLE BASE COURSES PART1- GENERAL 1.1 SUMMARY 321123-2 FLEXIBLE BASE COURSES Page 2 of 7 A. Section Includes: 1. Foundation course for surface course or for other base course composed offlexible base constructed in one or more courses in conformity with the typical section. B. Deviations from this City of Fort Worth Standard Specification 1. FOR TOIS PROJECT FLEXIBLE EASE COI iRS£S SECTION 32 11 23 ST-Lk-LL HE MIJASURED BY CUBIC YA RJE) OF COMPLETED QUANTITY. 2.- EJ CLASSrFIED EXCAVATION ALIT] HAUL9gG REQUTRE TO PLACE FLE7GBLE BASE COURSE SHALL BE CONSIDERED SUBSIDIARY, N0 SEPARATE POLY. ` C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms, and Conditions of the Contract 2. Division 1 General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Measurement a. Measurement for this Item will be by the square yard of Flexible BascCourse for various: 1) Depths 2) Types 3) Gradations 2. Payment a. The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price bid per square yard of Flexible Base Course. 3. The price bid shall include: a. Preparation and correction of subgrade b. Furnishing of material c. Hauling d. Blading e. Sprinkling f. Compacting 1.3 REFERENCES A. Definitions 1. RAP Recycled Asphalt Pavement. B. Reference Standards 1. Reference standards cited in this specification refer to the current reference standard published at the time of the latest revision date logged at the end of this 321123-3 FLEXIBLE BASE COURSES Page 2 of 7 specification, unless a date is specifically cited. 2. ASTM International (ASTM): a. D698, Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort (12 400 ft-lbf/ft3 (600 kN-m/m3)) 3. Texas Department of Transportation (TXDOT): a. Tex -I 04-E, Determining Liquid Limits of Soils b. Tex-106-E, Calculating the Plasticity Cndex of Soils c. Tex- 107-E, Determining the Bar Linear Shrinkage of Soils d. Tex- 110-E, Particle Size Analysis of Soils e. Tex- 116-E, Ball Mill Method for Determining the Disintegration of Flexible Base Material f. Tex-117-E, Triaxial Compression for Disturbed Soils and Base Materials g. Tex-41 I -A, Soundness of Aggregate Using Sodium Sulfate orMagnesium Sulfate h. Tex-413-A, Determining Deleterious Material in Mineral Aggregate 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 ACTION SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] 2.1 OWNER -FURNISHED PRODUCTS [NOT USED] 2.2 MATERIALS A. General 1. Furnish uncontaminated materials of uniform quality that meet the requirements of the Drawings and specifications. 2. Obtain materials from approved sources. 3. Notify City of changes to material sources. 4. The City may sample and test project materials at any time before compaction throughout the duration of the project to assure specification compliance. B. Aggregate 1. Furnish aggregate of the type and grade shown on the Drawings and conformingto the requirements of Table 1. 2. Each source must meet Table 1 requirements for liquid limit, plastiCity index, and wet ball mill for the grade specified. 3. Do not use additives such as but not limited to lime, cement, or fly ash to modify aggregates to meet the requirements of Table I, unless shown on the Drawings. 321123-3 FLEXIBLE BASE COURSES Page 3 of 7 Table 1 Material Requirements Property Test Method Grade 1 Grade 2 Master gradation sieve size % retained Tex-110-E 2-1/2 in. — 0 1-314 in. 0 0-10 7/8 in. 10-35 — 318 in. 30-50 — No. 4 45-65 45-75 No. 40 _ 70-85 60-85 Liquid limit, % max.' Tex-104-E 35 40 PlastiCiLy index, max.' Tex-106-E 10 12 Wet ball mill, % max.2 Tex- 116-E 40 45 Wet ball mill, % max. increase passing the No. 40 sieve 20 20 Classification' Tex- 117-E LO 1.1-2.3 Min. compressive strength', psi lateral pressure 0 psi lateral pressure 15 psi 45 175 35 175 1. Determine plastic index in accordance with Tex-107-E (linear shrinkage) when liquid limit is unattainable as defined in Tex-104-R 2. When a soundness value is required by the Drawings, test material in accordance with Tex--411-A. 3. Meet both the classification and the minimum compressive strength, unless otherwise shown on the Drawings. 4. Material Tolerances a. The City may accept material if no more than 1 of the 5 most recent gradation tests has an individual sieve outside the specified limits of the gradation. b. When target grading is required by the Drawings, no single failing test may exceed the master grading by more than 5 percentage points on sieves No. 4 and larger or 3 percentage points on sieves smaller than No. 4. c. The City may accept material if no more than 1 of the 5 most recent plasticity index tests is outside the specified limit. No single failing test may exceedthe allowable limit by more than 2 points. 5. Material Types a. Do not use fillers or binders unless approved. b. Furnish the type specified on the Drawings in accordance with the following: 1) Type A a) Crushed stone produced and graded from oversize quarried aggregate that originates from a single, naturally occurring source. b) Do not use gravel or multiple sources. 2) Type B a) Only for use as base material for temporary pavement repairs. b) Do not exceed 20 percent RAP by weight unless shown on Drawings. 3) Type D a) Type A material or crushed concrete. b) Crushed concrete containing gravel will be considered Type D material. 32 11 23 - F4 FLEXIBLE BASE COURSES Page 4 of 7 a) The City may require separate dedicated stockpiles in order to verify compliance. b) Crushed concrete must meet the following requirements: (1) Table 1 for the grade specified. (2) Recycled materials must be free from reinforcing steel and other objectionable material and have at most 1.5 percent deleterious material when tested in accordance with TEX-413-A. C. Water 1. Furnish water free of industrial wastes and other objectionable matter. 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION A. General 1. Shape the subgrade or existing base to conform to the typical sections shown onthe Drawings or as directed. 2. When new base is required to be mixed with existing base: a. Deliver, place, and spread the new flexible base in the required amount. b. Manipulate and thoroughly mix the new base with existing material to provide a uniform mixture to the specified depth before shaping. B. Subgrade Compaction Proof roll the roadbed before pulverizing or scarifying in accordance withthe following: a. Proof Rolling 1) City Project Representative must be on -site during proof rolling operations. 2) Use equipment that will apply sufficient load to identify soft spots that rut or pump. a) Acceptable equipment includes fully loaded single -axle water truck with a 1500 gallon capacity. 3) Make at least 2 passes with the proof roller (down and back = 1 pass). 4) Offset each trip by at most 1 tire width. 5) If an unstable or non -uniform area is found, correct the area. b. Correct 1) Soft spots that rut or pump greater than 3/4 inch 2) Areas that are unstable or non -uniform 2. Installation of base material cannot proceed until compacted subgrade approved by the City. 3.4 INSTALLATION A. General 321123-5 FLEXIBLE BASE COURSES Page 5 of 7 I . Construct each layer uniformly, free of loose or segregated areas, and with the required density and moisture content. 2. Provide a smooth surface that conforms to the typical sections, lines, and grades shown on the Drawings or as directed. 3. Haul approved flexible base in clean, covered trucks. B. Equipment 1. General a. Provide machinery, tools, and equipment necessary for proper execution ofthe work. 2. Rollers a. The Contractor may use any type of roller to meet the production rates and quality requirements of the Contract unless otherwise shown on the Drawings or directed. b. When specific types of equipment are required, use equipment that meets the specified requirements. c. Alternate Equipment. 1) Instead of the specified equipment, the Contractor may, as approved, operate other compaction equipment that produces equivalent results. 2) Discontinue the use of the alternate equipment and furnish the specified equipment if the desired results are not achieved. d. City may require Contractor to substitute equipment if production rate and quality requirements of the Contract are not met. C. Placing 1. Spread and shape flexible base into a uniform layer by approved means the same day as delivered unless otherwise approved. 2. Place material such that it is mined to minimize segregation. 3. Construct Iayers to the thickness shown on the Drawings, while maintaining the shape of the course. 4. Where subbase or base course exceeds 6 inches in thickness, construct in 2 or more courses of equal thickness. 5. Minimum lift depth: 3 inches 6. Control dust by sprinkling. 7. Correct or replace segregated areas as directed. 8. Place successive base courses and finish courses using the sameconstruction methods required for the first course. D. Compaction 1. General a. Compact using density control unless otherwise shown on the drawings. b. Multiple lifts are permitted when shown on the Drawings or approved. c. Bring each layer to the moisture content directed. When necessary, sprinkle the material to the extent necessary to provide not less than the required density. d. Compact the full depth of the subbase or base to the extent necessary to remain firm and stable under construction equipment. 2. Rolling 321123-6 FLEXIBLE BASE COURSES Page 6 of 7 a. Begin roiling longitudinally at the sides and proceed towards the center, overlapping on successive trips by at least 1/2 the width of the rollerunit. b. On superelevated curves, begin rolling at the low side and progress towardthe high side. c. Offset alternate trips of the roller. d. Operate rollers at a speed between 2 and 6 mph as directed. e. Rework, recompact, and refinish material that fails to meet or that loses required moisture, density, stability, or finish before the next course is placedor the project is accepted. f. Continue work until specification requirements are met. g. Proof roll the compacted flexible base in accordance with the following: 1) Proof Rolling a) City Project Representative must be on -site during proof rolling operations. b) Use equipment that will apply sufficient load to identify soft spots that rut or pump. (1) Acceptable equipment includes fully loaded single -axle water truck with a 1500 gallon capacity. c) Make at least 2 passes with the proof roller (down and back T 1 pass). d) Offset each trip by at most 1 tire width. e) 1f an unstable or non -uniform area is found, correct the area. 2) Correct a) Soft spots that rut or pump greater than 3/4 inch. b) Areas that are unstable or non -uniform. 3. Tolerances a. Maintain the shape of the course by blading. b. Completed surface shall be smooth and in conformity with the typical sections shown on the Drawings to the established lines and grades. c. For subgrade beneath paving surfaces, correct any deviation in excess of 1/4 inch in cross section in length greater than 16 feet measured longitudinally by loosening, adding or removing material. Reshape and recompact by sprinkling and rolling. d. Correct all fractures, settlement or segregation immediately by scarifyingthe areas affected, adding suitable material as required. Reshape and recompact by sprinkling and rolling. c. ShouId the subbase or base course, due to any reason., lose the required stability, density and finish before the surfacing is complete, it shall be recompacted at the sole expense of the Contractor. 4. Density Control a. Minimum Density: 95 percent compaction as determined by ASTM D698. b. Moisture content: minus 2 to plus 4 of optimum. E. Finishing 1. After completing compaction, clip, skin, or tight -blade the surface with a maintainer or subgrade trimmer to a depth of approximately 1 /4 inch. 2. Remove loosened material and dispose of it at an approved location. 3. Seal the clipped surface immediately by rolling with an appropriate size pneumatic tire roller until a smooth surface is attained. 4. Add small increments of water as needed during rolling. 32 11 23-7 FLEXIBLE BASE COURSES Page 7 of 7 5. Shape and maintain the course and surface in conformity with the typical sections, lines, and grades as shown on the Drawings or as directed. 6. In areas where surfacing is to be placed, correct grade deviations greater than 1/4 inch in 16 feet measured longitudinally or greater than 1 /4 inch over the entire width of the cross-section. 7. Correct by loosening, adding, or removing material. 8. Reshape and recompact in accordance with 3A.C. 3.5 REPAIR/RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 QUALITY CONTROL A. Density Test 1. City to measure density of flexible base course. a. Notify City Project Representative when flexible base ready for density testing. b. Spacing directed by City (1 per block minimum). c. City Project Representative determines location of density testing. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED4 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 321320--2 CONCRETE SIDEWALKS, DRIVEWAYS AND BARRIER FREE RAMPS Page 2 of 6 SECTION 32 13 20 CONCRETE SIDEWALKS, DRIVEWAYS AND BARRIER FREE RAMPS PARTI- GENERAL 1.1 SUMMARY A. Section Includes: 1. Concrete sidewalks 2. Driveways 3. Barrier free ramps B. Deviations from this City of Fort Worth Standard Specification i, FURNISH ANT) INSI'ALL UR1CK RED COLOR CAST IN PLACE D TIC FABLE 141Al2.K1,NO DOM.l?-1-11A , MAN I A -UM33) BY ADA SOLIF1'10N NC. OR APPROVED EQUAL UY THIS C1TY_ C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract 2. Division 1 - General Requirements 3. Section 02 41 13 - Selective Site Demolition 4. Section 32 13 13 - Concrete Paving 5. Section 32 13 73 - Concrete Paving Joint Sealants 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Concrete Sidewalk a. Measurement 1) Measurement for this Item shall be by the square foot of completed and accepted Concrete Sidewalk in its final position for various: a) Thicknesses b) Types b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price bid per square foot of Concrete Sidewalk. c. The price bid shall include: 1) Excavating and preparing the subgrade 2) Furnishing and placing all materials 2. Concrete Curb at Back of Sidewalk (6 to 12 inch max) a. Measurement 1) Measurement for this Item shall be by the linear foot of completed and accepted Concrete Curb at the Back of Sidewalk within the 6 to 12 inch curb height at back of walk in its final position. b. Payment 1) The work perfonmed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price bid per Iinear foot of Concrete Curb at the Back of Sidewalk. c. The price bid shall include: 321320-3 CONCRETE SIDEWALKS, DRIVEWAYS AND BARRIER FREE RANTS Page 2 of b 1) Excavating and preparing the subgrade 2) Furnishing and placing all materials, including concrete and reinforcing steel 3) Excavation in back of "retaining" curb 4) Furnishing, placing, and compacting backfill Concrete Driveway a. Measurement 1) Measurement for this Item shall be by the square foot of completed and accepted Concrete Driveway in its final position for various: a) Thicknesses b) Types 2) Dimensions will betaken from the back of the projected curb, includingthe area of the curb radii and will extend to the limits specified in the Drawings. 3) Sidewalk portion of drive will be included in driveway measurement. 4) Curb on drive will be included in the driveway measurement. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price bid per square foot of Concrete Driveway. c. The price bid shall include: 1) Excavating and preparing the subgrade 2) Furnishing and placing all materials 4. Barrier Free Ramps a. Measurement 1) Measurement for this Item shall be per each Barrier Free Ramp completed and accepted for various: a) Types b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price bid per each "Barrier Free Ramp" installed. c. The price bid shall include: I ) Excavating and preparing the subgrade 2) Furnishing and placing all materials 3) Curb Ramp 4) Landing and detectable warning surface as shown on the Drawings 5) Adjacent flares or side curb 1.3 REFERENCES A. Abbreviations and Acronyms 1. TAS — Texas Accessibility Standards 2. TDLR Texas Department of Licensing and Regulation B. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date Iogged at the end ofthis Specification, unless a date is specifically cited. 2. American Society for Testing and Materials (ASTM) a. D545, Test Methods for Preformed Expansion Joint Fillers for Concrete Construction (Non -extruding and Resilient Types) 321320-3 CONCRE'IE SIDEWALKS, DRIVEWAYS AND BARRIER FREE RAMPS Page 3 of 6 b. D698, Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/fO) 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS A.Mix Design: submit for approval. Section 32 13 13. B. Product Data: submit product data and sample for pre -cast detectable warning for barrier free ramp. 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] Lll FIELD CONDITIONS A. Weather Conditions: Placement of concrete shall be as specified in Section 32 13 13. 1.12 WARRANTY [NOT USED] PART 2- PRODUCTS 2.1 OWNER -FURNISHED PRODUCTS [NOT USED] 2.2 EQUIPMENT AND MATERIALS A.Forms: wood or metal straight, free from warp and of a depth equal to the thickness of the finished work. B. Concrete: see Section 32 13 13. 1. Unless otherwise shown on the Drawings or detailed specifications, the standard class for concrete sidewalks, driveways and barrier free ramps is shown in the following table: Standard Classes of Pavement Concrete Class of Minimum 28 Day Min. I Maximum I Course Concrete' Cementitious, Compressive Water/ Aggregate Lb./CY Strength2 Cementitious Maximum psi Ratio Size, inch A 470 3000 0.58 1-1/2 C. Reinforcement: see Section 32 13 13. 1. Sidewalk, driveway and barrier free ramp reinforcing steel shall be 43 deformed bars at 18 inches on -center -both -ways at the center plane of all slabs, unless otherwise shown on the Drawings or detailed specifications. D. Joint Filler 1. Wood Filler: see Section 32 13 13. 2. Pre -Molded Asphalt Board Filler a. Use only in areas where not practical for wood boards. 321320-4 CONCRETE SIDEWALKS, DRIVEWAYS AND BARRIER FRET: RAMPS Page 4 of 6 b. Pre -molded asphalt board filler: ASTM D545. c. Install the required size and uniform thickness and as specified in Drawings. d. Include 2 Iiners of 0.016 asphalt impregnated kraft paper filled with amastic mixture of asphalt and vegetable fiber and/or mineral filler. E. Expansion Joint Sealant: see Section 32 13 73 where shown on the Drawings. 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION A. Surface Preparation 1. Excavation: Excavation required for the construction of sidewalks, driveways and barrier free ramps shall be to the lines and grades as shown on the Drawings or as established by the City. 2. Fine Grading a. The Contractor shall do all necessary filling, leveling and fine gradingrequired to bring the subgrade to the exact grades specified and compacted to at least 90 percent of maximum density as determined by ASTM D698. b. Moisture content shall be within minus 2 to plus 4 of optimum. c. Any over -excavation shall be repaired to the satisfaction of the City. B. Demolition / Removal 1. Sidewalk, Driveway and/ or Barrier Free Ramp Removal: see Section 02 41 13. 3.4 INSTALLATION A. General 1. Concrete sidewalks shall have a minimum thickness of 4 inches. 2. Sidewalks constructed in driveway approach sections shall have aminimum thickness equal to that of driveway approach or as called for by Drawings and specifications within the limits of the driveway approach. 3. Driveways shall have a minimum thickness of 6 inches. Standard cross -slopes for walks shall be 2 percent max in accordance with current TAS/TDLR guidelines. The construction of the driveway approach shall include the variable height radius curb in accordance with the Drawings. 4. All pedestrian facilities shall comply with provisions of TAS including location, slope, width, shapes, texture and coloring. Pedestrian facilities installed bythe Contractor and not meeting TAS must be removed and replaced to meet TAS (no separate pay). B.Forms: Forms shall be securely staked to line and grade and maintained in atrue position during the depositing of concrete. C. Reinforcement: see Section 32 13 13. D. Concrete Placement: see Section 32 13 13. 321320-6 CONCRETE SIDEWALKS, DRIVEWAYS AND BARRIER FREE RAMPS Page 6 of 6 E. Finishing 1. Concrete sidewalks, driveways and barrier free ramps shall be finished to atrue, even surface. 2. Trowel and then brush transversely to obtain a smooth uniform brush finish. 3. Provide exposed aggregate finish if specified. 4. Edge joints and sides shall with suitable tools. F. Joints 1. Expansion joints for sidewalks, driveways and barrier free ramps shall be formed using redwood. 2. Expansion joints shall be placed at 40 foot intervals for 4 foot wide sidewalk and50 foot intervals for 5 foot wide and greater sidewalk. 3. Expansion joints shall also be placed at all intersections, sidewalks with concrete driveways, curbs, formations, other sidewalks and other adjacent old concrete work. ,Similar material shall be placed around all obstructions protruding into orthrough sidewalks or driveways. 4. All expansion joints shall be 112 inch in thickness. 5. Edges of all construction and expansion joints and outer edges of all sidewalks shall be finished to approximately a 1/2 inch radius with a suitable finishing tool. 6. Sidewalks shall be marked at intervals equal to the width of the walk with a marking tool. 7. When sidewalk is against the curb, expansion joints shall match those in the curb. G. Barrier Free Ramp l . Furnish and install brick red color pre -East CAST -IN -PLACE TACTILE detectable warning Dome -Tile, manufactured by ADA SOLUTION, INC. or approved equal by the City. 2. Detectable warning surface shall be a minimum of 24-inch in depth in the direction of pedestrian travel, and extend to a minimum of 48-inch along the curb ramp or landing where the pedestrian access route enters the street. 3. Locate detectable warning surface so that the edge nearest the curb Iine is a minimum of 6-inch and maximum of 8-inch from the extension of the face of the curb. 4. Detectable warning Dome -Tile surface may be curved along the corner radius. 5. Install detectable warning surface according to manufacturer's instructions. 3.5 REPAIR/RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 321320-7 CONCRETE SIDEWAI.ICS, DRWEWAYS AND BARRIPR FREE RAMPS Page 6 of 6 3.14 ATTACHMENTS [NOT USE, END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1.2.A.3 — Measurement and Payment for Barrier Free Ramps modified tomatch updated City Details 4/30/2013 F. Griffin Corrected Part 1, 1.2, A, 3, b, 1 to read, from ... square foot of Concrete Sidewalk. to ...each `Barrier Free Ramp" installed. June 5, 2018 M Owen Revised Measurement and Payment.section. 3291 19 - 1 TOPSOIL PLACEMENT AND FINISHING OF PARKWAYS Page 1 of 3 SECTION 32 9119 TOPSOIL PLACEMENT AND FINISHING OF PARKWAYS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Furnish and place topsoil to the depths and on the areas shown on the Drawings. B. Deviations from this City of Fort Worth Standard Specification 1. FOR -ITIFS PROJE.CTr'IJRNISMMI, NMLi1_JNG. 1.UAC]INOr r1NO PI.r<1 t1 O TOPSOIL SEALL BE CONSIDE- FF) SUBSIDIARY TO MAJOR PAY ITEMS. C. Related Specification Sections include but are not necessarily limited to 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract 2. Division I - General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment �-r �cira cir �xzxv�zi ne,..,stff,,..,. F , Uh-is Re-i .shall be by in ,.1.,..., a, efA eub.ie ar-d afTapseil "Neleaswer3ent" ..ill be 1 fl ..,+ tl,o fne&.` ufad as bid p ..b,ie provided under- 5and ,.f TE)ps .il pdai unit pFine 4*4h for the items involved the arevOR-44—p4wate that provisions various .stir, _i e excavation with F PFOViSiO,., manipulations will measured al..,d and paid eftee, fegardless of -the The „ e bid sha4ml ; ..lu de: a-. pufflishi„rT T.,,,S0 Leadi d. Plaoin 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 ACTION SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised December 20, 2012 3291 19 - 2 TOPSOIL PLACEMENT AND FINISHING OF PARKWAYS Page 2 of 3 PART 2 - PRODUCTS 2.1 OWNER -FURNISHED [ox] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 MATERIALS A. Topsoil 1. Use easily cultivated, fertile topsoil that: a. Is free from objectionable material including subsoil, weeds, clay lumps, non - soil materials, roots, stumps or stones larger than 1.5 inches b. Has a high resistance to erosion c. Is able to support plant growth 2. Secure topsoil from approved sources. 3. Topsoil is subject to testing by the City. 4. pH: 5.5 to 8.5. 5. Liquid Limit: 50 or less 6. Plasticity Index: 20 or less 7. Gradation: maximum of 10 percent passing No. 200 sieve B. Water. Clean and free of industrial wastes and other substances harmful to the growth of vegetation 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. Finishing of Parkways 1. Smoothly shape parkways, shoulders, slopes, and ditches. 2. Cut parkways to finish grade prior to the placing of any improvements in or adjacent to the roadway. 3. In the event that unsuitable material for parkways is encountered, extend the depth of excavation in the parkways 6 inches and backfill with top soil. 4. Make standard parkway grade perpendicular to and draining to the curb line. a. Minimum: 1/4 inch per foot b. Maximum:4:1 c. City may approve variations from these requirements in special cases. 5. Whenever the adjacent property is lower than the design curb grade and runoff drains away from the street, the parkway grade must be set level with the top ofthe curb. 6. The design grade from the parkway extends to the back of the walk line. 7. From that point (behind the walk), the grade may slope up or down at maximum slope of 4: 1. CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised December 20, 2012 3291 19 - 3 TOPSOIL PLACEMENT AND FINISHING OF PARKWAYS Page 3 of 3 B. Placing of Topsoil 1. Spread the topsoil to a uniform Ioose cover at the thickness specified. 2. Place and shape the topsoil as directed. 3. Hand rake finish a minimum of 5 feet from all flatwork. 4. Tamp the topsoil with a light roller or other suitable equipment. 3.5 REPAIR/RESTORATION] [NOT USED] 3.6 RE INSTALLATION [NOT USED] 3.7 FIELD QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SLN D ARY OF CHANGE CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised December 20, 2012 3471 13 - 1 TRAFFIC CONTROL Page 1 of 6 1 SECTION 34 7113 2 TRAFFIC CONTROL 3 PART1- GENERAL 5 A. Section Includes: 6 1. Installation of Traffic Control Devices and preparation of Traffic Control Plans 7 B. Deviations from this City of Fort Worth Standard Specification 8 1_ FOR THIS PROJECT TRAFFICr CONTROL 8EC'.TION 34 11 13 SHAL1, BE 9 CONSIDERED SUB STDTARY WORK, N10 S2PAR ATE. PAY. 10 2, TRAFFIC CONTROL. IMPLEMENTATION, IN TAI-LAI'lt:)N. I• NF- I I MAINTANCE, AWLISTMENTS, REP AND ItllM0VAL (IR. 12 TRAFFIC CONTROL DEVICES S1,IALL BE CONSIDERED SUBSIDIARY 13 WORK, NO SEPARATE PAY. 14 3. PREPAR ATTON OF TRAF.FIC CONTROL PLAN DETAILS, ADHERENCE TO 15 :i'l' 'A ND 'I ERAS MANUAL ON UN WORM TRAFFIC C ON 1-R0i, DE -VI CES 16 (1 -M UTCD ), 013-iWIN1NC SWNA'L`URE AND SEAL OF A LICENSED TEXAS 17 PROFESSIONAL ENO INFER SIIALL 13r CONS IDERS-D SUBS FDIAR 18 WORK, WO SEPARATE PAY. 19 C. Related Specification Sections include, but are not necessarily limited to: 20 1. Division 0 -- Bidding Requirements, Contract Forms and Conditions of the Contract 21 2. Division 1 --- General Requirements 22 1.2 PRICE AND PAYMENT PROCEDURES 23 A. Measurement and Payment 24 1. Installation of Traffic Control Devices 25 a. M n 26 1) Measurement rement f r Tr- ffio GefAfol Tl.,:.iees Shall be „ .,+h f r the PF8j.,.,+ 27 d114*1*iB1; 28 a) A oH41i isd-t-A-MRed —As 39 leers. 29 b, Paynte44 30 31 and measLffed as provided under "Measurement" shall be pa4d �4 at 32 uflntpnee bid f0f"Tffiffie Gofit+912 33 6. The p e bid sha l ..1ude: 34 1) Tr-affie EopAfe' implementatien 35 2) installatian 36 3) Mainten 37 4) Adjustments 38 ) Reel - nts 39 6) Removal 40 7) U.,1;...1 .1114-PE .,eRk h..11rr 41 2. Portable Message Signs CITY OF FORT WORTH IIMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised November 22, 2013 3471 13 - 2 TRAFFIC CONTROL Page 2 of 6 1 a. Measurement 2 1) Measurement for this Item shall be per week for the duration of use. 3 b. Payment 4 1) The work performed and materials furnished in accordance to this Item and 5 measured as provided under "Measurement" shall be paid for at the unit 6 price bid per week for "Portable Message Sign" rental. 7 c. The price bid shall include: 8 1) Delivery of Portable Message Sign to Site 9 2) Message updating 10 3) Sign movement throughout construction 11 4) Return of the Portable Message Sign post -construction 12 3. Preparation of Traffic Control Plan Details 13 a. Measurement 14 1) Measurement for this Item be per each Traffic Control Detail prepared. 15 b. Payment 16 1) The work performed and materials furnished in accordance with this Item 17 shall be paid for at the unit price bid per each "Traffic Control Detail" 18 prepared. 19 c. The price bid shall include: 20 1) Preparing the Traffic Control Plan Details for closures of 24 hours or 21 longer 22 2) Adherence to City and Texas Manual on Uniform Traffic Control Devices 23 (TM UTCD) 24 3) Obtaining the signature and seal of a licensed Texas Professional Engineer 25 4) Incorporation of City comments 26 1.3 REFERENCES 27 A. Reference Standards 28 1. Reference standards cited in this Specification refer to the current reference 29 standard published at the time of the latest revision date logged at the end of this 30 Specification, unless a date is specifically cited. 31 2. Texas Manual on Uniform Traffic Control Devices (TMUTCD). 32 3. Item 502, Barricades, Signs, and Traffic Handling of the Texas Department of 33 Transportation, Standard Specifications for Construction and Maintenance of 34 Highways, Streets, and Bridges. 35 1.4 ADMINISTRATIVE REQUIREMENTS 36 A. Coordination 37 1. Contact Traffic Services Division (817-392-7738) a minimum of 48 hours prior to 38 implementing Traffic Control within 500 feet of a traffic signal. 39 B. Sequencing 40 1. Any deviations to the Traffic Control Plan included in the Drawings must be first 41 approved by the City and design Engineer before implementation. 42 1.5 SUBMITTALS 43 A. Provide the City with a current list of qualified flaggers before beginning flagging 44 activities. Use only flaggers on the qualified list. CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019--6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised November 22, 2013 3471 13-3 TRAFFIC CONTROL Page 3 of 6 1 B. Obtain a Street Use Permit from the Street Management Section of the Traffic 2 Engineering Division, 311 W. 10'h Street. The Traffic Control Plan (TCP) for the 3 Project shall be as detailed on the Traffic Control Plan Detail sheets of the Drawing set. 4 A copy of this Traffic Control Plan shall be submitted with the Street Use Permit. 5 C. Traffic Control Plans shall be signed and sealed by a licensed Texas Professional 6 Engineer. 7 D. Contractor shall prepare Traffic Control Plans if required by the Drawings or 8 Specifications. The Contractor will be responsible for having a licensed Texas 9 Professional Engineer sign and seal the Traffic Control Plan sheets. 10 E. Lane closures 24 hours or longer shall require a site -specific traffic control plan. 1 I F. Contractor responsible for having a licensed Texas Professional Engineer sign and seal 12 changes to the Traffic Control Plan(s) developed by the Design Engineer, 13 G. Design Engineer will furnish standard details for Traffic Control. 14 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 15 1.7 CLOSEOUT SUBMITTALS [NOT USED] 16 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 17 1.9 QUALITY ASSURANCE [NOT USED] 18 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 19 1.11 FIELD [SITE] CONDITIONS [NOT USED] 20 112 WARRANTY [NOT USED] 21 PART 2 - PRODUCTS 22 2.1 OWNER -FURNISHED [oR] OWNER -SUPPLIED PRODUCTS [NOT USED] 23 2.2 ASSEMBLIES AND MATERIALS 24 A. Description 25 1. Regulatory Requirements 26 a. Provide Traffic Control Devices that conform to details shown on the 27 Drawings, the TMUTCD, and TXDOT'S Compliant Work Zone Traffic Control 28 Device List (CWZTCDL). 29 2. Materials 30 a. Traffic Control Devices must meet all reflectivity requirements included in the 31 TMUTCD and TxDOT Specifications — Item 502 at all times during 32 construction. 33 b. Electronic message boards shall be provided in accordance with the TMUTCD. CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised November 22, 2013 3471 13 - 4 TRAFFIC CONTROL Page 4 of 6 2.3 ACCESSORIES [NOT USED] 2 2.4 SOURCE QUALITY CONTROL [NOT USED] 3 PART 3 - EXECUTION 4 3.1 EXAMINATION [NOT USED] 5 3.2 PREPARATION 6 A. Protection of In -Place Conditions 7 1. Protect existing traffic signal equipment. 8 3.3 INSTALLATION 9 A. Follow the Traffic Control Plan (TCP) and install Traffic Control Devices as shown on 10 the Drawings and as directed. I I B. Install Traffic Control Devices straight and plumb. 12 C. Do not make changes to the location of any device or implement any other changes to 13 the Traffic Control Plan without the approval of the Engineer. 14 1. Minor adjustments to meet field constructability and visibility are allowed. 15 D. Maintain Traffic Control Devices by taking corrective action as soon as possible. 16 1. Corrective action includes but is not limited to cleaning, replacing, straightening, 17 covering, or removing Devices. 18 2. Maintain the Devices such that they are properly positioned, spaced, and Iegible, 19 and that retroreflective characteristics meet requirements during darkness and rain. 20 E. If the Inspector discovers that the Contractor has failed to comply with applicable federal 21 and state laws (by failing to furnish the necessary flagmen, warning devices, barricades, 22 lights, signs, or other precautionary measures for the protection of persons or property), the 23 Inspector may order such additional precautionary measures be taken to protect persons 24 and property. 25 F. Subject to the approval of the Inspector, portions of this Project, which are not affected by 26 or in conflict with the proposed method of handling traffic or utility adjustments, can be 27 constructed during any phase. 28 G. Barricades and signs shall be placed in such a manner as to not interfere with the sight 29 distance of drivers entering the highway from driveways or side streets. 30 H. To facilitate shifting, barricades and signs used in lane closures or traffic staging may 31 be erected and mounted on portable supports. 32 1. The support design is subject to the approval of the Engineer. 33 1. Lane closures shall be in accordance with the approved Traffic Control Plans. 34 J . If at any time the existing traffic signals become inoperable as a result of construction 35 operations, the Contractor shall provide portable stop signs with 2 orange flags, as 36 approved by the Engineer, to be used for Traffic Control. CITY OF FORT WORTH I-IMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised November 22, 2013 347113-5 TRAFFIC CONTROL Page 5 of 6 1 K. Contractor shall make arrangements for police assistance to direct traffic if traffic signal 2 turn-ons, street light pole installation, or other construction will be done during peak traffic 3 times (AM: 7 am — 9 am, PM: 4 pm - 6 pm). 4 L. Flaggers 5 1. Provide a Contractor representative who has been certified as a flagging instructor 6 through courses offered by the Texas Engineering Extension Service, the American 7 Traffic Safety Services Association, the National Safety Council, or other approved 8 organizations. 9 a. Provide the certificate indicating course completion when requested. 10 b. This representative is responsible for training and assuring that all flaggers are 11 qualified to perform flagging duties. 12 2. A qualified flagger must be independently certified by 1 of the organizations listed 13 above or trained by the Contractor's certified flagging instructor. 14 3. Flaggers must be courteous and able to effectively communicate with the public. 15 4. When directing traffic, flaggers must use standard attire, flags, signs, and signals 16 and follow the flagging procedures set forth in the TMUTCD. 17 5. Provide and maintain flaggers at such points and for such periods of time as may be 18 required to provide for the safety and convenience of public travel and Contractor's 19 personnel, and as shown on the Drawings or as directed by the Engineer. 20 a. These flaggers shall be located at each end of the lane closure. 21 M. Removal 22 1. Upon completion of Work, remove from the Site all barricades, signs, cones, lights 23 and other Traffic Control Devices used for work -zone traffic handling in a timely 24 manner, unless otherwise shown on the Drawings. 25 3.4 REPAIR / RESTORATION [NOT USED] 26 3.5 RE -INSTALLATION [NOT USED] 27 3.6 FIELD [oR] SITE QUALITY CONTROL [NOT USED] 28 3.7 SYSTEM STARTUP [NOT USED] 29 3.8 ADJUSTING [NOT USED] 30 3.9 CLEANING [NOT USED] 31 3.10 CLOSEOUT ACTIVITIES [NOT USED] 32 3.11 PROTECTION [NOT USED] 33 3.12 MAINTENANCE [NOT USED] 34 3.13 ATTACHMENTS [NOT USED] 35 END OF SECTION 36 Revision Lag CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised November 22, 2013 347113-6 TRAFFIC CONTROL Page 6 of 6 DATE NAME SUMMARY OF CHANGE 11/22/13 S. Arnold Added police assistance, requirement for when a site specific TCP is required CITY OF FORT WORTH IIMAC SURFACE OVERLAY 2019-6 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised November 22, 2013 99 99 00 1 SPECIAL TECHNICAL SPECIFICATIONS Page Io£1 9999.0096 PAVING CONSTRUCTION ALLOWANCE The paving construction allowance shall consist of miscellaneous construction and other non -subsidiary items requested for construction by the City of Fort Worth and at the direction of the Project Engineer. The payment to the contractor for miscellaneous construction shall be the actual cost of the work plus 10% to cover the cost of overhead incurred by the Contractor in handling the construction. SPECIAL TECHNICAL SPECIFICATIONS HR STREET REHABILITATION zC 19 March 10, 2014 101615 APPENDIX GC-6.06.D Minority and Women Owned Business Enterprise Compliance GC-6.07 Wage Rates GN-1.00 General Notes SP- 1.00 Special Provisions SD- 1.00 Construction Specifications SD- 2.00 Standard Construction Details SL- 1,00 HMAC 2019-6 Street List SM- 2.00 HMAC 2019-6 Street Map Standard CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-4 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July 1, 2011 GC-6o06.D Minority and Women ®weed Business Enterprise Compliance This PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-4 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July 1, 2011 FORT WORTH "— • � ".� City of Fort Worth Minority Business Enterprise Specifications SPECIAL INSTRUCTIONS FOR OFFERORS APPLICATION OF POLICY If the total dollar value of the contract is $60,000.01 or snore, then a PABE subcontracting goal is applicable. POLICY STATEMENT It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority Business Enterprises (MBE) in the procurement of all goods and services. All requirements and regulations stated in the City's current Business Diversity Enterprise Ordinance applies to this bid. The City's MBE goal on this project is 93 ME- PROJECT GOALS % of the base bid value of the contract. Note: If boti) MBE and SBE subcontracting goals are established for this project, then an Offeror must submit both a MBE Utilization Form and a SBE Utilization Form to be deemed responsive. COMPLIANCE TO BID SPECIFICATIONS On City contracts $50,000.01 or more where a MBE subcontracting goal is applied, Offerors are required to comply with the intent of the City's Business Diversity Enterprise Ordinance by one of the following: 1. Meet or exceed the above stated MBE goal through MBE subcontracting participation, or 2. Meet or exceed the above stated MBE goal through MBE Joint Venture participation, or; 3. Good Faith Effort documentation, or; 4. Prime Waiver documentation. SUBMITTAL OF REQUIRED DOCUMENTATION The applicable documents must be received by the Purchasing Division, within the following times allocated, in order for the entire bid to be considered responsive to the specifications. The Offeror shall delluer tlio MBE doeum n' tatk )n in parson to lhe. appmpriale employee of the pumliasing division and obtain a dalo i nu ro eipt, Such receipt shall be evidence (bat the Ciiy r,�cewad the docuvnenlek w in tho lime allos*imd. A 1!aiced andlor smaiiled copy will not be accepted: 1. Subcontractor Utilization Form, if goal is received no later than 2:00 p.m., on the second City business day met or exceeded: after the bid opening date, exclusive of the bid opening date. 2. Good Faith Effort and Subcontractor received no later than 2:00 p.m., on the second City business day Utilization Form, if participation is less than after the bid opening date, exclusive of the bid opening date. stated goal: 3. Good Faith Effort and Subcontractor received no later than 2:00 p.m., on the second City business day Utilization Form, if no MBE participation: after the bid opening date, exclusive of the bid opening date. 4. Prime Contractor Waiver Form, if you will received no later than 2:00 p.m., on the second City business day perform all subcontracting/supplier work: after the bid opening date, exclusive of the bid opening date. 6. Joint Venture Form, if goal is met or received no later than 2:00 p.m., on the second City business day exceeded: after the bid opening date, exclusive of the bid opening date. FAILURE TO COI;4PLY WITH THE CITY'S BUSINESS DIVER iTY ENTERPRISE ORDINANCE, WILL RESULT IN THE BID BEING CONSIDERED NON-RESPONSWE TO SPEC IFIOA T lONS. FAILURE TO SUE30T THE REQUIRED MSE DOCUMENTAT#ON WILL RESULT IN THE BID BEING GONSIDERED ICON _RESPONSIVE, A SECOND FAILURE WILL RESULT IN THE OFFEROR BEING DiSQUALIFIED FOR A PERIOD OF ONE YEAR. THREE FAILURES IN A FIVE YEAR PERIOD WILL RESULT IN A DISQUALIFICATION PERIOD OF THREE YEARS. Any questions, please contact the Office of Business Diversity at (817) 392-2674. Office of Business Diversity Rev. 5/15/i9 Email: mwbeoffice@fortworthtexas.gov Phone: (817) 392-2674 FORT WORTH OFFEROR COMPANY NAME; City of Fort Worth Office of Business Diversity MBE Subcontractors/Suppliers Utilization Form Peachtree Construction, LTD. HMAC Surface Overlay (2019-6) 13 Rio Offeror's MBE Project Ca 6.9 MNVIDBE 10110/2019 PR 102098 ATTACHMENT1A Page 1 of 4 ile box to de! Certification NON- MIVVIDBE Identify all subcontractors/suppliers you will use on this project aiiur a to complete this foi-rr'I, in its entirety with requested documentation, and received 4 iy th— P,..lrr-hncir:y ivision no latw than 2;00 p.m. on the second City business day after bid opening, exclusive of bid opening date, ill result in the bid being considered non -responsive to bid specifications, The undersigned Offeror agrees to enter into a formal agreement with the MBE firm(s) listed f i this utilization schedule, Conditioned upon execution of a Contract with the City of Fort Worth. The intentional and/or knovAng misrepresentation of facts is grounds for consideration of disqualification and will result in the bits being Considered non -responsive to #old specificahons. MBEs listed toward meeting the project goal must be located in the six (6) county marketplace at the time of bid or the business has a Significant Business Presence in the Marketplace. Marketplace is the geographic area of Tarrant, Dallas, Denton, Johnson, Parker, and Wise counties. Prime contractors must identify by tier level of all subcontractors/suppliers. Tier, means the level of subcontracting betow the prime contractorlconsultant i.e. a direct payment from the prime Qontractor to a subcontractor is considered 1 �' tier. a payment by a subcontractor to its supplier is considered 2"d tier. The prime contractor is responsible to provide proof of payment of all tiered subcontractors identified as a MBE ani:l counting those dollars towards meeting the coritract corninitted goal. ALL MBEs MUSTBE CERTIFIED BEFORE CONTRACT AWARD. Certification means those firms, located within the Marketplace, that have been determined to be a bonafide minority business enterprise by the North Central Texas Regional Certification Agency (NCTRCA) and the Dallas/Fort Worth Minority Supplier Development Council (D/FW MSDC). If haullno services are utilized, the Offeror will be given credit as long as the MSE listen owns and opefates at least one fully licensed and operational truck to be used on the ctrritfact, The MGE may lease � trucks from another MBE firm, including MBE owner -operated, and receive full MBE credit. The MBE may lease trucks from non -MBEs, Including owner -operated, but will only recei.tle credit for the less and ccrnmissions earned by the MEE as outilned in Rie lease agreement. Rev. 2/13119 FORT WORTH ATTACHMENT IA Page 2 of 4 Offerors are required to identify ALL subcontractorslsuppliers, regardless of status; i.e., Mingrity and non-MSEs MBE firms are to be listed first, use additional sheets if necessary. Please note that only certified MBEs will be counted to meet an MBE goal. N SUBCONTRACTOR/SUPPLIER Company Name Address Telephone/Fax Email Contact Person T ; e r M B E w B E 0 r� I!" E Detail Subcontracting Work Detail Supplies Purchased Dollar Amount Westhill Construction 1 Concrete $681,310.00 P.O. Box 2016 Cleburne, TX. 76033 (817) 558-2504 (817) 558-0982 fax s t ❑ ❑ Sidewalks & Driveways, Curb & Gutter J Angela Reynolds westhillconst@aol.com Luna Dump Trucking 2 Haul off $75,000.00 2100 N. Sylvania Fort Worth, TX. 76111 (817) 637-0945 (817) 637-0945 fax In d ❑� ❑ concrete spoils (2nd tier to Westhill Const.) Alonzo Luna lunarendon@hotmail.com Stabile & Winn, Inc. Cement $108,375.00 P.O. Box 79380 Saginaw, TX. 76179 (817) 847-20 (817) 847-209898 fax S t ❑ ❑ Stabilization Jerry Henderson jerry.henderson@stabilewinn.com American Striping Company 1 $2,400.00 11551 Ravenview Road Dallas, TX. 75253 (972) 557-8565 S t ❑ ❑ estimating@americanstripin g.net Texas Bit 1 Hot Mix Asphalt $125,055.00 420 Decker Dr., Suite 200 Irving, TX. 75062 (214) 741-3531 s t ❑ ❑ Chris Michael chris.michael@texasbit.com ❑ ❑ Rev. 5115119 FoR,r WoRui ATTACHMENT1A Page 3 of 4 Offerors are required to identify ALL subcontractors/suppliers, regardless of status; i.e., Minoriiy and rvan-MBEs MBE firms are to be listed first, use additional sheets if necessary. Please note that only certified MBEs will be counted to meet an MBE goal. SUBCONTRACTORISUPPLIER Company Name T Address i TelephonelFax e Email r Contact Person M B E W B E N ° ° M g E Detail Subcontracting Work Detail Supplies Purchased Dollar Amount l� ❑ ❑ Rev. 5/15119 FORT WORTH Total Dollar Amount of MBE Subcontractors/Suppliers I s 75,000.00 Total Dollar Amount of Non -MBE Subcontractors/Suppliers I s 917,140.00 TOTAL DOLLAR AMOUNT OFF ALL SUBCONTRACTORSISUPPLIERS I s 924,640.00 ATTACHMENT1A Page 4 of 4 The Offeror will not make additions, deletions, or substitutions to this certified list without the prior approval of the Office of Business Diversity through the submittal of a Reques* for Approval of Char gehlAddiffon form. Any unjustified change or deletion shall be a rnateriai breach of contract and may result in debarment in accord with the procedures outlined in the ordinance. The Offeror shall submit a detailed explanation of how the requested Chang addition or deletion will affect the committed MBE goal. If the detail explanation is not submitted. it will affect the Final compllance determination, By affixing a signature to this form, the Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including MBE(s) and any special arrangements with MBEs. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company. The Offeror agrees to allow the transmission of interviews with owners, principals, officers, employees and applicable subcontractors/suppliers participating on the contract that will substantiate the actual work performed by the MBE(s) on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance creates a material breach of the contract and may result in a determination of an irresponsible Offeror and debarment from participating in City work for a period of time not less than one (1) year. - . I ' � 2M11% Autho ' d Signature` President Title Peachtree Construction, LT©. Company Name 5801 Park Vista Cir. Address Feller, TX. 70244 city/Statelzip Office of Business Diversity Email: mwbeoffice@fortworthtexas.gov Phone: (817) 392-2674 J . Printed Signature David Braack, GM - Operations Contact Name/Title (if different) (817) 741-4658, (817) 741-4648 fax Telephone and/or Fax dbraack'peachtreecon . com E-mail Address 10/14/2019 Date Rev. 5/15/19 ATTACHMENT 1C Page 1 of 4 FORT FORTH City of Fort Worth Minority Business Enterprise MBE Good Faith Effort Form OFFEROR COMPANY NAME: Check applicable box to describe Peachtree Construction, LTD. Offerors Certification PROJECT NAME: M/W1DBE 0 NON-MNWDBE HMAC Surface Overlay (2019-6) 10/10/2019 BID DATE City's MBE Project Goal: Offeror's MBE Project Commitment: PROJECT NUMBER 13 Rio 1 6.9 ova 102095 If the Offeror did not meet or exceed the MSE subcontracting goal for thN project. th2 offeror in usi complete this form. If the Offeror's method of compliance with the MBE goal is based upon demonstration of a "good faith effort", the Offeror will have the burden of correctly and accurately preparing and submitting the documentation required by the City. Compliance with each item, 1 thru 11 below, shall satisfy the Good Faith Effort requirement absent proof of fraud, intentional and/or knowing misrepresentation of the facts or intentional discrimination by the Offeror. Failure to complete this form, in its entirety with supporting documentation. and rixelved by the Purchasing Qivislon no later than 2:00 p.nl, on the second City business day after bid opening, exclusive of bld opening date, will result in the bid being considered non -responsive to b:d specificatjons, 1.) Please list each and every subcontracting and/or supplier opportunity for the completion of this project, regardless of whether it is to be provided by a MBE or non -MBE. {DO NOT LIST NAMES OF Fj. RMM51 On all projects, the Offeror must list each subcontracting and or supplier opportunity regardless of tier. aaamonai sneers, rr List of Subcontracting Opportunities List of Supplier Opportunities Concrete Sidewalks, etc. I Hot Mix Asphalt I Concrete Curb & Gutter I I Roadway Cement Stabilization I j Rev. 5115/19 ATTACHMENT 1C Page 2 of 4 2.) Obtain a current (not more than two (2) months old from the bid open date) list of MBE subcontractors and/or suppliers from the City's Office of Business Diversity. ❑J Yes ❑ No Date of Listing = 3.) Did you solicit bids from MBE firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by mail, exclusive of the day the bids are opened? © Yes (If yes, attach MBE mail listing to include name of firm and address and a dated copy of letter mailed.) ❑ No 4.) bid you solicit bids from MBE firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by telephone, exclusive of the day the bids are opened? ❑ Yes (If yes, attach list to include name of MBE firm, person contacted, phone number and date and time of contact.) ® No 5.) Did you solicit bids from MBE firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by facsimile (fax), exclusive of the day the bids are opened? ❑ Yes (If yes, attach list to include name of MBE firm, fax number and date and time of contact. In addition, if the fax is returned as undeliverable, then that "undeliverable confirmation" received must be printed directly from the facsimile for proper documentation. Failure to submit confirmation and/or "undeliverable confirmation" ❑� No documentation may render the GFE non -responsive.) 6.) Did you solicit bids from MBE firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by email, exclusive of the day the bids are opened? ® Yes (If yes, attach email confirmation to include name of MBE firm, date and time. In addition, if an email is returned as undeliverable, then that "undeliverable message" receipt must be printed directly from the email system for proper documentation. Failure to submit confirmation and/or "undeliverable message" documentation may ❑ No render the GFE non -responsive.) NOTE; The four methods identified above sire acceptable for soliciting bids, and each selected method must be applied to the applicable contract. The Offeror roust document that either at least two attempts were made using two of the four methods or that at least one successful contect was made using one of the four methods In order to deemed responsive to the Good FeIth Effort requlrement. NOTE: The Offeror must contact the entire MBE list specific to each Subcontracting and supplies opportunity to be in compliance with questions 3 thru 6. 7.) Did you provide plans and specifications to potential MBEs? ❑ Yes ❑ No 8.) Did you provide the information regarding the location of plans and specifications in order to assist the MBEs? 0 Yes ❑ No Rev. S115119 ATTACHMENT 1C Page 3of4 9.) Did you prepare a quotation for the MBEs to bid on goodstservices specific to their skill set? ❑ Yes (If yes, attach all copies of quotations.) 0 No 10.) Was the contact information on any of the listings not valid? (If yes, attach the information that was not valid in order for the Office of Business Diversity to address ❑ Yes the corrections needed.) NO 11.)Submit documentation if MBE quotes were rejected. The documentation submitted should be in the forms of an affidavit, include a detailed explanation of why the MBE was rejected and any supporting documentation the Offeror wishes to be considered by the City. In the event of a bona fide dispute concerning quotes, the Offeror will provide for confidential in -camera access to an inspection of any relevant documentation by City personnel. (Please use additional sheets, if necessary, and attach.) Company Name Telephone Contact Person Scope of work Reason for Rejection No quotes received by MBEs ADDITIONAL INFORMATION: Please provide additional information you feel will further explain your good and honest efforts to obtain MBE participation on this project. The Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed on this contract, the payment thereof and any proposed changes to the original arrangements submitted with this bid. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance shall create a material breach of contract and may result in a determination of an irresponsible Offeror and debarment from participating in City work for a period of time not less than one (1) year. Rev. 5115119 ATTACHMENT 1C Page 4of4 The undersigned certifies that the information provided and the IVIBE(s) listed was/were contacted in good faith. It is understood that any IVIBE(s) listed in Attachment 1C will be contacted and the reasons for not using them will be verified by the City's Office of Business Diversity. `1�� 'a i-R— Printed Signature Autho �` ed Signatue President Title Peachtree Construction, LTD. Company Name 5801 Park Vista Cir. Address Keller, TX. 76244 City/State/Zip Office of Business Diversity Email: mwbeoffice@fortworthtexas.gov Phone: (817) 392-2674 David Braack, GM - Operations Contact Name and Title (if different) (817) 741-4658 (817) 741-4648 Phone Number Fax Number dbraack@peachtreecon.com Email Address 10/14/2019 Date Rev. 5115119 PEACHTREE CON S-TRUCTION, LTD., 580I Park Vista Cir. + Keller, TX. 76244 Phone (817) 741-4658 e Fax (817) 741-4648 October 14, 2019 City of Fort Worth Office of Business Diversity Economic Development Dept. 1150 South Fwy. Fort Worth, TX. 76104 RE: Late quote due to incorrect email address Dear Economic Development Dept., This letter is being included in our submitted MBE paperwork for a job in which we were lot bidder. In preparation of an upcoming bid, HMAC Surface Overlay 2019-6, we submitted a Good Faith Effort correspondence using a list provided by the city on 9/20/19. Today, Monday 10/14 we received an email from CC Zamora Construction asking how they did on their bid. We never received the bid. Furthermore, that firm is listed under NAICS Code 238110 Pour Concrete Foundation and Structure Repair, which does not apply for concrete sidewalk, driveway, and Curb & Gutter repairs. They would not have been on our Good Faith Effort correspondence. Nevertheless, they apparently attempted to send us a quote, but on bid day, 10/10, their email was sent to the wrong email address, mlui peaclitree.com. It should nave been mltiig@peachtreecon.com. We had already committed to another concrete supplier as well as their second tier supplier, so we do not need a quote from CC Zamora Construction. We will communicate to them about their wrong email address used on bid day. Kind regards, David Braack Peachtree Construction Specializing in UNIIAC Paving Barry Clare From: Shekhar Mamtora <Shekhar@zamoraconstruction.com> Sent: Monday, October 14, 2019 7:28 AM To: mluig@peachtree.com; Barry Clark Subject: RE: HMAC Surface Overlay 2019-6 - COFW Good morning Marshall, I am just following up on the bid I submitted for the City of Fort Worth project. Let me know if you have any questions. Thanks, Shekhar Mamtora Estimator C: (817)366-9747 C.C. Zamora Construction, Inc. Main Office: (817) 759-oo63 Fax: (817) 759-oo64 P.O. Box: 1o396 River Oaks, Texas 76114 From: Shekhar Mamtora Sent: Thursday, October 10, 2019 7:35 AM To: mluig@peachtree.com Cc: Lupe Zamora <Lupe@zamoraconstruction.com>; Linda Zamora <Linda@zamoraconstruction.com>; Martin Carlson <Martin@zamoraconstruction.com> Subject: HMAC Surface Overlay 2019-6 - COFW Good morning Marshall, Please see attached quote on the City of Fort Worth — HMAC Surface Overlay 2019-6 project. Zamora Construction is MBE, DBE and HUB contractor. Please let me know if you have any questions. Thank you, au* C.C. Zamora Construction, Inc. Main Office: (817) 759-oo63 Fax: (817) 759-oo64 P.O. Box: 10396 River Oaks, Texas 76114 Shekhar Mamtora Estimator C: (817)366-9747 David Braack From: HED_MWBE <MWBEOffice@fortworthtexas.gov> Sent: Monday, October 14, 2019 10:33 AM To: David Braack; HED_MWBE Subject: RE: Request for MBE Supplier Lists Hello David, C.C. Zamora Construction is certified as MBE subcontractor and this company is listed under NAICS Code 238110 Pour Concrete Foundation and Structure Contractor. Nevertheless; if you can provide documented proof that their e-mail address is in valid, please provide that documentation in your documents and submit your documents to the Purchasing Division. Thanks, Patty Jean Wilson, BA, MCA, ECMCA Senior Contract Compliance Specialist Economic Development Department Office of Business Diversity 1150 South Freeway, Fort Worth, Texas 76104 Phone: 817-392-2678 Fax: 817-392-2681 patty.wilson@fortworthtexas.gov www.fortworthtexas.gov/businessdiversity City of Fort Worth - Working together to build a strong community. How am I doing? Please contact my manager: Gwen.Wilson@fortworthtexas.gov -----Original Message ----- From: David Braack [mailto:dbraack@peachtreecon.com] Sent: Monday, October 14, 2019 9:29 AM To: HED_MWBE <MWBEOffice@fortworthtexas.gov> Subject: FW: Request for MBE Supplier Lists Importance: High CAUTION: This email originated from outside of the City of Fort Worth email system. Do not click any links or open attachments unless you recognize the sender and know the content is safe. Dear Patty or Melani, I am wrapping up my submittal for MBE as we were low bidder on HMAC Surface Overlay 2019-6. Today we received an email from C.C. Zamora Construction wondering if we got their quote, which we didn't because they had a wrong email address. I did check the MBE listing attached and don't see them on the list anyway. I remember that they once were on the MBE listing. Have they lost their certification? If we get their quote today we don't plan on using them because we already committed to another 1st and 2nd tier concrete contractor. Thanks, David Braack Peachtree Construction -----Original Message ----- From: HED_MWBE [mailto:MWBEOffice@fortworthtexas.gov] Sent: Friday, September 20, 2019 10:48 AM To: David Braack <dbraack@peachtreecon.com> Subject: RE: Request for MBE Supplier Lists Importance: High Hello David, Above you will find the following: 1. Your complete Request for MBE Listing Form 2. Peachtree Cover Letter and 3. MBE Listing (Please note this list is good for 60 days.) Thanks, Patty Jean Wilson, BA, MCA, ECMCA Senior Contract Compliance Specialist Economic Development Department Office of Business Diversity 1150 South Freeway, Fort Worth, Texas 76104 Phone. 817-392-2678 Fax: 817-392-2681 patty.wilson@fortworthtexas.gov www.fortworthtexas.gov/businessdiversity City of Fort Worth - Working together to build a strong community. How am I doing? Please contact my manager: Gwen.Wilson@fortworthtexas.gov -----Original Message ----- From: David Braack [mailto:dbraack@peachtreecon.com] Sent: Friday, September 20, 2019 8:58 AM To: HED_MWBE <MWBEOffice@fortworthtexas.gov> Subject: Request for MBE Supplier Lists Dear Office of Business Diversity, Attached is a request form for MBE Firms listings. Please send the lists to me in Excel format if possible. My deadline for Good Faith Effort is Monday, so please send it to me sometime today. Thanks, David Braack Peachtree Construction Joint Venture Page 1 of 3 -FORT WORTH CITY OF FORT WORTH MBE Joint Venture Eligibility -Form All questions must be answered; use "NIA "if not applicable. Name of City project: HMAC Surface Overlay (2019.0) A joint venture form must be completed on each project RFPBid/Project Number: 102098 1. Joint venture information: Joint Venture Name: Nlf'4 Joint Venture Address: (If applicable) Telephone: Facsimile: E-mail Cellular: Identify the firms that comprise the joint venture: Please attach extra sheets if additional space is required to provide detailed explanations of work to be performed by each firm comprising the joint venture MBE firm name: Non -MBE firm name: Business Address: Business Address: City, State, Zip: City, state, Zip: Telephone E-mail Telephone E-mail Cellular Facsimile Cellular Facsimile Certification Status: Name of Certifying Agency: 2. Scope of work performed by the Joint Venture: Describe the scope of work of the MBE: 11 Describe the scope of work of the non -MBE: Rev. 5115/19 Joint Venture Page 2 of 3 3. What is the percentage of MBE participation on this joint venture that you wish to be counted toward meeting the project goat? 4. Attach a copy of the joint venture agreement. 5. List components of ownership of joint venture: (Do not complete if this information is described in joint venture agreement) Profit and loss sharing: Capital contributions, including equipment: Other applicable ownership interests: 6. Identify by name, race, sex and firm those individuals (with titles) who are responsible for the day-to-day management and decision making of the joint venture: Financial decisions (to include Account Payable and Receivable): Management decisions: a. Estimating —-- --------- -- ------------ b. Marketing and Sales — ------------------ ----------------- c. Hiring and Firing of management personnel ------------- ----- --- - ----------- d. Purchasing of major equipment and/or supplies Supervision of field operations The City's Office of Business Diversity will review your joint venture submission and will have final approval of the MBE percentage applied toward the goal for the project listed on this form. NOTE: From and after the date of project award, if any of the participants, the individually defined scopes of work or the dollar amounts/percentages change from the originally approved information, then the participants must inform the City's Office of Business Diversity immediately for approval. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the City's BDE Ordinance. Rev. 5/15119 Joint Venture Pape 3 of 3 AFFIDAVIT The undersigned affirms that the foregoing statements are true and correct and include all material information necessary to identify and explain the terms and operation of the joint venture. Furthermore, the undersigned shall agree to provide to the joint venture the stated scope of work, decision -making responsibilities and payments herein. The City also reserves the right to request any additional information deemed necessary to determine if the joint venture is eligible. Failure to cooperate and/or provide requested information within the time specified is grounds for termination of the eligibility process. The undersigned agree to permit audits, interviews with owners and examination of the books, records and files of the joint venture by any authorized representatives of the City of Fort Worth. Failure to comply with this provision shall result in the termination of any contract, which may be awarded under the provisions of this joint venture's eligibility and may initiate action under Federal, State and/or Local laws/ordinances concerning false _statements or willful misrepresentation of facts_ - ----------------- ------------- ----------- --------------------- - __-_-__ -__..---- _-------------- --- Name of MBE fine Name of non -MBE firm Printed Name of Owner Printed Name of Owner Signature of Owner Signature of Owner Printed Name of Owner Printed Name of Owner Signature ofOwner Signature of Owner Title Title Date Date State of Texas On this October Notarization County of Tarrant day of 1 4th , 20 19, before me appeared ®avid Braack - and to me personally known and who, being duly sworn, did execute the foregoing affidavit and did state that they were properly authorized to execute this affidavit and did so as their free act and deed. Notary Public _c'hery� �lorile Notary Public Commission Expires V P A L UZ-0 CHERYL JEROME Notary Public, State of Texas �r �Q: Comm. Expires 08-02-2020 Notaryll) 616044-1 (seal) Office of Business Diversity Email: mwbeoffice@fortworthtexas.gov Phone: (817) 392-2674 Rev. 5115119 FORT WORTH City of Fort Worth Minority Business Enterprise Specifications Prime Contractor Waiver Form Peachtree Construction, LTD. PROJECT NAME: b MAC Surface Overlay (2019-6) City's MBE Project Goal: I Offeror's MBE Project Cor 13 % 6.9 ova ATTACHMENTIB Page 1 of 1 IVINVfDBE I X I NON-M/WIDBE BID DATE 10/10/2019 PROJECT NUMBER 102098 If both answers to this form are YES, do not complete ATTACHMENT 1 C (Good Faith Effort Form). All questions on this form must be completed and a detailed explanation provided, if applicable. If the answer to either question is NO, then you must complete ATTACHMENT 1C. This form is only applicable if both answers are yes. Faifure to complete this form in Its entirety and be received by the Purchas nq €7iv.isiot3 tto lak2r kl�axt 2-00 m, on tho second C Ity business da after bid open In , exclosive of the bill 0peninq elate, will result in the bid being considered non -responsive to bid specifications. Will you perform this entire contract without subcontractors? YES If yes, please provide a detailed explanation that proves based on the size and scope of this project, this is your normal business practice and provide an operational profile of your business. x NO Will you perform this entire contract without suppliers? YES If yes, please provide a detailed explanation that proves based on the size and scope of this project, this is your normal business practice and provide an inventory profile of your business. x NO The Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including MBE(s) on this contract, the payment thereof and any proposed changes to the original MBE(s) arrangements submitted with this bid. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed by the MBEs on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance creates a material breach of contract and may result in a determination of an irresponsible Offeror and barred from participating in City work for a period of tim�6N& less than one (1) year. t I� Auth d Signature President Title Peachtree Construction, LTD. Company Name 5801 Park Vista Cir. Address Keller, TX. 76244 City/State/Zip Printed Signature ' David Braack, GM - Operations Contact Name (if different) (817) 741-4658 (817) 741-4648 Phone Number Fax Number dbraack@peachtreecon.com Email Address 10/14/2019 Date Office of Business Diversity Rev. 6/15I19 Email: mwbeoffice@fortworthtexas.gov Phone: (817) 392-2674 City ®f Fort forth MBE Good Faith Effort Form _ 3 J p u'J,z 1 FOv' E}I# m City of Fort Worth - Office of Business Diversity 1150 South Freewayl Fort Worth I TX 176104 I Office: (817) 392-2674 Certified M 13E Firms for ConstructIusi Request for Listing PLEASE ANSWER ALL QUESTIONS ON THIS FORM TO ENSURE FASTER PROCESSING COMPANY NAME: Peachtree Construction, LTD. ADDRESS: 5801 Park Vista Cir. CITY/STATE/ZIP: Fort Worth, TX. 76182 REQUESTER'S NAME: David Braack PHONE: (817) 741-4658 FAX: (817) 741-4648 EMAIL: IS THIS A CITY OF FORT WORTH FUNDED PROJECT?OYES Q NO HMAC Surface Overlay (2019-6) IS THIS A FEDERALLY FUNDED PROJECT? OYES NO dbraack@peachtreecon.com IF YES, PLEASE PROVIDE PROJECT NAME IF YES, PLEASE PROVIDE PROJECT NAME BID OPENING DATE: �°�I3 I�� l OR PROJECT DATE: YOUR REQUEST WILL BE RETURNED TO YOU VIA EMAIL UNLESS OTHERWISE SPECIFIED, SPECIFY OTHER: CONTRACTOR 1 CONSULTANT Concrete Sidewalks, Etc. Concrete Curb & Gutter SUPPLIER OPPORTUNITIES Hot Mix Asphalt Hauling by Dump Truck Roadway Cement Stabilization This listing inclusive of the commodities you requested can be utilized for two months from the date of this letter as outlined in the Business Diversity Ordinance #20020-12-2011. If additional commodities are needed within this two month period please email your request to the Office of Business Diversity at: mwbeoffice@a fortworthtexas g Y. David Braack From: HED_MWBE <MWBEOffice@fortworthtexas.gov> Sent: Friday, September 20, 2019 10:48 AM To: David Braack Subject: RE: Request for MBE Supplier Lists Attachments: 20190920093357109.pdf; Peachtree Construction - Coversheet.pdf; 190920_MBE Listing - Peachtree Const. - List good for 60 Days.xlsx Importance: High Hello David, Above you will find the following: 1. Your complete Request for MBE Listing Form 2. Peachtree Cover Letter and 3. MBE Listing (Please note this list is good for 60 days.) Thanks, Patty Jean Wilson, BA, MCA, ECMCA Senior Contract Compliance Specialist Economic Development Department Office of Business Diversity 1150 South Freeway, Fort Worth, Texas 76104 Phone: 817-392-2678 Fax: 817-392-2681 patty.wilson@fortworthtexas.gov www.fortworthtexas.gov/businessdiversity City of Fort Worth - Working together to build a strong community. How am I doing? Please contact my manager: Gwen.Wilson@fortworthtexas.gov -----Original Message ----- From: David Braack[mailto:dbraack@peachtreecon.com] Sent: Friday, September 20, 2019 8:58 AM To: HED_MWBE <MWBEOffice@fortworthtexas.gov> Subject: Request for MBE Supplier Lists Dear Office of Business Diversity, Attached is a request form for MBE Firms listings. Please send the lists to me in Excel format if possible. My deadline for Good Faith Effort is Monday, so please send it to me sometime today. Thanks, David Braack Peachtree Construction FoRTWORT11. September 20, 2019 David Braack Peachtree Construction, LTD. 5801 Park Vista Circle Fort Worth, Texas 76182 Dear Mr. Coby Brown This is in response to your request for the attached listings to assist your company in seeking and utilizing MBE sub -contractors and/or suppliers: Please note the attached listing is provided from the Business Diversity Management System. If you believe a firm is missing within the services F supplier opportunities provided, please contact the Office of Business Diversity. Contractor Opportunities Requested Concrete Sidewalks, Etc. Hauling by Dumptruck Concrete Curb and Gutter Roadway Cement Stabilization SuiMAier Opportunities Reauested Not Mik Asphalt Supplier Contractor Opportunities Provided 237310. Concrete Paving (highway, road, street, public sidewalk 484220: Dump trucking (e.g. gravel, sand, top -soil) 484220: Gravel hauling, local 484220: Sand hauling, local 238990: Curb and Gutter Construction, Residential and Commercial Driveway and Parking Area, Concrete 238120: Concrete Reinforcement Placement Contractor Opportunities Provided No MBrES The attached listings can be utilized up to two months from the date of this letter, per City of Fort Worth's Business Diversity Enterprise Ordinance #20020-12-2011. if additional commodities are needed within this 2-month period, please contact this office and your request will be processed immediately. Thank you for your interest and if the Office of Business Diversity can be of further assistance feel free to contact at (817) 392- 2674. Sincerely, Senior Contract Compliance Specialist Economic Development Department Minority/Women Business Enterprise Office ECONOMIC DEVELOPMENT DEPARTMENT OFFICE OF BUSINESS DIVERSITY THE CITY OF FORT WORTH * 200 TEXAS STREET * FORT WORTH, TEXAS 76102 Phone (817) 392-2674 * Fax (817) 392-2681 a a v L 0 d U c Ln E 6 p m V H C 7 LL a _ -oc u — s > O O c c w V m _ d O U v v v m c E m Y 7 O V C 7 Y L N Q m a O L_ r CL F t n G CL n m C O E _? ' C a �i cG L ro a O Q7 U L a O ? a a9 m p p m O Q u O U = Z Y N ._ 0 _ a � T 10 U m CL O U U } a U + f] E m w a m a m m U O � a u O U c ti T T p n 0 c z c V m a a a a @ m {O O a E 3 o V C O a m a � m E p 0 }O E c 0 Q 12 v c H w O a Y 4 u C m n. Q a ro c L u c O -o L c 3 a p . a m tf ro 0 ro a a o a N u p C E O al E N p E � O C _ O O 00 0 a O O - m = p p y m to a V v V a+ E C oo E c p ao E = V OV N a > 8 o `N° �' ° p O @� O c O a O o m o >- m a p E y c n i CL @j Ud T a) E u @J m u E m m e @J Y Vi -� a E L y. L O - } - a 0)�-1 00 00 a EO ^ .0 T d' 00 d' N rn r No T L r- Cr1iO N o N 00 n M EP v n 00 Ql n � dl n nl CO 00 ro DO ti co ca CO Ln n Ln o a N o" rn ti r co a n rn A M n lc 0 00 m .-i N n [h to r1 .--� to N m N A EA M M m M Vl M V l0 ET M ri 00 61 Q', M n 1i In Ltl 1- T n rV N a 01 V m 0 00 LA N ill N c-I C r If, M m C n A t0 N m w a 0 0 N N V l0 LO 00 10 N V1 Ln A 00 O A M In 00 A N V In N N N c N V iZ tl a A n '� N A n A n 01 T A Y " co N V -fd to co -V. T 000 co Y1 00 T N 0 -t 0 N N M M 0 df Vl N V K cy zt N M �!Y lc Lo O to N N N O uQi in v~i n h Leo n Lin n n n rn Eko h to r- Ln ko r- P. W rn Ln — X !C ` ` X X ` ` a u > � o .. v 0_ a o �o q a m 9 t C n f` V a — 'n a m m a L m a p O iL LY C) ClLn a # Lnai a v m O (7 O m V N a b ? L 'iyy N 0 U in N 00 x +ac a R � � x vl m m a N m m O 0 a n ,n-i C1 000 LNn Lo N m INn O Ln Ol O ri ^ rl U1 � C O ❑ O O Q a O O c m S C Y a v m a m 4tl a V m ` n J a ;] Z 0 �J J 0 d J u4 c c +a V U � m V al U u a to C U H c o .Q m C > C C O U H p O ul � c In W 'O � av�i Q q m o m oiS O a V ,� u t.n z —� a� 5 O e a a � m m a N c o Eo E o p c E O E T c� _ p @) hA v O m c u E O O m O O m Ito �7 � O }` u 0 C W w c O O 0 ) T Yo 'm u u O u O c T E LuJ v`� is N E u a LO @ aui c d�0 u ,? �3 �N O -�� r NJ (aj dc0 7 ob ,n ...� ++ S� N O = m C3J � _u � M x m CJ U �Q. � L S c fl tZ c N O E ao m E! v a)m c @7 Y Y uu O j v � u C _ F a [�J 3 E m i.+ 7a E .O o co m v s m m m m co V) m W O m w N :o 61 c0 n DO rn m m ID N O to l0 tD ti m N m m Vn c0 N .1 h 0 Ln u, ti rn ti ry co N v 0, co m m cD ran to r" r;eLn rl r-i o r: rl. a-T v d v N h ry v vs m in N v O lO a r 1p m 90 W N m N N oa o0 h l0 co r-1 rl In t0 N 0o 00 V O O1 O m h IT m w M c c O ry to w 00 h Vl h m co o 0o " O V m m =. .-I n W to v V. V In h to h oo -D co Lo h0 r co C. h - h 1? 1n N 1- ,--I T r N N ri Ol rl , INO Q � N N Lm ,h-1 In <-1 O +--I t1' e-1 Vn On Iz N V� N O m V a-i lO h In OO m m O 6n m m p!� V m N - N h N O CO m N 0c <t N � Vn On On c0 O T h a O O_ .--I h V'1 N E` V m +D h V V rn m VI N N N m h N V N V fV I� d' r- n h h 'r O h t rl N On 01 L v M L � N_ Ol_ Iq N QI Co 00 -rvr Y m 00 W 00 N h 00 co It N 00 m�'_ Vn CO N CO [ry co c0 O 00 O m W m V Vn ri rl. N r-I O O .1 c-I O c0 m N m N N N N rl N `.] 00 c-1 V :4 t0 N v-I ,1 .y O cy ,--I N .--I O Yr ri j y to w N CD Ca CD VI Vl l0 V) ti ✓] ul rD .O 'm V) r• Vn ti [O h n lO (O h Vn l0 l0 ^ t0 N FF�- C m H N r OC O c L Y rK L O oc O 2 a Ln nc o o �i o a m m -O m m F� ai tea a �o hp t0 m O— N O -- It 0 aa, m m CO rn n O n L n a m m `ry m ai v O D: al a• "i. ri J X L n ti � m a � O a O 0i ` 0' '6 rp p Z_ - d E C c n m > rQr-� U r— � N __ m 0 d' > !` -M m O c Q T Z -O 7 c-I F> p N 2 = O a p rn '6 Z v t L[Lj0 N O c .N-i N d m tNi f6 > w 0 m ,--i x c Z +�. c m m ai a m O �y v °° Q } Ea o co ar ✓i m m 2 cOn v m n 'a o dip m U o_ to U On O 4 m O o V m Vn .--r .-� .1 c0 m no m o pp o o O N KI m m ,-r O ry 00 a N ao O �f m 0 o r O N m O to V Ln a 0. lu 01 N 17, N m m a •n G C= C V 13 N N Lbi) Y ai y of en U iy d O Q O ai c a i+ a G O U u Y �. O L = co m m u c 7 O O r-- n O '0m 0 m Q o m ut � m m w c m IV 90 ck c O m Z' 'c r° E aci c� " m m w m c ._ m m a ar fa a a v N u' z i dui c u S U C o U U Z O ri° U J J N 4 on Q .n ✓1 v Li m z 2 c �°y C no wl [ c 3L bo O O c N N U a U u J U u L u �c F c u 2 J m m E L , u O U It m0 o p U °� mc '^ h m V H t m J C_ O > w ~ U O 0. m # m m it L al N t'n U W S rmr 0.. N C "O lA Y A m= V t f6 4A r+'S r1 3 Z rY1 m O Q Q O� 7 m O 7 1 O f1 `O a O ~ C O p E Ip E m E V E OV .n O C 0 O O U O E OV O 0O� O O O 01 O V� O 7 L O0 Y N T o N O o0 c o� 0 p C � u �1 p O O IIt� O V L _� - N .� N Q X pP' G 0 { L C C 1O aT' T��� V O > Q O L a/ O O fcc0 v ppT�� ���11 O � v x N � O - _V_ C! a O 03 N V Y U O C N pp��� / p0� v G V N Q i O1 T Y m O co L Lai J 7 IO L O CN oL N CO C fn y } +p+ •n Y 3 �A u i �' O �J qp C C �^ C r0 'Y t4 N (t�6� (T�.. J V V N N N y V") N 0.1 — "' N O tL6 bll �7 /�W N w a - Ln ` rO Y O ` cO — Q1 T O C 16 C m V i O m ONO t0 O ON`1U MD 0) a S7 RL ti r ? p E L p ro e c O D d �- = LO N Ln .--I C {D m V m 00 Ol LO O m e-I rl m 00 M m f Ih 01 N 01 ci LO .D lD LD l0 61 m N -4 lU 01 M O Ln Ol l0 O r-I n Ol Ln vv .-I Ln N m n lO Ql f I!1 h In Ol V' n H OO f1 N -e) N N m m N cO h 00 a Q co O1 N N It Ln O m 00 ID W Ln m N h n N V h V N h n 00 r, n 00 00 N M 00 00 00 co 00 co N V 00 O O 71 Gr 0 rD H M a ''a w U) N V n n h h O to rh LO O OS O Ol It 61 1n h Ln .--I h m f w lO N" m lO m 7 O h V m N V m m c-E M N IT •) 00 LO ul d' f' T tO n N LD lfl h O1 11 N 91 1?Q rn O m LD O O lT O r'0 rV T T 91 ill In ✓7 �3 e-I ql �1O1 C7 l Il to 10 0) O r..m m rti =� Ln .1D M O ri f-1 •O [ff fY f m n h ro V eo 00 m 0o h m ui 00 Ql LD .--I O f n al 00 w O h m m m n v n O v 00 cp O 40 J7 v n v LlY f Ln rn Ol LO m m n D V N N n f+ cY h h I•, h f f n f W 00 N 00 00 N O1 f N W 00 •N-• � � 00 lb N W 00 00 00 .,I N OO N T v] n ID Ol 4 h l{1 1p W Ul .-I m n m N •.O aG O h c-I Q m f ]0 ri M r1 0 0 Ul cy l!1 m N m LO N l0 N H H G O m ry ID [rO O +D lD O I<7 N ClN Q Ln :n n 1p 0 1D O N O .--I w T-L N O h ^ n ll V_ Ln Il >\ n n n l0 Ln n [c LD h h tD A 1p w H X X X lX- N 2 ~ Cb. L L L Y L 0 d n L o P }} 7 v o a m a "C — o M m W 0 }}In 7 ° o C �° o r Y? — � ,H 3 r N — E o s ._ �-- ee L N r0 — r= 0 ^ ra a 3 � o `1 n .c m LQ LsaP w _ Q X U) `~ T IL w a Ln p` al a n ¢ H > i V Ll LL -t3 al Ol -6 01 'r0 Ol f6 W U 0 w 0 in N LL w a0 = [11 Yn O DA C N Q N a m N Y N o Vl r6 a K a cc a C O Y � a 3 3 to - 3 N z m a z o O N c 0 0° C b0 C z LL C7 3 m @1 C o L aj L z Z o 01 O r0 C a = C -0 0 J y c � O C C O cc G no @ 01 3 U L m cn Y U Z U _ o a �i 1- U 00 z w fv vpi Y a Q m n Q Z N O N O Q CD f .-r m I-LD w m �-1 r-I ci V L-1 f0' ri =3 O O L.r) O Ln N N O O N 00 InO N O n N N O O O 00 r o N CD CD m N .H-. m� Ln C O N O U CL [6 N O N N N O L ro c N p N i0 IU .0 �L vvll O O �- C C Y -_ b v L m Ln } a O p N C ra H 'V 41 O O O LI m P N W cOO N 9 C � Y P N 01 O 05 Ql o C v ++ O > qj P = E 6 a' a p LL c @ a m y_ N D G c I-- p m cO al 'a C O [.7 p p N�fu V C L '�^ N C l6 a ro ai ar V > lu to G C d0 d0 — C � V p- r10 � � ♦- V I- C b by O U Y Ol L J tZ C Ctw p- V w CI m F O �^ C trP L J c y Ol vi Y C O V VI C a _00 m s L F- ` E Ol LZ Q 7 C c 0] Q y?, = N O O ~ O_ O 01 N rC6 O N O �"� al N 3 al ¢ co m H c7 L) . x ` m m 0 H C o E E O E o U D 0U U� O O C VO li E O E O p L V_ o _ 0 o o m o O T m E Eo E T O E O V .� E O Lj V C 2 ) to. E �1 c O rr�y���' u la bo L O Ln N E ma�y``. V i'' C D Y 7-- 10 IO u i iJ O O O U H .V m �J C1 ti �1 2 E n0 �1 co O O o_ Y u 0 Q L1 E � I a0 E u {n 2- o o r0 m 73 � M {x6 O W 0 ov0 O -o c i " @ a0 a+ W C CdJ p �D O Y l! p }-. E N [i 01 u c O m }- V L O .� to o0 4 O m c Lta 3 h m Y a O @J (c3j c Ln N N N di •- N c E Ln o D Yj E E O iJ O :_ S E 7 E j5 c m -O 6m0 m C j 0 Q oo %` of O l6 +O+ li L �n j O V .0 C }- f0 L O to c } l6 t' U of N _ O L G I O O m 00 co I- to r W m v Ln v m ,y a m m Ln m a1 M N N m Ln m m Lr oa 00 m Ln o n n m li ri n W m CO M Ln N V r� v m O tD T b6 P, lD m LD 00 U) .-a OO V 111 I, N �o O rn D1 V V N ld Ln N r- r- a V M ul N lD m n m N co W N ap Q I' m T to r, 1" M1 cn r- tO O r. A r. V N m 00 c0 LO V .-I .--1 Lo � v !0 1d O] .--I oti .--1 00 -i W e-I v n 0z 01 N O N tD i r, c0 m Ln r- 00 m -n V O LD V 01 N V CJ M C, d' try a N {O 00 00 O {O co O O O 01 G 01 c-I N m o ♦-1 r- �i {Y� n m '-I Go m O m r- kD G Ln rV V d' Ln Ln rr� LD ri a0 d m Cl* � [V H MF cD tD rl �-1 G Ln .A n N N In N M N 'rD 01 a 1? N N F` O �n n LD O O m 010 h {, 00 P r-L ci Ln O do Ln vn Ln N 10 00 m U7 rW m r-L cn V r- 0) h LOA 5! co M N N Ln N M in N lD Ln W N W W 0000 M N LDD v CO a {a n of r r- O K a 00 V V V N N O 1� F O 1� sT a n V 1� m 01 N m O a I, CO 00 On t0 Ol � ,--i N .-� N .ti .ti r cF N W 01 D1_ .-L D0 - ap a T .-t a0 .� N .-L r .� .-L N W N 00 ti un 01 Y r� to 01 VT m T CO M V e-I N m H O H O .� On Ln � M h a tD LO M O O n W r- tD 00 to .-{ M .--� O .--� d' m ri m M N a-i m G O O 90 r, v-i m O m" n n h l~O Ln i L Ln lN0 sn Lei L~D L~D tp tND in Lmn Cc Lpn ttD Ln If !Nl] � LND Ln � H x x X C t:C LC LC � C t t a v 0 O 0 C O O O O O O O O cCp aic ' OS " t� m - -T V t = t t LN O l m w pO p {o p Q ar m Q u6 C? A v. U L. Ix A -d 0 0 4D Ln v; an .-t QJ a a{ C y .°F nF N - N N L 7 "O m v N C 0 �' Ul ` m 2 sU_ lJ U LL J V] �- u LD h n C � N N NCD Y O m a V G C m a O N (K .� u .Ni N > - L 10 N r r- LL t6 O O C J m -a N M N C OL i O� e-I C -0 ao .i 7- = e]' OJ - C! O r, L .O xD `6 m V x LL Ln r x N 16 x ? v_o- j E O h LL ca {..f O LL ✓I ]G C7 V Z v] v'1 d O �w VI h = 00 O 00 N 00 0) V n M e-I 01 CO H tD O •D O O .� [O O Vl N m V7 �--I m n .--I r lD d M N H V m O to (\ f` lD N V CO 01 GP Ln O Ln O O Ln N Ln m tD O O l0 O O N N .--i N :J O N � CO 'D 01 Q r? •D12 r+ N y m N � Q O O C O N N a O a0 O (N 0 N `l D C N a C a1 C O N N tb a C al O L [6 L, N t iC.. t0 +. L C 1 rn C c U 2 4 U c j = =r [CO �% a = m O O p - v 0 p `to E p m C � 41 N 6 -tom a O C °; h - 7° -p L1 E hp0 ) T •� Y] n C G 5 o N O ro j t al rp t O al m a > 0 p m in 7 io '� LO m a¢ an �o O al' t4 5 - Q ( -_ - Y. ¢ LJ iN C7 Q' o. T _ - r-r ri - _, - S V O O 3 (LI ii i J W C J U 7 A C lJ CL J a)'O J J C m` ° h t "�° l6 E ` N -} c E Lo p v a L m y' u O J C C� pp U jp O 60 2 U V C uy bA U U t `J V _ C U N J _ C U C D L K U U J 7 V Y Y Y Y +-' h on G V d6 Y FO 3 N J Q O h u i i c�i j ` C Q JO C C= h Me> -O h f6 Y N ? K v IL6 U C O C: p H C ? O 7 h h h L U 'U 16 T > L6 'O i L 7 O U L qJ � W a d N N C O C Q N - QJ _ V - O O Lo (,] SL L !; - _ t- O L7 {n In T T Q. "I' - lO © O J J J J E 0o o E E =_ E o o m o E m E o o - G o am o E an c E E � E o o 8E E o E E o E O is O O O O O O O nm O O �` E m E N i O� -O NV V -D1 C u� '= @M �l u m L CaJ /��'' CA d[> bo oo: N a' C c C m 61to in a) p pp �n ro d pp`� bA .M h M x m c M O 0 in LO �E coI V Y •', N N O m dl u O m u 9a E D O m C Q Y U C O -6 C .2@j �p E.m O o -a v Ln 6 umu _oID o c ° m -D=s ° E O o m v m E _ = j°' F- ff ,-� m un +--I Ln e-I m co co Ol to h e-I O m co n �r m m o a rn N 1 h Ln m `i a oo cO oo io oo 0 d0 oo Ln o G h a' n' oo Ln h ` V T •O op fV T N f, H N mm O Omo 11 a m oo O O V .--I M �o w kD a d V N r, V of O r, W W 00 W N OI o1_ m m Jl oo .� N LP a O d .--i c 90 �--� LA u) c+ N a r,m d ao Va O m w N O m G N O N W a h a m [O m a CF o r,d' No) N N a M !� In r N ua m o) ID V rl oo W w, a a, N LO In P- O ri rl Q1 oc m N c0 m [D oo O O G O m o o m 9 d m a co on N M It Ln T T m T m m v L? r o o m co V] l0 o o h rn on d m 01 u2 ! h N N N N h u) ! -m N a ID a In � Ol m Lo rM � M i lO c0 Ol N o lO 0 O7 oo M m Vl n h h h a rq N O N O N m N r, h a' V h a t, h ♦• h d m W Od W r,n �--� n DD N !z v a Ol h O1 ti Ce io V h Ol_ ,--i rr o0 00 .--i N ti ti N ti N no N W H co N oo r co a Q1 o T Q1 r-i oia O +-i O1 r, w N N l4 N ea O O M a w m 'r.0 V ei r-1 M .� O r-I lD N m o .1 O O No o N m a' Lo o O .-[ O d c-[ N H w U 0 CO a K N .--I N r-i M rt l0 ri e-I .1 M e-I to ID w w,r-i cO u; ul m m c0 Ln l0 ul ^ �A U] I!1 'O ul �D i3O l0 lO X X N aw a C m e C `❑ t t t 0 0 o o a o a n ❑ o o o o > �' z," O m n U1 = O= O o O O L O LL aa. W -r? O U O U n O N o �l O Y 4 j a � m j T F- -O N � v 0 mm cc f o m qj o '6 a a m J C m N -p C O W u] i '- ❑ m T -O 9J O w C J N m? O m O T trf. N no [o N eJ 7- S O_ N 'J- O bo O 'ar chi a 3 '� O O ID O N �--� o in v}i C OJ '6 N O J N Y @ C N C �? W M N N fC6 W U w U CO N l7 - N Q }-- U N Y M t a Q Z - x tvco w 0 Ln O O� O h LD z .--i W ti ti a in iD Ooo m M � o O h N V N N 0" N V r O] N G n ri ✓i a N O N .--1 V .--� M O O a 0 0 [1'1 c-I O m I Q N a0 V �M-1 W N r-I fD all M �! N m O -p O _ O m aHl O U 'i H c m O toPm O = N Sl � c ❑ oo- L — a c ❑ y a o: y] .2 m � � ,a o °1 E m m a -°10 7 'a m v o oa J m p 0.cc V' m a v O m EL w u cO O c p C O N C E Y_ m m m bo C C OL ? C b N cC J —❑, O 3 r 'O d .�j Q Q of eT !l 5 3 A U U Vi o C J C C ym, U N C ¢ y U W a tr0 �y o Z v1 � C U % m ❑. bai Y � l7 dJ t � u Y U m Q C .� O U Y bA �• ~ TJ w, UI u w Y O �' m ad U E u C O. o f db C i O C ❑ K ~ ] C U W C M `- m -j O i y Y C aw C Q C -ZS Y ` Y ✓) 3 V Q U C N O .a4 = UO J U N C V i E > h C' N m 7 i am 3 m Y ❑ tf m S S S N O O O 4 Z J Q as m h- E } m a 1p J J_ Cl n _ Q' � W. M eY - A A .� J `� M O E E O O LD E pU p 0 - O E O O o E Y E as O O @j ° E p E p- L - E E O o -� m O 0 E E Ou p -Q L CO t)0 E O U O m 0 T _ � m E E tw p tJ E U O E E E a+ .� a u_ m @1 m }' m @7 O O 00 c CaJ E m E E (dJ E _ O O m 0 0 0 0 0 E O C i ro E c @) t c V m Y T. NO 1 O O 00 U E L - m =` .ro @1 p @i Ul E OD O 00 (aY O p u Cal Q- t>D E - rn O d0 C N 00 z m O C w 00 c1 C Y O m m iT� m LG p40'. 00 Q' Yj p N Y' O) '" 1 L U t "4 m fro a-' }' O O U O L OEO E v N c @) H' y m - 0 u= Y -dCU .ie p m .., C u ._ L m T al C `"'� m O en rn '0 ` a '� ` m F LM m C � C E o ' O Ln p C 3 ` tN0 a) 3 o a- Ua O N a L E> @7 E c m 12 u o E a m m �° E R E t' m w L '6 Y T O m o N 0 L c ` m 7 F m' U N N i m 'p U O V rn m a V O a 3 L n }. m m v C U a) _ _ _' T- - _ _ _ -" -I m P 0 E 1� 00 >n r-i w m m V m 0 ID V T+ Ul to r-1 10 U1 m tD N .-1 N m Uf m m Ln OO 00 M N CD h I-.H ro K Ln 00 4 h" M V O Ln O N h H M 0 tD 1f1 h 00 .[ n rn N lb V] :D cl V M O O N O rn O Ob to cn .--1 o v 1n — ri1 to In al 1n N r- d- r- r- �* � m In N w M v] M (74 w O0 N OO 0 M ka N V fhn 0000 O O [D N rl ♦-F lD ri ri ri r1 fr H .--I .--I �.-I .--I .--] .--1 O V v N 00 00 rn 00 00 00_ N 0) al N 00 00 co 00 O h tQ 00 O) h 00 m V O w V rn ' 4 O rn q V m � t0 V H Ln Ln .--1 cl O CR Ul r-1 N tD N O) C) ram+ h m r-1 fftn� h In 00 pp O) h SD to N V Ji• m 00 � W O F,, 4 m V Ln h Ln O h .-1 iy N .n N O) rn V N )0 h t, tD O) rn h V 1n lO N N SD r-1 h H N " M N O M to n to U) V m OO O N 00 tc CO rn ,J to H VI O rn V In N to N tU U) w r-1 m ri rn -4 e) h r, It 00 H N Ln Ill m ,fin N l�D uM'1 O^p Ln coON0 DO M N lm0 r,V T n lmU l�U W Urn) M Ol O V I� N O f� h d h V I� V n m O) N 6i V h n n n h n a tD Vr1 V W N N f` H T ri .--1 h V Ol Ul r-I W '-I W V rn H DO ati N ri ri r-F OO N co r-I tD rn zr_ t- w " r-I O) Is N 00 r-I ri H 00 00 w H c-i H 00 w N m C) .--1 n O i d 0 m Ln V v N h to to m 0 (D F-I .c to N O� ` O O O V 't N .--i N r-1 O r-1 N q a to M N O O V rf m r-I M N r-1 r1 N d d O 11 O N c0 h Cl m ,--1 1n �tYr1I ,--1 N' O N H .--I ,--1 O O .--1 In n ID ID n h l4 lD SO tD lO V) tD 1n tD L(F Vl Ln 1n ul tD lD tD tD 'n lU ld h X X X X K X .L L y L L u �• L .G n o t a `O 0 L a o L ._.. o o O` a ,n — 0 _ i0 c m 0 m m O m m `^ m� w : gy m �0 Q Q 6L U F'Oi O f-a) O n O O .�,'}- n J O ,d O w N O .mi m a to 3 a N } O 00 -O m C J } a a a+ C m d d O N v O �' tYi __ f0 N O v a _ m j v) a F> c)Y `>1 C x C 3 OJ C) 7 C H an d a �l J C m L m a m N L H � in 00 Cl) = Iti t0 m i10 O � N J M N L S 'O -O E m Q 'p ? J i� C c0 O ` m 0 00 `Ct c -1 ?- 2% w _ C) n L Q1 w C ? z N c T N m C G ? 12 - Q - N 7 „� O m W G U3 "" [O O O SD O Ln N O N N )D O) (A V) O U) 00 O Q:] m O 0 M In ,--1 M �t f-F mp O h N O t1Y Q m le N N N C)N O N h c-1 r, to m CI' h V to N in O O O N 00 ri N M n N a C � O p a w :n r c a Q E v c a n -a >3 m m w m E E U O 2 m C ai G 1v m O O l.7 O a O O a O O C a 0 a N 7 N pOp tea N CA V 4 t7 io f0 N O C 0) OOJ a N E m i j w E O Q N h " O m E m m J 4' F D Y 4T t� ,. .� .0 _ a O m rr !l O _� er O ? 4 > S !-. U]' 0 } J a '0 � J O c CD Z O. C T _^ J a V X C U O c U .a.. Of K h C 7 F- L b E U c z O N 4[ C t)n c F C C u C O_ U V 'A ab V u --F O t)0 0 I6 Jm+ C V 4 u O Q Y C ` _m 0 -txj y U ` C F 3 tn N vi J U u H w 3 F 7 F F E h- c n w a m R- 3 m -c = .� F ` yr 3 m C N NO a Y O c� G F m 0 lY.l c O N IO m = a a c O v) J F N n Q S u U ? O m 3 U > a a F w 0 n `. U- N a`1 � ro cl C) c m` to u i) t_) n 0 Lu C7 V` U T 2 � m m E 0 E - E g F0 E 0 E c 0 E 0 Cl t 0 E 0 C OU O @) j. C m U N 0 E _U 0 •' la NO @ T e1 .0 0, 0 T �_ @ E C C 1p V E @1 f6 N @j o V m @r 3 2 m s c o v m e @a p m o C�1 m m nca /o > (6 'n LIPY_ U I`l @ 16 UO � N Q Z E Y ca O O E- Ol m Ori rl m m W W Ln d O rl .� CO m l0 L/l 00 fll 4"� iD N Ch r 'i m O 61 -A to M IP ID N co M W IO 0) V I2 P V N r N V N I� n N O1 00 m V O� CO W N N O t4 N M r V) 114 �0 � M 0)m LO M 00 03 0000 LOO I/) d O dl M W •y M V Ln Ol 1p ✓1 W O1 r ry O) O M M O r N r�i N r �O 1p w N � l�l M:! p V rV %J IV N h T N V n h r .-1 r .� r N dl NQl r .-i .o N OO 00 co to N r-I If) ID N ri 00 0 1D w lD C3 rl 0 0 a N O O e-1 O O N rV e-I )D m O Q N to X` X F F X X X X X X 0 CO r O C 0 0 O a N OL 10 N 10 C 10 /t i A >- _ _ 0) Q Q lU m_ ff, Y in r O N N N O 0 0 ? m N 0 a K G1 Y '7 d o T3 a ID o � a o rr = a ca c m � un T s m = o a v -a N a C Y N m O OJ c m X C 0) N p m F L7 u D VI > F- O V 4 m m Y U Vp Z w IN[V cD Iq N O N Q l�V .�-1 pl Z � O Op 0 V 0 C O 0 L N Q) N f0 o o '- o a y o C7 o= 0 m c m u v ^ - Y m O o 'Q n T a N O S (J L] C U a) c m u n m c c Z v) o a m q0 ve o an d0 Q c � u oiS � a a bb Ofl C 7 V 00 'y C N a u w _ U j 0o Z F m m c O 7j O` o Y L' W m E 0) ~ V ? O R wC O O � y Z L 0 w m 0 City ®f Fort Worth MBE Good Faith Effort Form a MBL-- s.-onnted City of Fort Worth FIRE Good Faith Effort form ,,i forms n MIE soiiated by Flailed Postcards .5 N U U r U � 4 lD '� � '� as CCi U •..., `�'" i � '0� � cn 1-4 MI, 00 Qn O s in 7:1 cam, rn p •9 U O 40 N 00 4-4 U ✓� GO co ® vs 00 O rn "iN Z41 ° •� N t,r2l .4 ,0 1�.i V '� ° � � � •ice ° ��.i p1U bA 114 bb Pi 0 In G Q4 e� Iti $�'�p' ran � � � O c� "O • � :� 'e, � O 4-4 '-S400 o W.. ON UD tI N 2', LLJ 4-L" lux CQ c, co rj. C) cl� fl) rG > Ln o ai cd i= 00 V) co co CL al al o tf) wl G —0 � (O W N li Ck CL F. C75 LIJV) 00 Cd -cl C't t; :i �idXc5 On by X IP ON O T: > 0 (N �3 1/3 0 > as Q 0 (U 00 'n 4 VIA �J Cd ON > ON En -0 o .— V) u I'd U) 0 (Z) In WL w k K u u _t� —1 v rL P_ CA IN 0 b bb o , k V LVI 0 E; o 0 CA C.) Cd ,D En cn C"3 0 Q) V en 0 COO 0 kn C,3 Os O ;> ON C G "D cn C's law -0 Go C) CO > Cc N cid 0) 00 P�l 'n LU G .w g J F Q2.: 0 den w 19 O 0 > u ti d) 00 CL� W) 0 -1 Fr (f) rl cd k I cc -I- ID co 00 ( 7) Ol CZ) kn ck, t1i V) 'jt o FYI C) o i'Zr yv I�kf k M I>? b > o 0 E; 41 0 > ;en 0 00 0. Zn x M m O Ln I,- U t— co Cl- fl- ON <D C4 04 UO w c:> J6 n '4 CIS 0 00 P. RU 441 Fwj q cn x r- 7� CD rq o o 7r lo 00 > Cd L) 0 n x -se o C)am' >< � 4 �; e. Ir. a ci) `! F.. 1., C C';F S LO M r: N kri r1l�:y�#j O V] r� O� O � v a N � O 9 O o N + s d ' " `�° n r�a O > V] O O � a � a Zn times r H.. rL N C, o L X r5 ' !`- 1fNii NW n 1 LU VJ i. �� �r L{ 0.y, 4, •L'iYKr r1 � O O N N � � N 0 0 a U • •-• ,?? U M Cd � r o X W V U M r V� � �, al � r, b m w 'A • r g.. j J1J Cl 0 �y �• C r € r � � ii. U i`n•• N r aw �ID tix � LL7t•-[ flirt f> iCi n � O O � N a N N N f, a � Zn° �4 U o m �G �� f' -- ♦ " `_v :� Ell ". 1.14` I'd L7 I 00 Q O N � � M O O O N S U N U N U 44 r U �O D ai O V v M U d O -' U � � �i to F-' .•-* La o a� ova 4i tv ; N L'-', i cn c_ a-+ Cl 0 Yy� Cd 0. •i .�'.-..'-; : by 7_'�y,y � O� O O v N T N � � O � g C/1 P. ay U} O O rn U ai cG 6 �`�"�' co Qom-. Rn Ems+ U GC1 k! t.;•�, N Vie �y t. �O .bb Uri V U3 Q �f LL 0 0 2, 7- —0 en cn C) M C=) > aN 0 0 426 > (d V) 0 0 -u In (D Cd E cd CD 0 IM M 0 N I (:4 C> 0 r— > CD P r!. U �2�FFr�+ 0 E; O g <U U 16 In t O Cd q w PL, 00 kn x u 1°wcu LU u 2 �2 KJ E�: � x H ��4�� 41, 0 7, jam&% 7-T C) N cV X ji CJ ct.. ke IIII L Locn Q r" 7 b Cl 00 kkkkkk�JJ�JJ �1 01 Q p N N a N � � o o N o CJ N 0. �•� 0 � N -G � v 0] �^ � x� c;j CD P. v,� U tifllfiJ LOEd U r LO i 3{ �% 0 t- f.1. h, O cd I 4 r) rN dd� k',' O td w � x Wis O � U N Cd "o a> P Wx i r, Q N W - Cl) '40 0 CD cn C6 P, PT 41) > 0 r:l "20 U) Oqg C) "O_ U) cm xz > V r 4) 00 Zn Cd 00 kn w N rn 24. F 10 F kr) f. C-3 ui UJ U) U > Lf) 0 cq kn LL] 61) 41 r ire 0 ON > C7, o 00 t4 Oo Cd cn 0 CD CD CD fU Cd CD C3 C= 0 00 00 Cl. kn V) w C-1 C6 LLJ tot 0 Z11 tn 0 cc 4) 11 p� Q, � -4 0 LJ kn �WNn MO.- 4— tV . wz' O U In "s "o > u a O > pp t- a_rim x rn r. c:- > CT SUN Q- rr, XO U 00 a, in u �o ri CS C:) Ell CN CL LO a, I-- — 0 Cj 0 Q�VN 4'"j kn I "ILA. �.F IW" Jk j C:, -% GOA C> C> o % 4i, O O 0 E; UP) > p rJ 0 C> u 0 0 4) CD xa Cd c, 0 00 0- tr) 0 ca cc, it C"l a, q V r i 114 Ui O Cl) No� CD 0 > > oo,,-' Yi bl V) fl% J IJ .� I. i. A _� r NIAs rn Viz. � �`• bA O •; � : �L RP. u" � r cq �} fill- �✓ F -ON tic. O �4,�•�i a� rn o C7, 0 0 U j> U�m- U Go kf) Cf © -, a r J li r t a IS h uiI �uiC U 00 rt� ;:j Edcd JJNn " 3 -- o. 0 N l r. C> N T ] � O � O N U N t- C�. v) o 0 . to O ni �; O +, rn U UDr U� Cd a00 o v o � o v U-, o tlLi Nl. n. n (-4 tij r.; o i FYt cn `�- Mu E= Q) (�� '- ® 7 csaHt' c id D �tia ,,. 4_ G.. n Q 6� O O y N 'O tYi N (a 0 0 o + U a) z U N ei 00 U > � r ` V en aj E a� �QF- o o o p Z U Co CL1 w® M N tl R - ELJEL N N H k' � (� rV) C� r I. ai t� T Wit.' U) !I © �i bOr r C U 'n X d> � O O v N J-. r� tB N d O O N � U M In N rI.T 'Cc, 0 N U U Cn ¢0 xCSH U ti m w ON tT o ON N .i o o0 N 0 o� a) N +-+ 7.. U crqv U wM� a--; UN acn aJ L)> U in 0— I U� � � U acn d go �, to r O `t3 't7 00 N to `G U CP 0) - CD r4� i8 #kk i+ Wit.. � J �+Ildfl O O Frr �;3r• � O O N � � N N Cd W i-• 0, � U 4Cd M p � � x R F•r U � a) 0Q0 U a b 17., to �mlLk 4 N Pita s•��'��-rF, � � � Lit F� edit Ql Q N � a> > rn N N U01 Q) p � M U w 0.-. p 00 I U co pa ff r Imo, � �; ■ 3s. 9'I LIJ i ip : sk. f ©LO cd N f' (dam Y Yl GifNn '6 lf?d(1 0 0 F o ko {g4ri~ ty 3 �TYti_5H �CZ) i � O` O N as > °` 0 � O 0CJC1 N O N U o •� Ud Y ky c�UM� ',0- 54 a o M � U U M �a � xp�, �,_, � xQE✓ cd o sl n m co coo pw to U r� 40. � ��'•� N ik,. r` L � U U N O Cc3 vi 4d � r Simi •may ly,�' �1 0 U 'Al "o XO 000 .d a O p N N v cn � N � o0 U N m rri a Q C) y U U M Q0^ O U .°raw :, ati 0 N T d 5-• >� 00 4] N Ld co o Up^ � � E x0� f i' ✓ O � A,� m k L'1 _ N 1;'I R• N L1 > a r� V N X y��r� Q Cn ,. k•i 4 c^�d c p 5 L_ 37 a i O � N T m � N >C� r o0 N � U M V) [� C) 0 U M Cmod U 003CQ m �a rn q �R� N A a J LU tt M 45 O� O r � N v -p M N T td � > rr C p0 o N L) U U 0 4) O y X CNC 0 O W PL, v) x � O CO m N 43 0 '@ n�N' II M y;l 4 u N I` _� fN[n � Q OPi�' "' } 'SLL ?4• , Yf rr Cri M 4� t N 17 E. N IL F+ 4 6, PIT � "o U co [� py, N p O O it ON O N N T a N v U Cl y Ln Do- a Q j> X U l U U M U 0 O P. kn�e u ti W m m CD rn'' OP. n LP C7 w U p� U) tq by a--+ 044. N O c jo U}�4_ s ~ ! 3;{, 3 5# jjJJ�� O C> C> v T N T 'Cf M O O N O 0 4 N C J � a0.i g m ca 10cn 0. Pn c h, � N y �1 ►� , — u Off} F • Ii i sii` ? iFf;err a\ O N � N � o p U N U Y� ry) 0 y U M 000 y I U oCAa] (r; C* 0)r z rn w rn ❑ ,� �C �,un N 0 O > x x I �3 � O p N N T a-+ a N rn j O Oo N U � U U ao t ¢ Q cn I 7 �rg)plti; k.;�r�•o��, w ,ram � ►, r C`� � � o y e � _ rn "' U a� 'O bA 6� i�4 P to [,� O > []h It p N 0 `- Lq U CL C `n Cc) x oflE�i1 N 0 U F" TT N q co v�xt b O '4`f4 ocn �t�' d, a, 0 O o o 07 + �N N N U U �� UM SUN A w qM� CJ> � Uon d �p y 0b 0o �v 11Ln C,U timco ��� U �CL}R7 C:) o" u ci? O�N Lah X 0 LO 00 LO ON 0 r-- UO 0 00 1! Vie 0 wo C,4 X o CN) > C-q +5 0 ' y Oy' 0 Q.. 7, A[F", jl� 1! iu rn CD CD >ff) -d cq cd > (D > o C 0 q) fq 9D. ri 45 > c," L) U 0 cc C> a.) 00 a, krl 1 0 (D (5) � 0 G) I W — 14 M m li,, Q N4 a CL w LL, U) f N U El- 0 LL t- eq N 0 0 0 �t It M.11's N oc� (a rq > 0 0 rq cn Cl) O CZ) > r cn j3 t3 CZ 0 00 C�. tn Cd c) a) 00 1:L, tn �4 L) tio m CIO P:5 4 - ED C'.. jjj • ri) CL NJ cn IN0 0 n Yr <D S C=) ON > Q v > Cl SUN dJ cn CO d) ci u > P > xa CZ3 41) 00 a Zn U) C) el ILI Gl z > uj Lu 4M 0) V) Lk Z [-4 N 00 Z, An•.. C-4 VA, OooO PL4 MAI 12� W . , L 1-4 —;71 > a) > 0 c) cq cn P- > U > Cd U x Cd ID 00 U LLB Le) fir w Ch � PQ z 0 t IL CA U) Lj 1". it Cd o Fq in L- f, � R � W vi a > �' CC h C� N U � kn O W u rFa r •y ti C] f�i Q r Fc3 N UJ CU e�1a�.3 hN i }5 , 5 o L ,. � O L� z74�mp;k I , o, rn CD Q N N i � U O M 0. C!] Cn O O N ¢o -0b U �° do cry LI 0 0 rL ur) i'Z... y.yq J 00 0 1-1 00 7d- LO CA o > cr� 00 o U CV 411 CA 0 CD 0 > 00 In � u ui Pq a> LO FL 00 ON C, Cd 03 O Cq L) IN r-- 0 UO uo 0 0 2 CG 1 Li S- 00 U-3 LEI rn P4,4, > CON 0 G U cq rA In 0 C:) 4 0 Cd co a, a, 0 N }' � N N U > ON O N �• •�„ vl U > X Vj O CD U m Cd 07. C'jo E] C} 6 N r 7 r h.. ti O N ao=.Ctidit o � � � e0i zj: 0 q N N v Ti7 M � � N N > 0, O rz p �3 U r � U N o X N U m U 'y d Cd akfj U � � 7 0m oLP fl t� ® Na': tl I� - T a C> LO Q z h 40) dfFi a ." U p c+1 O �o U CA!� U� [`a it U U N o m w °- i t— cn am Y t— Cl) �m U0 °� U U ai lit ¢p I d0— Si cd o •0 •a m p..i Ef] } U ti rQ �} C rt `.� U m i SD °' k . o ..� � a y m& o\ - m) tx 3 ka§\\ cj / � �-§m & R o pe.� ryf \ ON of Fort Worth MBE Good Faith Effort fora V LDJ 1,41"1 Er- fuirrns sonated bY fir: Ali �' :? •;� - h Mailed Postcards ® Returned to Sender 00 N ,9 N v ate' O bA aU•' N W O as U O r/1 r�-a �, • �A � •O a...� U � U •� N � � � U O • cn 00 ci N m 'd O oo > oo � o � o 00 a� Cd >, E_ O.�•O �p A. �" O `i' N 4-1 00 U cn 4 a] F� U as p w ,-O O O U •O U ,� •O „O O U o on 'ocl (OU to GO O O • r, •-1 v� O U p pp O O N O cd cn CO,4-4 O. O 00 0 od gyp, " U CAG) pp �+-a O 6' w 6a1 . • , �+ N uj tom, N 3� `xr�a�s 0 kn �- �J o �cq T MI 0 to 0 Its d�1 +i1 w q rv` nr„to IlEI`i� 77 �m i.) E;,'a u k� I 0 rL Q N N - CL b O U � � Lt tij� 61 it';0 I!i a+c9>?N y_L1lCk� F�.tfi �f riFtillpF`�f _ in b4 fd yyy�y rx, U F= o ,100 boo € IC-) •�� ; 7313.49 ICE I" IIJ O O iF C% N N j rii s~ � U > a+ IA to t— Gel U; X V u O p. In° �4 U q cA 4i 1 ® ON 61frl cE ?1 E a CCL A `� CA i P7 I It IL Eti' Lit [Ya ill; •' I .P- 1 1 [ u'a'.' ~ E'- �1 V' U v m �'`�-" ^" t,! ' ` 3.> t w 1w' ! tl . "n Eye j 00 O d c� !Lf iV 0 _ eft M -- 40 LIJ Y v.•t �(iRlfit Cv :~ >~ H r-t `C �-;4 In eil L r�.iG 5-5 W 0 P IkJk. t:� IfS :v. I.E- ., _f 4 • ,t " S" cG 6 Ri t fri01 w E i !h.,��{ _ k� s�� k•� E"'• ui �• {^ 7., �t y ip-1 .. ,f r ,4• A :ice tit.4:t riH" isi "3LY7 c'a; iy�, 10 W on p Ill F.l 9w A L- °' O c li3 fy r + �I (Ucv E.lI O O A 'D La i%i U CV ¢ c m I! ! GOO O v y a 0 vi czs U C/7 O O aUi v ti �- O— d ai+: x v Q .. D U Cq r11 W. n a4 v�i U - i'J x�-Z Q � � (J� I., i3 �_] r^ •�. �; ErJ rjrt `i Sf d:' iq ri u �3 of tt3 ; uaE.. ter bfl .>~ 1-J `�"i f1 •` ", o En V3 tJ � It :� as ors 'n oll Ul a` 117 v, W, •-J 3 CD CA Ig o w 7 Oo 1-4 IN -, a' i > o' _ �` v r•-t 1.1 U ai O [� v] Ul o o W 00 U �i� a °�4 City of Fort forth MBE Good Faith Effort F®rr r, E foirms soncitedy telephon4 Citv of Fort Worth MBE Good Faith Effort Form Mi"nE f'irms solic'ited bj facsimile City ®f Fort Worth MBE Good Faith Effort Form AMBL- t 3 S j irms1'!1Ar David Braack From: David Braack <d braack@peachtreecon. cam> Sent: Friday, September 20, 2019 5:59 PM To: David Braack Subject: Upcoming City of Fort Worth Bid - Preview September 20, 2019 Dear Subcontractor, Peachtree Construction will be submitting a bid to the City of Fort Worth for an upcoming job, "HMAC Surface Overlay (2019-6)". The bid date and time for "HMAC Surface Overlay (2019-6)"" is October 3, 2019 at 1:30 PM. We are interested in receiving a bid from your firm for any portion of this project. Please submit all bids in writing, with project specific information in your quote. Plans can be downloaded from Buzzsaw on the City of Fort Worth's website at www.fortworthtexas.gov/purchasing, reviewed at various plan rooms within the area, or a set can be purchased from the City of Fort Worth. If you elect to secure a set for yourself you need to contact the City of Fort Worth department of Transportation and Public Works @ 817-392-7800 for information. The project consists of miscellaneous concrete removal and replacement items on various streets within the City of Fort Worth followed by restabilization and installation of a new asphalt surface course. If we can be of any assistance in the preparation of this bid please do not hesitate to call at 817-741-4658. Thank you for your consideration in this matter. Due to the magnitude and detail of this project, any firm whom does not submit a complete bid with all subsidiary work included will be cause for rejection of the bid. All bids must be submitted no later than Noon on the day of the bid to give us adequate time to compare and contact you if any questions need to be addressed. Best Regards, Peachtree Construction, Ltd This email was sent to dbraack@peachtreecon.com. If you are no longer interested you can unsubscribe instantly: https://peachtreeconstruction.cmai119.com/t/j-u-cljzit-l-r/ David Braack From: Campaign Monitor <info@campaignmonitor.com> Sent: Friday, September 20, 2019 6:01 PM To: David Braack Subject: Campaign Monitor: Tax invoice for delivery of Fort Worth Good Faith HMAC 2019-6 Tax invoice for the 20 Sep, 2019 campaign Your email campaign (Fort Worth Good Faith HMAC 2019-6) sent for Peachtree Construction was successfully sent to all 85 recipients. You were charged UM,5_0)5, Order details Deliver email campaign to 85 recipients $6.85 plus sales tax $0.00 that came to U 0.8 In the Billing section in your account, you can find a detailed billing history. Thanks for using Campaign Monitor. 1 Fort Worth Good Faith HMAC 2019-6 1 Campaign Monitor Page 2 of 2 Fort Forth Good Faith HMAC 2019-6 Sent today to 85 subscribers in List Imported for Fort Worth Good Faith HMAC 2019-6 98.82% Delivered 84 emails appear to be delivered 1.18% Bouncec 1 email couldn't be delivered 85 emails sent to subscribers 0%unsubscribed (0 people) 0 manually marked it as spam (0%) 0 shares across Facebook & email Where are the reports on opens and clicks? Because this campaign was sent as plain text, we can't track things like a subscriber opening your email or clicking a link. if you'd like to track these details, make sure you select the HTML or template format for your next campaign. Close Start spreadin' the news... Share your campaign with friends and we'll show you the results. II h�:/Icreatesend.com/Vj- https:llpeachtreeconstruction.create send.com/campaigns/reportsleampaignReportDetail.asp... 9/20/2019 Bounce Activity for Fort Worth Good Faith HMAC 2019-6 1 Campaign Monitor Page 2 of 2 Bounce Summery Fort Worth Good Faith HMAC 2019-6- Sent last Friday at 6:01 pm The following subscribers did not receive this campaign. Soft bounces are those that temporarily failed but the actual address is still valid, such as a full mailbox. Hard bounces are permanent and mean the email address is no longer valid. We automatically remove all hard bounces from your list. You can read . Email Address Name Bounced Reason invalidEmail@JRubioTrucking.com Last Friday Soft Bounce - Dns Failure (} https:llpeachtreeconstruction.createsend. comlcampaignslreportslbounceActivity.aspx?ID=... 9/23/2019 Bounce Activity for Fort Worth Good Faith HMAC 2019-6 1 Campaign Monitor Page 2 of 2 Bounce Summary Fort Worth Good Faith HMAC 2019-6- Sent last Friday at 6V pm The following subscribers did not receive this campaign. Soft bounces are those that temporarily failed but the actual address is still valid, such as a full mailbox. Hard bounces are permanent and mean the email address is no longer valid. We automatically remove all hard bounces from your list. You can read . Email Address N;t Itkc:- Bounced Reason truckinginstyle@yahoo.com Last Friday Hard Bounce () https:llpeachtreeconstruction.createsend.comlcampaigns/reportslbounceActivity. aspx?ID=... 9/23/2019 Add new subscribers f Campaign Monitor Page 2 of 2 Who will receive this campaign? Fort Worth Good Faith F;IIit11AC 2019-6 • Current lists • Import new 85 subscribers were added successfully Bringing the total to 84 in this list. Finish creating my campaign But there were problems. And 4 subscribers weren't added. See why below. • Invalid emails We couldn't recognise these email addresses, so they couldn't be added to your list. Correct them below. Email address Name (empty) Suppressed These addresses couldn't be imported because they are on your suppression list. This likely means they had unsubscribed or marked your emails as spam some time in the past, and it's best to not bother them again. Email address Name kimberleelw@verizon.net mikotrucking@aol.com Showing 2 of 2 Download all • Duplicates These addresses appeared more than once in the import. We used the details for the first time the address appeared. Email address Name brinkmanco2526@sbcglobal. net Showing 9 of 4 Download all https :llpeachtreeconstruction. createsend. com/subs criberslimportlreportlEOF75 6EA765 054... 9/23 /2019 City of Fort Worth MBE Good Faith Effort fora -,Vpt5E firms soI*Ic'Ited by IMBE list With email count Hi I C I � IU fC0 i I,E = O P s� a — O oG o o Z x ° - 8 o � m EGo= Lea s 't! v ° a E E ° —� yr a qv O R E E t; f z w } 3 0 V � 4 N V m a E o 0 Y n w W o N E r t E E r 4C �o3u�� a o Y o - c� E_ w ° w — E -. . ,- V A V v i i N ci ' i ri ' •-1 � N I e-I e-I � ri . ri ri r-I . ei , '-I .. I '-I � ; . f-I" H C E a I E C O 0) u E 0 0 p - z 'E 9 C u cc u u u a.I a-, OU @1 �l c E V CO 7 E O @i O n D UO a a�i O O p O V C [O.i u c L N °, O 7- m L 7 a V O T C n �n [�j L�j o0 @f a �CL1 CL @I C v - O 'C: @ Y Y O ,L a 0 — dL `v ° In In q rn ca 1* o m v Ln N v ID 00 Nm m� 6 N "'l O 91 m N N O N N n N V WV m' N 00 m N C, al 00 00 06 00 In r, m o In M ti In v r, m r, m r, N .--I w O a Oa rn N N 1-1,-I r� IZ In N a) In h m m m W m ,n m In rn m rl !>D Ol 0) M rh I -I Ill Ln .1 m r, : J N V Ql 4 6) O 00 In N In N c-1 O n Vl r+ Ol 6m r, In N m lO O C.) C.)In N {q r In 00 .O N m In rh 00 O h m m w I- N 'r V m rN rV N 'cr 00 d' -1 7 'D 1� f� f� N nJ h V r. r` � � n � r ao � v v Go .-I -t ate. aN. u '-I co r 00 00 OO n • • Ol 00 co co � v N m -) r, in .O O V o N N 06 m O VI N O rl V ri m H * O a --I O qfy M In c-1 In O lO O O .� lO N N N N .1 N .-I Q N In In In IO w IG In ID Ib Ill In IO ^) f N Ol � L L f0 c7 o m a w o O a 0 E c o C v o V o U v C C C 1p /0 C o o ru L m o m O m � o O In O Ln T 0 m N s d N v ro o ti? ¢ a t7 O m a > U p` w N' N in a T f6 IV ? m V 4 fL > -O f0 ❑ �% AV 2 C In r-i U }j -a p .0 .N�-I O ° H 7 C m x E X O Q U X a ro m r , m a m ,n m° a x z O O r-I O r.l N O a+ m N O r Ifl o O 0 In ti e-I N In N v m O ur6 .� Ipy a W ra O E ¢ o0 0 'a w = V� 17 m n w a o U c_ C C C C OO -a e O iE O my - = N ry CCO w U V .vd V C V J N 2j c u v _O O1 J a !n w J J n N N C C +� U C C in q LL ++ C +� O J C a U � N o �+ O 0 U a U U m J U 7 �v, ~ C 2 U V f0 U L U O O I6 U O U TS w O IV pj rJ d H C f0 C to C w H Y —_ a+ 3 N i w W amo' a a 0. 3 5 ' o i I o j ja I I I 0 O 31 c3 n m uu O 0 3 m m z w E @ fl. u m D tp@ cm z a 7 a c d N Ln a ? a� 46 � E '@C @r m `m « s a$ a C�1 9 .a @• o o M E z 8 _ v j o o axi E o v c E w O O N j s 3 — _ � }� Y U Q bA m al C N ° E o v E ol o a +- -- -_ — _ w N co m A m p v = co ui co oo O m 1D v N �D m 14 ` Y .a .--i m n m is V t0 n to n G m E E m m a M H cp Ln 4 ri N H n') Ln a nl "IV O -J PV c-e ll1 Ul � w N V N Q1 00 !! V} V {M-I� o!0 Om0 � a 11 N 01 I,V N V N h I, a h n m Ir ri x a o0 r-I n O� rl N n e-I 41 00_ e-I oa N_ N oo y`o c _ _ -- N H m N a ap o0 m m N a0 P') oo O N N as N O coV m ao V N r rV N ti a N Lr) 7+ Ln 1p i1 n Vn n V) j� Ln V1 ko n A lO n ^ l0 t ix X X X X x1 p = 17� d o R ;� m H to E u O 03 ° u o •'•= o In p @ m net» m io m T V = O W IL m o ¢ I'j H m = O O F 7 z a O O E L nt ou D � . i N .� 3 a� Z t a � m m _ a b o x o o -O LD 'o O cY if] lfl H H .-i oo -a�D co H N a oo �--t N O V m 0 r e m m O O N m - � 2 F R E c 3 N L C G ` m 0 uu u o m Y E- c m 71 o 2 ncop� m ` o °iOp° o E o _o c Ou G a�i c Y' U f`o n a k m 1a -r p Y__ V a F o o.a Cm � t e= a c u E z ie u° J z i v 3 u U y E cL c m _ 4` s E c Ul O of O u z C A i' O Y H p a a v s E u a x u u u m a a L ea r p a h E u o m _ 'c E 7 t a p ? a o u m 0 ci O 0 N b d 5 i 10 JU � I o E p O c m E u c G V V OU 4 OV o U OY tg °p V t.l O d Y ~ A N = T U O IL6 LL M m zV cc iJ O E m c 0 � V O j C(aj a 7 d0 Y r,�j fbil f0 ��� O f6 L WJ 01 $ d Yl 0 Y V G O C i6 ° G R E 0 O L u as N L F- m V L E iLl _0 „ 0 3 N73 [6 itko SP :2 0 -a �e t m ••• r• F L.7 z7 nU n, c 3 'n = UD s r - - - d 00 fn 111 m t0 o '0 10 ain N M N t n o 00 m Ln m C? y o C? 2 _ w 1n to 10 N 1n 1~ h r- r, m rr as 4 " V Ihn N 111 Vml N OND - y E o x r� H i� rK O N tO t0 _-. l- 10 10 ri t0 W r� w i '4 E O N m v h 00 00 00 7 CO 00 OD 00 fJ W 00 P .Nh .fF h W t0 V O7 O1 a 0 0n tN0 00 .n h 1WJ N N Q H h m N h. m 1- 00 0) Q V m 61 Vl co h rn m m OO W O n N N 111 rl M ✓1 ry ul 01 l0 O V m� a s O Q O � .--� .� �/] La rh h m ul 0 Qi m N� V m m rl 1fl ry 01 QO 00 p1 2 _ 3 0 t0 cn h N V t0 M If1 N N N 00 00 00 h 0- c d o p N 0 h rJ h rl d' N O N h V h N 01 H h lO I� h ri CF ci h h 0 .-J a .0 W W_ 00 N h 000 0 00 01 V 00 O'D 00 N 00 00 o n t -9 s LD r m V N ID Q1 O O R n a � O V i v - = l0 lD l0 lfl lO [O O 0- O N 1Q ul �l t0 t6 N t11 . i o l0 1p Y c O E o O _ tw L L 0[ O c O t' Y P o � o � o o a P a t t o L o m < o o n LL u m zP A, 00 00 N m a V O 'O � � lfl r 3 `°t ° _ m 00 0O m Z cc.1! - a - N � a U -O cr o B w Lr�LL we m u o u'i m m z m O a q0 = C7 O m 7W U co7 Q 1n ]G U Z V m O0 m l0 O - w O Le) V O N 10 61 O O m ul c-I rt ao � m N cr N tt O O 1n o - 4 a a N N n .h N ,-1 m �n _. Y d s 0 m iz E .�Qi _ c m d m ? - L] .0 0 i vObn C O C 6 [a IV 8° R o v yr t° w `m a O = c a o 10 n c g 3 GhLo o a t V J C _ C 0 C 'J u Q �G Um V O. E U O 00 WCL ., w 3 v an n Y bi n` m ~ t>ZI v - = T 0 0 a Y f N c d a P E m 7 O 7 J O 10 Z E m lL Q J m m U U C1 W W LL 'U (9 x 7 00 N l iw m E E E a $ E so �°oA O u EE °u o E E �[ — E d sa Y oO ° ° w ai o °u, c oEo L!civi _ io in �M1 x o pT a8. ? Q X a0 E +n ry @1 @f N p_ W Eon �C V 73 �J C M 3 Y ++ u� C N a m 'D uo m m ro O .a a 'E n h�i Q m o Y a� P? u cn as m m r- n o� N c° u rn A u w l o•, a In I: m as I, ° m o s - a v I1OO 00 0 -1 cp N N v m O m 00 m oa In _ y N iv n cf N 1� rn n 0a n n Ly o~o W W o0 ap F ° W a w ca •D Ln N d n n n I� O c° n V -- _ G m M o O n V m N 1 M [n m fn N Ol m a0 l° V V � w M� O Q7 G M N Ol tp Ol V7 LIl 9 VI r n L„ 0) 00 0) 'D rl co tp .1 O n m m O o as -i ID O l° In .n In cn a n m 1p O1 U1 d z o p t Cc:N 4 CT V f� T a N N n n V n n n n y p N ig L rl n In 171 V N 00 00 N Ol CQ V as Ca V 4 v v •- 5 0-6 o n w M ao M M N rn m W n cf�N �D N N rl L° N a �� n n la l m Q O J O N O O O O ci Ci N c-I 0 0 0 o u _ N N In t!1 In l0 .o Vl In L/! (6 LO � L/1 LO to (° �° 10 E `o v x x x H N F X X x x [ d i 3 C a 2 E p ptx o E -4 m w ro Mcc va m O DZE m = r n' C - - °ro m a V C 0 - W r V E CO H E v a r I- > U } w � to ai 3L0 '2 Z V m c w e O ° N H p° 3 Ln �^ o o o o ct '-I rn n - O O N 00 kD rn N O Cl i- N N .�-I O n O ul O o 00 It O 60 ri 00 N `a SL Y n E 1,27 y� �Op a� N C w N qOp N = N to al F Ti - - eL H vi _J D ° f ° Y Ir4 -p °. o@i N -° 4 C i1 Y O ` -a N O2 a a° m `m E - �o;v .0 w Y M C 3 G Y H D U V j C L U J bA o n m o v Q a0 o y C a H U ai E 3 o c ^ Y Y°z m n c u E o F c ti f0 O LT u 7 i u i I O � � _� _ .� W o .r V O p O O E no c O o o bq L r u 'm ° E o E o ° o� 3y ED sG m E �.� T 3 _ c m.. u A O @1 @J w� DO W CXJti @l P w@j o ram, c c O (c3j L O = �- w e a7 U ON E c n E d O_ C�1 �C O V 1-15. E W- a bn `s d n m co n V. .-i La m a Ln n m m cm m rn r W [Y M O V p �' m m V N I�f1 LA n- 1 a LO m m 3 n 4 m m n N It lO N M .0 Ln N £ x . N N N 00 00 •IDD V .ma.yy ��--I 10 N W W co 00 V w K F °i iO v Ln O rn O O N W V n LO m ft 00 M V O I-cO N .n n 00 r+ m m 'D 00 O o O m CD m .-� N m P H n m N m n m" m m C.)A 7 rnI? -T w V ,-v M .� m O ✓i n �O h N n ul N11 Vl m M Ln N Ln a_ V] in OO m lD m CD 00 W m u] cnj .ti to ri O O V Ih d IT� M n o m -3 rn m u1 9 M u1 N m En N n m m N +D >n W L s s p o � .v-I n-t n n O M m 0, n a P L v T CO OD W J - _Axu v `p - O m M V 00 m -4 (Y'1 N lD �t .--I c-1 m V' fryy m ri O 'i N .--1 H N O H N e-I O O e-I V W .q N O O V m In it, cv 0 `O T l0 l0 lfl In 10 m l0 In l0 lO LO n E ¢ 0 X X X L L L X X X i- c v� b0 C W m o 3 5 y bD 433 000 rL S Y V U V C _ c U a V o -_ n R _ N N p l0 0 p L O f0 f0 N 10 O L O O _ E t V ° `o N w W m > >cc m X - O 4 v n m 3 -6 > D m .ci ? N G - 't m n v O v m a 4t io U c O H 7 U O 0 tw .X m r_ 01 N N O ll C N N a ? C - `-- bA y m �i c L m o N m cNc _ C o .a .--� Z p i--1 d' ,--� 00 r 00 w m m = t+-1 7 lO O li O .0 O In N P N O O N v r O T % ti •ti O O mO W f� W .--I 10 T-I 00 n n lD .--i - .-1 4O M V R N N N E p CIO 0E p O u U o UR E cs cc 0 m " p U C = �0N OLN Wc 3 Ub E OE bo abDp ti cUJ Ol -p Q y O U> �a � P. p n O un a O N Ol z m a Y bA S: `m J E c�i a- `o - c o r O v p m c c o be c c m h by c Z 3 .e E Ed ry o u - m Y' = 10 ~ 7 i u H u z O_ j c O Y U CL N dd c m H m a C -a F L _ E o c a E F Q F Nj tl] 7 J _02 V O H 0 T �. u m ar O C r�6 - z E m ii V a Q m m U U U Q U fl w w ii i— Q) 0 O O m d 7 r--- ' I \ I I i s 7 I I I 1 N E o o p p E E p p o _ o f E o o m E ° m o E o E p ` C A m u on, V C m 00 E 6 O Cd1 E 0 m Cc,m+ c �Y cOi tC L O � 00 O0 N c c E N @J = ll Y ? j O O �. E� � ��t`u d ._ ` E p Y O al � tO d o N lD 01 01 �, E 1° ve D � a O v EI 00 �� OC O N 0 y j O G L p N- m C V Y 16 , h m m C3 ul 10 0.. Ln Ln f� T M 0� o m v N W lO m O O f�� Ol cam-[ h c C O M 00 .r f� -ado ccoo Q cs m Do o v O` rc E u E ° n rM-1 .h-1 .h-1 .�-1 r 6 a a V- LL. 00 N N OD 00 c0 dd N Ol rn V rn h [n o of o m N ca DO u4 .-1 [ N V 06 h h w o n N Ln m A V m UD m cD .--r " m m to N .--1 � m t, m h v m tD a o h N N A tD m T rl � co to N 4 m f� tD O 0 �-�1 Q O 0 0 0 41 T O a ° ul Ln N c0 �o N W Ol 'D N co Ln m M r+ m A Cil V' A of 1� 00 rn O1 V A 4 co CQ L l ti _ C « = Ol N . .00 00 .--t U) co M N lD -zt to c-r 61. E VI t\ Ol am d' tD tD 0 0 h 00 01 m n h r7, d N 61 a Ol V E N 00 V 00 00 00 L Ol Y - c a a M h IT m in O 0 0 o o m h h. ID h .o co to .� a m N N - m m o rn .-+ 10 to N m - N p__ tD rl a N ul m r 0 H m to m ko O M Vl tf] N O" N Q In [D 10 l!j ld .--I .+ O [D tD lD O a N tD V7 Vl u v Y - u r 0 x 'o a ao 3 'O E. d E J C L L 3 E o 0 o a 0 v = o 0 0 N p a C L 0 U 0 ❑ p m O !1 e l U Q m N m p !� p O❑ 1 LL l!l m Q_❑ t o E r y U LU a z E F~ E a N O E° N al ❑ O m? 00 Q = d m alb s a V p n a m �' o vZT �. z U o Z t/� t/� N N O E O O W ✓] F }j Z d ul h ID N CP Ol 61 �/) O Ln O >Z m 'o S w O Q N N N co N Ln o a 0 A GY O N N I/l Q 0 e-I O N E 00 ID O N .--1 0 O h m N 0 h - _ o Q _ ._ _ m N w N A N +� c E ` m] cJtm m �pv 0-02 c o o 12 q m po o o mb 2i o o V` g 0 o ° �o m m a c a u n'i o Q o a m p n 0 v O - ^- — — a E 5E C t 9 v V J J J71 c d u O N 'J V` V: w e s v 3 EE E ✓1 1 a+ w Z coil c n W. c bA c Y =. ° a[ m Y U L c r E c c O V U Y ?-' I-- i— 00 U u ti F p C h F C U L L j 3 m a J p r a R Y i Y F- F F-- F- ❑ m C E d C 4 p -d u 77 ai cN[ CI F- a j a = G c 3 E E m L j O U t w O p m F- O ._ V01 3 i o L 'u, 2 a ❑ O m U O E i7 2 M--4 J J S ;v , jo � a a O t ❑ � _ 0] r - O V �7 � ? L R g o z w Ern @, an o u E (3j - N C C tp o y. FYI+ E O V @ - v^i m W Ln 00 d V w 6 N f, m n a _ - Imfl N 11 dam' VD1 ti ✓\ n rn oo m 0) 00 W r = a r al m o 00 m O a rn w EE m M nn � 0 rn IIt p M V06V 00 ca N ID <a c; m QI `J ID In to a V' I0) N N lfl d� l0 N V V7 Z o C N V N O N I, m N 1, n Ir 6, 00 V m 00 00 Q n E 6 .N-1 M 10 O O H 10B n � - O rq :] O � rn Ilt ul In of l0 In In �n !O °3 5 E n •- � o }i A � np o y m E ? ma n a c ❑ a _ � ❑ ~ E m " a i 6 E o c' i E ❑ � O o � ❑ C a' ❑ :° Q 2 y N O O O p N 0 n o .j 'tl M W L7 O R Y W O C� c - N d 0 0_ 9 ? V a Q t a 0 n n = a)n N N O N ? C Y f6 -}p C C N m I- l7 Ili Q H V N z l "o � N fV m -t (Y 0� 4n O M N V +r-Y O V r N z n U O u O - cc N i N QI O n l7 ~ Jr t @ - y LLl c Cm N m Pl C O N In [O ? V w n IT W in E {J 0 E ar 0 tl O O V i � 00 trfi V Y 7 V M O + O R Ix I m Ix `7 � N ICY Ill Q Kl n In tb 03 o o N O O 00 M N v V1 o O V' rn O N_ V O w t, Ln n 0 00 m rnmrn m Y of rn 6 c M In m in In �a O N V h cl' I- t` N N CO T 00 d0 00 co 1 0 a m M e-I N ' 4 LC X X x X L 40 c t tf Y L/I t m V m — t n O O O n H O 11 ,a Y 0 V a cc m m oc r O O Y a O ° ca 3 Q] N a Q Z �G C �aIn �o V m O 0 a o O u-I r O J L C C 0 W t2 O1 N 1 m C O d N � N aaaa � os C J hA � C m V N c -y v o Z a Z N h PP V C J C VI O .Ei V ]L li 06 00 C Ccc C E� c, _ L Y c cYi w ci U ~ Z 3 F bo v. a c m c vai F O O C ++ 3. E _D u a a/ v � a 00_d_c cc w w a a 5 4 a a a a m � I I ' I I I I � I r r h0 u O �4 O D 7 o o o O u E o 0 0 o p 0 E p O U 0 O n' vC C n n - 0 u O �1 p4 p @ E @1 t� _ m h x 1 @1 r- Q) �Cd1 O Go O `o t 09 c M �° o 00 �y 00 E a c 0 a C m � L Q O Y pq. 0 E p u L w o an c m c L 7 3 Y � 'O Y �• O C � rg 0 L y m ao h 00 w m It �n m m m N m in crr m Ln co co m 0a -a m cY M [O r�E 1/ W N 9 10 h f4 '1 h `7 La C h h a V m 111 M O r- M _ m o -V u Ln N lD l!1 N x h h Ch O V i� O h h ~ 00 N 10 G <i h kD G m r-I W lO dl T Y n W m ci r, rf] N V W a Q to m 16 E E m 0�0 a Qcn N oO to lO N a a n M h OYl .--i N N L9 N 0) T N O6 h OO M Ol h 00 T rY [� c3 Lna 01 d' f1 Lnul Y Y. a o l0 o Ln m rn m w m Ln N M N h V o h h a s t m m N 10 m N h 00 vi N L` z S t o n n o m m v o a a'rz ni o rn n o e eo r 'N t L _ e-I e-I OO ¢I' Ol O lO F+ H 61 <r N N .-i Y .-1 Z ZL dl 00 00 m V � •1�- - O - _ "-- 8� m 10 IT m .i o v v 'a m N m m g wo a - 01 lD w It to e-I N N O N N M O H H H E 3 o 0 V c 0 '° W T LL v F V G w 3 E -� m i Lam' t S L f 0 0 0 y y O Pa O O Vi O O O Opp u �° J n a) n O L 0 0 0 a a a v � m O p c O � C N •� T Y Lf6 � m O H j U G rn Y 0 m00 45 N 6) M .O a to a Ln N a N [q Q a V n N N .~-i ILI C O 0 4 N 8 N a n N y O c CQ N R q L 0 u O t32.0 C N u a o a m 0) 9 a" a �a C c= L [o as ti y O L p y O@ t2 w tf O c J J = 0 CL E @ ~ J E U 0 U 0 1 C 90 O W. C C m y ` 0O 2 V 6 Y U t u O J OL E U 3 f`0 C 0 U C 'Y p- W W U ul U J ' N0 m E i6 U C � m 'p v _J ul 0 3 O O a 0 J L� Q J w U U U U J d V O W W ll F 0 0 U � ; rl ; .-i ; .-I rI O I O 01 0 v o o E o° E E O U O O E Du 18 bo V O N m E O u0 u c 0 6 E E = 3 E av 4 >. E oEo o 0 p m Y m o �. o u co u E y —oU n E �. > o L p 00 M m �l 9 vG @7 m c L c 00 E m N ti- aU Y s c a� 0 @JCal@1 ate' N p a^ ,- E c In t�D Y` O O EI E N �• O c m i6 V j O L m i- o N 7 N d 0 -0 E a v — 0 ' to r-I In Ln m r-1 p In a 6h n t0 ul r m .rDrn O O0 h tD K, m d 17 0011 tD G m O) } a Q 00 w r-4 coo a n n tmo 00 m a m n F n n n o ct (D .--I N 00 m 00 00 00 O N Q1 '' V �' - a r m O m m a D Ci c-I N In r1 O1 Q N h n ry E E m n 10 41 m In N V h d vl Va .4 tD i N m O N r-i m N to V M LO O1 V N V ill h G m N N OD to N m n N T to ul Iv r� ti o ml to T m 17 o rn a vl rn m V M u co N CT) to " 00 ul m 'n '-1 m h it Q al 1-, 06 Ol tO N }�} 1� 'r V m 00 d0 r-1 Lntp V O Is m g m M E: y '�' :E O' co M 0o cn N 1O '<I is V n n 'T to IO co 0l m 01 �r h d =O O y = r c h L ri V ri Iz V Iz t--I eW eI M Ol r-I lD N Ol G' 1� h to n n f� H h c0_ N w N 00 ITT Ol Y .--I .--I w Y Y 00 .-I e-I .--I 0o Go 00 -4 .n-I r�I 00 00 z- .N.. V N r - c8 _- m n tD to m Co G G O O o0 r to to N cn m rl Ql c-1 Ol rIl .-I m O to It h w c) o :O In c)1--I Q R w N In " Q t--I tO La tD CDn Lnsn N M N t-'I N ul Ln to rl H O tD ,D ID .y �-1 Li o 0 w to ul Ln Ln lnl " X X X x X C a 'e 0 0 O tlll hlt a_nS O D O O p N 2 0i m r .E w V V a° o J rL "' « u x c N O 0 t-! a a J d J p wm i A E LL m O y tUpp1 J mm C� C `d 5 E -6 ? V d a 6 n N +L+ O J y Z VI Z 10 C C N? N Ill d 0 f}6 J itl Ol J U 0] H Ln IDp m N O d N loll CD O N N O N 00 T N O N T ri Q r-I 4 C] M M1'1 .-I N N V W P - - rJ v'�M -O C vvII � O C [� P O E o— M c o ti a o� c o R o m m 2 c 0 E T3 j N q�j t C a fa g �, Q� J� o.�.� o �of0LL ��ID F E � a . �� � t_ `o �m` E m � � w c° ro o E- 2 J Y v a - m u c7 2 go no x 0 �' F- t E u 01 3° u u taf� M M u °° u 3 8 a CZ, F m o D ey=o `p U 3' 7 D vl C 11 J 0 bB "✓� N W O v= y U ru H L H 7 m E c !? c - -o G Y �c 0 ' - to }- hI N v, x c H 7 i6 N u O la N` L 03 C O J 0 N Q i Q 2 H N O i go,2 cC Vwl ry Qj c N Icp E A LL 2 2 f6 U O J J J J J- c 2i 0 d 13 S � I _ � G — o q ao P, Oq n a LL N : aRi w - a E W ' - m E Va a a a o s E 3 E E E J - a 1 s = a � _ 3 E o r .... q u .moo ks. — L n E Z c T N a t —Rs-. i� g " m M 4 q M c c 3 N E w q ' w E 0 o m o E o ° G G � H u r � ° w 3 G o 3 ° " a q C v O � •, a — — n n 3 E L E QF L E W m o Z E — I � N I I vC�i i i --_ r-I e-I ci' c-F I rl , r-r' rl• H c�� I a+ i � �O I -_ -c-11- I I � l E I r I 0 o — o E o V O E p E O V �1 U t OV O pOO� V [4 C T V O E L Ln C1 N m O Ln N m tO 0 m ?. _� O N C Y np D Q C _V OEO y p c v i O �n (dj Y o 0 C - L . rn c — L Ol N M Y E E N m i W m m n 11 ONl w ovc UU —1-1 m IL o°0o rn m m coh LO w m w � a .n m w m rn Y rn 22 PO N 06 to .--I m m LID d' m Vl co Ol ✓1 a O 40 In OP 0 00 .D m N m lD N m W CY 1n M p o Ol ' n L m n O� co ko -CTm40 r. N 00 V z .-i N LO p Q —f p O ca N i N ko m co CD N O m In w m IfS Lr� L �A A u J u Ol V C (D w co 7 DA Y nb � � A ~ F u L = o W O O J �+. ( K Z K K 6- H F kl'-X-6.07 Wage Rates THIS PAGE DEFT INTElTTIONALLY BLANK CITY OF PORT WORTH 13MAC SURFACE OVERLAY 2019-4 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July 1, 2011 M&C Review Page 1 of 1 Official site of the City of Fort Worth, Texas CITY COON ICL ACENDA COUNCIL ACTION: Approved on 10/29/2013 REFERENCE �, 20PREVAILING WAGE DATE: 10129/2013 NO.: C-26534 LOG NAME: RATES 2013 CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Adopt 2013 Prevailing Wage Rates for City Awarded Public Works Projects (ALL COUNCIL DISTRICTS) RECOMMENDATION: It is recommended that the City Council adopt the attached 2013 Prevailing Wage Rates for City - awarded Public Works projects. DISCUSSION: Texas Government Code Chapter 2258 requires that a public body awarding a contract for Public Works shall determine the general prevailing rate of per diem wages for each craft or type of worker needed to execute the contract. The public body is required to specify in the bid documents for any Public Works contract, and in the contract itself, the wages as determined and adopted by the public body. The attached 2013 Prevailing Wage Rates data for Heavy and Highway Construction projects identifies the current Davis -Bacon Act prevailing wages for heavy and highway construction projects applicable to the local wage rate zone. The attached 2013 Prevailing Wage Rates data for Commercial Construction projects identifies average wage rates based on a salary survey conducted and published by the North Texas Construction Industry (Fall 2012). The 2013 Prevailing Wage Rates will be included in future City -awarded infrastructure bid documents and contracts once adopted. FISCAL IN FORMATIONXERTIRCATION: The Financial Management Services Director certifies that this action will have no material effect on City funds. TO Fund/Account/Centers Submitted for City Manager's Office_by: Originating Department Head: Additional Information Contact: ATTACHMENTS NewCOFW-Hor.pdf NewCOFW Vert.pdf FROM Fund/Account/Centers Fernando Costa (6122) Douglas W. Wiersig (7801) Roy Teal (7958) http://apps.cfwnet.orglcouncil_packetlmc review.asp?ID=19155&councildate-10129l2013 11/7/2013 2013 PREVAILING WAGE RATES (Heavy and Highway Construction Projects) CLASSIFICATION DESCRIPTION Wage Rate Asphalt Distributor Operator $ 15.32 Asphalt Paving Machine Operator $ 13.99 Asphalt Raker $ 12.69 Broom or Sweeper Operator $ 11.74 Concrete Finisher, Paving and Structures $ 14.12 Concrete Pavement Finishing Machine Operator $ 16.05 Concrete Saw Operator $ 14.48 Crane Operator, Hydraulic 80 tons or less $ 18.12 Crane Operator, Lattice Boom 80 Tons or Less $ 17.27 Crane Operator, Lattice Boom Over 80 Tons $ 20.52 Crawler Tractor Operator $ 14.07 Electrician $ 19.80 Excavator Operator, 50,000 pounds or less $ 17.19 Excavator Operator, Over 50,000 pounds $ 16.99 Flagger $ 10.06 Form Builder/Setter, Structures $ 13.84 Form Setter, Paving & Curb $ 13.16 Foundation Drill Operator, Crawler Mounted $ 17.99 Foundation Drill Operator, Truck Mounted $ 21.07 Front End Loader Operator, 3 CY or Less $ 13.69 Front End Loader Operator, Over 3 CY $ 14.72 Laborer, Common $ 10.72 Laborer, Utility $ 12.32 Loader/Backhoe Operator $ 15.18 Mechanic $ 17.68 Milling Machine Operator $ 14.32 Motor Grader Operator, Fine Grade $ 17.19 Motor Grader Operator, Rough $ 16.02 Off Road Hauler $ 12.25 Pavement Marking Machine Operator $ 13.63 Pipelayer $ 13.24 Reclaimer/Pulverizer Operator $ 11.01 Reinforcing Steel Worker $ 16.18 Roller Operator, Asphalt $ 13.08 Roller Operator, Other $ 11.51 Scraper Operator $ 12.96 Servicer $ 14.58 Small Slipform Machine Operator $ 15.96 Spreader Box Operator $ 14.73 Truck Driver Lowboy -Float $ 16.24 Truck Driver Transit -Mix $ 14.14 Truck Driver, Single Axle $ 12,31 Truck Driver, Single or Tandem Axle Dump Truck $ 12.62 Truck Driver, Tandem Axle Tractor with Semi Trailer $ 12.86 Welder $ 14.84 Work Zone Barricade Servicer $ 11.68 The Davis -Bacon Act prevailing wage rates shown for Heavy and Highway construction projects were determined by the United States Department of Labor and current as of September 2013. The titles and descriptions forthe classifications listed are detailed in the AGC of Texas' Standard Job Classifications and Descriptions for Highway, Heavy, Utilities, and Industrial Construction in Texas. Page IofI 2013 PREVAILING WAGE RATES (Commercial Construction Projects) CLASSIFICATION DESCRIPTION Wage Rate AC Mechanic $ 25.24 AC Mechanic Helper $ 13.67 Acoustical Ceiling Installer $ 16.83 Acoustical Ceiling Installer Helper $ 12.70 Bricklayer/Stone Mason $ 19.45 Bricklayer/Stone Mason Trainee $ 13.31 Bricklayer/Stone Mason Helper $ 10.91 Carpenter $ 17.75 Carpenter Helper $ 14.32 Concrete Cutter/Sawer $ 17.00 Concrete Cutter/Sawer Helper $ 11.00 Concrete Finisher $ 15.77 Concrete Finisher Helper $ 11.00 Concrete Form Builder $ 15.27 Concrete Form Builder Helper $ 11.00 Drywall Mechanic $ 15.36 Drywall Helper $ 12.54 Drywall Taper $ 15.00 Drywall Taper Helper $ 11.50 Electrician (Journeyman) $ 19.63 Electrician Apprentice (Helper) $ 15.64 Electronic Technician $ 20.00 Floor layer $ 18.00 Floor Layer Helper $ 10.00 Glazier $ 21.03 Glazier Helper $ 12.81 Insulator $ 16.59 Insulator Helper $ 11.21 Laborer Common $ 10.89 Laborer Skilled $ 14.15 Lather $ 12.99 Metal Building Assembler $ 16.00 Metal Building Assembler Helper $ 12.00 Metal Installer (Miscellaneous) $ 13.00 Metal Installer Helper (Miscellaneous) $ 11.00 Metal Stud Framer $ 16.12 Metal Stud Framer Helper $ 12.54 Painter $ 16.44 Painter Helper $ 9.98 Pipefitter $ 21.22 Pipefitter Helper $ 15.39 Plasterer $ 16.17 Plasterer Helper $ 12.85 Plumber $ 21.98 Plumber Helper $ 15.85 Reinforcing Steel Setter $ 12.87 Page 1 of 2 Reinforcing Steel Setter Helper $ 11.08 Roofer $ 16.90 Roofer Helper $ 11.15 Sheet Metal Worker $ 16.35 Sheet Metal Worker Helper $ 13.11 Sprinkler System Installer $ 19.17 Sprinkler System Installer Helper $ 14.15 Steel Worker Structural $ 17.00 Steel Worker Structural Helper $ 13.74 Waterproofer $ 15.00 Equipment Operators Concrete Pump $ 18.50 Crane, Clamsheel, Backhoe, Derrick, D'Line Shovel $ 19.31 Forklift $ 16.45 Foundation Drill Operator $ 22.50 Front End Loader $ 16.97 Truck Driver $ 16.77 Welder $ 19.96 Welder Helper $ 13.00 The prevailing wage rates shown for Commercial construction projects were based on a salary survey conducted and published by the North Texas Construction Industry (fall 2012) Independently compiled by the Lane Gorman Trubitt, PLLC Construction Group. The descriptions forthe classifications listed are provided on the TFXO's (The Construction Association) website. www.texoassociation.org/Chapter/wagerates.asp Page 2 of 2 GAT-1.00 General Notes Tnis PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-4 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July 1, 2011 General Notes Division 01— General Requirements General: 1. The Contractor shall be responsible for locating all utilities, whether public or private, prior to excavation. The information and data shown with respect to existing underground facilities at or contiguous to the site is approximate and based on information furnished by the owners of such underground facilities or on physical appurtenances observed in the field. The City and Engineer shall not be responsible for the accuracy or completeness of any such information or data. The Contractor shall have full responsibility for reviewing and checking all such information or data, for locating all underground facilities, for coordination of the work with the owners of such underground facilities during construction and for the safety and protection thereof and repairing any damage thereto resulting from the Work. This Work shall be considered as a subsidiary item of Work, the cost of which shall be included in the price bid in the Proposal for various bid items. The Contractor shall notify any affected owners (utility companies) or agencies in writing at least 48 hours prior to construction. a. Notify TEXAS 811 (1-800-DIG-TESS or www,texas8lI.org) to locate existing utilities prior to construction. b. Caution! Buried electric lines may exist along this project. Contact electrical providers 48 hours prior to excavation : ® ONCOR Will Riegler 817-215-6707 . Tri County Kevon Mooney 817-752-8160 c. Caution! Buried gas lines may exist along this project. Contact Atmos Energy 48 hours prior to excavation, and within two (2) hours of encountering a gas line (John Crane: 817-207-2845) d. Caution! Buried communication cables may exist along this project. Contact communication companies 48 hours prior to excavation: • Spectrum/Charter Communication Sherri Trahan 817-271-8108 • AT&T Gary Tilory 817-338-6202 ® One Source Communications Jeremy Hegwood 817-745-2243 e. Caution! When doing work within 200 feet of any signalized intersection, the Contractor shall notify Traffic Management Division of City of Fort Worth T/PW, 72 hours prior to excavation (Kassem Elkhalil: 817-392-8742). The Contractor shall protect existing signal hardware, ground boxes, detection loops, and underground conduit at signalized intersections. Any damages at signalized intersections shall be replaced at the expense of the Contractor. The Contractor shall contact the City at 817-392-8100 to perform conduit line locates at signalized intersections 72 hours prior to commencing work at the intersection. f. The Contractor shall notify the City of Fort Worth Project Manager 48 hours prior to the start of any excavation (Juan Pablo De La Cruz: 817-392-6747) Contractor's personnel shall have identifying clothing, hats or badges at all times which identify the Contractor's name, logo or company. Protect concrete curb and gutter, driveways, and sidewalks that are not designated for removal. Removal and replacement of these items shall be as designated in the drawings. CITY OF FORT WORTH STANDARD CONSTRUCTION GENERAL NOTES Version Release December 18, 2017 Division 32 — Exterior Improvements General: 1. At locations where the curb and gutter are to be replaced, the Contractor shall assume all responsibility for the re-establishment of existing street and gutter grades. Establishment of grades shall be considered as a subsidiary item of Work, the cost of which shall be included in the price bid in the Proposal for various bid items. 2. All driveways, which are open cut, shall have at least a temporary driving surface at the end of each day. The temporary surface shall be considered as a subsidiary item of Work. The cost of which shall be included in the price bid in the Proposal for various bid items. Bike Lanes and Shared Pavement Markings: 1. Proposed bike lanes should maintain a minimum effective width of 4 feet (measured from edge of gutter to center of stripe). 2. Bicycle pavement markings should be located 20 feet from the curb return, stop bar, or cross walk (whichever is applicable) unless denoted otherwise in the drawings. 3. Combined width of bike lane and on -street parking should not be less than 13 feet. 4. If travel lane is greater than 14 feet wide, shared pavement markings shall be placed 4 feet from face of curb or edge of on -street parking (whichever is applicable). 5. If travel lane is less than or equal to 14 feet wide, shared pavement markings shall be placed in the middle of the travel lane. 3. Bike lane symbol, arrow, and shared pavement markings should be repeated at the beginning of each intersection. 4. On uninterrupted sections of roadway, bike lane symbol and arrow should not be spaced more than 330 feet apart and shared pavement markings should not be spaced more than 250 feet apart. 5. Bike lane symbol, arrow, and shared pavement markings should not be placed at private driveways or public intersections. 6. Bike lane striping should be 4 inches solid white, hot -applied thermoplastic unless specified otherwise in the drawings. All other bike lane pavement markings shall also be white, hot applied thermoplastic unless otherwise specified in the drawings. 7. All dimensions are from face of curb and are to center of the pavement marring. 8. Shared pavement markings should not be used on facilities with a posted speed greater than 35 mph. Sidewalks and Curb Ramps: 1. The curb ramp standard details are intended to show typical layouts for the construction of the curb ramps. The information shown on the standard details meet the requirements shown in the "2012 Texas Accessibility Standards" (TAS) and the "2010 ADA Standards for Accessible Design" by the Department of Justice. 2. City of Fort Worth Standard Details are only intended to indicate pay limits for each type of ramp, the Engineer is responsible for the development and design of the sidewalk and curb ramp layout, including actual dimensions and slope percentages. 3. The Contractor may not make changes to the sidewalk and curb ramp layout without approval of the City. The Contractor may propose changes to the sidewalk and curb ramp layout due to field conditions, but any proposed changes must be approved by the City. 4. Curb ramp running slopes shall not be steeper than 8.3% (12:1). Adjust curb ramp length or grade of approach sidewalks as directed by the City. 5. Curb ramp flare slopes shall not be steeper than 10% (10:1) as measured along back of curb. 6. Maximum allowable cross slope on sidewalk and curb ramp surfaces is 2%. 7. The minimum width of sidewalks and curb ramps shall be 4 feet. CITY OF FORT WORTH STANDARD CONSTRUCTION GENERAL NOTES Version Release December 18, 2017 8. Landings shall be provided at the top of curb ramps. The landing clear length shall be 5 feet minimum from the end of ramp. The landing clear width shall be at least as wide as the curb ramp, excluding flares. The landing shall have a maximum slope of 2% in any direction. 9. In alterations where there is no Ianding at the top of the curb ramp, curb ramp flares shall be provided and shall not be steeper than 8.3% (12.1). 10. Where turning is required, maneuvering space at the top and bottom of curb ramps shall be 5 feet by 5 feet minimum. The space at the bottom shall be wholly contained within the crosswalk markings and shall not project into vehicular traffic lanes. 11. Curb ramps with returned curbs may be used only where pedestrians would normally walk across the ramp, either because the adjacent surface is planting or other non -walking surface or because the side approach is substantially obstructed. 12. Where curb ramps are provided, crosswalk markings shall be required and ramps shall be aligned with the crosswalk. 13. Counter slopes of adjoining gutters and road surfaces immediately adjacent to the curb ramp shall not be steeper than 5% (20.1) in any direction. CITY OF FORT WORTH STANDARD CONSTRUCTION GENERAL NOTES Version Release December 18, 2017 Division 33 - Utilities General: 1. For utility work within utility easements, once pipe or appurtenances have been installed or rehabilitated, immediately commence temporary surface restoration. Complete surface restoration to the owner's satisfaction within seven (7) days of work finishing on site. Failure to maintain surface restoration, as noted above, may result in suspension of work until restoration is complete. 2. Existing vertical deflections and pipe slopes shown on the drawings are approximate and have not been field verified, unless otherwise noted. Rim elevations, flow Iines, and horizontal locations of existing manholes were determined from field survey. If field conditions vary from those shown on drawings Contractor shall notify City. 3. Maintain all existing water and sewer connections to customers in working order at all times, except for brief interruptions in service for water and sewer services to be reinstated. In no case shall services be allowed to remain out of service overnight. 4. Establish and maintain a trench safety system in accordance with the excavation safety plan and Federal, State or local safety requirements. 5. Provide and follow approved Confined Space Entry Program in accordance with OSHA requirements. Confined Spaces shall include manholes and all other confined spaces in accordance with OSHA's Permit required for Confined Spaces. 6. Only City prequalified Contractors, by appropriate Water Department work category, shall be allowed to adjust valve boxes, manholes, ring & covers, etc. Water: I . Provide thrust restraint by means of restraining joints at fittings and concrete blocking. When specifically indicated on the Drawings, provide thrust restraint at designated joints beyond the fittings. Each method shall be capable of thrust restraint independent of the other system. The Contractor shall refer to City Standard Details for area required to install concrete blocking. 2. All ductile iron mechanical joint fittings shall be restrained to pipe using retainer glands. 3. Proposed water mains shall have a minimum cover of 48-inches cover above the top of pipe, unless shown otherwise on the drawings or details. 4. All water services shall be installed above storm sewers, except where shown otherwise in the drawings. 5. Elevation adjustment at connections may be made with bends, offsets, or joint deflections. Joint deflections shall not exceed fifty percent (50°/a) of manufacturer's recommendations. 6. Temporary pressure plugs required for sequencing of construction and testing of proposed water lines shall be considered subsidiary to the work and shall be included in the price bid in the Proposal for various bid items. Sanitary Sewer: I. Verify that all connections to the sanitary sewer system are for sanitary sewer only. Notify City of any discovered illicit connections. 2. The Contractor shall be liable for all damages to properties, homes, and basements from backup, which may result during the installation of new pipe and/or abandonment of existing pipe. The Contractor will be allowed to open clean outs where available. The Contractor will be responsible for all clean up associated with opening clean outs. 3. For all sanitary sewer service connections at manholes, provide a hydraulic slide in accordance with the details. CITY OF FORT WORTH STANDARD CONSTRUCTION GENERAL NOTES Version Release December 18, 2017 Storm Drain: I . Maintain the existing storm drainage system until the proposed system is in service. In no case should the Contractor leave the existing storm drain out of service whereby runoff would cause damage to adjacent property. 2. Construct all drainage improvements from the downstream end to the upstream end to allow continued storm drain service. If the Contractor proposes to construct the system otherwise, the Contractor shall submit a sequencing plan to the City for approval. 3. Take appropriate measures to preserve wildlife in accordance with applicable federal, state and local guidelines. CITY OF FORT WORTH STANDARD CONSTRUCTION GENERAL NOTES Version Release December 18, 2017 Division 34 - Transportation General: 1. Prior to activating traffic signals with new or revised signal timing, the contractor should e-mail Aziz Rahman, Sr. Professional Engineer, at Aziz.Rahman@fortworthtexas.gov (and copy Kassem Elkhalil, Professional Engineer, at Kassem.ElKhalilgfortworthtexas.gov) at least three (3) weeks in advance to schedule that. 2. If new cabinets and controllers are being installed and the controllers need to be programmed and tested by City Forces; the contractor should deliver them to the City of Fort Worth, Signal Shop at 5001 James Ave., at least three (3) weeks in advance to schedule that. 3. Unless there is a compelling reason, a new traffic signal will be put on flash on Thursdays and working colors the following Tuesday. 4. Switching from old traffic signal to a new one, this should be done on Tuesdays only. 5. Notify Traffic Management Division (817-392-7738) Project Representative at least 24-hours in advance of all concrete pours. Inspector must be present when concrete is placed on the project site. 6. If applicable, equipment supplied by the City will be available for pick up from the Transportation/Public Works (T/PW) Warehouse at 5001 James Avenue and/or the Village Creek Pole Yard (5000 MLK Freeway). The Project Representative must authorize all equipment pickups. 7. Design consultant shall submit electronic file in CAD format as well as PDF (I1" X 17") of final signed and sealed plans to the City. 8. Contractor shall provide a 5-year manufacturer warranty on APS systems. The warranty documentation shall include the start date (when material is delivered to job site) and the end date of the warranty and the serial number of the equipment. Traffic Signals: 1. The City will not provide traffic signal cabinet or traffic signal controller to the Contractor. The cost for these items must be included in the City project budget, or for all privately funded projects, the cost must be included in the bid package for purchase from the vendor. 2. The Contractor shall provide all materials needed to construct a fully operational traffic signal as called out for in the plans and specifications. 3. All existing signal equipment shall remain in place and operating until new equipment is in place and ready to operate. 4. The Contractor is responsible for hauling and properly disposing of salvaged material from the job site to a disposal site of their choosing. The Contractor will not be allowed to drop off salvaged materials at the City yards. Foundations: CITY Of PORT WORTH STANDARD CONSTRUCTION GENERAI. NOTES Version Release December 18, 2017 1. Dimensions shown on plans for locations of signal foundations, conduit, and otber items may vary in order to meet local conditions. All locations of foundations, conduit, and ground boxes shall be approved by the Traffic Signal Inspector or the City Engineer. 2. Contractor shall contact the City traffic signal inspector prior to pouring cabinet foundation to be sure that template and bolt patterns are correct for type of cabinet being supplied. Foundation shall be installed per City Specification and City Detail. 3. Pier Foundations shall be poured together in one piece. 4. No signal poles shall be placed on foundations prior to five (5) calendar days following pouring of concrete. 5. Contractor shall clean up and remove all loose material resulting from construction operations each day prior to the work is being suspended. 6. Controller cabinet concrete apron shall be subsidiary to the bid item for the controller cabinet foundation. Cabinet foundation and apron shall be poured together in one piece. Controller and Cabinet: 1. Contractor shall install controller cabinet and connect all associated field wiring. 2. City will install signal timing and program controller. Conduit: 1. A continuous grounded system shall be provided in PVC conduit by running 148 bare copper wire in conduit between foundations and grounding at each foundation ground rod. 2. All conduits shall be Schedule 80 PVC. 3. Electrical service shall be installed per City Specifications and City Detail in separate 2" conduit from the meter to the signal cabinet. Signal Heads: 1. All signal heads shall be McCalnTM, EconoliteTM, or approved equivalent style and dimensions. 2. All signal heads shall be covered with burlap or other approved material from the time of installation until the signal is placed in operation. 3. All signal head attachments shall be designed such that the wiring to each signal head shall pass from the mast arm through a rain tight connector to the signal head bracing or attachment hardware to the signal head. A small amount of exposed signal cable shall form a drip loop. 4. All LED signal indications shall be General Electric (GE) GelcoreTM or equivalent and shall meet the latest ITE standards. 5. Signal heads (all displays) and pedestrian Walk and Don't Walk heads with countdown displays shall have LED inserts. 6. Clam -Shell mounting assemblies shall be used for pedestrian indications. CITY OF FORT WORTH STANDARD CONSTRUCTION GENERAL NOTES Version Release December 18, 2017 7. All LED signals shall be of the incandescent appearance. 8. All signal heads shall have black aluminum, louvered, single piece back plates compatible with McCainTM, EconoliteT'l-', or approved equivalent signal head housings. Traffic Signs and Pavement Markings: 1. All traffic signs and mounting hardware shown on the plans will be furnished and installed by the contractor including the intro street name signs. The contractor shall provide a detail sheet for the metro street name signs with block numbers to the City for approval prior to fabrication and installation. 2. Existing stop signs and posts will be removed by the contractor upon, or before, the signal turn -on. Detection System: 1. The Contractor shall furnish and install the IterisTM Vantage Vector Hybrid Detection System and cable. 2. The Contractor shall install, aim and program all detectors as per City Standard Specifications and City Details. The Contractor shall refer to and City Standard Details and project plans for detection zones placement. Emergency Vehicle Preemption Equipment (EVP): 1. The Contractor shall furnish and install the OpticomTM EVP (detectors, cable, and discriminator units). 2. The Contractor shall install the EVP detectors on the mast arm as shown on the plans and appropriate City Detail, and run one continuous EVP cable from the detector to the cabinet. Installation of the EVP system will be paid for per bid item. Accessible Pedestrian Signal (APS): 1. APS units with audible message shall be installed on all TxDOT locations or at the direction of the City Engineer. 2. APS units shall comply with the latest version of the Texas Manual on Uniform Traffic Control Devices (TMUTCD). 3. APS units shall be installed per City Standard Specification and City Detail. Battery Backup: 1, if called out for in the plans, battery backup units supplied shall comply with the City Standard Specifications. Installation shall be completed per City Standard Specifications and City Detail. Traffic Control: 1. The Contractor shall submit a Work Schedule, Traffic Control Plan, and acquire a Development Permit from Development Department, at 200 Texas Street. Contact Chuck McLure (817-392- 7219). CITY OF FORT WORTH STANDARD CONSTRUCTION GENERAL NOTES Version Release December 18, 2017 2. The Contractor shall be responsible for the safety of pedestrians and motorists in the area of the traffic signal construction site. 3. Roads and streets shall be kept open to traffic at all times. Contractor shall arrange construction so as to close only one lane of a roadway at a time. 4. All construction operations shall be conducted to provide minimal interference to traffic. All traffic signal equipment installations shall be arranged so as to permit continuous movement of traffic in all directions at all times. 5. Contractor shall be responsible for any signage necessary during construction. 6. UnIess otherwise noted, it is the contractor's responsibility to ensure that signal indications and timing are adjusted and maintained to ensure safety in work zone at all times. 7. Any traffic signal modifications during construction are subsidiary to traffic control plan (TCP) pay item. 8. Any traffic signal modifications should be in compliance with the latest version of the Texas Manual on Uniform Traffic Control Devices (TMUTCD) and the City of Fort Worth Standards, 9. The contractor shall submit any proposed traffic signal modifications to the Traffic Signal Section for their approval ten (10) days prior to any changes. Electric Service: 1. InstalI the required electric services and obtain an electrical service permit in each instance, cost of which will be paid by the Contractor. 2. The electrical service shall be 100 amps with 120/240 voltage branch circuit and shall comply with City Standard Specifications and City Details as applicable per plans. Luminaires: 1. The City will not furnish luminaire material to the contractor. The Contractor shall furnish and install LED luminaires for traffic signals in accordance with the latest City Standard Specifications, City Details, and plans. 2. All new streetlight pole types shall match those of the surrounding area of Fort Worth for which they are being installed in. Contact the City Traffic Management, Street Light Section at (817) 392- 7738 for direction on light pole types allowed areas. The same poles shall be consistently used throughout subdivisions. CITY OF FORT WORTH STANDARD CONSTRUCTION GENERAL NOTES Version Release December 18, 2017 SP-I.®® Special Provisions THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH IIMAC SURFACE OVERLAY 2019-4 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July 1, 2011 Page 1 of 2 SPECIAL PROVISIONS 32 13 20 — Concrete Driveways: Contractor shall backfill** around the driveway within five (5) working days from pouring the driveway; if the contractor fails to complete the backfill within five (5) working days, a $100 dollars liquidated damage will be assessed per block per day. Backfilling is considered subsidiary to this bid list item, just as excavating and preparing the subgrade. 32 13 20 — Sidewalks: Contractor shall backfill around the sidewalk within five (5) working days from pouring the sidewalk; if the contractor fails to complete the backfill within five (5) working days, a $100 dollars liquidated damage will be assessed per block per day. BackfiIling is considered subsidiary to this bid list item, just as excavating and preparing the subgrade. 32 13 20 -- Ramps: Contractor shall backfill the wheelchair ramp within five (5) working days from pouring the ramp; if the contractor fails to complete the backfill within five (5) working days, a $100 dollars liquidated damage will be assessed per block per day. Backfilling is considered subsidiary to this bid list item, per each ramp removed and/or installed. 32 16 13 — 7" Concrete Curb and 18" Gutters, Construction Detail, D534: Contractor shall backfill behind the curb and front -fill to the saw -cut, with HMAC, within five (5) working days from the day of completing the curb and gutter; if the contractor fails to complete the backfill and front -fill within five (5) working days, a $100 dollars liquidated damage will be assessed per block per day. Included and figured subsidiary to this bid list item will be the required HMAC front -fill and saw -cut excavation into the street, to aid in the construction of the curb and gutter, a limit of nine inches (9") out from the gutter lip. The HMAC front -fill is required irrespective of new or existing curb and gutter. The contractor shall saw -cut the curb and gutter and/or pavement prior to removal; with same day haul off of the removed material. 32 16 13 - Concrete Valley Gutters: Work shall be completed on each half within five (5) working days; if the contractor fails to complete the work on each half within five (5) working days, a $100 dollars liquidated damage will be assessed per each half of the valley gutter per day. Saw cutting, removal, hauling or disposal, tools, labor and incidentals necessary to execute the work are subsidiary, since they are covered under Division 2, Section 02 41-15, Pavement Removal. Also, asphalt transition is considered subsidiary to the concrete valley gutter. HMAC 2019-1 City Project No. 101615 Page 2 of 2 02 41 15 - Wedge Milling / Surface Milling: Shall be completed within 10 working days from the day of completing "flat -work" on any street; if the contractor fails to complete the Wedge Milling / Surface Milling within the 10 days, a $100 dollars liquidated damage will be assessed per block per day. 33 05 14 —Adjusting Manholes, Inlets, Valve Boxes, and Other Structures: Contractor shall complete the adjustments within five (5) working days from the day of completing the asphalt overlay on any street and the street shall be open to traffic within 10 working days; if the contractor fails to install the speed cushions within the 10 days, a $100 dollars liquidated damage will be assessed per each appurtenance per day. 32 92 13 — Block Sod: Contractor shall complete the replacement within 10 working days from the day of completing the asphalt overlay on any street; if the contractor fails to complete the sodding within the 10 days, a $100 dollars liquidated damage will be assessed per block per day. ** Native soil can be used if it will sustain vegetation growth; otherwise, top soil must be used, if needed, and shall be compacted and leveled to grade. Also, all removed flatwork items shall be replaced as soon as possible. Under no circumstances, except for situations and / or conditions beyond your control, shall excavated areas remain open for more than HMAC 2019-1 City Project No. 101615 SIB® L®® Standard Construction Specifications THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-4 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No, 102098 Revised July 1, 2011 if ®pVll PLASTICS®1N ® PO Box 648 Bedford, Texas 76095 Tel: 817.439.3600 Fax: 817.439.3700 www_dfwplasticsine,com DFW37► H-12-BODY Recommended Concrete & Rebar Installation Guidelines Page 1 of 1 This product is designed to withstand loading in non -deliberate and incidental traffic. Not to be installed in roadway. Meter box and meter box lid shall be BLACK and constructed out of modified polyethylene material for maximum durability and corrosion resistance, The BLACK material is for maximum UV protection. The BLACK material shall be uniform throughout the meter box and meter box lid for maximum longevity and not have a foaming agent that creates air pockets within the polymer body wall or polymer lid. Recommended Concrete & Rebar Installation Guidelines 1. Drill holes in polymer box in the locations shown to run #4 or 0-21" rebar through the polymer box. 2. Secure rebar together with rebar wire ties. 3. Pour a concrete pad that measures 22" length x 14" width x depth that brings the polymer box to grade. The polymer box MUST be placed on a concrete pad to allow proper footing for a clean installation. 4. Set polymer box to grade so the top surface of the polymer box will be flush and level with the surrounding area. 5. Place two (2) 2"x4" wood boards inside polymer box, in the middle of the box depth, as shown to reinforce the box from side wall compression as the concrete sets around the box. 6. Place plastic sheeting over the top of the polymer box to prevent excess concrete from settling around the top of the box and lid. Put the lid in the box over the plastic sheeting, then remove excess plastic sheeting so it is away from the concrete pour. Polymer lid will assist with maintaining polymer box shape during the concrete set. 7. Place four (4) 8" thick shims between the polymer box and polymer lid at the four corners, as illustrated below, to prevent top of box compressing around the lid as the concrete sets around the box. 8. After concrete has set, remove the shims, plastic sheeting, and 2"x4" wood boards from the box. Make sure the lid opening is clear of any debris. 9. Complete polymer box installation in concrete by placing the polymer lid back into the box before leaving job site. D 2'x4' WOOD MARDS SHIHS M HERE WITH LID IN THE DDx RERAR K➢] Recommended Concrete & Rebar Installation Guidelines Modifications to any meter box or lid may affect actual food DFW37AH--12--BODY ratings. This guide is a recommendation only and does not May 2017 1 guarantee actual field results. A W 17$ —,-REBAR WIRE -TIED NOTCHES FOR LID] ENGAGEME U-BOLT CLIP OPT FOR BOLT DOWN f FEATURE 11I a REBAR 21 1 POLYMER DFW37AH-12-BODY HOLES 12—BODY LID DETAIL SIDE HOOKS G0 UNDER LIP OF 141 TO PREVENT REMOVAL. i r (u ;-� � I.W. , -� PIPE SLOT I- 126 JCS 1) DIM'S d: 1/8" U.N.O. DFW PLASTICS, INC. ENGAGES IN ONGOING RESEARCH AND 2) WALL THICKNESS: 1/2" MINIMUM DEVELOPMENT TO IMPROVE AND ENHANCE ITS PRODUCTS. 3) LW.A. = INSIDE WORK AREA THEREFORE, DFW PLASTICS, INC. RESERVES THE RIGHT TO 4) BODY MATERIAL: LLDPE CHANGE PRODUCT OR SYSTEM SPECIFICATIONS WITHOUT NOTICE. CREATED: 05/0912017 (ED R E B A R I N TA L L AT 1 N UPDATED: omainv DFW PLASTICS, INC. Po BOX 648 ACCEPTED: JMc BEDF(817) 3 TEXA-360 76695 (817) 439-3606 D FW 3 7A H 12 - BODY DRAWN BY: RMc PLOT SCALE: (817) 439-3700 (f) WWW.dfwplastfcsine.com THIS DRAWING IS THE PROPERTY OF DFW PLASTICS, INC. SD- 2.00 Standard Construction Details THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-4 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July 1, 2011 4' 4' f"0RTW0RTH=====L 1„ 41 62 3" 3' Pr°Ct Title V. Funding 12 Contractor: 1„ 22„_ Contractor's Name 2 12„ 12" Questions on this Project Call: 1„ 12, (817) 392 o XXXX 1" i2° After Hours Call: (31 7) 392 - XXXX } 22„ R1" TYP. 1" TYP. FONTS: FORT WORTH LOGO IN CHELTINGHAM BOLD ALL OTHER LETTERING IN ARIAL BOLD COLORS: FORT WORTH - PMS 288 - BLUE LONGHORN LOGO - PMS 725 - BROWN LETTERING - PMS 288 - BLUE BACKGROUND -WHITE BORDER -SLUE NOTES: IF APPLICABLE TO THE PROJECT, CONTRACTOR SHALL OBTAIN VINYL STICKER "CITY GAS LEASE REVENUE IN ACTION" 1 LOGO AT CDR SIGN AND ENGRAVING, 6311 EAST LANCASTER AVE (817-451-4684), PEEL AND PLACE IN FUNDING SECTION. PROJECT DESIGNATION SIGN CITY OF FORT WORTH - CONSTRUCTION STANDARD DRAWING NO. 1 - H DATE: o (V d z¢ o �Jw in �> uf� w� M: Z uiW� ww¢a �L ;_..fy. ,S.%';'• ' ,.q.', W �Mo� fnJ=W 58Z jOr ._•.'y,�:e i' �,-: :':�v-:; z� y F0rnF Gx— C1x a ¢w �¢¢ ao� �rnzr �aa' �aW� ¢ <a <r� �F Maa ZWa? mew m��r w � Z w w m " 3 O � W . w r��zW ¢ w ww rn =� �wowLa Z,Znm>- m �OdW WW'¢z LLI orn¢?¢P' a oO w� ¢OhwMn�LU 02 ¢ OZOZ zWWU 0¢ 00¢�Z� WLO 3OQL, OQCO fL 0wxMw"z<LEn Z�a xa Z JQ�Jd�isZ RzOZ¢LLI '0L3d ww_n03.c.T<0�x¢¢-� Oo�¢nQQuaoW z Z .= N 17 d' LO ID F- a 4 U li "� QTy WOfx Q ® Z yy o LLI a w0 zz� wI z Z� R O F Z LLJ z ,n x OU = o w ¢ ¢ J� � wo w w a UJ � ;3.. 7 a z r � w �¢o pq� U 0 W 0.W aZ zO m J<¢ w C3 En L�1 o�a XFo 0w0 oI F' U J ¢¢ a w O w OW:z w O (% J W Z WM<m¢ W W m w J 0 Q ¢ Q K JO w w w w w J In O O a J ©z a W o DnC7)zD4 wz �— w ¢pw CD o m Z J ¢ x LLIaCr LL Ld LLJ LLJ LLJ Lti O m O z 1 VA EXISTING HMAC PAVEMENT TREATED SUBGRADE ACCEPTABLE BACKFILL OR AS REQUIRED BY DRAWINGS PER SECTION 33 05 10 2" MIN. SEPARATION DISTANCE (TYP.) `l e. 57" lAlAl PLAN VIEW SECTION VIEW PROPOSED HMAC PAVEMENT REPAIR EXISTING HMAC PAVEMENT PAVEMENT REPAIR PER ASPHALT PAVEMENT TRENCH -REPAIR DETAILS MANHOLE OR VAULT PER DRAWINGS 1. THIS DETAIL TO BE USED ONLY WHERE SPECIFIED ON THE DRAWINGS IN COMBINATION WITH PROPOSED MANHOLE OR VAULT IN THE SAME LOCATION. 2. IF GRADE RINGS ARE USED, THEY SHALL BE NO LESS THAN 2" THICK, AND SHALL NOT EXCEED 12" IN TOTAL HEIGHT. NO MORE THAN 3 TOTAL GRADE RINGS. SHALL BE ALLOWED. 3. MEASUREMENTS ARE TYPICAL FOR ALL SIDES OF MANHDLF/VAULT LID ASSEMBLY. CITY OF FORT WORTH, TEXAS REVISED: 08-31-2012 MANHOLE LID ASSEMBLY - EXISTING HMAC PAVEMENT (CONE) 33 05 13-®0I0 VA EXISTING HMAC PAVEMENT ACCEPTABLE BACKFILL OR AS REQUIRED BY DRAWINGS PER SECTION 33 05 10 A � � I offs I INS.��®� �'XX31 \1 PLAN VIEW SECTION VIEW PROPOSED HMAC PAVEMENT REPAIR EXISTING HMAC PAVEMENT PAVEMENT REPAIR PER ASPHALT PAVEMENT TRENCH REPAIR DETAILS AS INDICATED IN THE MAINMU� UM VnULi PER DRAWINGS 1. THIS DETAIL TO BE USED ONLY INHERE SPECIFIED ON THE DRAWINGS IN COMBINATION WITH PROPOSED MANHOLE OR VAULT IN THE SAME LOCATION_ 2. IF GRADE RINGS ARE USED, THEY SHALL BE NO LESS THAN 2" THICK, AND SHALL NOT EXCEED 12" IN TOTAL HEIGHT. NO MORE THAN 3 TOTAL GRADE RINGS. SHALL BE ALLOWED. 3. MEASUREMENTS ARE TYPICAL FOR ALL SIDES OF MANHOLE/VAULT LID ASSEMBLY. CITY OF FORT WORTH, TEXAS REVISED: 08-31-2012 J �■ A� MANHOLE LID ASSEMBLY m EXISTING HMAC PAVEMENT (FLAT TOP) 33 05 13m®0l1 1/2" REBAR (2) PICK HOLE POCKET 3" x 9/16"x THRU HULL WITH 3/160 304SS ROD go—o—I—o—o—o— el=oe.°eepeg o�l o�o�o�o I�➢ CITY OF Ojl rroxm ppfl c,n�e I�A�I�I�O�V�0�0 Iap=I=1=0 r p�j1�0�1�0�0��0 LLU t0 0°0°0�0°�0 I—o—o—I—o o—o'�o�l—o�o�o—o 0o0 1o°i°o�0-1 oD T i000i SNAP LOCK 1-3/4„— 11" POCKET, SEE NOTE #4 M�TLR BOX LID 17-7/8" — a w a f rn Y n .` 6 � 6 c03X- 19-1/8" I.O. WORK AREA 21" T N cq 3/8" WALL METER BOX NOTE. 1. USE THIS METER BOX IN NON -PAVED AREAS ONLY. 2. DIMENSIONS t 1/8- U.N.O. 3. WALL THICKNESS: 3/8" 4. SNAP LOCK POCKET WILL RECEIVE AMR/AMI DEVICE ENDPOINT. SNAP LOCK SLOT IS 1.80" f .015" TO ALLOW FOR A FINGER FORCE INSTALL. POCKET HEIGHT IS 15/16" FOR MIN 1/8" AIR GAP. ®DrrI�L CITY OF FORT WORTH, TEXAS REVISED: 08-31-2012 AAII l 1-INCH STANDARD PLASTIC METER BOX (% & 1-INCH METERS) 33 12 10-®113 1/Z- RLUAK SNAP LOCK 1-3/4" POCKET. SEE NOTE #2 22-3/4" iv 1 I.D. WORK AREA —' 21-1/2" (2) PICK HOLE POCKET 3" x 9/16'x THRU HOLE WITH 3/160 304SS ROD 1=1=I=0=0=p= 01-1-9 0-0- I�1�0�1 0�0�l�0 1 0 1 CITY OF p o p x FOATb-DNiH v pp! d000 Upl n r -U 10o r�rrp 1�1=a=1=1=o=I-lo o!o°o!n°i!o�p opioops�llaQ000 mp-p-pep-peps METER BOX LID NOTE: 1. USE THIS METER BOX IN PAVED AREAS ONLY. 2. SNAP LOCK POCKET WILL RECEIVE AMR/AMI DEVICE ENDPOINT. SNAP LOCK SLOT IS 1.80" ± .015" TO ALLOW FOR A FINGER FORCE INSTALL. POCKET HEIGHT IS 15/16 FOR MIN 1/8" AIR GAP. 15-1 /4" 12" I.D. WORK AREA 13-1/2" FORT WO T CITY OF FORT WORTH, TEXAS 1-INCH STANDARD CONCRETE METER BOX (% & 1-INCH METERS) REVISED: 08-31-2012 33 12 10-®116 o � (V V�- II o � U �a chi I j LLJ f I I c.n�w a O La w w j W F- I I H� OQO Ur o zo Ld W r a= ix z L� D z m d Z�w I I ir0Q Q �\ w,�s0 I O W a^ M UHa Q /� L w w ode 3 Ld D 0-a11 �V)m LLJ n Y W a N FEe F!/ m wnwINIW Q z= LdLLa m fQ U3 O ILL U Ld z z D U ; o Y o z Q..: `0 '� XKV dZd� a w z 1 U U DiF=W K CL f~n vim -L ..:;_ w ;.1% Qn z } oaM 4- D � N a 1 Q z w mowCL n z ca n aFa a:- -- �0 QU13L W as ~o9 m W r m J (A0 Jm J Q DW acc m x J= ¢ W Q 8 W W mwmQ wQ 3 �(j� >o W Z O w J W I �zlr..IDmZV1 CL C� n F- 0'0W� a c� n NWi ZOwLil4Jnlwilo �n.OUm�O..lI771.- ��Zr N M 3Nn KW3dOdd a � N � M w I ' W l!1 0 0 VJ • c'+ a z �"' a ❑ �o t-y I m OM V w u Z za �4 C m 5 Y y Vtw]E K 44- z ww z`-z zg; fn I f I I aU� w W w u�ma a� y •� s 'mg` k�w �noZS�'� z �E ® LL II II � � zq`z_''Woozzax z�W� I I % I 30 LI GI A IF •� W L.L O LO 1 o U N 4 o J E-wo m m� II zw I I Vv it .� ----CE !J � I I u w � <I >I - Li -El mm r w w •I � � ` 1 41 sElir as azgo� iA oil L�W Q zz iz i�i omociz § §k � Z � gz " z In ) 2 y « i \ ca | , | || m Q) q CLO ;N g - 5 _ �km ( ! % � _ � \ e 0 \ _W 0 ZF— U W \ �W W f w 0) w NOTES TO DESIGNER: 1. FILL IN BLANKS AND OR VERIFY ALL TEXT IN BLUE. 2. REVISE DETAIL AS NECESSARY TO MATCH ACTUAL ROADWAY DESIGN. PVMT. THICKNESS �± OR G" MIN. ; 12" ASPHALT PAVEMENT PER PAVING TYPICAL #4 BARS SEC7101Q STABILIZED SUBGRADE PER PAVING TYPICAL COMPACTED SUBGRADE SECTION PER SECTION 32 13 20 NOTES: 1. PLACE CONCRETE TYPE H PER SECTION 32 13 13. 2. PLACE EXPANSION JOINTS AT 200-FOOT INTERVALS AND AT INTERSECTION RETURNS AND OTHER RIGID STRUCTURES. 3. PLACE TOOLED JOINTS AT 15-FOOT INTERVALS TO A DEPTH OF 1 X INCHES. 4. PLACE EXPANSION JOINTS AT ALL INTERSECTIONS WITH CONCRETE DRIVEWAYS. S. MAKE EXPANSION JOINTS NO LESS THAN A INCH IN THICKNESS, EXTENDING THE FULL DEPTH OF THE CONCRETE. 6. NEATLY TRIM ANY EXPANSION MATERIAL EXTENDING ABOVE THE FINISHED TO THE SURFACE OF THE FINISHED WORK. 7. PLACE LONGITUDINAL DOWELS ACROSS THE EXPANSION JOINTS. 8. INSTALL 3 NO. 4 ROUND, SMOOTH BARS, 24 INCHES IN LENGTH, FOR DOWELS AT EACH EXPANSION JOINT. 9. COAT h OF THE DOWEL WITH A BOND BREAKER AND TERMINATE WITH A DOWEL CAP THAT PROVIDES A MINIMUM OF 1 INCH FREE EXPANSION. 10. SUPPORT DOWELS BY AN APPROVED METHOD. &%w CITY OF FORT WORTH, TEXAS CONCRETE EDGEIRETAINER FOR ASPHALT PAVING REVISED: 08-31-2012 32 13 713-D51 U N � o CV LO C? 0 O W P LLI OC txi A a. {QLU F cl U w [ cow {� W ~.��, 0m Z 1w- XMQ W2d I —1'�`� i Qm UJ O 'm Z 4•+++++ :2n.o J Ld CC w OF C] w3 F �.:-rr-.•_ + + } U i mUULLI + } + S w F 5�61:+ S• +++++ Q z z o ac% c + + L) U ;' + + + + Q C0 + + J F m Q �T:zm flj IN ad I W is W .2 Z dw�d I QQ `` aP n 0 F IQfiv ��' F}-�r� raw in�r`Vim a lxs.l wQm w FQ wFAz w0 2 zF w Elry 0 zF dwo- w� o�W nQ- N 0F=-� O¢a¢ w F LdWll� a H ozjox w Z U to 0 N La O Cq N LO 00 w t�9 W N IL' (� O Lr3 m FLd w wri CV'z O O J o U, O LLx z ��a w�c� Q N oFm ocr �mZwF- a in}� oL� � EnFm� k —66/ o- aQ.Ldp Zp0 F m00 � EL ' C o a r ca z �n Q IIT` Of � LL F. w� fl 111 I ILL r®y' NOLLO35 U 1=_I o Qn w IVOldJ,l aid - p'_; III- a o 9W)3 „L 80 a -Q�0 a F I pwon --III afwww n.acnw- i l=_ ZLd IIIV I w ,. w o o z w� w U ww III ��w LL ^...ter � au) J H W w U 4 w Z O�� III oo I ULd x [7 >9 u,o rK Q O H 7 11 O r SOW n, J v) In a: Ir U} ul Q Exi3 Vw1...1� I< Z ? 2 dUQ d] O LL 0 paw o w I d 0 �? Q p I to ul O 1 �Z QO w \ h > U] 4 Z U �w LA Q w cn a- 0 w Y m }ss Fm Z F — Q U ULn U } O O Z li Z N W vl D- w tn O z N so. om z F FD Q a �aN � R U¢z 0 I �W� �B YYM% 9.O krc adn x�ad mm �p 09FO Fn� il�m pU3 o TFV I r U V LL LL Lw�- Q O �.�. �.dK VaO U per_p � wk' vt maF V j0'ov" �. !O xJY3 ® y W LU SSS°TLLL VV N (n � o h _ o I M'o'a zazUO ��0. NOS S�w�d Ga w4¢ wY YzW „ 00a' }u M - ��i�cwiFz 11yy ��uri OD w� T`Nk� I wULLF% mrc� � W w Igiao rc6 o¢Fx z a 5N _ za4 u� Wj x o `u ww sQ z� a� zia zoU z�N �}W i 0. [[�YUNmp Z�U 4 • �Ua mU w0 wauV 9�Q� sim WF � U~ M z -¢ wa¢ur zF� -000m2 2 w - •J rf d of NOTES TO DESIGNER: 1. DETAIL DEFINES PAY LIMITS OF HMAC TRANSITION SUBSIDIARY TO THE CONCRETE VALLEY GUTTER CONSTRUCTION. -EXPANSION JOINTS AI PER 32 13 13--D513 /24" HMAC - TRANSITION /PER SECTION 32 12 16 9" HMAC / 7 TRANSIT ON / PER SECTION 32 12 16 PLAN VIEW 4( y EXPANSION - 1 JOINTS PER 11 \ 32 13 13-D513 o= 0 SEE NOTE 4 INTERSECITNG VALLEY 9„ NOT9.. E SEE NOTE 4 #4 BARS ® 1" MAX OR AS DIRECTED BY 4 18" O.C.B.W. THE ENGINEER COMPACTED - SUBGRADE (SEE NOTE 2) 8'-O" MIN. (RESIDENTIAL STREETS) NOTES: 1. THE 7" REINFORCED CONCRETE VALLEY SHALL REPLACE THE TOP 7" OF THE PAVEMENT WITH THE REMAINING PORTION OF PAVEMENT TO BE CONSTRUCTED INCLUDING SUBGRADE TREATMENT, IN ACCORDANCE WITH THE TYPICAL PAVING SECTION. 2. 6" FLEX BASE, TYPE A, GR-1 OR MATCH THE PREPARED SURGRADF REQUIREMENTS FOR THE PAVEMENT SECTION. TYPE D OR TYPE B ASPHALT OR PREPARED SUBGRADE MAY BE USED. 3. PAY LIMITS FROM EXPANSION JOINT TO EXPANSION JOINT. 4. 9" AND 24" HMAC TRANSITION SUBSIDIARY TO CONCRETE VALLEY GUTTER. CITY MAY APPROVE ADDITIONAL HMAC TRANSITION BEYOND THESE LIMTS UNDER SEPARATE PAY ITEM FOR HMAC TRANSITION PER SECTION 32 12 16. 5, GUTTER TO BE SHAPED TO CONFORM WITH CONCRETE VALLEY (OR PAVEMENT). FUD-rFLAWOD 'H CITY OF FORT WORTH, TEXAS REVISED: 08-31-2012 Il CONCRETE VALLEY GUTTER 32 16 13W®630 w e� cq n 3 F a Ozm ZO[�i M iY0 /�� tH I1 !11 �.r .•.y If emna W m .L a0 .9 ..-.:'--r �. .' 11- N a QII �� .-°. .'i� • "m¢ �rc�F-moo �� m FN �-� - I o Y—{ 0.mgI�,�io rcm � O I LL doe oilm , I�� o — F G �� _ ��'&Z os� Z 531aYA z2 _ Z m z� _1 �I ff Not Q a C a Ep w E r� �RA -I- t� OFF'IF Sp .'.�-- Q I� 0P p I .X q 8��€€IiII'I`�.`� r I I II "III- $ .r's' pp®� f� - -� I OEM GI �.... - Z w a -. n �S �toz U ZOO' 3 q jj Z CFI � a o 3 _.•: �. I II: zwp� APCT w{�ua�o yy� H z o s 40y+ N a� I w wa C14 �33 o Q' m UI Z w w Q C U r)ui�C4¢ wU< Q Ztyw LLI W OW 0 -a -UZU3 0Y p [ VS W U aU ZQJ SW m Uo � qW U No�Ua " y z � �zmwZ U �=r W UIUILw Y �Lr 2 ULLJ,nazc�z < �'§wam-wr oz�� o w a 3 =U --- U U b ZZ� U NJ mn¢ a O=rU W Z m ~O Q wM I- NU V1�Wh- W MWUV)UwQQ Zww7 J W Q N OU m zc~�Of �aw�-n �=vroz�?3 omwa tj r w �4 z ¢r- zm �Jm Wa mwZ~w<a OwW w � Z m Z Q K U, W In Q=ww' --Wa- WW Mp UU@UWw V)W= W p_ d h0 I1 In_ >- c7 �y�l Z wQ Fa LU Fw-WN mm¢- M:0 Oa�O U 0 m a mZ Z p3 I.7 W O wxmw�Z~ U ph O J Z J 00000 m p CD <ZV7Zp wm U)W m© m0O7J mUO W- OU10 W o Z3 !� P000O Z r> p o W H W J Z J pC tr U W Z 60000 Jz¢ WJw�W,m ip<<mu QZ (Y 6- d+ a eoaao Q J rtL2 JtY p OZS wxOpwO WI- fKZ�pC tr d Q�Uj ❑oaPP r� w:l U 3� pQcnJWtnU) Q 3zOr W U �W v 3mJ 13AV231 nooao © O �0^-X1, 0 oz�7aUw�aY o�a�FaWUM ¢ 0r w~H Ir� NVIN1S303d OPPPP aw <WM<ViAz' > W-W<wU~U0m Jo-via,45aJ J '0' � cl Q N0I1071HI 00000 U w vw � a a jra z a w z W J J U W U o ¢ ¢ o Pooao dQ zi U� LL U 1. L~ tifZO l=iQwQ�pw IL f W S W ¢ov)¢U Ir z:2=ZWWLLI rrH -Z o Uo NIW Q� zpp- ai �¢�<-DF, L, aza<� U Nw UY Oo mph' ��a, ttW a3Q��Wp�- �i lL Z wS¢ li .j,z }CJ U�i1Q V1 KZ Z a Ww ZV�13 Zak w Z w�03 w w Q w w zln pHo 0 ~z vri�aZo°ozo�zoc�zlna��zzai�olnF` 3 oar ¢ g���aa¢�3WaawoaWa��wwUwOa[7ow-a 3"0 �wz�z�W�rnIW3� zzJ�n f gor�Wa�'Wo¢w�� v��o�az �� 0 o J�pO JO WwJ JJ no .. I d WUV1IrM W r0W L.L LLI QwmZWOml-=mmzmm J�A JJO?- UV)5-WZ tY�VI w�UH ~ ��U H 7)Z �UWjryQ Vlapa ��U IW--mm00 Z-Z LL 0 mKwam�w�z -00 _Ooz Z� UwI~ilU w� LL HZ OUSaJ3 O LW Ir U-�IL H�C7W �w�tiw�r�rw>-¢Z�Z2w< w¢O FUO¢¢a� o3amoolfmr-3 �a oJJ�Q�F--fir N rr] 0 0o m m U f 1 Z r C` vi 4 ui 6 r 00 of V ¢ W 3 w m W W 0 U W Q Z OD< U OwH m 3 LLJ _ Z W ¢¢ SW W 'M o J mwV} ra �o w� ¢m EL Fr �w w� a mn nn LLJ= pia xU< aJ 0 W N a Q- C.? `-'U U p� z MZ m I� M�zLa , LLJ a V� O LLJ 003 IILL)I Ii W ZOO LLJi- _ U o p U Q Q J U r Q J Of Mz ouwi o J m Q Q ¢ Z K It tL 00000 a IL 00000 wC W 00000 S 00000 13AVa1 OPPOP r Z NVI?11S303d dWVN aa000 F z 0 j0 NOLL03NI0 aa000 U aa000 Q ¢ m PPoaP W V) a NIW WN ` a ¢� lz a z IL o _ z Up � zo 3 Z 6 Q W r m LaCc ¢ n m wa ¢m ¢0 m o a ELM W-xQ m- C-) LI1 l t'1 c I T T .4 1 I 1 F r i m Y +�+ �' W a m W 1. J z aU m o ao gz� ir UWVi M �� �; rdVA NQ"dJ�F? O 'Z ON U p C� _z o n � m Q w � mm m1 `v imp Ma 111 g i i plus .r p mf . a ix}y O 03 Nwio w �I oa oi'�i za U $ d Q z U I W 1 a Q Of cni s U m �i 53RNA ��[ z �O n4 E� O CV W) (vJ 0 O cq ❑ w LLLJ cq w O ¢ I j m O N � O Y] n F _Z O C J w Z aN Z O � J Z w w Q O ¢ U w w w za 1 o¢ cn a w �, Z C) W 1 Q H- ti K Li D LU - o cn X WL LU )i]VM3O15 N I N XV�'V l:Zl *�'�3„+,+, \ � z �i O w LL LL w W \� a I U co w Z �y w w LU Xz I j -3� a_ V) ¢ I W_ Ncq „y z X �o r. I Xyry %Z I z z � Y J w L- F 3U Z. 'Xyyq z w — _ �Z o 7 z z v) a V) Z —EL Y a Li m q IK N 71 C) o w U Q Z _.1 w �U Z w o� z In m LLP W O U 4 w l Z_ UM Z Z / J X Z 7 \ d U \\\ U N Q . F z Q Q V ma w� F N Y J Q _ zZ) wa m o a Z ;� N O p U x Uf oQ LL Q O W w a a m m U, W U Fn Qa Q wa Q um L, U U ao O p F- �� �- z w Lu w a fn z 7)p oQ z z w r a a L- p Q d w a z z o E J L� Z Z a U F t- z Y d d J X Ld v w�p Ln ` Z Z U U ` � pV) RPMMPX• ; . � 1 �'� 2p' � k7 o � OD C o cm Q M � P L�LJ C-4 [Y � m 73 z U ® IL W 0 O _ I 6fTi7 trs�� � ¢ U 4 m WIL W L U 6 O U Q � a d Z W l d 6 ~ of N J 0 M O D O � , F Z W W J O W I--Z U¢ �/ I O 5 iL 4 � / Z I O 1 a'� o� // I Z LLI o 00000 2. I I � io 0 I i Z WIN L:6Z 'XvW L :Z L +{*+#++ >- z `r' J x dWtla ++++.++ }*{+{+LO { I < I ++++++' I o I qO I I z I �L LLI Ix U Z °IoZ \ I D ICOW Er o 0 m J F W It a x La W v W O � U kJ Z Q Y � r J d w U � O 0 w O v) 0 I- O 2 .- o N LO (V � C] C4 LIJ U r C4 m Lu o Z 3 U a 0 Ld z o � ~ Z U ue xdw < M IL �z ®� Ld w a m��< z I I I S IL is �au o� r �T � ®® (nx r N" i o (Ifo I LL I I LL 6 L I ,}+ �;I e Z� ++. I _ LU z"� 6Z +++ i—_ x I� m QI�j a w I E,j a 7 z 'n to j T N I a z I I N awe wa Imo m_____ cri a M a w way wow 0 7 drna 0 � z O J W Z Q Z 7r 0 aEL a w U w Y 2 ~ ¢ U Mz � DO z cn J f W U N � © f R W W C] H W 0 w R H H C] z o LO 0o LV � o cm n � twy z o � F C) J w 11 OJ O(Y U O O� Qp z rn NIIN (D U- L) W 7 2 S �Ir �o 71 o 0 m O � Z) o Qz �I L j LJ 3 ° Ill IL 000 o0 000 v O UJ .. iE \ U >rivm301S N a I z 'NIW 1,74z ++*,*++ -�� �� \ z n Z in 'XVW lZ4 ••��- `� \ I 1 z _F z L) i LON 33S m� o z , w 3 mn ¢a �¢ zv�i `'= wscY��sxm x n. ao wr wzmamzl�� W - �p D w N O m Z wT w x d J 0 J M O 7 Y¢ Q F o>- O Q Cal Q� �QUF InzQQz0 zCA T r NLLJ W 00 L'iO LL z ~ WM U W 0 }Q-UOz�W Zx Tr I- Ld � W F oa v~i a�w aawzIL Q is 0M LD Ina JOw O ND � w w � F- w� x r F o 3 `fl z •-- rN J } aQ f w Lw z .L71* A N v ~a w o M W Q z d F Wz Vi Q 0 W J W Fa Q H Z .-a Owj 00 � B a � � o < ? W N O N _ A 5 a � �via F �% � aIi- a o I KK. W i RRn� Z 12 U c� c z rc n G o V Fs I h xVF q a Z N w GFffi #N zo � � g� }zg wo �F Il1Z j NN r:. � -1 a4 11. U �. 6r WxIKC L how Q aw rry a N Z I 0 zg^ 6 = off= € a x�d a �� i r id o � 13N ai a LD !ja Ci r� i f5 U <ua �iu SS O �w gz ozy C�C m o �" V rV J LL o U- 3 F Z aci ri f n r m m r m Z z � N F 2 2d Zam �U x0 ywti ja OLLQ O� lol III���If�y _ fj+I �w�r�N � L�f MAN Z3 D II^I' 11^II m�enlma� Wb 0 xirco¢cliz I�fl l�fl � zw 6 rBC tTn4O��JX VIOa2'� WN V �53362U WIL Na� a CA a fn FM I� YOZ a I— J 0 d � X W LL orb a U 0 SL-1m00 ]MAC 2019-6 Street List THIS PAGE ]LEFT INTENTIONAL]LY BLANK CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-4 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July 1, 2011 HMAC SURFACE OVERLAY 2019-6 Street Location Block Number CD Mapsco Denver Ave Grand Ave - W Northside Dr 1200 - 1299 2 62P Lagonda Ave Grand Ave - W Northside Dr 1201- 1299 2 62T 5th Ave W Magnolia Ave - W Allen Ave 1300 - 1699 9 76M Page St Hemphill St - College Ave T 700 - 999 9 76V Elizabeth Blvd College Ave - S Adams St 1 1000 - 1095 9 76V SM-1.0® HIMAC 2019-6 Street Map THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH HMAC SURFACE OVERLAY 2019-4 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 102098 Revised July 1, 2011 (0 0 N X LLI > 0 LLI LL U) OAV -PO-ISIV Iniv �AVLTV PA-V I.,-: LIM S .4s D3 VT Q",v lials1v 4:sit 3A V 1: 0 11111 S '?.A-% IS LpITITS _AV ILI 11 OTELU L;�'j ,IAV AO 1,11111- C) 04 LU 0 LU LL n� n co C) 4s co u OAV su,yk LLco O U C* SIS —do-s—iopTIPH Qh�v Imistv S,Rq F=-PV I If r7 Z-0 93. 6f FM P3 is I I I L I f) INt, I E ZAV CL iG CL ti af LD :E